Put bids in the order your team needs
Product updates for September 1, 2026–September 7, 2026
Product ·
Asphalt paving
Drilled shafts
Cap pour
Driveway tie-insWeather6:00 AM72°Wind 5 MPH | Rain 0.00 in12:00 PM89°Wind 8 MPH | Rain 0.00 in4:00 PM93°Wind 11 MPH | Rain 0.00 inWork LogsCrewDescription / LocationWorkersLabor HrsPavingPlaced 1,144 TON SP-B on the EB lane.880DrillingDrilled 37 LF 60-in shaft at Bent 3 piers 1–4.550ConcretePoured 42 CY Cl C at Bent 2 cap and abut 1.660DrivewayPlaced 234 SY ACP in driveways, north side.440Total23230Equipment & ProductionEquipment HoursPaver + 2 rollers • 30 hrs combinedDrill rig • 10 hrsPump truck • 8 hrsInstalled TodaySP MIXES SP-B PG64-22 • 1,144 TONDRILL SHAFT (60 IN) • 37 LFCL C CONC (CAP) • 27 CYDRIVEWAYS (ACP) • 234 SYCL C CONC (ABUT) • 15 CYSite NotesQuality: SP-B density cores passed; cap pour inspected and accepted.Safety / Delays: No incidents. No weather delays. Lane reopened at 5:30 PM.Daily Progress Report | Smith Widen Road | Page 1 of 1
Denton Widen Road - Add Lanes - ID: 0195-02-092TXDOT11/4/2026Bidding
Tarrant Bridge Replacement - ID: 0363-03-060TXDOT9/30/2026InterestedGarver Project No.: W07- 2401219 - NORTH FORK WWTPCity of Liberty Hill10/1/2026Calcasieu River and Pass, LA, Maintenance Dredging FY26, Mile 5.0 to Mile 17.0DEPT OF DEFENSE9/16/2026
Starr Construct Rio Grande City/Roma Relief Route - ID: 3632-01-002TXDOT9/2/2026
Kaufman Bridge Replacement - ID: 0095-03-100TXDOT10/6/2026
Dallas Interchange Improvement - ID: 0009-11-248TXDOT10/6/2026
In their own words.