  • The Texas Department of Transportation's (TxDOT) active project pipeline value increased from $30.12B to $30.34B, reflecting a $223.10M rise.
  • A total of 5,440 active projects were recorded, marking a gain of 5 projects since the last snapshot, with 79 entering and 74 exiting the letting window.
  • Houston experienced the largest net cost increase of $178.94M, while San Antonio saw a decrease of $46.63M.

Overview

Looking at the June 3 vs. July 3, 2026 snapshots, across a letting window of July 3, 2026 to July 1, 2029, the pipeline reflects a mixed dynamic. The letting dates show a drift with 99 projects shifting later and 71 moving earlier, indicating a net delay for the cohort. Roadway projects dominate the active pipeline at 78.1% of the total, while the pipeline value saw an increase of $223.10M. Overall, the changes suggest a moderate level of activity and adjustments in project timing.


Letting Date Shifts (Slippage)

How to read this chart:

The letting dates for projects are shifting mainly later, with 99 projects pushed out over 6 months and 60 over 12 months. In contrast, 71 projects moved to earlier dates by 6 months or more, and 42 by 12 months or more. Overall, this leads to a net shift to later dates, indicating a trend towards delayed timelines in the project list.

CSJDistrictEst. Letting DateProject EstimateCurrent TypeCurrent SubtypePrev. TypePrev. SubtypePrev. DateLetting Δ (days)Letting Date ΔCost Δ%Cost ΔType/Subtype ΔLifecycle
0093-04-050Waco09/01/27$0.00ConstructionRoadwayUnassignedUnassigned09/01/49-8036-22 yearsUnassigned → Construction / Roadway
2061-04-014Waco09/06/28$374,017.86ConstructionRoadwayUnassignedUnassigned10/01/49-7695-21 years$(3,824,482.14)-91%Unassigned → Construction / Roadway
2867-01-009Waco09/06/28$129,464.29ConstructionRoadwayUnassignedUnassigned10/01/49-7695-21 years$(2,070,535.71)-94%Unassigned → Construction / Roadway
0834-02-033Waco09/01/45$44,500.00ConstructionRoadway09/01/27657518 years
2061-03-014Waco09/01/45$292,050.00ConstructionRoadway09/01/27657518 years
0834-05-008Waco09/01/27$637,962.96ConstructionRoadwayUnassignedUnassigned09/01/45-6575-18 yearsUnassigned → Construction / Roadway
0168-09-195Amarillo04/01/45$900,000.0004/06/27657018 years
0232-04-016Waco01/01/45$77,900.00ConstructionRoadway09/01/27633217 years
0550-05-002Waco01/01/45$77,900.00ConstructionRoadway09/01/27633217 years
0162-02-041Waco09/06/28$1,616,526.79ConstructionRoadwayUnassignedUnassigned11/01/45-6265-17 years$866,526.79116%Unassigned → Construction / Roadway
0752-04-030Waco09/06/28$467,633.93ConstructionRoadwayUnassignedUnassigned09/01/45-6204-17 years$361,633.93341%Unassigned → Construction / Roadway
1372-02-015Waco09/06/28$330,357.14ConstructionRoadwayUnassignedUnassigned09/01/45-6204-17 years$101,357.1444%Unassigned → Construction / Roadway
1720-01-011Waco01/01/45$443,650.00ConstructionRoadway09/06/28596116 years
0168-09-198Amarillo12/01/40$900,000.00ConstructionNon Roadway12/01/27474913 years
2635-04-020Amarillo01/02/40$11,760,000.00Non-LetRoadway01/01/28438412 years
0904-02-057Amarillo05/01/40$500,000.00ConstructionNon Roadway05/03/28438112 years
0932-01-120Beaumont12/01/37$1,000,000.00ConstructionRoadway10/06/26407411 years
0041-01-053Amarillo01/01/40$4,000,000.00ConstructionRoadway01/01/29401711 yearsCanceled
0808-02-015Waco09/01/27$518,055.56ConstructionRoadwayUnassignedUnassigned01/01/38-3775-10 years$(5,981,944.44)-92%Unassigned → Construction / Roadway
0808-03-009Waco09/01/27$650,000.00ConstructionRoadwayUnassignedUnassigned01/01/38-3775-10 yearsUnassigned → Construction / Roadway
2920-02-005Austin02/01/38$2,166,877.78ConstructionRoadway02/02/28365210 years
0521-04-309San Antonio09/01/37$8,000,000.00ConstructionRoadway09/06/2832829 years
0521-04-310San Antonio09/01/37$6,000,000.00ConstructionRoadway09/06/2832829 years
0245-06-091Tyler03/02/35$142,770.00Non-LetRoadway03/02/2825567 years
0281-07-009Dallas10/01/33$215,599.80ConstructionRoadway10/06/2625527 years
0007-02-066Abilene12/01/32$296,259.00ConstructionRoadway12/01/2718275 years
0904-11-068Amarillo07/01/33$1,010,854.00ConstructionNon Roadway07/06/2818215 years
0904-11-072Amarillo07/01/33$58,840.00ConstructionRoadway07/06/2818215 years
0981-01-122Houston04/01/31$1,235,700.00ConstructionRoadway09/02/2616725 years
0981-02-012Houston04/01/31$678,042.00ConstructionRoadway09/02/2616725 years
0180-01-086Yoakum05/05/27$39,769,715.00ConstructionBridgeUnassignedUnassigned10/01/31-1610-4 yearsUnassigned → Construction / Bridge
0528-01-113Pharr12/01/26$27,120,566.00ConstructionRoadwayUnassignedUnassigned08/01/30-1339-4 yearsUnassigned → Construction / Roadway
0976-03-122Houston04/01/31$528,000.00ConstructionRoadway11/02/2712463 years
1566-01-023Austin10/02/29$676,923.08ConstructionLocal LetConstructionLocal Let10/01/2610973 years
0162-11-005Dallas10/05/27$1,885,635.00ConstructionRoadwayUnassignedUnassigned10/01/30-1092-3 yearsUnassigned → Construction / Roadway
0261-02-087Dallas04/05/28$2,264,548.86ConstructionRoadwayUnassignedUnassigned11/01/30-940-3 yearsUnassigned → Construction / Roadway
0918-47-555Dallas06/26/26$7,940,000.00Non-LetNon RoadwayConstructionRoadway08/02/28-768-2 yearsConstruction / Roadway → Non-Let / Non Roadway
0421-06-025San Antonio10/01/30$18,200,000.00ConstructionRoadway09/06/287552 years
0015-11-068Austin09/01/26$13,017,053.57ConstructionLocal LetConstructionLocal Let09/02/28-732-2 years
0006-14-006Abilene12/01/29$158,589.00ConstructionRoadwayConstructionRoadway12/01/277312 years
0006-15-042Abilene12/01/29$621,190.61ConstructionRoadwayConstructionRoadway12/01/277312 years
0007-01-063Abilene12/01/29$393,636.29ConstructionRoadwayConstructionRoadway12/01/277312 years
0033-05-094Abilene12/01/29$2,452,243.00ConstructionRoadwayConstructionRoadway12/01/277312 years
0296-05-036Abilene12/01/29$1,108,232.00ConstructionRoadwayConstructionRoadway12/01/277312 years
0332-01-028Abilene12/01/29$585,803.00ConstructionRoadwayConstructionRoadway12/01/277312 years
0480-03-047Abilene12/01/29$252,285.00ConstructionRoadwayConstructionRoadway12/01/277312 years
0480-03-048Abilene12/01/29$111,474.00ConstructionRoadwayConstructionRoadway12/01/277312 years
0550-07-005Waco09/01/29$310,600.00ConstructionRoadwayConstructionRoadway09/01/277312 years
1927-02-015Waco09/01/29$378,400.00ConstructionRoadwayConstructionRoadway09/01/277312 years
1927-03-018Waco09/01/29$485,950.00ConstructionRoadwayConstructionRoadway09/01/277312 years
2308-01-008Waco09/01/29$425,150.00ConstructionRoadwayConstructionRoadway09/01/277312 years
1243-02-033Amarillo03/05/29$1,000,000.00Non-LetRail - SafetyNon-LetRail - Safety03/05/277312 years
1042-02-026San Antonio02/01/31$4,210,518.00ConstructionRoadway02/01/297302 years
0367-02-084Houston09/01/30$456,000.00ConstructionRoadway09/06/287252 years
1503-02-014Abilene10/01/30$7,000,000.00ConstructionRoadway11/01/286992 years
0918-46-358Dallas06/07/30$5,430,200.00ConstructionRoadwayConstructionRoadway08/04/286722 years
0912-72-583Houston01/15/29$736,806.00ConstructionLocal LetConstructionLocal Let03/15/276722 years
0092-03-053Dallas12/01/26$62,131,255.85ConstructionRoadwayConstructionRoadway09/06/28-645-2 years
1051-03-001Dallas12/01/26$54,002,986.08ConstructionRoadwayConstructionRoadway09/06/28-645-2 years
0452-02-041Abilene01/01/31$5,100,000.00ConstructionRoadway04/01/296402 years
0168-08-077Amarillo02/01/29$300,000.00ConstructionBridgeConstructionBridge05/05/276382 years
0904-11-067Amarillo02/01/29$2,397,026.00ConstructionNon RoadwayConstructionNon Roadway05/05/276382 years
0089-15-019Yoakum01/06/27$690,000.00ConstructionNon RoadwayConstructionNon Roadway10/04/28-637-2 years
0266-03-033Yoakum01/06/27$265,000.00ConstructionNon RoadwayConstructionNon Roadway10/04/28-637-2 years
0266-08-018Yoakum01/06/27$690,000.00ConstructionNon RoadwayConstructionNon Roadway10/04/28-637-2 years
1685-06-049Houston01/15/28$500,000.00Non-LetRail - SafetyNon-LetRail - Safety05/15/266102 years
1414-03-043Houston10/06/26$1,027,880.00ConstructionRoadwayConstructionRoadway06/01/28-604-2 years
0086-14-108Laredo08/04/27$197,420.69ConstructionNon RoadwayConstructionNon Roadway01/01/265802 years
2523-01-031Houston01/15/28$700,000.00Non-LetRail - SafetyNon-LetRail - Safety06/15/265792 years
3595-01-030Houston01/15/28$238,000.00Non-LetRail - SafetyNon-LetRail - Safety06/15/265792 years
3595-01-031Houston01/15/28$258,800.00Non-LetRail - SafetyNon-LetRail - Safety06/15/265792 years
0902-90-338Fort Worth08/02/30$20,000,000.00ConstructionLocal LetConstructionLocal Let01/02/295772 years
0341-04-075Beaumont01/06/27$104,910.00ConstructionRoadwayConstructionRoadway08/02/28-574-2 years
0508-04-192Beaumont01/06/27$206,249.00ConstructionRoadwayConstructionRoadway08/02/28-574-2 years
0883-02-097Beaumont01/06/27$61,394.00ConstructionRoadwayConstructionRoadway08/02/28-574-2 years
1024-01-092Beaumont01/06/27$91,879.00ConstructionRoadwayConstructionRoadway08/02/28-574-2 years
0521-04-305San Antonio05/05/27$30,151,873.00ConstructionRoadwayConstructionRoadway10/04/28-518-1 year
0523-04-021Houston06/01/28$1,937,328.00ConstructionBridgeConstructionBridge01/06/275121 year
0741-01-025Abilene11/01/30$6,500,000.00ConstructionRoadway07/01/294881 year
0902-90-365Fort Worth08/01/27$11,748.22Non-LetRail - SafetyNon-LetRail - Safety04/02/264861 year
0249-02-026Wichita Falls10/06/26$4,723,750.00ConstructionRoadwayConstructionRoadway02/02/28-484-1 year
0249-03-056Wichita Falls10/06/26$276,250.00ConstructionRoadwayConstructionRoadway02/02/28-484-1 year
0113-09-072Austin07/03/26$16,950,000.00ConstructionLocal LetConstructionLocal Let09/03/27-427-1 year
0627-04-070Beaumont12/01/26$3,000,000.00ConstructionRoadwayConstructionRoadway01/05/28-400-1 year
0177-01-123Lufkin02/02/27$2,677,773.44ConstructionRoadwayConstructionRoadway03/07/28-399-1 year
0903-28-073Wichita Falls09/02/26$1,239,741.87ConstructionBridgeConstructionBridge10/05/27-398-1 year$155,741.8714%
2950-01-010Houston01/05/28$4,624,667.00ConstructionRoadwayConstructionRoadway02/01/29-393-1 year
0387-01-016Dallas10/06/26$6,039,010.45ConstructionRoadwayConstructionRoadway11/02/27-392-1 year
0051-03-123Houston07/06/28$9,073,088.00ConstructionRoadwayConstructionRoadway08/01/29-391-1 year
1361-03-030Abilene12/05/28$806,245.00ConstructionRoadwayConstructionRoadway12/01/273701 year
2032-01-011Abilene12/05/28$250,584.00ConstructionRoadwayConstructionRoadway12/01/273701 year
2032-02-016Abilene12/05/28$773,738.50ConstructionRoadwayConstructionRoadway12/01/273701 year
0062-07-098Atlanta03/07/28$9,175,275.00ConstructionRoadwayConstructionRoadway03/03/273701 year
1601-02-037Fort Worth12/01/27$450,000.00ConstructionRoadwayConstructionRoadway12/05/28-370-1 year
1601-03-017Fort Worth12/01/27$450,000.00ConstructionRoadwayConstructionRoadway12/05/28-370-1 year
0111-05-019Houston03/03/27$4,480,673.00ConstructionRoadwayConstructionRoadway03/07/28-370-1 year
0847-06-013Houston03/03/27$3,919,359.00ConstructionRoadwayConstructionRoadway03/07/28-370-1 year
0912-72-799Houston02/15/28$5,012,434.62ConstructionLocal LetConstructionLocal Let02/15/273651 year$(709,773.38)-12%
0027-08-192Houston01/15/28$1,407,100.00ConstructionLocal LetConstructionLocal Let01/15/273651 year
0109-04-030Lufkin04/06/27$1,248,237.85ConstructionRoadwayConstructionRoadway04/05/28-365-1 year
0109-05-045Lufkin04/06/27$990,000.00ConstructionRoadwayConstructionRoadway04/05/28-365-1 year
0117-07-046Lufkin04/06/27$811,501.22ConstructionRoadwayConstructionRoadway04/05/28-365-1 year
0118-01-021Lufkin04/06/27$1,253,430.00ConstructionRoadwayConstructionRoadway04/05/28-365-1 year
0336-01-067Lufkin04/06/27$986,678.00ConstructionRoadwayConstructionRoadway04/05/28-365-1 year
0340-01-042Lufkin04/06/27$722,577.70ConstructionRoadwayConstructionRoadway04/05/28-365-1 year
1875-02-031Lufkin04/06/27$1,126,458.63ConstructionRoadwayConstructionRoadway04/05/28-365-1 year
0172-09-045Fort Worth02/02/27$4,306,849.55ConstructionNon RoadwayConstructionNon Roadway02/02/28-365-1 year
0271-14-244Houston02/02/27$1,000,000.00ConstructionRoadwayConstructionRoadway02/02/28-365-1 year
0156-07-115Wichita Falls12/01/26$528,592.00ConstructionRoadwayConstructionRoadway12/01/27-365-1 year
1344-02-027Lubbock08/01/29$40,000,000.00ConstructionRoadwayConstructionRoadway08/02/2836412 months
0511-02-030San Antonio05/03/28$5,773,214.00ConstructionRoadwayConstructionRoadway05/05/2736412 months
0511-02-031San Antonio05/03/28$4,372,262.00ConstructionRoadwayConstructionRoadway05/05/2736412 months
1076-01-040Wichita Falls11/02/27$273,746.00ConstructionRoadwayConstructionRoadway11/03/2636412 months
6493-98-001Houston09/01/27$1,902,980.58MaintenanceRoutine Maintenance ContractMaintenanceRoutine Maintenance Contract09/02/2636412 months
3271-01-019Beaumont09/02/26$442,193.04ConstructionRoadwayConstructionRoadway09/01/27-364-12 months$(324,983.96)-42%
0918-24-316Dallas06/02/29$3,907,500.00ConstructionLocal LetConstructionLocal Let06/04/2836312 months
0780-01-021Fort Worth12/01/29$450,000.00ConstructionRoadwayConstructionRoadway12/05/2836112 months
1004-01-066Houston04/05/28$2,690,262.00ConstructionRoadwayConstructionRoadway04/01/29-361-12 months
1004-01-067Houston04/05/28$3,392,846.00ConstructionRoadwayConstructionRoadway04/01/29-361-12 months
3158-01-048Houston04/05/28$2,859,997.00ConstructionRoadwayConstructionRoadway04/01/29-361-12 months
0232-01-056Waco09/01/29$1,442,651.79ConstructionRoadwayConstructionRoadway09/06/2836012 months$(173,118.21)-11%
0251-02-057Waco09/01/29$1,860,160.71ConstructionRoadwayConstructionRoadway09/06/2836012 months$(223,219.29)-11%
0909-37-070Waco03/07/28$399,000.00ConstructionBridgeConstructionBridge03/01/29-359-12 months
0298-01-044Lubbock05/03/28$695,200.00ConstructionRoadwayConstructionRoadway06/01/2733711 months
0453-05-019Lubbock05/03/28$752,400.00ConstructionRoadwayConstructionRoadway06/01/2733711 months
0558-01-015Lubbock05/03/28$607,200.00ConstructionRoadwayConstructionRoadway06/01/2733711 months
0806-04-021Lubbock05/03/28$734,800.00ConstructionRoadwayConstructionRoadway06/01/2733711 months
0053-05-055Lubbock06/01/27$1,200,000.00ConstructionRoadwayConstructionRoadway05/03/28-337-11 months
0053-05-056Lubbock06/01/27$1,200,000.00ConstructionRoadwayConstructionRoadway05/03/28-337-11 months
0067-07-108Lubbock06/01/27$569,000.00ConstructionRoadwayConstructionRoadway05/03/28-337-11 months
0380-01-099Lubbock06/01/27$2,000,000.00ConstructionRoadwayConstructionRoadway05/03/28-337-11 months
1139-02-024Dallas04/06/27$12,120,167.17ConstructionRoadwayConstructionRoadway03/07/28-336-11 months
0718-01-077Dallas01/06/27$605,770.20ConstructionRoadwayConstructionRoadway12/01/27-329-11 months
0222-05-054Atlanta09/06/28$750,000.00ConstructionRail - SafetyConstructionRail - Safety11/02/2730910 months
0027-02-034Yoakum11/01/29$21,600,000.00ConstructionRoadwayConstructionRoadway01/01/2930410 months
0047-07-252Dallas06/02/29$3,000,000.00ConstructionLocal LetConstructionLocal Let08/04/2830210 months
0918-00-472Dallas06/02/29$495,000.00ConstructionRoadwayConstructionRoadway08/04/2830210 months
0918-46-363Dallas06/02/29$3,750,000.00ConstructionLocal LetConstructionLocal Let08/04/2830210 months
2304-03-016Waco01/06/27$19,300,000.00ConstructionRoadwayConstructionRoadway11/02/27-300-10 months
2150-04-102Laredo08/04/27$1,651,000.00ConstructionRoadwayConstructionRoadway11/01/262769 months
0677-01-025Abilene01/01/30$1,250,000.00ConstructionRoadwayConstructionRoadway04/01/292759 months
0699-03-019Abilene01/01/30$2,900,000.00ConstructionRoadwayConstructionRoadway04/01/292759 months
0699-03-021Abilene01/01/30$650,000.00ConstructionRoadwayConstructionRoadway04/01/292759 months
0141-07-034San Angelo02/02/27$9,303,974.04ConstructionRoadwayConstructionRoadway11/02/27-273-9 months
2240-01-021Atlanta07/01/27$746,753.00ConstructionBridgeConstructionBridge10/06/262689 months
0233-05-039El Paso08/04/27$72,115.38ConstructionRailConstructionRail12/01/262468 months
0674-01-077El Paso08/04/27$72,115.38ConstructionRailConstructionRail12/01/262468 months
1281-01-020El Paso08/04/27$72,115.38ConstructionRailConstructionRail12/01/262468 months
1378-04-058Austin05/03/28$1,494,901.64ConstructionRoadwayConstructionRoadway09/01/272458 months
0619-03-065Dallas02/01/27$805,000.00ConstructionRoadwayConstructionRoadway06/01/262458 months
0581-02-158Dallas12/03/26$1,527,291.40ConstructionLocal LetConstructionLocal Let08/02/27-242-8 months$877,291.40135%
0052-07-067Lubbock04/06/27$590,724.69ConstructionRoadwayConstructionRoadway12/01/27-239-8 months
0228-03-034Lubbock04/06/27$629,522.76ConstructionRoadwayConstructionRoadway12/01/27-239-8 months
0880-04-045Lubbock04/06/27$1,068,204.01ConstructionRoadwayConstructionRoadway12/01/27-239-8 months
2883-02-011San Antonio09/01/27$1,105,769.00ConstructionRoadwayConstructionRoadway01/06/272388 months
1062-03-055Houston06/01/27$6,804,421.00ConstructionRoadwayConstructionRoadway01/05/28-218-7 months
0195-02-090Dallas06/01/29$159,894,765.10ConstructionRoadwayConstructionRoadway11/01/282127 months
0397-02-043Childress07/01/27$1,200,000.00ConstructionRoadwayConstructionRoadway12/01/262127 months
1530-01-012Abilene03/07/28$6,218,588.70ConstructionRoadwayConstructionRoadway10/04/28-211-7 months$(383,859.00)-6%
3256-02-122Houston06/01/27$130,000.00ConstructionBridgeConstructionBridge11/03/262107 months
0918-47-542Dallas04/06/27$902,431.20ConstructionRoadwayConstructionRoadway11/02/27-210-7 months
0014-01-033Fort Worth08/01/27$0.00ConstructionLocal LetNon-LetLocal01/15/271987 months$(2,000,000.00)-100%Non-Let / Local → Construction / Local Let
0143-10-059Yoakum03/07/28$9,280,000.00ConstructionRoadwayConstructionRoadway09/01/271886 months
0181-02-033Abilene09/06/28$11,871,252.80ConstructionRoadwayConstructionRoadway03/07/281836 months
0111-03-064Houston08/04/27$108,568,030.00ConstructionRoadwayConstructionRoadway02/02/271836 months
0643-01-057Bryan08/04/27$22,973,558.00ConstructionRoadwayConstructionRoadway02/02/271836 months
0168-10-084Amarillo06/01/27$100,000.00ConstructionNon RoadwayConstructionNon Roadway12/01/27-183-6 months
0168-09-197Amarillo06/01/27$847,000.00ConstructionNon RoadwayConstructionNon Roadway12/01/261826 months
0168-10-083Amarillo06/01/27$300,000.00ConstructionRoadwayConstructionRoadway12/01/261826 months
0502-01-252Houston04/15/27$600,000.00Non-LetRail - SafetyNon-LetRail - Safety10/15/261826 months
0648-03-082Bryan04/06/27$506,313.00ConstructionRoadwayConstructionRoadway10/05/27-182-6 months
0648-04-004Bryan04/06/27$142,727.00ConstructionRoadwayConstructionRoadway10/05/27-182-6 months
0916-36-024Corpus Christi12/01/26$4,000,000.00ConstructionBridgeConstructionBridge06/01/27-182-6 months
0918-47-544Dallas05/05/27$643,616.00ConstructionRoadwayConstructionRoadway11/02/27-181-6 months
1418-03-021Houston06/01/26$431,140.00Non-LetRail - SafetyNon-LetRail - Safety11/15/26-167-5 months
0275-01-261Amarillo10/05/27$800,000.00ConstructionBridgeConstructionBridge03/07/28-154-5 months
0275-01-262Amarillo10/05/27$800,000.00ConstructionBridgeConstructionBridge03/07/28-154-5 months
0049-07-072Bryan05/05/27$540,512.00ConstructionRoadwayConstructionRoadway10/05/27-153-5 months
0912-37-259Houston03/15/27$13,200,000.00ConstructionLocal LetConstructionLocal Let10/15/261515 months
0317-01-045Abilene04/06/27$5,250,000.00ConstructionRoadwayConstructionRoadway09/01/27-148-5 months
0619-05-040Dallas04/06/27$493,912.10ConstructionRoadwayConstructionRoadway09/01/27-148-5 months
2121-03-172El Paso06/01/27$5,373,871.15ConstructionBridgeConstructionBridge01/06/271465 months
0035-01-036San Angelo12/01/26$16,300,000.00ConstructionRoadwayConstructionRoadway04/06/27-126-4 months
2006-03-013San Angelo12/01/26$926,675.86ConstructionRoadwayConstructionRoadway04/06/27-126-4 months
1911-01-023Houston09/02/26$3,375,346.25ConstructionBridgeConstructionBridge01/06/27-126-4 months$(572,500.75)-15%
3595-01-027Houston04/15/27$540,000.00ConstructionLocal LetConstructionLocal Let12/15/261214 months
0918-22-174Dallas05/01/29$1,128,765.60ConstructionBridgeConstructionBridge01/01/291204 months
0002-05-053El Paso02/02/28$25,138.30ConstructionRoadwayConstructionRoadway10/05/271204 months
0002-06-065El Paso02/02/28$16,758.86ConstructionRoadwayConstructionRoadway10/05/271204 months
0002-07-059El Paso02/02/28$50,276.59ConstructionRoadwayConstructionRoadway10/05/271204 months
0002-08-058El Paso02/02/28$25,138.30ConstructionRoadwayConstructionRoadway10/05/271204 months
0002-09-042El Paso02/02/28$16,758.86ConstructionRoadwayConstructionRoadway10/05/271204 months
0002-10-041El Paso02/02/28$67,035.46ConstructionRoadwayConstructionRoadway10/05/271204 months
0002-11-063El Paso02/02/28$41,897.17ConstructionRoadwayConstructionRoadway10/05/271204 months
0003-01-069El Paso02/02/28$16,758.86ConstructionRoadwayConstructionRoadway10/05/271204 months
0003-02-054El Paso02/02/28$16,758.86ConstructionRoadwayConstructionRoadway10/05/271204 months
0003-03-053El Paso02/02/28$16,758.86ConstructionRoadwayConstructionRoadway10/05/271204 months
0003-04-060El Paso02/02/28$50,276.59ConstructionRoadwayConstructionRoadway10/05/271204 months
0358-01-033El Paso02/02/28$52,821.56ConstructionRoadwayConstructionRoadway10/05/271204 months
0358-05-019El Paso02/02/28$313,963.89ConstructionRoadwayConstructionRoadway10/05/271204 months
0415-01-028El Paso02/02/28$166,804.95ConstructionRoadwayConstructionRoadway10/05/271204 months
0415-02-033El Paso02/02/28$125,103.71ConstructionRoadwayConstructionRoadway10/05/271204 months
0512-02-017El Paso02/02/28$41,701.24ConstructionRoadwayConstructionRoadway10/05/271204 months
2121-05-058El Paso02/02/28$33,517.73ConstructionRoadwayConstructionRoadway10/05/271204 months
2121-06-061El Paso02/02/28$16,758.86ConstructionRoadwayConstructionRoadway10/05/271204 months
0013-08-149Fort Worth03/03/27$15,928,453.33ConstructionRoadwayConstructionRoadway07/01/27-120-4 months
0500-03-656Houston03/03/27$1,280,375.00ConstructionRoadwayConstructionRoadway11/03/261204 months
0009-11-248Dallas10/06/26$57,043,890.08ConstructionRoadwayConstructionRoadway02/02/27-119-4 months
0013-10-092Fort Worth07/15/26$449,928.60ConstructionLocal LetConstructionLocal Let04/01/261053 months
0023-05-092San Antonio07/01/27$800,000.00ConstructionBridgeConstructionBridge10/05/27-96-3 months
0072-06-093San Antonio07/01/27$676,000.00ConstructionBridgeConstructionBridge10/05/27-96-3 months
0073-09-043San Antonio07/01/27$500,000.00ConstructionBridgeConstructionBridge10/05/27-96-3 months
0073-09-044San Antonio07/01/27$500,000.00ConstructionBridgeConstructionBridge10/05/27-96-3 months
0073-10-067San Antonio07/01/27$500,000.00ConstructionBridgeConstructionBridge10/05/27-96-3 months
0521-06-167San Antonio07/01/27$471,000.00ConstructionBridgeConstructionBridge10/05/27-96-3 months
0521-06-168San Antonio07/01/27$623,000.00ConstructionBridgeConstructionBridge10/05/27-96-3 months
0916-27-016Corpus Christi12/01/26$1,050,000.00ConstructionBridgeConstructionBridge03/03/27-92-3 months
2208-02-026Dallas11/01/28$6,590,209.08ConstructionRoadwayConstructionRoadway08/02/28913 months
3510-06-038Houston08/04/27$23,978,813.00ConstructionRoadwayConstructionRoadway05/05/27913 months
3510-07-012Houston08/04/27$63,904,122.00ConstructionRoadwayConstructionRoadway05/05/27913 months
0195-02-091Dallas08/04/27$130,262,376.64ConstructionRoadwayConstructionRoadway11/02/27-90-3 months
0014-15-090Fort Worth06/01/27$55,912,929.52ConstructionRoadwayConstructionRoadway03/03/27903 months
0981-02-014Houston09/02/26$80,542.96ConstructionRoadwayConstructionRoadway12/01/26-90-3 months$19,942.9633%
1414-01-025Houston09/02/26$411,754.93ConstructionRoadwayConstructionRoadway12/01/26-90-3 months$90,979.9328%
1844-01-032Houston09/02/26$98,200.58ConstructionRoadwayConstructionRoadway12/01/26-90-3 months$8,200.589%
1844-02-025Houston09/02/26$136,321.34ConstructionRoadwayConstructionRoadway12/01/26-90-3 months$(1,678.66)-1%
3055-01-011Houston09/02/26$154,991.03ConstructionRoadwayConstructionRoadway12/01/26-90-3 months$28,991.0323%
0904-11-069Amarillo02/01/29$2,193,438.00ConstructionNon RoadwayConstructionNon Roadway05/01/29-89-3 months$679,300.0045%
0018-05-110Laredo08/04/27$33,110.00ConstructionRoadwayConstructionRoadway11/01/27-89-3 months
0018-06-223Laredo08/04/27$871,519.00ConstructionRoadwayConstructionRoadway11/01/27-89-3 months
0922-33-217Laredo01/06/27$700,000.00ConstructionBridgeConstructionBridge11/03/26642 months
0912-73-246Houston03/15/27$9,403,008.00ConstructionLocal LetConstructionLocal Let01/15/27592 months
0238-06-040Amarillo11/01/28$6,000,000.00ConstructionRoadwayConstructionRoadway09/06/28562 months$(2,000,000.00)-25%
0451-01-053Dallas11/01/28$117,610,100.89ConstructionRoadwayConstructionRoadway09/06/28562 months
0027-03-078Yoakum01/06/27$1,500,000.00ConstructionRoadwayConstructionRoadway03/03/27-56-2 months
0445-01-072Yoakum01/06/27$7,200,000.00ConstructionRoadwayConstructionRoadway03/03/27-56-2 months
0445-02-074Yoakum01/06/27$800,000.00ConstructionRoadwayConstructionRoadway03/03/27-56-2 months
0196-03-297Dallas06/12/26$4,000,000.00TransferTransferTransferTransfer08/02/26-51-2 months
2635-03-031Amarillo12/01/26$4,000,000.00ConstructionRoadwayConstructionRoadway01/06/27-36-1 month$2,800,000.00233%
2635-04-048Amarillo12/01/26$300,000.00ConstructionRoadwayConstructionRoadway01/06/27-36-1 month
0924-06-749El Paso02/02/28$88,385.63ConstructionRoadwayConstructionRoadway03/07/28-34-1 month$(0.93)0%
0924-06-750El Paso02/02/28$36,787.85ConstructionRoadwayConstructionRoadway03/07/28-34-1 month$(0.93)0%
0110-06-151Houston09/02/26$937,804.97ConstructionRoadwayConstructionRoadway10/06/26-34-1 month$(67,347.09)-7%
0110-07-022Houston09/02/26$346,537.14ConstructionRoadwayConstructionRoadway10/06/26-34-1 month$(3,369.99)-1%
0747-01-020Dallas02/01/29$2,868,310.60ConstructionBridgeConstructionBridge01/01/29311 month
0747-01-021Dallas02/01/29$3,269,965.03ConstructionBridgeConstructionBridge01/01/29311 month
0549-01-041Paris02/02/27$2,200,000.00ConstructionRoadwayConstructionRoadway03/03/27-29-29 days
0066-05-071Amarillo03/01/29$4,240,000.00ConstructionBridgeConstructionBridge02/01/292828 days
0066-05-072Amarillo03/01/29$4,150,000.00ConstructionBridgeConstructionBridge02/01/292828 days
0066-05-076Amarillo03/01/29$3,090,000.00ConstructionBridgeConstructionBridge02/01/292828 days
0066-05-077Amarillo03/01/29$3,150,000.00ConstructionBridgeConstructionBridge02/01/292828 days
0090-03-067Amarillo02/01/29$1,000,000.00ConstructionBridgeConstructionBridge03/01/29-28-28 days
0090-05-119Amarillo02/01/29$720,000.00ConstructionBridgeConstructionBridge03/01/29-28-28 days
0727-04-022Amarillo02/02/28$2,071,017.51ConstructionRoadwayConstructionRoadway01/05/282828 days
2001-01-011Amarillo02/02/28$1,435,425.24ConstructionRoadwayConstructionRoadway01/05/282828 days
2494-01-018Amarillo02/02/28$1,176,471.00ConstructionRoadwayConstructionRoadway01/05/282828 days$1,000.000%
0912-73-247Houston03/15/27$6,043,008.00ConstructionLocal LetConstructionLocal Let02/15/272828 days
0089-07-166Yoakum08/05/26$240,432,788.90ConstructionRoadwayConstructionRoadway09/02/26-28-28 days$10,675,535.405%
0265-03-042Austin01/06/27$60,122,400.00ConstructionRoadwayConstructionRoadway02/02/27-27-27 days
0902-90-296Fort Worth09/24/26$2,573,875.05ConstructionLocal LetConstructionLocal Let09/15/2699 days
0902-90-350Fort Worth09/24/26$1,552,000.00ConstructionLocal LetConstructionLocal Let09/15/2699 days
6495-90-001Dallas10/14/26$333,500.00MaintenanceBridge PreventiveMaintenanceBridge Preventive10/06/2688 days
262 rows · download CSV

Project Type & Subtype Changes

The subtype mix within the pipeline remained relatively stable. Roadway projects make up 78.1% of the pipeline, slightly down from 78.3%. There were 17 type/subtype transitions in total, with 13 newly assigned classifications, highlighting some level of reclassification activity without significant churn in the overall structure.

SubtypeJun 3Jul 3Δ (pp, n)
Roadway78.3% (4,231)78.1% (4,224)-0.2 (-7)
Bridge13.7% (741)13.7% (743)+0.0 (+2)
Local Let3.3% (179)3.4% (183)+0.1 (+4)
Non Roadway1.8% (99)1.8% (99)-0.0 (+0)
Rail - Safety1.1% (60)1.2% (64)+0.1 (+4)
CSJDistrictEst. Letting DateProject EstimateCurrent TypeCurrent SubtypeType/Subtype ΔPrev. TypePrev. SubtypePrev. CostPrev. DateLetting Δ (days)Letting Date ΔCost Δ%Cost ΔLifecycle
0918-47-555Dallas06/26/26$7,940,000.00Non-LetNon RoadwayConstruction / Roadway → Non-Let / Non RoadwayConstructionRoadway$7,940,000.0008/02/28-768-2 years
0528-01-113Pharr12/01/26$27,120,566.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$27,120,566.0008/01/30-1339-4 years
0180-01-086Yoakum05/05/27$39,769,715.00ConstructionBridgeUnassigned → Construction / BridgeUnassignedUnassigned$39,769,715.0010/01/31-1610-4 years
0014-01-033Fort Worth08/01/27$0.00ConstructionLocal LetNon-Let / Local → Construction / Local LetNon-LetLocal$2,000,000.0001/15/271987 months$(2,000,000.00)-100%
0093-04-050Waco09/01/27$0.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$0.0009/01/49-8036-22 years
0808-02-015Waco09/01/27$518,055.56ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$6,500,000.0001/01/38-3775-10 years$(5,981,944.44)-92%
0808-03-009Waco09/01/27$650,000.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$650,000.0001/01/38-3775-10 years
0834-05-008Waco09/01/27$637,962.96ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$637,962.9609/01/45-6575-18 years
0162-11-005Dallas10/05/27$1,885,635.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$1,885,635.0010/01/30-1092-3 years
0261-02-087Dallas04/05/28$2,264,548.86ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$2,264,548.8611/01/30-940-3 years
0918-24-315Dallas08/04/28$1,296,500.00TransferTransferConstruction / Roadway → Transfer / TransferConstructionRoadway$1,250,000.0008/04/280$46,500.004%
1137-02-047Pharr09/01/28$5,265,000.00ConstructionLocal LetConstruction / Roadway → Construction / Local LetConstructionRoadway$5,265,000.0009/01/280
0162-02-041Waco09/06/28$1,616,526.79ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$750,000.0011/01/45-6265-17 years$866,526.79116%
0752-04-030Waco09/06/28$467,633.93ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$106,000.0009/01/45-6204-17 years$361,633.93341%
1372-02-015Waco09/06/28$330,357.14ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$229,000.0009/01/45-6204-17 years$101,357.1444%
2061-04-014Waco09/06/28$374,017.86ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$4,198,500.0010/01/49-7695-21 years$(3,824,482.14)-91%
2867-01-009Waco09/06/28$129,464.29ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$2,200,000.0010/01/49-7695-21 years$(2,070,535.71)-94%
17 rows · download CSV

Cost Changes

The active pipeline value rose by $223.10M, from $30.12B to $30.34B, indicating a repricing within the same pipeline rather than a total restructuring. The largest district net cost increase was noted in Houston at $178.94M, with others like Austin (+$86.13M) and Abilene (+$64.28M) also contributing positively. Conversely, San Antonio reported a net decrease of $46.63M. In total, 254 projects exhibited changes in cost exceeding 10%, with 96 increasing and 158 decreasing, reflecting a mix of upward and downward adjustments.

CSJDistrictEst. Letting DateProject EstimateCurrent TypeCurrent SubtypePrev. TypePrev. SubtypePrev. CostCost Δ%Cost ΔLetting Δ (days)Letting Date ΔType/Subtype ΔLifecycle
1718-05-019Odessa09/02/26$5,061,804.94ConstructionRoadwayConstructionRoadway$1,039,545.49$4,022,259.45387%0
0185-01-046Waco09/02/26$627,269.33ConstructionRoadwayConstructionRoadway$132,913.46$494,355.87372%0
2910-02-002Pharr09/02/26$455,029.15ConstructionRoadwayConstructionRoadway$100,967.00$354,062.15351%0
0042-01-032Amarillo12/01/26$2,100,000.00ConstructionRoadwayConstructionRoadway$470,000.00$1,630,000.00347%0
0752-04-030Waco09/06/28$467,633.93ConstructionRoadwayUnassignedUnassigned$106,000.00$361,633.93341%-6204-17 yearsUnassigned → Construction / Roadway
2635-03-031Amarillo12/01/26$4,000,000.00ConstructionRoadwayConstructionRoadway$1,200,000.00$2,800,000.00233%-36-1 month
3292-01-017Waco09/02/26$271,116.54ConstructionRoadwayConstructionRoadway$81,894.23$189,222.31231%0
0015-13-452Austin02/02/27$125,961,538.46ConstructionRoadwayConstructionRoadway$40,384,615.38$85,576,923.08212%0
0086-07-038Pharr09/02/26$779,993.90ConstructionRoadwayConstructionRoadway$265,229.64$514,764.26194%0
0039-10-095Pharr09/02/26$849,644.03ConstructionRoadwayConstructionRoadway$298,996.92$550,647.11184%0
0912-72-773Houston01/01/29$1,204,686.05ConstructionBridgeConstructionBridge$427,000.00$777,686.05182%0
0028-05-057Beaumont09/02/26$2,120,317.21ConstructionRoadwayConstructionRoadway$774,594.00$1,345,723.21174%0
0912-72-807Houston12/05/28$1,366,096.00ConstructionBridgeConstructionBridge$500,000.00$866,096.00173%0
0912-72-806Houston12/05/28$1,270,690.00ConstructionBridgeConstructionBridge$500,000.00$770,690.00154%0
0600-01-013Odessa09/02/26$766,184.70ConstructionRoadwayConstructionRoadway$311,138.27$455,046.43146%0
0169-06-043Amarillo11/03/26$950,000.00ConstructionRoadwayConstructionRoadway$400,000.00$550,000.00138%0
0581-02-158Dallas12/03/26$1,527,291.40ConstructionLocal LetConstructionLocal Let$650,000.00$877,291.40135%-242-8 months
1228-03-060Pharr09/02/26$212,288.32ConstructionRoadwayConstructionRoadway$90,451.00$121,837.32135%0
0169-08-029Amarillo11/03/26$1,280,000.00ConstructionRoadwayConstructionRoadway$550,000.00$730,000.00133%0
0912-31-327Houston10/04/28$1,078,489.10ConstructionBridgeConstructionBridge$495,000.00$583,489.10118%0
0162-02-041Waco09/06/28$1,616,526.79ConstructionRoadwayUnassignedUnassigned$750,000.00$866,526.79116%-6265-17 yearsUnassigned → Construction / Roadway
0167-01-136El Paso09/02/26$655,917.00ConstructionRoadwayConstructionRoadway$307,125.00$348,792.00114%0
0228-05-072Odessa09/02/26$5,259,381.35ConstructionRoadwayConstructionRoadway$2,489,658.75$2,769,722.60111%0
1717-01-012Odessa09/02/26$386,480.13ConstructionRoadwayConstructionRoadway$185,981.37$200,498.76108%0
3510-04-083Houston11/01/28$138,000,000.00ConstructionRoadwayConstructionRoadway$66,500,000.00$71,500,000.00108%0
0026-06-039Yoakum08/04/27$0.01ConstructionNon Roadway$95,000.00$(94,999.99)-100%0Canceled
0014-01-033Fort Worth08/01/27$0.00ConstructionLocal LetNon-LetLocal$2,000,000.00$(2,000,000.00)-100%1987 monthsNon-Let / Local → Construction / Local Let
0169-09-021Amarillo11/03/26$600,000.00ConstructionRoadwayConstructionRoadway$300,000.00$300,000.00100%0
0375-06-027Laredo09/02/26$1,022,199.30ConstructionRoadwayConstructionRoadway$513,794.40$508,404.9099%0
0427-01-042Paris09/02/26$1,786,746.95ConstructionBridgeConstructionBridge$901,300.00$885,446.9598%0
2867-01-009Waco09/06/28$129,464.29ConstructionRoadwayUnassignedUnassigned$2,200,000.00$(2,070,535.71)-94%-7695-21 yearsUnassigned → Construction / Roadway
0912-72-656Houston12/05/28$977,230.01ConstructionBridgeConstructionBridge$505,000.00$472,230.0194%0
0808-02-015Waco09/01/27$518,055.56ConstructionRoadwayUnassignedUnassigned$6,500,000.00$(5,981,944.44)-92%-3775-10 yearsUnassigned → Construction / Roadway
0912-72-808Houston12/05/28$1,149,207.00ConstructionBridgeConstructionBridge$600,000.00$549,207.0092%0
2061-04-014Waco09/06/28$374,017.86ConstructionRoadwayUnassignedUnassigned$4,198,500.00$(3,824,482.14)-91%-7695-21 yearsUnassigned → Construction / Roadway
0004-02-075Odessa09/02/26$3,238,830.18ConstructionRoadwayConstructionRoadway$1,727,517.00$1,511,313.1887%0
1588-01-003Pharr09/02/26$27,788.31ConstructionRoadwayConstructionRoadway$213,543.00$(185,754.69)-87%0
0092-02-145Dallas10/06/26$1,278,476.75ConstructionRoadwayConstructionRoadway$7,080,000.00$(5,801,523.25)-82%0
0791-05-022Amarillo11/03/26$1,270,000.00ConstructionRoadwayConstructionRoadway$700,000.00$570,000.0081%0
0167-01-135El Paso09/02/26$46,858.00ConstructionRoadwayConstructionRoadway$230,992.34$(184,134.34)-80%0
0320-01-083Waco09/06/28$601,598.21ConstructionRoadwayConstructionRoadway$336,895.00$264,703.2179%0
1414-01-024Houston09/02/26$13,329.16ConstructionRoadwayConstructionRoadway$61,492.00$(48,162.84)-78%0
0243-03-072Beaumont09/02/26$208,128.60ConstructionRoadwayConstructionRoadway$768,700.00$(560,571.40)-73%0
0001-01-075El Paso09/02/26$691,556.00ConstructionRoadwayConstructionRoadway$400,700.02$290,855.9873%0
0115-03-028Austin08/04/27$1,214,302.88ConstructionRoadwayConstructionRoadway$705,649.04$508,653.8472%0
1192-03-018Waco09/02/26$184,850.97ConstructionRoadwayConstructionRoadway$617,019.23$(432,168.26)-70%0
1491-01-020Amarillo11/03/26$1,700,000.00ConstructionRoadwayConstructionRoadway$1,000,000.00$700,000.0070%0
1065-02-044Pharr09/02/26$447,883.08ConstructionRoadwayConstructionRoadway$266,917.68$180,965.4068%0
0386-03-024Waco09/02/26$901,234.06ConstructionRoadwayConstructionRoadway$539,759.62$361,474.4467%0
1043-01-012Houston09/02/26$342,330.90ConstructionRoadwayConstructionRoadway$1,000,000.00$(657,669.10)-66%0
1687-02-010Houston09/02/26$352,443.60ConstructionRoadwayConstructionRoadway$1,000,959.00$(648,515.40)-65%0
0101-01-070Corpus Christi09/02/26$120,610.80ConstructionRoadwayConstructionRoadway$326,866.00$(206,255.20)-63%0
0045-10-022Paris11/01/28$207,947.52ConstructionRoadwayConstructionRoadway$551,738.88$(343,791.36)-62%0
2326-01-032El Paso09/02/26$101,831.00ConstructionRoadwayConstructionRoadway$267,680.40$(165,849.40)-62%0
2635-04-043Amarillo09/01/27$4,000,000.00ConstructionRoadwayConstructionRoadway$10,000,000.00$(6,000,000.00)-60%0
1687-01-019Houston09/02/26$366,039.44ConstructionRoadwayConstructionRoadway$886,354.00$(520,314.56)-59%0
1801-01-065Pharr09/02/26$129,648.40ConstructionRoadwayConstructionRoadway$82,175.00$47,473.4058%0
3544-06-003San Antonio10/06/26$16,400.00ConstructionRoadwayConstructionRoadway$38,627.00$(22,227.00)-58%0
0652-01-042Laredo09/02/26$165,560.43ConstructionRoadwayConstructionRoadway$388,011.75$(222,451.32)-57%0
1043-02-005Houston09/02/26$76,953.87ConstructionRoadwayConstructionRoadway$177,120.00$(100,166.13)-57%0
1718-07-048Odessa09/02/26$161,720.30ConstructionRoadwayConstructionRoadway$369,919.58$(208,199.28)-56%0
0015-13-457Austin01/01/29$6,927,606.51ConstructionNon RoadwayConstructionNon Roadway$15,535,714.29$(8,608,107.78)-55%0
0307-01-157Beaumont09/02/26$20,380.72ConstructionRoadwayConstructionRoadway$45,407.00$(25,026.28)-55%0
0932-01-122Beaumont09/02/26$346,453.56ConstructionRoadwayConstructionRoadway$766,227.00$(419,773.44)-55%0
0187-05-068Houston09/02/26$322,456.55ConstructionRoadwayConstructionRoadway$699,790.00$(377,333.45)-54%0
2726-01-016Amarillo11/03/26$1,230,000.00ConstructionRoadwayConstructionRoadway$800,000.00$430,000.0054%0
0092-06-112Dallas08/05/26$641,135.01ConstructionBridgeConstructionBridge$426,254.00$214,881.0150%0
0433-05-027Pharr09/02/26$1,214,912.94ConstructionRoadwayConstructionRoadway$810,304.56$404,608.3850%0
0027-10-074Houston08/05/26$1,986,114.00ConstructionBridgeConstructionBridge$3,967,039.00$(1,980,925.00)-50%0
0275-02-076Amarillo12/01/27$3,500,000.00ConstructionRoadwayConstructionRoadway$6,900,000.00$(3,400,000.00)-49%0
0320-03-104Austin10/06/26$123,388.60ConstructionBridgeConstructionBridge$236,912.50$(113,523.90)-48%0
0865-01-118Pharr09/02/26$401,878.34ConstructionRoadwayConstructionRoadway$271,882.38$129,995.9648%0
0549-02-038Paris09/02/26$2,626,356.93ConstructionRoadwayConstructionRoadway$5,000,000.00$(2,373,643.07)-47%0
0185-01-045Waco09/02/26$213,488.97ConstructionRoadwayConstructionRoadway$144,855.77$68,633.2047%0
0844-04-011Childress09/02/26$2,670,739.78ConstructionBridgeConstructionBridge$5,000,000.00$(2,329,260.22)-47%0
0873-01-029Pharr09/02/26$790,740.20ConstructionRoadwayConstructionRoadway$539,696.52$251,043.6847%0
0371-02-083Corpus Christi09/02/26$1,603,267.91ConstructionRoadwayConstructionRoadway$2,971,790.00$(1,368,522.09)-46%0
0909-00-074Waco08/05/26$1,849,456.42ConstructionRoadwayConstructionRoadway$1,267,977.00$581,479.4246%0
0904-11-069Amarillo02/01/29$2,193,438.00ConstructionNon RoadwayConstructionNon Roadway$1,514,138.00$679,300.0045%-89-3 months
1372-02-015Waco09/06/28$330,357.14ConstructionRoadwayUnassignedUnassigned$229,000.00$101,357.1444%-6204-17 yearsUnassigned → Construction / Roadway
2905-01-015Odessa09/02/26$796,133.26ConstructionRoadwayConstructionRoadway$1,396,822.36$(600,689.10)-43%0
3271-01-019Beaumont09/02/26$442,193.04ConstructionRoadwayConstructionRoadway$767,177.00$(324,983.96)-42%-364-12 months
0722-03-016Paris09/02/26$1,707,256.67ConstructionBridgeConstructionBridge$1,200,000.00$507,256.6742%0
1258-02-044Houston09/02/26$479,659.19ConstructionRoadwayConstructionRoadway$829,051.00$(349,391.81)-42%0
0231-03-159Waco09/02/26$303,486.48ConstructionRoadwayConstructionRoadway$524,250.00$(220,763.52)-42%0
0265-02-043Austin08/02/28$2,270,411.00ConstructionRoadwayConstructionRoadway$1,600,000.00$670,411.0042%0
0258-03-048Waco09/02/26$319,519.11ConstructionRoadwayConstructionRoadway$547,375.00$(227,855.89)-42%0
0299-03-077Laredo09/02/26$870,746.20ConstructionRoadwayConstructionRoadway$614,952.00$255,794.2042%0
2158-01-020Tyler08/05/26$18,471,565.25ConstructionRoadwayConstructionRoadway$31,500,000.00$(13,028,434.75)-41%0
0068-05-039Lubbock09/02/26$3,673,081.36ConstructionRoadwayConstructionRoadway$2,599,497.00$1,073,584.3641%0
0092-04-087Dallas10/06/26$8,347,322.50ConstructionRoadwayConstructionRoadway$5,940,000.00$2,407,322.5041%0
0037-02-060Laredo08/05/26$17,896,171.15ConstructionBridgeConstructionBridge$30,000,000.00$(12,103,828.85)-40%0
2266-02-169Fort Worth09/02/26$5,198,453.23ConstructionRoadwayConstructionRoadway$8,658,289.39$(3,459,836.16)-40%0
0305-03-046Beaumont09/02/26$591,399.36ConstructionRoadwayConstructionRoadway$974,186.00$(382,786.64)-39%0
3534-01-021Waco08/05/26$4,466,139.97ConstructionRoadwayConstructionRoadway$7,261,014.00$(2,794,874.03)-38%0
0601-01-066Beaumont09/02/26$1,157,862.42ConstructionRoadwayConstructionRoadway$1,881,849.00$(723,986.58)-38%0
0092-06-114Dallas10/06/26$8,192,021.25ConstructionRoadwayConstructionRoadway$5,940,000.00$2,252,021.2538%0
0092-03-067Dallas10/06/26$3,720,762.00ConstructionRoadwayConstructionRoadway$5,940,000.00$(2,219,238.00)-37%0
0710-01-051Beaumont09/02/26$720,678.84ConstructionRoadwayConstructionRoadway$1,146,420.00$(425,741.16)-37%0
0695-01-019Odessa09/02/26$383,124.24ConstructionRoadwayConstructionRoadway$600,099.10$(216,974.86)-36%0
0221-09-039Atlanta09/02/26$1,181,335.97ConstructionRoadwayConstructionRoadway$1,823,023.80$(641,687.83)-35%0
0305-04-039Beaumont09/02/26$596,516.62ConstructionRoadwayConstructionRoadway$917,779.00$(321,262.38)-35%0
1664-01-022Waco09/02/26$763,599.41ConstructionRoadwayConstructionRoadway$1,161,875.00$(398,275.59)-34%0
1718-06-013Odessa09/02/26$136,312.63ConstructionRoadwayConstructionRoadway$207,105.93$(70,793.30)-34%0
0047-07-251Dallas07/02/28$1,868,055.56ConstructionLocal LetConstructionLocal Let$2,830,000.00$(961,944.44)-34%0
0275-03-073Amarillo12/01/27$5,100,000.00ConstructionRoadwayConstructionRoadway$7,700,000.00$(2,600,000.00)-34%0
1658-01-012Waco09/02/26$166,189.59ConstructionRoadwayConstructionRoadway$250,769.23$(84,579.64)-34%0
1373-01-014Waco09/02/26$230,320.90ConstructionRoadwayConstructionRoadway$347,115.38$(116,794.48)-34%0
0029-02-060San Antonio10/06/26$1,334,390.00ConstructionRoadwayConstructionRoadway$998,593.00$335,797.0034%0
0674-01-079El Paso09/02/26$406,267.00ConstructionRoadwayConstructionRoadway$611,274.48$(205,007.48)-34%0
3044-01-017Pharr09/02/26$424,749.15ConstructionRoadwayConstructionRoadway$637,489.44$(212,740.29)-33%0
0981-02-014Houston09/02/26$80,542.96ConstructionRoadwayConstructionRoadway$60,600.00$19,942.9633%-90-3 months
0867-03-029Waco09/02/26$328,676.36ConstructionRoadwayConstructionRoadway$486,105.77$(157,429.41)-32%0
0093-01-110Dallas10/06/26$7,855,998.00ConstructionRoadwayConstructionRoadway$5,940,000.00$1,915,998.0032%0
0116-02-049Bryan08/05/26$931,513.85ConstructionRoadwayConstructionRoadway$1,370,000.00$(438,486.15)-32%0
1057-01-016Pharr09/02/26$250,822.06ConstructionRoadwayConstructionRoadway$190,139.40$60,682.6632%0
0917-31-037Bryan09/02/26$510,699.80ConstructionBridgeConstructionBridge$739,395.09$(228,695.29)-31%0
0166-01-061Dallas10/06/26$4,115,608.25ConstructionRoadwayConstructionRoadway$5,940,000.00$(1,824,391.75)-31%0
0593-01-142Beaumont09/02/26$89,087.32ConstructionRoadwayConstructionRoadway$128,234.00$(39,146.68)-31%0
0028-15-063Beaumont09/02/26$178,010.08ConstructionRoadwayConstructionRoadway$136,576.00$41,434.0830%0
0276-04-033Laredo09/02/26$1,814,980.38ConstructionRoadwayConstructionRoadway$1,392,920.55$422,059.8330%0
0276-05-030Laredo09/02/26$863,508.86ConstructionRoadwayConstructionRoadway$1,215,427.50$(351,918.64)-29%0
0917-31-036Bryan09/02/26$530,140.30ConstructionBridgeConstructionBridge$744,534.09$(214,393.79)-29%0
0024-06-070San Antonio04/06/27$45,000,000.00ConstructionRoadwayConstructionRoadway$35,000,000.00$10,000,000.0029%0
0028-01-116Houston03/03/27$4,520,787.96ConstructionRoadwayConstructionRoadway$3,520,023.00$1,000,764.9628%0
2484-01-008Laredo09/02/26$138,791.95ConstructionRoadwayConstructionRoadway$193,780.65$(54,988.70)-28%0
1414-01-025Houston09/02/26$411,754.93ConstructionRoadwayConstructionRoadway$320,775.00$90,979.9328%-90-3 months
2059-02-014Waco09/02/26$291,367.54ConstructionRoadwayConstructionRoadway$402,596.15$(111,228.61)-28%0
0143-03-049San Antonio10/06/26$50,707,452.96ConstructionRoadwayConstructionRoadway$69,947,811.00$(19,240,358.04)-28%0
0143-10-058Yoakum09/02/26$6,548,377.50ConstructionRoadwayConstructionRoadway$9,000,000.00$(2,451,622.50)-27%0
0307-02-052Beaumont09/02/26$972,857.88ConstructionRoadwayConstructionRoadway$1,337,111.00$(364,253.12)-27%0
0593-01-141Beaumont09/02/26$188,400.68ConstructionRoadwayConstructionRoadway$257,972.00$(69,571.32)-27%0
0173-06-058Paris11/03/26$255,552.00ConstructionRoadwayConstructionRoadway$349,615.79$(94,063.79)-27%0
2614-01-031Amarillo11/03/26$22,000.00ConstructionRoadwayConstructionRoadway$17,500.00$4,500.0026%0
0228-06-098Odessa09/02/26$865,519.02ConstructionRoadwayConstructionRoadway$691,209.02$174,310.0025%0
0238-06-040Amarillo11/01/28$6,000,000.00ConstructionRoadwayConstructionRoadway$8,000,000.00$(2,000,000.00)-25%562 months
0042-10-004Amarillo12/01/26$2,350,000.00ConstructionRoadwayConstructionRoadway$1,880,000.00$470,000.0025%0
2850-01-020Bryan10/06/26$1,500,000.00ConstructionRoadwayConstructionRoadway$2,000,000.00$(500,000.00)-25%0
1081-01-020Odessa09/02/26$565,395.08ConstructionRoadwayConstructionRoadway$753,310.87$(187,915.79)-25%0
0024-02-081San Antonio10/06/26$1,224,062.00ConstructionRoadwayConstructionRoadway$980,458.00$243,604.0025%0
3451-01-050El Paso09/02/26$132,319.00ConstructionRoadwayConstructionRoadway$174,955.72$(42,636.72)-24%0
0307-01-161Beaumont09/02/26$249,212.44ConstructionRoadwayConstructionRoadway$329,100.00$(79,887.56)-24%0
1430-02-018Pharr09/02/26$251,601.58ConstructionRoadwayConstructionRoadway$202,458.00$49,143.5824%0
0331-02-061Pharr09/02/26$484,573.78ConstructionRoadwayConstructionRoadway$639,326.52$(154,752.74)-24%0
0496-04-036Childress07/01/27$8,200,000.00ConstructionBridgeConstructionBridge$10,789,200.00$(2,589,200.00)-24%0
1099-05-048Tyler02/02/27$14,919,102.59ConstructionRoadwayConstructionRoadway$12,037,603.90$2,881,498.6924%0
0243-04-062Beaumont09/02/26$115,153.71ConstructionRoadwayConstructionRoadway$150,550.00$(35,396.29)-24%0
0013-08-154Fort Worth08/05/26$1,221,713.62ConstructionRoadwayConstructionRoadway$1,593,892.79$(372,179.17)-23%0
3055-01-011Houston09/02/26$154,991.03ConstructionRoadwayConstructionRoadway$126,000.00$28,991.0323%-90-3 months
0276-01-044Laredo08/05/26$11,559,333.07ConstructionRoadwayConstructionRoadway$15,000,000.00$(3,440,666.93)-23%0
0249-08-046Fort Worth08/05/26$253,842.60ConstructionRoadwayConstructionRoadway$329,106.80$(75,264.20)-23%0
0116-03-074Bryan05/05/27$1,500,000.00ConstructionRoadwayConstructionRoadway$1,940,000.00$(440,000.00)-23%0
1639-01-019Odessa09/02/26$575,308.51ConstructionRoadwayConstructionRoadway$472,682.83$102,625.6822%0
0081-01-054Fort Worth08/05/26$284,356.20ConstructionBridgeConstructionBridge$362,932.72$(78,576.52)-22%0
1061-01-040Beaumont09/02/26$246,933.04ConstructionRoadwayConstructionRoadway$314,558.00$(67,624.96)-22%0
0696-03-018Pharr09/02/26$132,989.12ConstructionRoadwayConstructionRoadway$109,478.00$23,511.1221%0
0388-03-090Beaumont09/02/26$18,848.40ConstructionRoadwayConstructionRoadway$24,000.00$(5,151.60)-21%0
0090-06-050Amarillo05/03/28$4,877,269.00ConstructionRoadwayConstructionRoadway$6,210,000.00$(1,332,731.00)-21%0
0863-01-080Pharr09/02/26$73,709.29ConstructionRoadwayConstructionRoadway$93,671.64$(19,962.35)-21%0
1937-02-034Laredo09/02/26$409,887.28ConstructionRoadwayConstructionRoadway$520,139.55$(110,252.27)-21%0
0092-05-061Dallas10/06/26$4,700,639.25ConstructionRoadwayConstructionRoadway$5,940,000.00$(1,239,360.75)-21%0
1077-01-029Waco09/02/26$171,367.12ConstructionRoadwayConstructionRoadway$216,346.15$(44,979.03)-21%0
0200-01-093Lufkin10/06/26$29,476,360.55ConstructionRoadwayConstructionRoadway$36,934,615.38$(7,458,254.83)-20%0
2185-01-002Lubbock08/05/26$535,523.81ConstructionRoadwayConstructionRoadway$445,995.11$89,528.7020%0
0066-03-045Amarillo11/03/26$3,000,000.00ConstructionRoadwayConstructionRoadway$2,500,000.00$500,000.0020%0
0001-04-106El Paso09/02/26$268,577.50ConstructionRoadwayConstructionRoadway$335,523.95$(66,946.45)-20%0
0042-07-077Childress05/05/27$431,000.00ConstructionBridgeConstructionBridge$360,000.00$71,000.0020%0
1947-02-017Beaumont09/02/26$614,931.12ConstructionRoadwayConstructionRoadway$514,348.00$100,583.1220%0
0090-06-053Amarillo06/01/27$14,250,000.00ConstructionRoadwayConstructionRoadway$17,700,000.00$(3,450,000.00)-19%0
3625-01-002Pharr09/02/26$26,653.32ConstructionRoadwayConstructionRoadway$33,035.04$(6,381.72)-19%0
1803-03-010Pharr09/02/26$85,855.52ConstructionRoadwayConstructionRoadway$106,132.68$(20,277.16)-19%0
3027-01-007Waco09/02/26$172,551.25ConstructionRoadwayConstructionRoadway$213,317.31$(40,766.06)-19%0
2384-01-011Odessa09/02/26$410,791.72ConstructionRoadwayConstructionRoadway$506,216.56$(95,424.84)-19%0
1803-02-052Pharr09/02/26$498,934.21ConstructionRoadwayConstructionRoadway$614,634.48$(115,700.27)-19%0
0924-06-724El Paso09/02/26$114,522.00ConstructionRoadwayConstructionRoadway$96,544.39$17,977.6119%0
2395-01-015Waco09/02/26$24,929.42ConstructionRoadwayConstructionRoadway$30,625.00$(5,695.58)-19%0
3032-01-008Waco09/02/26$346,340.13ConstructionRoadwayConstructionRoadway$425,384.62$(79,044.49)-19%0
1582-01-025Lufkin06/01/29$2,670,383.75ConstructionBridgeConstructionBridge$3,267,117.40$(596,733.65)-18%0
0627-03-029Beaumont09/02/26$904,174.21ConstructionRoadwayConstructionRoadway$764,589.00$139,585.2118%0
0056-03-067Waco09/02/26$1,201,173.44ConstructionRoadwayConstructionRoadway$1,468,805.00$(267,631.56)-18%0
0866-07-016Odessa09/02/26$993,296.11ConstructionRoadwayConstructionRoadway$1,213,516.55$(220,220.44)-18%0
0132-03-036Childress08/05/26$11,087,882.05ConstructionRoadwayConstructionRoadway$13,520,000.00$(2,432,117.95)-18%0
0204-01-075Austin10/06/26$68,546.50ConstructionBridgeConstructionBridge$58,125.00$10,421.5018%0
2094-01-075Pharr09/02/26$189,908.03ConstructionRoadwayConstructionRoadway$231,198.00$(41,289.97)-18%0
1061-01-039Beaumont09/02/26$65,066.30ConstructionRoadwayConstructionRoadway$79,100.00$(14,033.70)-18%0
0043-17-036Wichita Falls09/02/26$1,188,329.00ConstructionRoadwayConstructionRoadway$1,442,307.69$(253,978.69)-18%0
2450-01-028Pharr09/02/26$584,447.27ConstructionRoadwayConstructionRoadway$708,762.96$(124,315.69)-18%0
2643-01-006Pharr09/02/26$26,269.52ConstructionRoadwayConstructionRoadway$31,781.16$(5,511.64)-17%0
0121-03-067Waco09/02/26$1,234,481.90ConstructionRoadwayConstructionRoadway$1,491,250.00$(256,768.10)-17%0
0028-06-098Beaumont09/02/26$93,755.78ConstructionRoadwayConstructionRoadway$113,202.00$(19,446.22)-17%0
0921-02-526Pharr09/02/26$230,687.93ConstructionRoadwayConstructionRoadway$278,302.00$(47,614.07)-17%0
0292-07-022Odessa09/02/26$690,850.59ConstructionRoadwayConstructionRoadway$829,933.03$(139,082.44)-17%0
0980-02-020Houston09/01/27$8,353,888.19ConstructionRoadwayConstructionRoadway$10,000,000.00$(1,646,111.81)-16%0
0088-05-116Yoakum08/04/27$262,019.23ConstructionNon RoadwayConstructionNon Roadway$225,000.00$37,019.2316%0
2350-01-078Yoakum08/04/27$262,019.23ConstructionNon RoadwayConstructionNon Roadway$225,000.00$37,019.2316%0
0784-03-020Beaumont08/05/26$2,713,254.01ConstructionRoadwayConstructionRoadway$2,335,724.00$377,530.0116%0
2262-03-018Odessa09/02/26$969,862.75ConstructionRoadwayConstructionRoadway$1,155,783.85$(185,921.10)-16%0
2530-01-017Pharr09/02/26$880,688.02ConstructionRoadwayConstructionRoadway$759,598.00$121,090.0216%0
0527-06-022Houston01/06/27$3,626,282.00ConstructionRoadwayConstructionRoadway$4,312,960.00$(686,678.00)-16%0
0667-01-130Beaumont09/02/26$340,907.65ConstructionRoadwayConstructionRoadway$403,770.00$(62,862.35)-16%0
1717-02-024Odessa09/02/26$2,253,461.83ConstructionRoadwayConstructionRoadway$2,652,866.75$(399,404.92)-15%0
0133-01-055Childress08/05/26$16,096,986.21ConstructionRoadwayConstructionRoadway$14,000,000.00$2,096,986.2115%0
0600-02-015Odessa09/02/26$600,455.86ConstructionRoadwayConstructionRoadway$705,516.29$(105,060.43)-15%0
0237-06-054Laredo08/05/26$851,466.51ConstructionRoadwayConstructionRoadway$1,000,337.79$(148,871.28)-15%0
3510-04-071Houston08/05/26$16,148,907.85ConstructionRoadwayConstructionRoadway$14,072,310.00$2,076,597.8515%0
0412-02-022San Angelo09/06/28$3,186,577.66ConstructionBridgeConstructionBridge$3,732,167.00$(545,589.34)-15%0
1911-01-023Houston09/02/26$3,375,346.25ConstructionBridgeConstructionBridge$3,947,847.00$(572,500.75)-15%-126-4 months
0903-28-073Wichita Falls09/02/26$1,239,741.87ConstructionBridgeConstructionBridge$1,084,000.00$155,741.8714%-398-1 year
1229-01-083Laredo09/02/26$345,798.63ConstructionRoadwayConstructionRoadway$403,022.00$(57,223.37)-14%0
3510-04-072Houston08/05/26$11,775,459.70ConstructionRoadwayConstructionRoadway$10,347,404.00$1,428,055.7014%0
1583-02-020Beaumont09/02/26$357,904.07ConstructionRoadwayConstructionRoadway$314,688.00$43,216.0714%0
1803-02-051Pharr09/02/26$411,862.97ConstructionRoadwayConstructionRoadway$476,947.44$(65,084.47)-14%0
0254-01-149Corpus Christi08/05/26$10,383,718.65ConstructionRoadwayConstructionRoadway$12,000,000.00$(1,616,281.35)-13%0
0924-06-721El Paso09/02/26$108,912.00ConstructionRoadwayConstructionRoadway$125,768.27$(16,856.27)-13%0
2262-01-022Odessa09/02/26$550,894.97ConstructionRoadwayConstructionRoadway$633,632.82$(82,737.85)-13%0
0236-02-021Laredo09/02/26$718,334.98ConstructionRoadwayConstructionRoadway$824,911.00$(106,576.02)-13%0
1179-03-012Fort Worth09/01/27$4,958,677.46ConstructionBridgeConstructionBridge$4,394,655.60$564,021.8613%0
0056-02-034Waco09/02/26$2,465,492.67ConstructionRoadwayConstructionRoadway$2,824,625.00$(359,132.33)-13%0
0907-00-243San Angelo06/13/28$9,581,000.00ConstructionRoadwayConstructionRoadway$8,509,000.00$1,072,000.0013%0
0912-72-799Houston02/15/28$5,012,434.62ConstructionLocal LetConstructionLocal Let$5,722,208.00$(709,773.38)-12%3651 year
1046-01-048El Paso09/02/26$836,436.50ConstructionRoadwayConstructionRoadway$744,447.12$91,989.3812%0
2252-01-010Childress09/02/26$342,525.70ConstructionBridgeConstructionBridge$306,000.00$36,525.7012%0
0168-03-041Lubbock08/05/26$318,555.25ConstructionRoadwayConstructionRoadway$361,462.26$(42,907.01)-12%0
0774-03-017Waco09/02/26$307,829.65ConstructionRoadwayConstructionRoadway$349,086.54$(41,256.89)-12%0
2635-01-044Amarillo09/01/27$11,300,000.00ConstructionRoadwayConstructionRoadway$12,800,000.00$(1,500,000.00)-12%0
0703-03-030Beaumont09/02/26$403,282.08ConstructionRoadwayConstructionRoadway$456,800.00$(53,517.92)-12%0
2395-01-014Waco09/02/26$210,823.78ConstructionRoadwayConstructionRoadway$238,798.08$(27,974.30)-12%0
0236-03-029Laredo09/02/26$1,082,954.49ConstructionRoadwayConstructionRoadway$1,225,889.00$(142,934.51)-12%0
0412-06-022Laredo09/02/26$476,390.44ConstructionRoadwayConstructionRoadway$538,683.60$(62,293.16)-12%0
1582-01-026Lufkin06/01/29$3,155,801.25ConstructionBridgeConstructionBridge$3,549,996.50$(394,195.25)-11%0
2012-02-018Laredo09/02/26$653,161.35ConstructionRoadwayConstructionRoadway$731,824.80$(78,663.45)-11%0
0232-01-056Waco09/01/29$1,442,651.79ConstructionRoadwayConstructionRoadway$1,615,770.00$(173,118.21)-11%36012 months
0251-02-057Waco09/01/29$1,860,160.71ConstructionRoadwayConstructionRoadway$2,083,380.00$(223,219.29)-11%36012 months
0184-02-062Waco09/06/28$1,667,075.89ConstructionRoadwayConstructionRoadway$1,867,125.00$(200,049.11)-11%0
0184-03-041Waco09/06/28$957,125.00ConstructionRoadwayConstructionRoadway$1,071,980.00$(114,855.00)-11%0
0320-06-011Waco09/06/28$474,732.14ConstructionRoadwayConstructionRoadway$531,700.00$(56,967.86)-11%0
0567-03-004Waco09/06/28$68,705.36ConstructionRoadwayConstructionRoadway$76,950.00$(8,244.64)-11%0
0774-02-019Waco09/06/28$397,410.71ConstructionRoadwayConstructionRoadway$445,100.00$(47,689.29)-11%0
0833-03-052Waco09/06/28$375,446.43ConstructionRoadwayConstructionRoadway$420,500.00$(45,053.57)-11%0
1054-03-015Waco09/06/28$391,339.29ConstructionRoadwayConstructionRoadway$438,300.00$(46,960.71)-11%0
1192-01-031Waco09/06/28$1,528,196.43ConstructionRoadwayConstructionRoadway$1,711,580.00$(183,383.57)-11%0
1308-01-037Waco09/06/28$567,232.14ConstructionRoadwayConstructionRoadway$635,300.00$(68,067.86)-11%0
1594-02-016Waco09/06/28$536,741.07ConstructionRoadwayConstructionRoadway$601,150.00$(64,408.93)-11%0
2061-01-014Waco09/06/28$410,758.93ConstructionRoadwayConstructionRoadway$460,050.00$(49,291.07)-11%0
2133-01-013Waco09/06/28$283,705.36ConstructionRoadwayConstructionRoadway$317,750.00$(34,044.64)-11%0
2674-01-010Waco09/06/28$85,803.57ConstructionRoadwayConstructionRoadway$96,100.00$(10,296.43)-11%0
3128-01-014Waco09/06/28$356,571.43ConstructionRoadwayConstructionRoadway$399,360.00$(42,788.57)-11%0
0050-08-105Houston09/02/26$912,360.25ConstructionRoadwayConstructionRoadway$1,020,566.25$(108,206.00)-11%0
0095-04-079Dallas08/05/26$1,290,272.50ConstructionBridgeConstructionBridge$1,166,626.06$123,646.4411%0
0598-02-133Houston01/06/27$442,264.00ConstructionBridgeConstructionBridge$400,000.00$42,264.0011%0
3510-04-069Houston08/05/26$27,634,165.45ConstructionRoadwayConstructionRoadway$25,084,165.45$2,550,000.0010%0
0050-06-109Houston09/02/26$1,377,934.30ConstructionRoadwayConstructionRoadway$1,533,686.80$(155,752.50)-10%0
0696-03-017Pharr09/02/26$225,557.34ConstructionRoadwayConstructionRoadway$204,906.00$20,651.3410%0
0275-01-258Amarillo12/01/26$450,000.00ConstructionRoadwayConstructionRoadway$500,000.00$(50,000.00)-10%0
0168-03-038Lubbock08/05/26$9,199,739.53ConstructionRoadwayConstructionRoadway$10,186,000.00$(986,260.47)-10%0
0114-12-018Houston09/02/26$568,348.63ConstructionRoadwayConstructionRoadway$628,922.38$(60,573.75)-10%0
0860-01-022Pharr09/02/26$613,061.79ConstructionRoadwayConstructionRoadway$560,202.48$52,859.319%0
1587-01-019Pharr09/02/26$476,160.05ConstructionRoadwayConstructionRoadway$524,697.00$(48,536.95)-9%0
0864-01-082Pharr09/02/26$141,732.88ConstructionRoadwayConstructionRoadway$155,944.00$(14,211.12)-9%0
1844-01-032Houston09/02/26$98,200.58ConstructionRoadwayConstructionRoadway$90,000.00$8,200.589%-90-3 months
3632-01-002Pharr09/02/26$60,369,515.45ConstructionRoadwayConstructionRoadway$66,374,838.63$(6,005,323.18)-9%0
0027-08-147Houston08/05/26$54,960,380.56ConstructionRoadwayConstructionRoadway$60,321,355.00$(5,360,974.44)-9%0
2966-01-017Pharr09/02/26$138,878.38ConstructionRoadwayConstructionRoadway$152,292.00$(13,413.62)-9%0
0388-05-011Beaumont09/02/26$269,778.04ConstructionRoadwayConstructionRoadway$248,179.00$21,599.049%0
0698-01-018Pharr09/02/26$249,209.57ConstructionRoadwayConstructionRoadway$229,313.00$19,896.579%0
0001-04-107El Paso09/02/26$102,278.00ConstructionRoadwayConstructionRoadway$111,841.35$(9,563.35)-9%0
0703-01-068Beaumont09/02/26$830,720.32ConstructionRoadwayConstructionRoadway$908,148.00$(77,427.68)-9%0
0093-07-023Waco09/02/26$785,047.90ConstructionRoadwayConstructionRoadway$857,000.00$(71,952.10)-8%0
2879-01-012Atlanta12/01/26$433,241.85ConstructionRoadwayConstructionRoadway$400,010.78$33,231.078%0
1947-01-021Beaumont09/02/26$1,048,785.06ConstructionRoadwayConstructionRoadway$1,137,660.00$(88,874.94)-8%0
0775-01-021Pharr09/02/26$386,659.59ConstructionRoadwayConstructionRoadway$418,556.16$(31,896.57)-8%0
0991-02-014Corpus Christi08/05/26$9,316,494.15ConstructionRoadwayConstructionRoadway$10,085,299.15$(768,805.00)-8%0
0669-01-068Pharr09/02/26$683,590.86ConstructionRoadwayConstructionRoadway$635,316.00$48,274.868%0
0598-02-134Houston01/06/27$427,693.00ConstructionBridgeConstructionBridge$400,000.00$27,693.007%0
0674-01-080El Paso09/02/26$157,058.50ConstructionRoadwayConstructionRoadway$168,562.08$(11,503.58)-7%0
0321-01-056Austin10/06/26$679,854.80ConstructionBridgeConstructionBridge$729,150.00$(49,295.20)-7%0
0051-09-128Houston08/05/26$3,767,287.50ConstructionRoadwayConstructionRoadway$4,039,867.80$(272,580.30)-7%0
0110-06-151Houston09/02/26$937,804.97ConstructionRoadwayConstructionRoadway$1,005,152.06$(67,347.09)-7%-34-1 month
0022-03-032Odessa11/03/26$963,525.31ConstructionBridgeConstructionBridge$1,032,508.84$(68,983.53)-7%0
0081-01-053Fort Worth08/05/26$1,297,122.14ConstructionBridgeConstructionBridge$1,388,165.32$(91,043.18)-7%0
0217-02-037Atlanta12/01/28$17,442,427.00ConstructionRoadwayConstructionRoadway$18,642,426.36$(1,199,999.36)-6%0
2635-05-005Amarillo08/05/26$50,287,231.93ConstructionRoadwayConstructionRoadway$47,259,223.32$3,028,008.616%0
1685-05-140Houston08/05/26$2,479,057.90ConstructionRoadwayConstructionRoadway$2,645,375.20$(166,317.30)-6%0
1138-01-043Pharr09/02/26$182,609.52ConstructionRoadwayConstructionRoadway$172,068.00$10,541.526%0
0050-06-108Houston08/05/26$1,299,070.05ConstructionBridgeConstructionBridge$1,380,770.05$(81,700.00)-6%0
0140-13-023San Angelo08/05/26$19,998,294.70ConstructionSafety Rest AreaConstructionSafety Rest Area$18,889,057.95$1,109,236.756%0
1530-01-012Abilene03/07/28$6,218,588.70ConstructionRoadwayConstructionRoadway$6,602,447.70$(383,859.00)-6%-211-7 months
0079-07-019Fort Worth03/07/28$1,155,543.00ConstructionRoadwayConstructionRoadway$1,093,877.00$61,666.006%0
1251-04-008Abilene01/05/28$1,176,493.20ConstructionBridgeConstructionBridge$1,245,950.70$(69,457.50)-6%0
0313-02-073Fort Worth06/01/28$2,954,102.52ConstructionRoadwayConstructionRoadway$2,802,358.00$151,744.525%0
0610-05-060Atlanta08/05/26$12,401,196.00ConstructionRoadwayConstructionRoadway$13,081,456.70$(680,260.70)-5%0
1228-01-014Pharr09/02/26$265,829.18ConstructionRoadwayConstructionRoadway$252,730.00$13,099.185%0
0784-02-011Beaumont08/05/26$1,050,709.80ConstructionRoadwayConstructionRoadway$1,000,000.00$50,709.805%0
1052-02-098Corpus Christi11/03/26$4,769,574.60ConstructionRoadwayConstructionRoadway$4,543,952.00$225,622.605%0
1505-01-016Pharr09/02/26$11,236,733.53ConstructionRoadwayConstructionRoadway$11,804,130.31$(567,396.78)-5%0
0089-07-166Yoakum08/05/26$240,432,788.90ConstructionRoadwayConstructionRoadway$229,757,253.50$10,675,535.405%-28-28 days
2528-01-006Odessa08/05/26$7,922,603.47ConstructionRoadwayConstructionRoadway$8,304,083.23$(381,479.76)-5%0
0181-01-071Abilene09/02/26$429,762.50ConstructionRoadwayConstructionRoadway$410,925.00$18,837.505%0
0924-06-716El Paso09/02/26$182,031.50ConstructionRoadwayConstructionRoadway$174,086.44$7,945.065%0
2690-01-040Austin12/01/27$7,674,074.07ConstructionRoadwayConstructionRoadway$7,346,428.57$327,645.504%0
0208-01-026Atlanta08/05/26$3,307,700.41ConstructionRoadwayConstructionRoadway$3,449,866.61$(142,166.20)-4%0
0050-09-099Houston09/02/26$1,964,365.36ConstructionRoadwayConstructionRoadway$2,047,628.36$(83,263.00)-4%0
0337-03-020Austin09/02/26$3,125,366.79ConstructionRoadwayConstructionRoadway$3,257,848.14$(132,481.35)-4%0
0186-03-071Bryan08/05/26$4,389,174.70ConstructionRoadwayConstructionRoadway$4,225,000.00$164,174.704%0
0172-05-134Dallas03/01/27$1,055,097.50ConstructionLocal LetConstructionLocal Let$1,097,301.00$(42,203.50)-4%0
0015-13-441Austin11/03/26$81,730,769.23ConstructionRoadwayConstructionRoadway$85,000,000.00$(3,269,230.77)-4%0
0500-03-664Houston08/05/26$4,921,686.24ConstructionRoadwayConstructionRoadway$5,117,903.93$(196,217.69)-4%0
0918-24-315Dallas08/04/28$1,296,500.00TransferTransferConstructionRoadway$1,250,000.00$46,500.004%0Construction / Roadway → Transfer / Transfer
0214-03-035Beaumont11/02/27$25,600,000.00ConstructionBridgeConstructionBridge$26,584,615.38$(984,615.38)-4%0
0114-10-102Bryan08/05/26$4,214,218.54ConstructionRoadwayConstructionRoadway$4,370,000.00$(155,781.46)-4%0
1982-01-031Laredo08/05/26$119,406.04ConstructionRoadwayConstructionRoadway$123,600.00$(4,193.96)-3%0
0047-06-178Dallas09/02/26$1,167,955.25ConstructionRoadwayConstructionRoadway$1,208,060.70$(40,105.45)-3%0
1057-03-057Pharr09/02/26$222,214.08ConstructionRoadwayConstructionRoadway$215,398.44$6,815.643%0
1012-03-027Dallas08/05/26$9,562,778.90ConstructionRoadwayConstructionRoadway$9,867,597.40$(304,818.50)-3%0
0231-16-039Waco09/02/26$168,159.90ConstructionRoadwayConstructionRoadway$164,320.26$3,839.642%0
0283-02-040Wichita Falls08/05/26$4,158,923.39ConstructionRoadwayConstructionRoadway$4,248,978.39$(90,055.00)-2%0
0173-04-063Dallas09/02/26$900,431.25ConstructionRoadwayConstructionRoadway$883,168.07$17,263.182%0
0275-03-072Amarillo09/02/26$10,704,179.35ConstructionBridgeConstructionBridge$10,500,000.00$204,179.352%0
0047-03-106Paris08/05/26$1,185,228.20ConstructionRoadwayConstructionRoadway$1,164,466.93$20,761.272%0
1068-01-242Fort Worth02/02/28$3,000,643.80ConstructionRoadwayConstructionRoadway$3,053,262.00$(52,618.20)-2%0
0541-02-033Childress08/05/26$8,730,229.70ConstructionRoadwayConstructionRoadway$8,874,218.10$(143,988.40)-2%0
0517-02-046San Antonio09/01/27$6,604,270.95ConstructionBridgeConstructionBridge$6,501,914.80$102,356.152%0
0441-09-054Odessa08/05/26$17,312,839.88ConstructionRoadwayConstructionRoadway$17,048,526.81$264,313.072%0
0051-09-127Houston09/02/26$2,378,421.60ConstructionNon RoadwayConstructionNon Roadway$2,342,467.00$35,954.602%0
0976-03-120Houston09/02/26$477,545.44ConstructionRoadwayConstructionRoadway$484,617.00$(7,071.56)-1%0
0842-03-037Yoakum08/05/26$33,704,491.10ConstructionRoadwayConstructionRoadway$33,218,001.00$486,490.101%0
1844-02-025Houston09/02/26$136,321.34ConstructionRoadwayConstructionRoadway$138,000.00$(1,678.66)-1%-90-3 months
0047-14-092Dallas09/02/26$1,995,770.00ConstructionRoadwayConstructionRoadway$2,018,779.35$(23,009.35)-1%0
0398-04-078Waco09/02/26$1,433,620.53ConstructionRoadwayConstructionRoadway$1,418,625.00$14,995.531%0
0006-11-030Abilene01/05/28$100,000.00ConstructionBridgeConstructionBridge$99,000.00$1,000.001%0
0110-07-022Houston09/02/26$346,537.14ConstructionRoadwayConstructionRoadway$349,907.13$(3,369.99)-1%-34-1 month
1801-01-064Pharr09/02/26$464,860.04ConstructionRoadwayConstructionRoadway$469,360.04$(4,500.00)-1%0
1513-02-047Fort Worth02/02/27$1,935,387.85ConstructionRoadwayConstructionRoadway$1,917,557.73$17,830.121%0
0041-07-123Amarillo08/05/26$4,790,956.65ConstructionRoadwayConstructionRoadway$4,750,000.00$40,956.651%0
0222-03-065Atlanta08/05/26$11,759,396.31ConstructionRoadwayConstructionRoadway$11,659,080.64$100,315.671%0
0018-05-089Laredo08/05/26$226,855,600.99ConstructionRoadwayConstructionRoadway$228,583,900.49$(1,728,299.50)-1%0
0581-01-179Dallas08/05/26$1,714,401.50ConstructionRoadwayConstructionRoadway$1,725,917.34$(11,515.84)-1%0
0581-01-177Dallas08/05/26$1,384,026.00ConstructionRoadwayConstructionRoadway$1,376,754.86$7,271.141%0
2158-01-028Tyler08/05/26$994,700.00ConstructionRoadwayConstructionRoadway$990,000.00$4,700.000%0
1479-01-028San Antonio09/02/26$2,818,208.09ConstructionRoadwayConstructionRoadway$2,826,369.36$(8,161.27)-0%0
1012-03-028Dallas08/05/26$6,885,055.10ConstructionRoadwayConstructionRoadway$6,866,910.20$18,144.900%0
0904-11-071Amarillo05/05/27$6,114,395.83ConstructionBridgeConstructionBridge$6,100,000.00$14,395.830%0
0283-03-023Wichita Falls08/05/26$9,460,554.44ConstructionRoadwayConstructionRoadway$9,438,454.44$22,100.000%0
0041-07-121Amarillo08/05/26$26,146,123.75ConstructionRoadwayConstructionRoadway$26,200,000.00$(53,876.25)-0%0
0140-05-029Odessa11/03/26$119,753.30ConstructionBridgeConstructionBridge$119,942.70$(189.40)-0%0
3510-04-070Houston08/05/26$16,853,512.33ConstructionRoadwayConstructionRoadway$16,878,891.00$(25,378.67)-0%0
2494-01-018Amarillo02/02/28$1,176,471.00ConstructionRoadwayConstructionRoadway$1,175,471.00$1,000.000%2828 days
0173-04-059Dallas08/05/26$7,199,789.52ConstructionRoadwayConstructionRoadway$7,203,790.42$(4,000.90)-0%0
1492-01-013Dallas08/05/26$1,879,427.60ConstructionRoadwayConstructionRoadway$1,878,822.25$605.350%0
0001-04-104El Paso03/01/29$2,431,891.96ConstructionRoadwayConstructionRoadway$2,431,892.59$(0.63)0%0
0374-06-024El Paso01/01/29$414,196.43ConstructionRoadwayConstructionRoadway$414,196.50$(0.07)0%0
2121-02-189El Paso12/05/28$1,008,439.29ConstructionRoadwayConstructionRoadway$1,008,439.25$0.040%0
2121-03-173El Paso12/05/28$115,616.96ConstructionRoadwayConstructionRoadway$115,617.14$(0.18)0%0
2552-03-073El Paso12/05/28$262,553.57ConstructionRoadwayConstructionRoadway$262,553.31$0.260%0
0924-06-767El Paso11/01/28$453,617.86ConstructionRoadwayConstructionRoadway$453,618.00$(0.14)0%0
0924-06-768El Paso11/01/28$241,348.21ConstructionRoadwayConstructionRoadway$241,348.00$0.210%0
2552-03-072El Paso11/01/28$792,167.86ConstructionRoadwayConstructionRoadway$792,168.17$(0.31)0%0
0924-06-749El Paso02/02/28$88,385.63ConstructionRoadwayConstructionRoadway$88,386.56$(0.93)0%-34-1 month
0924-06-750El Paso02/02/28$36,787.85ConstructionRoadwayConstructionRoadway$36,788.78$(0.93)0%-34-1 month
0015-13-462Austin08/04/27$11,000,000.00ConstructionRoadwayConstructionRoadway$11,000,001.00$(1.00)0%0
360 rows · download CSV

Putting It Together

The TxDOT project's timeline adjustments suggest significant letting shifts while maintaining a consistent subtype profile. As costs compress within the active pipeline, districts like Houston and Austin persist in driving overall value despite some projects facing cuts.


Final Takeaway

The ongoing adjustments in project timing and costs hint at the need for adaptable strategies within the state's transportation planning efforts.