Pipeline Changes

TxDOT Pipeline Changes - February 2026

McKenna Wolfe4 min read
TxDOT Pipeline Changes - February 2026
  • The pipeline remains stable in structure, with 5,541 projects in the March 2026–January 2029 letting window and no meaningful shift in project mix.
  • Movement is concentrated in timing and cost, with projects continuing to shift in both directions and total value decreasing by $723M (-2.1%).
  • Cost changes are top-heavy, with a small number of large projects driving the majority of dollar movement while most projects see routine estimate updates

Overview

This analysis covers 5,541 TxDOT projects scheduled to let between March 6, 2026 and January 1, 2029, comparing how that pipeline changed from February 2 to March 3.

Across that window, the pipeline remains structurally consistent, with movement concentrated in timing and cost rather than scope. Total pipeline value decreased by $723.45M (-2.1%), moving from $33.91B to $33.19B, while the overall mix of projects by size remains effectively unchanged. The work program is still heavily weighted toward smaller jobs, and the types of work being let are consistent with prior snapshots.

The takeaway is straightforward. This is not a shift in what TxDOT plans to build. It is an adjustment in when projects are expected to let and how they are being priced.


Letting Date Shifts (Slippage)

How to read this chart:

Letting dates continue to move in both directions, with a slight bias toward projects being pushed further out. A total of 138 projects shifted by at least six months, with 73 moving later and 65 moving earlier. At the 12-month threshold, 60 projects shifted, with 41 moving later.

At the pipeline level, these shifts show up as a gradual redistribution across time. The share of projects expected in the next 12 months increased slightly from 40.5% to 40.7%, while the share of projects two or more years out increased from 26.4% to 26.8%.

For estimators, the signal is not delay in isolation. The near-term pipeline remains largely intact, but more work is being pushed into later years. That makes the outer pipeline more crowded and less certain, while the next 12 months remain relatively stable. The result is a steady flow of opportunities in the near term, with increasing competition and variability further out.

CSJDistrictEst. Letting DateProject EstimateCurrent TypeCurrent SubtypePrev. TypePrev. SubtypePrev. DateLetting Δ (days)Letting Date ΔCost Δ%Cost ΔType/Subtype ΔLifecycle
0085-02-058Atlanta10/01/45$683,520.0010/03/28620617 years
0909-00-076Waco01/01/29$4,471,365.74ConstructionBridgeUnassignedUnassigned10/31/45-6148-17 years$4,202,365.741562%Unassigned / Unassigned → Construction / Bridge
0923-06-079Brownwood01/01/40$650,000.00ConstructionBridge10/04/27447112 years
0231-01-069Brownwood01/01/40$4,000,000.0012/31/28401711 years
2560-01-079Lufkin08/04/27$7,615,384.62ConstructionRoadwayUnassignedUnassigned02/28/38-3862-11 years$(5,084,615.38)-40%Unassigned / Unassigned → Construction / Roadway
0921-02-376Pharr05/05/35$14,990,126.63ConstructionLocal Let05/04/2825567 years
0921-02-521Pharr05/02/35$14,654,418.00ConstructionLocal Let05/01/2825567 years
2263-02-112Corpus Christi10/04/28$17,000,000.00ConstructionFerry BoatUnassignedUnassigned09/30/35-2553-7 yearsUnassigned / Unassigned → Construction / Ferry Boat
2069-01-009Lufkin09/06/28$6,910,402.19ConstructionRoadwayConstructionRoadway08/31/35-2551-7 years
0921-02-395Pharr05/05/33$32,240,557.00ConstructionLocal Let05/04/2818265 years
0033-08-045Abilene05/01/32$5,384,615.00ConstructionRoadway05/04/2718235 years
0921-02-447Pharr05/02/32$22,400,000.00ConstructionLocal Let05/01/2814614 years
0921-02-540Pharr01/04/32$17,792,625.00ConstructionRoadway01/03/2814614 years
0508-01-396Houston03/01/32$166,666,667.00ConstructionRoadway03/06/2814554 years$(13,333,333.40)-7%
2941-02-054Houston09/06/28$1,288,740.00ConstructionRoadwayUnassignedUnassigned07/31/32-1425-4 yearsUnassigned / Unassigned → Construction / Roadway
2941-02-056Houston09/06/28$32,000,000.00ConstructionRoadwayUnassignedUnassigned07/31/32-1425-4 yearsUnassigned / Unassigned → Construction / Roadway
0681-02-017Wichita Falls02/01/31$7,000,000.00ConstructionRoadway08/31/2712493 years
1609-01-031Wichita Falls05/01/31$13,000,000.00ConstructionRoadway02/01/2811843 years
0921-02-360Pharr01/02/31$20,331,577.00ConstructionRoadway01/01/2810963 years
0921-02-512Pharr05/02/30$12,663,774.13ConstructionLocal Let05/01/2710963 years
2690-01-040Austin12/01/27$7,346,428.57ConstructionRoadwayUnassignedUnassigned11/30/30-1096-3 yearsUnassigned / Unassigned → Construction / Roadway
2690-01-046Austin12/01/27$714,285.71ConstructionRail - SafetyUnassignedUnassigned11/30/30-1096-3 yearsUnassigned / Unassigned → Construction / Rail - Safety
0921-02-436Pharr05/02/31$6,688,200.00ConstructionLocal Let05/01/2810953 years
0256-01-060Wichita Falls02/01/31$8,000,000.00ConstructionRoadway02/01/2810953 years
0773-02-020Paris11/01/30$1,180,502.40ConstructionRoadway11/01/2710953 years
1378-01-061Austin05/01/31$14,537,037.0405/02/2810933 years
0465-02-032San Antonio10/01/30$202,400.00ConstructionRoadway10/04/2710923 years
0283-04-037Wichita Falls03/01/31$5,100,000.00ConstructionRoadway03/06/2810893 years
0007-06-268Brownwood10/06/26$1,500,000.00ConstructionRoadwayConstructionRoadway12/31/28-818-2 years$(6,100,000.00)-80%
0013-08-154Fort Worth08/05/26$1,681,823.02ConstructionRoadwayUnassignedUnassigned09/05/28-763-2 yearsUnassigned / Unassigned → Construction / Roadway
0902-90-267Fort Worth12/01/29$22,985,119.18ConstructionRoadway11/30/277312 years
0902-90-268Fort Worth12/01/29$35,000,000.00ConstructionRoadway11/30/277312 years
0502-01-244Houston01/15/29$56,000,000.00Non-LetRoadwayNon-LetRoadway01/14/277312 years
1685-05-105Houston01/01/31$7,770,938.3912/31/287302 years$(932,511.61)-11%
1835-01-026Waco01/01/31$15,000,000.0012/31/287302 years$(1,799,999.00)-11%
0921-06-330Pharr09/03/27$17,023,422.00ConstructionLocal LetUnassignedUnassigned09/01/29-730-2 yearsUnassigned / Unassigned → Construction / Local Let
0216-03-039San Antonio10/01/29$240,010.00ConstructionRoadway10/04/277272 years$(1,380.00)-1%
0804-04-032Wichita Falls03/01/30$9,100,000.00ConstructionRoadway03/06/287242 years
0918-47-577Dallas04/02/28$5,700,000.00ConstructionLocal LetUnassignedUnassigned08/01/266092 yearsUnassigned / Unassigned → Construction / Local Let
0005-03-071Odessa08/31/27$500,000.00Non-LetRail - SafetyNon-LetRail - Safety01/01/266062 years
0005-03-073Odessa08/31/27$500,000.00Non-LetRail - SafetyNon-LetRail - Safety01/01/266062 years
0683-03-043Austin03/03/27$1,837,409.82ConstructionRoadwayUnassignedUnassigned09/05/28-553-2 yearsUnassigned / Unassigned → Construction / Roadway
1810-01-033Lufkin06/01/27$9,167,239.01ConstructionRoadwayConstructionRoadway10/03/28-491-1 year$(366,689.56)-4%
0914-05-250Austin05/06/26$504,441.50ConstructionRoadwayConstructionRoadway08/31/27-483-1 year
0072-08-148San Antonio12/01/27$948,661.00ConstructionRoadwayConstructionRoadway09/01/264551 year
0018-05-089Laredo06/01/27$255,607,277.70ConstructionRoadwayConstructionRoadway03/03/264541 year$(39,670,598.30)-13%
1794-01-023Lufkin10/01/29$6,834,659.82ConstructionRoadway07/05/284521 year$(820,159.18)-11%
2721-03-006Abilene02/01/29$3,000,000.00ConstructionRoadwayConstructionRoadway11/30/274281 year
0907-24-060San Angelo06/03/27$3,552,743.00ConstructionLocal LetUnassignedUnassigned03/31/264281 yearUnassigned / Unassigned → Construction / Local Let
0675-08-121Houston07/01/26$3,627,242.00ConstructionNon RoadwayUnassignedUnassigned08/31/27-427-1 yearUnassigned / Unassigned → Construction / Non Roadway
3510-04-064Houston07/01/26$3,693,789.00ConstructionNon RoadwayUnassignedUnassigned08/31/27-427-1 yearUnassigned / Unassigned → Construction / Non Roadway
3510-04-065Houston07/01/26$3,942,056.00ConstructionNon RoadwayUnassignedUnassigned08/31/27-427-1 yearUnassigned / Unassigned → Construction / Non Roadway
0189-01-014Paris11/02/27$44,953.92ConstructionRoadwayUnassignedUnassigned12/04/28-399-1 yearUnassigned / Unassigned → Construction / Roadway
0189-02-064Paris11/02/27$1,915,826.88ConstructionRoadwayUnassignedUnassigned12/04/28-399-1 yearUnassigned / Unassigned → Construction / Roadway
0027-02-034Yoakum09/06/28$8,200,000.00ConstructionRoadwayConstructionRoadway08/31/273711 year
1134-01-021Abilene12/05/28$6,000,000.00ConstructionRoadwayConstructionRoadway11/30/273701 year
0091-05-081Dallas08/04/28$1,200,000.00ConstructionRoadwayUnassignedUnassigned08/03/273661 yearUnassigned / Unassigned → Construction / Roadway
0124-05-032Wichita Falls11/01/29$418,272.0010/31/283651 year
1532-02-004Abilene02/01/29$3,300,000.00ConstructionRoadwayConstructionRoadway02/01/283651 year
0124-04-042Wichita Falls11/01/28$1,232,735.00ConstructionRoadwayConstructionRoadway11/01/273651 year$793,418.00181%
0203-04-044Paris11/01/28$814,668.80ConstructionRoadwayConstructionRoadway11/01/273651 year
0315-06-051Bryan11/01/28$3,000,000.00ConstructionRoadwayConstructionRoadway11/01/273651 year
0401-01-035Paris11/01/28$1,082,920.96ConstructionRoadwayConstructionRoadway11/01/273651 year
0729-01-052Paris11/01/28$434,170.88ConstructionRoadwayConstructionRoadway11/01/273651 year
0017-06-093San Antonio10/04/28$290,969.00ConstructionRoadwayConstructionRoadway10/04/273651 year$(488,852.00)-63%
1730-01-046San Antonio10/04/28$479,735.00ConstructionRoadwayConstructionRoadway10/04/273651 year$(209,540.00)-30%
1730-02-024San Antonio10/04/28$369,611.00ConstructionRoadwayConstructionRoadway10/04/273651 year$(28,677.00)-7%
0587-01-060Houston12/01/27$35,503,031.00ConstructionBridgeConstructionBridge11/30/263651 year
2121-02-167El Paso07/01/27$30,118,818.27ConstructionRoadwayConstructionRoadway06/30/263651 year$1,642,845.276%
0070-06-056Brownwood01/05/28$400,000.00ConstructionRoadwayUnassignedUnassigned01/05/2736412 monthsUnassigned / Unassigned → Construction / Roadway
0289-04-037Brownwood01/05/28$3,568,950.00ConstructionRoadwayUnassignedUnassigned01/05/2736412 months$568,950.0019%Unassigned / Unassigned → Construction / Roadway
0301-03-028San Antonio10/05/27$520,281.00ConstructionRoadwayConstructionRoadway10/05/2636412 months$90,520.0021%
0421-05-035San Antonio10/05/27$290,724.00ConstructionRoadwayConstructionRoadway10/05/2636412 months$(154,116.00)-35%
0993-01-014Corpus Christi10/05/27$205,460.00ConstructionRoadwayUnassignedUnassigned10/05/2636412 monthsUnassigned / Unassigned → Construction / Roadway
1434-01-016San Antonio10/05/27$363,650.00ConstructionRoadwayConstructionRoadway10/05/2636412 months$(252,783.00)-41%
0143-02-032San Antonio09/01/27$1,431,302.00ConstructionRoadwayConstructionRoadway09/01/2636412 months
0024-05-105San Antonio10/06/26$145,199.00ConstructionRoadwayConstructionRoadway10/04/27-364-12 months$(198,801.00)-58%
0142-02-030San Antonio10/06/26$498,436.00ConstructionRoadwayConstructionRoadway10/04/27-364-12 months$(360,937.00)-42%
0143-11-006San Antonio10/06/26$69,700.00ConstructionRoadwayConstructionRoadway10/04/27-364-12 months$(15,422.00)-18%
0143-12-006San Antonio10/06/26$109,675.00ConstructionRoadwayConstructionRoadway10/04/27-364-12 months$34,825.0047%
0143-14-009San Antonio10/06/26$30,910.00ConstructionRoadwayConstructionRoadway10/04/27-364-12 months$(11,280.00)-27%
0143-15-034San Antonio10/06/26$86,564.00ConstructionRoadwayConstructionRoadway10/04/27-364-12 months$(19,153.00)-18%
0215-11-025San Antonio10/06/26$331,148.00ConstructionRoadwayConstructionRoadway10/04/27-364-12 months$(25,692.00)-7%
0215-11-026San Antonio10/06/26$154,100.00ConstructionRoadwayConstructionRoadway10/04/27-364-12 months$(11,956.00)-7%
0328-01-016San Antonio10/06/26$387,945.00ConstructionRoadwayConstructionRoadway10/04/27-364-12 months$(225,186.00)-37%
0366-03-075San Antonio10/06/26$510,359.00ConstructionRoadwayConstructionRoadway10/04/27-364-12 months$(516,226.00)-50%
0526-01-023San Antonio10/06/26$90,851.00ConstructionRoadwayConstructionRoadway10/04/27-364-12 months$(26,629.00)-23%
1009-01-044San Antonio10/06/26$389,823.00ConstructionRoadwayConstructionRoadway10/04/27-364-12 months$(2,240.00)-1%
1548-01-018San Antonio10/06/26$448,540.00ConstructionRoadwayConstructionRoadway10/04/27-364-12 months$(25,472.00)-5%
1899-01-020San Antonio10/06/26$159,286.00ConstructionRoadwayConstructionRoadway10/04/27-364-12 months$(915.00)-1%
1899-02-023San Antonio10/06/26$489,943.00ConstructionRoadwayConstructionRoadway10/04/27-364-12 months$(2,816.00)-1%
2452-05-005San Antonio10/06/26$55,940.00ConstructionRoadwayConstructionRoadway10/04/27-364-12 months$(8,359.00)-13%
2116-01-020Lufkin05/01/29$5,942,228.57ConstructionRoadwayConstructionRoadway05/02/2836312 months$(713,067.43)-11%
0407-06-046Abilene04/01/29$4,000,000.00ConstructionRoadwayConstructionRoadway04/04/2836112 months
0407-06-049Abilene04/01/29$2,500,000.00ConstructionRoadwayConstructionRoadway04/04/2836112 months
0500-03-599Houston09/01/29$600,000,000.00ConstructionRoadway09/05/2836012 months$(565,067,716.00)-49%
0137-04-019Wichita Falls03/01/29$3,000,000.00ConstructionRoadwayConstructionRoadway03/06/2835912 months
0137-05-038Wichita Falls03/01/29$5,000,000.00ConstructionRoadwayConstructionRoadway03/06/2835912 months
0508-01-410Houston03/01/29$42,867,000.00ConstructionRoadwayUnassignedUnassigned03/06/2835912 monthsUnassigned / Unassigned → Construction / Roadway
0910-34-042Tyler12/01/27$727,368.96ConstructionBridgeUnassignedUnassigned10/31/28-336-11 monthsUnassigned / Unassigned → Construction / Bridge
0364-03-108Dallas05/06/26$1,162,679.97ConstructionRoadwayConstructionRoadway04/05/27-335-11 months
0316-03-011Paris11/01/29$676,146.2412/04/2833111 months
0908-23-058Abilene04/07/26$744,831.50ConstructionBridgeConstructionBridge03/02/27-330-11 months$15,000.002%
0908-23-059Abilene04/07/26$677,937.00ConstructionBridgeConstructionBridge03/02/27-330-11 months
0908-33-109Abilene04/07/26$1,084,409.78ConstructionBridgeConstructionBridge03/02/27-330-11 months
0039-10-096Pharr12/01/27$3,112,459.28ConstructionBridgeConstructionBridge10/03/28-308-10 months
0581-02-162Dallas06/02/26$13,126,775.13ConstructionRoadwayConstructionRoadway04/05/27-308-10 months
0915-17-070San Antonio09/01/27$682,625.00ConstructionBridgeConstructionBridge11/02/2630210 months
0005-08-109Abilene04/07/26$12,628,622.92ConstructionRoadwayConstructionRoadway02/01/27-301-10 months$(233,671.08)-2%
0371-05-022Corpus Christi07/01/26$314,636.00ConstructionRoadwayConstructionRoadway04/05/27-279-9 months
1115-01-010Corpus Christi07/01/26$583,647.00ConstructionRoadwayConstructionRoadway04/05/27-279-9 months
1294-02-022Corpus Christi07/01/26$723,570.00ConstructionRoadwayConstructionRoadway04/05/27-279-9 months
1446-01-016Corpus Christi07/01/26$130,740.00ConstructionRoadwayConstructionRoadway04/05/27-279-9 months
1555-01-009Corpus Christi07/01/26$139,502.00ConstructionRoadwayConstructionRoadway04/05/27-279-9 months
2942-02-019Corpus Christi07/01/26$285,222.00ConstructionRoadwayConstructionRoadway04/05/27-279-9 months
3116-01-033Corpus Christi07/01/26$151,985.00ConstructionRoadwayConstructionRoadway04/05/27-279-9 months
1794-01-028Lufkin10/05/27$4,138,513.00ConstructionRoadwayConstructionRoadway07/05/28-275-9 months
1794-01-029Lufkin10/05/27$1,666,666.67ConstructionRoadwayUnassignedUnassigned07/05/28-275-9 monthsUnassigned / Unassigned → Construction / Roadway
1875-03-023Lufkin09/01/27$4,809,375.00ConstructionRoadwayConstructionRoadway05/31/28-274-9 months
0018-01-102Laredo05/06/26$11,432,116.76ConstructionRoadwayConstructionRoadway02/01/27-272-9 months
0018-06-219Laredo05/06/26$5,830,944.65ConstructionRoadwayConstructionRoadway02/01/27-272-9 months
0037-06-110Laredo05/06/26$5,260,307.25ConstructionRoadwayConstructionRoadway02/01/27-272-9 months
0038-01-108Laredo05/06/26$239,077.76ConstructionRoadwayUnassignedUnassigned02/01/27-272-9 monthsUnassigned / Unassigned → Construction / Roadway
0301-04-027Laredo05/06/26$308,090.60ConstructionRoadwayUnassignedUnassigned02/01/27-272-9 monthsUnassigned / Unassigned → Construction / Roadway
0542-03-040Laredo05/06/26$7,504,710.40ConstructionRoadwayUnassignedUnassigned02/01/27-272-9 monthsUnassigned / Unassigned → Construction / Roadway
0088-02-063Corpus Christi07/01/26$4,100,000.00ConstructionRoadwayConstructionRoadway03/02/27-245-8 months
0088-03-050Corpus Christi07/01/26$500,000.00ConstructionRoadwayConstructionRoadway03/02/27-245-8 months
0114-07-089Austin09/01/29$2,030,955.3612/31/282438 months
0987-03-018Austin03/01/27$662,756.00ConstructionLocal LetConstructionLocal Let07/02/262418 months
0265-06-036Austin03/07/28$5,000,000.00ConstructionNon RoadwayUnassignedUnassigned08/03/272167 monthsUnassigned / Unassigned → Construction / Non Roadway
0143-01-068San Antonio07/01/26$6,038,484.00ConstructionRoadwayConstructionRoadway02/01/27-216-7 months
0502-01-243Houston08/09/27$24,000,000.00Non-LetLocalNon-LetLocal01/14/272067 months
0199-01-090Tyler07/01/26$811,456.44ConstructionRoadwayConstructionRoadway01/05/27-189-6 months
0199-01-091Tyler07/01/26$516,736.73ConstructionRoadwayConstructionRoadway01/05/27-189-6 months
0619-03-065Dallas06/01/26$805,000.00ConstructionRoadwayConstructionRoadway12/02/26-185-6 months
0981-01-121Houston08/04/27$411,012.00ConstructionRoadwayConstructionRoadway02/01/271836 months
1530-01-012Abilene10/04/28$6,602,447.70ConstructionRoadwayConstructionRoadway04/04/281826 months
0116-03-074Bryan04/06/27$1,940,000.00ConstructionRoadwayConstructionRoadway10/05/261826 months
0911-28-062Lufkin12/01/26$780,558.50ConstructionBridgeConstructionBridge06/01/261826 months
0911-28-064Lufkin12/01/26$771,108.50ConstructionBridgeConstructionBridge06/01/261826 months
0908-23-045Abilene04/07/26$778,888.61ConstructionBridgeConstructionBridge10/05/26-182-6 months
0908-23-051Abilene04/07/26$803,680.77ConstructionBridgeConstructionBridge10/05/26-182-6 months
0908-23-052Abilene04/07/26$808,631.95ConstructionBridgeConstructionBridge10/05/26-182-6 months
0908-23-054Abilene04/07/26$588,619.15ConstructionBridgeConstructionBridge10/05/26-182-6 months
0908-24-051Abilene04/07/26$1,074,354.43ConstructionBridgeConstructionBridge10/05/26-182-6 months
0908-24-052Abilene04/07/26$519,848.38ConstructionBridgeConstructionBridge10/05/26-182-6 months
0912-72-583Houston03/15/27$736,806.00ConstructionLocal LetConstructionRoadway09/14/261816 monthsConstruction / Roadway → Construction / Local Let
0442-02-166Dallas05/06/26$12,657,475.67ConstructionRoadwayConstructionRoadway11/02/26-181-6 months$(349,330.26)-3%
0915-12-691San Antonio09/02/26$250,000.00ConstructionRail - SafetyNon-LetChange Order02/28/27-180-6 monthsNon-Let / Change Order → Construction / Rail - Safety
0005-06-129Abilene06/01/27$4,000,000.00ConstructionRoadwayConstructionRoadway11/01/27-154-5 months$500,000.0014%
0908-33-115Abilene06/02/26$212,705.00ConstructionRoadwayConstructionRoadway11/02/26-154-5 months
0908-33-116Abilene06/02/26$204,953.00ConstructionRoadwayConstructionRoadway11/02/26-154-5 months
0073-02-092San Antonio05/06/26$889,145.81ConstructionRoadwayConstructionRoadway10/05/26-153-5 months
0253-06-042San Antonio05/06/26$894,023.73ConstructionRoadwayConstructionRoadway10/05/26-153-5 months
1283-01-012El Paso03/03/27$1,281,294.23ConstructionRoadwayConstructionRoadway10/05/261485 months
0017-16-008San Antonio01/05/28$828,335.00ConstructionRoadwayConstructionRoadway08/31/271264 months$(5,572,528.00)-87%
0922-33-208Laredo10/05/27$134,100.00ConstructionRoadwayConstructionRoadway05/31/271264 months
0922-33-244Laredo10/05/27$204,300.00ConstructionRoadwayConstructionRoadway05/31/271264 months
0024-06-070San Antonio04/06/27$35,000,000.00ConstructionRoadwayConstructionRoadway11/30/261264 months$9,900,000.0039%
0912-31-351Houston01/06/27$980,000.00ConstructionRoadwayConstructionRoadway09/01/261264 months
0917-29-152Bryan01/06/27$1,324,348.00ConstructionRoadwayUnassignedUnassigned09/01/261264 months$(392,047.50)-23%Unassigned / Unassigned → Construction / Roadway
2883-02-011San Antonio01/06/27$1,105,769.00ConstructionRoadwayNon-LetRail - Safety09/01/261264 monthsNon-Let / Rail - Safety → Construction / Roadway
0366-01-084Austin12/01/26$1,442,307.69ConstructionBridgeConstructionBridge04/05/27-126-4 months
0921-06-378Pharr05/01/26$4,116,950.00ConstructionLocal LetConstructionLocal Let08/30/26-122-4 months
0915-12-800San Antonio09/01/27$6,398,908.00ConstructionRoadwayConstructionRoadway05/04/271194 months
0038-07-085Pharr05/06/26$231,845.30ConstructionRoadwayConstructionRoadway09/01/26-119-4 months$(92,965.70)-29%
0220-01-039Pharr05/06/26$293,029.05ConstructionRoadwayConstructionRoadway09/01/26-119-4 months$(111,239.95)-28%
0220-01-040Pharr05/06/26$261,235.01ConstructionRoadwayConstructionRoadway09/01/26-119-4 months$35,837.0116%
0630-01-059Pharr05/06/26$64,985.00ConstructionRoadwayConstructionRoadway09/01/26-119-4 months$(259,826.00)-80%
0698-03-107Pharr05/06/26$264,761.15ConstructionRoadwayConstructionRoadway09/01/26-119-4 months$(158,911.85)-38%
0863-01-081Pharr05/06/26$245,353.80ConstructionRoadwayConstructionRoadway09/01/26-119-4 months$(79,457.20)-24%
1064-01-048Pharr05/06/26$200,135.05ConstructionRoadwayConstructionRoadway09/01/26-119-4 months$(124,675.95)-38%
1228-03-057Pharr05/06/26$249,764.25ConstructionRoadwayConstructionRoadway09/01/26-119-4 months$24,366.2511%
1228-03-058Pharr05/06/26$63,360.00ConstructionRoadwayConstructionRoadway09/01/26-119-4 months$(236,355.00)-79%
1228-03-059Pharr05/06/26$54,710.00ConstructionRoadwayConstructionRoadway09/01/26-119-4 months$(170,688.00)-76%
1429-01-039Pharr05/06/26$241,056.05ConstructionRoadwayConstructionRoadway09/01/26-119-4 months$(163,212.95)-40%
1586-01-093Pharr05/06/26$177,268.35ConstructionRoadwayConstructionRoadway09/01/26-119-4 months$(147,542.65)-45%
6497-67-001Beaumont05/06/26$1.00MaintenanceRoutine Maintenance ContractUnassignedUnassigned09/01/26-119-4 monthsUnassigned / Unassigned → Maintenance / Routine Maintenance Contract
1194-02-020Beaumont07/01/26$10,174,500.00ConstructionRoadwayConstructionRoadway10/05/26-97-3 months
0912-72-687Houston05/15/28$30,689,860.00ConstructionLocal LetConstructionLocal Let08/14/28-92-3 months
0912-72-845Houston05/15/28$75,920,000.00ConstructionLocal LetUnassignedUnassigned08/14/28-92-3 monthsUnassigned / Unassigned → Construction / Local Let
0215-07-056San Antonio01/05/28$742,662.00ConstructionRoadwayConstructionRoadway10/04/27923 months$240,035.0048%
0521-05-168San Antonio01/05/28$325,096.00ConstructionRoadwayConstructionRoadway10/04/27923 months$(82,904.00)-20%
0521-05-169San Antonio01/05/28$173,444.00ConstructionRoadwayConstructionRoadway10/04/27923 months$51,044.0042%
2104-02-042San Antonio01/05/28$152,551.00ConstructionRoadwayConstructionRoadway10/04/27923 months$(59,860.00)-28%
2452-01-074San Antonio01/05/28$120,561.00ConstructionRoadwayConstructionRoadway10/04/27923 months$8,672.008%
0025-02-229San Antonio01/06/27$972,889.00ConstructionRoadwayConstructionRoadway10/05/26923 months$673,348.00225%
0143-01-066San Antonio01/06/27$763,955.00ConstructionRoadwayConstructionRoadway10/05/26923 months$(117,097.00)-13%
0143-02-031San Antonio01/06/27$1,064,259.00ConstructionRoadwayConstructionRoadway10/05/26923 months$255,996.0032%
0291-05-051San Antonio01/06/27$1,286,888.00ConstructionRoadwayConstructionRoadway10/05/26923 months$532,948.0071%
0013-10-098Fort Worth12/01/26$8,507,754.06ConstructionRoadwayUnassignedUnassigned03/02/27-92-3 monthsUnassigned / Unassigned → Construction / Roadway
0909-37-081Waco09/02/26$552,000.00ConstructionBridgeConstructionBridge06/01/26923 months
0909-37-082Waco09/02/26$593,000.00ConstructionBridgeConstructionBridge06/01/26923 months
0039-02-080Pharr06/02/26$205,724.00ConstructionRoadwayConstructionRoadway09/01/26-92-3 months
0220-03-038Pharr06/02/26$242,842.00ConstructionRoadwayConstructionRoadway09/01/26-92-3 months
0327-07-046Pharr06/02/26$140,770.85ConstructionRoadwayConstructionRoadway09/01/26-92-3 months
0698-03-108Pharr06/02/26$70,480.00ConstructionRoadwayConstructionRoadway09/01/26-92-3 months
1228-03-055Pharr06/02/26$192,788.00ConstructionRoadwayConstructionRoadway09/01/26-92-3 months
2094-01-073Pharr06/02/26$365,803.00ConstructionRoadwayConstructionRoadway09/01/26-92-3 months
2039-01-019Brownwood08/04/27$2,249,213.00ConstructionRoadwayConstructionRoadway05/04/27913 months
2039-01-020Brownwood08/04/27$2,249,213.00ConstructionRoadwayConstructionRoadway05/04/27913 months
2964-01-052Dallas02/01/27$1,044,443.79ConstructionLocal LetConstructionLocal Let11/01/26913 months
0019-01-146Fort Worth06/02/26$19,442,730.37ConstructionRoadwayConstructionRoadway03/03/26903 months$(10,400,051.63)-35%
0912-37-265Houston05/15/26$9,413,000.00ConstructionLocal LetConstructionRoadway02/14/26893 monthsConstruction / Roadway → Construction / Local Let
0978-01-049Houston04/06/27$360,225.00ConstructionRoadwayConstructionRoadway02/01/27632 months
3049-01-036Houston04/06/27$232,500.00ConstructionRoadwayConstructionRoadway02/01/27632 months
0015-09-208Austin07/01/26$3,980,769.23ConstructionRoadwayConstructionRoadway09/01/26-63-2 months
0114-09-103Bryan07/01/26$163,870.00ConstructionRoadwayUnassignedUnassigned09/01/26-63-2 monthsUnassigned / Unassigned → Construction / Roadway
0185-02-042Bryan07/01/26$75,610.00ConstructionRoadwayUnassignedUnassigned09/01/26-63-2 monthsUnassigned / Unassigned → Construction / Roadway
0185-03-037Bryan07/01/26$76,360.00ConstructionRoadwayUnassignedUnassigned09/01/26-63-2 monthsUnassigned / Unassigned → Construction / Roadway
0186-03-073Bryan07/01/26$43,920.00ConstructionRoadwayUnassignedUnassigned09/01/26-63-2 monthsUnassigned / Unassigned → Construction / Roadway
0186-03-074Bryan07/01/26$31,920.00ConstructionRoadwayUnassignedUnassigned09/01/26-63-2 monthsUnassigned / Unassigned → Construction / Roadway
0186-04-036Bryan07/01/26$22,690.00ConstructionRoadwayUnassignedUnassigned09/01/26-63-2 monthsUnassigned / Unassigned → Construction / Roadway
0204-05-046Bryan07/01/26$64,590.00ConstructionRoadwayUnassignedUnassigned09/01/26-63-2 monthsUnassigned / Unassigned → Construction / Roadway
0262-07-047Bryan07/01/26$62,410.00ConstructionRoadwayUnassignedUnassigned09/01/26-63-2 monthsUnassigned / Unassigned → Construction / Roadway
1953-01-035Bryan07/01/26$76,940.00ConstructionRoadwayUnassignedUnassigned09/01/26-63-2 monthsUnassigned / Unassigned → Construction / Roadway
2133-02-016Bryan07/01/26$18,780.00ConstructionRoadwayUnassignedUnassigned09/01/26-63-2 monthsUnassigned / Unassigned → Construction / Roadway
0253-06-037San Antonio09/03/27$3,628,000.00ConstructionLocal LetConstructionLocal Let07/02/27622 months
0253-06-039San Antonio09/03/27$14,522,000.00ConstructionLocal LetConstructionLocal Let07/02/27622 months
0034-01-144Abilene07/01/27$7,000,000.00ConstructionRoadwayUnassignedUnassigned08/31/27-62-2 months$2,000,000.0040%Unassigned / Unassigned → Construction / Roadway
0918-24-316Dallas06/04/28$3,907,500.00ConstructionLocal LetUnassignedUnassigned08/03/28-61-2 monthsUnassigned / Unassigned → Construction / Local Let
0009-06-058Paris11/01/28$506,769.12ConstructionRoadwayUnassignedUnassigned12/04/28-34-1 monthUnassigned / Unassigned → Construction / Roadway
0045-10-022Paris11/01/28$551,738.88ConstructionRoadwayUnassignedUnassigned12/04/28-34-1 monthUnassigned / Unassigned → Construction / Roadway
0045-20-029Paris11/01/28$2,214,062.40ConstructionRoadwayUnassignedUnassigned12/04/28-34-1 monthUnassigned / Unassigned → Construction / Roadway
0279-04-025Paris11/01/28$335,237.76ConstructionRoadwayUnassignedUnassigned12/04/28-34-1 monthUnassigned / Unassigned → Construction / Roadway
0510-02-035Paris11/01/28$551,522.40ConstructionRoadwayUnassignedUnassigned12/04/28-34-1 monthUnassigned / Unassigned → Construction / Roadway
0549-01-042Paris11/01/28$95,821.44ConstructionRoadwayUnassignedUnassigned12/04/28-34-1 month$(54,637.44)-36%Unassigned / Unassigned → Construction / Roadway
0641-04-022Paris11/01/28$378,824.16ConstructionRoadwayUnassignedUnassigned12/04/28-34-1 monthUnassigned / Unassigned → Construction / Roadway
0641-05-023Paris11/01/28$148,262.40ConstructionRoadwayUnassignedUnassigned12/04/28-34-1 monthUnassigned / Unassigned → Construction / Roadway
0722-02-053Paris11/01/28$110,667.67ConstructionRoadwayUnassignedUnassigned12/04/28-34-1 monthUnassigned / Unassigned → Construction / Roadway
0723-01-044Paris11/01/28$291,202.56ConstructionRoadwayUnassignedUnassigned12/04/28-34-1 monthUnassigned / Unassigned → Construction / Roadway
0728-03-017Paris11/01/28$64,408.96ConstructionRoadwayUnassignedUnassigned12/04/28-34-1 month$(317,709.92)-83%Unassigned / Unassigned → Construction / Roadway
0728-04-014Paris11/01/28$258,255.36ConstructionRoadwayUnassignedUnassigned12/04/28-34-1 monthUnassigned / Unassigned → Construction / Roadway
0749-04-014Paris11/01/28$233,418.24ConstructionRoadwayUnassignedUnassigned12/04/28-34-1 monthUnassigned / Unassigned → Construction / Roadway
0764-03-019Paris11/01/28$235,641.12ConstructionRoadwayUnassignedUnassigned12/04/28-34-1 monthUnassigned / Unassigned → Construction / Roadway
0765-03-030Paris11/01/28$152,449.44ConstructionRoadwayUnassignedUnassigned12/04/28-34-1 monthUnassigned / Unassigned → Construction / Roadway
0766-01-033Paris11/01/28$835,005.60ConstructionRoadwayUnassignedUnassigned12/04/28-34-1 monthUnassigned / Unassigned → Construction / Roadway
0768-01-060Paris11/01/28$44,272.80ConstructionRoadwayUnassignedUnassigned12/04/28-34-1 monthUnassigned / Unassigned → Construction / Roadway
0768-02-025Paris11/01/28$97,812.00ConstructionRoadwayUnassignedUnassigned12/04/28-34-1 monthUnassigned / Unassigned → Construction / Roadway
0769-02-036Paris11/01/28$1,106,957.28ConstructionRoadwayUnassignedUnassigned12/04/28-34-1 monthUnassigned / Unassigned → Construction / Roadway
0772-02-019Paris11/01/28$639,894.89ConstructionRoadwayUnassignedUnassigned12/04/28-34-1 monthUnassigned / Unassigned → Construction / Roadway
1154-01-021Paris11/01/28$601,149.12ConstructionRoadwayUnassignedUnassigned12/04/28-34-1 monthUnassigned / Unassigned → Construction / Roadway
1454-01-024Paris11/01/28$525,719.04ConstructionRoadwayUnassignedUnassigned12/04/28-34-1 monthUnassigned / Unassigned → Construction / Roadway
1465-01-016Paris11/01/28$204,145.92ConstructionRoadwayUnassignedUnassigned12/04/28-34-1 monthUnassigned / Unassigned → Construction / Roadway
1849-01-012Paris11/01/28$390,561.60ConstructionRoadwayUnassignedUnassigned12/04/28-34-1 monthUnassigned / Unassigned → Construction / Roadway
1849-02-008Paris11/01/28$65,413.92ConstructionRoadwayUnassignedUnassigned12/04/28-34-1 monthUnassigned / Unassigned → Construction / Roadway
1849-03-023Paris11/01/28$1,294,719.36ConstructionRoadwayUnassignedUnassigned12/04/28-34-1 month$(42,863.04)-3%Unassigned / Unassigned → Construction / Roadway
1979-01-017Paris11/01/28$467,596.80ConstructionRoadwayUnassignedUnassigned12/04/28-34-1 monthUnassigned / Unassigned → Construction / Roadway
2003-01-011Paris11/01/28$311,794.56ConstructionRoadwayUnassignedUnassigned12/04/28-34-1 monthUnassigned / Unassigned → Construction / Roadway
2459-02-015Paris11/01/28$125,062.08ConstructionRoadwayUnassignedUnassigned12/04/28-34-1 monthUnassigned / Unassigned → Construction / Roadway
2683-01-009Paris11/01/28$66,792.00ConstructionRoadwayUnassignedUnassigned12/04/28-34-1 monthUnassigned / Unassigned → Construction / Roadway
2875-01-010Paris11/01/28$338,976.00ConstructionRoadwayUnassignedUnassigned12/04/28-34-1 monthUnassigned / Unassigned → Construction / Roadway
0915-15-088San Antonio10/05/27$1,070,039.00ConstructionBridgeConstructionBridge08/31/27341 month
0338-11-062Houston05/15/27$2,403,000.00ConstructionLocal LetConstructionRoadway06/14/27-31-1 monthConstruction / Roadway → Construction / Local Let
0912-37-259Houston09/15/26$13,200,000.00ConstructionLocal LetConstructionRoadway08/14/26311 monthConstruction / Roadway → Construction / Local Let
0912-72-761Houston09/15/26$1,026,535.00ConstructionLocal LetConstructionLocal Let08/14/26311 month
0912-72-762Houston09/15/26$408,301.00ConstructionLocal LetConstructionLocal Let08/14/26311 month
0912-72-819Houston09/15/26$17,209,746.00ConstructionLocal LetConstructionLocal Let08/14/26311 month
0912-72-824Houston09/15/26$8,000,000.00ConstructionLocal LetConstructionLocal Let08/14/26311 month
0912-73-249Houston09/15/26$3,250,000.00ConstructionLocal LetConstructionLocal Let08/14/26311 month
3595-01-028Houston09/15/26$525,000.00ConstructionLocal LetConstructionLocal Let08/14/26311 month
6496-99-001Houston07/09/26$950,000.00MaintenanceBridge PreventiveUnassignedUnassigned06/08/263030 daysUnassigned / Unassigned → Maintenance / Bridge Preventive
0384-04-035Austin06/01/28$314,391.74ConstructionRoadwayUnassignedUnassigned05/02/282929 daysUnassigned / Unassigned → Construction / Roadway
2552-01-062El Paso11/02/27$961,538.46ConstructionRoadwayConstructionRoadway10/04/272828 days
0128-01-122Brownwood02/02/27$2,900,000.00ConstructionBridgeUnassignedUnassigned01/05/272727 daysUnassigned / Unassigned → Construction / Bridge
0289-04-036Brownwood02/02/27$650,000.00ConstructionBridgeUnassignedUnassigned01/05/272727 daysUnassigned / Unassigned → Construction / Bridge
0550-01-032Brownwood02/02/27$150,000.00ConstructionBridgeUnassignedUnassigned01/05/272727 daysUnassigned / Unassigned → Construction / Bridge
0550-01-033Brownwood02/02/27$200,000.00ConstructionBridgeUnassignedUnassigned01/05/272727 daysUnassigned / Unassigned → Construction / Bridge
0550-01-034Brownwood02/02/27$150,000.00ConstructionBridgeUnassignedUnassigned01/05/272727 daysUnassigned / Unassigned → Construction / Bridge
1026-01-014Brownwood02/02/27$138,304.00ConstructionBridgeUnassignedUnassigned01/05/272727 daysUnassigned / Unassigned → Construction / Bridge
1697-02-036Brownwood02/02/27$350,000.00ConstructionBridgeUnassignedUnassigned01/05/272727 daysUnassigned / Unassigned → Construction / Bridge
2106-01-011Brownwood02/02/27$300,000.00ConstructionBridgeUnassignedUnassigned01/05/272727 daysUnassigned / Unassigned → Construction / Bridge
1756-01-024Yoakum06/02/26$937,067.00ConstructionRoadwayUnassignedUnassigned05/05/262727 daysUnassigned / Unassigned → Construction / Roadway
0907-00-242San Angelo04/05/28$1,956,000.00ConstructionRoadwayUnassignedUnassigned04/12/28-8-8 days$178,000.0010%Unassigned / Unassigned → Construction / Roadway
0184-03-044Waco11/01/26$142,061.00Non-LetRoadwayUnassignedUnassigned11/02/26-2-2 daysUnassigned / Unassigned → Non-Let / Roadway
275 rows · download CSV

Project Type & Subtype Changes

The mix of work in the pipeline remains consistent. Construction continues to dominate, increasing to 95.7% of the pipeline, with roadway work making up the majority of projects and bridge work representing a smaller but steady share.

The measurable changes at the subtype level are small:

SubtypeFeb 2March 3Δ
Roadway52.7%76.0%+23.3
Bridge11.0%15.4%+4.4
Local Let2.7%3.6%+1.0
Non Roadway1.1%1.8%+0.7
Local0.2%0.6%+0.4
Rail - Safety1.1%1.4%+0.3
Routine Maintenance Contract0.1%0.3%+0.2

Only 5.3% of projects experienced a subtype change across the window.

For contractors, this reinforces a familiar structure. The pipeline is still overwhelmingly roadway-driven, with bridge work as the primary secondary category. There is no indication of a shift toward new types of work or a change in how TxDOT is allocating scope across categories.

CSJDistrictEst. Letting DateProject EstimateCurrent TypeCurrent SubtypeType/Subtype ΔPrev. TypePrev. SubtypePrev. CostPrev. DateLetting Δ (days)Letting Date ΔCost Δ%Cost ΔLifecycle
0047-03-091Paris04/07/26$147,195,094.80ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$152,906,394.00$(5,711,299.20)-4%
0079-05-073Fort Worth04/07/26$72,390.52ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned$76,624.33$(4,233.81)-6%
0172-09-046Fort Worth04/07/26$286,038.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$280,000.00$6,038.002%
0314-07-087Fort Worth04/07/26$537,434.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$534,158.80$3,275.201%
0337-02-054Austin04/07/26$2,566,158.62ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$2,645,257.53$(79,098.91)-3%
0543-02-089Houston04/07/26$770,105.75ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned$836,725.75$(66,620.00)-8%
0986-03-015Austin04/07/26$1,713,954.79ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$1,911,737.44$(197,782.65)-10%
1014-03-065Dallas04/07/26$1,202,059.26ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$852,000.00$350,059.2641%
1091-04-033Dallas04/07/26$277,376.80ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$426,000.00$(148,623.20)-35%
1290-03-033Dallas04/07/26$690,184.30ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$1,266,000.00$(575,815.70)-45%
1330-02-052Fort Worth04/07/26$8,810,551.86ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$7,785,159.27$1,025,392.5913%
2150-03-034Laredo04/07/26$806,013.55ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$419,000.00$387,013.5592%
2752-01-008Laredo04/07/26$907,598.60ConstructionBridgeConstruction / Roadway → Construction / BridgeConstructionRoadway$639,624.41$267,974.1942%
0271-17-188Houston04/15/26$1,600,000.00Non-LetBridgeUnassigned / Unassigned → Non-Let / BridgeUnassignedUnassigned$1,000,000.00$600,000.0060%
0038-01-108Laredo05/06/26$239,077.76ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned02/01/27-272-9 months
0048-04-109Dallas05/06/26$615,349.25ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$636,000.00$(20,650.75)-3%
0081-03-047Dallas05/06/26$116,223,406.70ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$172,970,558.00$(56,747,151.30)-33%
0172-11-017Dallas05/06/26$1,104,055.45ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$1,272,000.00$(167,944.55)-13%
0301-04-027Laredo05/06/26$308,090.60ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned02/01/27-272-9 months
0542-03-040Laredo05/06/26$7,504,710.40ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned02/01/27-272-9 months
0815-08-044Dallas05/06/26$1,230,656.05ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$1,272,000.00$(41,343.95)-3%
1394-02-031Dallas05/06/26$1,048,966.35ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$848,400.00$200,566.3524%
3256-02-121Houston05/06/26$2,286,187.03ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$2,436,237.84$(150,050.81)-6%
6497-67-001Beaumont05/06/26$1.00MaintenanceRoutine Maintenance ContractUnassigned / Unassigned → Maintenance / Routine Maintenance ContractUnassignedUnassigned09/01/26-119-4 months
0912-37-265Houston05/15/26$9,413,000.00ConstructionLocal LetConstruction / Roadway → Construction / Local LetConstructionRoadway02/14/26893 months
0166-07-073Bryan06/02/26$404,475.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned$360,772.88$43,702.1212%
1756-01-024Yoakum06/02/26$937,067.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned05/05/262727 days
0081-02-079Fort Worth06/11/26$515,157.78ConstructionLocal LetUnassigned / Unassigned → Construction / Local LetUnassignedUnassigned$513,104.90$2,052.880%
0363-01-153Fort Worth06/17/26$647,757.55ConstructionLocal LetUnassigned / Unassigned → Construction / Local LetUnassignedUnassigned$420,708.00$227,049.5554%
0353-03-117Fort Worth06/18/26$516,490.30ConstructionLocal LetUnassigned / Unassigned → Construction / Local LetUnassignedUnassigned$568,354.60$(51,864.30)-9%
0114-01-070Austin07/01/26$620,000.00ConstructionNon RoadwayUnassigned / Unassigned → Construction / Non RoadwayUnassignedUnassigned$1,800,000.00$(1,180,000.00)-66%
0114-01-071Austin07/01/26$4,200,000.00ConstructionNon RoadwayUnassigned / Unassigned → Construction / Non RoadwayUnassignedUnassigned$7,200,000.00$(3,000,000.00)-42%
0114-09-103Bryan07/01/26$163,870.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned09/01/26-63-2 months
0185-02-042Bryan07/01/26$75,610.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned09/01/26-63-2 months
0185-03-037Bryan07/01/26$76,360.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned09/01/26-63-2 months
0186-03-073Bryan07/01/26$43,920.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned09/01/26-63-2 months
0186-03-074Bryan07/01/26$31,920.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned09/01/26-63-2 months
0186-04-036Bryan07/01/26$22,690.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned09/01/26-63-2 months
0204-05-046Bryan07/01/26$64,590.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned09/01/26-63-2 months
0211-10-053Yoakum07/01/26$2,000,000.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0262-07-047Bryan07/01/26$62,410.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned09/01/26-63-2 months
0370-05-057Yoakum07/01/26$540,000.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$500,000.00$40,000.008%
0675-08-121Houston07/01/26$3,627,242.00ConstructionNon RoadwayUnassigned / Unassigned → Construction / Non RoadwayUnassignedUnassigned08/31/27-427-1 year
1953-01-035Bryan07/01/26$76,940.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned09/01/26-63-2 months
2133-02-016Bryan07/01/26$18,780.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned09/01/26-63-2 months
3510-04-064Houston07/01/26$3,693,789.00ConstructionNon RoadwayUnassigned / Unassigned → Construction / Non RoadwayUnassignedUnassigned08/31/27-427-1 year
3510-04-065Houston07/01/26$3,942,056.00ConstructionNon RoadwayUnassigned / Unassigned → Construction / Non RoadwayUnassignedUnassigned08/31/27-427-1 year
6496-99-001Houston07/09/26$950,000.00MaintenanceBridge PreventiveUnassigned / Unassigned → Maintenance / Bridge PreventiveUnassignedUnassigned06/08/263030 days
0313-07-023Fort Worth08/01/26$1,142,907.00Non-LetChange OrderUnassigned / Unassigned → Non-Let / Change OrderUnassignedUnassigned
0050-02-132Bryan08/03/26$39,771.75Non-LetRoadwayUnassigned / Unassigned → Non-Let / RoadwayUnassignedUnassigned
0013-08-154Fort Worth08/05/26$1,681,823.02ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned09/05/28-763-2 years
0095-04-079Dallas08/05/26$1,338,522.57ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned$2,463,673.44$(1,125,150.87)-46%
6499-31-001Dallas08/12/26$400,000.00MaintenanceRoutine Maintenance ContractUnassigned / Unassigned → Maintenance / Routine Maintenance ContractUnassignedUnassigned
0015-13-437Austin09/02/26$387,000,000.00ConstructionRoadwayConstruction / Rail → Construction / RoadwayConstructionRail$402,480,000.00$(15,480,000.00)-4%
0028-06-098Beaumont09/02/26$113,202.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0172-09-047Fort Worth09/02/26$7,466,647.62ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0307-01-161Beaumont09/02/26$329,100.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0388-03-090Beaumont09/02/26$24,000.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0593-01-142Beaumont09/02/26$128,234.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0915-12-691San Antonio09/02/26$250,000.00ConstructionRail - SafetyNon-Let / Change Order → Construction / Rail - SafetyNon-LetChange Order02/28/27-180-6 months
2266-02-169Fort Worth09/02/26$8,658,289.39ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0912-37-259Houston09/15/26$13,200,000.00ConstructionLocal LetConstruction / Roadway → Construction / Local LetConstructionRoadway08/14/26311 month
0132-01-058Childress10/06/26$60,311.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0215-09-037San Antonio10/06/26$385,985.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0236-01-024San Antonio10/06/26$265,286.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0349-01-033Corpus Christi10/06/26$829,681.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0517-01-050San Antonio10/06/26$331,964.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0613-02-071San Antonio10/06/26$260,631.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
1738-02-015San Antonio10/06/26$316,285.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
2556-02-013San Antonio10/06/26$347,521.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
2882-02-007San Antonio10/06/26$168,636.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
3075-02-014Corpus Christi10/06/26$11,415.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
3352-01-009San Antonio10/06/26$292,520.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0184-03-044Waco11/01/26$142,061.00Non-LetRoadwayUnassigned / Unassigned → Non-Let / RoadwayUnassignedUnassigned11/02/26-2-2 days
0044-06-079Wichita Falls11/03/26$225,735.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0044-07-077Wichita Falls11/03/26$716,433.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0047-04-032Dallas11/03/26$46,922,696.42ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$63,694,143.00$(16,771,446.58)-26%
0080-03-049Fort Worth11/03/26$115,461,159.10ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$126,999,999.80$(11,538,840.70)-9%
0136-03-073Paris11/03/26$2,076,861.02ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0239-04-024Wichita Falls11/03/26$531,657.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0239-08-002Wichita Falls11/03/26$9,318.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0906-18-022Odessa11/03/26$938,819.42ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
2635-05-005Amarillo11/03/26$47,259,223.32ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$69,477,353.12$(22,218,129.80)-32%
2659-02-004Paris11/03/26$192,154.45ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
2706-02-018Wichita Falls11/03/26$108,280.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0013-10-098Fort Worth12/01/26$8,507,754.06ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned03/02/27-92-3 months
0042-10-004Amarillo12/01/26$1,880,000.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0168-09-197Amarillo12/01/26$847,000.00ConstructionNon RoadwayUnassigned / Unassigned → Construction / Non RoadwayUnassignedUnassigned$547,000.00$300,000.0055%
0168-09-198Amarillo12/01/26$900,000.00ConstructionNon RoadwayUnassigned / Unassigned → Construction / Non RoadwayUnassignedUnassigned
0168-10-084Amarillo12/01/26$100,000.00ConstructionNon RoadwayUnassigned / Unassigned → Construction / Non RoadwayUnassignedUnassigned
0187-01-060Bryan12/01/26$537,819.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0363-03-061Fort Worth12/01/26$2,718,460.17ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0397-02-043Childress12/01/26$1,200,000.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
2452-03-128San Antonio12/01/26$190,314,322.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$215,816,440.00$(25,502,118.00)-12%
0054-06-109Brownwood01/06/27$1,600,000.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$98,640.00$1,501,360.001522%
0128-04-045Brownwood01/06/27$2,644,230.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$2,500,000.00$144,230.006%
0917-29-152Bryan01/06/27$1,324,348.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$1,716,395.5009/01/261264 months$(392,047.50)-23%
1601-02-036Fort Worth01/06/27$8,441,246.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$9,033,592.70$(592,346.70)-7%
2883-02-011San Antonio01/06/27$1,105,769.00ConstructionRoadwayNon-Let / Rail - Safety → Construction / RoadwayNon-LetRail - Safety09/01/261264 months
0009-11-248Dallas02/02/27$57,043,890.08ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$79,147,850.00$(22,103,959.92)-28%
0128-01-122Brownwood02/02/27$2,900,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned01/05/272727 days
0259-05-086Fort Worth02/02/27$716,072.23ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0289-04-036Brownwood02/02/27$650,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned01/05/272727 days
0550-01-032Brownwood02/02/27$150,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned01/05/272727 days
0550-01-033Brownwood02/02/27$200,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned01/05/272727 days
0550-01-034Brownwood02/02/27$150,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned01/05/272727 days
1026-01-014Brownwood02/02/27$138,304.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned01/05/272727 days
1697-02-036Brownwood02/02/27$350,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned01/05/272727 days
2106-01-011Brownwood02/02/27$300,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned01/05/272727 days
0683-03-043Austin03/03/27$1,837,409.82ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned09/05/28-553-2 years
0915-12-827San Antonio03/03/27$654,893.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0915-12-828San Antonio03/03/27$362,736.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
2208-01-074Fort Worth03/03/27$3,905,479.41ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0413-06-015Bryan03/07/27$563,448.00ConstructionLocal LetUnassigned / Unassigned → Construction / Local LetUnassignedUnassigned
0912-72-583Houston03/15/27$736,806.00ConstructionLocal LetConstruction / Roadway → Construction / Local LetConstructionRoadway09/14/261816 months
0114-09-104Bryan04/06/27$2,000,000.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$3,000,000.00$(1,000,000.00)-33%
0199-08-029Lufkin04/06/27$1,935,915.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0200-01-098Lufkin04/06/27$1,626,716.60ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0200-13-013Lufkin04/06/27$572,283.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0336-05-071Lufkin04/06/27$1,388,369.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0576-02-077Lufkin04/06/27$861,976.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
2006-03-013San Angelo04/06/27$926,675.86ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0024-07-068San Antonio05/05/27$278,604,536.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$312,037,081.00$(33,432,545.00)-11%
0267-01-036Yoakum05/05/27$1,338,000.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$1,216,000.00$122,000.0010%
0338-11-062Houston05/15/27$2,403,000.00ConstructionLocal LetConstruction / Roadway → Construction / Local LetConstructionRoadway06/14/27-31-1 month
0907-24-060San Angelo06/03/27$3,552,743.00ConstructionLocal LetUnassigned / Unassigned → Construction / Local LetUnassignedUnassigned03/31/264281 year
0034-01-144Abilene07/01/27$7,000,000.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$5,000,000.0008/31/27-62-2 months$2,000,000.0040%
0908-33-118Abilene08/04/27$613,311.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$640,506.41$(27,195.41)-4%
2560-01-079Lufkin08/04/27$7,615,384.62ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$12,700,000.0002/28/38-3862-11 years$(5,084,615.38)-40%
0177-03-110Beaumont09/01/27$679,006.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0610-06-098Atlanta09/01/27$14,560,000.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$16,307,200.00$(1,747,200.00)-11%
0883-02-098Beaumont09/01/27$341,440.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
1024-01-097Beaumont09/01/27$16,676.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0921-06-330Pharr09/03/27$17,023,422.00ConstructionLocal LetUnassigned / Unassigned → Construction / Local LetUnassignedUnassigned09/01/29-730-2 years
3417-02-043Austin09/03/27$1,805,976.85Non-LetRoadwayUnassigned / Unassigned → Non-Let / RoadwayUnassignedUnassigned$1,712,962.96$93,013.895%
0024-05-107San Antonio10/05/27$589,451.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0043-02-078Childress10/05/27$18,800,000.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$21,056,000.00$(2,256,000.00)-11%
0328-02-048San Antonio10/05/27$520,690.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0328-02-049San Antonio10/05/27$26,377.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0359-05-013San Antonio10/05/27$448,499.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0517-01-051San Antonio10/05/27$390,803.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0517-02-050San Antonio10/05/27$515,422.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0993-01-014Corpus Christi10/05/27$205,460.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned10/05/2636412 months
1794-01-029Lufkin10/05/27$1,666,666.67ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned07/05/28-275-9 months
0217-02-037Atlanta11/01/27$18,642,426.36ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$20,879,517.00$(2,237,090.64)-11%
0044-06-080Wichita Falls11/02/27$1,352,204.50ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0189-01-014Paris11/02/27$44,953.92ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned12/04/28-399-1 year
0189-02-064Paris11/02/27$1,915,826.88ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned12/04/28-399-1 year
0610-01-055Paris11/02/27$64,408.96ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
1611-01-013Wichita Falls11/02/27$168,468.94ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
1766-01-010Wichita Falls11/02/27$144,371.40ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
1767-01-008Wichita Falls11/02/27$32,496.55ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
2438-01-011Wichita Falls11/02/27$338,547.43ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
3375-01-007Wichita Falls11/02/27$59,587.18ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0910-34-042Tyler12/01/27$727,368.96ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned10/31/28-336-11 months
2690-01-040Austin12/01/27$7,346,428.57ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned11/30/30-1096-3 years
2690-01-046Austin12/01/27$714,285.71ConstructionRail - SafetyUnassigned / Unassigned → Construction / Rail - SafetyUnassignedUnassigned11/30/30-1096-3 years
0070-06-056Brownwood01/05/28$400,000.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned01/05/2736412 months
0289-04-037Brownwood01/05/28$3,568,950.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$3,000,000.0001/05/2736412 months$568,950.0019%
1239-01-034Brownwood01/05/28$125,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned$150,000.00$(25,000.00)-17%
3538-01-067Houston01/05/28$1,000,000.00ConstructionNon RoadwayUnassigned / Unassigned → Construction / Non RoadwayUnassignedUnassigned$2,061,504.00$(1,061,504.00)-51%
3538-01-071Houston01/05/28$1,000,000.00ConstructionNon RoadwayUnassigned / Unassigned → Construction / Non RoadwayUnassignedUnassigned
0495-03-076Tyler02/02/28$3,846,153.85ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$4,000,000.00$(153,846.15)-4%
3632-01-003Pharr02/02/28$90,352,435.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$101,194,726.00$(10,842,291.00)-11%
0027-13-261Houston03/07/28$300,000.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0177-11-170Houston03/07/28$1,700,000.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0265-06-036Austin03/07/28$5,000,000.00ConstructionNon RoadwayUnassigned / Unassigned → Construction / Non RoadwayUnassignedUnassigned08/03/272167 months
0918-47-577Dallas04/02/28$5,700,000.00ConstructionLocal LetUnassigned / Unassigned → Construction / Local LetUnassignedUnassigned08/01/266092 years
0081-04-047Dallas04/05/28$460,407.60ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0907-00-242San Angelo04/05/28$1,956,000.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$1,778,000.0004/12/28-8-8 days$178,000.0010%
1416-03-022Houston05/03/28$6,000,000.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0912-72-845Houston05/15/28$75,920,000.00ConstructionLocal LetUnassigned / Unassigned → Construction / Local LetUnassignedUnassigned08/14/28-92-3 months
0263-05-027Abilene06/01/28$2,358,156.80ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$2,613,672.48$(255,515.68)-10%
0384-04-035Austin06/01/28$314,391.74ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned05/02/282929 days
0918-24-316Dallas06/04/28$3,907,500.00ConstructionLocal LetUnassigned / Unassigned → Construction / Local LetUnassignedUnassigned08/03/28-61-2 months
0907-00-243San Angelo06/13/28$8,509,000.00ConstructionLocal LetUnassigned / Unassigned → Construction / Local LetUnassignedUnassigned$9,581,000.00$(1,072,000.00)-11%
0091-05-081Dallas08/04/28$1,200,000.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned08/03/273661 year
0081-13-071Dallas09/06/28$232,779,659.10ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$260,713,231.60$(27,933,572.50)-11%
0092-03-053Dallas09/06/28$62,131,255.85ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$83,760,305.57$(21,629,049.72)-26%
0095-02-096Dallas09/06/28$347,679,308.50ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$395,000,825.50$(47,321,517.00)-12%
0167-01-138El Paso09/06/28$2,762,500.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned
0249-07-072Fort Worth09/06/28$42,784,246.29ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned$41,153,041.00$1,631,205.294%
0273-02-028Austin09/06/28$321,428.57ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned
0451-01-053Dallas09/06/28$117,610,100.90ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$132,731,313.00$(15,121,212.10)-11%
0915-12-829San Antonio09/06/28$1,566,606.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
1051-01-064Dallas09/06/28$101,546,735.70ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$115,412,344.00$(13,865,608.30)-12%
1051-03-001Dallas09/06/28$54,002,986.08ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$74,481,854.00$(20,478,867.92)-28%
2941-02-054Houston09/06/28$1,288,740.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned07/31/32-1425-4 years
2941-02-056Houston09/06/28$32,000,000.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned07/31/32-1425-4 years
0024-06-079San Antonio10/04/28$407,013.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0052-01-046Lubbock10/04/28$27,200,001.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned$83,640,398.24$(56,440,397.24)-67%
0150-05-053Austin10/04/28$830,357.14ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned
0595-02-026San Antonio10/04/28$721,746.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0748-05-046San Antonio10/04/28$588,185.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0926-05-009Lufkin10/04/28$9,169,916.07ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$8,482,142.86$687,773.218%
1167-01-014San Antonio10/04/28$181,335.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
2263-02-112Corpus Christi10/04/28$17,000,000.00ConstructionFerry BoatUnassigned / Unassigned → Construction / Ferry BoatUnassignedUnassigned09/30/35-2553-7 years
3127-01-010San Antonio10/04/28$93,424.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0005-15-097Odessa11/01/28$900,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned
0005-15-098Odessa11/01/28$900,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned
0009-06-058Paris11/01/28$506,769.12ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned12/04/28-34-1 month
0045-10-022Paris11/01/28$551,738.88ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned12/04/28-34-1 month
0045-12-099Paris11/01/28$221,892.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0045-20-029Paris11/01/28$2,214,062.40ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned12/04/28-34-1 month
0124-03-067Wichita Falls11/01/28$381,561.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0134-02-065Wichita Falls11/01/28$893,996.40ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0195-02-090Dallas11/01/28$159,894,765.10ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$179,082,136.90$(19,187,371.80)-11%
0239-01-025Wichita Falls11/01/28$328,848.96ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0249-01-061Wichita Falls11/01/28$50,574.77ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0249-02-027Wichita Falls11/01/28$204,648.11ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0279-04-025Paris11/01/28$335,237.76ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned12/04/28-34-1 month
0283-04-038Wichita Falls11/01/28$571,016.75ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0423-05-012Wichita Falls11/01/28$113,875.52ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0423-06-017Wichita Falls11/01/28$160,881.60ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0510-02-035Paris11/01/28$551,522.40ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned12/04/28-34-1 month
0549-01-042Paris11/01/28$95,821.44ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$150,458.8812/04/28-34-1 month$(54,637.44)-36%
0641-04-022Paris11/01/28$378,824.16ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned12/04/28-34-1 month
0641-05-023Paris11/01/28$148,262.40ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned12/04/28-34-1 month
0702-01-016Wichita Falls11/01/28$228,176.96ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0722-02-053Paris11/01/28$110,667.67ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned12/04/28-34-1 month
0723-01-044Paris11/01/28$291,202.56ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned12/04/28-34-1 month
0728-03-017Paris11/01/28$64,408.96ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$382,118.8812/04/28-34-1 month$(317,709.92)-83%
0728-04-014Paris11/01/28$258,255.36ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned12/04/28-34-1 month
0749-04-014Paris11/01/28$233,418.24ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned12/04/28-34-1 month
0764-03-019Paris11/01/28$235,641.12ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned12/04/28-34-1 month
0765-03-030Paris11/01/28$152,449.44ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned12/04/28-34-1 month
0766-01-033Paris11/01/28$835,005.60ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned12/04/28-34-1 month
0768-01-060Paris11/01/28$44,272.80ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned12/04/28-34-1 month
0768-02-025Paris11/01/28$97,812.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned12/04/28-34-1 month
0769-02-036Paris11/01/28$1,106,957.28ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned12/04/28-34-1 month
0772-02-019Paris11/01/28$639,894.89ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned12/04/28-34-1 month
0782-01-038Wichita Falls11/01/28$206,803.52ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0802-02-080Wichita Falls11/01/28$92,850.56ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0815-09-010Wichita Falls11/01/28$548,339.73ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0845-03-070Wichita Falls11/01/28$122,936.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
1135-01-028Austin11/01/28$267,857.14ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned
1154-01-021Paris11/01/28$601,149.12ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned12/04/28-34-1 month
1188-02-136Odessa11/01/28$1,200,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned
1188-02-137Odessa11/01/28$720,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned
1188-02-138Odessa11/01/28$490,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned
1357-01-029Wichita Falls11/01/28$166,534.72ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
1357-01-030Wichita Falls11/01/28$143,225.28ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
1357-02-015Wichita Falls11/01/28$94,154.13ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
1454-01-024Paris11/01/28$525,719.04ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned12/04/28-34-1 month
1465-01-016Paris11/01/28$204,145.92ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned12/04/28-34-1 month
1767-03-021Wichita Falls11/01/28$102,801.60ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
1849-01-012Paris11/01/28$390,561.60ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned12/04/28-34-1 month
1849-02-008Paris11/01/28$65,413.92ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned12/04/28-34-1 month
1849-03-023Paris11/01/28$1,294,719.36ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$1,337,582.4012/04/28-34-1 month$(42,863.04)-3%
1855-01-033Wichita Falls11/01/28$179,583.36ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
1979-01-017Paris11/01/28$467,596.80ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned12/04/28-34-1 month
2003-01-011Paris11/01/28$311,794.56ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned12/04/28-34-1 month
2322-01-012Wichita Falls11/01/28$171,206.93ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
2459-02-015Paris11/01/28$125,062.08ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned12/04/28-34-1 month
2683-01-009Paris11/01/28$66,792.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned12/04/28-34-1 month
2706-01-012Wichita Falls11/01/28$119,580.27ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
2706-02-019Wichita Falls11/01/28$137,294.67ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
2875-01-010Paris11/01/28$338,976.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned12/04/28-34-1 month
3553-01-008Wichita Falls11/01/28$170,258.29ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$191,928.00$(21,669.71)-11%
3562-01-009Wichita Falls11/01/28$218,606.66ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
3569-02-005Wichita Falls11/01/28$34,323.67ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
3569-03-009Wichita Falls11/01/28$162,664.33ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned
0152-01-092Austin12/05/28$401,785.71ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned
0005-04-074Odessa01/01/29$50,435,715.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned$56,488,000.00$(6,052,285.00)-11%
0005-13-063Odessa01/01/29$240,150,931.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$268,969,042.70$(28,818,111.70)-11%
0013-05-071Wichita Falls01/01/29$1,500,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned
0013-05-072Wichita Falls01/01/29$550,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned
0013-05-073Wichita Falls01/01/29$400,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned
0013-05-074Wichita Falls01/01/29$475,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned
0054-07-086Brownwood01/01/29$25,000,000.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$28,000,000.00$(3,000,000.00)-11%
0098-03-041Childress01/01/29$790,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned
0156-07-116Wichita Falls01/01/29$125,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned
0156-07-117Wichita Falls01/01/29$125,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned
0156-07-118Wichita Falls01/01/29$100,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned
0156-07-119Wichita Falls01/01/29$100,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned
0156-07-120Wichita Falls01/01/29$100,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned
0156-07-121Wichita Falls01/01/29$100,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned
0157-02-059Childress01/01/29$225,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned
0157-02-060Childress01/01/29$225,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned
0157-10-004Childress01/01/29$200,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned
0157-10-005Childress01/01/29$175,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned
0231-02-070Waco01/01/29$9,047,322.32ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$10,133,000.00$(1,085,677.68)-11%
0508-02-139Beaumont01/01/29$8,354,659.82ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned$9,357,218.00$(1,002,558.18)-11%
0685-01-033Wichita Falls01/01/29$150,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned
0711-02-046Childress01/01/29$125,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned
0909-00-076Waco01/01/29$4,471,365.74ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned$269,000.0010/31/45-6148-17 years$4,202,365.741562%
0949-01-018Childress01/01/29$160,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned
0950-01-030Childress01/01/29$120,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned
0970-03-025Childress01/01/29$450,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned
0971-03-011Childress01/01/29$570,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned
1225-01-014Childress01/01/29$230,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned
2011-01-010Childress01/01/29$240,000.00ConstructionBridgeUnassigned / Unassigned → Construction / BridgeUnassignedUnassigned
0508-01-410Houston03/01/29$42,867,000.00ConstructionRoadwayUnassigned / Unassigned → Construction / RoadwayUnassignedUnassigned03/06/2835912 months
293 rows · download CSV

Cost Changes

Cost movement is active across the pipeline, but the financial impact is concentrated in a small number of large projects. Total absolute cost movement reached $1.98B, with the top five projects accounting for 56.6% of that total, or $1.12B.

The largest individual changes include:

  • CSJ 0500-03-599: -$600.00M
  • CSJ 0018-05-089: +$255.61M
  • CSJ 0508-01-396: -$166.67M
  • CSJ 0502-01-244: -$56.00M
  • CSJ 0508-01-410: -$42.87M

At the aggregate level, construction accounts for the majority of the net change, with a total decrease of -$573.23M.

District-level changes are uneven. Houston drives the largest decrease at -$836.97M, while Laredo sees a significant increase of +$256.29M, with smaller movements across other districts.

For estimators, this creates two realities. Many projects are being repriced as estimates evolve, but a small number of large jobs are driving most of the dollar movement. The headline change in total pipeline value is not broad-based. It is driven by a handful of major adjustments.

CSJDistrictEst. Letting DateProject EstimateCurrent TypeCurrent SubtypePrev. TypePrev. SubtypePrev. CostCost Δ%Cost ΔLetting Δ (days)Letting Date ΔType/Subtype ΔLifecycle
0275-13-075Childress06/01/28$4,100,000.00ConstructionBridgeConstructionBridge$100,000.00$4,000,000.004000%
0033-06-129Abilene05/06/26$2,003,350.40ConstructionBridgeConstructionBridge$100,000.00$1,903,350.401903%
0909-00-076Waco01/01/29$4,471,365.74ConstructionBridgeUnassignedUnassigned$269,000.00$4,202,365.741562%-6148-17 yearsUnassigned / Unassigned → Construction / Bridge
0054-06-109Brownwood01/06/27$1,600,000.00ConstructionRoadwayUnassignedUnassigned$98,640.00$1,501,360.001522%Unassigned / Unassigned → Construction / Roadway
0033-06-130Abilene05/06/26$1,223,572.00ConstructionBridgeConstructionBridge$100,000.00$1,123,572.001124%
0421-04-035San Antonio10/05/27$657,314.00ConstructionRoadwayConstructionRoadway$65,358.00$591,956.00906%
0024-09-027San Antonio04/07/26$11,342,513.21ConstructionRoadwayConstructionRoadway$1,338,675.48$10,003,837.73747%
0017-10-294San Antonio04/07/26$23,214,563.41ConstructionRoadwayConstructionRoadway$3,160,403.08$20,054,160.33635%
0176-01-116Lufkin05/06/26$8,019,500.93ConstructionRoadwayConstructionRoadway$1,921,786.49$6,097,714.44317%
0258-08-035Waco03/03/27$8,846,153.85ConstructionRoadwayConstructionRoadway$2,407,999.00$6,438,154.85267%
0025-02-229San Antonio01/06/27$972,889.00ConstructionRoadwayConstructionRoadway$299,541.00$673,348.00225%923 months
1499-01-034San Antonio10/05/27$195,585.00ConstructionRoadwayConstructionRoadway$62,069.00$133,516.00215%
0124-04-042Wichita Falls11/01/28$1,232,735.00ConstructionRoadwayConstructionRoadway$439,317.00$793,418.00181%3651 year
0912-72-626Houston10/05/27$980,366.00ConstructionBridgeConstructionBridge$350,000.00$630,366.00180%
0031-01-024Childress05/03/28$5,000,000.00ConstructionRoadwayConstructionRoadway$1,792,000.00$3,208,000.00179%
0523-09-023Houston05/06/26$1,625,131.85ConstructionRoadwayConstructionRoadway$770,688.00$854,443.85111%
0262-02-031Bryan11/03/26$6,000,000.00ConstructionRoadwayConstructionRoadway$3,000,000.00$3,000,000.00100%
0646-02-033Tyler12/05/28$352,039.00ConstructionRoadwayConstructionRoadway$24,000,000.00$(23,647,961.00)-99%
0007-02-072Abilene05/06/26$26,670.00ConstructionBridgeConstructionBridge$370,000.00$(343,330.00)-93%
0007-02-073Abilene05/06/26$26,670.00ConstructionBridgeConstructionBridge$359,000.00$(332,330.00)-93%
2005-01-030Odessa04/07/26$42,689.00ConstructionRoadwayConstructionRoadway$593,352.00$(550,663.00)-93%
0007-02-074Abilene05/06/26$24,870.00ConstructionBridgeConstructionBridge$295,000.00$(270,130.00)-92%
2150-03-034Laredo04/07/26$806,013.55ConstructionRoadwayUnassignedUnassigned$419,000.00$387,013.5592%Unassigned / Unassigned → Construction / Roadway
0912-72-627Houston10/05/27$1,157,249.00ConstructionBridgeConstructionBridge$605,000.00$552,249.0091%
0338-03-094Houston05/06/26$32,440.00ConstructionRoadwayConstructionRoadway$348,560.00$(316,120.00)-91%
0006-04-086Abilene05/06/26$32,020.00ConstructionBridgeConstructionBridge$328,000.00$(295,980.00)-90%
0007-02-069Abilene05/06/26$34,620.00ConstructionBridgeConstructionBridge$339,000.00$(304,380.00)-90%
0007-02-070Abilene05/06/26$45,165.00ConstructionBridgeConstructionBridge$382,000.00$(336,835.00)-88%
0017-16-008San Antonio01/05/28$828,335.00ConstructionRoadwayConstructionRoadway$6,400,863.00$(5,572,528.00)-87%1264 months
0006-07-090Abilene05/06/26$42,035.00ConstructionBridgeConstructionBridge$321,000.00$(278,965.00)-87%
0006-07-089Abilene05/06/26$42,035.00ConstructionBridgeConstructionBridge$278,000.00$(235,965.00)-85%
0747-05-043Fort Worth05/06/26$3,701,393.15ConstructionRoadwayConstructionRoadway$2,000,000.00$1,701,393.1585%
0006-04-085Abilene05/06/26$51,145.00ConstructionBridgeConstructionBridge$328,000.00$(276,855.00)-84%
0090-02-057Amarillo04/07/26$330,464.50ConstructionBridgeConstructionBridge$180,000.00$150,464.5084%
0728-03-017Paris11/01/28$64,408.96ConstructionRoadwayUnassignedUnassigned$382,118.88$(317,709.92)-83%-34-1 monthUnassigned / Unassigned → Construction / Roadway
2255-02-033San Antonio10/05/27$186,521.00ConstructionRoadwayConstructionRoadway$957,722.00$(771,201.00)-81%
0211-10-050Yoakum07/01/26$500,000.00ConstructionRoadwayConstructionRoadway$2,618,342.00$(2,118,342.00)-81%
0007-06-268Brownwood10/06/26$1,500,000.00ConstructionRoadwayConstructionRoadway$7,600,000.00$(6,100,000.00)-80%-818-2 years
0630-01-059Pharr05/06/26$64,985.00ConstructionRoadwayConstructionRoadway$324,811.00$(259,826.00)-80%-119-4 months
1228-03-058Pharr05/06/26$63,360.00ConstructionRoadwayConstructionRoadway$299,715.00$(236,355.00)-79%-119-4 months
0007-02-067Abilene05/06/26$815,415.00ConstructionBridgeConstructionBridge$461,000.00$354,415.0077%
0007-02-071Abilene05/06/26$89,840.00ConstructionBridgeConstructionBridge$388,000.00$(298,160.00)-77%
0917-16-040Bryan08/05/26$617,323.07ConstructionBridgeConstructionBridge$350,000.00$267,323.0776%
1228-03-059Pharr05/06/26$54,710.00ConstructionRoadwayConstructionRoadway$225,398.00$(170,688.00)-76%-119-4 months
0092-06-112Dallas08/05/26$456,170.72ConstructionBridgeConstructionBridge$1,834,595.53$(1,378,424.81)-75%
0314-04-038Fort Worth07/01/26$23,218.09ConstructionBridgeConstructionBridge$13,287.76$9,930.3375%
2255-02-030San Antonio10/06/26$339,191.00ConstructionRoadwayConstructionRoadway$194,641.00$144,550.0074%
0291-05-051San Antonio01/06/27$1,286,888.00ConstructionRoadwayConstructionRoadway$753,940.00$532,948.0071%923 months
0917-16-041Bryan08/05/26$591,407.82ConstructionBridgeConstructionBridge$350,000.00$241,407.8269%
0052-01-046Lubbock10/04/28$27,200,001.00ConstructionBridgeUnassignedUnassigned$83,640,398.24$(56,440,397.24)-67%Unassigned / Unassigned → Construction / Bridge
0043-22-012Wichita Falls11/02/27$565,892.00ConstructionRoadwayConstructionRoadway$340,800.00$225,092.0066%
0114-01-070Austin07/01/26$620,000.00ConstructionNon RoadwayUnassignedUnassigned$1,800,000.00$(1,180,000.00)-66%Unassigned / Unassigned → Construction / Non Roadway
0909-22-206Waco05/06/26$94,904.00ConstructionBridgeConstructionBridge$275,000.00$(180,096.00)-65%
0216-01-062San Antonio04/07/26$589,966.45ConstructionRoadwayConstructionRoadway$357,143.00$232,823.4565%
0017-06-093San Antonio10/04/28$290,969.00ConstructionRoadwayConstructionRoadway$779,821.00$(488,852.00)-63%3651 year
0015-13-452Austin10/06/26$40,384,615.38ConstructionRoadwayConstructionRoadway$25,000,000.00$15,384,615.3862%
1745-01-020Houston04/07/26$951,319.38ConstructionRoadwayConstructionRoadway$2,503,999.00$(1,552,679.62)-62%
0271-17-188Houston04/15/26$1,600,000.00Non-LetBridgeUnassignedUnassigned$1,000,000.00$600,000.0060%Unassigned / Unassigned → Non-Let / Bridge
0271-04-070Houston12/05/28$194,998,997.70ConstructionRoadwayConstructionRoadway$479,159,276.00$(284,160,278.30)-59%
0271-04-093Houston12/05/28$46,286,366.28ConstructionRoadwayConstructionRoadway$111,483,482.00$(65,197,115.72)-58%
0024-05-105San Antonio10/06/26$145,199.00ConstructionRoadwayConstructionRoadway$344,000.00$(198,801.00)-58%-364-12 months
0002-02-066El Paso05/06/26$366,346.70ConstructionRoadwayConstructionRoadway$232,157.22$134,189.4858%
1421-01-027Beaumont04/07/26$836,754.00ConstructionRoadwayConstructionRoadway$2,000,000.00$(1,163,246.00)-58%
0089-07-145Yoakum12/05/28$213,653,605.60ConstructionRoadwayConstructionRoadway$500,000,000.00$(286,346,394.40)-57%
0187-01-054Bryan12/01/26$333,820.00ConstructionRoadwayConstructionRoadway$778,755.00$(444,935.00)-57%
0114-02-116Austin08/05/26$3,800,845.31ConstructionRoadwayConstructionRoadway$2,426,884.00$1,373,961.3157%
0549-01-041Paris03/03/27$2,200,000.00ConstructionRoadwayConstructionRoadway$5,000,000.00$(2,800,000.00)-56%
0168-09-197Amarillo12/01/26$847,000.00ConstructionNon RoadwayUnassignedUnassigned$547,000.00$300,000.0055%Unassigned / Unassigned → Construction / Non Roadway
0015-13-441Austin07/01/26$85,000,000.00ConstructionRoadwayConstructionRoadway$189,100,000.00$(104,100,000.00)-55%
0706-02-023Tyler04/07/26$3,491,717.55ConstructionRoadwayConstructionRoadway$2,250,000.00$1,241,717.5555%
0363-01-153Fort Worth06/17/26$647,757.55ConstructionLocal LetUnassignedUnassigned$420,708.00$227,049.5554%Unassigned / Unassigned → Construction / Local Let
0917-16-042Bryan08/05/26$534,337.38ConstructionBridgeConstructionBridge$350,000.00$184,337.3853%
2116-01-024Lufkin05/06/26$5,281,722.85ConstructionRoadwayConstructionRoadway$3,442,697.90$1,839,024.9553%
2100-01-074Austin08/04/27$46,340.00ConstructionBridgeConstructionBridge$97,456.73$(51,116.73)-52%
3538-01-067Houston01/05/28$1,000,000.00ConstructionNon RoadwayUnassignedUnassigned$2,061,504.00$(1,061,504.00)-51%Unassigned / Unassigned → Construction / Non Roadway
2835-01-008San Antonio10/05/27$75,176.00ConstructionRoadwayConstructionRoadway$49,925.00$25,251.0051%
0366-03-075San Antonio10/06/26$510,359.00ConstructionRoadwayConstructionRoadway$1,026,585.00$(516,226.00)-50%-364-12 months
0090-02-056Amarillo04/07/26$263,261.00ConstructionBridgeConstructionBridge$525,000.00$(261,739.00)-50%
0500-03-599Houston09/01/29$600,000,000.00ConstructionRoadway$1,165,067,716.00$(565,067,716.00)-49%36012 months
0008-06-052Fort Worth06/01/27$21,629,185.61ConstructionRoadwayConstructionRoadway$42,500,000.40$(20,870,814.79)-49%
0215-07-056San Antonio01/05/28$742,662.00ConstructionRoadwayConstructionRoadway$502,627.00$240,035.0048%923 months
0143-12-006San Antonio10/06/26$109,675.00ConstructionRoadwayConstructionRoadway$74,850.00$34,825.0047%-364-12 months
3089-01-013Dallas07/01/26$419,957.48ConstructionRoadwayConstructionRoadway$797,564.99$(377,607.51)-47%
0214-03-032Beaumont11/02/27$19,000,000.00ConstructionBridgeConstructionBridge$13,000,000.00$6,000,000.0046%
0095-04-079Dallas08/05/26$1,338,522.57ConstructionBridgeUnassignedUnassigned$2,463,673.44$(1,125,150.87)-46%Unassigned / Unassigned → Construction / Bridge
0446-01-056Yoakum09/02/26$1,600,000.00ConstructionRoadwayConstructionRoadway$1,100,000.00$500,000.0045%
0091-06-061Dallas07/01/26$2,734,376.72ConstructionRoadwayConstructionRoadway$5,005,185.35$(2,270,808.63)-45%
1586-01-093Pharr05/06/26$177,268.35ConstructionRoadwayConstructionRoadway$324,811.00$(147,542.65)-45%-119-4 months
1290-03-033Dallas04/07/26$690,184.30ConstructionRoadwayUnassignedUnassigned$1,266,000.00$(575,815.70)-45%Unassigned / Unassigned → Construction / Roadway
0495-03-070Tyler01/06/27$11,057,692.31ConstructionRoadwayConstructionRoadway$19,656,000.00$(8,598,307.69)-44%
0917-16-044Bryan08/05/26$574,104.91ConstructionBridgeConstructionBridge$400,000.00$174,104.9144%
1685-05-140Houston08/05/26$2,437,069.00ConstructionRoadwayConstructionRoadway$4,306,162.00$(1,869,093.00)-43%
0521-05-169San Antonio01/05/28$173,444.00ConstructionRoadwayConstructionRoadway$122,400.00$51,044.0042%923 months
0142-02-030San Antonio10/06/26$498,436.00ConstructionRoadwayConstructionRoadway$859,373.00$(360,937.00)-42%-364-12 months
0114-01-071Austin07/01/26$4,200,000.00ConstructionNon RoadwayUnassignedUnassigned$7,200,000.00$(3,000,000.00)-42%Unassigned / Unassigned → Construction / Non Roadway
2752-01-008Laredo04/07/26$907,598.60ConstructionBridgeConstructionRoadway$639,624.41$267,974.1942%Construction / Roadway → Construction / Bridge
1434-01-016San Antonio10/05/27$363,650.00ConstructionRoadwayConstructionRoadway$616,433.00$(252,783.00)-41%36412 months
2020-02-037San Antonio10/05/27$571,811.00ConstructionRoadwayConstructionRoadway$965,982.00$(394,171.00)-41%
0914-04-356Austin06/02/26$520,779.00ConstructionRoadwayConstructionRoadway$876,903.18$(356,124.18)-41%
0073-08-183San Antonio05/06/26$34,945,459.80ConstructionRoadwayConstructionRoadway$24,699,593.00$10,245,866.8041%
0151-02-026Austin05/06/26$10,279,819.07ConstructionRoadwayConstructionRoadway$17,555,042.02$(7,275,222.95)-41%
0276-01-046Laredo04/07/26$10,653,201.30ConstructionRoadwayConstructionRoadway$7,573,676.00$3,079,525.3041%
1014-03-065Dallas04/07/26$1,202,059.26ConstructionRoadwayUnassignedUnassigned$852,000.00$350,059.2641%Unassigned / Unassigned → Construction / Roadway
1388-01-010Tyler04/07/26$5,762,645.24ConstructionRoadwayConstructionRoadway$4,095,000.00$1,667,645.2441%
2560-01-079Lufkin08/04/27$7,615,384.62ConstructionRoadwayUnassignedUnassigned$12,700,000.00$(5,084,615.38)-40%-3862-11 yearsUnassigned / Unassigned → Construction / Roadway
0034-01-144Abilene07/01/27$7,000,000.00ConstructionRoadwayUnassignedUnassigned$5,000,000.00$2,000,000.0040%-62-2 monthsUnassigned / Unassigned → Construction / Roadway
0006-05-134Abilene05/06/26$349,520.00ConstructionBridgeConstructionBridge$578,000.00$(228,480.00)-40%
1429-01-039Pharr05/06/26$241,056.05ConstructionRoadwayConstructionRoadway$404,269.00$(163,212.95)-40%-119-4 months
0508-02-140Beaumont04/07/26$2,709,064.39ConstructionRoadwayConstructionRoadway$4,500,000.00$(1,790,935.61)-40%
0193-01-040San Antonio10/05/27$942,770.00ConstructionRoadwayConstructionRoadway$677,277.00$265,493.0039%
0024-06-070San Antonio04/06/27$35,000,000.00ConstructionRoadwayConstructionRoadway$25,100,000.00$9,900,000.0039%1264 months
0216-03-034San Antonio06/02/26$2,799,009.42ConstructionRoadwayConstructionRoadway$4,600,000.00$(1,800,990.58)-39%
0006-05-133Abilene05/06/26$186,020.00ConstructionBridgeConstructionBridge$307,000.00$(120,980.00)-39%
0698-03-107Pharr05/06/26$264,761.15ConstructionRoadwayConstructionRoadway$423,673.00$(158,911.85)-38%-119-4 months
1064-01-048Pharr05/06/26$200,135.05ConstructionRoadwayConstructionRoadway$324,811.00$(124,675.95)-38%-119-4 months
0328-01-016San Antonio10/06/26$387,945.00ConstructionRoadwayConstructionRoadway$613,131.00$(225,186.00)-37%-364-12 months
0549-01-042Paris11/01/28$95,821.44ConstructionRoadwayUnassignedUnassigned$150,458.88$(54,637.44)-36%-34-1 monthUnassigned / Unassigned → Construction / Roadway
0003-01-066El Paso05/06/26$175,344.38ConstructionRoadwayConstructionRoadway$272,105.97$(96,761.59)-36%
0309-01-049Amarillo04/07/26$926,403.90ConstructionBridgeConstructionBridge$681,600.00$244,803.9036%
0421-05-035San Antonio10/05/27$290,724.00ConstructionRoadwayConstructionRoadway$444,840.00$(154,116.00)-35%36412 months
0019-01-146Fort Worth06/02/26$19,442,730.37ConstructionRoadwayConstructionRoadway$29,842,782.00$(10,400,051.63)-35%903 months
0006-05-135Abilene05/06/26$350,180.00ConstructionBridgeConstructionBridge$542,000.00$(191,820.00)-35%
0601-01-067Beaumont05/06/26$1,647,471.00ConstructionRoadwayConstructionRoadway$2,550,000.00$(902,529.00)-35%
1091-04-033Dallas04/07/26$277,376.80ConstructionRoadwayUnassignedUnassigned$426,000.00$(148,623.20)-35%Unassigned / Unassigned → Construction / Roadway
0218-05-037Atlanta04/07/26$1,415,316.83ConstructionRoadwayConstructionRoadway$2,132,187.25$(716,870.42)-34%
0156-04-114Wichita Falls01/05/28$28,091,831.67ConstructionRoadwayConstructionRoadway$41,732,800.00$(13,640,968.33)-33%
0114-09-104Bryan04/06/27$2,000,000.00ConstructionRoadwayUnassignedUnassigned$3,000,000.00$(1,000,000.00)-33%Unassigned / Unassigned → Construction / Roadway
0081-03-047Dallas05/06/26$116,223,406.70ConstructionRoadwayUnassignedUnassigned$172,970,558.00$(56,747,151.30)-33%Unassigned / Unassigned → Construction / Roadway
0143-02-031San Antonio01/06/27$1,064,259.00ConstructionRoadwayConstructionRoadway$808,263.00$255,996.0032%923 months
2635-05-005Amarillo11/03/26$47,259,223.32ConstructionRoadwayUnassignedUnassigned$69,477,353.12$(22,218,129.80)-32%Unassigned / Unassigned → Construction / Roadway
0095-03-103Dallas10/06/26$9,784,408.00ConstructionBridgeConstructionBridge$14,294,730.66$(4,510,322.66)-32%
0114-02-120Austin08/05/26$3,577,315.00ConstructionRoadwayConstructionRoadway$2,714,671.00$862,644.0032%
0095-03-098Dallas10/06/26$4,724,338.30ConstructionBridgeConstructionBridge$6,884,505.24$(2,160,166.94)-31%
3538-01-061Houston05/06/26$2,218,948.70ConstructionRoadwayConstructionRoadway$1,692,410.00$526,538.7031%
1730-01-046San Antonio10/04/28$479,735.00ConstructionRoadwayConstructionRoadway$689,275.00$(209,540.00)-30%3651 year
0095-03-100Dallas10/06/26$7,924,367.30ConstructionBridgeConstructionBridge$11,392,450.94$(3,468,083.64)-30%
1421-01-028Beaumont04/07/26$3,075,865.50ConstructionRoadwayConstructionRoadway$4,400,000.00$(1,324,134.50)-30%
0095-03-099Dallas10/06/26$7,142,577.25ConstructionBridgeConstructionBridge$10,049,183.11$(2,906,605.86)-29%
0038-07-085Pharr05/06/26$231,845.30ConstructionRoadwayConstructionRoadway$324,811.00$(92,965.70)-29%-119-4 months
0177-14-038Houston05/06/26$4,957,990.50ConstructionRoadwayConstructionRoadway$6,986,976.00$(2,028,985.50)-29%
1051-03-001Dallas09/06/28$54,002,986.08ConstructionRoadwayUnassignedUnassigned$74,481,854.00$(20,478,867.92)-28%Unassigned / Unassigned → Construction / Roadway
0249-07-071Fort Worth06/01/28$71,927,225.18ConstructionBridgeConstructionBridge$100,000,000.00$(28,072,774.82)-28%
2104-02-042San Antonio01/05/28$152,551.00ConstructionRoadwayConstructionRoadway$212,411.00$(59,860.00)-28%923 months
0009-11-248Dallas02/02/27$57,043,890.08ConstructionRoadwayUnassignedUnassigned$79,147,850.00$(22,103,959.92)-28%Unassigned / Unassigned → Construction / Roadway
0220-01-039Pharr05/06/26$293,029.05ConstructionRoadwayConstructionRoadway$404,269.00$(111,239.95)-28%-119-4 months
0905-06-096Lubbock04/07/26$14,463,074.29ConstructionRoadwayConstructionRoadway$20,000,000.00$(5,536,925.71)-28%
0091-01-061Paris11/02/27$1,197,738.67ConstructionRoadwayConstructionRoadway$1,629,957.12$(432,218.45)-27%
0095-03-108Dallas10/06/26$7,397,762.80ConstructionBridgeConstructionBridge$10,094,022.52$(2,696,259.72)-27%
0095-03-109Dallas10/06/26$13,641,956.75ConstructionBridgeConstructionBridge$18,780,750.97$(5,138,794.22)-27%
0143-14-009San Antonio10/06/26$30,910.00ConstructionRoadwayConstructionRoadway$42,190.00$(11,280.00)-27%-364-12 months
2502-01-024Waco10/06/26$23,600,000.00ConstructionRoadwayConstructionRoadway$32,480,000.00$(8,880,000.00)-27%
2964-05-034Dallas06/02/26$949,650.98ConstructionRoadwayConstructionRoadway$747,600.00$202,050.9827%
0683-04-025Austin04/07/26$459,780.45ConstructionRoadwayConstructionRoadway$632,842.80$(173,062.35)-27%
0092-03-053Dallas09/06/28$62,131,255.85ConstructionRoadwayUnassignedUnassigned$83,760,305.57$(21,629,049.72)-26%Unassigned / Unassigned → Construction / Roadway
0718-01-077Dallas12/01/27$652,586.55ConstructionRoadwayConstructionRoadway$882,020.00$(229,433.45)-26%
0047-04-032Dallas11/03/26$46,922,696.42ConstructionRoadwayUnassignedUnassigned$63,694,143.00$(16,771,446.58)-26%Unassigned / Unassigned → Construction / Roadway
0492-04-034Tyler07/01/26$45,157,109.53ConstructionRoadwayConstructionRoadway$61,360,000.00$(16,202,890.47)-26%
0151-03-043Austin05/06/26$890,964.62ConstructionRoadwayConstructionRoadway$1,201,830.24$(310,865.62)-26%
0165-02-061Tyler07/01/26$66,001,500.00ConstructionRoadwayConstructionRoadway$88,500,000.00$(22,498,500.00)-25%
0683-05-015Austin04/07/26$440,350.80ConstructionRoadwayConstructionRoadway$587,777.40$(147,426.60)-25%
0073-03-071San Antonio06/02/26$1,140,659.29ConstructionRoadwayConstructionRoadway$1,491,158.00$(350,498.71)-24%
0863-01-081Pharr05/06/26$245,353.80ConstructionRoadwayConstructionRoadway$324,811.00$(79,457.20)-24%-119-4 months
1394-02-031Dallas05/06/26$1,048,966.35ConstructionRoadwayUnassignedUnassigned$848,400.00$200,566.3524%Unassigned / Unassigned → Construction / Roadway
0683-05-017Austin04/07/26$7,697,810.85ConstructionRoadwayConstructionRoadway$10,071,079.76$(2,373,268.91)-24%
2005-03-010Odessa04/07/26$620,623.00ConstructionRoadwayConstructionRoadway$500,618.00$120,005.0024%
0917-29-152Bryan01/06/27$1,324,348.00ConstructionRoadwayUnassignedUnassigned$1,716,395.50$(392,047.50)-23%1264 monthsUnassigned / Unassigned → Construction / Roadway
0526-01-023San Antonio10/06/26$90,851.00ConstructionRoadwayConstructionRoadway$117,480.00$(26,629.00)-23%-364-12 months
1655-01-036Abilene07/01/26$4,804,601.45ConstructionRoadwayConstructionRoadway$6,269,814.00$(1,465,212.55)-23%
0007-02-068Abilene05/06/26$385,665.00ConstructionBridgeConstructionBridge$504,000.00$(118,335.00)-23%
0156-04-127Wichita Falls05/06/26$3,996,578.52ConstructionRoadwayConstructionRoadway$5,199,999.00$(1,203,420.48)-23%
0008-05-029Fort Worth06/01/27$102,309,774.80ConstructionRoadwayConstructionRoadway$131,069,840.00$(28,760,065.20)-22%
2270-01-029Abilene07/01/26$570,188.00ConstructionRoadwayConstructionRoadway$730,750.00$(160,562.00)-22%
0195-02-091Dallas11/02/27$130,262,376.60ConstructionRoadwayConstructionRoadway$165,000,000.00$(34,737,623.40)-21%
0301-03-028San Antonio10/05/27$520,281.00ConstructionRoadwayConstructionRoadway$429,761.00$90,520.0021%36412 months
0108-11-022Paris06/01/28$15,679,422.00ConstructionRoadwayConstructionRoadway$19,510,400.00$(3,830,978.00)-20%
0521-05-168San Antonio01/05/28$325,096.00ConstructionRoadwayConstructionRoadway$408,000.00$(82,904.00)-20%923 months
0195-02-092Dallas11/03/26$157,580,992.90ConstructionRoadwayConstructionRoadway$196,881,863.00$(39,300,870.10)-20%
0095-03-101Dallas10/06/26$11,827,282.00ConstructionBridgeConstructionBridge$9,882,855.21$1,944,426.7920%
0492-04-041Tyler07/01/26$30,037,794.85ConstructionRoadwayConstructionRoadway$37,752,000.00$(7,714,205.15)-20%
0366-02-089San Antonio06/02/26$47,921,160.02ConstructionRoadwayConstructionRoadway$59,830,714.00$(11,909,553.98)-20%
2452-01-066San Antonio04/07/26$59,934,274.21ConstructionRoadwayConstructionRoadway$74,749,299.00$(14,815,024.79)-20%
3133-01-022Amarillo04/07/26$618,044.00ConstructionBridgeConstructionBridge$775,000.00$(156,956.00)-20%
1502-01-032Lubbock09/06/28$141,321,045.00ConstructionRoadwayConstructionRoadway$173,979,465.80$(32,658,420.80)-19%
0289-04-037Brownwood01/05/28$3,568,950.00ConstructionRoadwayUnassignedUnassigned$3,000,000.00$568,950.0019%36412 monthsUnassigned / Unassigned → Construction / Roadway
3632-01-002Pharr09/02/26$66,374,838.63ConstructionRoadwayConstructionRoadway$82,258,131.00$(15,883,292.37)-19%
0314-04-041Fort Worth07/01/26$26,222.89ConstructionBridgeConstructionBridge$22,120.68$4,102.2119%
0309-01-048Amarillo04/07/26$1,285,866.90ConstructionBridgeConstructionBridge$1,590,000.00$(304,133.10)-19%
0065-06-067Beaumont02/02/28$48,335,222.00ConstructionRoadwayConstructionRoadway$58,600,000.00$(10,264,778.00)-18%
0387-01-016Dallas11/02/27$6,039,010.45ConstructionRoadwayConstructionRoadway$7,340,124.07$(1,301,113.62)-18%
0025-03-108San Antonio10/06/26$150,609.00ConstructionRoadwayConstructionRoadway$127,920.00$22,689.0018%
0143-11-006San Antonio10/06/26$69,700.00ConstructionRoadwayConstructionRoadway$85,122.00$(15,422.00)-18%-364-12 months
0143-15-034San Antonio10/06/26$86,564.00ConstructionRoadwayConstructionRoadway$105,717.00$(19,153.00)-18%-364-12 months
0014-15-035Fort Worth08/05/26$1,515,651.69ConstructionRoadwayConstructionRoadway$1,838,179.00$(322,527.31)-18%
0165-03-036Tyler07/01/26$53,872,550.00ConstructionRoadwayConstructionRoadway$65,300,000.00$(11,427,450.00)-18%
0006-06-109Abilene06/02/26$123,039,621.00ConstructionRoadwayConstructionRoadway$150,000,000.00$(26,960,379.00)-18%
1186-02-028Austin05/06/26$3,339,793.85ConstructionRoadwayConstructionRoadway$4,064,877.41$(725,083.56)-18%
2094-01-063Pharr05/06/26$33,798,958.95ConstructionRoadwayConstructionRoadway$41,335,821.00$(7,536,862.05)-18%
0299-14-010Laredo04/07/26$97,708,652.77ConstructionRoadwayConstructionRoadway$119,587,049.00$(21,878,396.23)-18%
0683-05-016Austin04/07/26$1,721,002.10ConstructionRoadwayConstructionRoadway$2,103,080.55$(382,078.45)-18%
1239-01-034Brownwood01/05/28$125,000.00ConstructionBridgeUnassignedUnassigned$150,000.00$(25,000.00)-17%Unassigned / Unassigned → Construction / Bridge
0008-09-037Fort Worth09/01/27$17,300,891.50ConstructionRoadwayConstructionRoadway$14,739,999.84$2,560,891.6617%
0914-04-364Austin06/02/26$591,082.70ConstructionNon RoadwayConstructionNon Roadway$713,756.00$(122,673.30)-17%
0216-01-063San Antonio04/07/26$444,153.75ConstructionRoadwayConstructionRoadway$535,713.00$(91,559.25)-17%
0338-02-032Houston09/06/28$92,559,593.00ConstructionRoadwayConstructionRoadway$109,802,683.00$(17,243,090.00)-16%
1012-03-027Dallas03/03/27$9,106,958.96ConstructionRoadwayConstructionRoadway$7,834,052.56$1,272,906.4016%
0220-01-040Pharr05/06/26$261,235.01ConstructionRoadwayConstructionRoadway$225,398.00$35,837.0116%-119-4 months
0747-08-002Fort Worth05/06/26$7,024,465.15ConstructionRoadwayConstructionRoadway$8,400,000.00$(1,375,534.85)-16%
0047-09-034Dallas08/02/28$15,277,063.68ConstructionRoadwayConstructionRoadway$17,930,683.45$(2,653,619.77)-15%
0014-15-033Fort Worth08/05/26$9,188,337.11ConstructionRoadwayConstructionRoadway$10,800,000.00$(1,611,662.89)-15%
0220-04-049Pharr08/05/26$23,319,932.34ConstructionRoadwayConstructionRoadway$27,388,925.00$(4,068,992.66)-15%
0018-06-185Laredo06/02/26$79,245,892.42ConstructionRoadwayConstructionRoadway$93,505,334.00$(14,259,441.58)-15%
2157-01-022Atlanta04/07/26$1,130,952.25ConstructionRoadwayConstructionRoadway$982,170.20$148,782.0515%
0271-05-025Houston10/04/28$258,400,000.00ConstructionRoadwayConstructionRoadway$299,509,331.00$(41,109,331.00)-14%
0271-06-117Houston10/04/28$21,987,988.48ConstructionRoadwayConstructionRoadway$25,421,662.20$(3,433,673.72)-14%
0200-04-020Beaumont09/06/28$18,000,000.00ConstructionRoadwayConstructionRoadway$20,906,667.70$(2,906,667.70)-14%
0842-03-042Yoakum09/06/28$17,418,439.00ConstructionRoadwayConstructionRoadway$20,337,444.00$(2,919,005.00)-14%
0005-06-129Abilene06/01/27$4,000,000.00ConstructionRoadwayConstructionRoadway$3,500,000.00$500,000.0014%-154-5 months
0912-56-059Houston10/06/26$1,227,767.00ConstructionBridgeConstructionBridge$1,428,864.00$(201,097.00)-14%
0229-01-042Odessa05/06/26$48,984,668.33ConstructionRoadwayConstructionRoadway$43,100,000.00$5,884,668.3314%
0909-22-218Waco05/06/26$305,269.00ConstructionBridgeConstructionBridge$268,000.00$37,269.0014%
2230-01-020San Antonio04/07/26$30,754,969.97ConstructionRoadwayConstructionRoadway$35,818,217.00$(5,063,247.03)-14%
0675-06-103Bryan12/01/27$302,019,326.00ConstructionRoadwayConstructionRoadway$345,751,721.00$(43,732,395.00)-13%
0018-05-089Laredo06/01/27$255,607,277.70ConstructionRoadwayConstructionRoadway$295,277,876.00$(39,670,598.30)-13%4541 year
0085-02-053Atlanta01/06/27$7,660,750.00ConstructionRoadwayConstructionRoadway$8,810,750.00$(1,150,000.00)-13%
0143-01-066San Antonio01/06/27$763,955.00ConstructionRoadwayConstructionRoadway$881,052.00$(117,097.00)-13%923 months
2452-05-005San Antonio10/06/26$55,940.00ConstructionRoadwayConstructionRoadway$64,299.00$(8,359.00)-13%-364-12 months
0212-04-041Bryan09/02/26$12,490,493.00ConstructionBridgeConstructionBridge$14,396,824.00$(1,906,331.00)-13%
2158-01-020Tyler08/05/26$31,500,000.00ConstructionRoadwayConstructionRoadway$36,400,000.00$(4,900,000.00)-13%
0172-11-017Dallas05/06/26$1,104,055.45ConstructionRoadwayUnassignedUnassigned$1,272,000.00$(167,944.55)-13%Unassigned / Unassigned → Construction / Roadway
0747-05-042Fort Worth05/06/26$10,743,744.95ConstructionRoadwayConstructionRoadway$9,500,000.00$1,243,744.9513%
1330-02-052Fort Worth04/07/26$8,810,551.86ConstructionRoadwayUnassignedUnassigned$7,785,159.27$1,025,392.5913%Unassigned / Unassigned → Construction / Roadway
2523-02-074Houston11/01/28$72,541,920.00ConstructionBridgeConstructionBridge$82,434,000.00$(9,892,080.00)-12%
0095-02-096Dallas09/06/28$347,679,308.50ConstructionRoadwayUnassignedUnassigned$395,000,825.50$(47,321,517.00)-12%Unassigned / Unassigned → Construction / Roadway
0495-09-065Atlanta09/06/28$125,439,075.30ConstructionRoadwayConstructionRoadway$142,544,403.70$(17,105,328.40)-12%
1006-01-079Houston09/06/28$42,835,489.94ConstructionRoadwayConstructionRoadway$48,676,693.00$(5,841,203.06)-12%
1051-01-064Dallas09/06/28$101,546,735.70ConstructionRoadwayUnassignedUnassigned$115,412,344.00$(13,865,608.30)-12%Unassigned / Unassigned → Construction / Roadway
1159-01-030Dallas07/06/28$4,874,070.50ConstructionBridgeConstructionBridge$5,551,003.32$(676,932.82)-12%
2452-03-128San Antonio12/01/26$190,314,322.00ConstructionRoadwayUnassignedUnassigned$215,816,440.00$(25,502,118.00)-12%Unassigned / Unassigned → Construction / Roadway
0027-08-147Houston08/05/26$60,321,355.00ConstructionRoadwayConstructionRoadway$68,275,405.00$(7,954,050.00)-12%
0314-04-037Fort Worth07/01/26$437,865.47ConstructionBridgeConstructionBridge$391,798.68$46,066.7912%
0166-07-073Bryan06/02/26$404,475.00ConstructionBridgeUnassignedUnassigned$360,772.88$43,702.1212%Unassigned / Unassigned → Construction / Bridge
0255-06-073Pharr05/06/26$73,905,739.17ConstructionRoadwayConstructionRoadway$84,390,866.00$(10,485,126.83)-12%
0921-06-373Pharr05/06/26$628,778.15ConstructionRoadwayConstructionRoadway$559,313.35$69,464.8012%
0197-03-082Dallas04/07/26$2,282,217.58ConstructionRoadwayConstructionRoadway$2,595,355.76$(313,138.18)-12%
1245-02-053Amarillo04/07/26$6,093,863.96ConstructionRoadwayConstructionRoadway$6,900,000.00$(806,136.04)-12%
1685-05-105Houston01/01/31$7,770,938.39$8,703,450.00$(932,511.61)-11%7302 years
1835-01-026Waco01/01/31$15,000,000.00$16,799,999.00$(1,799,999.00)-11%7302 years
1794-01-023Lufkin10/01/29$6,834,659.82ConstructionRoadway$7,654,819.00$(820,159.18)-11%4521 year
2116-01-020Lufkin05/01/29$5,942,228.57ConstructionRoadwayConstructionRoadway$6,655,296.00$(713,067.43)-11%36312 months
0005-04-074Odessa01/01/29$50,435,715.00ConstructionBridgeUnassignedUnassigned$56,488,000.00$(6,052,285.00)-11%Unassigned / Unassigned → Construction / Bridge
0005-13-063Odessa01/01/29$240,150,931.00ConstructionRoadwayUnassignedUnassigned$268,969,042.70$(28,818,111.70)-11%Unassigned / Unassigned → Construction / Roadway
0015-13-423Austin01/01/29$1,502,285,713.00ConstructionRoadwayConstructionRoadway$1,682,559,998.00$(180,274,285.00)-11%
0054-07-086Brownwood01/01/29$25,000,000.00ConstructionRoadwayUnassignedUnassigned$28,000,000.00$(3,000,000.00)-11%Unassigned / Unassigned → Construction / Roadway
0231-02-070Waco01/01/29$9,047,322.32ConstructionRoadwayUnassignedUnassigned$10,133,000.00$(1,085,677.68)-11%Unassigned / Unassigned → Construction / Roadway
0508-02-139Beaumont01/01/29$8,354,659.82ConstructionRoadwayUnassignedUnassigned$9,357,218.00$(1,002,558.18)-11%Unassigned / Unassigned → Construction / Roadway
0195-02-090Dallas11/01/28$159,894,765.10ConstructionRoadwayUnassignedUnassigned$179,082,136.90$(19,187,371.80)-11%Unassigned / Unassigned → Construction / Roadway
3553-01-008Wichita Falls11/01/28$170,258.29ConstructionRoadwayUnassignedUnassigned$191,928.00$(21,669.71)-11%Unassigned / Unassigned → Construction / Roadway
0086-14-077Laredo10/04/28$33,330,081.25ConstructionRoadwayConstructionRoadway$37,329,691.00$(3,999,609.75)-11%
0086-14-086Laredo10/04/28$71,102,563.39ConstructionRoadwayConstructionRoadway$79,634,871.00$(8,532,307.61)-11%
0081-13-071Dallas09/06/28$232,779,659.10ConstructionRoadwayUnassignedUnassigned$260,713,231.60$(27,933,572.50)-11%Unassigned / Unassigned → Construction / Roadway
0200-05-036Beaumont09/06/28$90,000,000.00ConstructionRoadwayConstructionRoadway$100,800,000.00$(10,800,000.00)-11%
0451-01-053Dallas09/06/28$117,610,100.90ConstructionRoadwayUnassignedUnassigned$132,731,313.00$(15,121,212.10)-11%Unassigned / Unassigned → Construction / Roadway
1575-05-024Atlanta09/06/28$237,272,901.00ConstructionRoadwayConstructionRoadway$265,974,733.00$(28,701,832.00)-11%
3098-01-022Pharr09/06/28$23,644,598.00ConstructionRoadwayConstructionRoadway$26,481,950.00$(2,837,352.00)-11%
0114-09-091Bryan06/14/28$84,922,091.00Alternative DeliveryDesign BuildAlternative DeliveryDesign Build$94,955,858.28$(10,033,767.28)-11%
0907-00-243San Angelo06/13/28$8,509,000.00ConstructionLocal LetUnassignedUnassigned$9,581,000.00$(1,072,000.00)-11%Unassigned / Unassigned → Construction / Local Let
0050-01-094Bryan04/05/28$14,207,310.00ConstructionRoadwayConstructionRoadway$16,034,370.56$(1,827,060.56)-11%
3632-01-003Pharr02/02/28$90,352,435.00ConstructionRoadwayUnassignedUnassigned$101,194,726.00$(10,842,291.00)-11%Unassigned / Unassigned → Construction / Roadway
0217-02-037Atlanta11/01/27$18,642,426.36ConstructionRoadwayUnassignedUnassigned$20,879,517.00$(2,237,090.64)-11%Unassigned / Unassigned → Construction / Roadway
0043-02-078Childress10/05/27$18,800,000.00ConstructionRoadwayUnassignedUnassigned$21,056,000.00$(2,256,000.00)-11%Unassigned / Unassigned → Construction / Roadway
0610-06-098Atlanta09/01/27$14,560,000.00ConstructionRoadwayUnassignedUnassigned$16,307,200.00$(1,747,200.00)-11%Unassigned / Unassigned → Construction / Roadway
0024-07-068San Antonio05/05/27$278,604,536.00ConstructionRoadwayUnassignedUnassigned$312,037,081.00$(33,432,545.00)-11%Unassigned / Unassigned → Construction / Roadway
0168-09-186Amarillo05/05/27$16,617,549.00ConstructionRoadwayConstructionRoadway$18,572,730.00$(1,955,181.00)-11%
2635-02-034Amarillo05/05/27$26,052,115.48ConstructionRoadwayConstructionRoadway$29,113,322.92$(3,061,207.44)-11%
2635-03-023Amarillo05/05/27$24,592,354.00ConstructionRoadwayConstructionRoadway$27,518,877.36$(2,926,523.36)-11%
2635-03-028Amarillo05/05/27$145,779,362.00ConstructionBridgeConstructionBridge$163,127,301.80$(17,347,939.80)-11%
0055-08-120Waco02/02/27$39,892,364.56ConstructionRoadwayConstructionRoadway$44,739,109.00$(4,846,744.44)-11%
0195-01-111Wichita Falls12/01/26$320,000,000.00ConstructionRoadwayConstructionRoadway$361,219,998.80$(41,219,998.80)-11%
0014-15-036Fort Worth08/05/26$20,865,852.16ConstructionRoadwayConstructionRoadway$18,856,479.00$2,009,373.1611%
0002-05-052El Paso05/06/26$539,871.38ConstructionRoadwayConstructionRoadway$609,787.61$(69,916.23)-11%
0187-05-061Houston05/06/26$4,313,954.25ConstructionRoadwayConstructionRoadway$3,885,669.45$428,284.8011%
0901-19-212Paris05/06/26$924,207.93ConstructionBridgeConstructionBridge$835,000.00$89,207.9311%
0914-04-340Austin05/06/26$442,945.20ConstructionRoadwayConstructionRoadway$500,393.13$(57,447.93)-11%
1228-03-057Pharr05/06/26$249,764.25ConstructionRoadwayConstructionRoadway$225,398.00$24,366.2511%-119-4 months
0263-05-027Abilene06/01/28$2,358,156.80ConstructionRoadwayUnassignedUnassigned$2,613,672.48$(255,515.68)-10%Unassigned / Unassigned → Construction / Roadway
0907-00-242San Angelo04/05/28$1,956,000.00ConstructionRoadwayUnassignedUnassigned$1,778,000.00$178,000.0010%-8-8 daysUnassigned / Unassigned → Construction / Roadway
0267-01-036Yoakum05/05/27$1,338,000.00ConstructionRoadwayUnassignedUnassigned$1,216,000.00$122,000.0010%Unassigned / Unassigned → Construction / Roadway
0918-47-401Dallas08/05/26$2,427,791.55ConstructionRoadwayConstructionRoadway$2,203,920.68$223,870.8710%
0921-02-525Pharr08/05/26$783,996.83ConstructionRoadwayConstructionRoadway$873,656.84$(89,660.01)-10%
0314-04-040Fort Worth07/01/26$43,907.58ConstructionBridgeConstructionBridge$39,819.12$4,088.4610%
2263-02-107Corpus Christi05/06/26$43,826,715.00ConstructionFerry BoatConstructionFerry Boat$40,000,000.00$3,826,715.0010%
0986-03-015Austin04/07/26$1,713,954.79ConstructionRoadwayUnassignedUnassigned$1,911,737.44$(197,782.65)-10%Unassigned / Unassigned → Construction / Roadway
0016-05-111San Antonio09/06/28$135,556,841.00ConstructionRoadwayConstructionRoadway$148,231,406.20$(12,674,565.20)-9%
0016-06-115San Antonio09/06/28$338,438,190.00ConstructionRoadwayConstructionRoadway$370,082,161.00$(31,643,971.00)-9%
0180-10-082Corpus Christi04/05/28$70,750,000.00ConstructionRoadwayConstructionRoadway$77,490,000.00$(6,740,000.00)-9%
0080-03-049Fort Worth11/03/26$115,461,159.10ConstructionRoadwayUnassignedUnassigned$126,999,999.80$(11,538,840.70)-9%Unassigned / Unassigned → Construction / Roadway
0095-03-102Dallas10/06/26$15,558,783.75ConstructionBridgeConstructionBridge$17,080,561.45$(1,521,777.70)-9%
0015-13-432Austin07/01/26$254,000,000.00ConstructionBridgeConstructionBridge$232,000,000.00$22,000,000.009%
0353-03-117Fort Worth06/18/26$516,490.30ConstructionLocal LetUnassignedUnassigned$568,354.60$(51,864.30)-9%Unassigned / Unassigned → Construction / Local Let
0926-05-009Lufkin10/04/28$9,169,916.07ConstructionRoadwayUnassignedUnassigned$8,482,142.86$687,773.218%Unassigned / Unassigned → Construction / Roadway
0976-02-086Houston08/02/28$70,907,942.00ConstructionRoadwayConstructionRoadway$77,064,068.00$(6,156,126.00)-8%
0049-09-092Bryan04/05/28$5,658,269.00ConstructionRoadwayConstructionRoadway$6,149,406.00$(491,137.00)-8%
0180-06-118Corpus Christi04/05/28$56,907,500.00ConstructionRoadwayConstructionRoadway$62,000,100.00$(5,092,600.00)-8%
2452-01-074San Antonio01/05/28$120,561.00ConstructionRoadwayConstructionRoadway$111,889.00$8,672.008%923 months
0027-13-201Houston10/05/27$710,022,858.00ConstructionRoadwayConstructionRoadway$771,763,977.80$(61,741,119.80)-8%
3416-01-012Houston09/01/27$74,299,327.00ConstructionRoadwayConstructionRoadway$80,760,137.01$(6,460,810.01)-8%
0171-11-003Bryan08/04/27$118,439,867.00ConstructionRoadwayConstructionRoadway$128,720,447.40$(10,280,580.40)-8%
0675-05-105Bryan08/04/27$89,176,337.00ConstructionRoadwayConstructionRoadway$96,916,842.00$(7,740,505.00)-8%
0068-01-073Lubbock10/06/26$135,847,883.00ConstructionRoadwayConstructionRoadway$148,162,938.60$(12,315,055.60)-8%
0912-34-209Houston10/06/26$1,085,413.00ConstructionBridgeConstructionBridge$1,178,554.00$(93,141.00)-8%
1741-02-039San Antonio10/06/26$294,195.00ConstructionRoadwayConstructionRoadway$318,598.00$(24,403.00)-8%
0173-04-063Dallas09/02/26$883,168.07ConstructionRoadwayConstructionRoadway$818,248.75$64,919.328%
0212-03-058Bryan09/02/26$13,742,128.00ConstructionBridgeConstructionBridge$14,934,943.92$(1,192,815.92)-8%
0212-03-059Bryan09/02/26$14,811,612.00ConstructionBridgeConstructionBridge$16,097,259.36$(1,285,647.36)-8%
0314-04-039Fort Worth07/01/26$25,160.09ConstructionBridgeConstructionBridge$27,382.20$(2,222.11)-8%
0370-05-057Yoakum07/01/26$540,000.00ConstructionRoadwayUnassignedUnassigned$500,000.00$40,000.008%Unassigned / Unassigned → Construction / Roadway
0508-07-296Houston05/06/26$646,244.64ConstructionRoadwayConstructionRoadway$599,300.64$46,944.008%
0079-05-069Fort Worth04/07/26$27,891.23ConstructionBridgeConstructionBridge$30,241.77$(2,350.54)-8%
0543-02-089Houston04/07/26$770,105.75ConstructionBridgeUnassignedUnassigned$836,725.75$(66,620.00)-8%Unassigned / Unassigned → Construction / Bridge
1016-04-021Dallas04/07/26$3,804,796.15ConstructionRoadwayConstructionRoadway$4,149,692.15$(344,896.00)-8%
1823-01-011Odessa04/07/26$7,852,149.83ConstructionRoadwayConstructionRoadway$7,300,000.00$552,149.838%
0508-01-396Houston03/01/32$166,666,667.00ConstructionRoadway$180,000,000.40$(13,333,333.40)-7%14554 years
0692-01-020Paris10/04/28$33,000,000.00ConstructionRoadwayConstructionRoadway$35,640,000.00$(2,640,000.00)-7%
1730-02-024San Antonio10/04/28$369,611.00ConstructionRoadwayConstructionRoadway$398,288.00$(28,677.00)-7%3651 year
0014-10-074Waco09/06/28$5,092,592.59ConstructionBridgeConstructionBridge$5,500,000.00$(407,407.41)-7%
0014-10-075Waco09/06/28$5,092,592.59ConstructionBridgeConstructionBridge$5,500,000.00$(407,407.41)-7%
0038-04-064Pharr09/06/28$83,428,593.00ConstructionRoadwayConstructionRoadway$90,102,879.00$(6,674,286.00)-7%
0495-10-105Atlanta09/06/28$5,976,110.38ConstructionRoadwayConstructionRoadway$6,454,190.00$(478,079.62)-7%
3100-02-002Pharr09/06/28$37,840,008.12ConstructionRoadwayConstructionRoadway$40,867,208.00$(3,027,199.88)-7%
3629-02-002Pharr09/06/28$167,568,412.00ConstructionRoadwayConstructionRoadway$180,973,885.00$(13,405,473.00)-7%
0265-01-118Austin08/02/28$419,999.07ConstructionRoadwayConstructionRoadway$453,600.00$(33,600.93)-7%
0265-02-043Austin08/02/28$1,600,000.00ConstructionRoadwayConstructionRoadway$1,728,000.00$(128,000.00)-7%
0069-01-061Abilene07/06/28$20,000,000.00ConstructionRoadwayConstructionRoadway$21,600,000.00$(1,600,000.00)-7%
0069-02-030San Angelo07/06/28$5,000,000.00ConstructionRoadwayConstructionRoadway$5,400,000.00$(400,000.00)-7%
0186-06-082Bryan06/14/28$199,548,797.00Alternative DeliveryDesign BuildAlternative DeliveryDesign Build$215,512,700.00$(15,963,903.00)-7%
0251-03-022Waco05/03/28$11,407,407.41ConstructionRoadwayConstructionRoadway$12,319,999.00$(912,591.59)-7%
0251-04-023Brownwood05/03/28$111,585,185.20ConstructionRoadwayConstructionRoadway$120,512,000.00$(8,926,814.80)-7%
2977-01-011Dallas05/03/28$12,330,496.94ConstructionRoadwayConstructionRoadway$13,190,108.33$(859,611.39)-7%
3409-01-011Waco05/01/28$6,200,000.00ConstructionRoadwayConstructionRoadway$6,678,325.00$(478,325.00)-7%
1690-01-131Paris04/05/28$144,217,308.00ConstructionRoadwayConstructionRoadway$155,754,265.00$(11,536,957.00)-7%
0047-05-061Dallas03/07/28$52,099,915.91ConstructionRoadwayConstructionRoadway$56,267,909.18$(4,167,993.27)-7%
0065-07-065Beaumont02/02/28$13,629,629.00ConstructionRoadwayConstructionRoadway$14,719,999.00$(1,090,370.00)-7%
0035-05-059San Angelo01/05/28$81,417,639.00ConstructionRoadwayConstructionRoadway$87,931,050.12$(6,513,411.12)-7%
1803-01-092Pharr01/05/28$14,796,701.00ConstructionRoadwayConstructionRoadway$15,980,437.00$(1,183,736.00)-7%
2121-02-186El Paso12/01/27$462,962,963.00ConstructionRoadwayConstructionRoadway$500,000,000.00$(37,037,037.00)-7%
0545-04-048Tyler09/01/27$151,000,000.00ConstructionRoadwayConstructionRoadway$163,080,000.00$(12,080,000.00)-7%
1149-01-033Austin09/01/27$56,500,000.00ConstructionRoadwayConstructionRoadway$61,020,000.00$(4,520,000.00)-7%
3138-01-020Bryan07/01/27$100,882,922.00ConstructionRoadwayConstructionRoadway$109,003,297.00$(8,120,375.00)-7%
1012-03-028Dallas03/03/27$6,692,513.42ConstructionRoadwayConstructionRoadway$6,278,088.98$414,424.447%
1601-02-036Fort Worth01/06/27$8,441,246.00ConstructionRoadwayUnassignedUnassigned$9,033,592.70$(592,346.70)-7%Unassigned / Unassigned → Construction / Roadway
0215-11-025San Antonio10/06/26$331,148.00ConstructionRoadwayConstructionRoadway$356,840.00$(25,692.00)-7%-364-12 months
0215-11-026San Antonio10/06/26$154,100.00ConstructionRoadwayConstructionRoadway$166,056.00$(11,956.00)-7%-364-12 months
0842-03-037Yoakum10/06/26$33,218,001.00ConstructionRoadwayConstructionRoadway$35,863,495.00$(2,645,494.00)-7%
0143-10-058Yoakum09/02/26$9,000,000.00ConstructionRoadwayConstructionRoadway$9,724,860.00$(724,860.00)-7%
0051-09-128Houston08/05/26$4,032,301.00ConstructionRoadwayConstructionRoadway$4,316,678.00$(284,377.00)-7%
0178-02-092Houston06/04/26$186,793,464.00Alternative DeliveryDesign BuildAlternative DeliveryDesign Build$175,379,122.00$11,414,342.007%
0196-07-034Dallas06/02/26$98,325,151.30ConstructionBridgeConstructionBridge$106,035,488.00$(7,710,336.70)-7%
0523-10-049Houston05/06/26$1,163,842.80ConstructionRoadwayConstructionRoadway$1,088,363.00$75,479.807%
0091-06-062Dallas04/07/26$400,030.00ConstructionRoadwayConstructionRoadway$431,780.00$(31,750.00)-7%
0197-02-138Dallas04/07/26$2,133,482.80ConstructionRoadwayConstructionRoadway$2,287,242.04$(153,759.24)-7%
0909-40-098Waco04/07/26$408,388.21ConstructionBridgeConstructionBridge$438,822.13$(30,433.92)-7%
0918-47-450Dallas04/07/26$408,665.50ConstructionRoadwayConstructionRoadway$437,984.00$(29,318.50)-7%
0933-01-044Lubbock04/07/26$4,462,426.10ConstructionBridgeConstructionBridge$4,163,000.00$299,426.107%
2374-01-196Dallas04/07/26$424,730.00ConstructionRoadwayConstructionRoadway$457,425.00$(32,695.00)-7%
3510-05-048Houston04/07/26$67,799,039.32ConstructionRoadwayConstructionRoadway$72,645,337.99$(4,846,298.67)-7%
0221-01-078Paris03/07/28$108,728,384.30ConstructionRoadwayConstructionRoadway$115,672,734.00$(6,944,349.70)-6%
2121-02-167El Paso07/01/27$30,118,818.27ConstructionRoadwayConstructionRoadway$28,475,973.00$1,642,845.276%3651 year
0172-12-007Dallas02/02/27$51,472,754.02ConstructionRoadwayConstructionRoadway$54,618,327.00$(3,145,572.98)-6%
0128-04-045Brownwood01/06/27$2,644,230.00ConstructionRoadwayUnassignedUnassigned$2,500,000.00$144,230.006%Unassigned / Unassigned → Construction / Roadway
0372-01-101Corpus Christi01/06/27$102,000,000.00ConstructionRoadwayConstructionRoadway$108,160,000.00$(6,160,000.00)-6%
1197-01-027Austin01/06/27$3,110,829.60ConstructionRoadwayConstructionRoadway$2,942,307.69$168,521.916%
0917-30-068Bryan11/03/26$584,088.08ConstructionBridgeConstructionBridge$550,000.00$34,088.086%
0909-22-211Waco05/06/26$269,520.50ConstructionBridgeConstructionBridge$255,000.00$14,520.506%
3256-02-121Houston05/06/26$2,286,187.03ConstructionRoadwayUnassignedUnassigned$2,436,237.84$(150,050.81)-6%Unassigned / Unassigned → Construction / Roadway
0079-05-067Fort Worth04/07/26$2,613,446.11ConstructionBridgeConstructionBridge$2,770,316.50$(156,870.39)-6%
0079-05-073Fort Worth04/07/26$72,390.52ConstructionBridgeUnassignedUnassigned$76,624.33$(4,233.81)-6%Unassigned / Unassigned → Construction / Bridge
0909-40-086Waco04/07/26$656,233.49ConstructionBridgeConstructionBridge$699,904.28$(43,670.79)-6%
0918-47-444Dallas04/07/26$442,486.00ConstructionRoadwayConstructionRoadway$472,374.00$(29,888.00)-6%
0918-47-446Dallas04/07/26$500,829.50ConstructionRoadwayConstructionRoadway$531,748.50$(30,919.00)-6%
3417-02-043Austin09/03/27$1,805,976.85Non-LetRoadwayUnassignedUnassigned$1,712,962.96$93,013.895%Unassigned / Unassigned → Non-Let / Roadway
1492-01-013Dallas03/03/27$1,398,066.02ConstructionRoadwayConstructionRoadway$1,466,641.12$(68,575.10)-5%
0912-37-247Houston10/06/26$769,262.00ConstructionBridgeConstructionBridge$806,146.00$(36,884.00)-5%
1502-01-031Lubbock10/06/26$164,867,291.60ConstructionRoadwayConstructionRoadway$173,944,900.10$(9,077,608.50)-5%
1548-01-018San Antonio10/06/26$448,540.00ConstructionRoadwayConstructionRoadway$474,012.00$(25,472.00)-5%-364-12 months
0266-05-055Yoakum09/02/26$1,050,000.00ConstructionRoadwayConstructionRoadway$1,100,000.00$(50,000.00)-5%
0314-04-036Fort Worth07/01/26$380,384.33ConstructionBridgeConstructionBridge$399,381.13$(18,996.80)-5%
0389-02-059Beaumont05/06/26$4,682,081.87ConstructionRoadwayConstructionRoadway$4,466,985.00$215,096.875%
1064-01-027Pharr05/06/26$33,504,116.11ConstructionRoadwayConstructionRoadway$35,262,482.00$(1,758,365.89)-5%
0094-02-147Fort Worth04/07/26$5,591,881.98ConstructionRoadwayConstructionRoadway$5,883,006.44$(291,124.46)-5%
1006-01-082Houston04/07/26$495,827.00ConstructionRoadwayConstructionRoadway$519,567.00$(23,740.00)-5%
3510-05-047Houston04/07/26$78,509,398.62ConstructionRoadwayConstructionRoadway$83,067,703.44$(4,558,304.82)-5%
0339-04-036Beaumont01/01/29$115,100,000.00ConstructionRoadwayConstructionRoadway$119,784,000.00$(4,684,000.00)-4%
0249-07-072Fort Worth09/06/28$42,784,246.29ConstructionBridgeUnassignedUnassigned$41,153,041.00$1,631,205.294%Unassigned / Unassigned → Construction / Bridge
1024-01-077Beaumont05/03/28$70,192,307.69ConstructionRoadwayConstructionRoadway$73,000,000.00$(2,807,692.31)-4%
0180-11-016Corpus Christi04/05/28$2,600,000.00ConstructionRoadwayConstructionRoadway$2,700,000.00$(100,000.00)-4%
0248-06-017Tyler04/05/28$11,700,000.00ConstructionRoadwayConstructionRoadway$12,168,000.00$(468,000.00)-4%
0374-07-027El Paso04/05/28$20,941,251.92ConstructionRoadwayConstructionRoadway$21,778,901.00$(837,649.08)-4%
3290-02-009Tyler04/05/28$14,500,000.00ConstructionRoadwayConstructionRoadway$15,080,000.00$(580,000.00)-4%
0221-01-079Paris03/07/28$95,956,769.00ConstructionRoadwayConstructionRoadway$99,795,039.00$(3,838,270.00)-4%
0495-02-071Tyler02/02/28$8,653,846.15ConstructionRoadwayConstructionRoadway$9,000,000.00$(346,153.85)-4%
0495-03-076Tyler02/02/28$3,846,153.85ConstructionRoadwayUnassignedUnassigned$4,000,000.00$(153,846.15)-4%Unassigned / Unassigned → Construction / Roadway
1803-01-094Pharr01/05/28$56,017,974.00ConstructionRoadwayConstructionRoadway$58,258,692.96$(2,240,718.96)-4%
0214-03-035Beaumont11/02/27$26,584,615.38ConstructionBridgeConstructionBridge$27,648,000.00$(1,063,384.62)-4%
0908-33-118Abilene08/04/27$613,311.00ConstructionRoadwayUnassignedUnassigned$640,506.41$(27,195.41)-4%Unassigned / Unassigned → Construction / Roadway
0039-10-091Pharr07/01/27$185,000,000.00ConstructionRoadwayConstructionRoadway$192,400,000.00$(7,400,000.00)-4%
0508-01-397Houston07/01/27$262,691,401.00ConstructionRoadwayConstructionRoadway$273,199,057.00$(10,507,656.00)-4%
1810-01-033Lufkin06/01/27$9,167,239.01ConstructionRoadwayConstructionRoadway$9,533,928.57$(366,689.56)-4%-491-1 year
0178-09-019Houston05/05/27$48,016,232.69ConstructionRoadwayConstructionRoadway$49,936,882.00$(1,920,649.31)-4%
0342-01-093Pharr05/05/27$29,063,727.00ConstructionRoadwayConstructionRoadway$30,226,276.08$(1,162,549.08)-4%
0865-01-108Pharr05/05/27$21,354,188.00ConstructionRoadwayConstructionRoadway$22,208,355.00$(854,167.00)-4%
2398-01-062Abilene05/05/27$10,384,616.00ConstructionRoadwayConstructionRoadway$10,800,000.00$(415,384.00)-4%
0005-14-092Odessa03/03/27$213,979,449.80ConstructionRoadwayConstructionRoadway$222,538,626.00$(8,559,176.20)-4%
0045-08-039Paris03/03/27$124,861,809.00ConstructionRoadwayConstructionRoadway$129,856,280.00$(4,994,471.00)-4%
0045-09-103Paris03/03/27$93,663,191.00ConstructionRoadwayConstructionRoadway$97,409,718.64$(3,746,527.64)-4%
0111-03-064Houston02/02/27$108,568,030.00ConstructionRoadwayConstructionRoadway$112,910,751.00$(4,342,721.00)-4%
0265-03-042Austin02/02/27$60,122,400.00ConstructionRoadwayConstructionRoadway$62,527,296.00$(2,404,896.00)-4%
0342-01-103Pharr02/02/27$12,043,275.00ConstructionRoadwayConstructionRoadway$12,525,006.00$(481,731.00)-4%
0252-01-084Austin12/01/26$10,866,345.19ConstructionRoadwayConstructionRoadway$11,301,000.00$(434,654.81)-4%
0005-02-112Odessa10/06/26$6,346,155.00ConstructionRail - SafetyConstructionRail - Safety$6,600,001.20$(253,846.20)-4%
0133-01-055Childress10/06/26$14,000,000.00ConstructionRoadwayConstructionRoadway$14,560,000.00$(560,000.00)-4%
0143-03-049San Antonio10/06/26$69,947,811.00ConstructionRoadwayConstructionRoadway$72,900,000.16$(2,952,189.16)-4%
0200-01-093Lufkin10/06/26$36,934,615.38ConstructionRoadwayConstructionRoadway$38,411,999.00$(1,477,383.62)-4%
0015-13-437Austin09/02/26$387,000,000.00ConstructionRoadwayConstructionRail$402,480,000.00$(15,480,000.00)-4%Construction / Rail → Construction / Roadway
0902-48-579Fort Worth08/05/26$23,961,192.05ConstructionRoadwayConstructionRoadway$25,056,079.00$(1,094,886.95)-4%
0167-01-122El Paso06/02/26$85,272,327.66ConstructionRoadwayConstructionRoadway$88,452,915.00$(3,180,587.34)-4%
0047-03-091Paris04/07/26$147,195,094.80ConstructionRoadwayUnassignedUnassigned$152,906,394.00$(5,711,299.20)-4%Unassigned / Unassigned → Construction / Roadway
0079-05-066Fort Worth04/07/26$73,735.15ConstructionBridgeConstructionBridge$76,821.46$(3,086.31)-4%
0299-04-083Laredo04/07/26$10,629,521.20ConstructionRoadwayConstructionRoadway$11,049,043.00$(419,521.80)-4%
0674-01-083El Paso04/07/26$1,250,605.30ConstructionRoadwayConstructionRoadway$1,307,462.30$(56,857.00)-4%
0909-40-081Waco04/07/26$393,796.64ConstructionBridgeConstructionBridge$408,468.48$(14,671.84)-4%
0922-48-004Laredo04/07/26$723,938.06ConstructionBridgeConstructionBridge$698,962.51$24,975.554%
1508-01-010Laredo04/07/26$4,480,000.35ConstructionRoadwayConstructionRoadway$4,646,337.92$(166,337.57)-4%
1790-02-048Tyler04/07/26$1,629,505.50ConstructionBridgeConstructionBridge$1,690,315.50$(60,810.00)-4%
1849-03-023Paris11/01/28$1,294,719.36ConstructionRoadwayUnassignedUnassigned$1,337,582.40$(42,863.04)-3%-34-1 monthUnassigned / Unassigned → Construction / Roadway
0048-04-109Dallas05/06/26$615,349.25ConstructionRoadwayUnassignedUnassigned$636,000.00$(20,650.75)-3%Unassigned / Unassigned → Construction / Roadway
0187-02-074Yoakum05/06/26$718,612.65ConstructionRoadwayConstructionRoadway$741,114.00$(22,501.35)-3%
0187-05-062Houston05/06/26$6,075,775.00ConstructionRoadwayConstructionRoadway$5,918,914.90$156,860.103%
0442-02-166Dallas05/06/26$12,657,475.67ConstructionRoadwayConstructionRoadway$13,006,805.93$(349,330.26)-3%-181-6 months
0815-08-044Dallas05/06/26$1,230,656.05ConstructionRoadwayUnassignedUnassigned$1,272,000.00$(41,343.95)-3%Unassigned / Unassigned → Construction / Roadway
0079-05-068Fort Worth04/07/26$1,400,688.19ConstructionBridgeConstructionBridge$1,446,179.03$(45,490.84)-3%
0337-01-053Austin04/07/26$7,329,605.75ConstructionRoadwayConstructionRoadway$7,553,905.75$(224,300.00)-3%
0337-02-054Austin04/07/26$2,566,158.62ConstructionRoadwayUnassignedUnassigned$2,645,257.53$(79,098.91)-3%Unassigned / Unassigned → Construction / Roadway
0353-05-133Dallas04/07/26$660,175.50ConstructionRoadwayConstructionRoadway$680,452.90$(20,277.40)-3%
0909-40-089Waco04/07/26$746,742.67ConstructionBridgeConstructionBridge$772,186.82$(25,444.15)-3%
1062-04-063Houston04/07/26$1,703,466.80ConstructionRoadwayConstructionRoadway$1,655,946.32$47,520.483%
0683-02-086Austin08/04/27$4,423,285.43ConstructionBridgeConstructionBridge$4,507,875.00$(84,589.57)-2%
0371-04-062Corpus Christi01/06/27$51,000,000.00ConstructionRoadwayConstructionRoadway$52,000,000.00$(1,000,000.00)-2%
1068-04-181Dallas06/02/26$653,883.04ConstructionRoadwayConstructionRoadway$666,808.73$(12,925.69)-2%
0521-04-285San Antonio05/06/26$159,536,000.00ConstructionRoadwayConstructionRoadway$162,726,720.00$(3,190,720.00)-2%
0643-05-067Bryan05/06/26$2,539,776.40ConstructionRoadwayConstructionRoadway$2,579,522.00$(39,745.60)-2%
0005-08-109Abilene04/07/26$12,628,622.92ConstructionRoadwayConstructionRoadway$12,862,294.00$(233,671.08)-2%-301-10 months
0172-09-046Fort Worth04/07/26$286,038.00ConstructionRoadwayUnassignedUnassigned$280,000.00$6,038.002%Unassigned / Unassigned → Construction / Roadway
0598-02-120Houston04/07/26$4,974,658.00ConstructionRoadwayConstructionRoadway$5,083,588.00$(108,930.00)-2%
0908-23-058Abilene04/07/26$744,831.50ConstructionBridgeConstructionBridge$729,831.50$15,000.002%-330-11 months
0216-03-039San Antonio10/01/29$240,010.00ConstructionRoadway$241,390.00$(1,380.00)-1%7272 years
1009-01-044San Antonio10/06/26$389,823.00ConstructionRoadwayConstructionRoadway$392,063.00$(2,240.00)-1%-364-12 months
1899-01-020San Antonio10/06/26$159,286.00ConstructionRoadwayConstructionRoadway$160,201.00$(915.00)-1%-364-12 months
1899-02-023San Antonio10/06/26$489,943.00ConstructionRoadwayConstructionRoadway$492,759.00$(2,816.00)-1%-364-12 months
0014-15-034Fort Worth08/05/26$18,925,918.73ConstructionRoadwayConstructionRoadway$19,066,000.00$(140,081.27)-1%
0014-03-088Fort Worth07/01/26$82,826,148.94ConstructionRoadwayConstructionRoadway$84,000,000.00$(1,173,851.06)-1%
0110-05-136Houston05/06/26$991,742.20ConstructionRoadwayConstructionRoadway$1,005,910.00$(14,167.80)-1%
0500-03-655Houston05/06/26$9,120,774.40ConstructionBridgeConstructionBridge$9,030,488.00$90,286.401%
0314-07-087Fort Worth04/07/26$537,434.00ConstructionRoadwayUnassignedUnassigned$534,158.80$3,275.201%Unassigned / Unassigned → Construction / Roadway
0909-38-100Waco04/07/26$1,062,294.75ConstructionBridgeConstructionBridge$1,054,694.75$7,600.001%
1245-02-052Amarillo04/07/26$1,708,880.79ConstructionRoadwayConstructionRoadway$1,700,000.00$8,880.791%
1823-02-014Odessa04/07/26$2,075,285.37ConstructionRoadwayConstructionRoadway$2,100,000.00$(24,714.63)-1%
2005-03-009Odessa04/07/26$7,108,332.52ConstructionRoadwayConstructionRoadway$7,062,223.42$46,109.101%
2230-01-021San Antonio04/07/26$54,752,251.98ConstructionRoadwayConstructionRoadway$54,175,797.00$576,454.981%
0081-02-079Fort Worth06/11/26$515,157.78ConstructionLocal LetUnassignedUnassigned$513,104.90$2,052.880%Unassigned / Unassigned → Construction / Local Let
2964-04-010Dallas06/02/26$901,904.59ConstructionRoadwayConstructionRoadway$903,563.10$(1,658.51)0%
0077-07-010San Angelo05/06/26$5,202,796.65ConstructionBridgeConstructionBridge$5,206,596.65$(3,800.00)0%
0138-06-049Lufkin05/06/26$3,877,907.00ConstructionRoadwayConstructionRoadway$3,877,900.00$7.000%
0463-07-055Odessa05/06/26$1,299,947.36ConstructionRoadwayConstructionRoadway$1,293,759.66$6,187.700%
1271-01-013San Antonio05/06/26$1,202,995.95ConstructionBridgeConstructionBridge$1,199,651.14$3,344.810%
474 rows · download CSV

Putting It Together

Across February, the pattern is consistent. Letting dates are moving, with a slight drift toward later years. Costs are being updated across a wide set of projects, but the financial impact is concentrated in a handful of large jobs. The mix of work remains unchanged, with roadway construction continuing to dominate.


Final Takeaway

The TxDOT pipeline is not changing direction. It is being adjusted.

Expect continued movement in letting dates, especially beyond the next 12 months. Expect ongoing cost updates, with large projects driving most of the dollar impact. Do not expect meaningful changes in the type of work being let.

The signal is not in what is coming. It is in when it will hit and how it will be priced.