TxDOT Pipeline Changes - February 2026
- The pipeline remains stable in structure, with 5,541 projects in the March 2026–January 2029 letting window and no meaningful shift in project mix.
- Movement is concentrated in timing and cost, with projects continuing to shift in both directions and total value decreasing by $723M (-2.1%).
- Cost changes are top-heavy, with a small number of large projects driving the majority of dollar movement while most projects see routine estimate updates
Overview
This analysis covers 5,541 TxDOT projects scheduled to let between March 6, 2026 and January 1, 2029, comparing how that pipeline changed from February 2 to March 3.
Across that window, the pipeline remains structurally consistent, with movement concentrated in timing and cost rather than scope. Total pipeline value decreased by $723.45M (-2.1%), moving from $33.91B to $33.19B, while the overall mix of projects by size remains effectively unchanged. The work program is still heavily weighted toward smaller jobs, and the types of work being let are consistent with prior snapshots.
The takeaway is straightforward. This is not a shift in what TxDOT plans to build. It is an adjustment in when projects are expected to let and how they are being priced.
Letting Date Shifts (Slippage)
How to read this chart:
Letting dates continue to move in both directions, with a slight bias toward projects being pushed further out. A total of 138 projects shifted by at least six months, with 73 moving later and 65 moving earlier. At the 12-month threshold, 60 projects shifted, with 41 moving later.
At the pipeline level, these shifts show up as a gradual redistribution across time. The share of projects expected in the next 12 months increased slightly from 40.5% to 40.7%, while the share of projects two or more years out increased from 26.4% to 26.8%.
For estimators, the signal is not delay in isolation. The near-term pipeline remains largely intact, but more work is being pushed into later years. That makes the outer pipeline more crowded and less certain, while the next 12 months remain relatively stable. The result is a steady flow of opportunities in the near term, with increasing competition and variability further out.
| CSJ | District | Est. Letting Date | Project Estimate | Current Type | Current Subtype | Prev. Type | Prev. Subtype | Prev. Date | Letting Δ (days) | Letting Date Δ | Cost Δ | %Cost Δ | Type/Subtype Δ | Lifecycle |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0085-02-058 | Atlanta | 10/01/45 | $683,520.00 | 10/03/28 | 6206 | 17 years | ||||||||
| 0909-00-076 | Waco | 01/01/29 | $4,471,365.74 | Construction | Bridge | Unassigned | Unassigned | 10/31/45 | -6148 | -17 years | $4,202,365.74 | 1562% | Unassigned / Unassigned → Construction / Bridge | |
| 0923-06-079 | Brownwood | 01/01/40 | $650,000.00 | Construction | Bridge | 10/04/27 | 4471 | 12 years | ||||||
| 0231-01-069 | Brownwood | 01/01/40 | $4,000,000.00 | 12/31/28 | 4017 | 11 years | ||||||||
| 2560-01-079 | Lufkin | 08/04/27 | $7,615,384.62 | Construction | Roadway | Unassigned | Unassigned | 02/28/38 | -3862 | -11 years | $(5,084,615.38) | -40% | Unassigned / Unassigned → Construction / Roadway | |
| 0921-02-376 | Pharr | 05/05/35 | $14,990,126.63 | Construction | Local Let | 05/04/28 | 2556 | 7 years | ||||||
| 0921-02-521 | Pharr | 05/02/35 | $14,654,418.00 | Construction | Local Let | 05/01/28 | 2556 | 7 years | ||||||
| 2263-02-112 | Corpus Christi | 10/04/28 | $17,000,000.00 | Construction | Ferry Boat | Unassigned | Unassigned | 09/30/35 | -2553 | -7 years | Unassigned / Unassigned → Construction / Ferry Boat | |||
| 2069-01-009 | Lufkin | 09/06/28 | $6,910,402.19 | Construction | Roadway | Construction | Roadway | 08/31/35 | -2551 | -7 years | ||||
| 0921-02-395 | Pharr | 05/05/33 | $32,240,557.00 | Construction | Local Let | 05/04/28 | 1826 | 5 years | ||||||
| 0033-08-045 | Abilene | 05/01/32 | $5,384,615.00 | Construction | Roadway | 05/04/27 | 1823 | 5 years | ||||||
| 0921-02-447 | Pharr | 05/02/32 | $22,400,000.00 | Construction | Local Let | 05/01/28 | 1461 | 4 years | ||||||
| 0921-02-540 | Pharr | 01/04/32 | $17,792,625.00 | Construction | Roadway | 01/03/28 | 1461 | 4 years | ||||||
| 0508-01-396 | Houston | 03/01/32 | $166,666,667.00 | Construction | Roadway | 03/06/28 | 1455 | 4 years | $(13,333,333.40) | -7% | ||||
| 2941-02-054 | Houston | 09/06/28 | $1,288,740.00 | Construction | Roadway | Unassigned | Unassigned | 07/31/32 | -1425 | -4 years | Unassigned / Unassigned → Construction / Roadway | |||
| 2941-02-056 | Houston | 09/06/28 | $32,000,000.00 | Construction | Roadway | Unassigned | Unassigned | 07/31/32 | -1425 | -4 years | Unassigned / Unassigned → Construction / Roadway | |||
| 0681-02-017 | Wichita Falls | 02/01/31 | $7,000,000.00 | Construction | Roadway | 08/31/27 | 1249 | 3 years | ||||||
| 1609-01-031 | Wichita Falls | 05/01/31 | $13,000,000.00 | Construction | Roadway | 02/01/28 | 1184 | 3 years | ||||||
| 0921-02-360 | Pharr | 01/02/31 | $20,331,577.00 | Construction | Roadway | 01/01/28 | 1096 | 3 years | ||||||
| 0921-02-512 | Pharr | 05/02/30 | $12,663,774.13 | Construction | Local Let | 05/01/27 | 1096 | 3 years | ||||||
| 2690-01-040 | Austin | 12/01/27 | $7,346,428.57 | Construction | Roadway | Unassigned | Unassigned | 11/30/30 | -1096 | -3 years | Unassigned / Unassigned → Construction / Roadway | |||
| 2690-01-046 | Austin | 12/01/27 | $714,285.71 | Construction | Rail - Safety | Unassigned | Unassigned | 11/30/30 | -1096 | -3 years | Unassigned / Unassigned → Construction / Rail - Safety | |||
| 0921-02-436 | Pharr | 05/02/31 | $6,688,200.00 | Construction | Local Let | 05/01/28 | 1095 | 3 years | ||||||
| 0256-01-060 | Wichita Falls | 02/01/31 | $8,000,000.00 | Construction | Roadway | 02/01/28 | 1095 | 3 years | ||||||
| 0773-02-020 | Paris | 11/01/30 | $1,180,502.40 | Construction | Roadway | 11/01/27 | 1095 | 3 years | ||||||
| 1378-01-061 | Austin | 05/01/31 | $14,537,037.04 | 05/02/28 | 1093 | 3 years | ||||||||
| 0465-02-032 | San Antonio | 10/01/30 | $202,400.00 | Construction | Roadway | 10/04/27 | 1092 | 3 years | ||||||
| 0283-04-037 | Wichita Falls | 03/01/31 | $5,100,000.00 | Construction | Roadway | 03/06/28 | 1089 | 3 years | ||||||
| 0007-06-268 | Brownwood | 10/06/26 | $1,500,000.00 | Construction | Roadway | Construction | Roadway | 12/31/28 | -818 | -2 years | $(6,100,000.00) | -80% | ||
| 0013-08-154 | Fort Worth | 08/05/26 | $1,681,823.02 | Construction | Roadway | Unassigned | Unassigned | 09/05/28 | -763 | -2 years | Unassigned / Unassigned → Construction / Roadway | |||
| 0902-90-267 | Fort Worth | 12/01/29 | $22,985,119.18 | Construction | Roadway | 11/30/27 | 731 | 2 years | ||||||
| 0902-90-268 | Fort Worth | 12/01/29 | $35,000,000.00 | Construction | Roadway | 11/30/27 | 731 | 2 years | ||||||
| 0502-01-244 | Houston | 01/15/29 | $56,000,000.00 | Non-Let | Roadway | Non-Let | Roadway | 01/14/27 | 731 | 2 years | ||||
| 1685-05-105 | Houston | 01/01/31 | $7,770,938.39 | 12/31/28 | 730 | 2 years | $(932,511.61) | -11% | ||||||
| 1835-01-026 | Waco | 01/01/31 | $15,000,000.00 | 12/31/28 | 730 | 2 years | $(1,799,999.00) | -11% | ||||||
| 0921-06-330 | Pharr | 09/03/27 | $17,023,422.00 | Construction | Local Let | Unassigned | Unassigned | 09/01/29 | -730 | -2 years | Unassigned / Unassigned → Construction / Local Let | |||
| 0216-03-039 | San Antonio | 10/01/29 | $240,010.00 | Construction | Roadway | 10/04/27 | 727 | 2 years | $(1,380.00) | -1% | ||||
| 0804-04-032 | Wichita Falls | 03/01/30 | $9,100,000.00 | Construction | Roadway | 03/06/28 | 724 | 2 years | ||||||
| 0918-47-577 | Dallas | 04/02/28 | $5,700,000.00 | Construction | Local Let | Unassigned | Unassigned | 08/01/26 | 609 | 2 years | Unassigned / Unassigned → Construction / Local Let | |||
| 0005-03-071 | Odessa | 08/31/27 | $500,000.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 01/01/26 | 606 | 2 years | ||||
| 0005-03-073 | Odessa | 08/31/27 | $500,000.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 01/01/26 | 606 | 2 years | ||||
| 0683-03-043 | Austin | 03/03/27 | $1,837,409.82 | Construction | Roadway | Unassigned | Unassigned | 09/05/28 | -553 | -2 years | Unassigned / Unassigned → Construction / Roadway | |||
| 1810-01-033 | Lufkin | 06/01/27 | $9,167,239.01 | Construction | Roadway | Construction | Roadway | 10/03/28 | -491 | -1 year | $(366,689.56) | -4% | ||
| 0914-05-250 | Austin | 05/06/26 | $504,441.50 | Construction | Roadway | Construction | Roadway | 08/31/27 | -483 | -1 year | ||||
| 0072-08-148 | San Antonio | 12/01/27 | $948,661.00 | Construction | Roadway | Construction | Roadway | 09/01/26 | 455 | 1 year | ||||
| 0018-05-089 | Laredo | 06/01/27 | $255,607,277.70 | Construction | Roadway | Construction | Roadway | 03/03/26 | 454 | 1 year | $(39,670,598.30) | -13% | ||
| 1794-01-023 | Lufkin | 10/01/29 | $6,834,659.82 | Construction | Roadway | 07/05/28 | 452 | 1 year | $(820,159.18) | -11% | ||||
| 2721-03-006 | Abilene | 02/01/29 | $3,000,000.00 | Construction | Roadway | Construction | Roadway | 11/30/27 | 428 | 1 year | ||||
| 0907-24-060 | San Angelo | 06/03/27 | $3,552,743.00 | Construction | Local Let | Unassigned | Unassigned | 03/31/26 | 428 | 1 year | Unassigned / Unassigned → Construction / Local Let | |||
| 0675-08-121 | Houston | 07/01/26 | $3,627,242.00 | Construction | Non Roadway | Unassigned | Unassigned | 08/31/27 | -427 | -1 year | Unassigned / Unassigned → Construction / Non Roadway | |||
| 3510-04-064 | Houston | 07/01/26 | $3,693,789.00 | Construction | Non Roadway | Unassigned | Unassigned | 08/31/27 | -427 | -1 year | Unassigned / Unassigned → Construction / Non Roadway | |||
| 3510-04-065 | Houston | 07/01/26 | $3,942,056.00 | Construction | Non Roadway | Unassigned | Unassigned | 08/31/27 | -427 | -1 year | Unassigned / Unassigned → Construction / Non Roadway | |||
| 0189-01-014 | Paris | 11/02/27 | $44,953.92 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -399 | -1 year | Unassigned / Unassigned → Construction / Roadway | |||
| 0189-02-064 | Paris | 11/02/27 | $1,915,826.88 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -399 | -1 year | Unassigned / Unassigned → Construction / Roadway | |||
| 0027-02-034 | Yoakum | 09/06/28 | $8,200,000.00 | Construction | Roadway | Construction | Roadway | 08/31/27 | 371 | 1 year | ||||
| 1134-01-021 | Abilene | 12/05/28 | $6,000,000.00 | Construction | Roadway | Construction | Roadway | 11/30/27 | 370 | 1 year | ||||
| 0091-05-081 | Dallas | 08/04/28 | $1,200,000.00 | Construction | Roadway | Unassigned | Unassigned | 08/03/27 | 366 | 1 year | Unassigned / Unassigned → Construction / Roadway | |||
| 0124-05-032 | Wichita Falls | 11/01/29 | $418,272.00 | 10/31/28 | 365 | 1 year | ||||||||
| 1532-02-004 | Abilene | 02/01/29 | $3,300,000.00 | Construction | Roadway | Construction | Roadway | 02/01/28 | 365 | 1 year | ||||
| 0124-04-042 | Wichita Falls | 11/01/28 | $1,232,735.00 | Construction | Roadway | Construction | Roadway | 11/01/27 | 365 | 1 year | $793,418.00 | 181% | ||
| 0203-04-044 | Paris | 11/01/28 | $814,668.80 | Construction | Roadway | Construction | Roadway | 11/01/27 | 365 | 1 year | ||||
| 0315-06-051 | Bryan | 11/01/28 | $3,000,000.00 | Construction | Roadway | Construction | Roadway | 11/01/27 | 365 | 1 year | ||||
| 0401-01-035 | Paris | 11/01/28 | $1,082,920.96 | Construction | Roadway | Construction | Roadway | 11/01/27 | 365 | 1 year | ||||
| 0729-01-052 | Paris | 11/01/28 | $434,170.88 | Construction | Roadway | Construction | Roadway | 11/01/27 | 365 | 1 year | ||||
| 0017-06-093 | San Antonio | 10/04/28 | $290,969.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | 365 | 1 year | $(488,852.00) | -63% | ||
| 1730-01-046 | San Antonio | 10/04/28 | $479,735.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | 365 | 1 year | $(209,540.00) | -30% | ||
| 1730-02-024 | San Antonio | 10/04/28 | $369,611.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | 365 | 1 year | $(28,677.00) | -7% | ||
| 0587-01-060 | Houston | 12/01/27 | $35,503,031.00 | Construction | Bridge | Construction | Bridge | 11/30/26 | 365 | 1 year | ||||
| 2121-02-167 | El Paso | 07/01/27 | $30,118,818.27 | Construction | Roadway | Construction | Roadway | 06/30/26 | 365 | 1 year | $1,642,845.27 | 6% | ||
| 0070-06-056 | Brownwood | 01/05/28 | $400,000.00 | Construction | Roadway | Unassigned | Unassigned | 01/05/27 | 364 | 12 months | Unassigned / Unassigned → Construction / Roadway | |||
| 0289-04-037 | Brownwood | 01/05/28 | $3,568,950.00 | Construction | Roadway | Unassigned | Unassigned | 01/05/27 | 364 | 12 months | $568,950.00 | 19% | Unassigned / Unassigned → Construction / Roadway | |
| 0301-03-028 | San Antonio | 10/05/27 | $520,281.00 | Construction | Roadway | Construction | Roadway | 10/05/26 | 364 | 12 months | $90,520.00 | 21% | ||
| 0421-05-035 | San Antonio | 10/05/27 | $290,724.00 | Construction | Roadway | Construction | Roadway | 10/05/26 | 364 | 12 months | $(154,116.00) | -35% | ||
| 0993-01-014 | Corpus Christi | 10/05/27 | $205,460.00 | Construction | Roadway | Unassigned | Unassigned | 10/05/26 | 364 | 12 months | Unassigned / Unassigned → Construction / Roadway | |||
| 1434-01-016 | San Antonio | 10/05/27 | $363,650.00 | Construction | Roadway | Construction | Roadway | 10/05/26 | 364 | 12 months | $(252,783.00) | -41% | ||
| 0143-02-032 | San Antonio | 09/01/27 | $1,431,302.00 | Construction | Roadway | Construction | Roadway | 09/01/26 | 364 | 12 months | ||||
| 0024-05-105 | San Antonio | 10/06/26 | $145,199.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | -364 | -12 months | $(198,801.00) | -58% | ||
| 0142-02-030 | San Antonio | 10/06/26 | $498,436.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | -364 | -12 months | $(360,937.00) | -42% | ||
| 0143-11-006 | San Antonio | 10/06/26 | $69,700.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | -364 | -12 months | $(15,422.00) | -18% | ||
| 0143-12-006 | San Antonio | 10/06/26 | $109,675.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | -364 | -12 months | $34,825.00 | 47% | ||
| 0143-14-009 | San Antonio | 10/06/26 | $30,910.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | -364 | -12 months | $(11,280.00) | -27% | ||
| 0143-15-034 | San Antonio | 10/06/26 | $86,564.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | -364 | -12 months | $(19,153.00) | -18% | ||
| 0215-11-025 | San Antonio | 10/06/26 | $331,148.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | -364 | -12 months | $(25,692.00) | -7% | ||
| 0215-11-026 | San Antonio | 10/06/26 | $154,100.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | -364 | -12 months | $(11,956.00) | -7% | ||
| 0328-01-016 | San Antonio | 10/06/26 | $387,945.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | -364 | -12 months | $(225,186.00) | -37% | ||
| 0366-03-075 | San Antonio | 10/06/26 | $510,359.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | -364 | -12 months | $(516,226.00) | -50% | ||
| 0526-01-023 | San Antonio | 10/06/26 | $90,851.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | -364 | -12 months | $(26,629.00) | -23% | ||
| 1009-01-044 | San Antonio | 10/06/26 | $389,823.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | -364 | -12 months | $(2,240.00) | -1% | ||
| 1548-01-018 | San Antonio | 10/06/26 | $448,540.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | -364 | -12 months | $(25,472.00) | -5% | ||
| 1899-01-020 | San Antonio | 10/06/26 | $159,286.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | -364 | -12 months | $(915.00) | -1% | ||
| 1899-02-023 | San Antonio | 10/06/26 | $489,943.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | -364 | -12 months | $(2,816.00) | -1% | ||
| 2452-05-005 | San Antonio | 10/06/26 | $55,940.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | -364 | -12 months | $(8,359.00) | -13% | ||
| 2116-01-020 | Lufkin | 05/01/29 | $5,942,228.57 | Construction | Roadway | Construction | Roadway | 05/02/28 | 363 | 12 months | $(713,067.43) | -11% | ||
| 0407-06-046 | Abilene | 04/01/29 | $4,000,000.00 | Construction | Roadway | Construction | Roadway | 04/04/28 | 361 | 12 months | ||||
| 0407-06-049 | Abilene | 04/01/29 | $2,500,000.00 | Construction | Roadway | Construction | Roadway | 04/04/28 | 361 | 12 months | ||||
| 0500-03-599 | Houston | 09/01/29 | $600,000,000.00 | Construction | Roadway | 09/05/28 | 360 | 12 months | $(565,067,716.00) | -49% | ||||
| 0137-04-019 | Wichita Falls | 03/01/29 | $3,000,000.00 | Construction | Roadway | Construction | Roadway | 03/06/28 | 359 | 12 months | ||||
| 0137-05-038 | Wichita Falls | 03/01/29 | $5,000,000.00 | Construction | Roadway | Construction | Roadway | 03/06/28 | 359 | 12 months | ||||
| 0508-01-410 | Houston | 03/01/29 | $42,867,000.00 | Construction | Roadway | Unassigned | Unassigned | 03/06/28 | 359 | 12 months | Unassigned / Unassigned → Construction / Roadway | |||
| 0910-34-042 | Tyler | 12/01/27 | $727,368.96 | Construction | Bridge | Unassigned | Unassigned | 10/31/28 | -336 | -11 months | Unassigned / Unassigned → Construction / Bridge | |||
| 0364-03-108 | Dallas | 05/06/26 | $1,162,679.97 | Construction | Roadway | Construction | Roadway | 04/05/27 | -335 | -11 months | ||||
| 0316-03-011 | Paris | 11/01/29 | $676,146.24 | 12/04/28 | 331 | 11 months | ||||||||
| 0908-23-058 | Abilene | 04/07/26 | $744,831.50 | Construction | Bridge | Construction | Bridge | 03/02/27 | -330 | -11 months | $15,000.00 | 2% | ||
| 0908-23-059 | Abilene | 04/07/26 | $677,937.00 | Construction | Bridge | Construction | Bridge | 03/02/27 | -330 | -11 months | ||||
| 0908-33-109 | Abilene | 04/07/26 | $1,084,409.78 | Construction | Bridge | Construction | Bridge | 03/02/27 | -330 | -11 months | ||||
| 0039-10-096 | Pharr | 12/01/27 | $3,112,459.28 | Construction | Bridge | Construction | Bridge | 10/03/28 | -308 | -10 months | ||||
| 0581-02-162 | Dallas | 06/02/26 | $13,126,775.13 | Construction | Roadway | Construction | Roadway | 04/05/27 | -308 | -10 months | ||||
| 0915-17-070 | San Antonio | 09/01/27 | $682,625.00 | Construction | Bridge | Construction | Bridge | 11/02/26 | 302 | 10 months | ||||
| 0005-08-109 | Abilene | 04/07/26 | $12,628,622.92 | Construction | Roadway | Construction | Roadway | 02/01/27 | -301 | -10 months | $(233,671.08) | -2% | ||
| 0371-05-022 | Corpus Christi | 07/01/26 | $314,636.00 | Construction | Roadway | Construction | Roadway | 04/05/27 | -279 | -9 months | ||||
| 1115-01-010 | Corpus Christi | 07/01/26 | $583,647.00 | Construction | Roadway | Construction | Roadway | 04/05/27 | -279 | -9 months | ||||
| 1294-02-022 | Corpus Christi | 07/01/26 | $723,570.00 | Construction | Roadway | Construction | Roadway | 04/05/27 | -279 | -9 months | ||||
| 1446-01-016 | Corpus Christi | 07/01/26 | $130,740.00 | Construction | Roadway | Construction | Roadway | 04/05/27 | -279 | -9 months | ||||
| 1555-01-009 | Corpus Christi | 07/01/26 | $139,502.00 | Construction | Roadway | Construction | Roadway | 04/05/27 | -279 | -9 months | ||||
| 2942-02-019 | Corpus Christi | 07/01/26 | $285,222.00 | Construction | Roadway | Construction | Roadway | 04/05/27 | -279 | -9 months | ||||
| 3116-01-033 | Corpus Christi | 07/01/26 | $151,985.00 | Construction | Roadway | Construction | Roadway | 04/05/27 | -279 | -9 months | ||||
| 1794-01-028 | Lufkin | 10/05/27 | $4,138,513.00 | Construction | Roadway | Construction | Roadway | 07/05/28 | -275 | -9 months | ||||
| 1794-01-029 | Lufkin | 10/05/27 | $1,666,666.67 | Construction | Roadway | Unassigned | Unassigned | 07/05/28 | -275 | -9 months | Unassigned / Unassigned → Construction / Roadway | |||
| 1875-03-023 | Lufkin | 09/01/27 | $4,809,375.00 | Construction | Roadway | Construction | Roadway | 05/31/28 | -274 | -9 months | ||||
| 0018-01-102 | Laredo | 05/06/26 | $11,432,116.76 | Construction | Roadway | Construction | Roadway | 02/01/27 | -272 | -9 months | ||||
| 0018-06-219 | Laredo | 05/06/26 | $5,830,944.65 | Construction | Roadway | Construction | Roadway | 02/01/27 | -272 | -9 months | ||||
| 0037-06-110 | Laredo | 05/06/26 | $5,260,307.25 | Construction | Roadway | Construction | Roadway | 02/01/27 | -272 | -9 months | ||||
| 0038-01-108 | Laredo | 05/06/26 | $239,077.76 | Construction | Roadway | Unassigned | Unassigned | 02/01/27 | -272 | -9 months | Unassigned / Unassigned → Construction / Roadway | |||
| 0301-04-027 | Laredo | 05/06/26 | $308,090.60 | Construction | Roadway | Unassigned | Unassigned | 02/01/27 | -272 | -9 months | Unassigned / Unassigned → Construction / Roadway | |||
| 0542-03-040 | Laredo | 05/06/26 | $7,504,710.40 | Construction | Roadway | Unassigned | Unassigned | 02/01/27 | -272 | -9 months | Unassigned / Unassigned → Construction / Roadway | |||
| 0088-02-063 | Corpus Christi | 07/01/26 | $4,100,000.00 | Construction | Roadway | Construction | Roadway | 03/02/27 | -245 | -8 months | ||||
| 0088-03-050 | Corpus Christi | 07/01/26 | $500,000.00 | Construction | Roadway | Construction | Roadway | 03/02/27 | -245 | -8 months | ||||
| 0114-07-089 | Austin | 09/01/29 | $2,030,955.36 | 12/31/28 | 243 | 8 months | ||||||||
| 0987-03-018 | Austin | 03/01/27 | $662,756.00 | Construction | Local Let | Construction | Local Let | 07/02/26 | 241 | 8 months | ||||
| 0265-06-036 | Austin | 03/07/28 | $5,000,000.00 | Construction | Non Roadway | Unassigned | Unassigned | 08/03/27 | 216 | 7 months | Unassigned / Unassigned → Construction / Non Roadway | |||
| 0143-01-068 | San Antonio | 07/01/26 | $6,038,484.00 | Construction | Roadway | Construction | Roadway | 02/01/27 | -216 | -7 months | ||||
| 0502-01-243 | Houston | 08/09/27 | $24,000,000.00 | Non-Let | Local | Non-Let | Local | 01/14/27 | 206 | 7 months | ||||
| 0199-01-090 | Tyler | 07/01/26 | $811,456.44 | Construction | Roadway | Construction | Roadway | 01/05/27 | -189 | -6 months | ||||
| 0199-01-091 | Tyler | 07/01/26 | $516,736.73 | Construction | Roadway | Construction | Roadway | 01/05/27 | -189 | -6 months | ||||
| 0619-03-065 | Dallas | 06/01/26 | $805,000.00 | Construction | Roadway | Construction | Roadway | 12/02/26 | -185 | -6 months | ||||
| 0981-01-121 | Houston | 08/04/27 | $411,012.00 | Construction | Roadway | Construction | Roadway | 02/01/27 | 183 | 6 months | ||||
| 1530-01-012 | Abilene | 10/04/28 | $6,602,447.70 | Construction | Roadway | Construction | Roadway | 04/04/28 | 182 | 6 months | ||||
| 0116-03-074 | Bryan | 04/06/27 | $1,940,000.00 | Construction | Roadway | Construction | Roadway | 10/05/26 | 182 | 6 months | ||||
| 0911-28-062 | Lufkin | 12/01/26 | $780,558.50 | Construction | Bridge | Construction | Bridge | 06/01/26 | 182 | 6 months | ||||
| 0911-28-064 | Lufkin | 12/01/26 | $771,108.50 | Construction | Bridge | Construction | Bridge | 06/01/26 | 182 | 6 months | ||||
| 0908-23-045 | Abilene | 04/07/26 | $778,888.61 | Construction | Bridge | Construction | Bridge | 10/05/26 | -182 | -6 months | ||||
| 0908-23-051 | Abilene | 04/07/26 | $803,680.77 | Construction | Bridge | Construction | Bridge | 10/05/26 | -182 | -6 months | ||||
| 0908-23-052 | Abilene | 04/07/26 | $808,631.95 | Construction | Bridge | Construction | Bridge | 10/05/26 | -182 | -6 months | ||||
| 0908-23-054 | Abilene | 04/07/26 | $588,619.15 | Construction | Bridge | Construction | Bridge | 10/05/26 | -182 | -6 months | ||||
| 0908-24-051 | Abilene | 04/07/26 | $1,074,354.43 | Construction | Bridge | Construction | Bridge | 10/05/26 | -182 | -6 months | ||||
| 0908-24-052 | Abilene | 04/07/26 | $519,848.38 | Construction | Bridge | Construction | Bridge | 10/05/26 | -182 | -6 months | ||||
| 0912-72-583 | Houston | 03/15/27 | $736,806.00 | Construction | Local Let | Construction | Roadway | 09/14/26 | 181 | 6 months | Construction / Roadway → Construction / Local Let | |||
| 0442-02-166 | Dallas | 05/06/26 | $12,657,475.67 | Construction | Roadway | Construction | Roadway | 11/02/26 | -181 | -6 months | $(349,330.26) | -3% | ||
| 0915-12-691 | San Antonio | 09/02/26 | $250,000.00 | Construction | Rail - Safety | Non-Let | Change Order | 02/28/27 | -180 | -6 months | Non-Let / Change Order → Construction / Rail - Safety | |||
| 0005-06-129 | Abilene | 06/01/27 | $4,000,000.00 | Construction | Roadway | Construction | Roadway | 11/01/27 | -154 | -5 months | $500,000.00 | 14% | ||
| 0908-33-115 | Abilene | 06/02/26 | $212,705.00 | Construction | Roadway | Construction | Roadway | 11/02/26 | -154 | -5 months | ||||
| 0908-33-116 | Abilene | 06/02/26 | $204,953.00 | Construction | Roadway | Construction | Roadway | 11/02/26 | -154 | -5 months | ||||
| 0073-02-092 | San Antonio | 05/06/26 | $889,145.81 | Construction | Roadway | Construction | Roadway | 10/05/26 | -153 | -5 months | ||||
| 0253-06-042 | San Antonio | 05/06/26 | $894,023.73 | Construction | Roadway | Construction | Roadway | 10/05/26 | -153 | -5 months | ||||
| 1283-01-012 | El Paso | 03/03/27 | $1,281,294.23 | Construction | Roadway | Construction | Roadway | 10/05/26 | 148 | 5 months | ||||
| 0017-16-008 | San Antonio | 01/05/28 | $828,335.00 | Construction | Roadway | Construction | Roadway | 08/31/27 | 126 | 4 months | $(5,572,528.00) | -87% | ||
| 0922-33-208 | Laredo | 10/05/27 | $134,100.00 | Construction | Roadway | Construction | Roadway | 05/31/27 | 126 | 4 months | ||||
| 0922-33-244 | Laredo | 10/05/27 | $204,300.00 | Construction | Roadway | Construction | Roadway | 05/31/27 | 126 | 4 months | ||||
| 0024-06-070 | San Antonio | 04/06/27 | $35,000,000.00 | Construction | Roadway | Construction | Roadway | 11/30/26 | 126 | 4 months | $9,900,000.00 | 39% | ||
| 0912-31-351 | Houston | 01/06/27 | $980,000.00 | Construction | Roadway | Construction | Roadway | 09/01/26 | 126 | 4 months | ||||
| 0917-29-152 | Bryan | 01/06/27 | $1,324,348.00 | Construction | Roadway | Unassigned | Unassigned | 09/01/26 | 126 | 4 months | $(392,047.50) | -23% | Unassigned / Unassigned → Construction / Roadway | |
| 2883-02-011 | San Antonio | 01/06/27 | $1,105,769.00 | Construction | Roadway | Non-Let | Rail - Safety | 09/01/26 | 126 | 4 months | Non-Let / Rail - Safety → Construction / Roadway | |||
| 0366-01-084 | Austin | 12/01/26 | $1,442,307.69 | Construction | Bridge | Construction | Bridge | 04/05/27 | -126 | -4 months | ||||
| 0921-06-378 | Pharr | 05/01/26 | $4,116,950.00 | Construction | Local Let | Construction | Local Let | 08/30/26 | -122 | -4 months | ||||
| 0915-12-800 | San Antonio | 09/01/27 | $6,398,908.00 | Construction | Roadway | Construction | Roadway | 05/04/27 | 119 | 4 months | ||||
| 0038-07-085 | Pharr | 05/06/26 | $231,845.30 | Construction | Roadway | Construction | Roadway | 09/01/26 | -119 | -4 months | $(92,965.70) | -29% | ||
| 0220-01-039 | Pharr | 05/06/26 | $293,029.05 | Construction | Roadway | Construction | Roadway | 09/01/26 | -119 | -4 months | $(111,239.95) | -28% | ||
| 0220-01-040 | Pharr | 05/06/26 | $261,235.01 | Construction | Roadway | Construction | Roadway | 09/01/26 | -119 | -4 months | $35,837.01 | 16% | ||
| 0630-01-059 | Pharr | 05/06/26 | $64,985.00 | Construction | Roadway | Construction | Roadway | 09/01/26 | -119 | -4 months | $(259,826.00) | -80% | ||
| 0698-03-107 | Pharr | 05/06/26 | $264,761.15 | Construction | Roadway | Construction | Roadway | 09/01/26 | -119 | -4 months | $(158,911.85) | -38% | ||
| 0863-01-081 | Pharr | 05/06/26 | $245,353.80 | Construction | Roadway | Construction | Roadway | 09/01/26 | -119 | -4 months | $(79,457.20) | -24% | ||
| 1064-01-048 | Pharr | 05/06/26 | $200,135.05 | Construction | Roadway | Construction | Roadway | 09/01/26 | -119 | -4 months | $(124,675.95) | -38% | ||
| 1228-03-057 | Pharr | 05/06/26 | $249,764.25 | Construction | Roadway | Construction | Roadway | 09/01/26 | -119 | -4 months | $24,366.25 | 11% | ||
| 1228-03-058 | Pharr | 05/06/26 | $63,360.00 | Construction | Roadway | Construction | Roadway | 09/01/26 | -119 | -4 months | $(236,355.00) | -79% | ||
| 1228-03-059 | Pharr | 05/06/26 | $54,710.00 | Construction | Roadway | Construction | Roadway | 09/01/26 | -119 | -4 months | $(170,688.00) | -76% | ||
| 1429-01-039 | Pharr | 05/06/26 | $241,056.05 | Construction | Roadway | Construction | Roadway | 09/01/26 | -119 | -4 months | $(163,212.95) | -40% | ||
| 1586-01-093 | Pharr | 05/06/26 | $177,268.35 | Construction | Roadway | Construction | Roadway | 09/01/26 | -119 | -4 months | $(147,542.65) | -45% | ||
| 6497-67-001 | Beaumont | 05/06/26 | $1.00 | Maintenance | Routine Maintenance Contract | Unassigned | Unassigned | 09/01/26 | -119 | -4 months | Unassigned / Unassigned → Maintenance / Routine Maintenance Contract | |||
| 1194-02-020 | Beaumont | 07/01/26 | $10,174,500.00 | Construction | Roadway | Construction | Roadway | 10/05/26 | -97 | -3 months | ||||
| 0912-72-687 | Houston | 05/15/28 | $30,689,860.00 | Construction | Local Let | Construction | Local Let | 08/14/28 | -92 | -3 months | ||||
| 0912-72-845 | Houston | 05/15/28 | $75,920,000.00 | Construction | Local Let | Unassigned | Unassigned | 08/14/28 | -92 | -3 months | Unassigned / Unassigned → Construction / Local Let | |||
| 0215-07-056 | San Antonio | 01/05/28 | $742,662.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | 92 | 3 months | $240,035.00 | 48% | ||
| 0521-05-168 | San Antonio | 01/05/28 | $325,096.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | 92 | 3 months | $(82,904.00) | -20% | ||
| 0521-05-169 | San Antonio | 01/05/28 | $173,444.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | 92 | 3 months | $51,044.00 | 42% | ||
| 2104-02-042 | San Antonio | 01/05/28 | $152,551.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | 92 | 3 months | $(59,860.00) | -28% | ||
| 2452-01-074 | San Antonio | 01/05/28 | $120,561.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | 92 | 3 months | $8,672.00 | 8% | ||
| 0025-02-229 | San Antonio | 01/06/27 | $972,889.00 | Construction | Roadway | Construction | Roadway | 10/05/26 | 92 | 3 months | $673,348.00 | 225% | ||
| 0143-01-066 | San Antonio | 01/06/27 | $763,955.00 | Construction | Roadway | Construction | Roadway | 10/05/26 | 92 | 3 months | $(117,097.00) | -13% | ||
| 0143-02-031 | San Antonio | 01/06/27 | $1,064,259.00 | Construction | Roadway | Construction | Roadway | 10/05/26 | 92 | 3 months | $255,996.00 | 32% | ||
| 0291-05-051 | San Antonio | 01/06/27 | $1,286,888.00 | Construction | Roadway | Construction | Roadway | 10/05/26 | 92 | 3 months | $532,948.00 | 71% | ||
| 0013-10-098 | Fort Worth | 12/01/26 | $8,507,754.06 | Construction | Roadway | Unassigned | Unassigned | 03/02/27 | -92 | -3 months | Unassigned / Unassigned → Construction / Roadway | |||
| 0909-37-081 | Waco | 09/02/26 | $552,000.00 | Construction | Bridge | Construction | Bridge | 06/01/26 | 92 | 3 months | ||||
| 0909-37-082 | Waco | 09/02/26 | $593,000.00 | Construction | Bridge | Construction | Bridge | 06/01/26 | 92 | 3 months | ||||
| 0039-02-080 | Pharr | 06/02/26 | $205,724.00 | Construction | Roadway | Construction | Roadway | 09/01/26 | -92 | -3 months | ||||
| 0220-03-038 | Pharr | 06/02/26 | $242,842.00 | Construction | Roadway | Construction | Roadway | 09/01/26 | -92 | -3 months | ||||
| 0327-07-046 | Pharr | 06/02/26 | $140,770.85 | Construction | Roadway | Construction | Roadway | 09/01/26 | -92 | -3 months | ||||
| 0698-03-108 | Pharr | 06/02/26 | $70,480.00 | Construction | Roadway | Construction | Roadway | 09/01/26 | -92 | -3 months | ||||
| 1228-03-055 | Pharr | 06/02/26 | $192,788.00 | Construction | Roadway | Construction | Roadway | 09/01/26 | -92 | -3 months | ||||
| 2094-01-073 | Pharr | 06/02/26 | $365,803.00 | Construction | Roadway | Construction | Roadway | 09/01/26 | -92 | -3 months | ||||
| 2039-01-019 | Brownwood | 08/04/27 | $2,249,213.00 | Construction | Roadway | Construction | Roadway | 05/04/27 | 91 | 3 months | ||||
| 2039-01-020 | Brownwood | 08/04/27 | $2,249,213.00 | Construction | Roadway | Construction | Roadway | 05/04/27 | 91 | 3 months | ||||
| 2964-01-052 | Dallas | 02/01/27 | $1,044,443.79 | Construction | Local Let | Construction | Local Let | 11/01/26 | 91 | 3 months | ||||
| 0019-01-146 | Fort Worth | 06/02/26 | $19,442,730.37 | Construction | Roadway | Construction | Roadway | 03/03/26 | 90 | 3 months | $(10,400,051.63) | -35% | ||
| 0912-37-265 | Houston | 05/15/26 | $9,413,000.00 | Construction | Local Let | Construction | Roadway | 02/14/26 | 89 | 3 months | Construction / Roadway → Construction / Local Let | |||
| 0978-01-049 | Houston | 04/06/27 | $360,225.00 | Construction | Roadway | Construction | Roadway | 02/01/27 | 63 | 2 months | ||||
| 3049-01-036 | Houston | 04/06/27 | $232,500.00 | Construction | Roadway | Construction | Roadway | 02/01/27 | 63 | 2 months | ||||
| 0015-09-208 | Austin | 07/01/26 | $3,980,769.23 | Construction | Roadway | Construction | Roadway | 09/01/26 | -63 | -2 months | ||||
| 0114-09-103 | Bryan | 07/01/26 | $163,870.00 | Construction | Roadway | Unassigned | Unassigned | 09/01/26 | -63 | -2 months | Unassigned / Unassigned → Construction / Roadway | |||
| 0185-02-042 | Bryan | 07/01/26 | $75,610.00 | Construction | Roadway | Unassigned | Unassigned | 09/01/26 | -63 | -2 months | Unassigned / Unassigned → Construction / Roadway | |||
| 0185-03-037 | Bryan | 07/01/26 | $76,360.00 | Construction | Roadway | Unassigned | Unassigned | 09/01/26 | -63 | -2 months | Unassigned / Unassigned → Construction / Roadway | |||
| 0186-03-073 | Bryan | 07/01/26 | $43,920.00 | Construction | Roadway | Unassigned | Unassigned | 09/01/26 | -63 | -2 months | Unassigned / Unassigned → Construction / Roadway | |||
| 0186-03-074 | Bryan | 07/01/26 | $31,920.00 | Construction | Roadway | Unassigned | Unassigned | 09/01/26 | -63 | -2 months | Unassigned / Unassigned → Construction / Roadway | |||
| 0186-04-036 | Bryan | 07/01/26 | $22,690.00 | Construction | Roadway | Unassigned | Unassigned | 09/01/26 | -63 | -2 months | Unassigned / Unassigned → Construction / Roadway | |||
| 0204-05-046 | Bryan | 07/01/26 | $64,590.00 | Construction | Roadway | Unassigned | Unassigned | 09/01/26 | -63 | -2 months | Unassigned / Unassigned → Construction / Roadway | |||
| 0262-07-047 | Bryan | 07/01/26 | $62,410.00 | Construction | Roadway | Unassigned | Unassigned | 09/01/26 | -63 | -2 months | Unassigned / Unassigned → Construction / Roadway | |||
| 1953-01-035 | Bryan | 07/01/26 | $76,940.00 | Construction | Roadway | Unassigned | Unassigned | 09/01/26 | -63 | -2 months | Unassigned / Unassigned → Construction / Roadway | |||
| 2133-02-016 | Bryan | 07/01/26 | $18,780.00 | Construction | Roadway | Unassigned | Unassigned | 09/01/26 | -63 | -2 months | Unassigned / Unassigned → Construction / Roadway | |||
| 0253-06-037 | San Antonio | 09/03/27 | $3,628,000.00 | Construction | Local Let | Construction | Local Let | 07/02/27 | 62 | 2 months | ||||
| 0253-06-039 | San Antonio | 09/03/27 | $14,522,000.00 | Construction | Local Let | Construction | Local Let | 07/02/27 | 62 | 2 months | ||||
| 0034-01-144 | Abilene | 07/01/27 | $7,000,000.00 | Construction | Roadway | Unassigned | Unassigned | 08/31/27 | -62 | -2 months | $2,000,000.00 | 40% | Unassigned / Unassigned → Construction / Roadway | |
| 0918-24-316 | Dallas | 06/04/28 | $3,907,500.00 | Construction | Local Let | Unassigned | Unassigned | 08/03/28 | -61 | -2 months | Unassigned / Unassigned → Construction / Local Let | |||
| 0009-06-058 | Paris | 11/01/28 | $506,769.12 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | Unassigned / Unassigned → Construction / Roadway | |||
| 0045-10-022 | Paris | 11/01/28 | $551,738.88 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | Unassigned / Unassigned → Construction / Roadway | |||
| 0045-20-029 | Paris | 11/01/28 | $2,214,062.40 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | Unassigned / Unassigned → Construction / Roadway | |||
| 0279-04-025 | Paris | 11/01/28 | $335,237.76 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | Unassigned / Unassigned → Construction / Roadway | |||
| 0510-02-035 | Paris | 11/01/28 | $551,522.40 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | Unassigned / Unassigned → Construction / Roadway | |||
| 0549-01-042 | Paris | 11/01/28 | $95,821.44 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | $(54,637.44) | -36% | Unassigned / Unassigned → Construction / Roadway | |
| 0641-04-022 | Paris | 11/01/28 | $378,824.16 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | Unassigned / Unassigned → Construction / Roadway | |||
| 0641-05-023 | Paris | 11/01/28 | $148,262.40 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | Unassigned / Unassigned → Construction / Roadway | |||
| 0722-02-053 | Paris | 11/01/28 | $110,667.67 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | Unassigned / Unassigned → Construction / Roadway | |||
| 0723-01-044 | Paris | 11/01/28 | $291,202.56 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | Unassigned / Unassigned → Construction / Roadway | |||
| 0728-03-017 | Paris | 11/01/28 | $64,408.96 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | $(317,709.92) | -83% | Unassigned / Unassigned → Construction / Roadway | |
| 0728-04-014 | Paris | 11/01/28 | $258,255.36 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | Unassigned / Unassigned → Construction / Roadway | |||
| 0749-04-014 | Paris | 11/01/28 | $233,418.24 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | Unassigned / Unassigned → Construction / Roadway | |||
| 0764-03-019 | Paris | 11/01/28 | $235,641.12 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | Unassigned / Unassigned → Construction / Roadway | |||
| 0765-03-030 | Paris | 11/01/28 | $152,449.44 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | Unassigned / Unassigned → Construction / Roadway | |||
| 0766-01-033 | Paris | 11/01/28 | $835,005.60 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | Unassigned / Unassigned → Construction / Roadway | |||
| 0768-01-060 | Paris | 11/01/28 | $44,272.80 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | Unassigned / Unassigned → Construction / Roadway | |||
| 0768-02-025 | Paris | 11/01/28 | $97,812.00 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | Unassigned / Unassigned → Construction / Roadway | |||
| 0769-02-036 | Paris | 11/01/28 | $1,106,957.28 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | Unassigned / Unassigned → Construction / Roadway | |||
| 0772-02-019 | Paris | 11/01/28 | $639,894.89 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | Unassigned / Unassigned → Construction / Roadway | |||
| 1154-01-021 | Paris | 11/01/28 | $601,149.12 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | Unassigned / Unassigned → Construction / Roadway | |||
| 1454-01-024 | Paris | 11/01/28 | $525,719.04 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | Unassigned / Unassigned → Construction / Roadway | |||
| 1465-01-016 | Paris | 11/01/28 | $204,145.92 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | Unassigned / Unassigned → Construction / Roadway | |||
| 1849-01-012 | Paris | 11/01/28 | $390,561.60 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | Unassigned / Unassigned → Construction / Roadway | |||
| 1849-02-008 | Paris | 11/01/28 | $65,413.92 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | Unassigned / Unassigned → Construction / Roadway | |||
| 1849-03-023 | Paris | 11/01/28 | $1,294,719.36 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | $(42,863.04) | -3% | Unassigned / Unassigned → Construction / Roadway | |
| 1979-01-017 | Paris | 11/01/28 | $467,596.80 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | Unassigned / Unassigned → Construction / Roadway | |||
| 2003-01-011 | Paris | 11/01/28 | $311,794.56 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | Unassigned / Unassigned → Construction / Roadway | |||
| 2459-02-015 | Paris | 11/01/28 | $125,062.08 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | Unassigned / Unassigned → Construction / Roadway | |||
| 2683-01-009 | Paris | 11/01/28 | $66,792.00 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | Unassigned / Unassigned → Construction / Roadway | |||
| 2875-01-010 | Paris | 11/01/28 | $338,976.00 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | Unassigned / Unassigned → Construction / Roadway | |||
| 0915-15-088 | San Antonio | 10/05/27 | $1,070,039.00 | Construction | Bridge | Construction | Bridge | 08/31/27 | 34 | 1 month | ||||
| 0338-11-062 | Houston | 05/15/27 | $2,403,000.00 | Construction | Local Let | Construction | Roadway | 06/14/27 | -31 | -1 month | Construction / Roadway → Construction / Local Let | |||
| 0912-37-259 | Houston | 09/15/26 | $13,200,000.00 | Construction | Local Let | Construction | Roadway | 08/14/26 | 31 | 1 month | Construction / Roadway → Construction / Local Let | |||
| 0912-72-761 | Houston | 09/15/26 | $1,026,535.00 | Construction | Local Let | Construction | Local Let | 08/14/26 | 31 | 1 month | ||||
| 0912-72-762 | Houston | 09/15/26 | $408,301.00 | Construction | Local Let | Construction | Local Let | 08/14/26 | 31 | 1 month | ||||
| 0912-72-819 | Houston | 09/15/26 | $17,209,746.00 | Construction | Local Let | Construction | Local Let | 08/14/26 | 31 | 1 month | ||||
| 0912-72-824 | Houston | 09/15/26 | $8,000,000.00 | Construction | Local Let | Construction | Local Let | 08/14/26 | 31 | 1 month | ||||
| 0912-73-249 | Houston | 09/15/26 | $3,250,000.00 | Construction | Local Let | Construction | Local Let | 08/14/26 | 31 | 1 month | ||||
| 3595-01-028 | Houston | 09/15/26 | $525,000.00 | Construction | Local Let | Construction | Local Let | 08/14/26 | 31 | 1 month | ||||
| 6496-99-001 | Houston | 07/09/26 | $950,000.00 | Maintenance | Bridge Preventive | Unassigned | Unassigned | 06/08/26 | 30 | 30 days | Unassigned / Unassigned → Maintenance / Bridge Preventive | |||
| 0384-04-035 | Austin | 06/01/28 | $314,391.74 | Construction | Roadway | Unassigned | Unassigned | 05/02/28 | 29 | 29 days | Unassigned / Unassigned → Construction / Roadway | |||
| 2552-01-062 | El Paso | 11/02/27 | $961,538.46 | Construction | Roadway | Construction | Roadway | 10/04/27 | 28 | 28 days | ||||
| 0128-01-122 | Brownwood | 02/02/27 | $2,900,000.00 | Construction | Bridge | Unassigned | Unassigned | 01/05/27 | 27 | 27 days | Unassigned / Unassigned → Construction / Bridge | |||
| 0289-04-036 | Brownwood | 02/02/27 | $650,000.00 | Construction | Bridge | Unassigned | Unassigned | 01/05/27 | 27 | 27 days | Unassigned / Unassigned → Construction / Bridge | |||
| 0550-01-032 | Brownwood | 02/02/27 | $150,000.00 | Construction | Bridge | Unassigned | Unassigned | 01/05/27 | 27 | 27 days | Unassigned / Unassigned → Construction / Bridge | |||
| 0550-01-033 | Brownwood | 02/02/27 | $200,000.00 | Construction | Bridge | Unassigned | Unassigned | 01/05/27 | 27 | 27 days | Unassigned / Unassigned → Construction / Bridge | |||
| 0550-01-034 | Brownwood | 02/02/27 | $150,000.00 | Construction | Bridge | Unassigned | Unassigned | 01/05/27 | 27 | 27 days | Unassigned / Unassigned → Construction / Bridge | |||
| 1026-01-014 | Brownwood | 02/02/27 | $138,304.00 | Construction | Bridge | Unassigned | Unassigned | 01/05/27 | 27 | 27 days | Unassigned / Unassigned → Construction / Bridge | |||
| 1697-02-036 | Brownwood | 02/02/27 | $350,000.00 | Construction | Bridge | Unassigned | Unassigned | 01/05/27 | 27 | 27 days | Unassigned / Unassigned → Construction / Bridge | |||
| 2106-01-011 | Brownwood | 02/02/27 | $300,000.00 | Construction | Bridge | Unassigned | Unassigned | 01/05/27 | 27 | 27 days | Unassigned / Unassigned → Construction / Bridge | |||
| 1756-01-024 | Yoakum | 06/02/26 | $937,067.00 | Construction | Roadway | Unassigned | Unassigned | 05/05/26 | 27 | 27 days | Unassigned / Unassigned → Construction / Roadway | |||
| 0907-00-242 | San Angelo | 04/05/28 | $1,956,000.00 | Construction | Roadway | Unassigned | Unassigned | 04/12/28 | -8 | -8 days | $178,000.00 | 10% | Unassigned / Unassigned → Construction / Roadway | |
| 0184-03-044 | Waco | 11/01/26 | $142,061.00 | Non-Let | Roadway | Unassigned | Unassigned | 11/02/26 | -2 | -2 days | Unassigned / Unassigned → Non-Let / Roadway |
Project Type & Subtype Changes
The mix of work in the pipeline remains consistent. Construction continues to dominate, increasing to 95.7% of the pipeline, with roadway work making up the majority of projects and bridge work representing a smaller but steady share.
The measurable changes at the subtype level are small:
| Subtype | Feb 2 | March 3 | Δ |
|---|---|---|---|
| Roadway | 52.7% | 76.0% | +23.3 |
| Bridge | 11.0% | 15.4% | +4.4 |
| Local Let | 2.7% | 3.6% | +1.0 |
| Non Roadway | 1.1% | 1.8% | +0.7 |
| Local | 0.2% | 0.6% | +0.4 |
| Rail - Safety | 1.1% | 1.4% | +0.3 |
| Routine Maintenance Contract | 0.1% | 0.3% | +0.2 |
Only 5.3% of projects experienced a subtype change across the window.
For contractors, this reinforces a familiar structure. The pipeline is still overwhelmingly roadway-driven, with bridge work as the primary secondary category. There is no indication of a shift toward new types of work or a change in how TxDOT is allocating scope across categories.
| CSJ | District | Est. Letting Date | Project Estimate | Current Type | Current Subtype | Type/Subtype Δ | Prev. Type | Prev. Subtype | Prev. Cost | Prev. Date | Letting Δ (days) | Letting Date Δ | Cost Δ | %Cost Δ | Lifecycle |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0047-03-091 | Paris | 04/07/26 | $147,195,094.80 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $152,906,394.00 | $(5,711,299.20) | -4% | ||||
| 0079-05-073 | Fort Worth | 04/07/26 | $72,390.52 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | $76,624.33 | $(4,233.81) | -6% | ||||
| 0172-09-046 | Fort Worth | 04/07/26 | $286,038.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $280,000.00 | $6,038.00 | 2% | ||||
| 0314-07-087 | Fort Worth | 04/07/26 | $537,434.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $534,158.80 | $3,275.20 | 1% | ||||
| 0337-02-054 | Austin | 04/07/26 | $2,566,158.62 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $2,645,257.53 | $(79,098.91) | -3% | ||||
| 0543-02-089 | Houston | 04/07/26 | $770,105.75 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | $836,725.75 | $(66,620.00) | -8% | ||||
| 0986-03-015 | Austin | 04/07/26 | $1,713,954.79 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $1,911,737.44 | $(197,782.65) | -10% | ||||
| 1014-03-065 | Dallas | 04/07/26 | $1,202,059.26 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $852,000.00 | $350,059.26 | 41% | ||||
| 1091-04-033 | Dallas | 04/07/26 | $277,376.80 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $426,000.00 | $(148,623.20) | -35% | ||||
| 1290-03-033 | Dallas | 04/07/26 | $690,184.30 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $1,266,000.00 | $(575,815.70) | -45% | ||||
| 1330-02-052 | Fort Worth | 04/07/26 | $8,810,551.86 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $7,785,159.27 | $1,025,392.59 | 13% | ||||
| 2150-03-034 | Laredo | 04/07/26 | $806,013.55 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $419,000.00 | $387,013.55 | 92% | ||||
| 2752-01-008 | Laredo | 04/07/26 | $907,598.60 | Construction | Bridge | Construction / Roadway → Construction / Bridge | Construction | Roadway | $639,624.41 | $267,974.19 | 42% | ||||
| 0271-17-188 | Houston | 04/15/26 | $1,600,000.00 | Non-Let | Bridge | Unassigned / Unassigned → Non-Let / Bridge | Unassigned | Unassigned | $1,000,000.00 | $600,000.00 | 60% | ||||
| 0038-01-108 | Laredo | 05/06/26 | $239,077.76 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 02/01/27 | -272 | -9 months | ||||
| 0048-04-109 | Dallas | 05/06/26 | $615,349.25 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $636,000.00 | $(20,650.75) | -3% | ||||
| 0081-03-047 | Dallas | 05/06/26 | $116,223,406.70 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $172,970,558.00 | $(56,747,151.30) | -33% | ||||
| 0172-11-017 | Dallas | 05/06/26 | $1,104,055.45 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $1,272,000.00 | $(167,944.55) | -13% | ||||
| 0301-04-027 | Laredo | 05/06/26 | $308,090.60 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 02/01/27 | -272 | -9 months | ||||
| 0542-03-040 | Laredo | 05/06/26 | $7,504,710.40 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 02/01/27 | -272 | -9 months | ||||
| 0815-08-044 | Dallas | 05/06/26 | $1,230,656.05 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $1,272,000.00 | $(41,343.95) | -3% | ||||
| 1394-02-031 | Dallas | 05/06/26 | $1,048,966.35 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $848,400.00 | $200,566.35 | 24% | ||||
| 3256-02-121 | Houston | 05/06/26 | $2,286,187.03 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $2,436,237.84 | $(150,050.81) | -6% | ||||
| 6497-67-001 | Beaumont | 05/06/26 | $1.00 | Maintenance | Routine Maintenance Contract | Unassigned / Unassigned → Maintenance / Routine Maintenance Contract | Unassigned | Unassigned | 09/01/26 | -119 | -4 months | ||||
| 0912-37-265 | Houston | 05/15/26 | $9,413,000.00 | Construction | Local Let | Construction / Roadway → Construction / Local Let | Construction | Roadway | 02/14/26 | 89 | 3 months | ||||
| 0166-07-073 | Bryan | 06/02/26 | $404,475.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | $360,772.88 | $43,702.12 | 12% | ||||
| 1756-01-024 | Yoakum | 06/02/26 | $937,067.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 05/05/26 | 27 | 27 days | ||||
| 0081-02-079 | Fort Worth | 06/11/26 | $515,157.78 | Construction | Local Let | Unassigned / Unassigned → Construction / Local Let | Unassigned | Unassigned | $513,104.90 | $2,052.88 | 0% | ||||
| 0363-01-153 | Fort Worth | 06/17/26 | $647,757.55 | Construction | Local Let | Unassigned / Unassigned → Construction / Local Let | Unassigned | Unassigned | $420,708.00 | $227,049.55 | 54% | ||||
| 0353-03-117 | Fort Worth | 06/18/26 | $516,490.30 | Construction | Local Let | Unassigned / Unassigned → Construction / Local Let | Unassigned | Unassigned | $568,354.60 | $(51,864.30) | -9% | ||||
| 0114-01-070 | Austin | 07/01/26 | $620,000.00 | Construction | Non Roadway | Unassigned / Unassigned → Construction / Non Roadway | Unassigned | Unassigned | $1,800,000.00 | $(1,180,000.00) | -66% | ||||
| 0114-01-071 | Austin | 07/01/26 | $4,200,000.00 | Construction | Non Roadway | Unassigned / Unassigned → Construction / Non Roadway | Unassigned | Unassigned | $7,200,000.00 | $(3,000,000.00) | -42% | ||||
| 0114-09-103 | Bryan | 07/01/26 | $163,870.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 09/01/26 | -63 | -2 months | ||||
| 0185-02-042 | Bryan | 07/01/26 | $75,610.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 09/01/26 | -63 | -2 months | ||||
| 0185-03-037 | Bryan | 07/01/26 | $76,360.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 09/01/26 | -63 | -2 months | ||||
| 0186-03-073 | Bryan | 07/01/26 | $43,920.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 09/01/26 | -63 | -2 months | ||||
| 0186-03-074 | Bryan | 07/01/26 | $31,920.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 09/01/26 | -63 | -2 months | ||||
| 0186-04-036 | Bryan | 07/01/26 | $22,690.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 09/01/26 | -63 | -2 months | ||||
| 0204-05-046 | Bryan | 07/01/26 | $64,590.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 09/01/26 | -63 | -2 months | ||||
| 0211-10-053 | Yoakum | 07/01/26 | $2,000,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0262-07-047 | Bryan | 07/01/26 | $62,410.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 09/01/26 | -63 | -2 months | ||||
| 0370-05-057 | Yoakum | 07/01/26 | $540,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $500,000.00 | $40,000.00 | 8% | ||||
| 0675-08-121 | Houston | 07/01/26 | $3,627,242.00 | Construction | Non Roadway | Unassigned / Unassigned → Construction / Non Roadway | Unassigned | Unassigned | 08/31/27 | -427 | -1 year | ||||
| 1953-01-035 | Bryan | 07/01/26 | $76,940.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 09/01/26 | -63 | -2 months | ||||
| 2133-02-016 | Bryan | 07/01/26 | $18,780.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 09/01/26 | -63 | -2 months | ||||
| 3510-04-064 | Houston | 07/01/26 | $3,693,789.00 | Construction | Non Roadway | Unassigned / Unassigned → Construction / Non Roadway | Unassigned | Unassigned | 08/31/27 | -427 | -1 year | ||||
| 3510-04-065 | Houston | 07/01/26 | $3,942,056.00 | Construction | Non Roadway | Unassigned / Unassigned → Construction / Non Roadway | Unassigned | Unassigned | 08/31/27 | -427 | -1 year | ||||
| 6496-99-001 | Houston | 07/09/26 | $950,000.00 | Maintenance | Bridge Preventive | Unassigned / Unassigned → Maintenance / Bridge Preventive | Unassigned | Unassigned | 06/08/26 | 30 | 30 days | ||||
| 0313-07-023 | Fort Worth | 08/01/26 | $1,142,907.00 | Non-Let | Change Order | Unassigned / Unassigned → Non-Let / Change Order | Unassigned | Unassigned | |||||||
| 0050-02-132 | Bryan | 08/03/26 | $39,771.75 | Non-Let | Roadway | Unassigned / Unassigned → Non-Let / Roadway | Unassigned | Unassigned | |||||||
| 0013-08-154 | Fort Worth | 08/05/26 | $1,681,823.02 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 09/05/28 | -763 | -2 years | ||||
| 0095-04-079 | Dallas | 08/05/26 | $1,338,522.57 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | $2,463,673.44 | $(1,125,150.87) | -46% | ||||
| 6499-31-001 | Dallas | 08/12/26 | $400,000.00 | Maintenance | Routine Maintenance Contract | Unassigned / Unassigned → Maintenance / Routine Maintenance Contract | Unassigned | Unassigned | |||||||
| 0015-13-437 | Austin | 09/02/26 | $387,000,000.00 | Construction | Roadway | Construction / Rail → Construction / Roadway | Construction | Rail | $402,480,000.00 | $(15,480,000.00) | -4% | ||||
| 0028-06-098 | Beaumont | 09/02/26 | $113,202.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0172-09-047 | Fort Worth | 09/02/26 | $7,466,647.62 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0307-01-161 | Beaumont | 09/02/26 | $329,100.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0388-03-090 | Beaumont | 09/02/26 | $24,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0593-01-142 | Beaumont | 09/02/26 | $128,234.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0915-12-691 | San Antonio | 09/02/26 | $250,000.00 | Construction | Rail - Safety | Non-Let / Change Order → Construction / Rail - Safety | Non-Let | Change Order | 02/28/27 | -180 | -6 months | ||||
| 2266-02-169 | Fort Worth | 09/02/26 | $8,658,289.39 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0912-37-259 | Houston | 09/15/26 | $13,200,000.00 | Construction | Local Let | Construction / Roadway → Construction / Local Let | Construction | Roadway | 08/14/26 | 31 | 1 month | ||||
| 0132-01-058 | Childress | 10/06/26 | $60,311.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0215-09-037 | San Antonio | 10/06/26 | $385,985.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0236-01-024 | San Antonio | 10/06/26 | $265,286.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0349-01-033 | Corpus Christi | 10/06/26 | $829,681.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0517-01-050 | San Antonio | 10/06/26 | $331,964.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0613-02-071 | San Antonio | 10/06/26 | $260,631.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 1738-02-015 | San Antonio | 10/06/26 | $316,285.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 2556-02-013 | San Antonio | 10/06/26 | $347,521.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 2882-02-007 | San Antonio | 10/06/26 | $168,636.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 3075-02-014 | Corpus Christi | 10/06/26 | $11,415.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 3352-01-009 | San Antonio | 10/06/26 | $292,520.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0184-03-044 | Waco | 11/01/26 | $142,061.00 | Non-Let | Roadway | Unassigned / Unassigned → Non-Let / Roadway | Unassigned | Unassigned | 11/02/26 | -2 | -2 days | ||||
| 0044-06-079 | Wichita Falls | 11/03/26 | $225,735.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0044-07-077 | Wichita Falls | 11/03/26 | $716,433.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0047-04-032 | Dallas | 11/03/26 | $46,922,696.42 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $63,694,143.00 | $(16,771,446.58) | -26% | ||||
| 0080-03-049 | Fort Worth | 11/03/26 | $115,461,159.10 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $126,999,999.80 | $(11,538,840.70) | -9% | ||||
| 0136-03-073 | Paris | 11/03/26 | $2,076,861.02 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0239-04-024 | Wichita Falls | 11/03/26 | $531,657.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0239-08-002 | Wichita Falls | 11/03/26 | $9,318.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0906-18-022 | Odessa | 11/03/26 | $938,819.42 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 2635-05-005 | Amarillo | 11/03/26 | $47,259,223.32 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $69,477,353.12 | $(22,218,129.80) | -32% | ||||
| 2659-02-004 | Paris | 11/03/26 | $192,154.45 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 2706-02-018 | Wichita Falls | 11/03/26 | $108,280.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0013-10-098 | Fort Worth | 12/01/26 | $8,507,754.06 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 03/02/27 | -92 | -3 months | ||||
| 0042-10-004 | Amarillo | 12/01/26 | $1,880,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0168-09-197 | Amarillo | 12/01/26 | $847,000.00 | Construction | Non Roadway | Unassigned / Unassigned → Construction / Non Roadway | Unassigned | Unassigned | $547,000.00 | $300,000.00 | 55% | ||||
| 0168-09-198 | Amarillo | 12/01/26 | $900,000.00 | Construction | Non Roadway | Unassigned / Unassigned → Construction / Non Roadway | Unassigned | Unassigned | |||||||
| 0168-10-084 | Amarillo | 12/01/26 | $100,000.00 | Construction | Non Roadway | Unassigned / Unassigned → Construction / Non Roadway | Unassigned | Unassigned | |||||||
| 0187-01-060 | Bryan | 12/01/26 | $537,819.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0363-03-061 | Fort Worth | 12/01/26 | $2,718,460.17 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0397-02-043 | Childress | 12/01/26 | $1,200,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 2452-03-128 | San Antonio | 12/01/26 | $190,314,322.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $215,816,440.00 | $(25,502,118.00) | -12% | ||||
| 0054-06-109 | Brownwood | 01/06/27 | $1,600,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $98,640.00 | $1,501,360.00 | 1522% | ||||
| 0128-04-045 | Brownwood | 01/06/27 | $2,644,230.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $2,500,000.00 | $144,230.00 | 6% | ||||
| 0917-29-152 | Bryan | 01/06/27 | $1,324,348.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $1,716,395.50 | 09/01/26 | 126 | 4 months | $(392,047.50) | -23% | |
| 1601-02-036 | Fort Worth | 01/06/27 | $8,441,246.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $9,033,592.70 | $(592,346.70) | -7% | ||||
| 2883-02-011 | San Antonio | 01/06/27 | $1,105,769.00 | Construction | Roadway | Non-Let / Rail - Safety → Construction / Roadway | Non-Let | Rail - Safety | 09/01/26 | 126 | 4 months | ||||
| 0009-11-248 | Dallas | 02/02/27 | $57,043,890.08 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $79,147,850.00 | $(22,103,959.92) | -28% | ||||
| 0128-01-122 | Brownwood | 02/02/27 | $2,900,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | 01/05/27 | 27 | 27 days | ||||
| 0259-05-086 | Fort Worth | 02/02/27 | $716,072.23 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0289-04-036 | Brownwood | 02/02/27 | $650,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | 01/05/27 | 27 | 27 days | ||||
| 0550-01-032 | Brownwood | 02/02/27 | $150,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | 01/05/27 | 27 | 27 days | ||||
| 0550-01-033 | Brownwood | 02/02/27 | $200,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | 01/05/27 | 27 | 27 days | ||||
| 0550-01-034 | Brownwood | 02/02/27 | $150,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | 01/05/27 | 27 | 27 days | ||||
| 1026-01-014 | Brownwood | 02/02/27 | $138,304.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | 01/05/27 | 27 | 27 days | ||||
| 1697-02-036 | Brownwood | 02/02/27 | $350,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | 01/05/27 | 27 | 27 days | ||||
| 2106-01-011 | Brownwood | 02/02/27 | $300,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | 01/05/27 | 27 | 27 days | ||||
| 0683-03-043 | Austin | 03/03/27 | $1,837,409.82 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 09/05/28 | -553 | -2 years | ||||
| 0915-12-827 | San Antonio | 03/03/27 | $654,893.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0915-12-828 | San Antonio | 03/03/27 | $362,736.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 2208-01-074 | Fort Worth | 03/03/27 | $3,905,479.41 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0413-06-015 | Bryan | 03/07/27 | $563,448.00 | Construction | Local Let | Unassigned / Unassigned → Construction / Local Let | Unassigned | Unassigned | |||||||
| 0912-72-583 | Houston | 03/15/27 | $736,806.00 | Construction | Local Let | Construction / Roadway → Construction / Local Let | Construction | Roadway | 09/14/26 | 181 | 6 months | ||||
| 0114-09-104 | Bryan | 04/06/27 | $2,000,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $3,000,000.00 | $(1,000,000.00) | -33% | ||||
| 0199-08-029 | Lufkin | 04/06/27 | $1,935,915.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0200-01-098 | Lufkin | 04/06/27 | $1,626,716.60 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0200-13-013 | Lufkin | 04/06/27 | $572,283.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0336-05-071 | Lufkin | 04/06/27 | $1,388,369.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0576-02-077 | Lufkin | 04/06/27 | $861,976.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 2006-03-013 | San Angelo | 04/06/27 | $926,675.86 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0024-07-068 | San Antonio | 05/05/27 | $278,604,536.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $312,037,081.00 | $(33,432,545.00) | -11% | ||||
| 0267-01-036 | Yoakum | 05/05/27 | $1,338,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $1,216,000.00 | $122,000.00 | 10% | ||||
| 0338-11-062 | Houston | 05/15/27 | $2,403,000.00 | Construction | Local Let | Construction / Roadway → Construction / Local Let | Construction | Roadway | 06/14/27 | -31 | -1 month | ||||
| 0907-24-060 | San Angelo | 06/03/27 | $3,552,743.00 | Construction | Local Let | Unassigned / Unassigned → Construction / Local Let | Unassigned | Unassigned | 03/31/26 | 428 | 1 year | ||||
| 0034-01-144 | Abilene | 07/01/27 | $7,000,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $5,000,000.00 | 08/31/27 | -62 | -2 months | $2,000,000.00 | 40% | |
| 0908-33-118 | Abilene | 08/04/27 | $613,311.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $640,506.41 | $(27,195.41) | -4% | ||||
| 2560-01-079 | Lufkin | 08/04/27 | $7,615,384.62 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $12,700,000.00 | 02/28/38 | -3862 | -11 years | $(5,084,615.38) | -40% | |
| 0177-03-110 | Beaumont | 09/01/27 | $679,006.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0610-06-098 | Atlanta | 09/01/27 | $14,560,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $16,307,200.00 | $(1,747,200.00) | -11% | ||||
| 0883-02-098 | Beaumont | 09/01/27 | $341,440.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 1024-01-097 | Beaumont | 09/01/27 | $16,676.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0921-06-330 | Pharr | 09/03/27 | $17,023,422.00 | Construction | Local Let | Unassigned / Unassigned → Construction / Local Let | Unassigned | Unassigned | 09/01/29 | -730 | -2 years | ||||
| 3417-02-043 | Austin | 09/03/27 | $1,805,976.85 | Non-Let | Roadway | Unassigned / Unassigned → Non-Let / Roadway | Unassigned | Unassigned | $1,712,962.96 | $93,013.89 | 5% | ||||
| 0024-05-107 | San Antonio | 10/05/27 | $589,451.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0043-02-078 | Childress | 10/05/27 | $18,800,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $21,056,000.00 | $(2,256,000.00) | -11% | ||||
| 0328-02-048 | San Antonio | 10/05/27 | $520,690.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0328-02-049 | San Antonio | 10/05/27 | $26,377.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0359-05-013 | San Antonio | 10/05/27 | $448,499.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0517-01-051 | San Antonio | 10/05/27 | $390,803.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0517-02-050 | San Antonio | 10/05/27 | $515,422.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0993-01-014 | Corpus Christi | 10/05/27 | $205,460.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 10/05/26 | 364 | 12 months | ||||
| 1794-01-029 | Lufkin | 10/05/27 | $1,666,666.67 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 07/05/28 | -275 | -9 months | ||||
| 0217-02-037 | Atlanta | 11/01/27 | $18,642,426.36 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $20,879,517.00 | $(2,237,090.64) | -11% | ||||
| 0044-06-080 | Wichita Falls | 11/02/27 | $1,352,204.50 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0189-01-014 | Paris | 11/02/27 | $44,953.92 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 12/04/28 | -399 | -1 year | ||||
| 0189-02-064 | Paris | 11/02/27 | $1,915,826.88 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 12/04/28 | -399 | -1 year | ||||
| 0610-01-055 | Paris | 11/02/27 | $64,408.96 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 1611-01-013 | Wichita Falls | 11/02/27 | $168,468.94 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 1766-01-010 | Wichita Falls | 11/02/27 | $144,371.40 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 1767-01-008 | Wichita Falls | 11/02/27 | $32,496.55 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 2438-01-011 | Wichita Falls | 11/02/27 | $338,547.43 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 3375-01-007 | Wichita Falls | 11/02/27 | $59,587.18 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0910-34-042 | Tyler | 12/01/27 | $727,368.96 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | 10/31/28 | -336 | -11 months | ||||
| 2690-01-040 | Austin | 12/01/27 | $7,346,428.57 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 11/30/30 | -1096 | -3 years | ||||
| 2690-01-046 | Austin | 12/01/27 | $714,285.71 | Construction | Rail - Safety | Unassigned / Unassigned → Construction / Rail - Safety | Unassigned | Unassigned | 11/30/30 | -1096 | -3 years | ||||
| 0070-06-056 | Brownwood | 01/05/28 | $400,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 01/05/27 | 364 | 12 months | ||||
| 0289-04-037 | Brownwood | 01/05/28 | $3,568,950.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $3,000,000.00 | 01/05/27 | 364 | 12 months | $568,950.00 | 19% | |
| 1239-01-034 | Brownwood | 01/05/28 | $125,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | $150,000.00 | $(25,000.00) | -17% | ||||
| 3538-01-067 | Houston | 01/05/28 | $1,000,000.00 | Construction | Non Roadway | Unassigned / Unassigned → Construction / Non Roadway | Unassigned | Unassigned | $2,061,504.00 | $(1,061,504.00) | -51% | ||||
| 3538-01-071 | Houston | 01/05/28 | $1,000,000.00 | Construction | Non Roadway | Unassigned / Unassigned → Construction / Non Roadway | Unassigned | Unassigned | |||||||
| 0495-03-076 | Tyler | 02/02/28 | $3,846,153.85 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $4,000,000.00 | $(153,846.15) | -4% | ||||
| 3632-01-003 | Pharr | 02/02/28 | $90,352,435.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $101,194,726.00 | $(10,842,291.00) | -11% | ||||
| 0027-13-261 | Houston | 03/07/28 | $300,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0177-11-170 | Houston | 03/07/28 | $1,700,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0265-06-036 | Austin | 03/07/28 | $5,000,000.00 | Construction | Non Roadway | Unassigned / Unassigned → Construction / Non Roadway | Unassigned | Unassigned | 08/03/27 | 216 | 7 months | ||||
| 0918-47-577 | Dallas | 04/02/28 | $5,700,000.00 | Construction | Local Let | Unassigned / Unassigned → Construction / Local Let | Unassigned | Unassigned | 08/01/26 | 609 | 2 years | ||||
| 0081-04-047 | Dallas | 04/05/28 | $460,407.60 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0907-00-242 | San Angelo | 04/05/28 | $1,956,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $1,778,000.00 | 04/12/28 | -8 | -8 days | $178,000.00 | 10% | |
| 1416-03-022 | Houston | 05/03/28 | $6,000,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0912-72-845 | Houston | 05/15/28 | $75,920,000.00 | Construction | Local Let | Unassigned / Unassigned → Construction / Local Let | Unassigned | Unassigned | 08/14/28 | -92 | -3 months | ||||
| 0263-05-027 | Abilene | 06/01/28 | $2,358,156.80 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $2,613,672.48 | $(255,515.68) | -10% | ||||
| 0384-04-035 | Austin | 06/01/28 | $314,391.74 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 05/02/28 | 29 | 29 days | ||||
| 0918-24-316 | Dallas | 06/04/28 | $3,907,500.00 | Construction | Local Let | Unassigned / Unassigned → Construction / Local Let | Unassigned | Unassigned | 08/03/28 | -61 | -2 months | ||||
| 0907-00-243 | San Angelo | 06/13/28 | $8,509,000.00 | Construction | Local Let | Unassigned / Unassigned → Construction / Local Let | Unassigned | Unassigned | $9,581,000.00 | $(1,072,000.00) | -11% | ||||
| 0091-05-081 | Dallas | 08/04/28 | $1,200,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 08/03/27 | 366 | 1 year | ||||
| 0081-13-071 | Dallas | 09/06/28 | $232,779,659.10 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $260,713,231.60 | $(27,933,572.50) | -11% | ||||
| 0092-03-053 | Dallas | 09/06/28 | $62,131,255.85 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $83,760,305.57 | $(21,629,049.72) | -26% | ||||
| 0095-02-096 | Dallas | 09/06/28 | $347,679,308.50 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $395,000,825.50 | $(47,321,517.00) | -12% | ||||
| 0167-01-138 | El Paso | 09/06/28 | $2,762,500.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | |||||||
| 0249-07-072 | Fort Worth | 09/06/28 | $42,784,246.29 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | $41,153,041.00 | $1,631,205.29 | 4% | ||||
| 0273-02-028 | Austin | 09/06/28 | $321,428.57 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | |||||||
| 0451-01-053 | Dallas | 09/06/28 | $117,610,100.90 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $132,731,313.00 | $(15,121,212.10) | -11% | ||||
| 0915-12-829 | San Antonio | 09/06/28 | $1,566,606.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 1051-01-064 | Dallas | 09/06/28 | $101,546,735.70 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $115,412,344.00 | $(13,865,608.30) | -12% | ||||
| 1051-03-001 | Dallas | 09/06/28 | $54,002,986.08 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $74,481,854.00 | $(20,478,867.92) | -28% | ||||
| 2941-02-054 | Houston | 09/06/28 | $1,288,740.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 07/31/32 | -1425 | -4 years | ||||
| 2941-02-056 | Houston | 09/06/28 | $32,000,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 07/31/32 | -1425 | -4 years | ||||
| 0024-06-079 | San Antonio | 10/04/28 | $407,013.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0052-01-046 | Lubbock | 10/04/28 | $27,200,001.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | $83,640,398.24 | $(56,440,397.24) | -67% | ||||
| 0150-05-053 | Austin | 10/04/28 | $830,357.14 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | |||||||
| 0595-02-026 | San Antonio | 10/04/28 | $721,746.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0748-05-046 | San Antonio | 10/04/28 | $588,185.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0926-05-009 | Lufkin | 10/04/28 | $9,169,916.07 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $8,482,142.86 | $687,773.21 | 8% | ||||
| 1167-01-014 | San Antonio | 10/04/28 | $181,335.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 2263-02-112 | Corpus Christi | 10/04/28 | $17,000,000.00 | Construction | Ferry Boat | Unassigned / Unassigned → Construction / Ferry Boat | Unassigned | Unassigned | 09/30/35 | -2553 | -7 years | ||||
| 3127-01-010 | San Antonio | 10/04/28 | $93,424.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0005-15-097 | Odessa | 11/01/28 | $900,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | |||||||
| 0005-15-098 | Odessa | 11/01/28 | $900,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | |||||||
| 0009-06-058 | Paris | 11/01/28 | $506,769.12 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | ||||
| 0045-10-022 | Paris | 11/01/28 | $551,738.88 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | ||||
| 0045-12-099 | Paris | 11/01/28 | $221,892.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0045-20-029 | Paris | 11/01/28 | $2,214,062.40 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | ||||
| 0124-03-067 | Wichita Falls | 11/01/28 | $381,561.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0134-02-065 | Wichita Falls | 11/01/28 | $893,996.40 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0195-02-090 | Dallas | 11/01/28 | $159,894,765.10 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $179,082,136.90 | $(19,187,371.80) | -11% | ||||
| 0239-01-025 | Wichita Falls | 11/01/28 | $328,848.96 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0249-01-061 | Wichita Falls | 11/01/28 | $50,574.77 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0249-02-027 | Wichita Falls | 11/01/28 | $204,648.11 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0279-04-025 | Paris | 11/01/28 | $335,237.76 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | ||||
| 0283-04-038 | Wichita Falls | 11/01/28 | $571,016.75 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0423-05-012 | Wichita Falls | 11/01/28 | $113,875.52 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0423-06-017 | Wichita Falls | 11/01/28 | $160,881.60 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0510-02-035 | Paris | 11/01/28 | $551,522.40 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | ||||
| 0549-01-042 | Paris | 11/01/28 | $95,821.44 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $150,458.88 | 12/04/28 | -34 | -1 month | $(54,637.44) | -36% | |
| 0641-04-022 | Paris | 11/01/28 | $378,824.16 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | ||||
| 0641-05-023 | Paris | 11/01/28 | $148,262.40 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | ||||
| 0702-01-016 | Wichita Falls | 11/01/28 | $228,176.96 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0722-02-053 | Paris | 11/01/28 | $110,667.67 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | ||||
| 0723-01-044 | Paris | 11/01/28 | $291,202.56 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | ||||
| 0728-03-017 | Paris | 11/01/28 | $64,408.96 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $382,118.88 | 12/04/28 | -34 | -1 month | $(317,709.92) | -83% | |
| 0728-04-014 | Paris | 11/01/28 | $258,255.36 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | ||||
| 0749-04-014 | Paris | 11/01/28 | $233,418.24 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | ||||
| 0764-03-019 | Paris | 11/01/28 | $235,641.12 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | ||||
| 0765-03-030 | Paris | 11/01/28 | $152,449.44 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | ||||
| 0766-01-033 | Paris | 11/01/28 | $835,005.60 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | ||||
| 0768-01-060 | Paris | 11/01/28 | $44,272.80 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | ||||
| 0768-02-025 | Paris | 11/01/28 | $97,812.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | ||||
| 0769-02-036 | Paris | 11/01/28 | $1,106,957.28 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | ||||
| 0772-02-019 | Paris | 11/01/28 | $639,894.89 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | ||||
| 0782-01-038 | Wichita Falls | 11/01/28 | $206,803.52 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0802-02-080 | Wichita Falls | 11/01/28 | $92,850.56 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0815-09-010 | Wichita Falls | 11/01/28 | $548,339.73 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0845-03-070 | Wichita Falls | 11/01/28 | $122,936.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 1135-01-028 | Austin | 11/01/28 | $267,857.14 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | |||||||
| 1154-01-021 | Paris | 11/01/28 | $601,149.12 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | ||||
| 1188-02-136 | Odessa | 11/01/28 | $1,200,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | |||||||
| 1188-02-137 | Odessa | 11/01/28 | $720,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | |||||||
| 1188-02-138 | Odessa | 11/01/28 | $490,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | |||||||
| 1357-01-029 | Wichita Falls | 11/01/28 | $166,534.72 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 1357-01-030 | Wichita Falls | 11/01/28 | $143,225.28 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 1357-02-015 | Wichita Falls | 11/01/28 | $94,154.13 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 1454-01-024 | Paris | 11/01/28 | $525,719.04 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | ||||
| 1465-01-016 | Paris | 11/01/28 | $204,145.92 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | ||||
| 1767-03-021 | Wichita Falls | 11/01/28 | $102,801.60 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 1849-01-012 | Paris | 11/01/28 | $390,561.60 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | ||||
| 1849-02-008 | Paris | 11/01/28 | $65,413.92 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | ||||
| 1849-03-023 | Paris | 11/01/28 | $1,294,719.36 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $1,337,582.40 | 12/04/28 | -34 | -1 month | $(42,863.04) | -3% | |
| 1855-01-033 | Wichita Falls | 11/01/28 | $179,583.36 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 1979-01-017 | Paris | 11/01/28 | $467,596.80 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | ||||
| 2003-01-011 | Paris | 11/01/28 | $311,794.56 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | ||||
| 2322-01-012 | Wichita Falls | 11/01/28 | $171,206.93 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 2459-02-015 | Paris | 11/01/28 | $125,062.08 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | ||||
| 2683-01-009 | Paris | 11/01/28 | $66,792.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | ||||
| 2706-01-012 | Wichita Falls | 11/01/28 | $119,580.27 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 2706-02-019 | Wichita Falls | 11/01/28 | $137,294.67 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 2875-01-010 | Paris | 11/01/28 | $338,976.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | ||||
| 3553-01-008 | Wichita Falls | 11/01/28 | $170,258.29 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $191,928.00 | $(21,669.71) | -11% | ||||
| 3562-01-009 | Wichita Falls | 11/01/28 | $218,606.66 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 3569-02-005 | Wichita Falls | 11/01/28 | $34,323.67 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 3569-03-009 | Wichita Falls | 11/01/28 | $162,664.33 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | |||||||
| 0152-01-092 | Austin | 12/05/28 | $401,785.71 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | |||||||
| 0005-04-074 | Odessa | 01/01/29 | $50,435,715.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | $56,488,000.00 | $(6,052,285.00) | -11% | ||||
| 0005-13-063 | Odessa | 01/01/29 | $240,150,931.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $268,969,042.70 | $(28,818,111.70) | -11% | ||||
| 0013-05-071 | Wichita Falls | 01/01/29 | $1,500,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | |||||||
| 0013-05-072 | Wichita Falls | 01/01/29 | $550,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | |||||||
| 0013-05-073 | Wichita Falls | 01/01/29 | $400,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | |||||||
| 0013-05-074 | Wichita Falls | 01/01/29 | $475,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | |||||||
| 0054-07-086 | Brownwood | 01/01/29 | $25,000,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $28,000,000.00 | $(3,000,000.00) | -11% | ||||
| 0098-03-041 | Childress | 01/01/29 | $790,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | |||||||
| 0156-07-116 | Wichita Falls | 01/01/29 | $125,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | |||||||
| 0156-07-117 | Wichita Falls | 01/01/29 | $125,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | |||||||
| 0156-07-118 | Wichita Falls | 01/01/29 | $100,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | |||||||
| 0156-07-119 | Wichita Falls | 01/01/29 | $100,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | |||||||
| 0156-07-120 | Wichita Falls | 01/01/29 | $100,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | |||||||
| 0156-07-121 | Wichita Falls | 01/01/29 | $100,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | |||||||
| 0157-02-059 | Childress | 01/01/29 | $225,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | |||||||
| 0157-02-060 | Childress | 01/01/29 | $225,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | |||||||
| 0157-10-004 | Childress | 01/01/29 | $200,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | |||||||
| 0157-10-005 | Childress | 01/01/29 | $175,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | |||||||
| 0231-02-070 | Waco | 01/01/29 | $9,047,322.32 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $10,133,000.00 | $(1,085,677.68) | -11% | ||||
| 0508-02-139 | Beaumont | 01/01/29 | $8,354,659.82 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $9,357,218.00 | $(1,002,558.18) | -11% | ||||
| 0685-01-033 | Wichita Falls | 01/01/29 | $150,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | |||||||
| 0711-02-046 | Childress | 01/01/29 | $125,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | |||||||
| 0909-00-076 | Waco | 01/01/29 | $4,471,365.74 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | $269,000.00 | 10/31/45 | -6148 | -17 years | $4,202,365.74 | 1562% | |
| 0949-01-018 | Childress | 01/01/29 | $160,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | |||||||
| 0950-01-030 | Childress | 01/01/29 | $120,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | |||||||
| 0970-03-025 | Childress | 01/01/29 | $450,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | |||||||
| 0971-03-011 | Childress | 01/01/29 | $570,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | |||||||
| 1225-01-014 | Childress | 01/01/29 | $230,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | |||||||
| 2011-01-010 | Childress | 01/01/29 | $240,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | |||||||
| 0508-01-410 | Houston | 03/01/29 | $42,867,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | 03/06/28 | 359 | 12 months |
Cost Changes
Cost movement is active across the pipeline, but the financial impact is concentrated in a small number of large projects. Total absolute cost movement reached $1.98B, with the top five projects accounting for 56.6% of that total, or $1.12B.
The largest individual changes include:
- CSJ 0500-03-599: -$600.00M
- CSJ 0018-05-089: +$255.61M
- CSJ 0508-01-396: -$166.67M
- CSJ 0502-01-244: -$56.00M
- CSJ 0508-01-410: -$42.87M
At the aggregate level, construction accounts for the majority of the net change, with a total decrease of -$573.23M.
District-level changes are uneven. Houston drives the largest decrease at -$836.97M, while Laredo sees a significant increase of +$256.29M, with smaller movements across other districts.
For estimators, this creates two realities. Many projects are being repriced as estimates evolve, but a small number of large jobs are driving most of the dollar movement. The headline change in total pipeline value is not broad-based. It is driven by a handful of major adjustments.
| CSJ | District | Est. Letting Date | Project Estimate | Current Type | Current Subtype | Prev. Type | Prev. Subtype | Prev. Cost | Cost Δ | %Cost Δ | Letting Δ (days) | Letting Date Δ | Type/Subtype Δ | Lifecycle |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0275-13-075 | Childress | 06/01/28 | $4,100,000.00 | Construction | Bridge | Construction | Bridge | $100,000.00 | $4,000,000.00 | 4000% | ||||
| 0033-06-129 | Abilene | 05/06/26 | $2,003,350.40 | Construction | Bridge | Construction | Bridge | $100,000.00 | $1,903,350.40 | 1903% | ||||
| 0909-00-076 | Waco | 01/01/29 | $4,471,365.74 | Construction | Bridge | Unassigned | Unassigned | $269,000.00 | $4,202,365.74 | 1562% | -6148 | -17 years | Unassigned / Unassigned → Construction / Bridge | |
| 0054-06-109 | Brownwood | 01/06/27 | $1,600,000.00 | Construction | Roadway | Unassigned | Unassigned | $98,640.00 | $1,501,360.00 | 1522% | Unassigned / Unassigned → Construction / Roadway | |||
| 0033-06-130 | Abilene | 05/06/26 | $1,223,572.00 | Construction | Bridge | Construction | Bridge | $100,000.00 | $1,123,572.00 | 1124% | ||||
| 0421-04-035 | San Antonio | 10/05/27 | $657,314.00 | Construction | Roadway | Construction | Roadway | $65,358.00 | $591,956.00 | 906% | ||||
| 0024-09-027 | San Antonio | 04/07/26 | $11,342,513.21 | Construction | Roadway | Construction | Roadway | $1,338,675.48 | $10,003,837.73 | 747% | ||||
| 0017-10-294 | San Antonio | 04/07/26 | $23,214,563.41 | Construction | Roadway | Construction | Roadway | $3,160,403.08 | $20,054,160.33 | 635% | ||||
| 0176-01-116 | Lufkin | 05/06/26 | $8,019,500.93 | Construction | Roadway | Construction | Roadway | $1,921,786.49 | $6,097,714.44 | 317% | ||||
| 0258-08-035 | Waco | 03/03/27 | $8,846,153.85 | Construction | Roadway | Construction | Roadway | $2,407,999.00 | $6,438,154.85 | 267% | ||||
| 0025-02-229 | San Antonio | 01/06/27 | $972,889.00 | Construction | Roadway | Construction | Roadway | $299,541.00 | $673,348.00 | 225% | 92 | 3 months | ||
| 1499-01-034 | San Antonio | 10/05/27 | $195,585.00 | Construction | Roadway | Construction | Roadway | $62,069.00 | $133,516.00 | 215% | ||||
| 0124-04-042 | Wichita Falls | 11/01/28 | $1,232,735.00 | Construction | Roadway | Construction | Roadway | $439,317.00 | $793,418.00 | 181% | 365 | 1 year | ||
| 0912-72-626 | Houston | 10/05/27 | $980,366.00 | Construction | Bridge | Construction | Bridge | $350,000.00 | $630,366.00 | 180% | ||||
| 0031-01-024 | Childress | 05/03/28 | $5,000,000.00 | Construction | Roadway | Construction | Roadway | $1,792,000.00 | $3,208,000.00 | 179% | ||||
| 0523-09-023 | Houston | 05/06/26 | $1,625,131.85 | Construction | Roadway | Construction | Roadway | $770,688.00 | $854,443.85 | 111% | ||||
| 0262-02-031 | Bryan | 11/03/26 | $6,000,000.00 | Construction | Roadway | Construction | Roadway | $3,000,000.00 | $3,000,000.00 | 100% | ||||
| 0646-02-033 | Tyler | 12/05/28 | $352,039.00 | Construction | Roadway | Construction | Roadway | $24,000,000.00 | $(23,647,961.00) | -99% | ||||
| 0007-02-072 | Abilene | 05/06/26 | $26,670.00 | Construction | Bridge | Construction | Bridge | $370,000.00 | $(343,330.00) | -93% | ||||
| 0007-02-073 | Abilene | 05/06/26 | $26,670.00 | Construction | Bridge | Construction | Bridge | $359,000.00 | $(332,330.00) | -93% | ||||
| 2005-01-030 | Odessa | 04/07/26 | $42,689.00 | Construction | Roadway | Construction | Roadway | $593,352.00 | $(550,663.00) | -93% | ||||
| 0007-02-074 | Abilene | 05/06/26 | $24,870.00 | Construction | Bridge | Construction | Bridge | $295,000.00 | $(270,130.00) | -92% | ||||
| 2150-03-034 | Laredo | 04/07/26 | $806,013.55 | Construction | Roadway | Unassigned | Unassigned | $419,000.00 | $387,013.55 | 92% | Unassigned / Unassigned → Construction / Roadway | |||
| 0912-72-627 | Houston | 10/05/27 | $1,157,249.00 | Construction | Bridge | Construction | Bridge | $605,000.00 | $552,249.00 | 91% | ||||
| 0338-03-094 | Houston | 05/06/26 | $32,440.00 | Construction | Roadway | Construction | Roadway | $348,560.00 | $(316,120.00) | -91% | ||||
| 0006-04-086 | Abilene | 05/06/26 | $32,020.00 | Construction | Bridge | Construction | Bridge | $328,000.00 | $(295,980.00) | -90% | ||||
| 0007-02-069 | Abilene | 05/06/26 | $34,620.00 | Construction | Bridge | Construction | Bridge | $339,000.00 | $(304,380.00) | -90% | ||||
| 0007-02-070 | Abilene | 05/06/26 | $45,165.00 | Construction | Bridge | Construction | Bridge | $382,000.00 | $(336,835.00) | -88% | ||||
| 0017-16-008 | San Antonio | 01/05/28 | $828,335.00 | Construction | Roadway | Construction | Roadway | $6,400,863.00 | $(5,572,528.00) | -87% | 126 | 4 months | ||
| 0006-07-090 | Abilene | 05/06/26 | $42,035.00 | Construction | Bridge | Construction | Bridge | $321,000.00 | $(278,965.00) | -87% | ||||
| 0006-07-089 | Abilene | 05/06/26 | $42,035.00 | Construction | Bridge | Construction | Bridge | $278,000.00 | $(235,965.00) | -85% | ||||
| 0747-05-043 | Fort Worth | 05/06/26 | $3,701,393.15 | Construction | Roadway | Construction | Roadway | $2,000,000.00 | $1,701,393.15 | 85% | ||||
| 0006-04-085 | Abilene | 05/06/26 | $51,145.00 | Construction | Bridge | Construction | Bridge | $328,000.00 | $(276,855.00) | -84% | ||||
| 0090-02-057 | Amarillo | 04/07/26 | $330,464.50 | Construction | Bridge | Construction | Bridge | $180,000.00 | $150,464.50 | 84% | ||||
| 0728-03-017 | Paris | 11/01/28 | $64,408.96 | Construction | Roadway | Unassigned | Unassigned | $382,118.88 | $(317,709.92) | -83% | -34 | -1 month | Unassigned / Unassigned → Construction / Roadway | |
| 2255-02-033 | San Antonio | 10/05/27 | $186,521.00 | Construction | Roadway | Construction | Roadway | $957,722.00 | $(771,201.00) | -81% | ||||
| 0211-10-050 | Yoakum | 07/01/26 | $500,000.00 | Construction | Roadway | Construction | Roadway | $2,618,342.00 | $(2,118,342.00) | -81% | ||||
| 0007-06-268 | Brownwood | 10/06/26 | $1,500,000.00 | Construction | Roadway | Construction | Roadway | $7,600,000.00 | $(6,100,000.00) | -80% | -818 | -2 years | ||
| 0630-01-059 | Pharr | 05/06/26 | $64,985.00 | Construction | Roadway | Construction | Roadway | $324,811.00 | $(259,826.00) | -80% | -119 | -4 months | ||
| 1228-03-058 | Pharr | 05/06/26 | $63,360.00 | Construction | Roadway | Construction | Roadway | $299,715.00 | $(236,355.00) | -79% | -119 | -4 months | ||
| 0007-02-067 | Abilene | 05/06/26 | $815,415.00 | Construction | Bridge | Construction | Bridge | $461,000.00 | $354,415.00 | 77% | ||||
| 0007-02-071 | Abilene | 05/06/26 | $89,840.00 | Construction | Bridge | Construction | Bridge | $388,000.00 | $(298,160.00) | -77% | ||||
| 0917-16-040 | Bryan | 08/05/26 | $617,323.07 | Construction | Bridge | Construction | Bridge | $350,000.00 | $267,323.07 | 76% | ||||
| 1228-03-059 | Pharr | 05/06/26 | $54,710.00 | Construction | Roadway | Construction | Roadway | $225,398.00 | $(170,688.00) | -76% | -119 | -4 months | ||
| 0092-06-112 | Dallas | 08/05/26 | $456,170.72 | Construction | Bridge | Construction | Bridge | $1,834,595.53 | $(1,378,424.81) | -75% | ||||
| 0314-04-038 | Fort Worth | 07/01/26 | $23,218.09 | Construction | Bridge | Construction | Bridge | $13,287.76 | $9,930.33 | 75% | ||||
| 2255-02-030 | San Antonio | 10/06/26 | $339,191.00 | Construction | Roadway | Construction | Roadway | $194,641.00 | $144,550.00 | 74% | ||||
| 0291-05-051 | San Antonio | 01/06/27 | $1,286,888.00 | Construction | Roadway | Construction | Roadway | $753,940.00 | $532,948.00 | 71% | 92 | 3 months | ||
| 0917-16-041 | Bryan | 08/05/26 | $591,407.82 | Construction | Bridge | Construction | Bridge | $350,000.00 | $241,407.82 | 69% | ||||
| 0052-01-046 | Lubbock | 10/04/28 | $27,200,001.00 | Construction | Bridge | Unassigned | Unassigned | $83,640,398.24 | $(56,440,397.24) | -67% | Unassigned / Unassigned → Construction / Bridge | |||
| 0043-22-012 | Wichita Falls | 11/02/27 | $565,892.00 | Construction | Roadway | Construction | Roadway | $340,800.00 | $225,092.00 | 66% | ||||
| 0114-01-070 | Austin | 07/01/26 | $620,000.00 | Construction | Non Roadway | Unassigned | Unassigned | $1,800,000.00 | $(1,180,000.00) | -66% | Unassigned / Unassigned → Construction / Non Roadway | |||
| 0909-22-206 | Waco | 05/06/26 | $94,904.00 | Construction | Bridge | Construction | Bridge | $275,000.00 | $(180,096.00) | -65% | ||||
| 0216-01-062 | San Antonio | 04/07/26 | $589,966.45 | Construction | Roadway | Construction | Roadway | $357,143.00 | $232,823.45 | 65% | ||||
| 0017-06-093 | San Antonio | 10/04/28 | $290,969.00 | Construction | Roadway | Construction | Roadway | $779,821.00 | $(488,852.00) | -63% | 365 | 1 year | ||
| 0015-13-452 | Austin | 10/06/26 | $40,384,615.38 | Construction | Roadway | Construction | Roadway | $25,000,000.00 | $15,384,615.38 | 62% | ||||
| 1745-01-020 | Houston | 04/07/26 | $951,319.38 | Construction | Roadway | Construction | Roadway | $2,503,999.00 | $(1,552,679.62) | -62% | ||||
| 0271-17-188 | Houston | 04/15/26 | $1,600,000.00 | Non-Let | Bridge | Unassigned | Unassigned | $1,000,000.00 | $600,000.00 | 60% | Unassigned / Unassigned → Non-Let / Bridge | |||
| 0271-04-070 | Houston | 12/05/28 | $194,998,997.70 | Construction | Roadway | Construction | Roadway | $479,159,276.00 | $(284,160,278.30) | -59% | ||||
| 0271-04-093 | Houston | 12/05/28 | $46,286,366.28 | Construction | Roadway | Construction | Roadway | $111,483,482.00 | $(65,197,115.72) | -58% | ||||
| 0024-05-105 | San Antonio | 10/06/26 | $145,199.00 | Construction | Roadway | Construction | Roadway | $344,000.00 | $(198,801.00) | -58% | -364 | -12 months | ||
| 0002-02-066 | El Paso | 05/06/26 | $366,346.70 | Construction | Roadway | Construction | Roadway | $232,157.22 | $134,189.48 | 58% | ||||
| 1421-01-027 | Beaumont | 04/07/26 | $836,754.00 | Construction | Roadway | Construction | Roadway | $2,000,000.00 | $(1,163,246.00) | -58% | ||||
| 0089-07-145 | Yoakum | 12/05/28 | $213,653,605.60 | Construction | Roadway | Construction | Roadway | $500,000,000.00 | $(286,346,394.40) | -57% | ||||
| 0187-01-054 | Bryan | 12/01/26 | $333,820.00 | Construction | Roadway | Construction | Roadway | $778,755.00 | $(444,935.00) | -57% | ||||
| 0114-02-116 | Austin | 08/05/26 | $3,800,845.31 | Construction | Roadway | Construction | Roadway | $2,426,884.00 | $1,373,961.31 | 57% | ||||
| 0549-01-041 | Paris | 03/03/27 | $2,200,000.00 | Construction | Roadway | Construction | Roadway | $5,000,000.00 | $(2,800,000.00) | -56% | ||||
| 0168-09-197 | Amarillo | 12/01/26 | $847,000.00 | Construction | Non Roadway | Unassigned | Unassigned | $547,000.00 | $300,000.00 | 55% | Unassigned / Unassigned → Construction / Non Roadway | |||
| 0015-13-441 | Austin | 07/01/26 | $85,000,000.00 | Construction | Roadway | Construction | Roadway | $189,100,000.00 | $(104,100,000.00) | -55% | ||||
| 0706-02-023 | Tyler | 04/07/26 | $3,491,717.55 | Construction | Roadway | Construction | Roadway | $2,250,000.00 | $1,241,717.55 | 55% | ||||
| 0363-01-153 | Fort Worth | 06/17/26 | $647,757.55 | Construction | Local Let | Unassigned | Unassigned | $420,708.00 | $227,049.55 | 54% | Unassigned / Unassigned → Construction / Local Let | |||
| 0917-16-042 | Bryan | 08/05/26 | $534,337.38 | Construction | Bridge | Construction | Bridge | $350,000.00 | $184,337.38 | 53% | ||||
| 2116-01-024 | Lufkin | 05/06/26 | $5,281,722.85 | Construction | Roadway | Construction | Roadway | $3,442,697.90 | $1,839,024.95 | 53% | ||||
| 2100-01-074 | Austin | 08/04/27 | $46,340.00 | Construction | Bridge | Construction | Bridge | $97,456.73 | $(51,116.73) | -52% | ||||
| 3538-01-067 | Houston | 01/05/28 | $1,000,000.00 | Construction | Non Roadway | Unassigned | Unassigned | $2,061,504.00 | $(1,061,504.00) | -51% | Unassigned / Unassigned → Construction / Non Roadway | |||
| 2835-01-008 | San Antonio | 10/05/27 | $75,176.00 | Construction | Roadway | Construction | Roadway | $49,925.00 | $25,251.00 | 51% | ||||
| 0366-03-075 | San Antonio | 10/06/26 | $510,359.00 | Construction | Roadway | Construction | Roadway | $1,026,585.00 | $(516,226.00) | -50% | -364 | -12 months | ||
| 0090-02-056 | Amarillo | 04/07/26 | $263,261.00 | Construction | Bridge | Construction | Bridge | $525,000.00 | $(261,739.00) | -50% | ||||
| 0500-03-599 | Houston | 09/01/29 | $600,000,000.00 | Construction | Roadway | $1,165,067,716.00 | $(565,067,716.00) | -49% | 360 | 12 months | ||||
| 0008-06-052 | Fort Worth | 06/01/27 | $21,629,185.61 | Construction | Roadway | Construction | Roadway | $42,500,000.40 | $(20,870,814.79) | -49% | ||||
| 0215-07-056 | San Antonio | 01/05/28 | $742,662.00 | Construction | Roadway | Construction | Roadway | $502,627.00 | $240,035.00 | 48% | 92 | 3 months | ||
| 0143-12-006 | San Antonio | 10/06/26 | $109,675.00 | Construction | Roadway | Construction | Roadway | $74,850.00 | $34,825.00 | 47% | -364 | -12 months | ||
| 3089-01-013 | Dallas | 07/01/26 | $419,957.48 | Construction | Roadway | Construction | Roadway | $797,564.99 | $(377,607.51) | -47% | ||||
| 0214-03-032 | Beaumont | 11/02/27 | $19,000,000.00 | Construction | Bridge | Construction | Bridge | $13,000,000.00 | $6,000,000.00 | 46% | ||||
| 0095-04-079 | Dallas | 08/05/26 | $1,338,522.57 | Construction | Bridge | Unassigned | Unassigned | $2,463,673.44 | $(1,125,150.87) | -46% | Unassigned / Unassigned → Construction / Bridge | |||
| 0446-01-056 | Yoakum | 09/02/26 | $1,600,000.00 | Construction | Roadway | Construction | Roadway | $1,100,000.00 | $500,000.00 | 45% | ||||
| 0091-06-061 | Dallas | 07/01/26 | $2,734,376.72 | Construction | Roadway | Construction | Roadway | $5,005,185.35 | $(2,270,808.63) | -45% | ||||
| 1586-01-093 | Pharr | 05/06/26 | $177,268.35 | Construction | Roadway | Construction | Roadway | $324,811.00 | $(147,542.65) | -45% | -119 | -4 months | ||
| 1290-03-033 | Dallas | 04/07/26 | $690,184.30 | Construction | Roadway | Unassigned | Unassigned | $1,266,000.00 | $(575,815.70) | -45% | Unassigned / Unassigned → Construction / Roadway | |||
| 0495-03-070 | Tyler | 01/06/27 | $11,057,692.31 | Construction | Roadway | Construction | Roadway | $19,656,000.00 | $(8,598,307.69) | -44% | ||||
| 0917-16-044 | Bryan | 08/05/26 | $574,104.91 | Construction | Bridge | Construction | Bridge | $400,000.00 | $174,104.91 | 44% | ||||
| 1685-05-140 | Houston | 08/05/26 | $2,437,069.00 | Construction | Roadway | Construction | Roadway | $4,306,162.00 | $(1,869,093.00) | -43% | ||||
| 0521-05-169 | San Antonio | 01/05/28 | $173,444.00 | Construction | Roadway | Construction | Roadway | $122,400.00 | $51,044.00 | 42% | 92 | 3 months | ||
| 0142-02-030 | San Antonio | 10/06/26 | $498,436.00 | Construction | Roadway | Construction | Roadway | $859,373.00 | $(360,937.00) | -42% | -364 | -12 months | ||
| 0114-01-071 | Austin | 07/01/26 | $4,200,000.00 | Construction | Non Roadway | Unassigned | Unassigned | $7,200,000.00 | $(3,000,000.00) | -42% | Unassigned / Unassigned → Construction / Non Roadway | |||
| 2752-01-008 | Laredo | 04/07/26 | $907,598.60 | Construction | Bridge | Construction | Roadway | $639,624.41 | $267,974.19 | 42% | Construction / Roadway → Construction / Bridge | |||
| 1434-01-016 | San Antonio | 10/05/27 | $363,650.00 | Construction | Roadway | Construction | Roadway | $616,433.00 | $(252,783.00) | -41% | 364 | 12 months | ||
| 2020-02-037 | San Antonio | 10/05/27 | $571,811.00 | Construction | Roadway | Construction | Roadway | $965,982.00 | $(394,171.00) | -41% | ||||
| 0914-04-356 | Austin | 06/02/26 | $520,779.00 | Construction | Roadway | Construction | Roadway | $876,903.18 | $(356,124.18) | -41% | ||||
| 0073-08-183 | San Antonio | 05/06/26 | $34,945,459.80 | Construction | Roadway | Construction | Roadway | $24,699,593.00 | $10,245,866.80 | 41% | ||||
| 0151-02-026 | Austin | 05/06/26 | $10,279,819.07 | Construction | Roadway | Construction | Roadway | $17,555,042.02 | $(7,275,222.95) | -41% | ||||
| 0276-01-046 | Laredo | 04/07/26 | $10,653,201.30 | Construction | Roadway | Construction | Roadway | $7,573,676.00 | $3,079,525.30 | 41% | ||||
| 1014-03-065 | Dallas | 04/07/26 | $1,202,059.26 | Construction | Roadway | Unassigned | Unassigned | $852,000.00 | $350,059.26 | 41% | Unassigned / Unassigned → Construction / Roadway | |||
| 1388-01-010 | Tyler | 04/07/26 | $5,762,645.24 | Construction | Roadway | Construction | Roadway | $4,095,000.00 | $1,667,645.24 | 41% | ||||
| 2560-01-079 | Lufkin | 08/04/27 | $7,615,384.62 | Construction | Roadway | Unassigned | Unassigned | $12,700,000.00 | $(5,084,615.38) | -40% | -3862 | -11 years | Unassigned / Unassigned → Construction / Roadway | |
| 0034-01-144 | Abilene | 07/01/27 | $7,000,000.00 | Construction | Roadway | Unassigned | Unassigned | $5,000,000.00 | $2,000,000.00 | 40% | -62 | -2 months | Unassigned / Unassigned → Construction / Roadway | |
| 0006-05-134 | Abilene | 05/06/26 | $349,520.00 | Construction | Bridge | Construction | Bridge | $578,000.00 | $(228,480.00) | -40% | ||||
| 1429-01-039 | Pharr | 05/06/26 | $241,056.05 | Construction | Roadway | Construction | Roadway | $404,269.00 | $(163,212.95) | -40% | -119 | -4 months | ||
| 0508-02-140 | Beaumont | 04/07/26 | $2,709,064.39 | Construction | Roadway | Construction | Roadway | $4,500,000.00 | $(1,790,935.61) | -40% | ||||
| 0193-01-040 | San Antonio | 10/05/27 | $942,770.00 | Construction | Roadway | Construction | Roadway | $677,277.00 | $265,493.00 | 39% | ||||
| 0024-06-070 | San Antonio | 04/06/27 | $35,000,000.00 | Construction | Roadway | Construction | Roadway | $25,100,000.00 | $9,900,000.00 | 39% | 126 | 4 months | ||
| 0216-03-034 | San Antonio | 06/02/26 | $2,799,009.42 | Construction | Roadway | Construction | Roadway | $4,600,000.00 | $(1,800,990.58) | -39% | ||||
| 0006-05-133 | Abilene | 05/06/26 | $186,020.00 | Construction | Bridge | Construction | Bridge | $307,000.00 | $(120,980.00) | -39% | ||||
| 0698-03-107 | Pharr | 05/06/26 | $264,761.15 | Construction | Roadway | Construction | Roadway | $423,673.00 | $(158,911.85) | -38% | -119 | -4 months | ||
| 1064-01-048 | Pharr | 05/06/26 | $200,135.05 | Construction | Roadway | Construction | Roadway | $324,811.00 | $(124,675.95) | -38% | -119 | -4 months | ||
| 0328-01-016 | San Antonio | 10/06/26 | $387,945.00 | Construction | Roadway | Construction | Roadway | $613,131.00 | $(225,186.00) | -37% | -364 | -12 months | ||
| 0549-01-042 | Paris | 11/01/28 | $95,821.44 | Construction | Roadway | Unassigned | Unassigned | $150,458.88 | $(54,637.44) | -36% | -34 | -1 month | Unassigned / Unassigned → Construction / Roadway | |
| 0003-01-066 | El Paso | 05/06/26 | $175,344.38 | Construction | Roadway | Construction | Roadway | $272,105.97 | $(96,761.59) | -36% | ||||
| 0309-01-049 | Amarillo | 04/07/26 | $926,403.90 | Construction | Bridge | Construction | Bridge | $681,600.00 | $244,803.90 | 36% | ||||
| 0421-05-035 | San Antonio | 10/05/27 | $290,724.00 | Construction | Roadway | Construction | Roadway | $444,840.00 | $(154,116.00) | -35% | 364 | 12 months | ||
| 0019-01-146 | Fort Worth | 06/02/26 | $19,442,730.37 | Construction | Roadway | Construction | Roadway | $29,842,782.00 | $(10,400,051.63) | -35% | 90 | 3 months | ||
| 0006-05-135 | Abilene | 05/06/26 | $350,180.00 | Construction | Bridge | Construction | Bridge | $542,000.00 | $(191,820.00) | -35% | ||||
| 0601-01-067 | Beaumont | 05/06/26 | $1,647,471.00 | Construction | Roadway | Construction | Roadway | $2,550,000.00 | $(902,529.00) | -35% | ||||
| 1091-04-033 | Dallas | 04/07/26 | $277,376.80 | Construction | Roadway | Unassigned | Unassigned | $426,000.00 | $(148,623.20) | -35% | Unassigned / Unassigned → Construction / Roadway | |||
| 0218-05-037 | Atlanta | 04/07/26 | $1,415,316.83 | Construction | Roadway | Construction | Roadway | $2,132,187.25 | $(716,870.42) | -34% | ||||
| 0156-04-114 | Wichita Falls | 01/05/28 | $28,091,831.67 | Construction | Roadway | Construction | Roadway | $41,732,800.00 | $(13,640,968.33) | -33% | ||||
| 0114-09-104 | Bryan | 04/06/27 | $2,000,000.00 | Construction | Roadway | Unassigned | Unassigned | $3,000,000.00 | $(1,000,000.00) | -33% | Unassigned / Unassigned → Construction / Roadway | |||
| 0081-03-047 | Dallas | 05/06/26 | $116,223,406.70 | Construction | Roadway | Unassigned | Unassigned | $172,970,558.00 | $(56,747,151.30) | -33% | Unassigned / Unassigned → Construction / Roadway | |||
| 0143-02-031 | San Antonio | 01/06/27 | $1,064,259.00 | Construction | Roadway | Construction | Roadway | $808,263.00 | $255,996.00 | 32% | 92 | 3 months | ||
| 2635-05-005 | Amarillo | 11/03/26 | $47,259,223.32 | Construction | Roadway | Unassigned | Unassigned | $69,477,353.12 | $(22,218,129.80) | -32% | Unassigned / Unassigned → Construction / Roadway | |||
| 0095-03-103 | Dallas | 10/06/26 | $9,784,408.00 | Construction | Bridge | Construction | Bridge | $14,294,730.66 | $(4,510,322.66) | -32% | ||||
| 0114-02-120 | Austin | 08/05/26 | $3,577,315.00 | Construction | Roadway | Construction | Roadway | $2,714,671.00 | $862,644.00 | 32% | ||||
| 0095-03-098 | Dallas | 10/06/26 | $4,724,338.30 | Construction | Bridge | Construction | Bridge | $6,884,505.24 | $(2,160,166.94) | -31% | ||||
| 3538-01-061 | Houston | 05/06/26 | $2,218,948.70 | Construction | Roadway | Construction | Roadway | $1,692,410.00 | $526,538.70 | 31% | ||||
| 1730-01-046 | San Antonio | 10/04/28 | $479,735.00 | Construction | Roadway | Construction | Roadway | $689,275.00 | $(209,540.00) | -30% | 365 | 1 year | ||
| 0095-03-100 | Dallas | 10/06/26 | $7,924,367.30 | Construction | Bridge | Construction | Bridge | $11,392,450.94 | $(3,468,083.64) | -30% | ||||
| 1421-01-028 | Beaumont | 04/07/26 | $3,075,865.50 | Construction | Roadway | Construction | Roadway | $4,400,000.00 | $(1,324,134.50) | -30% | ||||
| 0095-03-099 | Dallas | 10/06/26 | $7,142,577.25 | Construction | Bridge | Construction | Bridge | $10,049,183.11 | $(2,906,605.86) | -29% | ||||
| 0038-07-085 | Pharr | 05/06/26 | $231,845.30 | Construction | Roadway | Construction | Roadway | $324,811.00 | $(92,965.70) | -29% | -119 | -4 months | ||
| 0177-14-038 | Houston | 05/06/26 | $4,957,990.50 | Construction | Roadway | Construction | Roadway | $6,986,976.00 | $(2,028,985.50) | -29% | ||||
| 1051-03-001 | Dallas | 09/06/28 | $54,002,986.08 | Construction | Roadway | Unassigned | Unassigned | $74,481,854.00 | $(20,478,867.92) | -28% | Unassigned / Unassigned → Construction / Roadway | |||
| 0249-07-071 | Fort Worth | 06/01/28 | $71,927,225.18 | Construction | Bridge | Construction | Bridge | $100,000,000.00 | $(28,072,774.82) | -28% | ||||
| 2104-02-042 | San Antonio | 01/05/28 | $152,551.00 | Construction | Roadway | Construction | Roadway | $212,411.00 | $(59,860.00) | -28% | 92 | 3 months | ||
| 0009-11-248 | Dallas | 02/02/27 | $57,043,890.08 | Construction | Roadway | Unassigned | Unassigned | $79,147,850.00 | $(22,103,959.92) | -28% | Unassigned / Unassigned → Construction / Roadway | |||
| 0220-01-039 | Pharr | 05/06/26 | $293,029.05 | Construction | Roadway | Construction | Roadway | $404,269.00 | $(111,239.95) | -28% | -119 | -4 months | ||
| 0905-06-096 | Lubbock | 04/07/26 | $14,463,074.29 | Construction | Roadway | Construction | Roadway | $20,000,000.00 | $(5,536,925.71) | -28% | ||||
| 0091-01-061 | Paris | 11/02/27 | $1,197,738.67 | Construction | Roadway | Construction | Roadway | $1,629,957.12 | $(432,218.45) | -27% | ||||
| 0095-03-108 | Dallas | 10/06/26 | $7,397,762.80 | Construction | Bridge | Construction | Bridge | $10,094,022.52 | $(2,696,259.72) | -27% | ||||
| 0095-03-109 | Dallas | 10/06/26 | $13,641,956.75 | Construction | Bridge | Construction | Bridge | $18,780,750.97 | $(5,138,794.22) | -27% | ||||
| 0143-14-009 | San Antonio | 10/06/26 | $30,910.00 | Construction | Roadway | Construction | Roadway | $42,190.00 | $(11,280.00) | -27% | -364 | -12 months | ||
| 2502-01-024 | Waco | 10/06/26 | $23,600,000.00 | Construction | Roadway | Construction | Roadway | $32,480,000.00 | $(8,880,000.00) | -27% | ||||
| 2964-05-034 | Dallas | 06/02/26 | $949,650.98 | Construction | Roadway | Construction | Roadway | $747,600.00 | $202,050.98 | 27% | ||||
| 0683-04-025 | Austin | 04/07/26 | $459,780.45 | Construction | Roadway | Construction | Roadway | $632,842.80 | $(173,062.35) | -27% | ||||
| 0092-03-053 | Dallas | 09/06/28 | $62,131,255.85 | Construction | Roadway | Unassigned | Unassigned | $83,760,305.57 | $(21,629,049.72) | -26% | Unassigned / Unassigned → Construction / Roadway | |||
| 0718-01-077 | Dallas | 12/01/27 | $652,586.55 | Construction | Roadway | Construction | Roadway | $882,020.00 | $(229,433.45) | -26% | ||||
| 0047-04-032 | Dallas | 11/03/26 | $46,922,696.42 | Construction | Roadway | Unassigned | Unassigned | $63,694,143.00 | $(16,771,446.58) | -26% | Unassigned / Unassigned → Construction / Roadway | |||
| 0492-04-034 | Tyler | 07/01/26 | $45,157,109.53 | Construction | Roadway | Construction | Roadway | $61,360,000.00 | $(16,202,890.47) | -26% | ||||
| 0151-03-043 | Austin | 05/06/26 | $890,964.62 | Construction | Roadway | Construction | Roadway | $1,201,830.24 | $(310,865.62) | -26% | ||||
| 0165-02-061 | Tyler | 07/01/26 | $66,001,500.00 | Construction | Roadway | Construction | Roadway | $88,500,000.00 | $(22,498,500.00) | -25% | ||||
| 0683-05-015 | Austin | 04/07/26 | $440,350.80 | Construction | Roadway | Construction | Roadway | $587,777.40 | $(147,426.60) | -25% | ||||
| 0073-03-071 | San Antonio | 06/02/26 | $1,140,659.29 | Construction | Roadway | Construction | Roadway | $1,491,158.00 | $(350,498.71) | -24% | ||||
| 0863-01-081 | Pharr | 05/06/26 | $245,353.80 | Construction | Roadway | Construction | Roadway | $324,811.00 | $(79,457.20) | -24% | -119 | -4 months | ||
| 1394-02-031 | Dallas | 05/06/26 | $1,048,966.35 | Construction | Roadway | Unassigned | Unassigned | $848,400.00 | $200,566.35 | 24% | Unassigned / Unassigned → Construction / Roadway | |||
| 0683-05-017 | Austin | 04/07/26 | $7,697,810.85 | Construction | Roadway | Construction | Roadway | $10,071,079.76 | $(2,373,268.91) | -24% | ||||
| 2005-03-010 | Odessa | 04/07/26 | $620,623.00 | Construction | Roadway | Construction | Roadway | $500,618.00 | $120,005.00 | 24% | ||||
| 0917-29-152 | Bryan | 01/06/27 | $1,324,348.00 | Construction | Roadway | Unassigned | Unassigned | $1,716,395.50 | $(392,047.50) | -23% | 126 | 4 months | Unassigned / Unassigned → Construction / Roadway | |
| 0526-01-023 | San Antonio | 10/06/26 | $90,851.00 | Construction | Roadway | Construction | Roadway | $117,480.00 | $(26,629.00) | -23% | -364 | -12 months | ||
| 1655-01-036 | Abilene | 07/01/26 | $4,804,601.45 | Construction | Roadway | Construction | Roadway | $6,269,814.00 | $(1,465,212.55) | -23% | ||||
| 0007-02-068 | Abilene | 05/06/26 | $385,665.00 | Construction | Bridge | Construction | Bridge | $504,000.00 | $(118,335.00) | -23% | ||||
| 0156-04-127 | Wichita Falls | 05/06/26 | $3,996,578.52 | Construction | Roadway | Construction | Roadway | $5,199,999.00 | $(1,203,420.48) | -23% | ||||
| 0008-05-029 | Fort Worth | 06/01/27 | $102,309,774.80 | Construction | Roadway | Construction | Roadway | $131,069,840.00 | $(28,760,065.20) | -22% | ||||
| 2270-01-029 | Abilene | 07/01/26 | $570,188.00 | Construction | Roadway | Construction | Roadway | $730,750.00 | $(160,562.00) | -22% | ||||
| 0195-02-091 | Dallas | 11/02/27 | $130,262,376.60 | Construction | Roadway | Construction | Roadway | $165,000,000.00 | $(34,737,623.40) | -21% | ||||
| 0301-03-028 | San Antonio | 10/05/27 | $520,281.00 | Construction | Roadway | Construction | Roadway | $429,761.00 | $90,520.00 | 21% | 364 | 12 months | ||
| 0108-11-022 | Paris | 06/01/28 | $15,679,422.00 | Construction | Roadway | Construction | Roadway | $19,510,400.00 | $(3,830,978.00) | -20% | ||||
| 0521-05-168 | San Antonio | 01/05/28 | $325,096.00 | Construction | Roadway | Construction | Roadway | $408,000.00 | $(82,904.00) | -20% | 92 | 3 months | ||
| 0195-02-092 | Dallas | 11/03/26 | $157,580,992.90 | Construction | Roadway | Construction | Roadway | $196,881,863.00 | $(39,300,870.10) | -20% | ||||
| 0095-03-101 | Dallas | 10/06/26 | $11,827,282.00 | Construction | Bridge | Construction | Bridge | $9,882,855.21 | $1,944,426.79 | 20% | ||||
| 0492-04-041 | Tyler | 07/01/26 | $30,037,794.85 | Construction | Roadway | Construction | Roadway | $37,752,000.00 | $(7,714,205.15) | -20% | ||||
| 0366-02-089 | San Antonio | 06/02/26 | $47,921,160.02 | Construction | Roadway | Construction | Roadway | $59,830,714.00 | $(11,909,553.98) | -20% | ||||
| 2452-01-066 | San Antonio | 04/07/26 | $59,934,274.21 | Construction | Roadway | Construction | Roadway | $74,749,299.00 | $(14,815,024.79) | -20% | ||||
| 3133-01-022 | Amarillo | 04/07/26 | $618,044.00 | Construction | Bridge | Construction | Bridge | $775,000.00 | $(156,956.00) | -20% | ||||
| 1502-01-032 | Lubbock | 09/06/28 | $141,321,045.00 | Construction | Roadway | Construction | Roadway | $173,979,465.80 | $(32,658,420.80) | -19% | ||||
| 0289-04-037 | Brownwood | 01/05/28 | $3,568,950.00 | Construction | Roadway | Unassigned | Unassigned | $3,000,000.00 | $568,950.00 | 19% | 364 | 12 months | Unassigned / Unassigned → Construction / Roadway | |
| 3632-01-002 | Pharr | 09/02/26 | $66,374,838.63 | Construction | Roadway | Construction | Roadway | $82,258,131.00 | $(15,883,292.37) | -19% | ||||
| 0314-04-041 | Fort Worth | 07/01/26 | $26,222.89 | Construction | Bridge | Construction | Bridge | $22,120.68 | $4,102.21 | 19% | ||||
| 0309-01-048 | Amarillo | 04/07/26 | $1,285,866.90 | Construction | Bridge | Construction | Bridge | $1,590,000.00 | $(304,133.10) | -19% | ||||
| 0065-06-067 | Beaumont | 02/02/28 | $48,335,222.00 | Construction | Roadway | Construction | Roadway | $58,600,000.00 | $(10,264,778.00) | -18% | ||||
| 0387-01-016 | Dallas | 11/02/27 | $6,039,010.45 | Construction | Roadway | Construction | Roadway | $7,340,124.07 | $(1,301,113.62) | -18% | ||||
| 0025-03-108 | San Antonio | 10/06/26 | $150,609.00 | Construction | Roadway | Construction | Roadway | $127,920.00 | $22,689.00 | 18% | ||||
| 0143-11-006 | San Antonio | 10/06/26 | $69,700.00 | Construction | Roadway | Construction | Roadway | $85,122.00 | $(15,422.00) | -18% | -364 | -12 months | ||
| 0143-15-034 | San Antonio | 10/06/26 | $86,564.00 | Construction | Roadway | Construction | Roadway | $105,717.00 | $(19,153.00) | -18% | -364 | -12 months | ||
| 0014-15-035 | Fort Worth | 08/05/26 | $1,515,651.69 | Construction | Roadway | Construction | Roadway | $1,838,179.00 | $(322,527.31) | -18% | ||||
| 0165-03-036 | Tyler | 07/01/26 | $53,872,550.00 | Construction | Roadway | Construction | Roadway | $65,300,000.00 | $(11,427,450.00) | -18% | ||||
| 0006-06-109 | Abilene | 06/02/26 | $123,039,621.00 | Construction | Roadway | Construction | Roadway | $150,000,000.00 | $(26,960,379.00) | -18% | ||||
| 1186-02-028 | Austin | 05/06/26 | $3,339,793.85 | Construction | Roadway | Construction | Roadway | $4,064,877.41 | $(725,083.56) | -18% | ||||
| 2094-01-063 | Pharr | 05/06/26 | $33,798,958.95 | Construction | Roadway | Construction | Roadway | $41,335,821.00 | $(7,536,862.05) | -18% | ||||
| 0299-14-010 | Laredo | 04/07/26 | $97,708,652.77 | Construction | Roadway | Construction | Roadway | $119,587,049.00 | $(21,878,396.23) | -18% | ||||
| 0683-05-016 | Austin | 04/07/26 | $1,721,002.10 | Construction | Roadway | Construction | Roadway | $2,103,080.55 | $(382,078.45) | -18% | ||||
| 1239-01-034 | Brownwood | 01/05/28 | $125,000.00 | Construction | Bridge | Unassigned | Unassigned | $150,000.00 | $(25,000.00) | -17% | Unassigned / Unassigned → Construction / Bridge | |||
| 0008-09-037 | Fort Worth | 09/01/27 | $17,300,891.50 | Construction | Roadway | Construction | Roadway | $14,739,999.84 | $2,560,891.66 | 17% | ||||
| 0914-04-364 | Austin | 06/02/26 | $591,082.70 | Construction | Non Roadway | Construction | Non Roadway | $713,756.00 | $(122,673.30) | -17% | ||||
| 0216-01-063 | San Antonio | 04/07/26 | $444,153.75 | Construction | Roadway | Construction | Roadway | $535,713.00 | $(91,559.25) | -17% | ||||
| 0338-02-032 | Houston | 09/06/28 | $92,559,593.00 | Construction | Roadway | Construction | Roadway | $109,802,683.00 | $(17,243,090.00) | -16% | ||||
| 1012-03-027 | Dallas | 03/03/27 | $9,106,958.96 | Construction | Roadway | Construction | Roadway | $7,834,052.56 | $1,272,906.40 | 16% | ||||
| 0220-01-040 | Pharr | 05/06/26 | $261,235.01 | Construction | Roadway | Construction | Roadway | $225,398.00 | $35,837.01 | 16% | -119 | -4 months | ||
| 0747-08-002 | Fort Worth | 05/06/26 | $7,024,465.15 | Construction | Roadway | Construction | Roadway | $8,400,000.00 | $(1,375,534.85) | -16% | ||||
| 0047-09-034 | Dallas | 08/02/28 | $15,277,063.68 | Construction | Roadway | Construction | Roadway | $17,930,683.45 | $(2,653,619.77) | -15% | ||||
| 0014-15-033 | Fort Worth | 08/05/26 | $9,188,337.11 | Construction | Roadway | Construction | Roadway | $10,800,000.00 | $(1,611,662.89) | -15% | ||||
| 0220-04-049 | Pharr | 08/05/26 | $23,319,932.34 | Construction | Roadway | Construction | Roadway | $27,388,925.00 | $(4,068,992.66) | -15% | ||||
| 0018-06-185 | Laredo | 06/02/26 | $79,245,892.42 | Construction | Roadway | Construction | Roadway | $93,505,334.00 | $(14,259,441.58) | -15% | ||||
| 2157-01-022 | Atlanta | 04/07/26 | $1,130,952.25 | Construction | Roadway | Construction | Roadway | $982,170.20 | $148,782.05 | 15% | ||||
| 0271-05-025 | Houston | 10/04/28 | $258,400,000.00 | Construction | Roadway | Construction | Roadway | $299,509,331.00 | $(41,109,331.00) | -14% | ||||
| 0271-06-117 | Houston | 10/04/28 | $21,987,988.48 | Construction | Roadway | Construction | Roadway | $25,421,662.20 | $(3,433,673.72) | -14% | ||||
| 0200-04-020 | Beaumont | 09/06/28 | $18,000,000.00 | Construction | Roadway | Construction | Roadway | $20,906,667.70 | $(2,906,667.70) | -14% | ||||
| 0842-03-042 | Yoakum | 09/06/28 | $17,418,439.00 | Construction | Roadway | Construction | Roadway | $20,337,444.00 | $(2,919,005.00) | -14% | ||||
| 0005-06-129 | Abilene | 06/01/27 | $4,000,000.00 | Construction | Roadway | Construction | Roadway | $3,500,000.00 | $500,000.00 | 14% | -154 | -5 months | ||
| 0912-56-059 | Houston | 10/06/26 | $1,227,767.00 | Construction | Bridge | Construction | Bridge | $1,428,864.00 | $(201,097.00) | -14% | ||||
| 0229-01-042 | Odessa | 05/06/26 | $48,984,668.33 | Construction | Roadway | Construction | Roadway | $43,100,000.00 | $5,884,668.33 | 14% | ||||
| 0909-22-218 | Waco | 05/06/26 | $305,269.00 | Construction | Bridge | Construction | Bridge | $268,000.00 | $37,269.00 | 14% | ||||
| 2230-01-020 | San Antonio | 04/07/26 | $30,754,969.97 | Construction | Roadway | Construction | Roadway | $35,818,217.00 | $(5,063,247.03) | -14% | ||||
| 0675-06-103 | Bryan | 12/01/27 | $302,019,326.00 | Construction | Roadway | Construction | Roadway | $345,751,721.00 | $(43,732,395.00) | -13% | ||||
| 0018-05-089 | Laredo | 06/01/27 | $255,607,277.70 | Construction | Roadway | Construction | Roadway | $295,277,876.00 | $(39,670,598.30) | -13% | 454 | 1 year | ||
| 0085-02-053 | Atlanta | 01/06/27 | $7,660,750.00 | Construction | Roadway | Construction | Roadway | $8,810,750.00 | $(1,150,000.00) | -13% | ||||
| 0143-01-066 | San Antonio | 01/06/27 | $763,955.00 | Construction | Roadway | Construction | Roadway | $881,052.00 | $(117,097.00) | -13% | 92 | 3 months | ||
| 2452-05-005 | San Antonio | 10/06/26 | $55,940.00 | Construction | Roadway | Construction | Roadway | $64,299.00 | $(8,359.00) | -13% | -364 | -12 months | ||
| 0212-04-041 | Bryan | 09/02/26 | $12,490,493.00 | Construction | Bridge | Construction | Bridge | $14,396,824.00 | $(1,906,331.00) | -13% | ||||
| 2158-01-020 | Tyler | 08/05/26 | $31,500,000.00 | Construction | Roadway | Construction | Roadway | $36,400,000.00 | $(4,900,000.00) | -13% | ||||
| 0172-11-017 | Dallas | 05/06/26 | $1,104,055.45 | Construction | Roadway | Unassigned | Unassigned | $1,272,000.00 | $(167,944.55) | -13% | Unassigned / Unassigned → Construction / Roadway | |||
| 0747-05-042 | Fort Worth | 05/06/26 | $10,743,744.95 | Construction | Roadway | Construction | Roadway | $9,500,000.00 | $1,243,744.95 | 13% | ||||
| 1330-02-052 | Fort Worth | 04/07/26 | $8,810,551.86 | Construction | Roadway | Unassigned | Unassigned | $7,785,159.27 | $1,025,392.59 | 13% | Unassigned / Unassigned → Construction / Roadway | |||
| 2523-02-074 | Houston | 11/01/28 | $72,541,920.00 | Construction | Bridge | Construction | Bridge | $82,434,000.00 | $(9,892,080.00) | -12% | ||||
| 0095-02-096 | Dallas | 09/06/28 | $347,679,308.50 | Construction | Roadway | Unassigned | Unassigned | $395,000,825.50 | $(47,321,517.00) | -12% | Unassigned / Unassigned → Construction / Roadway | |||
| 0495-09-065 | Atlanta | 09/06/28 | $125,439,075.30 | Construction | Roadway | Construction | Roadway | $142,544,403.70 | $(17,105,328.40) | -12% | ||||
| 1006-01-079 | Houston | 09/06/28 | $42,835,489.94 | Construction | Roadway | Construction | Roadway | $48,676,693.00 | $(5,841,203.06) | -12% | ||||
| 1051-01-064 | Dallas | 09/06/28 | $101,546,735.70 | Construction | Roadway | Unassigned | Unassigned | $115,412,344.00 | $(13,865,608.30) | -12% | Unassigned / Unassigned → Construction / Roadway | |||
| 1159-01-030 | Dallas | 07/06/28 | $4,874,070.50 | Construction | Bridge | Construction | Bridge | $5,551,003.32 | $(676,932.82) | -12% | ||||
| 2452-03-128 | San Antonio | 12/01/26 | $190,314,322.00 | Construction | Roadway | Unassigned | Unassigned | $215,816,440.00 | $(25,502,118.00) | -12% | Unassigned / Unassigned → Construction / Roadway | |||
| 0027-08-147 | Houston | 08/05/26 | $60,321,355.00 | Construction | Roadway | Construction | Roadway | $68,275,405.00 | $(7,954,050.00) | -12% | ||||
| 0314-04-037 | Fort Worth | 07/01/26 | $437,865.47 | Construction | Bridge | Construction | Bridge | $391,798.68 | $46,066.79 | 12% | ||||
| 0166-07-073 | Bryan | 06/02/26 | $404,475.00 | Construction | Bridge | Unassigned | Unassigned | $360,772.88 | $43,702.12 | 12% | Unassigned / Unassigned → Construction / Bridge | |||
| 0255-06-073 | Pharr | 05/06/26 | $73,905,739.17 | Construction | Roadway | Construction | Roadway | $84,390,866.00 | $(10,485,126.83) | -12% | ||||
| 0921-06-373 | Pharr | 05/06/26 | $628,778.15 | Construction | Roadway | Construction | Roadway | $559,313.35 | $69,464.80 | 12% | ||||
| 0197-03-082 | Dallas | 04/07/26 | $2,282,217.58 | Construction | Roadway | Construction | Roadway | $2,595,355.76 | $(313,138.18) | -12% | ||||
| 1245-02-053 | Amarillo | 04/07/26 | $6,093,863.96 | Construction | Roadway | Construction | Roadway | $6,900,000.00 | $(806,136.04) | -12% | ||||
| 1685-05-105 | Houston | 01/01/31 | $7,770,938.39 | $8,703,450.00 | $(932,511.61) | -11% | 730 | 2 years | ||||||
| 1835-01-026 | Waco | 01/01/31 | $15,000,000.00 | $16,799,999.00 | $(1,799,999.00) | -11% | 730 | 2 years | ||||||
| 1794-01-023 | Lufkin | 10/01/29 | $6,834,659.82 | Construction | Roadway | $7,654,819.00 | $(820,159.18) | -11% | 452 | 1 year | ||||
| 2116-01-020 | Lufkin | 05/01/29 | $5,942,228.57 | Construction | Roadway | Construction | Roadway | $6,655,296.00 | $(713,067.43) | -11% | 363 | 12 months | ||
| 0005-04-074 | Odessa | 01/01/29 | $50,435,715.00 | Construction | Bridge | Unassigned | Unassigned | $56,488,000.00 | $(6,052,285.00) | -11% | Unassigned / Unassigned → Construction / Bridge | |||
| 0005-13-063 | Odessa | 01/01/29 | $240,150,931.00 | Construction | Roadway | Unassigned | Unassigned | $268,969,042.70 | $(28,818,111.70) | -11% | Unassigned / Unassigned → Construction / Roadway | |||
| 0015-13-423 | Austin | 01/01/29 | $1,502,285,713.00 | Construction | Roadway | Construction | Roadway | $1,682,559,998.00 | $(180,274,285.00) | -11% | ||||
| 0054-07-086 | Brownwood | 01/01/29 | $25,000,000.00 | Construction | Roadway | Unassigned | Unassigned | $28,000,000.00 | $(3,000,000.00) | -11% | Unassigned / Unassigned → Construction / Roadway | |||
| 0231-02-070 | Waco | 01/01/29 | $9,047,322.32 | Construction | Roadway | Unassigned | Unassigned | $10,133,000.00 | $(1,085,677.68) | -11% | Unassigned / Unassigned → Construction / Roadway | |||
| 0508-02-139 | Beaumont | 01/01/29 | $8,354,659.82 | Construction | Roadway | Unassigned | Unassigned | $9,357,218.00 | $(1,002,558.18) | -11% | Unassigned / Unassigned → Construction / Roadway | |||
| 0195-02-090 | Dallas | 11/01/28 | $159,894,765.10 | Construction | Roadway | Unassigned | Unassigned | $179,082,136.90 | $(19,187,371.80) | -11% | Unassigned / Unassigned → Construction / Roadway | |||
| 3553-01-008 | Wichita Falls | 11/01/28 | $170,258.29 | Construction | Roadway | Unassigned | Unassigned | $191,928.00 | $(21,669.71) | -11% | Unassigned / Unassigned → Construction / Roadway | |||
| 0086-14-077 | Laredo | 10/04/28 | $33,330,081.25 | Construction | Roadway | Construction | Roadway | $37,329,691.00 | $(3,999,609.75) | -11% | ||||
| 0086-14-086 | Laredo | 10/04/28 | $71,102,563.39 | Construction | Roadway | Construction | Roadway | $79,634,871.00 | $(8,532,307.61) | -11% | ||||
| 0081-13-071 | Dallas | 09/06/28 | $232,779,659.10 | Construction | Roadway | Unassigned | Unassigned | $260,713,231.60 | $(27,933,572.50) | -11% | Unassigned / Unassigned → Construction / Roadway | |||
| 0200-05-036 | Beaumont | 09/06/28 | $90,000,000.00 | Construction | Roadway | Construction | Roadway | $100,800,000.00 | $(10,800,000.00) | -11% | ||||
| 0451-01-053 | Dallas | 09/06/28 | $117,610,100.90 | Construction | Roadway | Unassigned | Unassigned | $132,731,313.00 | $(15,121,212.10) | -11% | Unassigned / Unassigned → Construction / Roadway | |||
| 1575-05-024 | Atlanta | 09/06/28 | $237,272,901.00 | Construction | Roadway | Construction | Roadway | $265,974,733.00 | $(28,701,832.00) | -11% | ||||
| 3098-01-022 | Pharr | 09/06/28 | $23,644,598.00 | Construction | Roadway | Construction | Roadway | $26,481,950.00 | $(2,837,352.00) | -11% | ||||
| 0114-09-091 | Bryan | 06/14/28 | $84,922,091.00 | Alternative Delivery | Design Build | Alternative Delivery | Design Build | $94,955,858.28 | $(10,033,767.28) | -11% | ||||
| 0907-00-243 | San Angelo | 06/13/28 | $8,509,000.00 | Construction | Local Let | Unassigned | Unassigned | $9,581,000.00 | $(1,072,000.00) | -11% | Unassigned / Unassigned → Construction / Local Let | |||
| 0050-01-094 | Bryan | 04/05/28 | $14,207,310.00 | Construction | Roadway | Construction | Roadway | $16,034,370.56 | $(1,827,060.56) | -11% | ||||
| 3632-01-003 | Pharr | 02/02/28 | $90,352,435.00 | Construction | Roadway | Unassigned | Unassigned | $101,194,726.00 | $(10,842,291.00) | -11% | Unassigned / Unassigned → Construction / Roadway | |||
| 0217-02-037 | Atlanta | 11/01/27 | $18,642,426.36 | Construction | Roadway | Unassigned | Unassigned | $20,879,517.00 | $(2,237,090.64) | -11% | Unassigned / Unassigned → Construction / Roadway | |||
| 0043-02-078 | Childress | 10/05/27 | $18,800,000.00 | Construction | Roadway | Unassigned | Unassigned | $21,056,000.00 | $(2,256,000.00) | -11% | Unassigned / Unassigned → Construction / Roadway | |||
| 0610-06-098 | Atlanta | 09/01/27 | $14,560,000.00 | Construction | Roadway | Unassigned | Unassigned | $16,307,200.00 | $(1,747,200.00) | -11% | Unassigned / Unassigned → Construction / Roadway | |||
| 0024-07-068 | San Antonio | 05/05/27 | $278,604,536.00 | Construction | Roadway | Unassigned | Unassigned | $312,037,081.00 | $(33,432,545.00) | -11% | Unassigned / Unassigned → Construction / Roadway | |||
| 0168-09-186 | Amarillo | 05/05/27 | $16,617,549.00 | Construction | Roadway | Construction | Roadway | $18,572,730.00 | $(1,955,181.00) | -11% | ||||
| 2635-02-034 | Amarillo | 05/05/27 | $26,052,115.48 | Construction | Roadway | Construction | Roadway | $29,113,322.92 | $(3,061,207.44) | -11% | ||||
| 2635-03-023 | Amarillo | 05/05/27 | $24,592,354.00 | Construction | Roadway | Construction | Roadway | $27,518,877.36 | $(2,926,523.36) | -11% | ||||
| 2635-03-028 | Amarillo | 05/05/27 | $145,779,362.00 | Construction | Bridge | Construction | Bridge | $163,127,301.80 | $(17,347,939.80) | -11% | ||||
| 0055-08-120 | Waco | 02/02/27 | $39,892,364.56 | Construction | Roadway | Construction | Roadway | $44,739,109.00 | $(4,846,744.44) | -11% | ||||
| 0195-01-111 | Wichita Falls | 12/01/26 | $320,000,000.00 | Construction | Roadway | Construction | Roadway | $361,219,998.80 | $(41,219,998.80) | -11% | ||||
| 0014-15-036 | Fort Worth | 08/05/26 | $20,865,852.16 | Construction | Roadway | Construction | Roadway | $18,856,479.00 | $2,009,373.16 | 11% | ||||
| 0002-05-052 | El Paso | 05/06/26 | $539,871.38 | Construction | Roadway | Construction | Roadway | $609,787.61 | $(69,916.23) | -11% | ||||
| 0187-05-061 | Houston | 05/06/26 | $4,313,954.25 | Construction | Roadway | Construction | Roadway | $3,885,669.45 | $428,284.80 | 11% | ||||
| 0901-19-212 | Paris | 05/06/26 | $924,207.93 | Construction | Bridge | Construction | Bridge | $835,000.00 | $89,207.93 | 11% | ||||
| 0914-04-340 | Austin | 05/06/26 | $442,945.20 | Construction | Roadway | Construction | Roadway | $500,393.13 | $(57,447.93) | -11% | ||||
| 1228-03-057 | Pharr | 05/06/26 | $249,764.25 | Construction | Roadway | Construction | Roadway | $225,398.00 | $24,366.25 | 11% | -119 | -4 months | ||
| 0263-05-027 | Abilene | 06/01/28 | $2,358,156.80 | Construction | Roadway | Unassigned | Unassigned | $2,613,672.48 | $(255,515.68) | -10% | Unassigned / Unassigned → Construction / Roadway | |||
| 0907-00-242 | San Angelo | 04/05/28 | $1,956,000.00 | Construction | Roadway | Unassigned | Unassigned | $1,778,000.00 | $178,000.00 | 10% | -8 | -8 days | Unassigned / Unassigned → Construction / Roadway | |
| 0267-01-036 | Yoakum | 05/05/27 | $1,338,000.00 | Construction | Roadway | Unassigned | Unassigned | $1,216,000.00 | $122,000.00 | 10% | Unassigned / Unassigned → Construction / Roadway | |||
| 0918-47-401 | Dallas | 08/05/26 | $2,427,791.55 | Construction | Roadway | Construction | Roadway | $2,203,920.68 | $223,870.87 | 10% | ||||
| 0921-02-525 | Pharr | 08/05/26 | $783,996.83 | Construction | Roadway | Construction | Roadway | $873,656.84 | $(89,660.01) | -10% | ||||
| 0314-04-040 | Fort Worth | 07/01/26 | $43,907.58 | Construction | Bridge | Construction | Bridge | $39,819.12 | $4,088.46 | 10% | ||||
| 2263-02-107 | Corpus Christi | 05/06/26 | $43,826,715.00 | Construction | Ferry Boat | Construction | Ferry Boat | $40,000,000.00 | $3,826,715.00 | 10% | ||||
| 0986-03-015 | Austin | 04/07/26 | $1,713,954.79 | Construction | Roadway | Unassigned | Unassigned | $1,911,737.44 | $(197,782.65) | -10% | Unassigned / Unassigned → Construction / Roadway | |||
| 0016-05-111 | San Antonio | 09/06/28 | $135,556,841.00 | Construction | Roadway | Construction | Roadway | $148,231,406.20 | $(12,674,565.20) | -9% | ||||
| 0016-06-115 | San Antonio | 09/06/28 | $338,438,190.00 | Construction | Roadway | Construction | Roadway | $370,082,161.00 | $(31,643,971.00) | -9% | ||||
| 0180-10-082 | Corpus Christi | 04/05/28 | $70,750,000.00 | Construction | Roadway | Construction | Roadway | $77,490,000.00 | $(6,740,000.00) | -9% | ||||
| 0080-03-049 | Fort Worth | 11/03/26 | $115,461,159.10 | Construction | Roadway | Unassigned | Unassigned | $126,999,999.80 | $(11,538,840.70) | -9% | Unassigned / Unassigned → Construction / Roadway | |||
| 0095-03-102 | Dallas | 10/06/26 | $15,558,783.75 | Construction | Bridge | Construction | Bridge | $17,080,561.45 | $(1,521,777.70) | -9% | ||||
| 0015-13-432 | Austin | 07/01/26 | $254,000,000.00 | Construction | Bridge | Construction | Bridge | $232,000,000.00 | $22,000,000.00 | 9% | ||||
| 0353-03-117 | Fort Worth | 06/18/26 | $516,490.30 | Construction | Local Let | Unassigned | Unassigned | $568,354.60 | $(51,864.30) | -9% | Unassigned / Unassigned → Construction / Local Let | |||
| 0926-05-009 | Lufkin | 10/04/28 | $9,169,916.07 | Construction | Roadway | Unassigned | Unassigned | $8,482,142.86 | $687,773.21 | 8% | Unassigned / Unassigned → Construction / Roadway | |||
| 0976-02-086 | Houston | 08/02/28 | $70,907,942.00 | Construction | Roadway | Construction | Roadway | $77,064,068.00 | $(6,156,126.00) | -8% | ||||
| 0049-09-092 | Bryan | 04/05/28 | $5,658,269.00 | Construction | Roadway | Construction | Roadway | $6,149,406.00 | $(491,137.00) | -8% | ||||
| 0180-06-118 | Corpus Christi | 04/05/28 | $56,907,500.00 | Construction | Roadway | Construction | Roadway | $62,000,100.00 | $(5,092,600.00) | -8% | ||||
| 2452-01-074 | San Antonio | 01/05/28 | $120,561.00 | Construction | Roadway | Construction | Roadway | $111,889.00 | $8,672.00 | 8% | 92 | 3 months | ||
| 0027-13-201 | Houston | 10/05/27 | $710,022,858.00 | Construction | Roadway | Construction | Roadway | $771,763,977.80 | $(61,741,119.80) | -8% | ||||
| 3416-01-012 | Houston | 09/01/27 | $74,299,327.00 | Construction | Roadway | Construction | Roadway | $80,760,137.01 | $(6,460,810.01) | -8% | ||||
| 0171-11-003 | Bryan | 08/04/27 | $118,439,867.00 | Construction | Roadway | Construction | Roadway | $128,720,447.40 | $(10,280,580.40) | -8% | ||||
| 0675-05-105 | Bryan | 08/04/27 | $89,176,337.00 | Construction | Roadway | Construction | Roadway | $96,916,842.00 | $(7,740,505.00) | -8% | ||||
| 0068-01-073 | Lubbock | 10/06/26 | $135,847,883.00 | Construction | Roadway | Construction | Roadway | $148,162,938.60 | $(12,315,055.60) | -8% | ||||
| 0912-34-209 | Houston | 10/06/26 | $1,085,413.00 | Construction | Bridge | Construction | Bridge | $1,178,554.00 | $(93,141.00) | -8% | ||||
| 1741-02-039 | San Antonio | 10/06/26 | $294,195.00 | Construction | Roadway | Construction | Roadway | $318,598.00 | $(24,403.00) | -8% | ||||
| 0173-04-063 | Dallas | 09/02/26 | $883,168.07 | Construction | Roadway | Construction | Roadway | $818,248.75 | $64,919.32 | 8% | ||||
| 0212-03-058 | Bryan | 09/02/26 | $13,742,128.00 | Construction | Bridge | Construction | Bridge | $14,934,943.92 | $(1,192,815.92) | -8% | ||||
| 0212-03-059 | Bryan | 09/02/26 | $14,811,612.00 | Construction | Bridge | Construction | Bridge | $16,097,259.36 | $(1,285,647.36) | -8% | ||||
| 0314-04-039 | Fort Worth | 07/01/26 | $25,160.09 | Construction | Bridge | Construction | Bridge | $27,382.20 | $(2,222.11) | -8% | ||||
| 0370-05-057 | Yoakum | 07/01/26 | $540,000.00 | Construction | Roadway | Unassigned | Unassigned | $500,000.00 | $40,000.00 | 8% | Unassigned / Unassigned → Construction / Roadway | |||
| 0508-07-296 | Houston | 05/06/26 | $646,244.64 | Construction | Roadway | Construction | Roadway | $599,300.64 | $46,944.00 | 8% | ||||
| 0079-05-069 | Fort Worth | 04/07/26 | $27,891.23 | Construction | Bridge | Construction | Bridge | $30,241.77 | $(2,350.54) | -8% | ||||
| 0543-02-089 | Houston | 04/07/26 | $770,105.75 | Construction | Bridge | Unassigned | Unassigned | $836,725.75 | $(66,620.00) | -8% | Unassigned / Unassigned → Construction / Bridge | |||
| 1016-04-021 | Dallas | 04/07/26 | $3,804,796.15 | Construction | Roadway | Construction | Roadway | $4,149,692.15 | $(344,896.00) | -8% | ||||
| 1823-01-011 | Odessa | 04/07/26 | $7,852,149.83 | Construction | Roadway | Construction | Roadway | $7,300,000.00 | $552,149.83 | 8% | ||||
| 0508-01-396 | Houston | 03/01/32 | $166,666,667.00 | Construction | Roadway | $180,000,000.40 | $(13,333,333.40) | -7% | 1455 | 4 years | ||||
| 0692-01-020 | Paris | 10/04/28 | $33,000,000.00 | Construction | Roadway | Construction | Roadway | $35,640,000.00 | $(2,640,000.00) | -7% | ||||
| 1730-02-024 | San Antonio | 10/04/28 | $369,611.00 | Construction | Roadway | Construction | Roadway | $398,288.00 | $(28,677.00) | -7% | 365 | 1 year | ||
| 0014-10-074 | Waco | 09/06/28 | $5,092,592.59 | Construction | Bridge | Construction | Bridge | $5,500,000.00 | $(407,407.41) | -7% | ||||
| 0014-10-075 | Waco | 09/06/28 | $5,092,592.59 | Construction | Bridge | Construction | Bridge | $5,500,000.00 | $(407,407.41) | -7% | ||||
| 0038-04-064 | Pharr | 09/06/28 | $83,428,593.00 | Construction | Roadway | Construction | Roadway | $90,102,879.00 | $(6,674,286.00) | -7% | ||||
| 0495-10-105 | Atlanta | 09/06/28 | $5,976,110.38 | Construction | Roadway | Construction | Roadway | $6,454,190.00 | $(478,079.62) | -7% | ||||
| 3100-02-002 | Pharr | 09/06/28 | $37,840,008.12 | Construction | Roadway | Construction | Roadway | $40,867,208.00 | $(3,027,199.88) | -7% | ||||
| 3629-02-002 | Pharr | 09/06/28 | $167,568,412.00 | Construction | Roadway | Construction | Roadway | $180,973,885.00 | $(13,405,473.00) | -7% | ||||
| 0265-01-118 | Austin | 08/02/28 | $419,999.07 | Construction | Roadway | Construction | Roadway | $453,600.00 | $(33,600.93) | -7% | ||||
| 0265-02-043 | Austin | 08/02/28 | $1,600,000.00 | Construction | Roadway | Construction | Roadway | $1,728,000.00 | $(128,000.00) | -7% | ||||
| 0069-01-061 | Abilene | 07/06/28 | $20,000,000.00 | Construction | Roadway | Construction | Roadway | $21,600,000.00 | $(1,600,000.00) | -7% | ||||
| 0069-02-030 | San Angelo | 07/06/28 | $5,000,000.00 | Construction | Roadway | Construction | Roadway | $5,400,000.00 | $(400,000.00) | -7% | ||||
| 0186-06-082 | Bryan | 06/14/28 | $199,548,797.00 | Alternative Delivery | Design Build | Alternative Delivery | Design Build | $215,512,700.00 | $(15,963,903.00) | -7% | ||||
| 0251-03-022 | Waco | 05/03/28 | $11,407,407.41 | Construction | Roadway | Construction | Roadway | $12,319,999.00 | $(912,591.59) | -7% | ||||
| 0251-04-023 | Brownwood | 05/03/28 | $111,585,185.20 | Construction | Roadway | Construction | Roadway | $120,512,000.00 | $(8,926,814.80) | -7% | ||||
| 2977-01-011 | Dallas | 05/03/28 | $12,330,496.94 | Construction | Roadway | Construction | Roadway | $13,190,108.33 | $(859,611.39) | -7% | ||||
| 3409-01-011 | Waco | 05/01/28 | $6,200,000.00 | Construction | Roadway | Construction | Roadway | $6,678,325.00 | $(478,325.00) | -7% | ||||
| 1690-01-131 | Paris | 04/05/28 | $144,217,308.00 | Construction | Roadway | Construction | Roadway | $155,754,265.00 | $(11,536,957.00) | -7% | ||||
| 0047-05-061 | Dallas | 03/07/28 | $52,099,915.91 | Construction | Roadway | Construction | Roadway | $56,267,909.18 | $(4,167,993.27) | -7% | ||||
| 0065-07-065 | Beaumont | 02/02/28 | $13,629,629.00 | Construction | Roadway | Construction | Roadway | $14,719,999.00 | $(1,090,370.00) | -7% | ||||
| 0035-05-059 | San Angelo | 01/05/28 | $81,417,639.00 | Construction | Roadway | Construction | Roadway | $87,931,050.12 | $(6,513,411.12) | -7% | ||||
| 1803-01-092 | Pharr | 01/05/28 | $14,796,701.00 | Construction | Roadway | Construction | Roadway | $15,980,437.00 | $(1,183,736.00) | -7% | ||||
| 2121-02-186 | El Paso | 12/01/27 | $462,962,963.00 | Construction | Roadway | Construction | Roadway | $500,000,000.00 | $(37,037,037.00) | -7% | ||||
| 0545-04-048 | Tyler | 09/01/27 | $151,000,000.00 | Construction | Roadway | Construction | Roadway | $163,080,000.00 | $(12,080,000.00) | -7% | ||||
| 1149-01-033 | Austin | 09/01/27 | $56,500,000.00 | Construction | Roadway | Construction | Roadway | $61,020,000.00 | $(4,520,000.00) | -7% | ||||
| 3138-01-020 | Bryan | 07/01/27 | $100,882,922.00 | Construction | Roadway | Construction | Roadway | $109,003,297.00 | $(8,120,375.00) | -7% | ||||
| 1012-03-028 | Dallas | 03/03/27 | $6,692,513.42 | Construction | Roadway | Construction | Roadway | $6,278,088.98 | $414,424.44 | 7% | ||||
| 1601-02-036 | Fort Worth | 01/06/27 | $8,441,246.00 | Construction | Roadway | Unassigned | Unassigned | $9,033,592.70 | $(592,346.70) | -7% | Unassigned / Unassigned → Construction / Roadway | |||
| 0215-11-025 | San Antonio | 10/06/26 | $331,148.00 | Construction | Roadway | Construction | Roadway | $356,840.00 | $(25,692.00) | -7% | -364 | -12 months | ||
| 0215-11-026 | San Antonio | 10/06/26 | $154,100.00 | Construction | Roadway | Construction | Roadway | $166,056.00 | $(11,956.00) | -7% | -364 | -12 months | ||
| 0842-03-037 | Yoakum | 10/06/26 | $33,218,001.00 | Construction | Roadway | Construction | Roadway | $35,863,495.00 | $(2,645,494.00) | -7% | ||||
| 0143-10-058 | Yoakum | 09/02/26 | $9,000,000.00 | Construction | Roadway | Construction | Roadway | $9,724,860.00 | $(724,860.00) | -7% | ||||
| 0051-09-128 | Houston | 08/05/26 | $4,032,301.00 | Construction | Roadway | Construction | Roadway | $4,316,678.00 | $(284,377.00) | -7% | ||||
| 0178-02-092 | Houston | 06/04/26 | $186,793,464.00 | Alternative Delivery | Design Build | Alternative Delivery | Design Build | $175,379,122.00 | $11,414,342.00 | 7% | ||||
| 0196-07-034 | Dallas | 06/02/26 | $98,325,151.30 | Construction | Bridge | Construction | Bridge | $106,035,488.00 | $(7,710,336.70) | -7% | ||||
| 0523-10-049 | Houston | 05/06/26 | $1,163,842.80 | Construction | Roadway | Construction | Roadway | $1,088,363.00 | $75,479.80 | 7% | ||||
| 0091-06-062 | Dallas | 04/07/26 | $400,030.00 | Construction | Roadway | Construction | Roadway | $431,780.00 | $(31,750.00) | -7% | ||||
| 0197-02-138 | Dallas | 04/07/26 | $2,133,482.80 | Construction | Roadway | Construction | Roadway | $2,287,242.04 | $(153,759.24) | -7% | ||||
| 0909-40-098 | Waco | 04/07/26 | $408,388.21 | Construction | Bridge | Construction | Bridge | $438,822.13 | $(30,433.92) | -7% | ||||
| 0918-47-450 | Dallas | 04/07/26 | $408,665.50 | Construction | Roadway | Construction | Roadway | $437,984.00 | $(29,318.50) | -7% | ||||
| 0933-01-044 | Lubbock | 04/07/26 | $4,462,426.10 | Construction | Bridge | Construction | Bridge | $4,163,000.00 | $299,426.10 | 7% | ||||
| 2374-01-196 | Dallas | 04/07/26 | $424,730.00 | Construction | Roadway | Construction | Roadway | $457,425.00 | $(32,695.00) | -7% | ||||
| 3510-05-048 | Houston | 04/07/26 | $67,799,039.32 | Construction | Roadway | Construction | Roadway | $72,645,337.99 | $(4,846,298.67) | -7% | ||||
| 0221-01-078 | Paris | 03/07/28 | $108,728,384.30 | Construction | Roadway | Construction | Roadway | $115,672,734.00 | $(6,944,349.70) | -6% | ||||
| 2121-02-167 | El Paso | 07/01/27 | $30,118,818.27 | Construction | Roadway | Construction | Roadway | $28,475,973.00 | $1,642,845.27 | 6% | 365 | 1 year | ||
| 0172-12-007 | Dallas | 02/02/27 | $51,472,754.02 | Construction | Roadway | Construction | Roadway | $54,618,327.00 | $(3,145,572.98) | -6% | ||||
| 0128-04-045 | Brownwood | 01/06/27 | $2,644,230.00 | Construction | Roadway | Unassigned | Unassigned | $2,500,000.00 | $144,230.00 | 6% | Unassigned / Unassigned → Construction / Roadway | |||
| 0372-01-101 | Corpus Christi | 01/06/27 | $102,000,000.00 | Construction | Roadway | Construction | Roadway | $108,160,000.00 | $(6,160,000.00) | -6% | ||||
| 1197-01-027 | Austin | 01/06/27 | $3,110,829.60 | Construction | Roadway | Construction | Roadway | $2,942,307.69 | $168,521.91 | 6% | ||||
| 0917-30-068 | Bryan | 11/03/26 | $584,088.08 | Construction | Bridge | Construction | Bridge | $550,000.00 | $34,088.08 | 6% | ||||
| 0909-22-211 | Waco | 05/06/26 | $269,520.50 | Construction | Bridge | Construction | Bridge | $255,000.00 | $14,520.50 | 6% | ||||
| 3256-02-121 | Houston | 05/06/26 | $2,286,187.03 | Construction | Roadway | Unassigned | Unassigned | $2,436,237.84 | $(150,050.81) | -6% | Unassigned / Unassigned → Construction / Roadway | |||
| 0079-05-067 | Fort Worth | 04/07/26 | $2,613,446.11 | Construction | Bridge | Construction | Bridge | $2,770,316.50 | $(156,870.39) | -6% | ||||
| 0079-05-073 | Fort Worth | 04/07/26 | $72,390.52 | Construction | Bridge | Unassigned | Unassigned | $76,624.33 | $(4,233.81) | -6% | Unassigned / Unassigned → Construction / Bridge | |||
| 0909-40-086 | Waco | 04/07/26 | $656,233.49 | Construction | Bridge | Construction | Bridge | $699,904.28 | $(43,670.79) | -6% | ||||
| 0918-47-444 | Dallas | 04/07/26 | $442,486.00 | Construction | Roadway | Construction | Roadway | $472,374.00 | $(29,888.00) | -6% | ||||
| 0918-47-446 | Dallas | 04/07/26 | $500,829.50 | Construction | Roadway | Construction | Roadway | $531,748.50 | $(30,919.00) | -6% | ||||
| 3417-02-043 | Austin | 09/03/27 | $1,805,976.85 | Non-Let | Roadway | Unassigned | Unassigned | $1,712,962.96 | $93,013.89 | 5% | Unassigned / Unassigned → Non-Let / Roadway | |||
| 1492-01-013 | Dallas | 03/03/27 | $1,398,066.02 | Construction | Roadway | Construction | Roadway | $1,466,641.12 | $(68,575.10) | -5% | ||||
| 0912-37-247 | Houston | 10/06/26 | $769,262.00 | Construction | Bridge | Construction | Bridge | $806,146.00 | $(36,884.00) | -5% | ||||
| 1502-01-031 | Lubbock | 10/06/26 | $164,867,291.60 | Construction | Roadway | Construction | Roadway | $173,944,900.10 | $(9,077,608.50) | -5% | ||||
| 1548-01-018 | San Antonio | 10/06/26 | $448,540.00 | Construction | Roadway | Construction | Roadway | $474,012.00 | $(25,472.00) | -5% | -364 | -12 months | ||
| 0266-05-055 | Yoakum | 09/02/26 | $1,050,000.00 | Construction | Roadway | Construction | Roadway | $1,100,000.00 | $(50,000.00) | -5% | ||||
| 0314-04-036 | Fort Worth | 07/01/26 | $380,384.33 | Construction | Bridge | Construction | Bridge | $399,381.13 | $(18,996.80) | -5% | ||||
| 0389-02-059 | Beaumont | 05/06/26 | $4,682,081.87 | Construction | Roadway | Construction | Roadway | $4,466,985.00 | $215,096.87 | 5% | ||||
| 1064-01-027 | Pharr | 05/06/26 | $33,504,116.11 | Construction | Roadway | Construction | Roadway | $35,262,482.00 | $(1,758,365.89) | -5% | ||||
| 0094-02-147 | Fort Worth | 04/07/26 | $5,591,881.98 | Construction | Roadway | Construction | Roadway | $5,883,006.44 | $(291,124.46) | -5% | ||||
| 1006-01-082 | Houston | 04/07/26 | $495,827.00 | Construction | Roadway | Construction | Roadway | $519,567.00 | $(23,740.00) | -5% | ||||
| 3510-05-047 | Houston | 04/07/26 | $78,509,398.62 | Construction | Roadway | Construction | Roadway | $83,067,703.44 | $(4,558,304.82) | -5% | ||||
| 0339-04-036 | Beaumont | 01/01/29 | $115,100,000.00 | Construction | Roadway | Construction | Roadway | $119,784,000.00 | $(4,684,000.00) | -4% | ||||
| 0249-07-072 | Fort Worth | 09/06/28 | $42,784,246.29 | Construction | Bridge | Unassigned | Unassigned | $41,153,041.00 | $1,631,205.29 | 4% | Unassigned / Unassigned → Construction / Bridge | |||
| 1024-01-077 | Beaumont | 05/03/28 | $70,192,307.69 | Construction | Roadway | Construction | Roadway | $73,000,000.00 | $(2,807,692.31) | -4% | ||||
| 0180-11-016 | Corpus Christi | 04/05/28 | $2,600,000.00 | Construction | Roadway | Construction | Roadway | $2,700,000.00 | $(100,000.00) | -4% | ||||
| 0248-06-017 | Tyler | 04/05/28 | $11,700,000.00 | Construction | Roadway | Construction | Roadway | $12,168,000.00 | $(468,000.00) | -4% | ||||
| 0374-07-027 | El Paso | 04/05/28 | $20,941,251.92 | Construction | Roadway | Construction | Roadway | $21,778,901.00 | $(837,649.08) | -4% | ||||
| 3290-02-009 | Tyler | 04/05/28 | $14,500,000.00 | Construction | Roadway | Construction | Roadway | $15,080,000.00 | $(580,000.00) | -4% | ||||
| 0221-01-079 | Paris | 03/07/28 | $95,956,769.00 | Construction | Roadway | Construction | Roadway | $99,795,039.00 | $(3,838,270.00) | -4% | ||||
| 0495-02-071 | Tyler | 02/02/28 | $8,653,846.15 | Construction | Roadway | Construction | Roadway | $9,000,000.00 | $(346,153.85) | -4% | ||||
| 0495-03-076 | Tyler | 02/02/28 | $3,846,153.85 | Construction | Roadway | Unassigned | Unassigned | $4,000,000.00 | $(153,846.15) | -4% | Unassigned / Unassigned → Construction / Roadway | |||
| 1803-01-094 | Pharr | 01/05/28 | $56,017,974.00 | Construction | Roadway | Construction | Roadway | $58,258,692.96 | $(2,240,718.96) | -4% | ||||
| 0214-03-035 | Beaumont | 11/02/27 | $26,584,615.38 | Construction | Bridge | Construction | Bridge | $27,648,000.00 | $(1,063,384.62) | -4% | ||||
| 0908-33-118 | Abilene | 08/04/27 | $613,311.00 | Construction | Roadway | Unassigned | Unassigned | $640,506.41 | $(27,195.41) | -4% | Unassigned / Unassigned → Construction / Roadway | |||
| 0039-10-091 | Pharr | 07/01/27 | $185,000,000.00 | Construction | Roadway | Construction | Roadway | $192,400,000.00 | $(7,400,000.00) | -4% | ||||
| 0508-01-397 | Houston | 07/01/27 | $262,691,401.00 | Construction | Roadway | Construction | Roadway | $273,199,057.00 | $(10,507,656.00) | -4% | ||||
| 1810-01-033 | Lufkin | 06/01/27 | $9,167,239.01 | Construction | Roadway | Construction | Roadway | $9,533,928.57 | $(366,689.56) | -4% | -491 | -1 year | ||
| 0178-09-019 | Houston | 05/05/27 | $48,016,232.69 | Construction | Roadway | Construction | Roadway | $49,936,882.00 | $(1,920,649.31) | -4% | ||||
| 0342-01-093 | Pharr | 05/05/27 | $29,063,727.00 | Construction | Roadway | Construction | Roadway | $30,226,276.08 | $(1,162,549.08) | -4% | ||||
| 0865-01-108 | Pharr | 05/05/27 | $21,354,188.00 | Construction | Roadway | Construction | Roadway | $22,208,355.00 | $(854,167.00) | -4% | ||||
| 2398-01-062 | Abilene | 05/05/27 | $10,384,616.00 | Construction | Roadway | Construction | Roadway | $10,800,000.00 | $(415,384.00) | -4% | ||||
| 0005-14-092 | Odessa | 03/03/27 | $213,979,449.80 | Construction | Roadway | Construction | Roadway | $222,538,626.00 | $(8,559,176.20) | -4% | ||||
| 0045-08-039 | Paris | 03/03/27 | $124,861,809.00 | Construction | Roadway | Construction | Roadway | $129,856,280.00 | $(4,994,471.00) | -4% | ||||
| 0045-09-103 | Paris | 03/03/27 | $93,663,191.00 | Construction | Roadway | Construction | Roadway | $97,409,718.64 | $(3,746,527.64) | -4% | ||||
| 0111-03-064 | Houston | 02/02/27 | $108,568,030.00 | Construction | Roadway | Construction | Roadway | $112,910,751.00 | $(4,342,721.00) | -4% | ||||
| 0265-03-042 | Austin | 02/02/27 | $60,122,400.00 | Construction | Roadway | Construction | Roadway | $62,527,296.00 | $(2,404,896.00) | -4% | ||||
| 0342-01-103 | Pharr | 02/02/27 | $12,043,275.00 | Construction | Roadway | Construction | Roadway | $12,525,006.00 | $(481,731.00) | -4% | ||||
| 0252-01-084 | Austin | 12/01/26 | $10,866,345.19 | Construction | Roadway | Construction | Roadway | $11,301,000.00 | $(434,654.81) | -4% | ||||
| 0005-02-112 | Odessa | 10/06/26 | $6,346,155.00 | Construction | Rail - Safety | Construction | Rail - Safety | $6,600,001.20 | $(253,846.20) | -4% | ||||
| 0133-01-055 | Childress | 10/06/26 | $14,000,000.00 | Construction | Roadway | Construction | Roadway | $14,560,000.00 | $(560,000.00) | -4% | ||||
| 0143-03-049 | San Antonio | 10/06/26 | $69,947,811.00 | Construction | Roadway | Construction | Roadway | $72,900,000.16 | $(2,952,189.16) | -4% | ||||
| 0200-01-093 | Lufkin | 10/06/26 | $36,934,615.38 | Construction | Roadway | Construction | Roadway | $38,411,999.00 | $(1,477,383.62) | -4% | ||||
| 0015-13-437 | Austin | 09/02/26 | $387,000,000.00 | Construction | Roadway | Construction | Rail | $402,480,000.00 | $(15,480,000.00) | -4% | Construction / Rail → Construction / Roadway | |||
| 0902-48-579 | Fort Worth | 08/05/26 | $23,961,192.05 | Construction | Roadway | Construction | Roadway | $25,056,079.00 | $(1,094,886.95) | -4% | ||||
| 0167-01-122 | El Paso | 06/02/26 | $85,272,327.66 | Construction | Roadway | Construction | Roadway | $88,452,915.00 | $(3,180,587.34) | -4% | ||||
| 0047-03-091 | Paris | 04/07/26 | $147,195,094.80 | Construction | Roadway | Unassigned | Unassigned | $152,906,394.00 | $(5,711,299.20) | -4% | Unassigned / Unassigned → Construction / Roadway | |||
| 0079-05-066 | Fort Worth | 04/07/26 | $73,735.15 | Construction | Bridge | Construction | Bridge | $76,821.46 | $(3,086.31) | -4% | ||||
| 0299-04-083 | Laredo | 04/07/26 | $10,629,521.20 | Construction | Roadway | Construction | Roadway | $11,049,043.00 | $(419,521.80) | -4% | ||||
| 0674-01-083 | El Paso | 04/07/26 | $1,250,605.30 | Construction | Roadway | Construction | Roadway | $1,307,462.30 | $(56,857.00) | -4% | ||||
| 0909-40-081 | Waco | 04/07/26 | $393,796.64 | Construction | Bridge | Construction | Bridge | $408,468.48 | $(14,671.84) | -4% | ||||
| 0922-48-004 | Laredo | 04/07/26 | $723,938.06 | Construction | Bridge | Construction | Bridge | $698,962.51 | $24,975.55 | 4% | ||||
| 1508-01-010 | Laredo | 04/07/26 | $4,480,000.35 | Construction | Roadway | Construction | Roadway | $4,646,337.92 | $(166,337.57) | -4% | ||||
| 1790-02-048 | Tyler | 04/07/26 | $1,629,505.50 | Construction | Bridge | Construction | Bridge | $1,690,315.50 | $(60,810.00) | -4% | ||||
| 1849-03-023 | Paris | 11/01/28 | $1,294,719.36 | Construction | Roadway | Unassigned | Unassigned | $1,337,582.40 | $(42,863.04) | -3% | -34 | -1 month | Unassigned / Unassigned → Construction / Roadway | |
| 0048-04-109 | Dallas | 05/06/26 | $615,349.25 | Construction | Roadway | Unassigned | Unassigned | $636,000.00 | $(20,650.75) | -3% | Unassigned / Unassigned → Construction / Roadway | |||
| 0187-02-074 | Yoakum | 05/06/26 | $718,612.65 | Construction | Roadway | Construction | Roadway | $741,114.00 | $(22,501.35) | -3% | ||||
| 0187-05-062 | Houston | 05/06/26 | $6,075,775.00 | Construction | Roadway | Construction | Roadway | $5,918,914.90 | $156,860.10 | 3% | ||||
| 0442-02-166 | Dallas | 05/06/26 | $12,657,475.67 | Construction | Roadway | Construction | Roadway | $13,006,805.93 | $(349,330.26) | -3% | -181 | -6 months | ||
| 0815-08-044 | Dallas | 05/06/26 | $1,230,656.05 | Construction | Roadway | Unassigned | Unassigned | $1,272,000.00 | $(41,343.95) | -3% | Unassigned / Unassigned → Construction / Roadway | |||
| 0079-05-068 | Fort Worth | 04/07/26 | $1,400,688.19 | Construction | Bridge | Construction | Bridge | $1,446,179.03 | $(45,490.84) | -3% | ||||
| 0337-01-053 | Austin | 04/07/26 | $7,329,605.75 | Construction | Roadway | Construction | Roadway | $7,553,905.75 | $(224,300.00) | -3% | ||||
| 0337-02-054 | Austin | 04/07/26 | $2,566,158.62 | Construction | Roadway | Unassigned | Unassigned | $2,645,257.53 | $(79,098.91) | -3% | Unassigned / Unassigned → Construction / Roadway | |||
| 0353-05-133 | Dallas | 04/07/26 | $660,175.50 | Construction | Roadway | Construction | Roadway | $680,452.90 | $(20,277.40) | -3% | ||||
| 0909-40-089 | Waco | 04/07/26 | $746,742.67 | Construction | Bridge | Construction | Bridge | $772,186.82 | $(25,444.15) | -3% | ||||
| 1062-04-063 | Houston | 04/07/26 | $1,703,466.80 | Construction | Roadway | Construction | Roadway | $1,655,946.32 | $47,520.48 | 3% | ||||
| 0683-02-086 | Austin | 08/04/27 | $4,423,285.43 | Construction | Bridge | Construction | Bridge | $4,507,875.00 | $(84,589.57) | -2% | ||||
| 0371-04-062 | Corpus Christi | 01/06/27 | $51,000,000.00 | Construction | Roadway | Construction | Roadway | $52,000,000.00 | $(1,000,000.00) | -2% | ||||
| 1068-04-181 | Dallas | 06/02/26 | $653,883.04 | Construction | Roadway | Construction | Roadway | $666,808.73 | $(12,925.69) | -2% | ||||
| 0521-04-285 | San Antonio | 05/06/26 | $159,536,000.00 | Construction | Roadway | Construction | Roadway | $162,726,720.00 | $(3,190,720.00) | -2% | ||||
| 0643-05-067 | Bryan | 05/06/26 | $2,539,776.40 | Construction | Roadway | Construction | Roadway | $2,579,522.00 | $(39,745.60) | -2% | ||||
| 0005-08-109 | Abilene | 04/07/26 | $12,628,622.92 | Construction | Roadway | Construction | Roadway | $12,862,294.00 | $(233,671.08) | -2% | -301 | -10 months | ||
| 0172-09-046 | Fort Worth | 04/07/26 | $286,038.00 | Construction | Roadway | Unassigned | Unassigned | $280,000.00 | $6,038.00 | 2% | Unassigned / Unassigned → Construction / Roadway | |||
| 0598-02-120 | Houston | 04/07/26 | $4,974,658.00 | Construction | Roadway | Construction | Roadway | $5,083,588.00 | $(108,930.00) | -2% | ||||
| 0908-23-058 | Abilene | 04/07/26 | $744,831.50 | Construction | Bridge | Construction | Bridge | $729,831.50 | $15,000.00 | 2% | -330 | -11 months | ||
| 0216-03-039 | San Antonio | 10/01/29 | $240,010.00 | Construction | Roadway | $241,390.00 | $(1,380.00) | -1% | 727 | 2 years | ||||
| 1009-01-044 | San Antonio | 10/06/26 | $389,823.00 | Construction | Roadway | Construction | Roadway | $392,063.00 | $(2,240.00) | -1% | -364 | -12 months | ||
| 1899-01-020 | San Antonio | 10/06/26 | $159,286.00 | Construction | Roadway | Construction | Roadway | $160,201.00 | $(915.00) | -1% | -364 | -12 months | ||
| 1899-02-023 | San Antonio | 10/06/26 | $489,943.00 | Construction | Roadway | Construction | Roadway | $492,759.00 | $(2,816.00) | -1% | -364 | -12 months | ||
| 0014-15-034 | Fort Worth | 08/05/26 | $18,925,918.73 | Construction | Roadway | Construction | Roadway | $19,066,000.00 | $(140,081.27) | -1% | ||||
| 0014-03-088 | Fort Worth | 07/01/26 | $82,826,148.94 | Construction | Roadway | Construction | Roadway | $84,000,000.00 | $(1,173,851.06) | -1% | ||||
| 0110-05-136 | Houston | 05/06/26 | $991,742.20 | Construction | Roadway | Construction | Roadway | $1,005,910.00 | $(14,167.80) | -1% | ||||
| 0500-03-655 | Houston | 05/06/26 | $9,120,774.40 | Construction | Bridge | Construction | Bridge | $9,030,488.00 | $90,286.40 | 1% | ||||
| 0314-07-087 | Fort Worth | 04/07/26 | $537,434.00 | Construction | Roadway | Unassigned | Unassigned | $534,158.80 | $3,275.20 | 1% | Unassigned / Unassigned → Construction / Roadway | |||
| 0909-38-100 | Waco | 04/07/26 | $1,062,294.75 | Construction | Bridge | Construction | Bridge | $1,054,694.75 | $7,600.00 | 1% | ||||
| 1245-02-052 | Amarillo | 04/07/26 | $1,708,880.79 | Construction | Roadway | Construction | Roadway | $1,700,000.00 | $8,880.79 | 1% | ||||
| 1823-02-014 | Odessa | 04/07/26 | $2,075,285.37 | Construction | Roadway | Construction | Roadway | $2,100,000.00 | $(24,714.63) | -1% | ||||
| 2005-03-009 | Odessa | 04/07/26 | $7,108,332.52 | Construction | Roadway | Construction | Roadway | $7,062,223.42 | $46,109.10 | 1% | ||||
| 2230-01-021 | San Antonio | 04/07/26 | $54,752,251.98 | Construction | Roadway | Construction | Roadway | $54,175,797.00 | $576,454.98 | 1% | ||||
| 0081-02-079 | Fort Worth | 06/11/26 | $515,157.78 | Construction | Local Let | Unassigned | Unassigned | $513,104.90 | $2,052.88 | 0% | Unassigned / Unassigned → Construction / Local Let | |||
| 2964-04-010 | Dallas | 06/02/26 | $901,904.59 | Construction | Roadway | Construction | Roadway | $903,563.10 | $(1,658.51) | 0% | ||||
| 0077-07-010 | San Angelo | 05/06/26 | $5,202,796.65 | Construction | Bridge | Construction | Bridge | $5,206,596.65 | $(3,800.00) | 0% | ||||
| 0138-06-049 | Lufkin | 05/06/26 | $3,877,907.00 | Construction | Roadway | Construction | Roadway | $3,877,900.00 | $7.00 | 0% | ||||
| 0463-07-055 | Odessa | 05/06/26 | $1,299,947.36 | Construction | Roadway | Construction | Roadway | $1,293,759.66 | $6,187.70 | 0% | ||||
| 1271-01-013 | San Antonio | 05/06/26 | $1,202,995.95 | Construction | Bridge | Construction | Bridge | $1,199,651.14 | $3,344.81 | 0% |
Putting It Together
Across February, the pattern is consistent. Letting dates are moving, with a slight drift toward later years. Costs are being updated across a wide set of projects, but the financial impact is concentrated in a handful of large jobs. The mix of work remains unchanged, with roadway construction continuing to dominate.
Final Takeaway
The TxDOT pipeline is not changing direction. It is being adjusted.
Expect continued movement in letting dates, especially beyond the next 12 months. Expect ongoing cost updates, with large projects driving most of the dollar impact. Do not expect meaningful changes in the type of work being let.
The signal is not in what is coming. It is in when it will hit and how it will be priced.