TxDOT Pipeline Changes - July 2026
  • The active pipeline value increased from $31.35B to $33.71B, a change of +$2.36B.
  • Project entry into the letting window saw 91 new projects, with a net addition of 59 total projects.
  • Houston reports the largest district net cost increase at +$2.19B.

Overview

Looking at the July 3 vs. August 3, 2026 snapshots, across a letting window of July 1, 2026 to July 1, 2029, the active project pipeline shows a marked increase in both value and count. The total pipeline value rose by +$2.36B, underscoring a growing infrastructure commitment. Additionally, 91 projects entered the letting stage, while the predominant project type remains roadway, representing 76.2% of the pipeline value.


Letting Date Shifts (Slippage)

How to read this chart:

Of the 78 projects whose letting dates shifted by six months or more, 43 moved earlier and 35 moved later. This means 8 more projects were pulled forward than delayed. Overall, the changes leaned slightly toward earlier letting dates, although the volume of movement in both directions indicates meaningful scheduling adjustments.

CSJDistrictEst. Letting DateProject EstimateCurrent TypeCurrent SubtypePrev. TypePrev. SubtypePrev. DateLetting Δ (days)Letting Date ΔCost Δ%Cost ΔType/Subtype ΔLifecycle
0808-03-009Waco09/01/45$650,000.00ConstructionRoadway09/01/27657518 years
0598-02-136Houston01/01/40$1,341,371.02ConstructionRoadway11/02/27444312 years
0367-02-083Houston01/01/40$5,270,345.00ConstructionRoadway01/05/28437912 years
0367-03-039Houston01/01/40$5,270,345.00ConstructionRoadway01/05/28437912 years
0367-04-084Houston01/01/40$5,270,345.00ConstructionRoadway01/05/28437912 years
2523-03-020Houston01/01/40$3,681,924.00ConstructionRoadway01/05/28437912 years
0912-72-836Houston01/01/40$720,898.00ConstructionRoadway07/06/28419611 years
2920-02-005Austin07/01/27$2,083,536.54ConstructionRoadwayUnassignedUnassigned02/01/38-3868-11 years$(83,341.24)-4%Unassigned → Construction / Roadway
0912-72-797Houston01/15/37$28,142,008.00ConstructionLocal Let01/15/27365310 years
0598-02-093Houston07/30/26$216,068,000.00Non-LetRoadwayUnassignedUnassigned08/01/35-3289-9 years$26,068,000.0014%Unassigned → Non-Let / Roadway
3510-04-038Houston01/15/37$39,800,000.00ConstructionLocal Let01/15/2832889 years
0912-72-694Houston09/01/36$0.00ConstructionNon Roadway09/01/2732889 years
0422-05-011Fort Worth07/01/27$13,592,874.18ConstructionBridgeUnassignedUnassigned01/01/35-2741-8 yearsUnassigned → Construction / Bridge
1062-02-029Houston06/01/35$58,274,791.0006/01/2921916 years
0809-04-054Lufkin06/01/27$42,800,000.89ConstructionRoadwayUnassignedUnassigned01/01/32-1675-5 yearsUnassigned → Construction / Roadway
0809-05-021Lufkin06/01/27$8,200,000.89ConstructionRoadwayUnassignedUnassigned01/01/32-1675-5 yearsUnassigned → Construction / Roadway
0902-90-376Fort Worth08/15/31$20,017,500.00ConstructionLocal Let08/15/2714614 years
0261-02-087Dallas04/01/32$2,264,548.86ConstructionRoadway04/05/2814574 years
0314-01-086Fort Worth12/05/28$979,785.00ConstructionRoadwayUnassignedUnassigned01/01/32-1122-3 years$(953,578.39)-49%Unassigned → Construction / Roadway
0314-01-091Fort Worth12/05/28$3,016,004.00ConstructionRoadwayUnassignedUnassigned01/01/32-1122-3 years$(6,253,808.40)-67%Unassigned → Construction / Roadway
0902-90-374Fort Worth10/04/30$32,884,620.00ConstructionLocal Let10/04/2710963 years
0912-72-845Houston05/15/31$75,920,000.00ConstructionLocal Let05/15/2810953 years
2398-01-063Abilene03/03/27$11,607,143.00ConstructionBridgeConstructionBridge01/01/30-1035-3 years
0014-10-069Waco05/05/27$4,500,000.00ConstructionRoadwayConstructionRoadway09/01/29-850-2 years
1361-03-030Abilene12/01/26$806,245.00ConstructionRoadwayConstructionRoadway12/05/28-735-2 years
0151-09-151Austin10/02/29$462,962.96ConstructionLocal LetConstructionLocal Let10/02/277312 years
0008-02-078Fort Worth11/03/26$632,887.20ConstructionRoadwayConstructionRoadway10/04/28-701-2 years$(378,121.04)-37%
0912-72-796Houston10/27/25$2,500,000.00Non-LetNon RoadwayNon-LetNon Roadway08/15/27-657-2 years
0249-07-072Fort Worth01/06/27$42,784,246.29ConstructionBridgeConstructionBridge09/06/28-609-2 years
1006-02-012Houston03/07/28$6,000,000.00ConstructionRoadwayConstructionRoadway09/01/29-543-1 year$5,360,000.00838%
0451-01-053Dallas06/01/27$117,610,100.89ConstructionRoadwayConstructionRoadway11/01/28-519-1 year
0912-72-727Houston07/27/26$418,655.00ConstructionLocal LetConstructionLocal Let12/15/27-506-1 year
1127-05-024Odessa12/01/26$1,815,251.00ConstructionRoadwayConstructionRoadway04/05/28-491-1 year
1718-05-021Odessa12/01/26$2,153,993.53ConstructionRoadwayConstructionRoadway04/05/28-491-1 year
0014-01-033Fort Worth11/14/28$0.00ConstructionLocal LetConstructionLocal Let08/01/274711 year
2266-02-164Fort Worth10/31/28$4,200,000.00ConstructionLocal LetConstructionLocal Let10/11/273861 year
0358-03-040El Paso12/05/28$2,276,633.93ConstructionRoadwayConstructionRoadway12/01/273701 year$(84,319.77)-4%
0358-04-019El Paso12/05/28$2,285,513.39ConstructionRoadwayConstructionRoadway12/01/273701 year$(84,648.65)-4%
1003-01-112Houston03/03/27$722,090.00ConstructionRoadwayConstructionRoadway03/07/28-370-1 year
0912-00-704Houston09/15/28$1,000,000.00ConstructionLocal LetConstructionLocal Let09/15/273661 year
0263-05-027Abilene06/01/27$2,358,156.80ConstructionRoadwayConstructionRoadway06/01/28-366-1 year
0318-02-028Abilene12/01/27$1,135,643.00ConstructionRoadwayConstructionRoadway12/01/263651 year
0104-07-027El Paso12/01/26$1,601,075.00ConstructionRoadwayConstructionRoadway12/01/27-365-1 year$59,299.074%
0485-01-026El Paso12/01/26$1,919,937.50ConstructionRoadwayConstructionRoadway12/01/27-365-1 year$71,108.804%
0485-02-018El Paso12/01/26$1,313,086.54ConstructionRoadwayConstructionRoadway12/01/27-365-1 year$48,632.844%
1012-01-023Dallas06/02/29$4,550,000.00ConstructionRoadwayConstructionRoadway06/03/2836412 months
0103-01-047Odessa11/02/27$1,523,627.80ConstructionRoadwayConstructionRoadway11/03/2636412 months
0906-18-022Odessa11/02/27$938,819.42ConstructionRoadwayConstructionRoadway11/03/2636412 months
0836-03-075Waco09/04/25$540,374.48Non-LetChange OrderConstructionRoadway09/02/26-363-12 months$(15,445.38)-3%Construction / Roadway → Non-Let / Change Order
0065-05-159Beaumont06/01/27$5,500,000.00ConstructionRoadwayConstructionRoadway05/03/28-337-11 months
0693-03-046Abilene12/01/26$13,000,000.00ConstructionRoadwayConstructionRoadway11/02/27-336-11 months
3256-01-131Houston03/03/27$2,062,700.00ConstructionRoadwayConstructionRoadway01/05/28-308-10 months
0918-47-568Dallas06/02/29$8,290,000.00ConstructionRoadwayConstructionRoadway08/04/2830210 months
0131-02-044Lubbock08/04/27$1,622,164.23ConstructionRoadwayConstructionRoadway10/06/2630210 months
0740-02-030Lubbock08/04/27$351,903.99ConstructionRoadwayConstructionRoadway10/06/2630210 months
0079-05-075Fort Worth03/07/28$58,004.10ConstructionRoadwayConstructionRoadway01/01/29-300-10 months
0079-05-076Fort Worth03/07/28$54,084.10ConstructionRoadwayConstructionRoadway01/01/29-300-10 months
0080-01-059Fort Worth03/07/28$47,619.35ConstructionRoadwayConstructionRoadway01/01/29-300-10 months
0259-03-067Fort Worth03/07/28$54,372.42ConstructionRoadwayConstructionRoadway01/01/29-300-10 months
0912-72-722Houston08/13/26$2,156,235.00ConstructionLocal LetConstructionLocal Let05/15/27-275-9 months
2552-03-071El Paso04/06/27$4,417,014.42ConstructionRoadwayConstructionRoadway01/05/28-274-9 months$163,593.124%
0177-06-097Houston03/01/29$4,954,065.00ConstructionRoadwayConstructionRoadway06/01/282739 months
0336-03-082Lufkin01/06/27$2,716,548.07ConstructionRoadwayConstructionRoadway10/05/27-272-9 months$48,618.002%
0018-04-070Laredo07/01/27$752,697.07ConstructionRoadwayConstructionRoadway03/07/28-250-8 months
0909-36-205Waco06/03/28$782,407.41ConstructionLocal LetConstructionLocal Let10/02/272458 months
0002-04-039El Paso05/05/27$274,927.69ConstructionRoadwayConstructionRoadway01/05/28-245-8 months$10,182.504%
0002-07-058El Paso05/05/27$1,688,910.45ConstructionRoadwayConstructionRoadway01/05/28-245-8 months
0003-02-053El Paso05/05/27$740,740.74ConstructionRoadwayConstructionRoadway01/05/28-245-8 months
2326-01-033El Paso05/05/27$416,666.67ConstructionRoadwayConstructionRoadway01/05/28-245-8 months
0190-02-040Tyler08/01/27$200,000.00Non-LetRail - SafetyNon-LetRail - Safety12/03/262418 months
0914-05-194Austin12/04/26$20,620,128.85ConstructionLocal LetConstructionLocal Let08/02/27-241-8 months
0024-08-152San Antonio09/01/27$14,850,000.00ConstructionRoadwayConstructionRoadway01/06/272388 months
0114-11-101Houston06/01/27$6,000,000.00ConstructionRoadwayConstructionRoadway01/05/28-218-7 months
0912-00-703Houston09/01/27$500,000.00ConstructionRail - SafetyConstructionRail - Safety02/02/272117 months
0912-72-611Houston07/08/26$2,402,343.00ConstructionLocal LetConstructionLocal Let12/09/252117 months
3510-03-009Houston04/05/28$52,000,000.00ConstructionRoadwayConstructionRoadway11/01/28-210-7 months$(52,000,000.00)-50%
3510-04-083Houston04/05/28$138,000,000.00ConstructionRoadwayConstructionRoadway11/01/28-210-7 months
0008-08-079Dallas06/03/27$6,822,500.00ConstructionLocal LetConstructionLocal Let12/03/261826 months
1258-04-070Houston08/04/27$2,100,000.00ConstructionRoadwayConstructionRoadway03/03/271545 months
0177-01-123Lufkin07/01/27$2,677,773.44ConstructionRoadwayConstructionRoadway02/02/271495 months
0072-07-077San Antonio04/06/27$3,572,000.00ConstructionRoadwayConstructionRoadway09/01/27-148-5 months
0619-03-065Dallas06/03/27$805,000.00ConstructionRoadwayConstructionRoadway02/01/271224 months
0320-05-016Waco03/03/27$1,940,700.00ConstructionRoadwayConstructionRoadway07/01/27-120-4 months
0320-05-017Waco03/03/27$1,940,700.00ConstructionRoadwayConstructionRoadway07/01/27-120-4 months
0142-04-056San Antonio06/01/27$10,684,500.00ConstructionRoadwayConstructionRoadway02/02/271194 months
0142-05-088San Antonio06/01/27$467,278.00ConstructionRoadwayConstructionRoadway02/02/271194 months
0048-09-033Waco05/05/27$672,672.00ConstructionRoadwayConstructionRoadway09/01/27-119-4 months
0022-01-034Odessa10/06/26$10,000,000.00ConstructionBridgeConstructionBridge02/02/27-119-4 months
0172-06-108Fort Worth08/27/26$389,873.00ConstructionLocal LetConstructionLocal Let05/14/261053 months
1202-02-015Austin07/07/26$1,340,944.00ConstructionLocal LetConstructionLocal Let04/01/26973 months
0371-01-097Yoakum07/01/27$3,267,476.85ConstructionRoadwayConstructionRoadway10/05/27-96-3 months
1303-02-012Yoakum07/01/27$3,549,412.00ConstructionRoadwayConstructionRoadway10/05/27-96-3 months
1794-01-028Lufkin07/01/27$4,138,513.00ConstructionRoadwayConstructionRoadway10/05/27-96-3 months
1794-01-029Lufkin07/01/27$1,483,715.74ConstructionRoadwayConstructionRoadway10/05/27-96-3 months
0840-05-023Yoakum06/01/27$2,170,000.00ConstructionRoadwayConstructionRoadway09/01/27-92-3 months
1875-03-023Lufkin06/01/27$16,643,518.52ConstructionRoadwayConstructionRoadway09/01/27-92-3 months
0916-28-089Corpus Christi02/01/27$395,150.00ConstructionLocal LetConstructionLocal Let11/01/26923 months
0508-01-411Houston12/01/27$1,640,136.00ConstructionRoadwayConstructionRoadway09/01/27913 months
1310-03-029Fort Worth04/06/27$1,475,733.75ConstructionRoadwayConstructionRoadway01/06/27903 months
0018-03-066Laredo03/03/27$25,961,538.46ConstructionRoadwayConstructionRoadway06/01/27-90-3 months
2094-01-074Pharr07/29/26$3,810,405.84ConstructionLocal LetConstructionLocal Let05/01/26893 months
0921-02-565Pharr07/17/26$12,400,000.00ConstructionRoadwayConstructionRoadway05/02/26762 months
0915-17-083San Antonio02/15/27$141,779.00ConstructionLocal LetConstructionLocal Let12/07/26702 months
0909-36-192Waco07/07/26$3,955,000.00ConstructionLocal LetConstructionLocal Let05/02/26662 months
1186-01-104Austin12/04/26$711,000.00ConstructionLocal LetConstructionLocal Let10/01/26642 months
0055-08-120Waco04/06/27$39,892,364.56ConstructionRoadwayConstructionRoadway02/02/27632 months
0440-01-047Austin04/06/27$84,423.03ConstructionRoadwayConstructionRoadway02/02/27632 months
1201-01-016Austin04/06/27$64,740.80ConstructionRoadwayConstructionRoadway02/02/27632 months
1201-02-031Austin04/06/27$69,599.92ConstructionRoadwayConstructionRoadway02/02/27632 months
0271-15-106Houston12/05/28$774,390.00ConstructionRoadwayConstructionRoadway10/04/28622 months
6495-05-001Houston11/10/26$557,000.00MaintenanceRoutine Maintenance ContractMaintenanceRoutine Maintenance Contract09/10/26612 months
0914-05-257Austin02/01/27$9,426,620.00ConstructionLocal LetConstructionLocal Let12/03/26602 months
0271-15-107Houston12/01/27$2,400,000.00ConstructionBridgeConstructionBridge10/05/27572 months
0912-72-833Houston07/10/26$7,516,164.00TransferTransferTransferTransfer05/15/26562 months
0013-10-092Fort Worth09/04/26$449,928.60ConstructionLocal LetConstructionLocal Let07/15/26512 months
0912-72-819Houston07/29/26$17,209,746.00ConstructionLocal LetConstructionLocal Let09/15/26-48-2 months
0178-02-092Houston07/15/26$186,793,464.00Alternative DeliveryDesign BuildAlternative DeliveryDesign Build06/04/26411 month
0178-02-095Houston07/15/26$17,033,792.00Alternative DeliveryDesign BuildAlternative DeliveryDesign Build06/04/26411 month
0178-03-160Houston07/15/26$17,033,792.00Alternative DeliveryDesign BuildAlternative DeliveryDesign Build06/04/26411 month
3510-01-001Houston07/15/26$816,785,287.00Alternative DeliveryDesign BuildAlternative DeliveryDesign Build06/04/26411 month
3510-02-001Houston07/15/26$785,799,942.00Alternative DeliveryDesign BuildAlternative DeliveryDesign Build06/04/26411 month
3510-02-003Houston07/15/26$131,212,051.00Alternative DeliveryDesign BuildAlternative DeliveryDesign Build06/04/26411 month
0017-08-123Laredo09/06/28$100,000.00ConstructionBridgeConstructionBridge08/02/28351 month
0299-14-039Laredo09/06/28$85,000.00ConstructionBridgeConstructionBridge08/02/28351 month
0178-04-008Houston08/02/28$1,190,482.00ConstructionRoadwayConstructionRoadway09/06/28-35-1 month
0178-03-162Houston12/05/28$296,360.00ConstructionRoadwayConstructionRoadway11/01/28341 month
0271-16-172Houston12/05/28$1,265,799.00ConstructionRoadwayConstructionRoadway11/01/28341 month
0017-03-074San Antonio03/07/28$10,627,384.00ConstructionRoadwayConstructionRoadway02/02/28341 month
0143-01-070San Antonio03/07/28$5,943,716.00ConstructionRoadwayConstructionRoadway02/02/28341 month
0192-02-069Houston10/05/27$474,554.00ConstructionRoadwayConstructionRoadway09/01/27341 month
1316-01-068Bryan07/01/27$11,000,000.00ConstructionRoadwayConstructionRoadway08/04/27-34-1 month
1316-01-080Bryan07/01/27$13,000,000.00ConstructionRoadwayConstructionRoadway08/04/27-34-1 month
0177-11-165Houston04/06/27$750,873.00ConstructionRoadwayConstructionRoadway03/03/27341 month
0500-03-654Houston04/06/27$258,965.00ConstructionRoadwayConstructionRoadway03/03/27341 month
0151-09-152Austin10/05/26$292,293.27ConstructionLocal LetConstructionLocal Let09/04/26311 month
1003-01-113Houston10/04/28$447,805.00ConstructionRoadwayConstructionRoadway09/06/282828 days
1524-01-090Houston10/04/28$441,911.00ConstructionRoadwayConstructionRoadway09/06/282828 days
0980-02-020Houston08/04/27$8,353,888.19ConstructionRoadwayConstructionRoadway09/01/27-28-28 days
0196-03-297Dallas07/10/26$4,000,000.00TransferTransferTransferTransfer06/12/262828 days
0192-03-023Houston12/05/28$448,573.00ConstructionRoadwayConstructionRoadway01/01/29-27-27 days
0081-03-069Dallas07/16/26$620,464.93ConstructionLocal LetConstructionLocal Let08/02/26-17-17 days
0918-24-315Dallas08/01/28$1,296,500.00TransferTransferTransferTransfer08/04/28-3-3 days
142 rows · download CSV

Project Type & Subtype Changes

Overall, the project type and subtype mix remains largely stable with a slight shift, as roadway projects now comprise 77.9% of the active pipeline project count. There were 11 type/subtype changes observed, highlighting minimal churn in classifications. Furthermore, 7 projects achieved newly assigned classifications during this period.

SubtypeJul 3Aug 3Δ (pp, n)
Roadway78.2% (4,370)77.9% (4,404)-0.2 (+34)
Bridge13.8% (770)13.8% (781)+0.0 (+11)
Local Let3.3% (183)3.2% (179)-0.1 (-4)
Non Roadway2.0% (110)2.0% (113)+0.0 (+3)
Rail - Safety1.1% (64)1.1% (64)-0.0 (+0)
CSJDistrictEst. Letting DateProject EstimateCurrent TypeCurrent SubtypeType/Subtype ΔPrev. TypePrev. SubtypePrev. CostPrev. DateLetting Δ (days)Letting Date ΔCost Δ%Cost ΔLifecycle
0836-03-075Waco09/04/25$540,374.48Non-LetChange OrderConstruction / Roadway → Non-Let / Change OrderConstructionRoadway$555,819.8609/02/26-363-12 months$(15,445.38)-3%
0598-02-093Houston07/30/26$216,068,000.00Non-LetRoadwayUnassigned → Non-Let / RoadwayUnassignedUnassigned$190,000,000.0008/01/35-3289-9 years$26,068,000.0014%
2717-01-032Pharr08/31/26$0.00Non-LetNon RoadwayNon-Let / Local → Non-Let / Non RoadwayNon-LetLocal$0.0008/31/260
2032-01-012Abilene01/01/27$1,854,893.24Non-LetLocalNon-Let / Roadway → Non-Let / LocalNon-LetRoadway$1,854,893.2401/01/270
0809-04-054Lufkin06/01/27$42,800,000.89ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$42,800,000.8901/01/32-1675-5 years
0809-05-021Lufkin06/01/27$8,200,000.89ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$8,200,000.8901/01/32-1675-5 years
0422-05-011Fort Worth07/01/27$13,592,874.18ConstructionBridgeUnassigned → Construction / BridgeUnassignedUnassigned$13,592,874.1801/01/35-2741-8 years
2920-02-005Austin07/01/27$2,083,536.54ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$2,166,877.7802/01/38-3868-11 years$(83,341.24)-4%
0275-13-075Childress06/01/28$4,100,000.00ConstructionRoadwayConstruction / Bridge → Construction / RoadwayConstructionBridge$4,100,000.0006/01/280
0314-01-086Fort Worth12/05/28$979,785.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$1,933,363.3901/01/32-1122-3 years$(953,578.39)-49%
0314-01-091Fort Worth12/05/28$3,016,004.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$9,269,812.4001/01/32-1122-3 years$(6,253,808.40)-67%
11 rows · download CSV

Cost Changes

The active pipeline value has increased from $31.35B to $33.71B. Cost movements reveal that local let projects faced a decline of -$187.38M, while roadway projects saw an increase of +$284.11M. The largest net cost increase was reported in the Houston district at +$2.19B, while Fort Worth recorded a decrease of -$17.43M. This indicates a trend of repricing within the existing pipeline rather than significant structural changes.

CSJDistrictEst. Letting DateProject EstimateCurrent TypeCurrent SubtypePrev. TypePrev. SubtypePrev. CostCost Δ%Cost ΔLetting Δ (days)Letting Date ΔType/Subtype ΔLifecycle
3586-02-009Laredo07/01/27$20,000,000.00ConstructionRoadwayConstructionRoadway$1.00$19,999,999.001999999900%0
1042-02-029San Antonio09/01/27$8,023,990.00ConstructionRoadwayConstructionRoadway$10.00$8,023,980.0080239800%0
1042-03-017San Antonio09/01/27$3,106,799.00ConstructionRoadwayConstructionRoadway$10.00$3,106,789.0031067890%0
0049-14-015Bryan10/06/26$2,893,248.75ConstructionRoadwayConstructionRoadway$62,315.00$2,830,933.754543%0
0648-03-079Bryan10/06/26$30,081.50ConstructionRoadwayConstructionRoadway$1,597.00$28,484.501784%0
0017-13-013San Antonio10/06/26$776,325.10ConstructionRoadwayConstructionRoadway$76,000.00$700,325.10921%0
1006-02-012Houston03/07/28$6,000,000.00ConstructionRoadwayConstructionRoadway$640,000.00$5,360,000.00838%-543-1 year
0007-04-143Brownwood01/05/28$350,000.00ConstructionBridgeConstructionBridge$75,000.00$275,000.00367%0
0231-01-070Brownwood01/05/28$680,000.00ConstructionBridgeConstructionBridge$175,000.00$505,000.00289%0
0426-02-023Bryan10/06/26$247,877.40ConstructionRoadwayConstructionRoadway$85,136.00$162,741.40191%0
2377-01-051Brownwood01/06/27$2,300,000.00ConstructionRoadwayConstructionRoadway$800,000.00$1,500,000.00188%0
1412-03-045Yoakum06/01/28$695,000.00ConstructionRoadwayConstructionRoadway$250,000.00$445,000.00178%0
0578-02-050Bryan10/06/26$153,975.90ConstructionRoadwayConstructionRoadway$65,836.00$88,139.90134%0
0291-01-053Austin04/06/27$6,462,182.69ConstructionRoadwayConstructionRoadway$2,935,085.58$3,527,097.11120%0
1547-01-052San Antonio10/06/26$1,045,537.95ConstructionRoadwayConstructionRoadway$484,326.00$561,211.95116%0
0636-01-042Brownwood01/06/27$520,000.00ConstructionRoadwayConstructionRoadway$250,000.00$270,000.00108%0
0283-04-038Wichita Falls11/01/28$1,156,308.00ConstructionRoadwayConstructionRoadway$571,016.75$585,291.25103%0
2705-01-017Bryan10/06/26$162,910.80ConstructionRoadwayConstructionRoadway$82,460.00$80,450.8098%0
3544-06-003San Antonio10/06/26$32,384.21ConstructionRoadwayConstructionRoadway$16,400.00$15,984.2197%0
2705-01-016Bryan10/06/26$111,242.80ConstructionRoadwayConstructionRoadway$56,399.00$54,843.8097%0
1015-01-082Dallas10/06/26$339,360.27ConstructionRoadwayConstructionRoadway$174,831.75$164,528.5294%0
2827-01-013Bryan10/06/26$200,579.10ConstructionRoadwayConstructionRoadway$103,660.00$96,919.1094%0
2144-01-016Bryan10/06/26$297,416.25ConstructionRoadwayConstructionRoadway$155,859.00$141,557.2591%0
0098-05-038Childress05/05/27$100,000.00ConstructionBridgeConstructionBridge$1,000,000.00$(900,000.00)-90%0
0254-01-148Corpus Christi10/06/26$570,630.80ConstructionRoadwayConstructionRoadway$303,398.00$267,232.8088%0
0382-03-037Waco09/01/27$146,981.48ConstructionRoadwayConstructionRoadway$1,118,361.11$(971,379.63)-87%0
0057-07-018Bryan10/06/26$187,628.30ConstructionRoadwayConstructionRoadway$101,743.00$85,885.3084%0
1729-01-020San Antonio10/06/26$631,366.19ConstructionRoadwayConstructionRoadway$343,000.00$288,366.1984%0
0057-03-049Bryan10/06/26$13,184.20ConstructionRoadwayConstructionRoadway$69,987.46$(56,803.26)-81%0
0902-90-377Fort Worth01/15/28$449,823.18ConstructionLocal LetConstructionLocal Let$1,965,873.87$(1,516,050.69)-77%0
1092-01-025Dallas10/06/26$171,416.88ConstructionRoadwayConstructionRoadway$653,165.42$(481,748.54)-74%0
0675-07-107Bryan10/06/26$492,511.55ConstructionRoadwayConstructionRoadway$285,893.00$206,618.5572%0
3024-01-008Corpus Christi10/06/26$102,687.00ConstructionRoadwayConstructionRoadway$367,678.00$(264,991.00)-72%0
0598-04-030Houston02/02/27$1,276,256.10ConstructionRoadwayConstructionRoadway$4,200,000.00$(2,923,743.90)-70%0
0853-01-018San Antonio10/06/26$664,644.20ConstructionRoadwayConstructionRoadway$395,009.00$269,635.2068%0
0314-01-091Fort Worth12/05/28$3,016,004.00ConstructionRoadwayUnassignedUnassigned$9,269,812.40$(6,253,808.40)-67%-1122-3 yearsUnassigned → Construction / Roadway
0598-03-062Houston02/02/27$7,526,529.40ConstructionRoadwayConstructionRoadway$4,600,000.00$2,926,529.4064%0
1500-02-015Laredo10/06/26$141,740.76ConstructionRoadwayConstructionRoadway$86,820.00$54,920.7663%0
1039-03-022Brownwood01/05/28$285,000.00ConstructionBridgeConstructionBridge$175,000.00$110,000.0063%0
0289-03-029Brownwood01/05/28$300,000.00ConstructionBridgeConstructionBridge$185,000.00$115,000.0062%0
0987-03-017Austin11/03/26$123,537.07ConstructionRoadwayConstructionRoadway$324,482.69$(200,945.62)-62%0
0073-13-015San Antonio10/06/26$945,061.57ConstructionRoadwayConstructionRoadway$593,223.00$351,838.5759%0
0143-12-006San Antonio10/06/26$46,965.57ConstructionRoadwayConstructionRoadway$109,675.00$(62,709.43)-57%0
1500-01-027San Antonio10/06/26$417,065.52ConstructionRoadwayConstructionRoadway$265,500.00$151,565.5257%0
2238-01-015Bryan10/06/26$87,034.55ConstructionRoadwayConstructionRoadway$201,402.00$(114,367.45)-57%0
3024-02-009Corpus Christi10/06/26$172,199.20ConstructionRoadwayConstructionRoadway$367,678.00$(195,478.80)-53%0
0281-01-038Dallas10/06/26$523,382.75ConstructionRoadwayConstructionRoadway$1,090,833.41$(567,450.66)-52%0
0816-03-026Dallas10/06/26$223,461.31ConstructionRoadwayConstructionRoadway$459,601.38$(236,140.07)-51%0
0442-03-050Dallas12/01/26$491,217.88ConstructionRoadwayConstructionRoadway$997,198.66$(505,980.78)-51%0
0279-02-052Paris04/01/29$100,000.00ConstructionBridgeConstructionBridge$200,000.00$(100,000.00)-50%0
3510-03-009Houston04/05/28$52,000,000.00ConstructionRoadwayConstructionRoadway$104,000,000.00$(52,000,000.00)-50%-210-7 months
0050-07-016Bryan10/06/26$84,161.25ConstructionRoadwayConstructionRoadway$166,780.00$(82,618.75)-50%0
0314-01-086Fort Worth12/05/28$979,785.00ConstructionRoadwayUnassignedUnassigned$1,933,363.39$(953,578.39)-49%-1122-3 yearsUnassigned → Construction / Roadway
1500-03-012San Antonio10/06/26$72,696.83ConstructionRoadwayConstructionRoadway$49,000.00$23,696.8348%0
0280-02-046Dallas10/06/26$1,078,383.96ConstructionRoadwayConstructionRoadway$2,076,918.76$(998,534.80)-48%0
0816-03-025Dallas10/06/26$124,183.31ConstructionRoadwayConstructionRoadway$235,702.32$(111,519.01)-47%0
0029-02-060San Antonio10/06/26$715,223.49ConstructionRoadwayConstructionRoadway$1,334,390.00$(619,166.51)-46%0
0142-02-030San Antonio10/06/26$271,048.91ConstructionRoadwayConstructionRoadway$498,436.00$(227,387.09)-46%0
2358-01-008Corpus Christi10/06/26$189,423.80ConstructionRoadwayConstructionRoadway$130,432.00$58,991.8045%0
2238-02-027Bryan10/06/26$578,915.00ConstructionRoadwayConstructionRoadway$399,656.00$179,259.0045%0
0024-04-073San Antonio10/06/26$932,553.39ConstructionRoadwayConstructionRoadway$1,684,578.00$(752,024.61)-45%0
0792-04-051San Antonio10/06/26$283,721.13ConstructionRoadwayConstructionRoadway$495,000.00$(211,278.87)-43%0
1012-02-045Dallas10/06/26$68,826.14ConstructionRoadwayConstructionRoadway$119,463.46$(50,637.32)-42%0
1062-02-030Houston01/06/27$710,353.56ConstructionRoadwayConstructionRoadway$1,198,253.00$(487,899.44)-41%0
1318-01-022Dallas10/06/26$505,148.53ConstructionRoadwayConstructionRoadway$851,285.89$(346,137.36)-41%0
0526-01-023San Antonio10/06/26$53,938.94ConstructionRoadwayConstructionRoadway$90,851.00$(36,912.06)-41%0
0648-03-081Bryan10/06/26$558,497.65ConstructionRoadwayConstructionRoadway$397,704.38$160,793.2740%0
0320-03-104Austin10/06/26$73,542.88ConstructionBridgeConstructionBridge$123,388.60$(49,845.72)-40%0
0054-05-029Brownwood01/06/27$280,000.00ConstructionRoadwayConstructionRoadway$200,000.00$80,000.0040%0
1739-03-012San Antonio10/06/26$666,184.52ConstructionRoadwayConstructionRoadway$477,750.00$188,434.5239%0
0067-17-039Amarillo10/06/26$880,473.95ConstructionBridgeConstructionBridge$1,450,000.00$(569,526.05)-39%0
1559-01-027Corpus Christi10/06/26$272,289.40ConstructionRoadwayConstructionRoadway$443,420.00$(171,130.60)-39%0
0249-02-026Wichita Falls10/06/26$2,929,721.75ConstructionRoadwayConstructionRoadway$4,723,750.00$(1,794,028.25)-38%0
0116-04-113Bryan10/06/26$1,673,290.05ConstructionRoadwayConstructionRoadway$1,214,668.00$458,622.0538%0
0168-08-076Amarillo10/06/26$841,693.75ConstructionBridgeConstructionBridge$1,350,000.00$(508,306.25)-38%0
0048-04-111Dallas12/01/26$1,409,093.91ConstructionRoadwayConstructionRoadway$1,025,160.00$383,933.9137%0
0008-02-078Fort Worth11/03/26$632,887.20ConstructionRoadwayConstructionRoadway$1,011,008.24$(378,121.04)-37%-701-2 years
2175-03-011San Antonio10/06/26$28,031.32ConstructionRoadwayConstructionRoadway$44,650.00$(16,618.68)-37%0
0048-08-060Dallas12/01/26$3,033,308.84ConstructionRoadwayConstructionRoadway$2,210,949.60$822,359.2437%0
3426-01-005Dallas10/06/26$275,353.38ConstructionRoadwayConstructionRoadway$433,918.76$(158,565.38)-37%0
0426-01-014Bryan10/06/26$472,171.15ConstructionRoadwayConstructionRoadway$738,017.00$(265,845.85)-36%0
2512-03-010Dallas10/06/26$341,389.85ConstructionRoadwayConstructionRoadway$529,485.68$(188,095.83)-36%0
0299-14-037Laredo03/01/29$1,559,186.61ConstructionRoadwayConstructionRoadway$1,151,274.60$407,912.0135%0
0045-21-024Paris01/06/27$2,989,000.00ConstructionBridgeConstructionBridge$2,207,000.00$782,000.0035%0
2556-02-013San Antonio10/06/26$224,928.25ConstructionRoadwayConstructionRoadway$347,521.00$(122,592.75)-35%0
0037-01-046San Antonio10/06/26$432,668.31ConstructionRoadwayConstructionRoadway$666,418.00$(233,749.69)-35%0
0025-03-108San Antonio10/06/26$98,608.50ConstructionRoadwayConstructionRoadway$150,609.00$(52,000.50)-35%0
0150-05-053Austin10/04/28$544,642.86ConstructionBridgeConstructionBridge$830,357.14$(285,714.28)-34%0
0517-01-050San Antonio10/06/26$444,729.61ConstructionRoadwayConstructionRoadway$331,066.00$113,663.6134%0
0855-04-033San Antonio10/06/26$540,343.81ConstructionRoadwayConstructionRoadway$822,800.00$(282,456.19)-34%0
0873-01-030Pharr10/06/26$19,356.00ConstructionRoadwayConstructionRoadway$29,450.00$(10,094.00)-34%0
1396-01-016Dallas10/06/26$381,875.89ConstructionRoadwayConstructionRoadway$570,739.99$(188,864.10)-33%0
1564-01-037Bryan10/06/26$54,246.90ConstructionRoadwayConstructionRoadway$40,759.00$13,487.9033%0
0328-01-016San Antonio10/06/26$516,078.74ConstructionRoadwayConstructionRoadway$387,945.00$128,133.7433%0
0179-04-112Yoakum10/04/28$800,000.00ConstructionRoadwayConstructionRoadway$602,000.00$198,000.0033%0
2525-01-020Yoakum10/04/28$800,000.00ConstructionRoadwayConstructionRoadway$602,000.00$198,000.0033%0
0366-01-080Austin11/03/26$396,158.18ConstructionRoadwayConstructionRoadway$589,819.23$(193,661.05)-33%0
0285-03-066Austin11/03/26$966,889.00ConstructionNon RoadwayConstructionNon Roadway$1,439,357.92$(472,468.92)-33%0
0921-02-528Pharr10/06/26$84,487.25ConstructionRoadwayConstructionRoadway$63,969.00$20,518.2532%0
0067-17-040Amarillo10/06/26$850,003.00ConstructionBridgeConstructionBridge$1,250,000.00$(399,997.00)-32%0
2815-01-010Dallas10/06/26$222,479.71ConstructionRoadwayConstructionRoadway$326,937.80$(104,458.09)-32%0
2850-01-019Bryan10/06/26$378,523.00ConstructionRoadwayConstructionRoadway$556,174.08$(177,651.08)-32%0
0697-03-034Dallas10/06/26$272,745.38ConstructionRoadwayConstructionRoadway$399,567.90$(126,822.52)-32%0
0173-04-062Dallas10/06/26$69,047.73ConstructionRoadwayConstructionRoadway$52,898.66$16,149.0731%0
1974-01-013Dallas10/06/26$285,309.49ConstructionRoadwayConstructionRoadway$410,380.52$(125,071.03)-30%0
2343-01-040Corpus Christi10/06/26$253,068.80ConstructionRoadwayConstructionRoadway$362,659.00$(109,590.20)-30%0
3544-05-003San Antonio10/06/26$81,874.56ConstructionRoadwayConstructionRoadway$62,963.00$18,911.5630%0
3544-04-017San Antonio10/06/26$151,480.32ConstructionRoadwayConstructionRoadway$116,575.00$34,905.3230%0
0162-09-043Dallas10/06/26$964,677.94ConstructionRoadwayConstructionRoadway$1,376,529.70$(411,851.76)-30%0
0792-03-011San Antonio10/06/26$87,967.48ConstructionRoadwayConstructionRoadway$125,000.00$(37,032.52)-30%0
0204-01-075Austin10/06/26$48,395.78ConstructionBridgeConstructionBridge$68,546.50$(20,150.72)-29%0
3075-02-014Corpus Christi10/06/26$14,729.30ConstructionRoadwayConstructionRoadway$11,415.00$3,314.3029%0
0366-09-034San Antonio10/06/26$296,558.53ConstructionRoadwayConstructionRoadway$417,500.00$(120,941.47)-29%0
0299-04-088Laredo03/01/29$3,870,348.21ConstructionRoadwayConstructionRoadway$3,004,045.00$866,303.2129%0
0092-05-058Dallas10/06/26$3,246,330.95ConstructionRoadwayConstructionRoadway$4,553,198.71$(1,306,867.76)-29%0
0321-01-056Austin10/06/26$485,258.55ConstructionBridgeConstructionBridge$679,854.80$(194,596.25)-29%0
3279-01-009Corpus Christi10/06/26$380,814.20ConstructionRoadwayConstructionRoadway$532,557.00$(151,742.80)-28%0
2452-05-005San Antonio10/06/26$34,493.92ConstructionRoadwayConstructionRoadway$48,200.00$(13,706.08)-28%0
1015-02-017Dallas10/06/26$165,018.52ConstructionRoadwayConstructionRoadway$229,809.76$(64,791.24)-28%0
0483-02-022San Antonio10/06/26$691,761.64ConstructionRoadwayConstructionRoadway$963,132.00$(271,370.36)-28%0
0675-07-113Bryan10/06/26$86,385.15ConstructionRoadwayConstructionRoadway$67,400.00$18,985.1528%0
0054-06-109Brownwood01/06/27$2,050,000.00ConstructionRoadwayConstructionRoadway$1,600,000.00$450,000.0028%0
0057-02-040Bryan10/06/26$83,548.75ConstructionRoadwayConstructionRoadway$115,936.13$(32,387.38)-28%0
0483-05-011San Antonio10/06/26$5,515.85ConstructionRoadwayConstructionRoadway$4,317.00$1,198.8528%0
0122-01-047Dallas10/06/26$706,835.31ConstructionRoadwayConstructionRoadway$978,043.07$(271,207.76)-28%0
1209-02-023Corpus Christi10/06/26$248,688.60ConstructionRoadwayConstructionRoadway$340,501.00$(91,812.40)-27%0
0574-01-034Dallas10/06/26$496,905.09ConstructionRoadwayConstructionRoadway$676,908.40$(180,003.31)-27%0
3330-01-011Waco11/03/26$302,164.80ConstructionRoadwayConstructionRoadway$411,155.00$(108,990.20)-27%0
0349-01-033Corpus Christi10/06/26$610,807.80ConstructionRoadwayConstructionRoadway$829,681.00$(218,873.20)-26%0
0114-01-070Austin11/03/26$439,821.46ConstructionNon RoadwayConstructionNon Roadway$596,153.85$(156,332.39)-26%0
1899-02-023San Antonio10/06/26$363,137.27ConstructionRoadwayConstructionRoadway$489,943.00$(126,805.73)-26%0
1471-02-011Corpus Christi10/06/26$271,948.60ConstructionRoadwayConstructionRoadway$364,606.00$(92,657.40)-25%0
0197-05-066Dallas10/06/26$32,650.38ConstructionRoadwayConstructionRoadway$43,746.32$(11,095.94)-25%0
0280-04-009Dallas10/06/26$70,773.60ConstructionRoadwayConstructionRoadway$94,741.58$(23,967.98)-25%0
0992-01-023Corpus Christi10/06/26$473,580.60ConstructionRoadwayConstructionRoadway$633,621.00$(160,040.40)-25%0
0092-03-064Dallas10/06/26$4,017,336.55ConstructionRoadwayConstructionRoadway$5,342,838.96$(1,325,502.41)-25%0
0067-01-088Amarillo10/06/26$1,223,017.95ConstructionBridgeConstructionBridge$1,620,000.00$(396,982.05)-25%0
1052-01-087Corpus Christi10/06/26$241,756.40ConstructionRoadwayConstructionRoadway$317,948.00$(76,191.60)-24%0
0857-01-040San Antonio10/06/26$151,702.19ConstructionRoadwayConstructionRoadway$122,600.00$29,102.1924%0
1209-01-035Corpus Christi10/06/26$285,214.90ConstructionRoadwayConstructionRoadway$373,805.00$(88,590.10)-24%0
0016-03-125Austin11/03/26$2,827,670.53ConstructionRoadwayConstructionRoadway$3,696,666.35$(868,995.82)-24%0
0738-03-036Corpus Christi10/06/26$270,192.60ConstructionRoadwayConstructionRoadway$352,457.00$(82,264.40)-23%0
0092-02-145Dallas10/06/26$981,366.75ConstructionRoadwayConstructionRoadway$1,278,476.75$(297,110.00)-23%0
0051-09-128Houston08/05/26$2,897,520.60ConstructionRoadwayConstructionRoadway$3,767,287.50$(869,766.90)-23%0
0280-03-005Dallas10/06/26$167,428.56ConstructionRoadwayConstructionRoadway$217,333.66$(49,905.10)-23%0
0181-01-071Abilene09/02/26$331,750.00ConstructionRoadwayConstructionRoadway$429,762.50$(98,012.50)-23%0
0441-09-054Odessa08/05/26$21,197,037.88ConstructionRoadwayConstructionRoadway$17,312,839.88$3,884,198.0022%0
1548-01-018San Antonio10/06/26$348,599.39ConstructionRoadwayConstructionRoadway$449,250.00$(100,650.61)-22%0
2255-02-030San Antonio10/06/26$413,907.26ConstructionRoadwayConstructionRoadway$339,191.00$74,716.2622%0
2948-02-015Bryan10/06/26$406,879.55ConstructionRoadwayConstructionRoadway$333,793.00$73,086.5522%0
0249-03-056Wichita Falls10/06/26$216,523.18ConstructionRoadwayConstructionRoadway$276,250.00$(59,726.82)-22%0
0506-02-026Bryan10/06/26$322,440.25ConstructionRoadwayConstructionRoadway$265,181.00$57,259.2522%0
0024-02-081San Antonio10/06/26$1,487,182.70ConstructionRoadwayConstructionRoadway$1,224,062.00$263,120.7022%0
1558-02-040Corpus Christi10/06/26$226,727.60ConstructionRoadwayConstructionRoadway$288,752.00$(62,024.40)-21%0
0643-05-066Bryan10/06/26$773,518.65ConstructionRoadwayConstructionRoadway$637,560.00$135,958.6521%0
3544-07-002San Antonio10/06/26$40,084.08ConstructionRoadwayConstructionRoadway$33,074.00$7,010.0821%0
0215-09-037San Antonio10/06/26$307,386.24ConstructionRoadwayConstructionRoadway$385,985.00$(78,598.76)-20%0
1899-01-020San Antonio10/06/26$126,868.06ConstructionRoadwayConstructionRoadway$159,286.00$(32,417.94)-20%0
0068-05-039Lubbock09/02/26$4,420,417.03ConstructionRoadwayConstructionRoadway$3,673,081.36$747,335.6720%0
0050-03-111Bryan10/06/26$216,170.10ConstructionRoadwayConstructionRoadway$179,625.60$36,544.5020%0
0008-07-034Fort Worth11/03/28$4,331,078.00ConstructionLocal LetConstructionLocal Let$3,604,001.50$727,076.5020%0
0045-20-030Paris01/06/27$619,000.00ConstructionBridgeConstructionBridge$774,000.00$(155,000.00)-20%0
1239-01-034Brownwood01/05/28$150,000.00ConstructionBridgeConstructionBridge$125,000.00$25,000.0020%0
0918-47-544Dallas05/05/27$514,990.58ConstructionRoadwayConstructionRoadway$643,616.00$(128,625.42)-20%0
0135-04-043Dallas10/06/26$60,503.14ConstructionRoadwayConstructionRoadway$75,509.20$(15,006.06)-20%0
0024-05-105San Antonio10/06/26$116,384.02ConstructionRoadwayConstructionRoadway$145,199.00$(28,814.98)-20%0
1083-01-013Corpus Christi10/06/26$344,569.00ConstructionRoadwayConstructionRoadway$427,808.00$(83,239.00)-19%0
0215-11-026San Antonio10/06/26$186,352.80ConstructionRoadwayConstructionRoadway$156,200.00$30,152.8019%0
0270-08-024Corpus Christi10/06/26$759,771.30ConstructionRoadwayConstructionRoadway$936,058.00$(176,286.70)-19%0
0366-03-075San Antonio10/06/26$683,692.94ConstructionRoadwayConstructionRoadway$575,570.00$108,122.9419%0
0172-09-047Fort Worth09/02/26$4,776,312.18ConstructionRoadwayConstructionRoadway$4,029,170.17$747,142.0119%0
3441-01-004Corpus Christi10/06/26$163,595.60ConstructionRoadwayConstructionRoadway$200,517.00$(36,921.40)-18%0
0197-12-008Dallas10/06/26$239,271.24ConstructionRoadwayConstructionRoadway$202,195.99$37,075.2518%0
0540-01-053Bryan10/06/26$870,783.25ConstructionRoadwayConstructionRoadway$738,283.00$132,500.2518%0
2142-02-019Corpus Christi10/06/26$107,978.20ConstructionRoadwayConstructionRoadway$131,536.00$(23,557.80)-18%0
0516-02-034Corpus Christi10/06/26$285,606.10ConstructionRoadwayConstructionRoadway$346,779.00$(61,172.90)-18%0
0143-14-009San Antonio10/06/26$25,459.46ConstructionRoadwayConstructionRoadway$30,910.00$(5,450.54)-18%0
0275-01-265Amarillo03/01/29$2,235,776.00ConstructionRoadwayConstructionRoadway$1,901,170.00$334,606.0018%0
2452-04-020San Antonio10/06/26$201,314.19ConstructionRoadwayConstructionRoadway$171,200.00$30,114.1918%0
0086-11-054Corpus Christi10/06/26$1,034,740.80ConstructionRoadwayConstructionRoadway$1,246,242.00$(211,501.20)-17%0
0353-01-031Fort Worth11/03/26$654,905.19ConstructionRoadwayConstructionRoadway$561,319.55$93,585.6417%0
0014-01-031Fort Worth08/02/28$2,730,508.00ConstructionBridgeConstructionBridge$2,341,663.00$388,845.0017%0
0648-02-022Bryan10/06/26$246,338.00ConstructionRoadwayConstructionRoadway$211,381.63$34,956.3717%0
0916-27-016Corpus Christi12/01/26$882,212.21ConstructionBridgeConstructionBridge$1,050,000.00$(167,787.79)-16%0
0918-47-537Dallas10/05/27$693,359.89ConstructionRoadwayConstructionRoadway$598,483.05$94,876.8416%0
0552-02-034Bryan10/06/26$399,509.95ConstructionRoadwayConstructionRoadway$345,147.26$54,362.6916%0
1785-01-044Dallas01/05/28$513,849.71ConstructionRoadwayConstructionRoadway$609,042.00$(95,192.29)-16%0
1722-01-020Bryan10/06/26$472,621.30ConstructionRoadwayConstructionRoadway$409,502.00$63,119.3015%0
0143-11-006San Antonio10/06/26$58,969.58ConstructionRoadwayConstructionRoadway$69,700.00$(10,730.42)-15%0
1137-02-044Pharr10/06/26$85,827.65ConstructionRoadwayConstructionRoadway$101,055.00$(15,227.35)-15%0
0102-02-106Corpus Christi10/06/26$580,472.70ConstructionRoadwayConstructionRoadway$681,589.00$(101,116.30)-15%0
1451-01-032Dallas10/06/26$740,028.52ConstructionRoadwayConstructionRoadway$867,504.82$(127,476.30)-15%0
0015-13-441Austin11/03/26$93,710,663.04ConstructionRoadwayConstructionRoadway$81,730,769.23$11,979,893.8115%0
0387-01-016Dallas10/06/26$6,915,964.31ConstructionRoadwayConstructionRoadway$6,039,010.45$876,953.8615%0
1196-02-016Corpus Christi10/06/26$187,060.20ConstructionRoadwayConstructionRoadway$218,613.00$(31,552.80)-14%0
0092-03-067Dallas10/06/26$3,202,034.00ConstructionRoadwayConstructionRoadway$3,720,762.00$(518,728.00)-14%0
0943-04-037Corpus Christi10/06/26$763,048.80ConstructionRoadwayConstructionRoadway$886,353.00$(123,304.20)-14%0
0081-04-046Dallas01/05/28$587,379.76ConstructionRoadwayConstructionRoadway$682,245.00$(94,865.24)-14%0
1325-02-017Bryan10/06/26$206,462.55ConstructionRoadwayConstructionRoadway$181,533.00$24,929.5514%0
0598-02-093Houston07/30/26$216,068,000.00Non-LetRoadwayUnassignedUnassigned$190,000,000.00$26,068,000.0014%-3289-9 yearsUnassigned → Non-Let / Roadway
1327-02-026Bryan10/06/26$323,599.25ConstructionRoadwayConstructionRoadway$284,607.00$38,992.2514%0
1145-02-023Bryan10/06/26$636,717.80ConstructionRoadwayConstructionRoadway$560,964.00$75,753.8014%0
3033-02-015Bryan10/06/26$198,431.25ConstructionRoadwayConstructionRoadway$174,880.00$23,551.2513%0
3510-04-070Houston08/05/26$19,121,150.30ConstructionRoadwayConstructionRoadway$16,853,512.33$2,267,637.9713%0
0921-02-529Pharr10/06/26$409,038.76ConstructionRoadwayConstructionRoadway$360,698.00$48,340.7613%0
2346-02-010Corpus Christi10/06/26$43,712.60ConstructionRoadwayConstructionRoadway$50,385.00$(6,672.40)-13%0
0014-15-034Fort Worth08/05/26$19,177,771.10ConstructionRoadwayConstructionRoadway$16,946,001.10$2,231,770.0013%0
0506-05-010Bryan10/06/26$13,363.50ConstructionRoadwayConstructionRoadway$15,346.00$(1,982.50)-13%0
0337-03-020Austin09/02/26$2,723,608.24ConstructionRoadwayConstructionRoadway$3,125,366.79$(401,758.55)-13%0
0738-03-035Corpus Christi10/06/26$25,618.00ConstructionRoadwayConstructionRoadway$29,335.00$(3,717.00)-13%0
1553-01-015Corpus Christi10/06/26$477,164.00ConstructionRoadwayConstructionRoadway$543,321.00$(66,157.00)-12%0
0369-01-042San Antonio10/06/26$57,471.24ConstructionRoadwayConstructionRoadway$51,250.00$6,221.2412%0
2104-01-016San Antonio10/06/26$232,324.89ConstructionRoadwayConstructionRoadway$207,750.00$24,574.8912%0
0197-13-007Dallas10/06/26$197,779.93ConstructionRoadwayConstructionRoadway$223,904.41$(26,124.48)-12%0
2528-01-006Odessa08/05/26$8,844,235.35ConstructionRoadwayConstructionRoadway$7,922,603.47$921,631.8812%0
0648-04-005Bryan10/06/26$225,818.85ConstructionRoadwayConstructionRoadway$202,440.00$23,378.8512%0
0921-02-527Pharr10/06/26$122,310.50ConstructionRoadwayConstructionRoadway$138,101.00$(15,790.50)-11%0
3055-01-011Houston09/02/26$137,388.48ConstructionRoadwayConstructionRoadway$154,991.03$(17,602.55)-11%0
0981-02-014Houston09/02/26$71,481.66ConstructionRoadwayConstructionRoadway$80,542.96$(9,061.30)-11%0
0856-02-013San Antonio10/06/26$227,315.29ConstructionRoadwayConstructionRoadway$256,000.00$(28,684.71)-11%0
1685-05-140Houston08/05/26$2,203,492.80ConstructionRoadwayConstructionRoadway$2,479,057.90$(275,565.10)-11%0
0092-06-114Dallas10/06/26$7,283,254.00ConstructionRoadwayConstructionRoadway$8,192,021.25$(908,767.25)-11%0
0092-04-087Dallas10/06/26$7,432,853.20ConstructionRoadwayConstructionRoadway$8,347,322.50$(914,469.30)-11%0
0161-01-033Laredo03/01/29$1,595,078.57ConstructionRoadwayConstructionRoadway$1,438,067.40$157,011.1711%0
0506-04-027Bryan10/06/26$264,189.80ConstructionRoadwayConstructionRoadway$238,259.00$25,930.8011%0
0990-01-013Corpus Christi10/06/26$608,452.20ConstructionRoadwayConstructionRoadway$682,537.00$(74,084.80)-11%0
1844-01-032Houston09/02/26$87,577.43ConstructionRoadwayConstructionRoadway$98,200.58$(10,623.15)-11%0
0613-02-071San Antonio10/06/26$288,801.32ConstructionRoadwayConstructionRoadway$260,631.00$28,170.3211%0
0273-04-051Austin09/02/28$498,198.21ConstructionLocal LetConstructionLocal Let$557,981.88$(59,783.67)-11%0
1558-03-125Corpus Christi10/06/26$752,751.60ConstructionRoadwayConstructionRoadway$842,086.00$(89,334.40)-11%0
0944-01-029Bryan10/06/26$243,284.55ConstructionRoadwayConstructionRoadway$219,986.00$23,298.5511%0
0027-10-074Houston08/05/26$1,782,087.46ConstructionBridgeConstructionBridge$1,986,114.00$(204,026.54)-10%0
1122-01-034Corpus Christi10/06/26$12,832,486.60ConstructionRoadwayConstructionRoadway$14,250,000.00$(1,417,513.40)-10%0
0204-06-068Bryan10/06/26$469,399.50ConstructionRoadwayConstructionRoadway$519,983.00$(50,583.50)-10%0
3544-06-004San Antonio10/06/26$58,087.54ConstructionRoadwayConstructionRoadway$52,952.00$5,135.5410%0
0092-05-061Dallas10/06/26$4,248,174.25ConstructionRoadwayConstructionRoadway$4,700,639.25$(452,465.00)-10%0
1739-04-015San Antonio10/06/26$255,431.71ConstructionRoadwayConstructionRoadway$282,150.00$(26,718.29)-9%0
1147-03-017Bryan10/06/26$369,887.95ConstructionRoadwayConstructionRoadway$337,918.00$31,969.959%0
1122-01-036Corpus Christi10/06/26$118,519.80ConstructionRoadwayConstructionRoadway$108,350.00$10,169.809%0
1741-02-039San Antonio10/06/26$235,139.08ConstructionRoadwayConstructionRoadway$215,050.00$20,089.089%0
0267-08-008Bryan10/06/26$114,284.75ConstructionRoadwayConstructionRoadway$104,671.00$9,613.759%0
0187-05-068Houston09/02/26$352,056.55ConstructionRoadwayConstructionRoadway$322,456.55$29,600.009%0
0095-12-003Dallas10/06/26$19,676.50ConstructionRoadwayConstructionRoadway$21,625.24$(1,948.74)-9%0
0168-03-040Lubbock10/06/26$1,568,633.25ConstructionRoadwayConstructionRoadway$1,720,122.19$(151,488.94)-9%0
0093-01-110Dallas10/06/26$7,164,958.00ConstructionRoadwayConstructionRoadway$7,855,998.00$(691,040.00)-9%0
0009-11-248Dallas10/06/26$52,122,703.81ConstructionRoadwayConstructionRoadway$57,043,890.08$(4,921,186.27)-9%0
0209-05-054Bryan10/06/26$996,837.10ConstructionRoadwayConstructionRoadway$1,090,527.00$(93,689.90)-9%0
0166-01-061Dallas10/06/26$3,764,545.50ConstructionRoadwayConstructionRoadway$4,115,608.25$(351,062.75)-9%0
0500-03-664Houston08/05/26$4,502,236.90ConstructionRoadwayConstructionRoadway$4,921,686.24$(419,449.34)-9%0
0215-11-025San Antonio10/06/26$307,684.47ConstructionRoadwayConstructionRoadway$335,700.00$(28,015.53)-8%0
1739-01-015Corpus Christi10/06/26$6,691,123.84ConstructionRoadwayConstructionRoadway$7,300,000.00$(608,876.16)-8%0
0483-03-036San Antonio10/06/26$561,438.93ConstructionRoadwayConstructionRoadway$611,601.00$(50,162.07)-8%0
0738-02-028Corpus Christi10/06/26$178,349.20ConstructionRoadwayConstructionRoadway$164,992.00$13,357.208%0
0173-05-044Dallas10/06/26$533,456.92ConstructionRoadwayConstructionRoadway$579,192.66$(45,735.74)-8%0
0912-56-059Houston10/06/26$1,131,295.70ConstructionBridgeConstructionBridge$1,227,767.00$(96,471.30)-8%0
1159-02-041Dallas10/06/26$570,893.19ConstructionRoadwayConstructionRoadway$618,897.73$(48,004.54)-8%0
1754-02-033Austin05/05/27$13,817,307.69ConstructionRoadwayConstructionRoadway$12,850,961.54$966,346.158%0
1402-02-020Bryan10/06/26$425,658.95ConstructionRoadwayConstructionRoadway$396,773.00$28,885.957%0
1844-02-025Houston09/02/26$126,419.79ConstructionRoadwayConstructionRoadway$136,321.34$(9,901.55)-7%0
1009-01-044San Antonio10/06/26$361,666.47ConstructionRoadwayConstructionRoadway$389,823.00$(28,156.53)-7%0
0050-03-110Bryan10/06/26$152,320.65ConstructionRoadwayConstructionRoadway$142,148.16$10,172.497%0
3510-04-072Houston08/05/26$12,602,101.49ConstructionRoadwayConstructionRoadway$11,775,459.70$826,641.797%0
2132-01-014Bryan10/06/26$493,814.90ConstructionRoadwayConstructionRoadway$462,724.00$31,090.907%0
0114-01-071Austin11/03/26$3,768,059.17ConstructionNon RoadwayConstructionNon Roadway$4,038,461.54$(270,402.37)-7%0
0944-01-030Bryan10/06/26$236,822.70ConstructionRoadwayConstructionRoadway$221,972.00$14,850.707%0
1205-01-018Corpus Christi10/06/26$542,878.40ConstructionRoadwayConstructionRoadway$581,658.00$(38,779.60)-7%0
0022-04-021Laredo03/01/29$11,464,725.00ConstructionRoadwayConstructionRoadway$10,763,000.85$701,724.157%0
0013-05-046Wichita Falls08/05/26$15,521,039.92ConstructionSafety Rest AreaConstructionSafety Rest Area$14,570,882.56$950,157.367%0
0143-03-049San Antonio10/06/26$47,428,077.66ConstructionRoadwayConstructionRoadway$50,707,452.96$(3,279,375.30)-6%0
0016-08-053San Antonio12/01/26$1,127,594.15ConstructionRoadwayConstructionRoadway$1,060,000.00$67,594.156%0
0051-09-127Houston09/02/26$2,526,048.60ConstructionNon RoadwayConstructionNon Roadway$2,378,421.60$147,627.006%0
0168-04-019Lubbock10/06/26$649,207.75ConstructionRoadwayConstructionRoadway$692,068.47$(42,860.72)-6%0
0909-40-091Waco08/04/27$553,846.15ConstructionBridgeConstructionBridge$590,000.00$(36,153.85)-6%0
2337-02-012Bryan10/06/26$586,040.60ConstructionRoadwayConstructionRoadway$623,145.60$(37,105.00)-6%0
0903-28-073Wichita Falls09/02/26$1,165,961.87ConstructionBridgeConstructionBridge$1,239,741.87$(73,780.00)-6%0
0128-04-045Brownwood01/06/27$2,800,000.00ConstructionRoadwayConstructionRoadway$2,644,230.00$155,770.006%0
0912-31-343Houston01/05/28$529,109.68ConstructionBridgeConstructionBridge$500,000.00$29,109.686%0
1003-01-105Houston01/05/28$4,820,000.00ConstructionBridgeConstructionBridge$5,116,513.00$(296,513.00)-6%0
0648-03-084Bryan10/06/26$178,377.00ConstructionRoadwayConstructionRoadway$168,866.00$9,511.006%0
0173-04-063Dallas09/02/26$949,220.25ConstructionRoadwayConstructionRoadway$900,431.25$48,789.005%0
1088-01-025Corpus Christi10/06/26$465,110.00ConstructionRoadwayConstructionRoadway$491,228.00$(26,118.00)-5%0
1414-03-043Houston10/06/26$1,078,721.72ConstructionRoadwayConstructionRoadway$1,027,880.00$50,841.725%0
2830-02-014Bryan10/06/26$308,332.35ConstructionRoadwayConstructionRoadway$293,832.00$14,500.355%0
1414-01-025Houston09/02/26$391,484.38ConstructionRoadwayConstructionRoadway$411,754.93$(20,270.55)-5%0
0354-04-043Odessa12/01/26$26,242,851.29ConstructionRoadwayConstructionRoadway$25,039,685.33$1,203,165.965%0
0675-04-089Bryan10/06/26$71,800.65ConstructionRoadwayConstructionRoadway$68,568.00$3,232.655%0
0027-08-147Houston08/05/26$52,496,966.16ConstructionRoadwayConstructionRoadway$54,960,380.56$(2,463,414.40)-4%0
0050-06-108Houston08/05/26$1,357,254.35ConstructionBridgeConstructionBridge$1,299,070.05$58,184.304%0
0865-01-118Pharr09/02/26$419,668.34ConstructionRoadwayConstructionRoadway$401,878.34$17,790.004%0
3510-04-069Houston08/05/26$26,519,488.25ConstructionRoadwayConstructionRoadway$27,634,165.45$(1,114,677.20)-4%0
2920-02-005Austin07/01/27$2,083,536.54ConstructionRoadwayUnassignedUnassigned$2,166,877.78$(83,341.24)-4%-3868-11 yearsUnassigned → Construction / Roadway
0002-04-039El Paso05/05/27$274,927.69ConstructionRoadwayConstructionRoadway$264,745.19$10,182.504%-245-8 months
2552-03-071El Paso04/06/27$4,417,014.42ConstructionRoadwayConstructionRoadway$4,253,421.30$163,593.124%-274-9 months
0104-07-027El Paso12/01/26$1,601,075.00ConstructionRoadwayConstructionRoadway$1,541,775.93$59,299.074%-365-1 year
0485-01-026El Paso12/01/26$1,919,937.50ConstructionRoadwayConstructionRoadway$1,848,828.70$71,108.804%-365-1 year
0485-02-018El Paso12/01/26$1,313,086.54ConstructionRoadwayConstructionRoadway$1,264,453.70$48,632.844%-365-1 year
0410-02-047Paris10/06/26$9,134,695.27ConstructionRoadwayConstructionRoadway$8,800,000.00$334,695.274%0
0902-20-238Fort Worth08/05/26$854,301.50ConstructionBridgeConstructionBridge$824,349.50$29,952.004%0
0358-03-040El Paso12/05/28$2,276,633.93ConstructionRoadwayConstructionRoadway$2,360,953.70$(84,319.77)-4%3701 year
0358-04-019El Paso12/05/28$2,285,513.39ConstructionRoadwayConstructionRoadway$2,370,162.04$(84,648.65)-4%3701 year
0100-08-108Corpus Christi10/06/26$365,022.00ConstructionRoadwayConstructionRoadway$378,254.00$(13,232.00)-4%0
0047-06-178Dallas09/02/26$1,127,227.75ConstructionRoadwayConstructionRoadway$1,167,955.25$(40,727.50)-3%0
0976-03-120Houston09/02/26$460,985.44ConstructionRoadwayConstructionRoadway$477,545.44$(16,560.00)-3%0
0100-08-107Corpus Christi10/06/26$345,930.00ConstructionRoadwayConstructionRoadway$358,043.00$(12,113.00)-3%0
3510-04-071Houston08/05/26$15,647,807.69ConstructionRoadwayConstructionRoadway$16,148,907.85$(501,100.16)-3%0
0427-01-042Paris09/02/26$1,731,524.25ConstructionBridgeConstructionBridge$1,786,746.95$(55,222.70)-3%0
0578-03-054Bryan10/06/26$821,766.65ConstructionRoadwayConstructionRoadway$798,159.00$23,607.653%0
0573-02-008Austin09/02/26$5,431,676.47ConstructionRoadwayConstructionRoadway$5,595,395.23$(163,718.76)-3%0
0410-03-020Dallas10/06/26$124,285.46ConstructionRoadwayConstructionRoadway$128,004.79$(3,719.33)-3%0
0236-01-024San Antonio10/06/26$257,793.75ConstructionRoadwayConstructionRoadway$265,286.00$(7,492.25)-3%0
0836-03-075Waco09/04/25$540,374.48Non-LetChange OrderConstructionRoadway$555,819.86$(15,445.38)-3%-363-12 monthsConstruction / Roadway → Non-Let / Change Order
1223-01-050Bryan10/06/26$227,749.95ConstructionRoadwayConstructionRoadway$221,760.00$5,989.953%0
0848-02-010San Antonio10/06/26$189,288.61ConstructionRoadwayConstructionRoadway$194,500.00$(5,211.39)-3%0
0204-07-057Bryan10/06/26$445,864.90ConstructionRoadwayConstructionRoadway$457,801.00$(11,936.10)-3%0
1564-01-038Bryan10/06/26$30,998.60ConstructionRoadwayConstructionRoadway$30,337.00$661.602%0
0902-20-233Fort Worth05/05/27$1,201,880.91ConstructionBridgeConstructionBridge$1,176,674.45$25,206.462%0
0912-34-209Houston10/06/26$1,107,896.28ConstructionBridgeConstructionBridge$1,085,413.00$22,483.282%0
1068-01-242Fort Worth02/02/28$3,057,330.65ConstructionRoadwayConstructionRoadway$3,000,643.80$56,686.852%0
0336-03-082Lufkin01/06/27$2,716,548.07ConstructionRoadwayConstructionRoadway$2,667,930.07$48,618.002%-272-9 months
0918-47-542Dallas04/06/27$916,907.25ConstructionRoadwayConstructionRoadway$902,431.20$14,476.052%0
0675-04-092Bryan10/06/26$183,527.75ConstructionRoadwayConstructionRoadway$186,323.00$(2,795.25)-2%0
3537-01-007Bryan10/06/26$34,691.00ConstructionRoadwayConstructionRoadway$34,195.39$495.611%0
0143-15-034San Antonio10/06/26$85,377.59ConstructionRoadwayConstructionRoadway$86,564.00$(1,186.41)-1%0
0254-01-149Corpus Christi08/05/26$10,519,557.65ConstructionRoadwayConstructionRoadway$10,383,718.65$135,839.001%0
0541-02-033Childress08/05/26$8,833,129.70ConstructionRoadwayConstructionRoadway$8,730,229.70$102,900.001%0
0200-01-093Lufkin10/06/26$29,811,165.20ConstructionRoadwayConstructionRoadway$29,476,360.55$334,804.651%0
0043-20-023Wichita Falls05/03/28$979,629.00ConstructionRoadwayConstructionRoadway$989,000.00$(9,371.00)-1%0
0132-03-036Childress08/05/26$11,192,055.34ConstructionRoadwayConstructionRoadway$11,087,882.05$104,173.291%0
0041-07-121Amarillo08/05/26$26,383,173.75ConstructionRoadwayConstructionRoadway$26,146,123.75$237,050.001%0
0917-30-068Bryan11/03/26$664,775.00ConstructionBridgeConstructionBridge$670,698.73$(5,923.73)-1%0
0047-14-092Dallas09/02/26$2,012,848.75ConstructionRoadwayConstructionRoadway$1,995,770.00$17,078.751%0
0315-08-051Bryan10/06/26$499,467.35ConstructionRoadwayConstructionRoadway$495,766.66$3,700.691%0
0276-07-035San Antonio08/05/26$8,663,166.47ConstructionRoadwayConstructionRoadway$8,601,216.47$61,950.001%0
0366-01-089Austin11/03/26$227,251.37ConstructionRoadwayConstructionRoadway$225,793.27$1,458.101%0
2552-04-055El Paso08/05/26$3,871,558.00ConstructionRoadwayConstructionRoadway$3,847,548.00$24,010.001%0
0991-02-014Corpus Christi08/05/26$9,367,704.15ConstructionRoadwayConstructionRoadway$9,316,494.15$51,210.001%0
1147-02-029Bryan10/06/26$142,919.00ConstructionRoadwayConstructionRoadway$142,193.00$726.001%0
0056-02-034Waco09/02/26$2,474,491.12ConstructionRoadwayConstructionRoadway$2,465,492.67$8,998.450%0
0013-08-149Fort Worth03/03/27$15,880,993.12ConstructionRoadwayConstructionRoadway$15,928,453.33$(47,460.21)-0%0
0089-07-166Yoakum08/05/26$241,162,764.90ConstructionRoadwayConstructionRoadway$240,432,788.90$729,976.000%0
0028-05-057Beaumont09/02/26$2,125,317.21ConstructionRoadwayConstructionRoadway$2,120,317.21$5,000.000%0
0015-13-432Austin11/03/26$239,362,478.11ConstructionBridgeConstructionBridge$239,903,846.15$(541,368.04)-0%0
0902-48-579Fort Worth08/05/26$22,917,686.10ConstructionRoadwayConstructionRoadway$22,873,538.60$44,147.500%0
0016-09-045Austin11/03/26$213,525.75ConstructionRoadwayConstructionRoadway$213,254.81$270.940%0
1691-01-018Bryan10/06/26$613,560.95ConstructionRoadwayConstructionRoadway$612,944.64$616.310%0
0842-03-037Yoakum08/05/26$33,725,491.10ConstructionRoadwayConstructionRoadway$33,704,491.10$21,000.000%0
0110-07-022Houston09/02/26$346,443.13ConstructionRoadwayConstructionRoadway$346,537.14$(94.01)-0%0
0610-05-060Atlanta08/05/26$12,397,796.00ConstructionRoadwayConstructionRoadway$12,401,196.00$(3,400.00)-0%0
2552-04-058El Paso08/05/26$3,077,730.00ConstructionRoadwayConstructionRoadway$3,076,855.00$875.000%0
0133-01-055Childress08/05/26$16,097,926.96ConstructionRoadwayConstructionRoadway$16,096,986.21$940.750%0
0029-03-056Austin01/05/28$1,760,771.76ConstructionBridgeConstructionBridge$1,760,772.22$(0.46)0%0
0338-03-100Houston02/02/27$727,888.00ConstructionBridgeConstructionBridge$727,880.00$8.000%0
0018-05-089Laredo08/05/26$226,858,175.99ConstructionRoadwayConstructionRoadway$226,855,600.99$2,575.000%0
0014-15-077Fort Worth03/03/27$15,548,985.00ConstructionRoadwayConstructionRoadway$0.00$15,548,985.000
354 rows · download CSV

Putting It Together

The data reveals a dynamic landscape with increased project counts and adjusted letting dates. The slight shift in project types indicates stability, while the cost changes reflect active repricing among significant districts.


Final Takeaway

Pipeline changes last month resulted in a larger active pipeline, with total value increasing by $2.36B and project count rising by 59. Houston accounted for most of the value increase, while the overall project mix remained largely unchanged and roadway work continued to represent 77.9% of the pipeline. Letting-date changes were substantial in both directions, although slightly more projects moved earlier than later. Overall, the month’s movement reflects a combination of new project additions, estimate revisions, and scheduling changes rather than a major shift in the types of work entering the market.