Pipeline

TxDOT Pipeline Changes - August 2026

McKenna Wolfe2 min read
  • The active pipeline value increased from $30.79B to $33.34B, a change of +$2.55B (+8.3%).
  • The project count also rose, with 5,523 active projects increasing to 5,587, marking a net gain of 64 projects.
  • Houston saw the largest net cost increase at +$2.27B during the latest changes.

Overview

Looking at the August 3 vs. September 3, 2026 snapshots, across a letting window of August 1, 2026 to August 1, 2029, the pipeline shows growth in value and project numbers. The active pipeline value rose to $33.34B, reflecting a shift in cost structure as rebuilt projects unveil new classifications. Further, a slight drift in letting dates indicates changes in project timing, while the dominant roadway subtype remains stable at 78.7% of total projects.


Letting Date Shifts (Slippage)

How to read this chart:

In total, 134 projects experienced shifts of six months or more in their letting dates, with 93 moving later and 41 moving earlier. Looking at shifts of 12 months or more, 82 projects shifted their letting dates, 58 moving later and 24 earlier. Overall, this suggests a trend of projects generally being pushed out.

CSJDistrictEst. Letting DateProject EstimateCurrent TypeCurrent SubtypePrev. TypePrev. SubtypePrev. DateLetting Δ (days)Letting Date ΔCost Δ%Cost ΔType/Subtype ΔLifecycle
1024-01-092Beaumont01/01/45$91,879.00ConstructionRoadway01/06/27657018 years
0921-02-537Pharr05/02/45$7,718,488.50ConstructionLocal Let05/31/28618017 years
0921-02-538Pharr05/02/45$7,239,537.73ConstructionLocal Let05/31/28618017 years
0095-02-096Dallas09/01/44$315,730,103.05ConstructionRoadway09/06/28583916 years$(31,949,205.46)-9%
0190-05-076Tyler08/01/40$3,804,363.61ConstructionRoadway08/04/27474613 years
1026-01-014Brownwood01/01/40$138,304.00ConstructionBridge02/02/27471613 years
1697-02-036Brownwood01/01/40$350,000.00ConstructionBridge02/02/27471613 years
0914-05-211Austin08/02/40$1,211,853.00ConstructionLocal Let08/04/28438112 yearsCanceled
0231-01-071Brownwood01/01/40$1,039,426.56ConstructionRoadway05/03/28426012 years
0173-04-063Dallas08/01/37$949,220.25ConstructionRoadwayConstructionRoadway09/02/26398611 years
0187-02-079Yoakum11/01/37$602,064.00ConstructionRoadway11/01/2832879 years
0187-03-084Yoakum11/01/37$725,678.00ConstructionRoadway11/01/2832879 years
3510-04-038Houston04/05/28$101,000,000.00ConstructionRoadwayUnassignedUnassigned01/15/37-3207-9 years$61,200,000.00154%Unassigned → Construction / Roadway
0921-02-562Pharr05/02/35$1,319,040.00ConstructionNon Roadway01/02/2730428 years
0015-08-152Austin08/21/26$2,500,000.0012/01/1828208 years
0159-02-079San Angelo10/01/35$5,675,000.00ConstructionRoadway10/04/2825537 years
0299-13-037Laredo09/10/33$212,400.00Non-LetRail - Safety09/10/2721926 years
0006-08-057Abilene12/01/27$36,872.13ConstructionRoadwayUnassignedUnassigned12/01/33-2192-6 years$(26,375.87)-42%Unassigned → Construction / Roadway
0518-01-018Abilene12/01/27$114,851.26ConstructionRoadwayUnassignedUnassigned12/01/33-2192-6 years$38,050.2650%Unassigned → Construction / Roadway
1651-07-012San Angelo10/01/34$14,748,880.16ConstructionRoadway11/01/2821606 years
0558-11-018San Angelo11/01/28$15,474,285.00ConstructionRoadwayUnassignedUnassigned10/01/34-2160-6 yearsUnassigned → Construction / Roadway
0081-06-050Dallas01/05/32$907,463.00ConstructionLocal Let01/01/2718305 years
0921-02-375Pharr05/02/32$14,621,204.29ConstructionLocal Let05/02/2718275 years
0213-05-042Lufkin01/05/28$28,571,428.57ConstructionRoadwayUnassignedUnassigned01/01/33-1823-5 yearsUnassigned → Construction / Roadway
0271-04-070Houston06/01/33$161,018,519.00ConstructionRoadway12/05/2816394 years$(33,980,478.72)-17%
0271-04-093Houston06/01/33$56,574,074.00ConstructionRoadway12/05/2816394 years$10,287,707.7222%
0921-02-395Pharr05/02/29$12,592,097.00ConstructionLocal LetUnassignedUnassigned05/05/33-1464-4 yearsUnassigned → Construction / Local Let
0033-08-041Abilene12/01/27$2,515,863.77ConstructionRoadwayUnassignedUnassigned12/01/31-1461-4 years$2,197,650.77691%Unassigned → Construction / Roadway
2941-01-042Houston09/01/28$3,571,429.00ConstructionRoadwayUnassignedUnassigned08/01/32-1430-4 yearsUnassigned → Construction / Roadway
1651-02-025San Angelo11/01/32$5,286,458.33ConstructionRoadway05/01/2912804 years
0168-02-029Lubbock06/01/28$33,340,000.00ConstructionRoadwayUnassignedUnassigned09/01/31-1187-3 yearsUnassigned → Construction / Roadway
0921-02-440Pharr05/08/31$6,567,414.39ConstructionLocal Let05/02/2811013 years
0921-02-561Pharr01/02/31$1,917,438.00ConstructionNon Roadway01/02/2810963 years
0015-13-462Austin05/01/30$11,440,000.00ConstructionRoadwayConstructionRoadway08/04/2710013 years$440,000.004%
0921-06-330Pharr05/02/30$25,435,821.86ConstructionLocal LetConstructionLocal Let09/03/279723 years
0921-26-113Pharr05/02/30$4,200,000.00ConstructionLocal LetConstructionLocal Let09/03/279723 years
0252-02-068Austin07/01/30$370,370.37ConstructionRoadwayConstructionRoadway12/01/279433 years
0463-02-081Odessa07/01/27$5,000,000.00ConstructionRoadwayConstructionRoadway01/01/30-915-3 years
0683-03-042Austin01/01/30$1,977,714.81ConstructionRoadwayConstructionRoadway09/01/278532 years
1201-01-015Austin01/01/30$120,000.00ConstructionBridgeConstructionBridge09/01/278532 years
0252-03-055Austin01/01/31$479,818.75ConstructionRoadway09/06/288472 years
0258-09-154Waco05/05/27$882,000.00ConstructionRoadwayConstructionRoadway08/01/29-819-2 years
6392-55-001Pharr12/05/28$2,100,000.00MaintenanceBridge PreventiveMaintenanceBridge Preventive10/06/267912 years
3510-10-026Beaumont01/15/30$170,000.00Non-LetRoadwayNon-LetRoadway01/15/287312 years
0518-02-017Abilene12/01/27$221,912.45ConstructionRoadwayUnassignedUnassigned12/01/29-731-2 years$(101,760.55)-31%Unassigned → Construction / Roadway
2537-01-006Abilene12/01/27$72,121.0012/01/29-731-2 years
0196-07-036Dallas08/04/30$6,500,000.00ConstructionLocal LetConstructionLocal Let08/04/287302 years
0921-26-115Pharr05/02/30$18,044,879.00ConstructionLocal LetConstructionLocal Let05/02/287302 years
0598-02-135Houston03/01/29$8,600,000.00ConstructionRoadwayConstructionRoadway03/03/277292 years
0088-05-112Yoakum11/01/28$132,441.00ConstructionRoadwayConstructionRoadway11/03/267292 years
0179-09-040Yoakum11/01/28$426,202.00ConstructionRoadwayConstructionRoadway11/03/267292 years
0371-01-095Yoakum11/01/28$49,236.00ConstructionRoadwayConstructionRoadway11/03/267292 years
0371-06-026Yoakum11/01/28$38,353.00ConstructionRoadwayConstructionRoadway11/03/267292 years
0503-01-002Yoakum11/01/28$40,695.00ConstructionRoadwayConstructionRoadway11/03/267292 years
1090-03-023Yoakum11/01/28$262,936.00ConstructionRoadwayConstructionRoadway11/03/267292 years
1425-03-074Pharr08/01/29$591,287.00ConstructionRoadwayConstructionRoadway08/04/277282 years
0910-07-095Tyler10/01/29$689,515.00ConstructionNon RoadwayConstructionNon Roadway11/02/276992 years
0038-01-110Laredo09/06/28$300,000.00ConstructionRoadwayConstructionRoadway11/03/266732 years
1227-04-023Pharr11/02/27$21,050,000.00ConstructionRoadwayConstructionRoadway09/01/29-669-2 years$(870,000.00)-4%
0306-01-072Beaumont12/05/28$600,000.00ConstructionBridgeConstructionBridge03/03/276432 years
0374-05-026El Paso02/02/28$20,792,795.54ConstructionRoadwayConstructionRoadway09/01/29-577-2 years
0007-10-068Fort Worth06/01/28$24,133,472.00ConstructionBridgeConstructionBridge12/01/29-548-2 years
3510-04-077Houston07/06/28$38,278,900.00ConstructionRoadwayConstructionRoadway03/03/274911 year
3510-05-054Houston07/06/28$698,935.00ConstructionRoadwayConstructionRoadway03/03/274911 year
2311-01-045Waco06/01/28$14,400,000.00ConstructionRoadwayConstructionRoadway02/02/274851 year
0022-04-021Laredo11/02/27$11,464,725.00ConstructionRoadwayConstructionRoadway03/01/29-485-1 year
0161-01-033Laredo11/02/27$1,595,078.57ConstructionRoadwayConstructionRoadway03/01/29-485-1 year
0299-04-088Laredo11/02/27$3,870,348.21ConstructionRoadwayConstructionRoadway03/01/29-485-1 year
0299-14-037Laredo11/02/27$1,559,186.61ConstructionRoadwayConstructionRoadway03/01/29-485-1 year
0842-03-042Yoakum07/01/27$26,245,701.93ConstructionRoadwayConstructionRoadway09/06/28-433-1 year$8,827,262.9351%
0414-01-002Austin08/14/26$129,807.69ConstructionLocal Let10/04/27-416-1 year
1149-01-033Austin10/04/28$58,673,076.90ConstructionRoadwayConstructionRoadway09/01/273991 year$2,173,076.904%
0089-07-145Yoakum12/01/27$223,653,606.50ConstructionRoadwayConstructionRoadway12/05/28-370-1 year$10,000,000.935%
3271-01-021Beaumont08/20/26$108,590.0008/15/253701 year
0915-12-724San Antonio09/03/28$12,700,323.00ConstructionLocal LetConstructionLocal Let09/03/273661 year
0168-09-197Amarillo06/01/28$847,000.00ConstructionNon RoadwayConstructionNon Roadway06/01/273661 year
0168-10-083Amarillo06/01/28$300,000.00ConstructionRoadwayConstructionRoadway06/01/273661 year
0168-10-084Amarillo06/01/28$100,000.00ConstructionNon RoadwayConstructionNon Roadway06/01/273661 year
0331-02-062Pharr01/01/29$4,191,426.00ConstructionRoadwayConstructionRoadway01/01/30-365-1 year
0151-05-124Austin11/03/28$342,592.59ConstructionLocal LetConstructionLocal Let11/04/273651 year
0151-06-148Austin10/01/28$24,292,129.63ConstructionLocal LetConstructionLocal Let10/02/273651 year
0005-07-060Abilene12/01/27$445,343.00ConstructionRoadwayUnassignedUnassigned12/01/263651 yearUnassigned → Construction / Roadway
0006-01-105Abilene12/01/27$447,776.57ConstructionRoadwayUnassignedUnassigned12/01/263651 year$(34,634.43)-7%Unassigned → Construction / Roadway
0220-04-050Pharr12/01/27$20,418,004.16ConstructionRoadwayConstructionRoadway12/01/263651 year$(3,039,802.84)-13%
0563-05-017Lubbock11/02/27$589,172.20ConstructionRoadwayConstructionRoadway11/01/28-365-1 year
0879-04-014Lubbock11/02/27$1,233,086.00ConstructionRoadwayConstructionRoadway11/01/28-365-1 year
0879-05-007Lubbock11/02/27$640,433.00ConstructionRoadwayConstructionRoadway11/01/28-365-1 year
2687-01-014Austin12/01/28$195,394.44ConstructionRoadwayConstructionRoadway12/03/2736412 months
0038-10-013Pharr08/02/28$9,725,893.91ConstructionRoadwayConstructionRoadway08/04/2736412 months
1065-02-045Pharr08/02/28$1,576,228.00ConstructionRoadwayConstructionRoadway08/04/2736412 months
6504-04-001Beaumont10/05/27$1,000,000.00MaintenanceRoutine Maintenance ContractMaintenanceRoutine Maintenance Contract10/06/2636412 months
1727-01-019Amarillo11/03/26$630,127.52ConstructionRoadwayConstructionRoadway11/02/27-364-12 months$(42,872.48)-6%
1885-03-013Amarillo11/03/26$714,212.48ConstructionRoadwayConstructionRoadway11/02/27-364-12 months$(345,787.52)-33%
2437-01-028Amarillo11/03/26$355,639.39ConstructionRoadwayConstructionRoadway11/02/27-364-12 months$(613,760.61)-63%
2552-01-062El Paso11/03/26$12,432,052.88ConstructionRoadwayConstructionRoadway11/02/27-364-12 months$460,446.404%
2552-01-066El Paso11/03/26$4,600,398.13ConstructionBridgeConstructionBridge11/02/27-364-12 months$170,385.114%
2121-02-166El Paso09/02/26$0.00ConstructionRoadwayConstructionRoadway09/01/27-364-12 months
2350-01-076Yoakum04/05/28$6,230,000.00ConstructionRoadwayConstructionRoadway04/01/29-361-12 months
0143-10-059Yoakum03/01/29$9,280,000.00ConstructionRoadwayConstructionRoadway03/07/2835912 months
0071-01-062Brownwood01/05/28$339,790.00ConstructionBridgeConstructionBridge02/02/2733711 months
0071-01-063Brownwood01/05/28$339,790.00ConstructionBridgeConstructionBridge02/02/2733711 months
0004-03-055Odessa11/02/27$26,785,714.29ConstructionRoadwayConstructionRoadway10/04/28-337-11 months
0231-01-070Brownwood02/02/27$680,000.00ConstructionBridgeConstructionBridge01/05/28-337-11 months
0164-04-167Tyler08/02/28$366,110.50ConstructionRoadwayConstructionRoadway09/01/2733611 months
0424-02-050Tyler08/02/28$413,477.00ConstructionRoadwayConstructionRoadway09/01/2733611 months
0520-06-048Tyler08/02/28$445,638.50ConstructionRoadwayConstructionRoadway09/01/2733611 months
0914-33-113Austin07/01/28$3,913,000.00ConstructionLocal LetConstructionLocal Let08/02/2733411 months
2879-01-011Atlanta10/05/27$2,563,215.00ConstructionRoadwayConstructionRoadway12/01/2630810 months$(24,805.00)-1%
2879-01-012Atlanta10/05/27$433,241.85ConstructionRoadwayConstructionRoadway12/01/2630810 months
0342-04-036Pharr11/01/28$32,596,524.00ConstructionRoadwayConstructionRoadway01/05/2830110 months
0254-03-083Corpus Christi06/01/27$900,000.00ConstructionRoadwayConstructionRoadway03/07/28-280-9 months
0255-01-097Corpus Christi06/01/27$800,000.00ConstructionRoadwayConstructionRoadway03/07/28-280-9 months
0924-06-669El Paso08/31/26$1,959,929.00ConstructionLocal Let12/17/252578 months
0921-02-560Pharr05/01/27$760,614.00ConstructionNon RoadwayConstructionNon Roadway01/02/28-246-8 months
0915-15-087San Antonio05/03/28$728,000.00ConstructionBridgeConstructionBridge09/01/272458 months
1198-02-019Austin05/03/28$56,956.61ConstructionRoadwayConstructionRoadway09/01/272458 months
0463-02-090Odessa07/01/27$6,626,189.00ConstructionRoadwayConstructionRoadway12/01/262127 months
0047-09-034Dallas03/01/29$24,203,553.90ConstructionRoadwayConstructionRoadway08/02/282117 months$8,926,490.2258%
3417-01-035Austin10/05/27$199,817.86ConstructionRoadwayConstructionRoadway05/03/28-211-7 months
3417-01-036Austin10/05/27$234,203.17ConstructionRoadwayConstructionRoadway05/03/28-211-7 months
1754-02-033Austin12/01/27$13,817,307.69ConstructionRoadwayConstructionRoadway05/05/272107 months
1754-02-035Austin12/01/27$4,831,957.00ConstructionRoadwayConstructionRoadway05/05/272107 months
0306-03-137Beaumont08/04/27$145,270.83ConstructionRoadwayConstructionRoadway01/06/272107 months
0307-01-156Beaumont08/04/27$120,000.00ConstructionRoadwayConstructionRoadway01/06/272107 months
0341-04-075Beaumont08/04/27$104,910.00ConstructionRoadwayConstructionRoadway01/06/272107 months
0366-01-077Austin08/04/27$841,346.15ConstructionRoadwayConstructionRoadway01/06/272107 months
0508-04-192Beaumont08/04/27$206,249.00ConstructionRoadwayConstructionRoadway01/06/272107 months
0883-02-097Beaumont08/04/27$61,394.00ConstructionRoadwayConstructionRoadway01/06/272107 months
1790-02-049Tyler03/07/28$2,023,746.10ConstructionRoadwayConstructionRoadway09/01/271886 months
0741-01-026Abilene07/03/27$61,892,390.49Non-LetLocalNon-LetLocal01/01/271836 months
0972-06-018Abilene07/03/27$12,330,152.97Non-LetLocalNon-LetLocal01/01/271836 months
0972-07-008Abilene07/03/27$19,139,950.31Non-LetLocalNon-LetLocal01/01/271836 months
2032-01-012Abilene07/03/27$1,854,893.24Non-LetLocalNon-LetLocal01/01/271836 months
2170-05-017Laredo02/02/28$10,000,000.00ConstructionRoadwayConstructionRoadway08/04/271826 months
0295-02-031Abilene07/03/27$13,650,000.00Non-LetLocalNon-LetLocal01/02/271826 months
0172-12-007Dallas11/02/27$51,363,055.90ConstructionRoadwayConstructionRoadway05/05/271816 months$(109,698.12)-0%
1776-01-039Austin03/01/27$1,130,919.64ConstructionLocal LetConstructionLocal Let09/04/261786 months
0371-04-062Corpus Christi07/01/27$64,769,601.51ConstructionRoadwayConstructionRoadway01/06/271766 months$13,769,601.5127%
0372-01-101Corpus Christi07/01/27$92,390,400.49ConstructionRoadwayConstructionRoadway01/06/271766 months$(9,609,599.51)-9%
6487-66-001Houston01/06/27$1,000,000.00MaintenanceRoutine Maintenance ContractUnassignedUnassigned08/01/261585 monthsUnassigned → Maintenance / Routine Maintenance Contract
0910-34-038Tyler03/07/28$500,000.00ConstructionBridgeConstructionBridge10/05/271545 months
1229-01-081Laredo08/04/27$350,085.00ConstructionBridgeConstructionBridge01/05/28-154-5 months
0684-01-068Pharr08/01/27$33,950,374.48ConstructionLocal LetConstructionLocal Let03/01/271535 months
0700-04-056Austin07/01/27$500,897.12ConstructionBridgeConstructionBridge02/02/271495 months
0917-29-151Bryan07/01/27$285,496.00ConstructionRoadwayConstructionRoadway02/02/271495 months
1099-05-048Tyler07/01/27$14,919,102.59ConstructionRoadwayConstructionRoadway02/02/271495 months
1437-01-042San Antonio07/01/27$8,482,129.00ConstructionRoadwayConstructionRoadway02/02/271495 months
1197-01-029Austin09/01/27$4,797,000.00ConstructionRoadwayConstructionRoadway04/06/271485 months
1755-01-025Austin04/06/27$2,215,384.62ConstructionBridgeConstructionBridge12/01/261264 months
1755-01-029Austin04/06/27$5,003,844.23ConstructionRoadwayConstructionRoadway12/01/261264 months
0186-02-036Bryan08/02/28$3,000,000.00ConstructionRoadwayConstructionRoadway12/05/28-125-4 months$(1,400,000.00)-32%
0757-01-026Austin08/04/26$1,346,153.85ConstructionLocal Let04/01/261254 months
2201-01-013El Paso09/02/29$4,927,410.00ConstructionLocal LetConstructionLocal Let05/01/291244 months
2240-01-021Atlanta11/02/27$746,753.00ConstructionBridgeConstructionBridge07/01/271244 months
2211-01-028Austin09/01/26$3,057,744.64ConstructionLocal LetConstructionLocal Let05/01/261234 months
0339-04-036Beaumont09/01/28$118,318,519.44ConstructionRoadwayConstructionRoadway01/01/29-122-4 months$3,218,519.443%
1566-02-022Austin06/03/27$3,019,935.00ConstructionLocal LetConstructionLocal Let02/01/271224 months
1566-02-030Austin06/03/27$800,000.00ConstructionLocal LetConstructionLocal Let02/01/271224 months
3271-01-020Beaumont12/15/26$415,000.00Non-LetLocalConstructionLocal Let08/15/261224 monthsConstruction / Local Let → Non-Let / Local
0910-08-084Tyler03/07/28$349,800.00ConstructionBridgeConstructionBridge07/06/28-121-4 months
0910-16-197Tyler03/07/28$750,000.00ConstructionBridgeConstructionBridge07/06/28-121-4 months
0914-33-107Austin08/31/26$8,520,056.00ConstructionLocal Let05/02/261214 months
0098-03-041Childress05/01/29$790,000.00ConstructionBridgeConstructionBridge01/01/291204 months
0157-02-059Childress05/01/29$225,000.00ConstructionBridgeConstructionBridge01/01/291204 months
0157-02-060Childress05/01/29$225,000.00ConstructionBridgeConstructionBridge01/01/291204 months
0157-10-004Childress05/01/29$200,000.00ConstructionBridgeConstructionBridge01/01/291204 months
0157-10-005Childress05/01/29$175,000.00ConstructionBridgeConstructionBridge01/01/291204 months
0711-02-046Childress05/01/29$125,000.00ConstructionBridgeConstructionBridge01/01/291204 months
0949-01-018Childress05/01/29$160,000.00ConstructionBridgeConstructionBridge01/01/291204 months
0950-01-030Childress05/01/29$120,000.00ConstructionBridgeConstructionBridge01/01/291204 months
0970-03-025Childress05/01/29$450,000.00ConstructionBridgeConstructionBridge01/01/291204 months
0971-03-011Childress05/01/29$570,000.00ConstructionBridgeConstructionBridge01/01/291204 months
1225-01-014Childress05/01/29$230,000.00ConstructionBridgeConstructionBridge01/01/291204 months
2011-01-010Childress05/01/29$240,000.00ConstructionBridgeConstructionBridge01/01/291204 months
0025-03-109San Antonio06/01/28$8,975,159.00ConstructionRoadwayConstructionRoadway02/02/281204 months
0535-01-082San Antonio06/01/28$2,316,576.00ConstructionRoadwayConstructionRoadway02/02/281204 months
0921-02-396Pharr05/01/28$8,213,618.71ConstructionLocal LetConstructionLocal Let01/02/281204 months
0258-08-035Waco07/01/27$9,200,000.00ConstructionRoadwayConstructionRoadway03/03/271204 months$353,846.154%
0473-02-043Austin07/01/27$186,767.38ConstructionRoadwayConstructionRoadway03/03/271204 months
3113-04-007Austin07/01/27$118,956.92ConstructionRoadwayConstructionRoadway03/03/271204 months
0921-02-399Pharr05/04/27$7,360,853.76ConstructionLocal LetConstructionLocal Let01/04/271204 months
1057-03-060Pharr03/03/27$5,643,901.12ConstructionRoadwayConstructionRoadway07/01/27-120-4 months
2263-03-053Corpus Christi03/03/27$10,500,000.00ConstructionRoadwayConstructionRoadway07/01/27-120-4 months
1377-01-022Austin04/05/28$829,629.63ConstructionRoadwayConstructionRoadway08/02/28-119-4 months
0088-05-115Yoakum09/01/27$250,000.00ConstructionRoadwayConstructionRoadway05/05/271194 months
0371-06-027Yoakum09/01/27$300,000.00ConstructionNon RoadwayConstructionNon Roadway05/05/271194 months
3510-10-024Beaumont06/01/27$33,000,000.00ConstructionRoadwayConstructionRoadway02/02/271194 months
0921-02-559Pharr05/01/27$698,113.00ConstructionNon RoadwayConstructionNon Roadway01/05/271164 months
0909-36-200Waco08/18/26$1,155,635.00ConstructionLocal Let05/02/261084 months
0724-01-061Waco08/18/26$167,032.30Non-LetBridge12/03/26-107-4 months
0039-11-002Pharr08/13/26$5,454,249.00ConstructionRoadway05/02/261033 months
0914-05-240Austin08/10/26$6,916,506.00ConstructionLocal Let05/02/261003 months
0917-29-152Bryan10/05/27$1,591,764.00ConstructionRoadwayConstructionRoadway07/01/27963 months
0921-06-290Pharr08/04/26$34,665,879.75ConstructionLocal Let05/01/26953 months
0921-06-378Pharr08/04/26$4,116,950.00ConstructionLocal Let05/01/26953 months
0065-06-067Beaumont11/02/27$46,476,175.96ConstructionRoadwayConstructionRoadway02/02/28-92-3 months$(1,859,046.04)-4%
0065-07-065Beaumont11/02/27$32,423,076.92ConstructionRoadwayConstructionRoadway02/02/28-92-3 months$18,793,447.92138%
0342-01-105Pharr06/01/27$195,531.00ConstructionRoadwayConstructionRoadway09/01/27-92-3 months
1586-01-097Pharr06/01/27$270,525.00ConstructionRoadwayConstructionRoadway09/01/27-92-3 months
0017-16-008San Antonio04/05/28$828,335.00ConstructionRoadwayConstructionRoadway01/05/28913 months
2690-01-040Austin09/01/27$7,400,000.00ConstructionRoadwayConstructionRoadway12/01/27-91-3 months$(274,074.07)-4%
2690-01-046Austin09/01/27$714,285.71ConstructionRail - SafetyConstructionRail - Safety12/01/27-91-3 months
0256-01-061Wichita Falls08/04/27$200,000.00ConstructionBridgeConstructionBridge05/05/27913 months
0922-33-226Laredo09/01/28$1,000,000.00ConstructionLocal LetConstructionLocal Let06/03/28903 months
0643-01-057Bryan11/02/27$22,973,558.00ConstructionRoadwayConstructionRoadway08/04/27903 months
0306-01-069Beaumont06/01/27$9,000,000.00ConstructionRoadwayConstructionRoadway03/03/27903 months
0306-01-070Beaumont06/01/27$2,000,000.00ConstructionRoadwayConstructionRoadway03/03/27903 months
0909-36-183Waco08/31/26$1,800,000.00ConstructionRoadway06/04/26883 months
0015-05-051Waco07/01/27$637,620.00ConstructionRoadwayConstructionRoadway04/06/27863 months
0015-05-052Waco07/01/27$2,600,000.00ConstructionRoadwayConstructionRoadway04/06/27863 months$100,000.004%
0015-18-007Waco07/01/27$1,912,861.00ConstructionRoadwayConstructionRoadway04/06/27863 months$382,573.0025%
0015-18-008Waco07/01/27$1,560,000.00ConstructionRoadwayConstructionRoadway04/06/27863 months$60,000.004%
1835-02-062Waco07/01/27$308,666.00ConstructionRoadwayConstructionRoadway04/06/27863 months
0081-02-079Fort Worth09/01/26$531,625.25ConstructionLocal LetConstructionLocal Let06/11/26823 months
0912-72-818Houston08/31/26$19,440,000.00ConstructionLocal Let06/15/26773 months
0915-12-726San Antonio08/12/26$6,762,055.00ConstructionLocal Let06/01/26722 months
0262-06-032Bryan08/04/27$2,350,000.00ConstructionBridgeConstructionBridge06/01/27642 months
0262-06-034Bryan08/04/27$2,350,000.0006/01/27642 months
0909-22-208Waco08/04/27$419,000.00ConstructionBridgeConstructionBridge06/01/27642 months
0917-18-087Bryan08/04/27$950,000.00ConstructionBridgeConstructionBridge06/01/27642 months
0315-01-041Bryan09/30/26$0.00Non-LetNon RoadwayNon-LetNon Roadway07/28/26642 months$(490,901.31)-100%
0173-11-003Dallas06/03/27$1,676,400.00ConstructionLocal LetConstructionLocal Let04/01/27632 months
0683-03-045Austin04/06/27$2,108,441.40ConstructionRoadwayConstructionRoadway02/02/27632 months
0050-06-110Houston02/02/27$1,846,179.07ConstructionRoadwayConstructionRoadway12/01/26632 months$50,084.073%
0200-14-104Beaumont02/02/27$13,175,000.00ConstructionRoadwayConstructionRoadway12/01/26632 months
0200-14-105Beaumont02/02/27$4,675,000.00ConstructionRoadwayConstructionRoadway12/01/26632 months
0200-14-106Beaumont02/02/27$15,673,076.92ConstructionRoadwayConstructionRoadway12/01/26632 months
0285-03-064Austin02/02/27$3,008,871.35ConstructionRoadwayConstructionRoadway12/01/26632 months
1717-02-026Odessa11/02/27$553,950.00ConstructionRoadwayConstructionRoadway09/01/27622 months
1717-02-027Odessa11/02/27$217,967.00ConstructionRoadwayConstructionRoadway09/01/27622 months
0380-09-106Odessa06/01/29$300,000.00ConstructionRoadwayConstructionRoadway04/01/29612 months
0463-02-100Odessa06/01/29$350,165.00ConstructionRoadwayConstructionRoadway04/01/29612 months
2296-01-061Odessa06/01/29$1,050,493.00ConstructionRoadwayConstructionRoadway04/01/29612 months
2296-02-034Odessa06/01/29$4,435,415.00ConstructionRoadwayConstructionRoadway04/01/29612 months
0095-13-050Dallas08/04/26$1,364,275.00ConstructionLocal Let06/04/26612 months
0196-02-139Dallas06/03/27$1,200,000.00ConstructionRoadwayConstructionRoadway08/01/27-59-2 months
0196-03-298Dallas06/03/27$2,311,100.00ConstructionRoadwayConstructionRoadway08/01/27-59-2 months
2374-01-199Dallas06/03/27$721,035.00ConstructionRoadwayConstructionRoadway08/01/27-59-2 months
0180-06-118Corpus Christi06/01/28$59,115,480.77ConstructionRoadwayConstructionRoadway04/05/28572 months$2,207,980.774%
0180-10-082Corpus Christi06/01/28$73,509,615.38ConstructionRoadwayConstructionRoadway04/05/28572 months$2,759,615.384%
0180-11-016Corpus Christi06/01/28$2,596,153.85ConstructionRoadwayConstructionRoadway04/05/28572 months$(3,846.15)-0%
1378-05-031Austin06/01/28$669,984.49ConstructionRoadwayConstructionRoadway04/05/28572 months
3586-02-009Laredo05/05/27$20,000,000.00ConstructionRoadwayConstructionRoadway07/01/27-57-2 months
1188-02-130Odessa11/01/28$433,182.82ConstructionRoadwayConstructionRoadway09/06/28562 months
1188-02-131Odessa11/01/28$1,568,788.63ConstructionRoadwayConstructionRoadway09/06/28562 months
3571-01-007Odessa11/01/28$57,565.82ConstructionRoadwayConstructionRoadway09/06/28562 months
3571-02-009Odessa11/01/28$206,517.39ConstructionRoadwayConstructionRoadway09/06/28562 months
1063-01-034Corpus Christi06/01/27$6,000,000.00ConstructionRoadwayConstructionRoadway04/06/27562 months
2103-01-046Austin03/03/27$1,186,207.69ConstructionRoadwayConstructionRoadway01/06/27562 months
2211-02-033Austin03/03/27$623,076.92ConstructionRoadwayConstructionRoadway01/06/27562 months
2304-03-016Waco03/03/27$19,300,000.00ConstructionRoadwayConstructionRoadway01/06/27562 months
0363-01-153Fort Worth08/12/26$201,801.05ConstructionLocal Let06/17/26562 months
0364-01-166Fort Worth08/12/26$414,264.00ConstructionLocal Let06/17/26562 months
0353-03-117Fort Worth08/12/26$516,490.30ConstructionLocal Let06/18/26552 months
0081-13-071Dallas08/02/28$198,251,363.58ConstructionRoadwayConstructionRoadway09/06/28-35-1 month$(34,528,295.53)-15%
0151-06-158Austin02/02/28$2,948,634.26ConstructionRoadwayConstructionRoadway03/07/28-34-1 month
0005-16-019Odessa10/05/27$289,627.99ConstructionRoadwayConstructionRoadway09/01/27341 month
0139-05-053Odessa10/05/27$1,476,494.79ConstructionRoadwayConstructionRoadway09/01/27341 month
0573-02-009Austin10/05/27$8,935,220.37ConstructionRoadwayConstructionRoadway09/01/27341 month
1718-08-015Odessa10/05/27$97,840.28ConstructionRoadwayConstructionRoadway09/01/27341 month
0018-05-110Laredo07/01/27$33,110.00ConstructionRoadwayConstructionRoadway08/04/27-34-1 month
0018-06-223Laredo07/01/27$871,519.00ConstructionRoadwayConstructionRoadway08/04/27-34-1 month
0086-14-108Laredo07/01/27$197,420.69ConstructionNon RoadwayConstructionNon Roadway08/04/27-34-1 month
2150-04-102Laredo07/01/27$1,651,000.00ConstructionRoadwayConstructionRoadway08/04/27-34-1 month
2150-04-096Laredo04/06/27$500,000.00ConstructionBridgeConstructionBridge03/03/27341 month
2150-04-097Laredo04/06/27$330,000.00ConstructionBridgeConstructionBridge03/03/27341 month
2150-04-098Laredo04/06/27$690,000.00ConstructionBridgeConstructionBridge03/03/27341 month
0005-01-119Odessa03/01/29$805,274.00ConstructionRoadwayConstructionRoadway04/01/29-31-1 month
0005-02-131Odessa03/01/29$300,000.00ConstructionRoadwayConstructionRoadway04/01/29-31-1 month
0463-03-058Odessa03/01/29$500,000.00ConstructionRoadwayConstructionRoadway04/01/29-31-1 month
1001-01-015Odessa02/01/29$33,700,649.00ConstructionRoadwayConstructionRoadway01/01/29311 month
1001-01-017Odessa02/01/29$3,326,298.00ConstructionRoadwayConstructionRoadway01/01/29311 month
1001-01-019Odessa02/01/29$600,000.00ConstructionBridgeConstructionBridge01/01/29311 month
1001-02-006Odessa02/01/29$9,573,053.00ConstructionRoadwayConstructionRoadway01/01/29311 month
0463-02-101Odessa05/01/29$301,970.00ConstructionRoadwayConstructionRoadway04/01/293030 days
1188-02-134Odessa05/01/29$721,663.00ConstructionRoadwayConstructionRoadway04/01/293030 days
1188-02-135Odessa05/01/29$147,810.00ConstructionRoadwayConstructionRoadway04/01/293030 days
2296-01-062Odessa05/01/29$301,969.00ConstructionRoadwayConstructionRoadway04/01/293030 days
2296-02-035Odessa05/01/29$301,969.00ConstructionRoadwayConstructionRoadway04/01/293030 days
0917-12-089Bryan07/01/27$900,000.00ConstructionBridgeConstructionBridge06/01/273030 days
0917-19-060Bryan07/01/27$600,000.00ConstructionBridgeConstructionBridge06/01/273030 days
0917-30-064Bryan07/01/27$500,000.00ConstructionBridgeConstructionBridge06/01/273030 days
3586-02-011Laredo06/01/27$1,450,383.27ConstructionRoadwayConstructionRoadway07/01/27-30-30 days
1014-03-063Dallas08/31/26$1,731,094.70ConstructionLocal Let08/01/263030 days
0014-07-112Waco05/05/27$500,000.00ConstructionBridgeConstructionBridge04/06/272929 days
0014-08-091Waco05/05/27$528,000.00ConstructionBridgeConstructionBridge04/06/272929 days
0014-08-092Waco05/05/27$670,000.00ConstructionBridgeConstructionBridge04/06/272929 days
0014-24-067Waco05/05/27$300,000.00ConstructionBridgeConstructionBridge04/06/272929 days
0015-01-261Waco05/05/27$250,000.00ConstructionBridgeConstructionBridge04/06/272929 days
0015-01-262Waco05/05/27$325,000.00ConstructionBridgeConstructionBridge04/06/272929 days
0015-02-063Waco05/05/27$500,000.00ConstructionBridgeConstructionBridge04/06/272929 days
0015-02-064Waco05/05/27$625,000.00ConstructionBridgeConstructionBridge04/06/272929 days
0015-04-090Waco05/05/27$260,000.00ConstructionBridgeConstructionBridge04/06/272929 days
0015-04-091Waco05/05/27$527,000.00ConstructionBridgeConstructionBridge04/06/272929 days
0015-07-088Waco05/05/27$500,000.00ConstructionBridgeConstructionBridge04/06/272929 days
0024-06-070San Antonio05/05/27$45,000,000.00ConstructionRoadwayConstructionRoadway04/06/272929 days
0024-06-078San Antonio05/05/27$950,000.00ConstructionRoadwayConstructionRoadway04/06/272929 days
0050-06-113Houston02/02/27$300,000.00ConstructionRoadwayConstructionRoadway03/03/27-29-29 days
0050-08-107Houston02/02/27$40,000.00ConstructionRoadwayConstructionRoadway03/03/27-29-29 days
0050-09-100Houston02/02/27$350,000.00ConstructionRoadwayConstructionRoadway03/03/27-29-29 days
0110-04-229Houston02/02/27$400,000.00ConstructionRoadwayConstructionRoadway03/03/27-29-29 days
0110-05-145Houston02/02/27$500,000.00ConstructionRoadwayConstructionRoadway03/03/27-29-29 days
0110-06-164Houston02/02/27$300,000.00ConstructionRoadwayConstructionRoadway03/03/27-29-29 days
0114-11-103Houston02/02/27$40,000.00ConstructionRoadwayConstructionRoadway03/03/27-29-29 days
0114-12-019Houston02/02/27$300,000.00ConstructionRoadwayConstructionRoadway03/03/27-29-29 days
0271-07-360Houston02/02/27$50,000.00ConstructionRoadwayConstructionRoadway03/03/27-29-29 days
0271-14-249Houston02/02/27$100,000.00ConstructionRoadwayConstructionRoadway03/03/27-29-29 days
0271-17-192Houston02/02/27$40,000.00ConstructionRoadwayConstructionRoadway03/03/27-29-29 days
0338-11-063Houston02/02/27$60,000.00ConstructionRoadwayConstructionRoadway03/03/27-29-29 days
0500-03-668Houston02/02/27$180,000.00ConstructionRoadwayConstructionRoadway03/03/27-29-29 days
0523-10-050Houston02/02/27$100,000.00ConstructionRoadwayConstructionRoadway03/03/27-29-29 days
0675-08-130Houston02/02/27$400,000.00ConstructionRoadwayConstructionRoadway03/03/27-29-29 days
1685-02-062Houston02/02/27$150,000.00ConstructionRoadwayConstructionRoadway03/03/27-29-29 days
1685-05-145Houston02/02/27$150,000.00ConstructionRoadwayConstructionRoadway03/03/27-29-29 days
3050-02-039Houston02/02/27$60,000.00ConstructionRoadwayConstructionRoadway03/03/27-29-29 days
3050-03-029Houston02/02/27$145,000.00ConstructionRoadwayConstructionRoadway03/03/27-29-29 days
3538-01-073Houston02/02/27$250,000.00ConstructionRoadwayConstructionRoadway03/03/27-29-29 days
1718-07-050Odessa05/03/28$294,661.00ConstructionRoadwayConstructionRoadway04/05/282828 days
0619-03-068Dallas11/03/26$1,606,585.00ConstructionRoadwayConstructionRoadway12/01/26-28-28 days$(196,761.39)-11%
0619-03-069Dallas11/03/26$442,425.00ConstructionRoadwayConstructionRoadway12/01/26-28-28 days$(146,065.88)-25%
0014-06-047Waco02/02/27$240,348.00ConstructionBridgeConstructionBridge01/06/272727 days
0014-06-048Waco02/02/27$389,508.00ConstructionBridgeConstructionBridge01/06/272727 days
0014-06-049Waco02/02/27$240,348.00ConstructionBridgeConstructionBridge01/06/272727 days
0014-06-050Waco02/02/27$150,216.00ConstructionBridgeConstructionBridge01/06/272727 days
0382-02-040Waco02/02/27$137,880.00ConstructionBridgeConstructionBridge01/06/272727 days
0590-03-015Waco02/02/27$475,848.00ConstructionBridgeConstructionBridge01/06/272727 days
2868-01-014Waco02/02/27$296,100.00ConstructionBridgeConstructionBridge01/06/272727 days
2868-01-015Waco02/02/27$247,971.00ConstructionBridgeConstructionBridge01/06/272727 days
0912-72-727Houston08/20/26$418,655.00ConstructionLocal Let07/27/262424 days
1590-01-024San Antonio08/20/26$3,057,574.27Non-LetBridge07/27/262424 days$3,057,564.2730575643%
2374-04-100Dallas08/20/26$582,613.56ConstructionRoadway08/02/261818 days
0902-20-243Fort Worth08/17/26$6,742.50Non-LetNon Roadway07/30/261818 days
0912-72-709Houston08/31/26$570,213.00ConstructionLocal Let08/15/261616 days
0912-72-713Houston08/31/26$582,888.00ConstructionLocal Let08/15/261616 days
0912-72-715Houston08/31/26$328,175.00ConstructionLocal Let08/15/261616 days
0047-06-182Dallas08/12/26$1,127,591.83ConstructionLocal Let08/01/261111 days
0912-72-707Houston08/20/26$110,381.00ConstructionLocal Let08/15/2655 days
0912-72-711Houston08/20/26$101,445.00ConstructionLocal Let08/15/2655 days
0912-72-726Houston08/20/26$65,691.00ConstructionLocal Let08/15/2655 days
0912-72-758Houston08/20/26$115,370.00ConstructionLocal Let08/15/2655 days
0205-05-056Bryan07/03/27$1,320,333.00Non-LetRoadwayConstructionLocal Let07/01/2722 daysConstruction / Local Let → Non-Let / Roadway
341 rows · download CSV

Project Type & Subtype Changes

The subtype mix remains stable, with roadway projects comprising 78.7% of all projects as of the latest snapshot. Additionally, there were 18 instances of type and subtype changes, with 13 projects newly classified, while the predominant transition remained from unclassified to construction types.

SubtypeAug 3 (% of projects)Sep 3 (% of projects)Δ projects (pp, n)
Roadway78.7% (4,154)78.7% (4,180)+0.0 (+26)
Bridge13.8% (727)13.8% (735)+0.1 (+8)
Local Let3.0% (158)2.8% (149)-0.2 (-9)
Non Roadway1.8% (94)1.7% (91)-0.1 (-3)
Rail - Safety1.2% (64)1.2% (65)+0.0 (+1)
CSJDistrictEst. Letting DateProject EstimateCurrent TypeCurrent SubtypeType/Subtype ΔPrev. TypePrev. SubtypePrev. CostPrev. DateLetting Δ (days)Letting Date ΔCost Δ%Cost ΔLifecycle
3271-01-020Beaumont12/15/26$415,000.00Non-LetLocalConstruction / Local Let → Non-Let / LocalConstructionLocal Let$415,000.0008/15/261224 months
6487-66-001Houston01/06/27$1,000,000.00MaintenanceRoutine Maintenance ContractUnassigned → Maintenance / Routine Maintenance ContractUnassignedUnassigned$1,000,000.0008/01/261585 months
0205-05-056Bryan07/03/27$1,320,333.00Non-LetRoadwayConstruction / Local Let → Non-Let / RoadwayConstructionLocal Let$1,320,333.0007/01/2722 days
0272-04-037Brownwood10/05/27$220,000.00ConstructionRoadwayConstruction / Non Roadway → Construction / RoadwayConstructionNon Roadway$220,000.0010/05/270
0005-07-060Abilene12/01/27$445,343.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$445,343.0012/01/263651 year
0006-01-105Abilene12/01/27$447,776.57ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$482,411.0012/01/263651 year$(34,634.43)-7%
0006-08-057Abilene12/01/27$36,872.13ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$63,248.0012/01/33-2192-6 years$(26,375.87)-42%
0033-08-041Abilene12/01/27$2,515,863.77ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$318,213.0012/01/31-1461-4 years$2,197,650.77691%
0518-01-018Abilene12/01/27$114,851.26ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$76,801.0012/01/33-2192-6 years$38,050.2650%
0518-02-017Abilene12/01/27$221,912.45ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$323,673.0012/01/29-731-2 years$(101,760.55)-31%
0213-05-042Lufkin01/05/28$28,571,428.57ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$28,571,428.5701/01/33-1823-5 years
3510-03-009Houston04/05/28$49,800,881.00Alternative DeliveryDesign BuildConstruction / Roadway → Alternative Delivery / Design BuildConstructionRoadway$52,000,000.0004/05/280$(2,199,119.00)-4%
3510-04-038Houston04/05/28$101,000,000.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$39,800,000.0001/15/37-3207-9 years$61,200,000.00154%
0168-02-029Lubbock06/01/28$33,340,000.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$33,340,000.0009/01/31-1187-3 years
2941-01-042Houston09/01/28$3,571,429.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$3,571,429.0008/01/32-1430-4 years
0912-00-704Houston09/15/28$1,000,000.00Non-LetLocalConstruction / Local Let → Non-Let / LocalConstructionLocal Let$1,000,000.0009/15/280
0558-11-018San Angelo11/01/28$15,474,285.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$15,474,285.0010/01/34-2160-6 years
0921-02-395Pharr05/02/29$12,592,097.00ConstructionLocal LetUnassigned → Construction / Local LetUnassignedUnassigned$12,592,097.0005/05/33-1464-4 years
18 rows · download CSV

Cost Changes

The total active pipeline value increased by $2.55B from $30.79B to $33.34B. Costs concentrated in roadway and design build subtypes, contributing to a net change of +$317.19M for roadway projects and +$1.15B for design build projects. District-level movements show Houston leading with a net increase of +$2.27B, while Dallas faced a decrease of -$288.84M. Overall, this indicates a repricing of existing projects rather than a structural rewrite of the pipeline.

CSJDistrictEst. Letting DateProject EstimateCurrent TypeCurrent SubtypePrev. TypePrev. SubtypePrev. CostCost Δ%Cost ΔLetting Δ (days)Letting Date ΔType/Subtype ΔLifecycle
1590-01-024San Antonio08/20/26$3,057,574.27Non-LetBridge$10.00$3,057,564.2730575643%2424 days
2208-02-027Dallas06/03/28$31,445,902.00ConstructionRoadwayConstructionRoadway$850,000.00$30,595,902.003600%0
1697-02-035Brownwood11/03/26$466,413.43ConstructionRoadwayConstructionRoadway$26,675.00$439,738.431649%0
3510-03-002Houston12/15/28$928,944,620.00Alternative DeliveryDesign BuildAlternative DeliveryDesign Build$55,381,565.00$873,563,055.001577%0
3510-03-003Houston12/15/28$928,944,620.00$55,381,565.00$873,563,055.001577%0
0288-01-043Brownwood11/03/26$164,283.50ConstructionRoadwayConstructionRoadway$10,653.00$153,630.501442%0
3285-01-008Brownwood11/03/26$116,373.79ConstructionRoadwayConstructionRoadway$9,058.00$107,315.791185%0
2786-01-020Brownwood11/03/26$303,082.34ConstructionRoadwayConstructionRoadway$23,985.00$279,097.341164%0
0714-04-014Brownwood11/03/26$126,628.35ConstructionRoadwayConstructionRoadway$10,724.00$115,904.351081%0
2106-01-010Brownwood11/03/26$278,935.09ConstructionRoadwayConstructionRoadway$23,943.00$254,992.091065%0
3102-01-010Brownwood11/03/26$124,575.77ConstructionRoadwayConstructionRoadway$11,207.00$113,368.771012%0
0007-14-008Brownwood11/03/26$220,995.77ConstructionRoadwayConstructionRoadway$19,982.00$201,013.771006%0
1777-03-013Brownwood11/03/26$132,695.23ConstructionRoadwayConstructionRoadway$12,538.00$120,157.23958%0
2013-01-014Brownwood11/03/26$277,392.51ConstructionRoadwayConstructionRoadway$26,323.00$251,069.51954%0
0550-01-031Brownwood11/03/26$350,245.33ConstructionRoadwayConstructionRoadway$33,255.00$316,990.33953%0
0274-01-043Brownwood11/03/26$1,000,454.78ConstructionRoadwayConstructionRoadway$95,344.00$905,110.78949%0
2561-01-014Brownwood11/03/26$118,505.94ConstructionRoadwayConstructionRoadway$11,554.00$106,951.94926%0
1030-01-021Brownwood11/03/26$140,978.51ConstructionRoadwayConstructionRoadway$13,997.00$126,981.51907%0
0870-07-008Brownwood11/03/26$297,311.30ConstructionRoadwayConstructionRoadway$29,637.00$267,674.30903%0
2199-01-015Brownwood11/03/26$323,631.53ConstructionRoadwayConstructionRoadway$32,400.00$291,231.53899%0
1027-01-026Brownwood11/03/26$366,362.67ConstructionRoadwayConstructionRoadway$37,320.00$329,042.67882%0
1293-02-023Brownwood11/03/26$259,837.34ConstructionRoadwayConstructionRoadway$27,103.00$232,734.34859%0
0054-07-091Brownwood11/03/26$598,651.13ConstructionRoadwayConstructionRoadway$63,040.00$535,611.13850%0
0027-03-077Yoakum11/03/26$2,014,989.00ConstructionRoadwayConstructionRoadway$221,276.00$1,793,713.00811%0
0714-02-020Brownwood11/03/26$262,919.66ConstructionRoadwayConstructionRoadway$29,943.00$232,976.66778%0
2570-01-015Brownwood11/03/26$149,544.23ConstructionRoadwayConstructionRoadway$17,427.00$132,117.23758%0
0033-08-041Abilene12/01/27$2,515,863.77ConstructionRoadwayUnassignedUnassigned$318,213.00$2,197,650.77691%-1461-4 yearsUnassigned → Construction / Roadway
1032-03-014Brownwood11/03/26$135,772.96ConstructionRoadwayConstructionRoadway$18,972.00$116,800.96616%0
0032-01-036Childress09/06/28$5,181,100.00ConstructionBridgeConstructionBridge$739,200.00$4,441,900.00601%0
0755-04-002Lubbock12/01/27$10,320,000.00ConstructionRoadwayConstructionRoadway$1,497,915.00$8,822,085.00589%0
1104-01-024Brownwood11/03/26$231,663.30ConstructionRoadwayConstructionRoadway$39,331.00$192,332.30489%0
3510-03-004Houston12/15/28$412,433,844.00Alternative DeliveryDesign BuildAlternative DeliveryDesign Build$76,000,000.00$336,433,844.00443%0
0044-06-079Wichita Falls11/03/26$1,173,291.24ConstructionRoadwayConstructionRoadway$225,735.00$947,556.24420%0
0272-05-037Brownwood11/03/26$202,744.12ConstructionRoadwayConstructionRoadway$39,122.00$163,622.12418%0
0179-10-118Yoakum11/03/26$391,926.95ConstructionRoadwayConstructionRoadway$76,508.00$315,418.95412%0
0224-04-007Wichita Falls11/03/26$283,050.03ConstructionRoadwayConstructionRoadway$74,769.00$208,281.03279%0
0508-01-410Houston03/01/29$157,407,407.00ConstructionRoadwayConstructionRoadway$42,867,000.00$114,540,407.00267%0
0010-08-061Atlanta10/06/26$1,613,285.30ConstructionRoadwayConstructionRoadway$471,744.00$1,141,541.30242%0
1068-01-239Fort Worth04/05/28$12,028,411.19ConstructionBridgeConstructionBridge$4,028,411.19$8,000,000.00199%0
1227-02-016Pharr10/06/26$33,444.96ConstructionRoadwayConstructionRoadway$11,357.00$22,087.96194%0
3510-03-012Houston12/15/28$52,257,099.00Alternative DeliveryDesign BuildAlternative DeliveryDesign Build$19,860,000.00$32,397,099.00163%0
1598-01-023Fort Worth12/01/26$1,630,015.84ConstructionRoadwayConstructionRoadway$641,145.47$988,870.37154%0
3510-04-038Houston04/05/28$101,000,000.00ConstructionRoadwayUnassignedUnassigned$39,800,000.00$61,200,000.00154%-3207-9 yearsUnassigned → Construction / Roadway
0052-04-054Lubbock11/03/26$2,234,347.68ConstructionRoadwayConstructionRoadway$922,592.00$1,311,755.68142%0
0065-07-065Beaumont11/02/27$32,423,076.92ConstructionRoadwayConstructionRoadway$13,629,629.00$18,793,447.92138%-92-3 months
2103-01-045Austin07/01/27$5,703,841.00ConstructionRoadwayConstructionRoadway$2,400,000.00$3,303,841.00138%0
3098-01-022Pharr09/06/28$52,212,609.20ConstructionRoadwayConstructionRoadway$23,644,598.00$28,568,011.20121%0
0380-01-096Lubbock11/03/26$464,494.09ConstructionRoadwayConstructionRoadway$210,360.00$254,134.09121%0
0187-03-086Yoakum11/03/26$535,668.20ConstructionRoadwayConstructionRoadway$250,000.00$285,668.20114%0
0089-15-019Yoakum01/06/27$1,454,192.50ConstructionNon RoadwayConstructionNon Roadway$690,000.00$764,192.50111%0
0197-05-065Dallas06/01/27$7,149,973.31ConstructionRoadwayConstructionRoadway$3,393,518.40$3,756,454.91111%0
0966-03-030Abilene12/01/27$428,122.76ConstructionRoadwayConstructionRoadway$206,361.00$221,761.76107%0
0265-13-025Austin12/01/27$0.00ConstructionRoadwayConstructionRoadway$1,900,087.96$(1,900,087.96)-100%0
0315-01-041Bryan09/30/26$0.00Non-LetNon RoadwayNon-LetNon Roadway$490,901.31$(490,901.31)-100%642 months
0187-02-080Yoakum11/03/26$390,848.95ConstructionRoadwayConstructionRoadway$200,000.00$190,848.9595%0
0007-05-016Brownwood11/03/26$498,742.26ConstructionRoadwayConstructionRoadway$10,000,000.00$(9,501,257.74)-95%0
0366-01-084Austin12/01/26$2,772,792.40ConstructionBridgeConstructionBridge$1,442,307.69$1,330,484.7192%0
0002-14-047El Paso12/01/26$31,544.58ConstructionRoadwayConstructionRoadway$396,637.10$(365,092.52)-92%0
0271-06-117Houston10/04/28$42,074,599.07ConstructionRoadwayConstructionRoadway$21,987,988.48$20,086,610.5991%0
2631-02-007Fort Worth12/01/26$49,922.66ConstructionRoadwayConstructionRoadway$450,000.00$(400,077.34)-89%0
1039-02-098Brownwood11/03/26$258,092.31ConstructionRoadwayConstructionRoadway$137,225.00$120,867.3188%0
0033-06-127Abilene12/01/27$178,053.80ConstructionRoadwayConstructionRoadway$930,000.00$(751,946.20)-81%0
0114-04-082Austin09/01/27$413,307.72ConstructionBridgeConstructionBridge$2,092,592.59$(1,679,284.87)-80%0
0313-02-070Fort Worth12/01/26$145,590.77ConstructionRoadwayConstructionRoadway$81,400.88$64,189.8979%0
0200-04-020Beaumont09/06/28$32,079,629.63ConstructionRoadwayConstructionRoadway$18,000,000.00$14,079,629.6378%0
2910-02-002Pharr09/02/26$102,705.27ConstructionRoadwayConstructionRoadway$455,029.15$(352,323.88)-77%0
2206-02-009Austin11/03/26$192,802.34ConstructionRoadwayConstructionRoadway$807,488.46$(614,686.12)-76%0
2094-01-076Pharr10/06/26$38,406.76ConstructionRoadwayConstructionRoadway$154,048.00$(115,641.24)-75%0
0008-06-052Fort Worth06/01/27$37,500,000.00ConstructionRoadwayConstructionRoadway$21,629,185.61$15,870,814.3973%0
0313-08-032Fort Worth12/01/26$120,204.60ConstructionRoadwayConstructionRoadway$450,000.00$(329,795.40)-73%0
0071-01-059Brownwood11/03/26$40,825.75ConstructionRoadwayConstructionRoadway$23,627.00$17,198.7573%0
0627-03-029Beaumont09/02/26$272,155.00ConstructionRoadwayConstructionRoadway$904,174.21$(632,019.21)-70%0
0912-34-229Houston01/05/28$1,100,000.00ConstructionBridgeConstructionBridge$652,839.00$447,161.0068%0
0683-07-013Austin01/06/27$2,581,650.00ConstructionRoadwayConstructionRoadway$8,173,076.92$(5,591,426.92)-68%0
2631-01-007Fort Worth12/01/26$144,552.64ConstructionRoadwayConstructionRoadway$450,000.00$(305,447.36)-68%0
0156-05-066Wichita Falls11/03/26$110,222.45ConstructionRoadwayConstructionRoadway$336,963.00$(226,740.55)-67%0
0843-02-031Atlanta10/06/26$67,975.85ConstructionRoadwayConstructionRoadway$198,036.00$(130,060.15)-66%0
0500-01-158Houston11/03/26$1,656,690.05ConstructionRoadwayConstructionRoadway$1,000,000.00$656,690.0566%0
0067-07-107Lubbock11/03/26$603,818.15ConstructionRoadwayConstructionRoadway$1,758,008.00$(1,154,189.85)-66%0
0721-05-018Lubbock11/03/26$266,687.94ConstructionRoadwayConstructionRoadway$762,023.00$(495,335.06)-65%0
0113-13-162Austin08/01/29$672,884.00ConstructionRoadwayConstructionRoadway$408,482.14$264,401.8665%0
0104-07-027El Paso12/01/26$2,627,832.43ConstructionRoadwayConstructionRoadway$1,601,075.00$1,026,757.4364%0
2437-01-028Amarillo11/03/26$355,639.39ConstructionRoadwayConstructionRoadway$969,400.00$(613,760.61)-63%-364-12 months
0510-06-024Paris10/06/26$10,924,688.49ConstructionRoadwayConstructionRoadway$6,710,000.00$4,214,688.4963%0
0132-01-058Childress10/06/26$97,835.09ConstructionRoadwayConstructionRoadway$60,311.00$37,524.0962%0
1006-01-079Houston09/06/28$68,806,344.00ConstructionRoadwayConstructionRoadway$42,835,489.94$25,970,854.0661%0
0239-08-002Wichita Falls11/03/26$14,951.10ConstructionRoadwayConstructionRoadway$9,318.00$5,633.1060%0
0144-03-046Yoakum11/03/26$609,258.35ConstructionRoadwayConstructionRoadway$1,500,000.00$(890,741.65)-59%0
0616-01-021Corpus Christi11/03/26$122,537.50ConstructionRoadwayConstructionRoadway$300,000.00$(177,462.50)-59%0
0714-02-022Brownwood11/03/26$182,685.62ConstructionRoadwayConstructionRoadway$445,147.00$(262,461.38)-59%0
0912-34-224Houston01/05/28$925,000.00ConstructionBridgeConstructionBridge$582,146.00$342,854.0059%0
0918-47-368Dallas08/04/28$2,879,629.63ConstructionLocal LetConstructionLocal Let$7,000,000.00$(4,120,370.37)-59%0
0912-31-336Houston10/04/28$311,918.62ConstructionBridgeConstructionBridge$756,690.00$(444,771.38)-59%0
3632-01-003Pharr02/02/28$143,460,600.00ConstructionRoadwayConstructionRoadway$90,352,435.00$53,108,165.0059%0
0047-09-034Dallas03/01/29$24,203,553.90ConstructionRoadwayConstructionRoadway$15,277,063.68$8,926,490.2258%2117 months
0912-31-326Houston10/04/28$324,932.04ConstructionBridgeConstructionBridge$753,823.00$(428,890.96)-57%0
1015-01-082Dallas10/06/26$532,361.81ConstructionRoadwayConstructionRoadway$339,360.27$193,001.5457%0
1041-01-027Lubbock11/03/26$101,787.21ConstructionRoadwayConstructionRoadway$64,974.00$36,813.2157%0
0246-02-056Atlanta10/06/26$544,143.42ConstructionRoadwayConstructionRoadway$1,252,080.00$(707,936.58)-57%0
0016-05-133San Antonio01/06/27$15,966,150.80ConstructionRoadwayConstructionRoadway$35,821,264.00$(19,855,113.20)-55%0
1156-02-026Abilene12/01/27$371,667.54ConstructionRoadwayConstructionRoadway$817,172.00$(445,504.46)-55%0
0114-09-091Bryan06/14/28$131,038,962.00Alternative DeliveryDesign BuildAlternative DeliveryDesign Build$84,922,091.00$46,116,871.0054%0
1413-01-020Houston10/04/28$897,625.39ConstructionBridgeConstructionBridge$1,960,979.00$(1,063,353.61)-54%0
0912-73-231Houston12/01/27$1,321,035.00ConstructionBridgeConstructionBridge$2,866,356.00$(1,545,321.00)-54%0
0095-03-101Dallas10/06/26$5,499,985.50ConstructionBridgeConstructionBridge$11,827,282.00$(6,327,296.50)-54%0
1055-01-014Lubbock11/03/26$188,648.82ConstructionRoadwayConstructionRoadway$404,264.00$(215,615.18)-53%0
1068-02-160Fort Worth12/05/28$12,864,571.49ConstructionRoadwayConstructionRoadway$27,467,857.00$(14,603,285.51)-53%0
2706-02-018Wichita Falls11/03/26$165,826.50ConstructionRoadwayConstructionRoadway$108,280.00$57,546.5053%0
0912-31-330Houston10/04/28$330,167.33ConstructionBridgeConstructionBridge$704,085.00$(373,917.67)-53%0
3123-02-014Fort Worth12/01/26$190,584.89ConstructionRoadwayConstructionRoadway$402,000.00$(211,415.11)-53%0
0346-01-042Yoakum11/03/26$104,192.50ConstructionRoadwayConstructionRoadway$219,284.00$(115,091.50)-52%0
1875-03-023Lufkin06/01/27$7,928,817.00ConstructionRoadwayConstructionRoadway$16,643,518.52$(8,714,701.52)-52%0
1491-02-013Amarillo11/03/26$202,269.14ConstructionRoadwayConstructionRoadway$420,000.00$(217,730.86)-52%0
0933-03-007Lubbock11/03/26$365,385.19ConstructionRoadwayConstructionRoadway$757,081.00$(391,695.81)-52%0
0508-01-397Houston07/01/27$398,371,929.00ConstructionRoadwayConstructionRoadway$262,691,400.96$135,680,528.0452%0
0880-04-041Lubbock11/03/26$282,898.48ConstructionRoadwayConstructionRoadway$187,658.00$95,240.4851%0
0842-03-042Yoakum07/01/27$26,245,701.93ConstructionRoadwayConstructionRoadway$17,418,439.00$8,827,262.9351%-433-1 year
1491-01-020Amarillo11/03/26$838,618.18ConstructionRoadwayConstructionRoadway$1,700,000.00$(861,381.82)-51%0
0052-07-076Lubbock11/03/26$753,458.95ConstructionRoadwayConstructionRoadway$500,980.00$252,478.9550%0
0590-05-057Bryan10/06/26$235,741.96ConstructionRoadwayConstructionRoadway$475,198.00$(239,456.04)-50%0
0683-06-035Austin01/06/27$3,155,350.00ConstructionRoadwayConstructionRoadway$6,346,153.85$(3,190,803.85)-50%0
0453-11-008Lubbock11/03/26$87,762.03ConstructionRoadwayConstructionRoadway$175,090.00$(87,327.97)-50%0
0518-01-018Abilene12/01/27$114,851.26ConstructionRoadwayUnassignedUnassigned$76,801.00$38,050.2650%-2192-6 yearsUnassigned → Construction / Roadway
0423-02-026Wichita Falls11/03/26$283,497.95ConstructionRoadwayConstructionRoadway$189,651.00$93,846.9549%0
0010-10-031Atlanta10/06/26$108,532.95ConstructionRoadwayConstructionRoadway$210,279.60$(101,746.65)-48%0
0453-10-020Lubbock11/03/26$327,438.26ConstructionRoadwayConstructionRoadway$632,820.00$(305,381.74)-48%0
0211-10-048Yoakum11/03/26$532,846.65ConstructionRoadwayConstructionRoadway$360,133.00$172,713.6548%0
1255-02-008Lubbock11/03/26$431,436.78ConstructionRoadwayConstructionRoadway$827,904.00$(396,467.22)-48%0
0616-01-020Corpus Christi11/03/26$366,718.10ConstructionRoadwayConstructionRoadway$700,000.00$(333,281.90)-48%0
0179-09-045Yoakum11/03/26$94,842.45ConstructionRoadwayConstructionRoadway$180,621.00$(85,778.55)-47%0
0007-06-272Brownwood11/03/26$192,014.27ConstructionRoadwayConstructionRoadway$131,061.00$60,953.2747%0
2529-01-026Pharr10/06/26$49,326.84ConstructionRoadwayConstructionRoadway$33,800.00$15,526.8446%0
0062-01-045Atlanta10/06/26$241,623.65ConstructionRoadwayConstructionRoadway$441,288.00$(199,664.35)-45%0
1621-02-007Amarillo11/03/26$60,785.41ConstructionRoadwayConstructionRoadway$110,000.00$(49,214.59)-45%0
0007-06-269Brownwood11/03/26$189,072.25ConstructionRoadwayConstructionRoadway$131,061.00$58,011.2544%0
1621-01-017Amarillo11/03/26$414,091.50ConstructionRoadwayConstructionRoadway$742,000.00$(327,908.50)-44%0
0696-02-004Pharr10/06/26$27,806.47ConstructionRoadwayConstructionRoadway$49,132.00$(21,325.53)-43%0
0067-02-076Lubbock11/03/26$163,956.86ConstructionRoadwayConstructionRoadway$114,778.00$49,178.8643%0
0976-02-086Houston08/02/28$101,155,221.00ConstructionRoadwayConstructionRoadway$70,907,942.00$30,247,279.0043%0
0002-02-065El Paso12/01/26$248,202.21ConstructionRoadwayConstructionRoadway$174,697.63$73,504.5842%0
1236-02-018Pharr10/06/26$33,663.76ConstructionRoadwayConstructionRoadway$58,084.00$(24,420.24)-42%0
2899-01-013Amarillo11/03/26$157,269.29ConstructionRoadwayConstructionRoadway$270,000.00$(112,730.71)-42%0
0006-08-057Abilene12/01/27$36,872.13ConstructionRoadwayUnassignedUnassigned$63,248.00$(26,375.87)-42%-2192-6 yearsUnassigned → Construction / Roadway
0168-09-194Amarillo11/03/26$641,547.14ConstructionBridgeConstructionBridge$1,100,000.00$(458,452.86)-42%0
0278-01-065Atlanta10/06/26$458,024.54ConstructionRoadwayConstructionRoadway$782,640.00$(324,615.46)-41%0
0303-04-039Childress10/06/26$1,343,645.02ConstructionRoadwayConstructionRoadway$950,400.00$393,245.0241%0
0355-05-048Amarillo11/03/26$818,721.04ConstructionRoadwayConstructionRoadway$580,000.00$238,721.0441%0
3063-01-013Yoakum11/03/26$76,923.40ConstructionRoadwayConstructionRoadway$130,000.00$(53,076.60)-41%0
0640-01-052Atlanta10/06/26$206,187.59ConstructionRoadwayConstructionRoadway$346,428.00$(140,240.41)-40%0
0022-03-032Odessa11/03/26$1,350,925.50ConstructionBridgeConstructionBridge$963,525.31$387,400.1940%0
0912-34-225Houston01/05/28$1,100,000.00ConstructionBridgeConstructionBridge$785,976.00$314,024.0040%0
0085-01-052Atlanta10/06/26$545,392.02ConstructionRoadwayConstructionRoadway$904,946.40$(359,554.38)-40%0
0022-01-034Odessa10/06/26$6,089,616.17ConstructionBridgeConstructionBridge$10,000,000.00$(3,910,383.83)-39%0
0750-01-027Atlanta10/06/26$18,556.74ConstructionRoadwayConstructionRoadway$30,412.80$(11,856.06)-39%0
0084-01-095Atlanta10/06/26$361,010.81ConstructionRoadwayConstructionRoadway$591,498.00$(230,487.19)-39%0
0684-02-031Pharr10/06/26$27,151.47ConstructionRoadwayConstructionRoadway$44,452.00$(17,300.53)-39%0
0583-02-013Lubbock11/03/26$1,009,682.43ConstructionRoadwayConstructionRoadway$1,647,075.00$(637,392.57)-39%0
0095-03-102Dallas10/06/26$9,538,842.50ConstructionBridgeConstructionBridge$15,558,783.75$(6,019,941.25)-39%0
0310-04-028Amarillo11/03/26$207,442.33ConstructionRoadwayConstructionRoadway$150,000.00$57,442.3338%0
0094-08-008Fort Worth09/06/28$2,110,558.30ConstructionBridgeConstructionBridge$3,413,675.90$(1,303,117.60)-38%0
0125-03-057Wichita Falls11/03/26$235,660.06ConstructionRoadwayConstructionRoadway$380,494.00$(144,833.94)-38%0
0645-02-016Lubbock11/03/26$415,169.29ConstructionRoadwayConstructionRoadway$668,088.00$(252,918.71)-38%0
0402-03-045Atlanta10/06/26$166,625.35ConstructionRoadwayConstructionRoadway$265,644.00$(99,018.65)-37%0
0342-01-103Pharr02/02/27$7,570,796.10ConstructionRoadwayConstructionRoadway$12,043,275.00$(4,472,478.90)-37%0
0846-03-050Yoakum11/03/26$436,768.00ConstructionRoadwayConstructionRoadway$318,518.00$118,250.0037%0
1583-02-020Beaumont09/02/26$227,437.70ConstructionRoadwayConstructionRoadway$357,904.07$(130,466.37)-36%0
1159-02-041Dallas10/06/26$778,049.81ConstructionRoadwayConstructionRoadway$570,893.19$207,156.6236%0
0114-08-037Yoakum11/03/26$630,224.60ConstructionRoadwayConstructionRoadway$985,295.00$(355,070.40)-36%0
0681-05-019Wichita Falls11/03/26$645,599.45ConstructionRoadwayConstructionRoadway$475,177.00$170,422.4536%0
0959-02-011Lubbock11/03/26$267,015.87ConstructionRoadwayConstructionRoadway$415,579.00$(148,563.13)-36%0
0179-04-112Yoakum10/04/28$514,253.80ConstructionRoadwayConstructionRoadway$800,000.00$(285,746.20)-36%0
1803-01-092Pharr01/05/28$20,070,328.00ConstructionRoadwayConstructionRoadway$14,796,701.00$5,273,627.0036%0
3066-01-005Brownwood11/03/26$18,932.11ConstructionRoadwayConstructionRoadway$13,961.00$4,971.1136%0
3510-03-013Houston12/15/28$182,987,469.00Alternative DeliveryDesign BuildAlternative DeliveryDesign Build$282,610,000.00$(99,622,531.00)-35%0
0716-01-049Yoakum11/03/26$634,248.35ConstructionRoadwayConstructionRoadway$469,875.00$164,373.3535%0
0026-02-040Yoakum02/02/27$370,648.75ConstructionRoadwayConstructionRoadway$275,000.00$95,648.7535%0
0402-04-037Atlanta10/06/26$378,092.48ConstructionRoadwayConstructionRoadway$577,800.00$(199,707.52)-35%0
0269-02-069Yoakum11/03/26$708,196.60ConstructionRoadwayConstructionRoadway$1,080,276.00$(372,079.40)-34%0
0214-03-032Beaumont11/02/27$12,500,000.00ConstructionBridgeConstructionBridge$19,000,000.00$(6,500,000.00)-34%0
0302-05-002Lubbock11/03/26$84,489.57ConstructionRoadwayConstructionRoadway$128,206.00$(43,716.43)-34%0
0154-01-069Yoakum11/03/26$172,390.25ConstructionRoadwayConstructionRoadway$260,005.00$(87,614.75)-34%0
0249-07-071Fort Worth06/01/28$96,153,846.15ConstructionBridgeConstructionBridge$71,927,225.18$24,226,620.9734%0
0249-07-080Fort Worth01/05/28$6,393,898.13ConstructionRoadwayConstructionRoadway$9,585,746.08$(3,191,847.95)-33%0
0918-47-460Dallas12/01/26$8,032,280.30ConstructionBridgeConstructionBridge$6,025,768.30$2,006,512.0033%0
2525-01-020Yoakum10/04/28$534,323.80ConstructionRoadwayConstructionRoadway$800,000.00$(265,676.20)-33%0
0008-05-029Fort Worth06/01/27$136,069,841.00ConstructionRoadwayConstructionRoadway$102,309,774.79$33,760,066.2133%0
0964-02-035Atlanta10/06/26$466,254.07ConstructionRoadwayConstructionRoadway$694,152.00$(227,897.93)-33%0
0562-03-013Wichita Falls11/03/26$261,751.95ConstructionRoadwayConstructionRoadway$197,362.00$64,389.9533%0
1885-03-013Amarillo11/03/26$714,212.48ConstructionRoadwayConstructionRoadway$1,060,000.00$(345,787.52)-33%-364-12 months
2726-01-016Amarillo11/03/26$831,208.32ConstructionRoadwayConstructionRoadway$1,230,000.00$(398,791.68)-32%0
2896-01-011Yoakum11/03/26$471,214.10ConstructionRoadwayConstructionRoadway$356,405.00$114,809.1032%0
0823-03-008Wichita Falls11/03/26$126,408.12ConstructionRoadwayConstructionRoadway$95,880.00$30,528.1232%0
0186-02-036Bryan08/02/28$3,000,000.00ConstructionRoadwayConstructionRoadway$4,400,000.00$(1,400,000.00)-32%-125-4 months
0924-06-722El Paso12/01/26$199,560.58ConstructionRoadwayConstructionRoadway$151,557.35$48,003.2332%0
0518-02-017Abilene12/01/27$221,912.45ConstructionRoadwayUnassignedUnassigned$323,673.00$(101,760.55)-31%-731-2 yearsUnassigned → Construction / Roadway
0645-01-017Lubbock11/03/26$598,209.26ConstructionRoadwayConstructionRoadway$872,570.00$(274,360.74)-31%0
1015-02-017Dallas10/06/26$216,654.70ConstructionRoadwayConstructionRoadway$165,018.52$51,636.1831%0
1439-02-016Yoakum11/03/26$181,694.15ConstructionRoadwayConstructionRoadway$138,495.00$43,199.1531%0
0168-09-193Amarillo11/03/26$722,714.98ConstructionBridgeConstructionBridge$1,050,000.00$(327,285.02)-31%0
3123-01-017Fort Worth12/01/26$229,955.95ConstructionRoadwayConstructionRoadway$175,601.00$54,354.9531%0
0669-01-070Pharr10/06/26$22,399.17ConstructionRoadwayConstructionRoadway$32,348.00$(9,948.83)-31%0
2126-03-009Amarillo11/03/26$125,452.61ConstructionRoadwayConstructionRoadway$180,500.00$(55,047.39)-31%0
0912-73-228Houston12/01/27$796,131.00ConstructionBridgeConstructionBridge$1,144,810.00$(348,679.00)-30%0
1412-01-023Yoakum11/03/26$39,944.45ConstructionRoadwayConstructionRoadway$30,625.00$9,319.4530%0
0549-02-038Paris09/02/26$1,829,363.32ConstructionRoadwayConstructionRoadway$2,626,356.93$(796,993.61)-30%0
0843-02-030Atlanta10/06/26$149,968.47ConstructionRoadwayConstructionRoadway$214,776.00$(64,807.53)-30%0
0714-01-016Fort Worth11/03/26$76,076.55ConstructionRoadwayConstructionRoadway$108,470.00$(32,393.45)-30%0
0356-02-050Amarillo11/03/26$142,427.10ConstructionRoadwayConstructionRoadway$202,000.00$(59,572.90)-29%0
0168-09-200Amarillo11/03/26$848,781.30ConstructionRoadwayConstructionRoadway$1,200,000.00$(351,218.70)-29%0
1451-01-032Dallas10/06/26$956,229.83ConstructionRoadwayConstructionRoadway$740,028.52$216,201.3129%0
0420-10-020Yoakum11/03/26$429,631.55ConstructionRoadwayConstructionRoadway$333,576.00$96,055.5529%0
0173-05-044Dallas10/06/26$687,003.67ConstructionRoadwayConstructionRoadway$533,456.92$153,546.7529%0
2213-02-012Fort Worth12/01/26$321,528.38ConstructionRoadwayConstructionRoadway$450,000.00$(128,471.62)-29%0
3510-07-012Houston08/04/27$81,894,039.00ConstructionRoadwayConstructionRoadway$63,904,122.00$17,989,917.0028%0
0440-06-030Austin01/06/27$50,000,000.00ConstructionRoadwayConstructionRoadway$39,074,038.46$10,925,961.5428%0
1947-01-021Beaumont09/02/26$756,980.80ConstructionRoadwayConstructionRoadway$1,048,785.06$(291,804.26)-28%0
0352-02-052Fort Worth01/05/28$9,580,820.57ConstructionRoadwayConstructionRoadway$13,254,306.88$(3,673,486.31)-28%0
1051-03-001Dallas12/01/26$68,964,680.56ConstructionRoadwayConstructionRoadway$54,002,986.08$14,961,694.4828%0
0574-01-034Dallas10/06/26$633,520.12ConstructionRoadwayConstructionRoadway$496,905.09$136,615.0327%0
0266-03-033Yoakum01/06/27$192,415.80ConstructionNon RoadwayConstructionNon Roadway$265,000.00$(72,584.20)-27%0
1260-03-016Yoakum11/03/26$114,984.50ConstructionRoadwayConstructionRoadway$90,335.00$24,649.5027%0
2350-01-074Yoakum11/03/26$354,089.35ConstructionRoadwayConstructionRoadway$278,345.00$75,744.3527%0
0371-04-062Corpus Christi07/01/27$64,769,601.51ConstructionRoadwayConstructionRoadway$51,000,000.00$13,769,601.5127%1766 months
0697-03-034Dallas10/06/26$346,029.34ConstructionRoadwayConstructionRoadway$272,745.38$73,283.9627%0
1947-02-017Beaumont09/02/26$449,838.10ConstructionRoadwayConstructionRoadway$614,931.12$(165,093.02)-27%0
0265-02-043Austin08/02/28$1,661,538.46ConstructionRoadwayConstructionRoadway$2,270,411.00$(608,872.54)-27%0
1629-02-008Lubbock11/03/26$467,439.28ConstructionRoadwayConstructionRoadway$369,482.00$97,957.2827%0
0172-09-047Fort Worth09/02/26$3,514,144.18ConstructionRoadwayConstructionRoadway$4,776,312.18$(1,262,168.00)-26%0
0211-03-039Austin12/01/26$1,833,490.08ConstructionRoadwayConstructionRoadway$2,489,243.27$(655,753.19)-26%0
2815-01-010Dallas10/06/26$281,061.68ConstructionRoadwayConstructionRoadway$222,479.71$58,581.9726%0
0280-04-009Dallas10/06/26$89,276.40ConstructionRoadwayConstructionRoadway$70,773.60$18,502.8026%0
0668-02-021Abilene12/01/27$454,483.54ConstructionRoadwayConstructionRoadway$360,441.00$94,042.5426%0
0010-08-063Atlanta10/06/26$435,558.98ConstructionRoadwayConstructionRoadway$588,445.20$(152,886.22)-26%0
2614-01-031Amarillo11/03/26$27,712.59ConstructionRoadwayConstructionRoadway$22,000.00$5,712.5926%0
1960-02-010Yoakum11/03/26$91,689.65ConstructionRoadwayConstructionRoadway$123,750.00$(32,060.35)-26%0
0195-02-091Dallas08/04/27$163,851,323.75ConstructionRoadwayConstructionRoadway$130,262,376.64$33,588,947.1126%0
0681-06-015Wichita Falls11/03/26$600,011.85ConstructionRoadwayConstructionRoadway$477,659.00$122,352.8526%0
1227-01-029Pharr10/06/26$87,344.30ConstructionRoadwayConstructionRoadway$117,367.00$(30,022.70)-26%0
2353-02-026Dallas05/05/27$9,505,718.00ConstructionRoadwayConstructionRoadway$7,573,314.29$1,932,403.7126%0
3041-02-021Atlanta10/06/26$251,690.45ConstructionRoadwayConstructionRoadway$337,644.00$(85,953.55)-25%0
0137-07-026Wichita Falls11/03/26$698,985.81ConstructionRoadwayConstructionRoadway$935,639.00$(236,653.19)-25%0
0794-06-023Amarillo11/03/26$898,793.63ConstructionRoadwayConstructionRoadway$1,200,000.00$(301,206.37)-25%0
0410-03-020Dallas10/06/26$155,431.79ConstructionRoadwayConstructionRoadway$124,285.46$31,146.3325%0
1988-01-025Atlanta10/06/26$316,216.41ConstructionRoadwayConstructionRoadway$421,725.60$(105,509.19)-25%0
0015-18-007Waco07/01/27$1,912,861.00ConstructionRoadwayConstructionRoadway$1,530,288.00$382,573.0025%863 months
0619-03-069Dallas11/03/26$442,425.00ConstructionRoadwayConstructionRoadway$588,490.88$(146,065.88)-25%-28-28 days
1974-01-013Dallas10/06/26$355,891.97ConstructionRoadwayConstructionRoadway$285,309.49$70,582.4825%0
0212-03-059Bryan11/03/26$11,162,673.25ConstructionBridgeConstructionBridge$14,811,612.00$(3,648,938.75)-25%0
0095-03-099Dallas10/06/26$5,383,731.50ConstructionBridgeConstructionBridge$7,142,577.25$(1,758,845.75)-25%0
0095-03-098Dallas10/06/26$3,570,273.00ConstructionBridgeConstructionBridge$4,724,338.30$(1,154,065.30)-24%0
0280-03-005Dallas10/06/26$208,242.16ConstructionRoadwayConstructionRoadway$167,428.56$40,813.6024%0
1575-03-019Atlanta10/06/26$406,886.52ConstructionRoadwayConstructionRoadway$535,860.00$(128,973.48)-24%0
2417-02-019Fort Worth12/01/26$483,666.99ConstructionRoadwayConstructionRoadway$390,000.00$93,666.9924%0
0269-09-020Yoakum11/03/26$104,920.55ConstructionRoadwayConstructionRoadway$138,095.00$(33,174.45)-24%0
0091-06-063Dallas08/04/28$3,800,000.00ConstructionRoadwayConstructionRoadway$5,000,000.00$(1,200,000.00)-24%0
0095-12-003Dallas10/06/26$24,392.62ConstructionRoadwayConstructionRoadway$19,676.50$4,716.1224%0
0212-03-058Bryan11/03/26$10,451,994.90ConstructionBridgeConstructionBridge$13,742,128.00$(3,290,133.10)-24%0
0580-02-014Yoakum11/03/26$148,543.10ConstructionRoadwayConstructionRoadway$195,059.00$(46,515.90)-24%0
2738-01-018Fort Worth12/01/26$443,811.77ConstructionRoadwayConstructionRoadway$581,433.18$(137,621.41)-24%0
0197-12-008Dallas10/06/26$295,898.13ConstructionRoadwayConstructionRoadway$239,271.24$56,626.8924%0
0169-09-021Amarillo11/03/26$740,513.45ConstructionRoadwayConstructionRoadway$600,000.00$140,513.4523%0
0280-02-046Dallas10/06/26$1,329,905.30ConstructionRoadwayConstructionRoadway$1,078,383.96$251,521.3423%0
0146-07-034Wichita Falls11/03/26$755,985.78ConstructionRoadwayConstructionRoadway$984,903.00$(228,917.22)-23%0
1506-01-015Pharr10/06/26$69,258.32ConstructionRoadwayConstructionRoadway$90,223.00$(20,964.68)-23%0
1012-02-045Dallas10/06/26$84,746.32ConstructionRoadwayConstructionRoadway$68,826.14$15,920.1823%0
0135-04-043Dallas10/06/26$74,488.20ConstructionRoadwayConstructionRoadway$60,503.14$13,985.0623%0
0092-03-053Dallas12/01/26$76,245,839.82ConstructionRoadwayConstructionRoadway$62,131,255.85$14,114,583.9723%0
0122-01-047Dallas10/06/26$867,320.71ConstructionRoadwayConstructionRoadway$706,835.31$160,485.4023%0
0640-04-015Atlanta10/06/26$332,811.18ConstructionRoadwayConstructionRoadway$430,200.00$(97,388.82)-23%0
0197-13-007Dallas10/06/26$242,202.23ConstructionRoadwayConstructionRoadway$197,779.93$44,422.3022%0
0271-04-093Houston06/01/33$56,574,074.00ConstructionRoadway$46,286,366.28$10,287,707.7222%16394 years
1861-01-014Amarillo11/03/26$17,919.14ConstructionRoadwayConstructionRoadway$23,000.00$(5,080.86)-22%0
0066-03-045Amarillo11/03/26$3,658,772.15ConstructionRoadwayConstructionRoadway$3,000,000.00$658,772.1522%0
0045-08-039Paris07/01/27$151,785,996.00ConstructionRoadwayConstructionRoadway$124,861,809.00$26,924,187.0022%0
0173-04-062Dallas10/06/26$83,929.47ConstructionRoadwayConstructionRoadway$69,047.73$14,881.7422%0
0092-05-058Dallas10/06/26$3,944,536.07ConstructionRoadwayConstructionRoadway$3,246,330.95$698,205.1222%0
0313-01-064Fort Worth12/01/26$544,447.53ConstructionRoadwayConstructionRoadway$693,522.64$(149,075.11)-22%0
0095-03-108Dallas10/06/26$5,807,189.50ConstructionBridgeConstructionBridge$7,397,762.80$(1,590,573.30)-22%0
0197-05-066Dallas10/06/26$39,646.21ConstructionRoadwayConstructionRoadway$32,650.38$6,995.8321%0
0912-31-338Houston12/01/27$1,251,838.00ConstructionBridgeConstructionBridge$1,592,420.00$(340,582.00)-21%0
1318-01-022Dallas10/06/26$612,594.34ConstructionRoadwayConstructionRoadway$505,148.53$107,445.8121%0
0257-02-042Brownwood11/03/26$280,071.71ConstructionRoadwayConstructionRoadway$355,605.00$(75,533.29)-21%0
0095-03-103Dallas10/06/26$7,710,438.50ConstructionBridgeConstructionBridge$9,784,408.00$(2,073,969.50)-21%0
0162-09-043Dallas10/06/26$1,166,880.57ConstructionRoadwayConstructionRoadway$964,677.94$202,202.6321%0
0918-47-497Dallas03/03/27$840,687.38ConstructionRoadwayConstructionRoadway$696,600.00$144,087.3821%0
1968-01-012Atlanta10/06/26$237,109.21ConstructionRoadwayConstructionRoadway$298,836.00$(61,726.79)-21%0
0095-03-109Dallas10/06/26$10,832,284.50ConstructionBridgeConstructionBridge$13,641,956.75$(2,809,672.25)-21%0
0380-01-097Lubbock11/03/26$41,350.47ConstructionRoadwayConstructionRoadway$34,332.00$7,018.4720%0
1068-01-242Fort Worth02/02/28$3,677,708.65ConstructionRoadwayConstructionRoadway$3,057,330.65$620,378.0020%0
0727-04-021Amarillo11/03/26$901,418.52ConstructionRoadwayConstructionRoadway$1,130,000.00$(228,581.48)-20%0
1441-01-016Yoakum11/03/26$252,114.55ConstructionRoadwayConstructionRoadway$316,033.00$(63,918.45)-20%0
1222-02-027Atlanta10/06/26$129,532.50ConstructionRoadwayConstructionRoadway$162,360.00$(32,827.50)-20%0
2398-01-063Abilene03/03/27$9,281,535.00ConstructionBridgeConstructionBridge$11,607,143.00$(2,325,608.00)-20%0
1105-01-018Yoakum11/03/26$430,635.05ConstructionRoadwayConstructionRoadway$538,511.00$(107,875.95)-20%0
0404-01-033Wichita Falls11/03/26$787,235.84ConstructionRoadwayConstructionRoadway$984,335.00$(197,099.16)-20%0
0015-13-423Austin01/01/29$1,202,030,435.19ConstructionRoadwayConstructionRoadway$1,502,285,712.50$(300,255,277.31)-20%0
2676-01-008Yoakum11/03/26$207,686.85ConstructionRoadwayConstructionRoadway$173,180.00$34,506.8520%0
1341-02-009Lubbock11/03/26$56,317.45ConstructionRoadwayConstructionRoadway$46,986.61$9,330.8420%0
1396-01-016Dallas10/06/26$457,675.44ConstructionRoadwayConstructionRoadway$381,875.89$75,799.5520%0
3510-07-017Houston09/01/27$3,350,904.00ConstructionRoadwayConstructionRoadway$2,799,907.00$550,997.0020%0
0200-05-036Beaumont09/06/28$107,698,149.07ConstructionRoadwayConstructionRoadway$90,000,000.00$17,698,149.0720%0
3426-01-005Dallas10/06/26$329,433.23ConstructionRoadwayConstructionRoadway$275,353.38$54,079.8520%0
0385-04-055Fort Worth12/01/26$499,088.52ConstructionRoadwayConstructionRoadway$621,003.75$(121,915.23)-20%0
2512-03-010Dallas10/06/26$408,415.96ConstructionRoadwayConstructionRoadway$341,389.85$67,026.1120%0
0153-02-047Yoakum11/03/26$79,467.10ConstructionRoadwayConstructionRoadway$98,736.00$(19,268.90)-20%0
0924-06-719El Paso12/01/26$196,694.75ConstructionRoadwayConstructionRoadway$244,297.44$(47,602.69)-19%0
3333-01-005Yoakum11/03/26$120,944.10ConstructionRoadwayConstructionRoadway$150,212.00$(29,267.90)-19%0
0045-09-103Paris03/03/27$75,480,004.00ConstructionRoadwayConstructionRoadway$93,663,191.00$(18,183,187.00)-19%0
0281-01-038Dallas10/06/26$624,564.34ConstructionRoadwayConstructionRoadway$523,382.75$101,181.5919%0
0140-01-083Odessa11/03/26$118,112.40ConstructionBridgeConstructionBridge$146,332.10$(28,219.70)-19%0
2631-03-007Fort Worth12/01/26$174,039.48ConstructionRoadwayConstructionRoadway$145,928.00$28,111.4819%0
2638-05-012Brownwood11/03/26$110,473.20ConstructionRoadwayConstructionRoadway$136,716.00$(26,242.80)-19%0
0538-02-024Childress10/06/26$288,861.92ConstructionRoadwayConstructionRoadway$357,153.00$(68,291.08)-19%0
0169-06-043Amarillo11/03/26$1,131,498.50ConstructionRoadwayConstructionRoadway$950,000.00$181,498.5019%0
0083-08-061Atlanta10/06/26$422,242.00ConstructionRoadwayConstructionRoadway$354,528.00$67,714.0019%0
0015-13-452Austin02/02/27$150,000,000.00ConstructionRoadwayConstructionRoadway$125,961,538.46$24,038,461.5419%0
0114-04-081Austin09/01/27$516,792.60ConstructionBridgeConstructionBridge$638,420.37$(121,627.77)-19%0
0356-03-020Amarillo11/03/26$744,087.55ConstructionRoadwayConstructionRoadway$625,000.00$119,087.5519%0
0212-04-041Bryan11/03/26$10,117,449.00ConstructionBridgeConstructionBridge$12,490,493.00$(2,373,044.00)-19%0
2697-01-037Yoakum11/03/26$198,635.70ConstructionRoadwayConstructionRoadway$167,102.00$31,533.7019%0
0451-01-053Dallas06/01/27$139,726,257.70ConstructionRoadwayConstructionRoadway$117,610,100.89$22,116,156.8119%0
0754-04-013Lubbock11/03/26$418,526.34ConstructionRoadwayConstructionRoadway$515,371.00$(96,844.66)-19%0
2855-01-032Fort Worth12/01/26$171,050.19ConstructionRoadwayConstructionRoadway$144,000.00$27,050.1919%0
1227-04-025Pharr10/06/26$38,511.46ConstructionRoadwayConstructionRoadway$47,410.00$(8,898.54)-19%0
0252-01-084Austin12/01/26$8,827,944.32ConstructionRoadwayConstructionRoadway$10,866,345.19$(2,038,400.87)-19%0
0269-10-027Yoakum11/03/26$439,573.75ConstructionRoadwayConstructionRoadway$541,028.00$(101,454.25)-19%0
1092-01-025Dallas10/06/26$203,267.10ConstructionRoadwayConstructionRoadway$171,416.88$31,850.2219%0
0005-05-115Abilene12/01/27$626,974.33ConstructionRoadwayConstructionRoadway$769,821.00$(142,846.67)-19%0
0342-01-093Pharr05/05/27$34,451,558.18ConstructionRoadwayConstructionRoadway$29,063,727.00$5,387,831.1819%0
0362-04-049Fort Worth12/01/26$565,103.85ConstructionRoadwayConstructionRoadway$476,876.40$88,227.4519%0
3108-01-005Yoakum11/03/26$125,382.05ConstructionRoadwayConstructionRoadway$153,651.00$(28,268.95)-18%0
0816-03-025Dallas10/06/26$146,947.80ConstructionRoadwayConstructionRoadway$124,183.31$22,764.4918%0
0800-03-019Lubbock11/03/26$485,434.05ConstructionRoadwayConstructionRoadway$410,623.00$74,811.0518%0
0708-01-033Brownwood11/03/26$71,860.10ConstructionRoadwayConstructionRoadway$60,805.00$11,055.1018%0
0007-07-028Fort Worth12/01/26$186,171.80ConstructionRoadwayConstructionRoadway$227,476.47$(41,304.67)-18%0
1302-03-012Yoakum11/03/26$147,164.15ConstructionRoadwayConstructionRoadway$179,700.00$(32,535.85)-18%0
0816-03-026Dallas10/06/26$263,816.55ConstructionRoadwayConstructionRoadway$223,461.31$40,355.2418%0
0220-01-038Pharr11/03/26$8,329,537.21ConstructionRoadwayConstructionRoadway$7,056,372.13$1,273,165.0818%0
0732-01-032Atlanta10/06/26$293,192.23ConstructionRoadwayConstructionRoadway$357,660.00$(64,467.77)-18%0
1894-01-024Atlanta10/06/26$343,654.91ConstructionRoadwayConstructionRoadway$418,788.00$(75,133.09)-18%0
0669-01-071Pharr10/06/26$16,951.88ConstructionRoadwayConstructionRoadway$20,650.00$(3,698.12)-18%0
2850-01-020Bryan10/06/26$1,767,958.90ConstructionRoadwayConstructionRoadway$1,500,000.00$267,958.9018%0
0560-05-008Amarillo11/03/26$92,020.64ConstructionRoadwayConstructionRoadway$112,000.00$(19,979.36)-18%0
0186-06-082Bryan06/14/28$164,094,463.00Alternative DeliveryDesign BuildAlternative DeliveryDesign Build$199,548,797.00$(35,454,334.00)-18%0
2208-01-074Fort Worth03/03/27$3,219,397.84ConstructionRoadwayConstructionRoadway$3,905,479.41$(686,081.57)-18%0
0750-02-021Atlanta10/06/26$353,528.36ConstructionRoadwayConstructionRoadway$428,688.00$(75,159.64)-18%0
0733-03-061Abilene12/01/27$659,306.62ConstructionRoadwayConstructionRoadway$561,000.00$98,306.6218%0
0220-04-049Pharr08/04/27$27,388,925.00ConstructionRoadwayConstructionRoadway$23,319,932.34$4,068,992.6617%0
0271-04-070Houston06/01/33$161,018,519.00ConstructionRoadway$194,998,997.72$(33,980,478.72)-17%16394 years
0271-04-077Houston12/05/28$161,018,519.00$194,998,997.72$(33,980,478.72)-17%0
0683-02-072Austin08/01/29$97,980,816.67ConstructionRoadwayConstructionRoadway$83,619,134.82$14,361,681.8517%0
3131-03-015Brownwood11/03/26$68,365.52ConstructionRoadwayConstructionRoadway$58,390.00$9,975.5217%0
0086-14-077Laredo10/04/28$38,936,927.80ConstructionRoadwayConstructionRoadway$33,330,081.25$5,606,846.5517%0
2213-01-016Fort Worth12/01/26$247,330.83ConstructionRoadwayConstructionRoadway$297,095.74$(49,764.91)-17%0
0861-02-022Pharr10/06/26$65,061.92ConstructionRoadwayConstructionRoadway$55,739.00$9,322.9217%0
0140-05-029Odessa11/03/26$100,016.20ConstructionBridgeConstructionBridge$119,753.30$(19,737.10)-16%0
0211-12-011Yoakum11/03/26$182,635.45ConstructionRoadwayConstructionRoadway$217,781.00$(35,145.55)-16%0
1007-02-020Yoakum11/03/26$555,923.35ConstructionRoadwayConstructionRoadway$662,000.00$(106,076.65)-16%0
0241-02-061Yoakum11/03/26$345,241.85ConstructionRoadwayConstructionRoadway$298,000.00$47,241.8516%0
0140-05-028Odessa11/03/26$776,785.50ConstructionBridgeConstructionBridge$671,189.90$105,595.6016%0
0168-09-192Amarillo11/03/26$1,821,007.20ConstructionBridgeConstructionBridge$2,160,000.00$(338,992.80)-16%0
0823-01-040Wichita Falls11/03/26$313,002.50ConstructionRoadwayConstructionRoadway$270,592.00$42,410.5016%0
0381-01-018Childress10/06/26$711,034.93ConstructionRoadwayConstructionRoadway$842,547.00$(131,512.07)-16%0
3256-01-127Houston04/06/27$11,320,453.00ConstructionRoadwayConstructionRoadway$9,798,415.00$1,522,038.0016%0
0044-07-077Wichita Falls11/03/26$605,538.86ConstructionRoadwayConstructionRoadway$716,433.00$(110,894.14)-15%0
0047-04-032Dallas11/03/26$39,780,866.34ConstructionRoadwayConstructionRoadway$46,922,696.42$(7,141,830.08)-15%0
0275-11-092Amarillo09/06/28$14,400,000.00ConstructionRoadwayConstructionRoadway$12,500,000.00$1,900,000.0015%0
0445-03-029Yoakum11/03/26$310,881.80ConstructionRoadwayConstructionRoadway$366,550.00$(55,668.20)-15%0
2516-01-012Yoakum11/03/26$203,609.05ConstructionRoadwayConstructionRoadway$240,000.00$(36,390.95)-15%0
0168-09-191Amarillo11/03/26$1,782,502.92ConstructionBridgeConstructionBridge$2,100,000.00$(317,497.08)-15%0
0140-04-049Odessa11/03/26$183,227.20ConstructionBridgeConstructionBridge$215,789.50$(32,562.30)-15%0
0912-72-381Houston11/15/28$57,700,000.00ConstructionLocal LetConstructionLocal Let$50,171,694.00$7,528,306.0015%0
0480-04-032Brownwood11/03/26$700,292.18ConstructionRoadwayConstructionRoadway$823,846.00$(123,553.82)-15%0
2932-03-004Lubbock11/03/26$177,580.31ConstructionRoadwayConstructionRoadway$208,553.00$(30,972.69)-15%0
0081-13-071Dallas08/02/28$198,251,363.58ConstructionRoadwayConstructionRoadway$232,779,659.11$(34,528,295.53)-15%-35-1 month
0721-01-025Lubbock11/03/26$158,602.21ConstructionRoadwayConstructionRoadway$138,214.00$20,388.2115%0
0918-47-498Dallas03/03/27$431,230.25ConstructionRoadwayConstructionRoadway$505,800.00$(74,569.75)-15%0
0693-03-046Abilene12/01/26$11,083,819.30ConstructionRoadwayConstructionRoadway$13,000,000.00$(1,916,180.70)-15%0
2376-03-011Brownwood11/03/26$20,752.95ConstructionRoadwayConstructionRoadway$18,087.00$2,665.9515%0
0054-05-027Brownwood11/03/26$112,542.84ConstructionRoadwayConstructionRoadway$98,099.00$14,443.8415%0
0371-02-083Corpus Christi09/02/26$1,367,466.20ConstructionRoadwayConstructionRoadway$1,603,267.91$(235,801.71)-15%0
2759-01-012Wichita Falls11/03/26$151,049.50ConstructionRoadwayConstructionRoadway$176,993.00$(25,943.50)-15%0
0791-05-022Amarillo11/03/26$1,087,171.51ConstructionRoadwayConstructionRoadway$1,270,000.00$(182,828.49)-14%0
0968-04-005Lubbock11/03/26$359,110.02ConstructionRoadwayConstructionRoadway$418,824.00$(59,713.98)-14%0
0101-01-070Corpus Christi09/02/26$103,530.32ConstructionRoadwayConstructionRoadway$120,610.80$(17,080.48)-14%0
0387-01-016Dallas10/06/26$5,938,082.20ConstructionRoadwayConstructionRoadway$6,915,964.31$(977,882.11)-14%0
1267-01-009Yoakum11/03/26$165,372.90ConstructionRoadwayConstructionRoadway$192,410.00$(27,037.10)-14%0
1686-01-018Yoakum11/03/26$335,842.70ConstructionRoadwayConstructionRoadway$294,735.00$41,107.7014%0
0560-01-034Amarillo11/03/26$936,330.15ConstructionRoadwayConstructionRoadway$822,000.00$114,330.1514%0
0098-04-040Childress10/06/26$500,424.13ConstructionRoadwayConstructionRoadway$580,923.00$(80,498.87)-14%0
0114-04-080Austin09/01/27$691,368.60ConstructionBridgeConstructionBridge$607,605.56$83,763.0414%0
0049-09-092Bryan04/05/28$6,437,177.00ConstructionRoadwayConstructionRoadway$5,658,269.00$778,908.0014%0
0051-09-127Houston09/02/26$2,179,545.80ConstructionNon RoadwayConstructionNon Roadway$2,526,048.60$(346,502.80)-14%0
1017-03-040Paris11/03/26$6,591,205.76ConstructionRoadwayConstructionRoadway$5,800,000.00$791,205.7614%0
0312-04-037Fort Worth12/01/26$638,814.45ConstructionRoadwayConstructionRoadway$739,036.14$(100,221.69)-14%0
1855-01-031Wichita Falls11/03/26$339,781.28ConstructionRoadwayConstructionRoadway$299,273.00$40,508.2814%0
0028-05-057Beaumont09/02/26$2,410,432.60ConstructionRoadwayConstructionRoadway$2,125,317.21$285,115.3913%0
0271-05-025Houston10/04/28$292,939,920.00ConstructionRoadwayConstructionRoadway$258,400,000.00$34,539,920.0013%0
0804-04-030Wichita Falls11/03/26$97,857.75ConstructionRoadwayConstructionRoadway$112,903.00$(15,045.25)-13%0
0315-09-013Yoakum11/03/26$214,641.10ConstructionRoadwayConstructionRoadway$247,500.00$(32,858.90)-13%0
1307-02-010Yoakum11/03/26$257,021.15ConstructionRoadwayConstructionRoadway$296,000.00$(38,978.85)-13%0
0318-02-028Abilene12/01/27$987,812.60ConstructionRoadwayConstructionRoadway$1,135,643.00$(147,830.40)-13%0
0220-04-050Pharr12/01/27$20,418,004.16ConstructionRoadwayConstructionRoadway$23,457,807.00$(3,039,802.84)-13%3651 year
0195-01-111Wichita Falls12/01/26$361,219,999.00ConstructionRoadwayConstructionRoadway$320,000,000.00$41,219,999.0013%0
0092-03-064Dallas10/06/26$4,533,561.52ConstructionRoadwayConstructionRoadway$4,017,336.55$516,224.9713%0
1076-02-048Wichita Falls11/03/26$245,809.05ConstructionRoadwayConstructionRoadway$218,022.00$27,787.0513%0
0089-03-100Yoakum11/03/26$227,930.25ConstructionRoadwayConstructionRoadway$261,163.00$(33,232.75)-13%0
0047-05-061Dallas03/07/28$58,697,319.72ConstructionRoadwayConstructionRoadway$52,099,915.91$6,597,403.8113%0
0420-09-027Yoakum11/03/26$193,340.10ConstructionRoadwayConstructionRoadway$220,580.00$(27,239.90)-12%0
2635-03-030Amarillo11/03/26$322,366.88ConstructionRoadwayConstructionRoadway$287,000.00$35,366.8812%0
0055-08-120Waco04/06/27$44,739,109.67ConstructionRoadwayConstructionRoadway$39,892,364.56$4,846,745.1112%0
0640-03-032Atlanta10/06/26$295,560.88ConstructionRoadwayConstructionRoadway$336,384.00$(40,823.12)-12%0
2126-02-021Amarillo11/03/26$615,295.25ConstructionRoadwayConstructionRoadway$700,000.00$(84,704.75)-12%0
0151-03-046Austin08/01/29$1,500,000.00ConstructionRoadwayConstructionRoadway$1,339,285.71$160,714.2912%0
0151-04-076Austin08/01/29$1,500,000.00ConstructionRoadwayConstructionRoadway$1,339,285.71$160,714.2912%0
0909-36-210Waco08/02/27$4,695,000.00ConstructionLocal LetConstructionLocal Let$4,191,964.29$503,035.7112%0
0138-11-034Atlanta10/06/26$329,754.52ConstructionRoadwayConstructionRoadway$373,824.00$(44,069.48)-12%0
0145-07-039Lubbock11/03/26$1,389,918.86ConstructionRoadwayConstructionRoadway$1,572,012.00$(182,093.14)-12%0
3569-01-007Wichita Falls11/03/26$193,499.25ConstructionRoadwayConstructionRoadway$173,679.00$19,820.2511%0
0754-05-015Lubbock11/03/26$645,482.91ConstructionRoadwayConstructionRoadway$727,871.00$(82,388.09)-11%0
0357-05-027Amarillo11/03/26$1,112,885.45ConstructionRoadwayConstructionRoadway$1,000,000.00$112,885.4511%0
0015-13-437Austin02/02/27$343,500,000.00ConstructionRoadwayConstructionRoadway$387,000,000.00$(43,500,000.00)-11%0
0452-03-036Brownwood11/03/26$486,303.41ConstructionRoadwayConstructionRoadway$547,407.00$(61,103.59)-11%0
1513-02-046Fort Worth12/01/26$446,454.13ConstructionRoadwayConstructionRoadway$402,000.00$44,454.1311%0
0440-05-015Austin01/06/27$250,000,000.00ConstructionRoadwayConstructionRoadway$225,252,884.62$24,747,115.3811%0
0249-07-072Fort Worth01/06/27$38,104,650.90ConstructionBridgeConstructionBridge$42,784,246.29$(4,679,595.39)-11%0
0619-03-068Dallas11/03/26$1,606,585.00ConstructionRoadwayConstructionRoadway$1,803,346.39$(196,761.39)-11%-28-28 days
0217-02-037Atlanta12/01/28$19,332,886.44ConstructionRoadwayConstructionRoadway$17,442,427.00$1,890,459.4411%0
0441-07-079Odessa11/03/26$717,837.10ConstructionBridgeConstructionBridge$647,802.80$70,034.3011%0
2638-01-028Brownwood11/03/26$752,754.21ConstructionRoadwayConstructionRoadway$843,798.00$(91,043.79)-11%0
0195-02-092Dallas11/03/26$140,644,268.13ConstructionRoadwayConstructionRoadway$157,580,992.94$(16,936,724.81)-11%0
0844-04-011Childress09/02/26$2,956,985.78ConstructionBridgeConstructionBridge$2,670,739.78$286,246.0011%0
0912-72-858Houston09/06/28$1,367,979.92ConstructionRoadwayConstructionRoadway$1,532,137.51$(164,157.59)-11%0
0912-72-859Houston09/06/28$191,024.20ConstructionRoadwayConstructionRoadway$213,947.10$(22,922.90)-11%0
0229-02-050Odessa03/07/28$5,803,571.43ConstructionRoadwayConstructionRoadway$6,500,000.00$(696,428.57)-11%0
0215-06-051San Antonio12/01/27$2,202,808.00ConstructionRoadwayConstructionRoadway$1,992,307.00$210,501.0011%0
0045-09-113Paris11/03/26$3,685,990.71ConstructionRoadwayConstructionRoadway$3,335,124.00$350,866.7111%0
0583-03-018Lubbock11/03/26$32,347.30ConstructionRoadwayConstructionRoadway$29,270.96$3,076.3411%0
1635-01-023Lubbock11/03/26$328,857.73ConstructionRoadwayConstructionRoadway$297,651.00$31,206.7310%0
0171-11-003Bryan08/04/27$130,780,979.00ConstructionRoadwayConstructionRoadway$118,439,867.00$12,341,112.0010%0
3073-01-010Wichita Falls11/03/26$208,164.01ConstructionRoadwayConstructionRoadway$232,171.00$(24,006.99)-10%0
0001-04-109El Paso01/06/27$1,865,286.10ConstructionRoadwayConstructionRoadway$1,691,661.52$173,624.5810%0
2523-02-074Houston11/01/28$79,972,723.00ConstructionBridgeConstructionBridge$72,541,920.00$7,430,803.0010%0
0169-08-029Amarillo11/03/26$1,149,728.31ConstructionRoadwayConstructionRoadway$1,280,000.00$(130,271.69)-10%0
0914-04-366Austin12/01/26$1,016,452.24ConstructionNon RoadwayConstructionNon Roadway$922,740.09$93,712.1510%0
0239-04-024Wichita Falls11/03/26$585,289.05ConstructionRoadwayConstructionRoadway$531,657.00$53,632.0510%0
0134-05-040Fort Worth12/01/26$568,076.73ConstructionRoadwayConstructionRoadway$516,074.59$52,002.1410%0
3463-02-007Brownwood11/03/26$29,705.59ConstructionRoadwayConstructionRoadway$27,000.00$2,705.5910%0
0132-03-041Childress02/02/28$6,300,000.00ConstructionRoadwayConstructionRoadway$7,000,000.00$(700,000.00)-10%0
0080-03-049Fort Worth06/01/27$127,000,000.00ConstructionRoadwayConstructionRoadway$115,461,159.08$11,538,840.9210%0
3138-01-020Bryan10/05/27$110,924,412.00ConstructionRoadwayConstructionRoadway$100,882,922.00$10,041,490.0010%0
0574-01-035Dallas03/03/27$4,402,357.07ConstructionRoadwayConstructionRoadway$4,005,386.56$396,970.5110%0
0912-56-059Houston10/06/26$1,019,293.93ConstructionBridgeConstructionBridge$1,131,295.70$(112,001.77)-10%0
0338-02-032Houston09/06/28$101,669,151.64ConstructionRoadwayConstructionRoadway$92,559,593.00$9,109,558.6410%0
0338-02-043Houston09/06/28$101,669,151.64$92,559,593.00$9,109,558.6410%0
0083-09-038Atlanta10/06/26$317,622.02ConstructionRoadwayConstructionRoadway$352,224.00$(34,601.98)-10%0
2599-02-012Yoakum11/03/26$123,570.55ConstructionRoadwayConstructionRoadway$136,974.00$(13,403.45)-10%0
0462-03-051Atlanta10/06/26$108,092.50ConstructionRoadwayConstructionRoadway$119,412.00$(11,319.50)-9%0
1525-02-010Fort Worth11/03/26$226,950.68ConstructionRoadwayConstructionRoadway$250,640.00$(23,689.32)-9%0
0372-01-101Corpus Christi07/01/27$92,390,400.49ConstructionRoadwayConstructionRoadway$102,000,000.00$(9,609,599.51)-9%1766 months
1864-02-008Lubbock11/03/26$377,917.03ConstructionRoadwayConstructionRoadway$417,136.00$(39,218.97)-9%0
1718-03-003Lubbock11/03/26$814,377.52ConstructionRoadwayConstructionRoadway$745,202.50$69,175.029%0
0095-02-096Dallas09/01/44$315,730,103.05ConstructionRoadway$347,679,308.51$(31,949,205.46)-9%583916 years
0334-08-039Yoakum11/03/26$265,063.35ConstructionRoadwayConstructionRoadway$291,572.00$(26,508.65)-9%0
0227-04-023Lubbock11/03/26$541,439.04ConstructionRoadwayConstructionRoadway$496,544.00$44,895.049%0
0528-01-113Pharr12/01/26$24,680,431.19ConstructionRoadwayConstructionRoadway$27,120,566.00$(2,440,134.81)-9%0
0845-03-069Wichita Falls11/03/26$379,631.56ConstructionRoadwayConstructionRoadway$417,042.00$(37,410.44)-9%0
0257-08-009Brownwood11/03/26$67,074.20ConstructionRoadwayConstructionRoadway$61,629.00$5,445.209%0
0228-03-033Lubbock11/03/26$1,601,474.26ConstructionRoadwayConstructionRoadway$1,756,636.00$(155,161.74)-9%0
0030-08-040Childress10/06/26$1,041,310.14ConstructionRoadwayConstructionRoadway$1,141,360.00$(100,049.86)-9%0
0275-01-263Amarillo11/03/26$182,729.93ConstructionRoadwayConstructionRoadway$200,000.00$(17,270.07)-9%0
0137-08-013Wichita Falls11/03/26$571,711.79ConstructionRoadwayConstructionRoadway$526,300.00$45,411.799%0
0942-01-023Yoakum11/03/26$158,718.60ConstructionRoadwayConstructionRoadway$173,702.00$(14,983.40)-9%0
0113-13-169Austin08/01/29$60,000,000.00ConstructionRoadwayConstructionRoadway$65,659,999.11$(5,659,999.11)-9%0
3510-06-038Houston08/04/27$21,913,559.00ConstructionRoadwayConstructionRoadway$23,978,813.00$(2,065,254.00)-9%0
1635-01-022Lubbock11/03/26$616,806.37ConstructionRoadwayConstructionRoadway$674,428.00$(57,621.63)-9%0
1696-01-018Yoakum11/03/26$245,444.35ConstructionRoadwayConstructionRoadway$226,280.00$19,164.358%0
1743-01-012Houston12/01/26$2,680,992.70ConstructionRoadwayConstructionRoadway$2,927,659.00$(246,666.30)-8%0
0374-02-125El Paso12/01/26$572,382.51ConstructionRoadwayConstructionRoadway$528,320.80$44,061.718%0
1265-01-020Yoakum11/03/26$455,776.85ConstructionRoadwayConstructionRoadway$497,068.00$(41,291.15)-8%0
2635-03-023Amarillo05/05/27$26,630,790.57ConstructionRoadwayConstructionRoadway$24,592,354.00$2,038,436.578%0
2635-03-028Amarillo05/05/27$157,862,866.00ConstructionBridgeConstructionBridge$145,779,362.00$12,083,504.008%0
0168-09-186Amarillo05/05/27$17,993,307.00ConstructionRoadwayConstructionRoadway$16,617,549.00$1,375,758.008%0
2635-02-034Amarillo05/05/27$28,208,659.00ConstructionRoadwayConstructionRoadway$26,052,115.48$2,156,543.528%0
0239-07-022Fort Worth12/01/26$886,168.30ConstructionRoadwayConstructionRoadway$819,179.33$66,988.978%0
0840-01-019Yoakum11/03/26$215,948.05ConstructionRoadwayConstructionRoadway$235,000.00$(19,051.95)-8%0
0092-02-145Dallas10/06/26$1,059,685.00ConstructionRoadwayConstructionRoadway$981,366.75$78,318.258%0
3582-01-003Amarillo11/03/26$69,096.89ConstructionRoadwayConstructionRoadway$75,000.00$(5,903.11)-8%0
0262-01-034Bryan11/03/26$4,820,339.12ConstructionRoadwayConstructionRoadway$5,231,425.00$(411,085.88)-8%0
0610-06-098Atlanta09/01/27$15,680,000.00ConstructionRoadwayConstructionRoadway$14,560,000.00$1,120,000.008%0
2819-02-012Yoakum11/03/26$133,887.75ConstructionRoadwayConstructionRoadway$145,043.00$(11,155.25)-8%0
0353-01-031Fort Worth11/03/26$605,622.93ConstructionRoadwayConstructionRoadway$654,905.19$(49,282.26)-8%0
0912-72-657Houston10/05/27$971,048.00ConstructionBridgeConstructionBridge$1,049,626.00$(78,578.00)-7%0
0095-03-100Dallas10/06/26$7,333,221.00ConstructionBridgeConstructionBridge$7,924,367.30$(591,146.30)-7%0
0014-10-067Waco09/06/28$8,333,333.33ConstructionBridgeConstructionBridge$9,000,000.00$(666,666.67)-7%0
0014-10-076Waco09/06/28$8,333,333.33ConstructionBridgeConstructionBridge$9,000,000.00$(666,666.67)-7%0
2941-02-056Houston09/06/28$29,629,629.63ConstructionRoadwayConstructionRoadway$32,000,000.00$(2,370,370.37)-7%0
0014-15-090Fort Worth06/01/27$60,000,000.00ConstructionRoadwayConstructionRoadway$55,912,929.52$4,087,070.487%0
0131-06-058Childress10/06/26$813,531.44ConstructionRoadwayConstructionRoadway$877,466.00$(63,934.56)-7%0
0515-02-006Yoakum11/03/26$250,422.40ConstructionRoadwayConstructionRoadway$270,000.00$(19,577.60)-7%0
2166-02-009Yoakum11/03/26$111,268.25ConstructionRoadwayConstructionRoadway$119,916.00$(8,647.75)-7%0
2444-01-011Lubbock11/03/26$202,268.58ConstructionRoadwayConstructionRoadway$217,946.00$(15,677.42)-7%0
0006-01-105Abilene12/01/27$447,776.57ConstructionRoadwayUnassignedUnassigned$482,411.00$(34,634.43)-7%3651 yearUnassigned → Construction / Roadway
0006-05-123Abilene12/01/27$571,509.29ConstructionRoadwayConstructionRoadway$615,714.00$(44,204.71)-7%0
0006-07-086Abilene12/01/27$664,676.44ConstructionRoadwayConstructionRoadway$716,088.00$(51,411.56)-7%0
0318-05-026Abilene12/01/27$273,763.47ConstructionRoadwayConstructionRoadway$294,939.00$(21,175.53)-7%0
0332-02-030Abilene12/01/27$348,087.19ConstructionRoadwayConstructionRoadway$375,011.00$(26,923.81)-7%0
0360-06-011Abilene12/01/27$53,495.74ConstructionRoadwayConstructionRoadway$57,634.00$(4,138.26)-7%0
0360-07-028Abilene12/01/27$470,349.47ConstructionRoadwayConstructionRoadway$506,730.00$(36,380.53)-7%0
0488-01-016Abilene12/01/27$238,956.49ConstructionRoadwayConstructionRoadway$257,439.00$(18,482.51)-7%0
0668-04-006Abilene12/01/27$87,747.22ConstructionRoadwayConstructionRoadway$94,534.00$(6,786.78)-7%0
0966-01-013Abilene12/01/27$243,576.95ConstructionRoadwayConstructionRoadway$262,417.00$(18,840.05)-7%0
0973-01-026Abilene12/01/27$410,104.95ConstructionRoadwayConstructionRoadway$441,826.00$(31,721.05)-7%0
1653-04-009Abilene12/01/27$170,963.29ConstructionRoadwayConstructionRoadway$184,187.00$(13,223.71)-7%0
2109-01-011Abilene12/01/27$180,788.02ConstructionRoadwayConstructionRoadway$194,772.00$(13,983.98)-7%0
3311-01-007Abilene12/01/27$128,056.90ConstructionRoadwayConstructionRoadway$137,962.00$(9,905.10)-7%0
3423-01-008Abilene12/01/27$90,546.50ConstructionRoadwayConstructionRoadway$97,550.00$(7,003.50)-7%0
0181-01-071Abilene09/02/26$307,957.60ConstructionRoadwayConstructionRoadway$331,750.00$(23,792.40)-7%0
0128-04-045Brownwood01/06/27$3,000,000.00ConstructionRoadwayConstructionRoadway$2,800,000.00$200,000.007%0
0917-30-068Bryan11/03/26$712,231.00ConstructionBridgeConstructionBridge$664,775.00$47,456.007%0
3044-01-017Pharr09/02/26$455,029.15ConstructionRoadwayConstructionRoadway$424,749.15$30,280.007%0
2444-02-010Lubbock11/03/26$369,348.05ConstructionRoadwayConstructionRoadway$397,222.00$(27,873.95)-7%0
0553-03-038Lufkin11/03/26$539,422.45ConstructionRoadwayConstructionRoadway$580,000.00$(40,577.55)-7%0
1523-01-021Wichita Falls11/03/26$871,816.05ConstructionRoadwayConstructionRoadway$814,908.00$56,908.057%0
2768-01-008Lubbock11/03/26$277,140.66ConstructionRoadwayConstructionRoadway$297,914.00$(20,773.34)-7%0
1525-01-010Brownwood11/03/26$28,199.05ConstructionRoadwayConstructionRoadway$26,376.00$1,823.057%0
0365-01-056Fort Worth12/01/26$1,285,439.56ConstructionRoadwayConstructionRoadway$1,202,665.09$82,774.477%0
0337-03-020Austin09/02/26$2,537,276.20ConstructionRoadwayConstructionRoadway$2,723,608.24$(186,332.04)-7%0
1687-01-019Houston09/02/26$391,090.71ConstructionRoadwayConstructionRoadway$366,039.44$25,051.277%0
1439-01-010Yoakum11/03/26$214,319.30ConstructionRoadwayConstructionRoadway$230,035.00$(15,715.70)-7%0
0941-01-027Yoakum11/03/26$398,501.60ConstructionRoadwayConstructionRoadway$426,933.00$(28,431.40)-7%0
0180-01-086Yoakum05/05/27$37,124,334.79ConstructionBridgeConstructionBridge$39,769,715.00$(2,645,380.21)-7%0
0117-06-053Lufkin11/03/26$355,387.45ConstructionRoadwayConstructionRoadway$380,000.00$(24,612.55)-6%0
0025-06-059Yoakum11/03/26$21,294.85ConstructionRoadwayConstructionRoadway$20,000.00$1,294.856%0
1122-01-034Corpus Christi10/06/26$12,009,748.99ConstructionRoadwayConstructionRoadway$12,832,486.60$(822,737.61)-6%0
1727-01-019Amarillo11/03/26$630,127.52ConstructionRoadwayConstructionRoadway$673,000.00$(42,872.48)-6%-364-12 months
1739-01-015Corpus Christi10/06/26$6,270,606.17ConstructionRoadwayConstructionRoadway$6,691,123.84$(420,517.67)-6%0
0199-07-012Lufkin11/03/26$53,004.60ConstructionRoadwayConstructionRoadway$50,000.00$3,004.606%0
0157-04-058Abilene11/03/26$7,519,837.49ConstructionRoadwayConstructionRoadway$8,000,000.00$(480,162.51)-6%0
0134-05-041Fort Worth12/01/26$423,060.36ConstructionRoadwayConstructionRoadway$450,000.00$(26,939.64)-6%0
0168-04-020Lubbock11/03/26$322,360.93ConstructionRoadwayConstructionRoadway$304,254.00$18,106.936%0
0196-03-288Dallas10/06/26$1,273,638.00ConstructionRoadwayConstructionRoadway$1,202,186.00$71,452.006%0
1626-01-013Amarillo11/03/26$734,199.30ConstructionRoadwayConstructionRoadway$780,000.00$(45,800.70)-6%0
1043-02-005Houston09/02/26$81,454.01ConstructionRoadwayConstructionRoadway$76,953.87$4,500.146%0
0195-02-090Dallas06/01/29$168,967,622.22ConstructionRoadwayConstructionRoadway$159,894,765.10$9,072,857.126%0
0565-03-003Lubbock11/03/26$262,715.24ConstructionRoadwayConstructionRoadway$277,654.00$(14,938.76)-5%0
2094-01-062Pharr08/01/29$37,064,434.30ConstructionRoadwayConstructionRoadway$39,151,312.00$(2,086,877.70)-5%0
0495-09-065Atlanta09/06/28$131,985,559.00ConstructionRoadwayConstructionRoadway$125,439,075.27$6,546,483.735%0
0111-03-064Houston08/04/27$102,910,751.00ConstructionRoadwayConstructionRoadway$108,568,030.00$(5,657,279.00)-5%0
0289-04-037Brownwood01/05/28$3,750,000.00ConstructionRoadwayConstructionRoadway$3,568,950.00$181,050.005%0
0302-01-025Lubbock11/03/26$740,989.89ConstructionRoadwayConstructionRoadway$705,762.00$35,227.895%0
0865-01-108Pharr05/05/27$22,407,904.00ConstructionRoadwayConstructionRoadway$21,354,188.00$1,053,716.005%0
0529-02-016Wichita Falls11/03/26$221,304.76ConstructionRoadwayConstructionRoadway$232,295.00$(10,990.24)-5%0
0912-72-852Houston09/06/28$1,010,886.13ConstructionRoadwayConstructionRoadway$1,060,990.00$(50,103.87)-5%0
0089-07-145Yoakum12/01/27$223,653,606.50ConstructionRoadwayConstructionRoadway$213,653,605.57$10,000,000.935%-370-1 year
2502-01-024Waco10/06/26$24,679,268.85ConstructionRoadwayConstructionRoadway$23,600,000.00$1,079,268.855%0
0027-13-201Houston10/05/27$742,080,747.88ConstructionRoadwayConstructionRoadway$710,022,858.04$32,057,889.845%0
0027-13-227Houston10/05/27$742,080,747.88Joint Bid UtilityRight-of-WayJoint Bid UtilityRight-of-Way$710,022,858.04$32,057,889.845%0
0804-03-026Wichita Falls11/03/26$583,343.13ConstructionRoadwayConstructionRoadway$610,745.00$(27,401.87)-4%0
0262-02-031Bryan11/03/26$5,732,189.80ConstructionRoadwayConstructionRoadway$6,000,000.00$(267,810.20)-4%0
0080-08-028Fort Worth12/01/26$143,262.25ConstructionRoadwayConstructionRoadway$137,158.74$6,103.514%0
1703-01-019Pharr10/06/26$48,695.64ConstructionRoadwayConstructionRoadway$50,937.00$(2,241.36)-4%0
0675-05-105Bryan08/04/27$93,077,241.00ConstructionRoadwayConstructionRoadway$89,176,337.00$3,900,904.004%0
3510-03-009Houston04/05/28$49,800,881.00Alternative DeliveryDesign BuildConstructionRoadway$52,000,000.00$(2,199,119.00)-4%0Construction / Roadway → Alternative Delivery / Design Build
0092-03-067Dallas10/06/26$3,067,165.50ConstructionRoadwayConstructionRoadway$3,202,034.00$(134,868.50)-4%0
1043-01-012Houston09/02/26$356,653.28ConstructionRoadwayConstructionRoadway$342,330.90$14,322.384%0
0166-01-061Dallas10/06/26$3,608,354.25ConstructionRoadwayConstructionRoadway$3,764,545.50$(156,191.25)-4%0
0721-01-024Lubbock11/03/26$328,382.32ConstructionRoadwayConstructionRoadway$342,479.00$(14,096.68)-4%0
0015-13-462Austin05/01/30$11,440,000.00ConstructionRoadwayConstructionRoadway$11,000,000.00$440,000.004%10013 years
0909-36-185Waco06/03/28$3,240,000.00ConstructionRoadwayConstructionRoadway$3,115,384.62$124,615.384%0
0233-05-039El Paso08/04/27$75,000.00ConstructionRailConstructionRail$72,115.38$2,884.624%0
0674-01-077El Paso08/04/27$75,000.00ConstructionRailConstructionRail$72,115.38$2,884.624%0
1281-01-020El Paso08/04/27$75,000.00ConstructionRailConstructionRail$72,115.38$2,884.624%0
0015-05-052Waco07/01/27$2,600,000.00ConstructionRoadwayConstructionRoadway$2,500,000.00$100,000.004%863 months
0015-18-008Waco07/01/27$1,560,000.00ConstructionRoadwayConstructionRoadway$1,500,000.00$60,000.004%863 months
0039-10-091Pharr07/01/27$192,400,000.00ConstructionRoadwayConstructionRoadway$185,000,000.00$7,400,000.004%0
0258-08-035Waco07/01/27$9,200,000.00ConstructionRoadwayConstructionRoadway$8,846,153.85$353,846.154%1204 months
2121-02-167El Paso07/01/27$31,323,571.00ConstructionRoadwayConstructionRoadway$30,118,818.27$1,204,752.734%0
0013-08-147Fort Worth06/01/27$56,800,000.00ConstructionRoadwayConstructionRoadway$54,615,384.64$2,184,615.364%0
0014-15-087Fort Worth06/01/27$21,200,000.00ConstructionRoadwayConstructionRoadway$20,384,615.38$815,384.624%0
2121-03-172El Paso06/01/27$5,588,826.00ConstructionBridgeConstructionBridge$5,373,871.15$214,954.854%0
0002-04-039El Paso05/05/27$285,924.80ConstructionRoadwayConstructionRoadway$274,927.69$10,997.114%0
0005-02-112Odessa05/05/27$6,600,001.00ConstructionRail - SafetyConstructionRail - Safety$6,346,155.00$253,846.004%0
0178-09-019Houston05/05/27$49,936,882.00ConstructionRoadwayConstructionRoadway$48,016,232.69$1,920,649.314%0
0264-06-044San Angelo05/05/27$34,067,539.00ConstructionRoadwayConstructionRoadway$32,757,248.59$1,310,290.414%0
0924-06-579El Paso05/05/27$1,639,924.20ConstructionBridgeConstructionBridge$1,576,850.19$63,074.014%0
0924-06-658El Paso05/05/27$1,980,000.00ConstructionBridgeConstructionBridge$1,903,846.15$76,153.854%0
2398-01-062Abilene05/05/27$10,800,000.00ConstructionRoadwayConstructionRoadway$10,384,616.00$415,384.004%0
0358-03-041El Paso04/06/27$717,659.00ConstructionRoadwayConstructionRoadway$690,056.73$27,602.274%0
0358-04-020El Paso04/06/27$105,062.00ConstructionRoadwayConstructionRoadway$101,021.15$4,040.854%0
0415-03-026El Paso04/06/27$60,850.00ConstructionRoadwayConstructionRoadway$58,509.62$2,340.384%0
0415-04-016El Paso04/06/27$40,567.00ConstructionRoadwayConstructionRoadway$39,006.73$1,560.274%0
0485-01-027El Paso04/06/27$165,302.00ConstructionRoadwayConstructionRoadway$158,944.23$6,357.774%0
0485-02-019El Paso04/06/27$110,202.00ConstructionRoadwayConstructionRoadway$105,963.46$4,238.544%0
2552-03-071El Paso04/06/27$4,593,695.00ConstructionRoadwayConstructionRoadway$4,417,014.42$176,680.584%0
0005-14-092Odessa03/03/27$222,538,627.80ConstructionRoadwayConstructionRoadway$213,979,449.81$8,559,177.994%0
0495-03-070Tyler01/06/27$11,500,000.00ConstructionRoadwayConstructionRoadway$11,057,692.31$442,307.694%0
1803-01-094Pharr01/05/28$53,783,237.00ConstructionRoadwayConstructionRoadway$56,017,974.00$(2,234,737.00)-4%0
1227-04-023Pharr11/02/27$21,050,000.00ConstructionRoadwayConstructionRoadway$21,920,000.00$(870,000.00)-4%-669-2 years
0130-01-022Lubbock11/03/26$1,107,315.10ConstructionRoadwayConstructionRoadway$1,152,424.00$(45,108.90)-4%0
0180-10-082Corpus Christi06/01/28$73,509,615.38ConstructionRoadwayConstructionRoadway$70,750,000.00$2,759,615.384%572 months
1182-01-013Wichita Falls11/03/26$164,694.60ConstructionRoadwayConstructionRoadway$158,515.00$6,179.604%0
0180-06-118Corpus Christi06/01/28$59,115,480.77ConstructionRoadwayConstructionRoadway$56,907,500.00$2,207,980.774%572 months
1149-01-033Austin10/04/28$58,673,076.90ConstructionRoadwayConstructionRoadway$56,500,000.00$2,173,076.904%3991 year
0251-03-022Waco08/02/28$11,846,153.85ConstructionRoadwayConstructionRoadway$11,407,407.41$438,746.444%0
0265-01-118Austin08/02/28$436,153.85ConstructionRoadwayConstructionRoadway$419,999.07$16,154.784%0
0909-36-175Waco07/02/28$31,615,384.62ConstructionLocal LetConstructionLocal Let$30,444,444.44$1,170,940.184%0
0909-36-205Waco06/03/28$812,500.00ConstructionLocal LetConstructionLocal Let$782,407.41$30,092.594%0
0001-04-114El Paso05/03/28$769,230.77ConstructionRoadwayConstructionRoadway$740,740.74$28,490.034%0
3409-01-011Waco05/01/28$6,421,466.35ConstructionRoadwayConstructionRoadway$6,183,634.26$237,832.094%0
1690-01-131Paris04/05/28$149,763,717.27ConstructionRoadwayConstructionRoadway$144,217,308.00$5,546,409.274%0
0002-05-053El Paso02/02/28$26,105.15ConstructionRoadwayConstructionRoadway$25,138.30$966.854%0
0002-06-065El Paso02/02/28$17,403.43ConstructionRoadwayConstructionRoadway$16,758.86$644.574%0
0002-07-059El Paso02/02/28$52,210.31ConstructionRoadwayConstructionRoadway$50,276.59$1,933.724%0
0002-08-058El Paso02/02/28$26,105.15ConstructionRoadwayConstructionRoadway$25,138.30$966.854%0
0002-09-042El Paso02/02/28$17,403.43ConstructionRoadwayConstructionRoadway$16,758.86$644.574%0
0002-10-041El Paso02/02/28$69,613.75ConstructionRoadwayConstructionRoadway$67,035.46$2,578.294%0
0002-11-063El Paso02/02/28$43,508.60ConstructionRoadwayConstructionRoadway$41,897.17$1,611.434%0
0003-01-069El Paso02/02/28$17,403.43ConstructionRoadwayConstructionRoadway$16,758.86$644.574%0
0003-02-054El Paso02/02/28$17,403.43ConstructionRoadwayConstructionRoadway$16,758.86$644.574%0
0003-03-050El Paso02/02/28$13,686,419.23ConstructionRoadwayConstructionRoadway$13,179,514.81$506,904.424%0
0003-03-053El Paso02/02/28$17,403.43ConstructionRoadwayConstructionRoadway$16,758.86$644.574%0
0003-04-060El Paso02/02/28$52,210.31ConstructionRoadwayConstructionRoadway$50,276.59$1,933.724%0
0358-01-033El Paso02/02/28$54,853.16ConstructionRoadwayConstructionRoadway$52,821.56$2,031.604%0
0358-05-019El Paso02/02/28$326,039.42ConstructionRoadwayConstructionRoadway$313,963.89$12,075.534%0
0415-01-028El Paso02/02/28$173,220.53ConstructionRoadwayConstructionRoadway$166,804.95$6,415.584%0
0415-02-033El Paso02/02/28$129,915.39ConstructionRoadwayConstructionRoadway$125,103.71$4,811.684%0
0512-02-017El Paso02/02/28$43,305.13ConstructionRoadwayConstructionRoadway$41,701.24$1,603.894%0
0924-06-749El Paso02/02/28$91,785.08ConstructionRoadwayConstructionRoadway$88,385.63$3,399.454%0
0924-06-750El Paso02/02/28$38,202.77ConstructionRoadwayConstructionRoadway$36,787.85$1,414.924%0
2121-05-058El Paso02/02/28$34,806.88ConstructionRoadwayConstructionRoadway$33,517.73$1,289.154%0
2121-06-061El Paso02/02/28$17,403.43ConstructionRoadwayConstructionRoadway$16,758.86$644.574%0
0035-04-043San Angelo01/05/28$480,769.00ConstructionRoadwayConstructionRoadway$500,000.00$(19,231.00)-4%0
0001-04-115El Paso12/01/27$387,187.98ConstructionRoadwayConstructionRoadway$372,846.76$14,341.224%0
0167-02-097El Paso12/01/27$376,931.15ConstructionRoadwayConstructionRoadway$362,970.74$13,960.414%0
0675-06-103Bryan12/01/27$313,635,452.00ConstructionRoadwayConstructionRoadway$302,019,326.00$11,616,126.004%0
2121-02-186El Paso12/01/27$504,807,692.31ConstructionRoadwayConstructionRoadway$486,111,111.11$18,696,581.204%0
0065-06-067Beaumont11/02/27$46,476,175.96ConstructionRoadwayConstructionRoadway$48,335,222.00$(1,859,046.04)-4%-92-3 months
0214-03-035Beaumont11/02/27$26,584,615.39ConstructionBridgeConstructionBridge$25,600,000.00$984,615.394%0
0924-06-694El Paso11/02/27$72,115.38ConstructionRailConstructionRail$69,444.44$2,670.944%0
0001-01-077El Paso10/05/27$344,519.34ConstructionRoadwayConstructionRoadway$331,759.36$12,759.984%0
0027-13-259Houston10/05/27$75,769,230.77ConstructionBridgeConstructionBridge$78,800,000.00$(3,030,769.23)-4%0
0374-02-128El Paso10/05/27$345,582.88ConstructionRoadwayConstructionRoadway$332,783.52$12,799.364%0
3451-01-051El Paso10/05/27$442,331.73ConstructionRoadwayConstructionRoadway$425,949.07$16,382.664%0
3451-01-052El Paso10/05/27$356,418.27ConstructionRoadwayConstructionRoadway$343,217.59$13,200.684%0
2696-02-010Waco10/02/27$1,163,461.54ConstructionLocal LetConstructionLocal Let$1,120,370.37$43,091.174%0
0909-22-235Waco09/03/27$3,335,576.92ConstructionRoadwayConstructionRoadway$3,212,000.00$123,576.924%0
0001-01-076El Paso09/01/27$908,276.82ConstructionRoadwayConstructionRoadway$874,636.93$33,639.894%0
0001-02-080El Paso09/01/27$432,692.31ConstructionRoadwayConstructionRoadway$416,666.67$16,025.644%0
0001-04-110El Paso09/01/27$670,960.76ConstructionRoadwayConstructionRoadway$646,110.36$24,850.404%0
0002-14-052El Paso09/01/27$302,528.10ConstructionRoadwayConstructionRoadway$291,323.35$11,204.754%0
0545-04-048Tyler09/01/27$156,807,692.31ConstructionRoadwayConstructionRoadway$151,000,000.00$5,807,692.314%0
0674-01-067El Paso09/01/27$19,015,959.62ConstructionBridgeConstructionBridge$18,311,664.81$704,294.814%0
0924-06-746El Paso09/01/27$307,297.30ConstructionRoadwayConstructionRoadway$295,915.92$11,381.384%0
0924-06-748El Paso09/01/27$62,709.77ConstructionRoadwayConstructionRoadway$60,387.19$2,322.584%0
0002-07-058El Paso05/05/27$1,753,868.55ConstructionRoadwayConstructionRoadway$1,688,910.45$64,958.104%0
0003-02-053El Paso05/05/27$769,230.77ConstructionRoadwayConstructionRoadway$740,740.74$28,490.034%0
2326-01-033El Paso05/05/27$432,692.31ConstructionRoadwayConstructionRoadway$416,666.67$16,025.644%0
2552-01-062El Paso11/03/26$12,432,052.88ConstructionRoadwayConstructionRoadway$11,971,606.48$460,446.404%-364-12 months
2552-01-066El Paso11/03/26$4,600,398.13ConstructionBridgeConstructionBridge$4,430,013.02$170,385.114%-364-12 months
1061-01-039Beaumont09/02/26$67,558.60ConstructionRoadwayConstructionRoadway$65,066.30$2,492.304%0
1575-05-024Atlanta09/06/28$246,272,901.00ConstructionRoadwayConstructionRoadway$237,272,901.00$9,000,000.004%0
3485-01-009Lubbock11/03/26$53,461.15ConstructionRoadwayConstructionRoadway$51,534.00$1,927.154%0
0424-01-057Tyler06/01/29$116,148,148.15ConstructionRoadwayConstructionRoadway$112,000,000.00$4,148,148.154%0
0424-02-045Tyler06/01/29$58,696,296.30ConstructionRoadwayConstructionRoadway$56,600,000.00$2,096,296.304%0
0001-04-105El Paso05/01/29$4,281,696.30ConstructionRoadwayConstructionRoadway$4,128,778.57$152,917.734%0
0002-01-110El Paso05/01/29$2,863,853.56ConstructionRoadwayConstructionRoadway$2,761,573.07$102,280.494%0
0054-07-086Brownwood05/01/29$25,925,925.93ConstructionRoadwayConstructionRoadway$25,000,000.00$925,925.934%0
0167-03-003El Paso05/01/29$783,578.70ConstructionRoadwayConstructionRoadway$755,593.75$27,984.954%0
2121-04-125El Paso05/01/29$894,151.85ConstructionRoadwayConstructionRoadway$862,217.86$31,933.994%0
0001-04-104El Paso03/01/29$2,521,962.04ConstructionRoadwayConstructionRoadway$2,431,891.96$90,070.084%0
0001-05-018El Paso02/01/29$1,111,111.11ConstructionBridgeConstructionBridge$1,071,428.57$39,682.544%0
0001-05-020El Paso02/01/29$3,625,722.22ConstructionBridgeConstructionBridge$3,496,232.14$129,490.084%0
0002-14-045El Paso02/01/29$12,633,217.59ConstructionRoadwayConstructionRoadway$12,182,031.25$451,186.344%0
0035-05-060San Angelo02/01/29$2,035,823.00ConstructionRoadwayConstructionRoadway$1,963,114.00$72,709.004%0
0035-06-033San Angelo02/01/29$43,100,201.00ConstructionRoadwayConstructionRoadway$41,560,907.00$1,539,294.004%0
0396-01-041San Angelo02/01/29$7,085,454.00ConstructionRoadwayConstructionRoadway$6,832,401.00$253,053.004%0
0002-14-051El Paso01/01/29$1,522,667.48ConstructionRoadwayConstructionRoadway$1,468,286.50$54,380.984%0
0003-03-055El Paso01/01/29$13,179,514.81ConstructionRoadwayConstructionRoadway$12,708,817.86$470,696.954%0
0003-04-057El Paso01/01/29$4,469,133.33ConstructionBridgeConstructionBridge$4,309,521.43$159,611.904%0
0003-04-058El Paso01/01/29$4,469,133.33ConstructionBridgeConstructionBridge$4,309,521.43$159,611.904%0
0005-04-074Odessa01/01/29$52,303,704.63ConstructionBridgeConstructionBridge$50,435,715.00$1,867,989.634%0
0005-13-063Odessa01/01/29$249,045,410.85ConstructionRoadwayConstructionRoadway$240,150,931.00$8,894,479.854%0
0075-01-025El Paso01/01/29$4,720,383.33ConstructionBridgeConstructionBridge$4,551,798.21$168,585.124%0
0167-02-094El Paso01/01/29$5,550,735.94ConstructionRoadwayConstructionRoadway$5,352,495.37$198,240.574%0
0231-02-070Waco01/01/29$9,382,407.41ConstructionRoadwayConstructionRoadway$9,047,322.32$335,085.094%0
0374-06-024El Paso01/01/29$429,537.04ConstructionRoadwayConstructionRoadway$414,196.43$15,340.614%0
0374-07-031El Paso01/01/29$429,537.11ConstructionRoadwayConstructionRoadway$414,196.50$15,340.614%0
0374-08-027El Paso01/01/29$3,546,863.89ConstructionBridgeConstructionBridge$3,420,190.18$126,673.714%0
0508-02-139Beaumont01/01/29$8,664,091.67ConstructionRoadwayConstructionRoadway$8,354,659.82$309,431.854%0
0002-06-063El Paso12/05/28$780,418.52ConstructionRoadwayConstructionRoadway$752,546.43$27,872.094%0
0002-07-055El Paso12/05/28$641,183.33ConstructionRoadwayConstructionRoadway$618,283.93$22,899.404%0
0002-08-056El Paso12/05/28$761,911.11ConstructionRoadwayConstructionRoadway$734,700.00$27,211.114%0
0002-09-041El Paso12/05/28$784,988.89ConstructionRoadwayConstructionRoadway$756,953.57$28,035.324%0
0002-10-040El Paso12/05/28$502,716.67ConstructionRoadwayConstructionRoadway$484,762.50$17,954.174%0
0002-11-062El Paso12/05/28$172,652.78ConstructionRoadwayConstructionRoadway$166,486.61$6,166.174%0
0002-14-049El Paso12/05/28$453,062.04ConstructionRoadwayConstructionRoadway$436,881.25$16,180.794%0
0002-20-012El Paso12/05/28$264,537.04ConstructionRoadwayConstructionRoadway$255,089.29$9,447.754%0
0003-01-065El Paso12/05/28$1,142,436.11ConstructionRoadwayConstructionRoadway$1,101,634.82$40,801.294%0
0003-02-050El Paso12/05/28$546,891.67ConstructionRoadwayConstructionRoadway$527,359.82$19,531.854%0
0003-03-052El Paso12/05/28$89,813.89ConstructionRoadwayConstructionRoadway$86,606.25$3,207.644%0
0167-02-096El Paso12/05/28$234,746.30ConstructionRoadwayConstructionRoadway$226,362.50$8,383.804%0
0358-03-040El Paso12/05/28$2,360,953.70ConstructionRoadwayConstructionRoadway$2,276,633.93$84,319.774%0
0358-04-019El Paso12/05/28$2,370,162.04ConstructionRoadwayConstructionRoadway$2,285,513.39$84,648.654%0
0374-03-033El Paso12/05/28$370,370.37ConstructionRoadwayConstructionRoadway$357,142.86$13,227.514%0
0674-01-082El Paso12/05/28$408,994.44ConstructionRoadwayConstructionRoadway$394,387.50$14,606.944%0
1282-01-017El Paso12/05/28$1,410,241.67ConstructionRoadwayConstructionRoadway$1,359,875.89$50,365.784%0
2121-02-189El Paso12/05/28$1,045,788.89ConstructionRoadwayConstructionRoadway$1,008,439.29$37,349.604%0
2121-03-173El Paso12/05/28$119,899.07ConstructionRoadwayConstructionRoadway$115,616.96$4,282.114%0
2122-01-019El Paso12/05/28$176,183.33ConstructionRoadwayConstructionRoadway$169,891.07$6,292.264%0
2552-03-073El Paso12/05/28$272,277.78ConstructionRoadwayConstructionRoadway$262,553.57$9,724.214%0
0001-02-081El Paso11/01/28$830,986.11ConstructionRoadwayConstructionRoadway$801,308.04$29,678.074%0
0001-03-064El Paso11/01/28$415,493.04ConstructionRoadwayConstructionRoadway$400,654.00$14,839.044%0
0002-01-109El Paso11/01/28$138,497.74ConstructionRoadwayConstructionRoadway$133,551.39$4,946.354%0
0002-02-064El Paso11/01/28$20,359,415.74ConstructionRoadwayConstructionRoadway$19,632,293.75$727,121.994%0
0167-02-098El Paso11/01/28$298,977.78ConstructionRoadwayConstructionRoadway$288,300.00$10,677.784%0
0924-06-767El Paso11/01/28$470,418.52ConstructionRoadwayConstructionRoadway$453,617.86$16,800.664%0
0924-06-768El Paso11/01/28$250,287.04ConstructionRoadwayConstructionRoadway$241,348.21$8,938.834%0
1046-03-013El Paso11/01/28$132,274.07ConstructionRoadwayConstructionRoadway$127,550.00$4,724.074%0
2552-03-072El Paso11/01/28$821,507.41ConstructionRoadwayConstructionRoadway$792,167.86$29,339.554%0
0086-14-086Laredo10/04/28$73,735,991.67ConstructionRoadwayConstructionRoadway$71,102,563.39$2,633,428.284%0
0014-10-064Waco09/06/28$31,525,925.93ConstructionRoadwayConstructionRoadway$30,400,000.00$1,125,925.934%0
0167-01-138El Paso09/06/28$2,864,814.81ConstructionBridgeConstructionBridge$2,762,500.00$102,314.814%0
0374-04-032El Paso09/06/28$4,714,168.52ConstructionRoadwayConstructionRoadway$4,545,805.36$168,363.164%0
0800-02-010Lubbock11/03/26$120,582.51ConstructionRoadwayConstructionRoadway$116,301.00$4,281.514%0
2252-01-010Childress09/02/26$330,125.70ConstructionBridgeConstructionBridge$342,525.70$(12,400.00)-4%0
0307-01-157Beaumont09/02/26$21,112.40ConstructionRoadwayConstructionRoadway$20,380.72$731.684%0
2690-01-040Austin09/01/27$7,400,000.00ConstructionRoadwayConstructionRoadway$7,674,074.07$(274,074.07)-4%-91-3 months
0380-02-028Lubbock11/03/26$1,054,219.47ConstructionRoadwayConstructionRoadway$1,093,137.00$(38,917.53)-4%0
1061-01-040Beaumont09/02/26$255,621.30ConstructionRoadwayConstructionRoadway$246,933.04$8,688.264%0
2777-01-007Lubbock11/03/26$423,370.18ConstructionRoadwayConstructionRoadway$438,001.00$(14,630.82)-3%0
2500-01-006Lubbock11/03/26$172,505.46ConstructionRoadwayConstructionRoadway$167,026.00$5,479.463%0
0035-05-059San Angelo01/05/28$84,068,318.00ConstructionRoadwayConstructionRoadway$81,417,639.00$2,650,679.003%0
3520-01-023Lubbock11/03/26$236,455.13ConstructionRoadwayConstructionRoadway$244,320.00$(7,864.87)-3%0
3416-01-012Houston08/04/27$71,912,652.00ConstructionRoadwayConstructionRoadway$74,299,327.00$(2,386,675.00)-3%0
0703-03-030Beaumont09/02/26$415,927.70ConstructionRoadwayConstructionRoadway$403,282.08$12,645.623%0
0249-02-026Wichita Falls10/06/26$2,839,873.45ConstructionRoadwayConstructionRoadway$2,929,721.75$(89,848.30)-3%0
0092-05-061Dallas10/06/26$4,119,048.50ConstructionRoadwayConstructionRoadway$4,248,174.25$(129,125.75)-3%0
0427-01-042Paris09/02/26$1,783,455.25ConstructionBridgeConstructionBridge$1,731,524.25$51,931.003%0
0305-03-046Beaumont09/02/26$608,997.50ConstructionRoadwayConstructionRoadway$591,399.36$17,598.143%0
0092-06-114Dallas10/06/26$7,078,917.75ConstructionRoadwayConstructionRoadway$7,283,254.00$(204,336.25)-3%0
0339-04-036Beaumont09/01/28$118,318,519.44ConstructionRoadwayConstructionRoadway$115,100,000.00$3,218,519.443%-122-4 months
0050-06-110Houston02/02/27$1,846,179.07ConstructionRoadwayConstructionRoadway$1,796,095.00$50,084.073%632 months
3629-02-002Pharr09/06/28$172,212,794.20ConstructionRoadwayConstructionRoadway$167,568,412.00$4,644,382.203%0
2748-02-015Lufkin11/03/26$106,962.80ConstructionRoadwayConstructionRoadway$110,000.00$(3,037.20)-3%0
0601-01-066Beaumont09/02/26$1,188,826.90ConstructionRoadwayConstructionRoadway$1,157,862.42$30,964.483%0
0305-04-039Beaumont09/02/26$612,390.70ConstructionRoadwayConstructionRoadway$596,516.62$15,874.083%0
0307-02-052Beaumont09/02/26$998,604.00ConstructionRoadwayConstructionRoadway$972,857.88$25,746.123%0
0703-01-068Beaumont09/02/26$852,520.20ConstructionRoadwayConstructionRoadway$830,720.32$21,799.883%0
1687-02-010Houston09/02/26$361,581.08ConstructionRoadwayConstructionRoadway$352,443.60$9,137.483%0
0485-01-026El Paso12/01/26$1,969,177.27ConstructionRoadwayConstructionRoadway$1,919,937.50$49,239.773%0
0265-03-042Austin01/06/27$61,647,805.38ConstructionRoadwayConstructionRoadway$60,122,400.00$1,525,405.383%0
0243-03-072Beaumont09/02/26$213,371.40ConstructionRoadwayConstructionRoadway$208,128.60$5,242.803%0
0912-72-828Houston05/15/28$1,677,345.00ConstructionLocal LetConstructionLocal Let$1,720,400.00$(43,055.00)-3%0
0710-01-051Beaumont09/02/26$738,380.90ConstructionRoadwayConstructionRoadway$720,678.84$17,702.062%0
0388-06-006Lufkin11/03/26$51,225.85ConstructionRoadwayConstructionRoadway$50,000.00$1,225.852%0
0275-13-075Childress06/01/28$4,000,000.00ConstructionRoadwayConstructionRoadway$4,100,000.00$(100,000.00)-2%0
0775-01-021Pharr09/02/26$377,459.59ConstructionRoadwayConstructionRoadway$386,659.59$(9,200.00)-2%0
2510-01-020Lufkin11/03/26$61,416.60ConstructionRoadwayConstructionRoadway$60,000.00$1,416.602%0
0804-01-020Wichita Falls11/03/26$249,504.24ConstructionRoadwayConstructionRoadway$255,468.00$(5,963.76)-2%0
1876-01-043Lufkin11/03/26$185,584.40ConstructionRoadwayConstructionRoadway$190,000.00$(4,415.60)-2%0
0553-02-019Lufkin11/03/26$195,376.00ConstructionRoadwayConstructionRoadway$200,000.00$(4,624.00)-2%0
0221-01-078Paris03/07/28$111,223,783.65ConstructionRoadwayConstructionRoadway$108,728,384.26$2,495,399.392%0
2810-01-014Lufkin11/03/26$214,785.20ConstructionRoadwayConstructionRoadway$210,000.00$4,785.202%0
0337-05-048Bryan09/01/27$3,349,749.79ConstructionBridgeConstructionBridge$3,278,786.69$70,963.102%0
0200-01-093Lufkin10/06/26$30,456,009.45ConstructionRoadwayConstructionRoadway$29,811,165.20$644,844.252%0
0014-23-042Waco10/06/26$6,123,029.55ConstructionRoadwayConstructionRoadway$6,000,000.00$123,029.552%0
0092-04-087Dallas10/06/26$7,280,456.10ConstructionRoadwayConstructionRoadway$7,432,853.20$(152,397.10)-2%0
0063-02-041Atlanta10/06/26$215,642.29ConstructionRoadwayConstructionRoadway$220,068.00$(4,425.71)-2%0
0970-01-019Childress10/06/26$488,693.10ConstructionRoadwayConstructionRoadway$498,665.00$(9,971.90)-2%0
0515-03-061Yoakum11/03/26$119,072.35ConstructionRoadwayConstructionRoadway$121,493.00$(2,420.65)-2%0
0810-03-016Lufkin11/03/26$265,136.20ConstructionRoadwayConstructionRoadway$260,000.00$5,136.202%0
0593-01-142Beaumont09/02/26$90,843.10ConstructionRoadwayConstructionRoadway$89,087.32$1,755.782%0
3018-01-011Wichita Falls11/03/26$211,522.82ConstructionRoadwayConstructionRoadway$215,708.00$(4,185.18)-2%0
0085-04-052Atlanta10/06/26$926,451.98ConstructionRoadwayConstructionRoadway$908,838.00$17,613.982%0
0342-03-040Pharr08/01/29$13,503,772.71ConstructionRoadwayConstructionRoadway$13,767,575.00$(263,802.29)-2%0
0445-01-068Yoakum11/03/26$94,804.75ConstructionRoadwayConstructionRoadway$93,038.00$1,766.752%0
0093-01-110Dallas10/06/26$7,031,121.50ConstructionRoadwayConstructionRoadway$7,164,958.00$(133,836.50)-2%0
3100-02-002Pharr09/06/28$38,538,427.00ConstructionRoadwayConstructionRoadway$37,840,008.12$698,418.882%0
0243-04-062Beaumont09/02/26$117,258.40ConstructionRoadwayConstructionRoadway$115,153.71$2,104.692%0
0028-06-098Beaumont09/02/26$95,444.30ConstructionRoadwayConstructionRoadway$93,755.78$1,688.522%0
0266-08-018Yoakum01/06/27$677,634.80ConstructionNon RoadwayConstructionNon Roadway$690,000.00$(12,365.20)-2%0
0912-72-627Houston10/05/27$1,136,754.00ConstructionBridgeConstructionBridge$1,157,249.00$(20,495.00)-2%0
2550-01-012Fort Worth12/01/26$521,254.27ConstructionRoadwayConstructionRoadway$530,468.22$(9,213.95)-2%0
1750-01-011Lubbock11/03/26$29,003.30ConstructionRoadwayConstructionRoadway$29,455.53$(452.23)-2%0
0285-03-066Austin11/03/26$981,254.00ConstructionNon RoadwayConstructionNon Roadway$966,889.00$14,365.001%0
0109-06-046Lufkin11/03/26$207,139.20ConstructionRoadwayConstructionRoadway$210,000.00$(2,860.80)-1%0
0593-01-141Beaumont09/02/26$185,837.00ConstructionRoadwayConstructionRoadway$188,400.68$(2,563.68)-1%0
0064-02-020Lufkin11/03/26$385,266.00ConstructionRoadwayConstructionRoadway$390,000.00$(4,734.00)-1%0
0869-02-018Brownwood11/03/26$577,386.94ConstructionRoadwayConstructionRoadway$570,977.00$6,409.941%0
0968-02-004Lubbock11/03/26$215,495.78ConstructionRoadwayConstructionRoadway$217,921.00$(2,425.22)-1%0
3271-01-019Beaumont09/02/26$447,006.40ConstructionRoadwayConstructionRoadway$442,193.04$4,813.361%0
0319-01-073Lufkin11/03/26$1,019,011.60ConstructionRoadwayConstructionRoadway$1,030,000.00$(10,988.40)-1%0
2419-01-011Lubbock11/03/26$579,019.39ConstructionRoadwayConstructionRoadway$584,914.00$(5,894.61)-1%0
2879-01-011Atlanta10/05/27$2,563,215.00ConstructionRoadwayConstructionRoadway$2,588,020.00$(24,805.00)-1%30810 months
0921-02-529Pharr10/06/26$412,890.76ConstructionRoadwayConstructionRoadway$409,038.76$3,852.001%0
1510-01-024Lufkin11/03/26$416,130.05ConstructionRoadwayConstructionRoadway$420,000.00$(3,869.95)-1%0
2164-02-020Childress10/06/26$319,941.00ConstructionRoadwayConstructionRoadway$322,692.00$(2,751.00)-1%0
0109-06-045Lufkin11/03/26$352,947.45ConstructionRoadwayConstructionRoadway$350,000.00$2,947.451%0
0475-09-041Lufkin11/03/26$446,318.40ConstructionRoadwayConstructionRoadway$450,000.00$(3,681.60)-1%0
0921-02-527Pharr10/06/26$123,310.50ConstructionRoadwayConstructionRoadway$122,310.50$1,000.001%0
0059-05-048Lufkin11/03/26$555,436.80ConstructionRoadwayConstructionRoadway$560,000.00$(4,563.20)-1%0
0388-05-011Beaumont09/02/26$271,935.80ConstructionRoadwayConstructionRoadway$269,778.04$2,157.761%0
1258-02-044Houston09/02/26$483,448.89ConstructionRoadwayConstructionRoadway$479,659.19$3,789.701%0
0009-11-248Dallas10/06/26$51,718,095.61ConstructionRoadwayConstructionRoadway$52,122,703.81$(404,608.20)-1%0
0388-03-090Beaumont09/02/26$18,995.40ConstructionRoadwayConstructionRoadway$18,848.40$147.001%0
0485-02-018El Paso12/01/26$1,322,645.59ConstructionRoadwayConstructionRoadway$1,313,086.54$9,559.051%0
0187-05-068Houston09/02/26$354,602.37ConstructionRoadwayConstructionRoadway$352,056.55$2,545.821%0
0354-04-043Odessa12/01/26$26,065,517.45ConstructionRoadwayConstructionRoadway$26,242,851.29$(177,333.84)-1%0
2094-01-072Pharr11/03/26$4,545,021.29ConstructionRoadwayConstructionRoadway$4,514,108.73$30,912.561%0
0918-47-544Dallas05/05/27$511,543.46ConstructionRoadwayConstructionRoadway$514,990.58$(3,447.12)-1%0
0304-02-042Lufkin11/03/26$845,503.30ConstructionRoadwayConstructionRoadway$840,000.00$5,503.301%0
0668-01-020Abilene12/01/27$248,803.93ConstructionRoadwayConstructionRoadway$247,216.00$1,587.931%0
0336-05-067Lufkin11/03/26$462,935.15ConstructionRoadwayConstructionRoadway$460,000.00$2,935.151%0
0336-07-078Lufkin11/03/26$308,058.95ConstructionRoadwayConstructionRoadway$310,000.00$(1,941.05)-1%0
0912-72-626Houston10/05/27$974,484.40ConstructionBridgeConstructionBridge$980,366.00$(5,881.60)-1%0
0921-02-528Pharr10/06/26$84,987.25ConstructionRoadwayConstructionRoadway$84,487.25$500.001%0
0014-23-041Waco10/06/26$5,965,959.25ConstructionRoadwayConstructionRoadway$6,000,000.00$(34,040.75)-1%0
1194-01-025Lufkin11/03/26$656,408.80ConstructionRoadwayConstructionRoadway$660,000.00$(3,591.20)-1%0
0667-01-130Beaumont09/02/26$339,090.70ConstructionRoadwayConstructionRoadway$340,907.65$(1,816.95)-1%0
3330-01-011Waco11/03/26$303,599.30ConstructionRoadwayConstructionRoadway$302,164.80$1,434.500%0
0251-04-023Brownwood08/02/28$111,069,230.76ConstructionRoadwayConstructionRoadway$111,585,185.19$(515,954.43)-0%0
3632-01-002Pharr09/02/26$60,647,815.45ConstructionRoadwayConstructionRoadway$60,369,515.45$278,300.000%0
0052-05-052Lubbock11/03/26$606,482.59ConstructionRoadwayConstructionRoadway$603,778.00$2,704.590%0
0307-01-161Beaumont09/02/26$248,232.80ConstructionRoadwayConstructionRoadway$249,212.44$(979.64)-0%0
0706-04-022Lufkin11/03/26$617,713.20ConstructionRoadwayConstructionRoadway$620,000.00$(2,286.80)-0%0
0014-15-036Fort Worth08/05/26$19,317,040.90ConstructionRoadway$19,258,280.90$58,760.000%0
0015-13-432Austin11/03/26$238,770,933.57ConstructionBridgeConstructionBridge$239,362,478.11$(591,544.54)-0%0
0074-06-256Corpus Christi11/03/26$1,496,610.00ConstructionBridgeConstructionBridge$1,500,000.00$(3,390.00)-0%0
0932-01-122Beaumont09/02/26$347,223.90ConstructionRoadwayConstructionRoadway$346,453.56$770.340%0
0172-12-007Dallas11/02/27$51,363,055.90ConstructionRoadwayConstructionRoadway$51,472,754.02$(109,698.12)-0%1816 months
0213-02-049Lufkin11/03/26$851,739.40ConstructionRoadwayConstructionRoadway$850,000.00$1,739.400%0
2292-01-035Fort Worth12/01/26$969,295.36ConstructionRoadwayConstructionRoadway$967,447.71$1,847.650%0
0015-13-441Austin11/03/26$93,542,062.51ConstructionRoadwayConstructionRoadway$93,710,663.04$(168,600.53)-0%0
0114-01-071Austin11/03/26$3,761,482.94ConstructionNon RoadwayConstructionNon Roadway$3,768,059.17$(6,576.23)-0%0
0180-11-016Corpus Christi06/01/28$2,596,153.85ConstructionRoadwayConstructionRoadway$2,600,000.00$(3,846.15)-0%572 months
0114-01-070Austin11/03/26$439,163.83ConstructionNon RoadwayConstructionNon Roadway$439,821.46$(657.63)-0%0
1582-01-029Lufkin11/03/26$1,058,560.90ConstructionRoadwayConstructionRoadway$1,060,000.00$(1,439.10)-0%0
1927-01-011Brownwood11/03/26$266,002.15ConstructionRoadwayConstructionRoadway$265,712.00$290.150%0
0014-15-033Fort Worth08/05/26$8,290,894.75ConstructionRoadway$8,282,938.75$7,956.000%0
0692-01-020Paris10/04/28$32,981,481.48ConstructionRoadwayConstructionRoadway$33,000,000.00$(18,518.52)-0%0
0336-01-071Lufkin11/03/26$350,218.05ConstructionRoadwayConstructionRoadway$350,000.00$218.050%0
0143-10-058Yoakum09/02/26$6,552,127.50ConstructionRoadwayConstructionRoadway$6,548,377.50$3,750.000%0
0902-48-579Fort Worth08/05/26$22,931,806.10ConstructionRoadway$22,917,686.10$14,120.000%0
3510-04-070Houston08/05/26$19,111,450.30ConstructionRoadway$19,121,150.30$(9,700.00)-0%0
0016-03-125Austin11/03/26$2,826,631.57ConstructionRoadwayConstructionRoadway$2,827,670.53$(1,038.96)-0%0
0016-09-045Austin11/03/26$213,459.69ConstructionRoadwayConstructionRoadway$213,525.75$(66.06)-0%0
0143-03-049San Antonio10/06/26$47,441,025.10ConstructionRoadwayConstructionRoadway$47,428,077.66$12,947.440%0
0366-01-080Austin11/03/26$396,072.86ConstructionRoadwayConstructionRoadway$396,158.18$(85.32)-0%0
0014-15-034Fort Worth08/05/26$19,181,957.10ConstructionRoadway$19,177,771.10$4,186.000%0
0366-01-089Austin11/03/26$227,222.93ConstructionRoadwayConstructionRoadway$227,251.37$(28.44)-0%0
0987-03-017Austin11/03/26$123,522.92ConstructionRoadwayConstructionRoadway$123,537.07$(14.15)-0%0
0028-15-063Beaumont09/02/26$177,997.00ConstructionRoadwayConstructionRoadway$178,010.08$(13.08)-0%0
0038-04-064Pharr09/06/28$83,428,591.67ConstructionRoadwayConstructionRoadway$83,428,593.00$(1.33)0%0
0495-10-105Atlanta09/06/28$5,976,102.00ConstructionRoadwayConstructionRoadway$5,976,110.38$(8.38)0%0
0008-09-037Fort Worth06/01/28$17,300,892.00ConstructionRoadwayConstructionRoadway$17,300,891.50$0.500%0
1024-01-077Beaumont05/03/28$70,192,308.65ConstructionRoadwayConstructionRoadway$70,192,307.69$0.960%0
1728-02-069San Antonio12/01/26$4,204,671.06ConstructionRoadwayConstructionRoadway$4,204,612.00$59.060%0
858 rows · download CSV

Putting It Together

The TxDOT pipeline shows an overall increase in both active project numbers and total value, driven by a mix of letting-date shifts and steady subtype classifications. While project costs have risen significantly, the concentration of projects mainly remains within the roadway category, supporting ongoing infrastructure development.


Final Takeaway

The updated pipeline reflects a continued investment in transportation infrastructure with stable classifications and a growing financial commitment.