Pipeline Changes

TxDOT Pipeline Changes - April 2026

McKenna Wolfe2 min read
TxDOT Pipeline Changes - April 2026
  • The TxDOT pipeline expanded from 6,282 to 6,414 total projects between the April 3 and May 4, 2026 snapshots, within a letting window from May 5, 2026 to March 1, 2029.
  • Overall pipeline value increased by $163.98 million to a total of $6.71 billion.
  • The largest cost movement occurred in Dallas with a net increase of $63.49 million.

Overview

Comparing how the project pipeline changed from April 3 to May 4, 2026, across a letting window of May 5, 2026 to March 1, 2029, there was significant activity. The total number of projects increased from 6,282 to 6,414. Letting dates reflected a drift with 211 projects shifting by six months or more, of which 142 moved later and 69 moved earlier. The overall pipeline value grew to $6.71 billion, indicating a shift in funding focus.


Letting Date Shifts (Slippage)

How to read this chart:

Project letting dates experienced notable shifts, with 211 projects having changes of six months or more, 142 moved later while 69 moved earlier. There were 130 projects with shifts of a year or more, 96 later and 34 earlier. This suggests that many projects are being deferred, contributing to a later project delivery schedule.

CSJDistrictEst. Letting DateProject EstimateCurrent TypeCurrent SubtypePrev. TypePrev. SubtypePrev. DateLetting Δ (days)Letting Date ΔCost Δ%Cost ΔType/Subtype ΔLifecycle
2664-01-007Lufkin10/04/28$4,882,572.05ConstructionRoadwayUnassignedUnassigned09/01/45-6176-17 yearsUnassigned → Construction / Roadway
0495-08-107Atlanta01/01/39$5,357,426.00ConstructionRoadway01/05/28401411 years
0495-10-090Atlanta01/01/39$7,841,466.00ConstructionRoadway01/05/28401411 years
0495-10-103Atlanta01/01/39$5,466,829.00ConstructionRoadway01/05/28401411 years
0495-10-104Atlanta01/01/39$8,713,538.00ConstructionRoadway01/05/28401411 years
0610-03-089Atlanta01/01/39$8,377,828.00ConstructionRoadway01/05/28401411 years
0610-05-052Atlanta01/01/39$7,638,133.00ConstructionRoadway01/05/28401411 years
0610-06-094Atlanta01/01/39$6,602,181.00ConstructionRoadway01/05/28401411 years
0610-06-095Atlanta01/01/39$5,452,059.00ConstructionRoadway01/05/28401411 years
0275-16-004Amarillo11/01/37$170,000.00ConstructionRoadway11/02/27365210 years
1092-01-026Dallas05/05/27$12,239,522.17ConstructionRoadwayUnassignedUnassigned08/01/35-3010-8 yearsUnassigned → Construction / Roadway
3510-03-003Houston01/15/37$55,381,565.0001/15/2929228 years
0558-09-040San Angelo06/01/35$13,200,000.00ConstructionRoadway06/01/2825567 years
0007-03-099Brownwood11/02/27$587,822.00ConstructionRoadwayUnassignedUnassigned11/01/34-2556-7 yearsUnassigned → Construction / Roadway
0007-03-100Brownwood11/02/27$590,391.00ConstructionRoadwayUnassignedUnassigned11/01/34-2556-7 yearsUnassigned → Construction / Roadway
1014-02-051Dallas10/01/35$548,755.00ConstructionRoadway10/04/2825537 years
2263-02-112Corpus Christi10/01/35$17,000,000.00ConstructionFerry Boat10/04/2825537 years
0997-01-051Dallas10/01/33$534,725.65ConstructionRoadway10/06/2625527 years
0999-01-049Dallas10/01/33$271,147.24ConstructionRoadway10/06/2625527 years
2462-04-009Dallas10/01/33$452,799.26ConstructionRoadway10/06/2625527 years
0520-05-054Atlanta08/02/28$3,500,000.00ConstructionRoadwayUnassignedUnassigned01/01/35-2343-6 years$(14,000,000.00)-80%Unassigned → Construction / Roadway
0143-14-006San Antonio09/06/28$6,540,250.00ConstructionRoadwayUnassignedUnassigned01/01/35-2308-6 yearsUnassigned → Construction / Roadway
0183-01-059Brownwood11/01/32$14,114.00ConstructionRoadway11/03/2621906 years
0047-04-042Dallas10/01/34$420,992.25ConstructionRoadway10/04/2821886 years
2170-05-018Laredo02/02/28$2,000,000.00ConstructionRoadwayUnassignedUnassigned11/01/33-2099-6 years$1,600,000.00400%Unassigned → Construction / Roadway
0521-05-144San Antonio09/01/27$589,100,000.00ConstructionRoadwayUnassignedUnassigned09/01/32-1827-5 yearsUnassigned → Construction / Roadway
2013-02-018Brownwood11/01/31$11,626.00ConstructionRoadway11/03/2618245 years
0337-02-055Austin10/02/30$945,350.00ConstructionLocal Let10/01/2614624 years
0088-02-070Corpus Christi12/01/31$1,000,000.00ConstructionNon Roadway12/01/2714614 years
0447-03-043Corpus Christi12/01/31$1,500,000.00ConstructionNon Roadway12/01/2714614 years
0912-71-692Houston09/15/30$15,000.00Non-LetRoadway09/15/2614614 years
0912-72-005Houston09/15/30$30,000.00Non-LetRoadway09/15/2614614 years
0054-04-119Brownwood11/01/28$454,880.00ConstructionRoadwayUnassignedUnassigned11/01/32-1461-4 yearsUnassigned → Construction / Roadway
0070-06-053Brownwood11/01/28$263,697.00ConstructionRoadwayUnassignedUnassigned11/01/32-1461-4 yearsUnassigned → Construction / Roadway
2270-01-030Abilene05/03/28$1,666,666.67ConstructionRoadwayUnassignedUnassigned05/01/32-1459-4 years$(565,476.33)-25%Unassigned → Construction / Roadway
0007-06-269Brownwood11/03/26$131,061.00ConstructionRoadwayUnassignedUnassigned11/01/30-1459-4 yearsUnassigned → Construction / Roadway
0007-06-272Brownwood11/03/26$131,061.00ConstructionRoadwayUnassignedUnassigned11/01/30-1459-4 yearsUnassigned → Construction / Roadway
0523-01-032Houston03/01/32$961,403.00ConstructionRoadway03/07/2814554 years
0367-02-084Houston09/01/31$500,000.00ConstructionRoadway03/07/2812733 years$(1,406,590.00)-74%
0014-23-042Waco10/06/26$6,000,000.00ConstructionRoadwayUnassignedUnassigned02/01/30-1214-3 years$(4,000,000.00)-40%Unassigned → Construction / Roadway
0756-05-021Lufkin09/01/31$6,440,000.00ConstructionBridge06/01/2811873 years
0038-01-089Laredo02/01/31$2,261,754.60ConstructionRoadway02/02/2810953 years
0086-14-104Laredo02/01/31$4,493,788.95ConstructionRoadway02/02/2810953 years
2786-01-020Brownwood11/01/29$23,985.00ConstructionRoadway11/03/2610943 years
0870-06-025Brownwood05/01/31$4,048,369.20ConstructionRoadway05/03/2810933 years
0999-01-048Dallas08/01/30$7,921,726.91ConstructionRoadway08/04/2710933 years
1003-01-098Houston09/01/31$1,088,146.00ConstructionRoadway09/06/2810903 years$(23,057,977.00)-95%
0843-06-020Atlanta02/01/29$3,751,667.00ConstructionRoadwayUnassignedUnassigned01/01/32-1064-3 yearsUnassigned → Construction / Roadway
0013-08-147Fort Worth06/01/27$54,615,384.64ConstructionRoadwayUnassignedUnassigned01/01/30-945-3 years$7,034,010.8815%Unassigned → Construction / Roadway
0014-15-087Fort Worth06/01/27$20,384,615.38ConstructionRoadwayUnassignedUnassigned01/01/30-945-3 years$5,826,381.5840%Unassigned → Construction / Roadway
0027-10-082Houston05/05/27$1,429,810.00ConstructionRoadwayUnassignedUnassigned12/01/29-941-3 yearsUnassigned → Construction / Roadway
2594-01-015Lufkin05/01/30$5,608,654.30ConstructionBridge10/05/279393 years
2374-05-092Fort Worth01/09/30$3,037,016.40ConstructionLocal Let11/09/277922 years
0063-04-069Atlanta01/06/27$5,242,917.00ConstructionRoadwayConstructionRoadway03/01/29-785-2 years
0063-05-041Atlanta01/06/27$3,257,083.00ConstructionRoadwayConstructionRoadway03/01/29-785-2 years
0978-02-092Houston11/01/29$17,357,933.00ConstructionRoadway10/05/277582 years
3049-01-037Houston11/01/29$64,696,185.00ConstructionRoadway10/05/277582 years
3049-01-038Houston11/01/29$33,838,904.00ConstructionRoadway10/05/277582 years
0378-06-024Tyler12/05/28$91,443.18ConstructionRoadwayConstructionRoadway12/01/267352 years
0187-05-063Houston09/06/28$3,674,142.32ConstructionNon RoadwayConstructionNon Roadway09/02/267352 years
1043-01-012Houston09/02/26$1,000,000.00ConstructionRoadwayConstructionRoadway09/06/28-735-2 years
1043-02-005Houston09/02/26$177,120.00ConstructionRoadwayConstructionRoadway09/06/28-735-2 years
3256-03-107Houston07/01/29$1,291,992.00ConstructionRoadwayConstructionRoadway07/01/277312 years
0300-01-111Laredo03/01/31$3,185,762.83ConstructionRoadway03/01/297302 years
1549-04-036Corpus Christi01/01/31$5,000,000.00ConstructionRoadway01/01/297302 years
0119-01-020Lufkin11/01/29$4,699,706.70ConstructionBridge11/02/277302 years
0743-02-029Lufkin11/01/29$4,925,806.28ConstructionBridge11/02/277302 years
0050-08-104Houston02/01/29$27,031,845.00ConstructionRoadwayConstructionRoadway02/02/277302 years
3022-02-009Dallas02/01/29$5,938,245.17ConstructionRoadwayConstructionRoadway02/02/277302 years$950,010.4919%
0109-08-052Lufkin11/02/27$1,126,844.19ConstructionRoadwayUnassignedUnassigned11/01/29-730-2 yearsUnassigned → Construction / Roadway
0720-02-098Houston03/03/27$7,639,008.00ConstructionRoadwayConstructionRoadway03/01/29-729-2 years
0815-03-016Dallas10/01/30$605,163.96ConstructionRoadway10/04/287272 years$536,313.96779%
0074-03-050Corpus Christi01/01/30$4,500,000.00ConstructionRoadway01/05/287272 years$1,100,000.0032%
0074-04-049Corpus Christi01/01/30$3,000,000.00ConstructionRoadway01/05/287272 years$900,000.0043%
2846-01-008Dallas12/01/30$6,759,240.62ConstructionRoadway12/05/287262 years$261,323.364%
0912-72-809Houston01/01/29$500,000.00ConstructionRail - SafetyConstructionRail - Safety01/06/277262 years
0069-01-061Abilene07/01/30$20,000,000.00ConstructionRoadway07/06/287252 years
0069-02-030San Angelo07/01/30$5,000,000.00ConstructionRoadway07/06/287252 years
0217-01-038Atlanta09/06/28$2,400,000.00ConstructionBridgeConstructionBridge10/06/267012 years
0051-03-123Houston08/01/29$9,073,088.00ConstructionRoadwayConstructionRoadway09/01/277002 years
0976-05-031Houston03/01/29$1,847,549.00ConstructionRoadwayConstructionRoadway04/06/276952 years
2977-01-011Dallas07/01/26$11,777,297.44ConstructionRoadwayConstructionRoadway05/03/28-672-2 years$(553,199.50)-4%
0138-08-034Tyler01/01/31$2,620,282.00ConstructionNon Roadway03/01/296712 years
1680-03-031Lufkin09/01/29$2,098,409.53ConstructionBridge11/02/276692 years
0912-72-812Houston09/15/28$500,000.00Non-LetRailConstructionRail - Safety12/01/266542 yearsConstruction / Rail - Safety → Non-Let / Rail
0070-03-062San Angelo07/01/26$3,599,697.00ConstructionRoadwayConstructionRoadway04/05/28-644-2 years$(1,026,460.00)-22%
0070-04-041San Angelo07/01/26$175,049.00ConstructionRoadwayConstructionRoadway04/05/28-644-2 years$36,849.0027%
0368-03-042Beaumont07/01/26$1,762,157.35ConstructionRoadwayConstructionRoadway04/05/28-644-2 years$262,157.3517%
0786-01-095Beaumont07/01/26$4,288,248.61ConstructionRoadwayConstructionRoadway04/05/28-644-2 years$(211,751.39)-5%
0118-08-085Lufkin06/01/30$5,554,561.67ConstructionBridge10/04/286052 years
0172-09-044Fort Worth08/02/28$2,582,000.00ConstructionRoadwayConstructionRoadway02/02/275471 year
0383-04-065Corpus Christi07/01/30$3,000,000.00ConstructionRoadway01/01/295461 year$(1,600,000.00)-35%
0008-07-034Fort Worth11/03/28$3,604,001.50ConstructionLocal LetConstructionLocal Let07/03/274891 year
0029-01-031San Antonio01/05/28$102,880.00ConstructionRoadwayConstructionRoadway10/06/264561 year
0366-12-033San Antonio01/05/28$90,889.00ConstructionRoadwayConstructionRoadway10/06/264561 year
1003-01-105Houston01/05/28$5,116,513.00ConstructionBridgeConstructionBridge10/06/264561 year
1385-01-046Atlanta01/05/28$600,000.00ConstructionRoadwayConstructionRoadway10/06/264561 year
1020-01-068Atlanta03/03/27$2,400,000.00ConstructionRoadwayConstructionRoadway06/01/28-456-1 year$598,270.0033%
0976-03-122Houston11/02/27$528,000.00ConstructionRoadwayConstructionRoadway09/02/264261 year
6487-61-001Houston09/02/27$1,000,000.00MaintenanceRoutine Maintenance ContractUnassignedUnassigned08/01/263971 yearUnassigned → Maintenance / Routine Maintenance Contract
0943-04-035Corpus Christi04/01/29$5,500,000.00ConstructionRoadwayConstructionRoadway03/07/283901 year
0912-00-704Houston09/15/27$1,000,000.00ConstructionLocal LetConstructionRail - Safety09/02/263781 yearConstruction / Rail - Safety → Construction / Local Let
0109-01-066Tyler09/06/28$3,800,000.00ConstructionRoadwayConstructionRoadway09/01/273711 year
0109-02-027Tyler09/06/28$3,250,000.00ConstructionRoadwayConstructionRoadway09/01/273711 year
0169-02-071Amarillo09/06/28$1,970,000.00ConstructionBridgeConstructionBridge09/01/273711 year
0169-02-072Amarillo09/06/28$1,500,000.00ConstructionBridgeConstructionBridge09/01/273711 year
2635-02-040Amarillo09/06/28$1,100,000.00ConstructionBridgeConstructionBridge09/01/273711 year
2635-02-041Amarillo09/06/28$1,140,000.00ConstructionBridgeConstructionBridge09/01/273711 year
0111-05-019Houston03/07/28$4,480,673.00ConstructionRoadwayConstructionRoadway03/03/273701 year
0847-06-013Houston03/07/28$3,919,359.00ConstructionRoadwayConstructionRoadway03/03/273701 year
0253-06-041San Antonio09/03/27$4,700,000.00Non-LetBridgeNon-LetBridge09/01/263671 year
0517-02-043San Antonio09/03/27$5,452,200.00Non-LetBridgeNon-LetBridge09/01/263671 year
0248-04-086Atlanta03/01/30$6,750,000.00ConstructionRoadway03/01/293651 year
0163-04-066Tyler02/01/30$12,300,000.00ConstructionRoadway02/01/293651 year
0192-04-113Houston02/01/30$7,570,207.00ConstructionRoadway02/01/293651 year
0495-02-072Tyler02/01/30$12,037,037.04ConstructionRoadway02/01/293651 year
0091-09-019Dallas01/01/30$8,932,684.66ConstructionRoadway01/01/293651 year$(2,862,848.38)-24%
0978-02-089Houston01/01/30$2,266,543.00ConstructionRoadway01/01/293651 year
1875-02-030Lufkin11/01/29$471,364.14ConstructionRoadway11/01/283651 year
0068-02-050Lubbock02/01/29$1,371,261.60ConstructionRoadwayUnassignedUnassigned02/01/30-365-1 yearUnassigned → Construction / Roadway
0192-04-110Houston01/01/29$19,417,883.00ConstructionRoadwayUnassignedUnassigned01/01/30-365-1 yearUnassigned → Construction / Roadway
0002-02-064El Paso11/01/28$19,632,293.75ConstructionRoadwayConstructionRoadway11/02/273651 year$(727,121.99)-4%
0109-07-056Lufkin11/01/28$1,496,424.29ConstructionRoadwayUnassignedUnassigned11/01/29-365-1 yearUnassigned → Construction / Roadway
0074-12-006Corpus Christi10/04/28$115,828.00ConstructionRoadwayConstructionRoadway10/05/273651 year
0087-04-043Corpus Christi10/04/28$197,663.00ConstructionRoadwayConstructionRoadway10/05/273651 year
0255-02-064Corpus Christi10/04/28$770,676.00ConstructionRoadwayConstructionRoadway10/05/273651 year
0507-02-061Corpus Christi10/04/28$264,978.00ConstructionRoadwayConstructionRoadway10/05/273651 year
2521-01-018Corpus Christi10/04/28$214,534.00ConstructionRoadwayConstructionRoadway10/05/273651 year
0172-06-109Fort Worth02/15/28$310,000.00ConstructionLocal LetConstructionLocal Let02/15/273651 year
0017-08-117Laredo02/02/28$8,699,053.65ConstructionRoadwayConstructionRoadway02/01/29-365-1 year$(2,344,163.85)-21%
0038-01-104Laredo02/02/28$2,615,401.95ConstructionRoadwayConstructionRoadway02/01/29-365-1 year$11,200.520%
0542-02-046Laredo02/02/28$6,049,963.50ConstructionRoadwayConstructionRoadway02/01/29-365-1 year$(750,036.50)-11%
0005-05-115Abilene12/01/27$769,821.00ConstructionRoadwayConstructionRoadway12/01/263651 year
0006-06-116Abilene12/01/27$404,000.00ConstructionRoadwayConstructionRoadway12/01/263651 year
0134-04-038Fort Worth12/01/27$25,848,256.43ConstructionRoadwayConstructionRoadway12/01/263651 year
0480-03-048Abilene12/01/27$111,474.00ConstructionRoadwayConstructionRoadway12/01/263651 year
1099-03-015Tyler12/01/27$427,539.09ConstructionRoadwayConstructionRoadway12/01/263651 year
1463-02-017Paris11/02/27$143,672.32ConstructionRoadwayConstructionRoadway11/01/28-365-1 year
0101-03-128Corpus Christi10/05/27$152,817.00ConstructionRoadwayConstructionRoadway10/04/28-365-1 year
1310-01-051Dallas10/05/27$8,305,445.16ConstructionRoadwayConstructionRoadway10/04/28-365-1 year$(2,369,843.23)-22%
1655-01-036Abilene07/01/27$5,512,640.10ConstructionRoadwayConstructionRoadway07/01/263651 year
0389-11-061Houston02/02/27$3,424,252.00ConstructionRoadwayConstructionRoadway02/02/28-365-1 year$(670,780.00)-16%
0008-03-140Fort Worth08/01/29$4,110,095.04ConstructionRoadwayConstructionRoadway08/02/2836412 months$734,341.3122%
0598-02-136Houston11/02/27$1,341,371.02ConstructionRoadwayConstructionRoadway11/03/2636412 months
0017-09-102San Antonio09/03/27$250,000.00Non-LetRail - SafetyNon-LetRail - Safety09/04/2636412 months
0017-09-103San Antonio09/03/27$250,000.00Non-LetRail - SafetyNon-LetRail - Safety09/04/2636412 months
0073-03-065San Antonio09/03/27$70,000.00Non-LetRail - SafetyNon-LetRail - Safety09/04/2636412 months
0915-12-599San Antonio09/03/27$250,000.00Non-LetRail - SafetyNon-LetRail - Safety09/04/2636412 months
0915-12-600San Antonio09/03/27$250,000.00Non-LetRail - SafetyNon-LetRail - Safety09/04/2636412 months
0915-12-606San Antonio09/03/27$250,000.00Non-LetRail - SafetyNon-LetRail - Safety09/04/2636412 months
0915-12-607San Antonio09/03/27$250,000.00Non-LetRail - SafetyNon-LetRail - Safety09/04/2636412 months
0915-17-082San Antonio09/03/27$250,000.00Non-LetRail - SafetyNon-LetRail - Safety09/04/2636412 months
0915-46-055San Antonio09/03/27$250,000.00Non-LetRail - SafetyNon-LetRail - Safety09/04/2636412 months
0915-46-056San Antonio09/03/27$250,000.00Non-LetRail - SafetyNon-LetRail - Safety09/04/2636412 months
1273-01-040San Antonio09/03/27$300,000.00Non-LetRail - SafetyNon-LetRail - Safety09/04/2636412 months
1433-02-049San Antonio09/03/27$250,000.00Non-LetRail - SafetyNon-LetRail - Safety09/04/2636412 months
0220-04-049Pharr08/04/27$23,319,932.34ConstructionRoadwayConstructionRoadway08/05/2636412 months
0872-04-035Pharr08/04/27$314,622.34ConstructionRoadwayConstructionRoadway08/05/2636412 months
0714-01-016Fort Worth11/03/26$189,398.00ConstructionRoadwayConstructionRoadway11/02/27-364-12 months
0714-02-022Brownwood11/03/26$445,147.00ConstructionRoadwayConstructionRoadway11/02/27-364-12 months
1051-01-065Dallas10/01/29$105,284.34ConstructionRoadway10/04/2836212 months$(14,680.63)-12%
2461-01-011Dallas10/01/29$1,051,197.00ConstructionRoadway10/04/2836212 months$(210,599.16)-17%
0164-03-058Tyler01/01/29$8,130,000.00ConstructionRoadwayConstructionRoadway01/05/2836212 months
1986-01-075Houston01/05/28$10,245,762.00ConstructionRoadwayConstructionRoadway01/01/29-362-12 months
1259-01-051Houston04/01/29$6,060,069.00ConstructionRoadwayConstructionRoadway04/05/2836112 months
1763-02-034Tyler07/01/29$1,637,000.00ConstructionRoadwayConstructionRoadway07/06/2836012 months
1763-03-049Tyler07/01/29$4,200,000.00ConstructionRoadwayConstructionRoadway07/06/2836012 months
0022-04-021Laredo03/01/29$10,763,000.85ConstructionRoadwayConstructionRoadway03/07/2835912 months$(259,864.50)-2%
0299-13-035Laredo03/01/29$1,789,754.40ConstructionRoadwayConstructionRoadway03/07/2835912 months$235,065.6015%
0299-14-037Laredo03/01/29$1,151,274.60ConstructionRoadwayConstructionRoadway03/07/2835912 months$(713,358.45)-38%
0172-11-016Dallas03/07/28$10,429,429.46ConstructionRoadwayConstructionRoadway03/01/29-359-12 months
3138-01-039Bryan05/03/28$761,876.00ConstructionRoadwayConstructionRoadway06/01/2733711 months$(76,995.00)-9%
1558-03-114Corpus Christi12/05/28$18,000,000.00ConstructionRoadwayConstructionRoadway01/05/2833511 months$5,600,000.0045%
0926-05-009Lufkin09/01/29$9,169,916.07ConstructionRoadway10/04/2833211 months
0161-01-033Laredo02/01/29$1,438,067.40ConstructionRoadwayConstructionRoadway03/07/2833111 months$(1,496,579.45)-51%
1685-01-123Houston05/05/27$3,451,656.00ConstructionRoadwayConstructionRoadway03/07/28-307-10 months
1685-02-053Houston05/05/27$3,763,259.00ConstructionRoadwayConstructionRoadway03/07/28-307-10 months
0044-04-066Wichita Falls08/02/28$2,464,352.00ConstructionRoadwayConstructionRoadway10/05/2730210 months
0914-04-370Austin08/04/27$78,014.05ConstructionRoadwayConstructionRoadway10/06/2630210 months
0914-04-371Austin08/04/27$131,936.30ConstructionNon RoadwayConstructionNon Roadway10/06/2630210 months
0173-04-059Dallas08/05/26$6,640,524.42ConstructionRoadwayConstructionRoadway06/01/27-300-10 months
0581-01-177Dallas08/05/26$1,376,754.86ConstructionRoadwayConstructionRoadway06/01/27-300-10 months$(218,877.45)-14%
0581-01-179Dallas08/05/26$1,725,917.34ConstructionRoadwayConstructionRoadway06/01/27-300-10 months$77,435.805%
0054-06-113Brownwood07/01/26$2,329,284.20ConstructionRoadwayConstructionRoadway04/06/27-279-9 months$329,284.2016%
0902-90-374Fort Worth10/04/27$32,884,620.00ConstructionLocal LetConstructionLocal Let01/02/272759 months
2744-01-041Houston08/04/27$10,000,000.00ConstructionRoadwayConstructionRoadway11/03/262749 months
0256-01-061Wichita Falls05/05/27$200,000.00ConstructionBridgeConstructionBridge09/02/262458 months
1556-01-032Corpus Christi11/02/27$8,000,000.00ConstructionRoadwayConstructionRoadway03/03/272448 months$4,000,000.00100%
1052-02-103Corpus Christi12/05/28$293,307.00ConstructionRoadwayConstructionRoadway08/01/29-239-8 months
0853-02-033San Antonio04/06/27$16,290,622.00ConstructionRoadwayConstructionRoadway09/02/262167 months
0019-01-153Fort Worth07/01/26$1,566,691.63ConstructionRoadwayConstructionRoadway02/02/27-216-7 months$1,650.100%
0249-01-053Wichita Falls07/01/26$425,058.58ConstructionBridgeConstructionBridge02/02/27-216-7 months$98,563.5830%
0249-01-054Wichita Falls07/01/26$181,321.60ConstructionBridgeConstructionBridge02/02/27-216-7 months$35,167.6024%
0249-01-055Wichita Falls07/01/26$219,131.60ConstructionBridgeConstructionBridge02/02/27-216-7 months$35,442.6019%
0249-01-056Wichita Falls07/01/26$251,218.60ConstructionBridgeConstructionBridge02/02/27-216-7 months$59,002.6031%
0249-01-057Wichita Falls07/01/26$216,315.60ConstructionBridgeConstructionBridge02/02/27-216-7 months$11,982.606%
0249-01-058Wichita Falls07/01/26$166,226.60ConstructionBridgeConstructionBridge02/02/27-216-7 months$(23,121.40)-12%
0249-01-059Wichita Falls07/01/26$341,741.20ConstructionBridgeConstructionBridge02/02/27-216-7 months$139,088.2069%
0249-01-060Wichita Falls07/01/26$261,344.20ConstructionBridgeConstructionBridge02/02/27-216-7 months$(2,987.80)-1%
0259-05-086Fort Worth07/01/26$568,444.50ConstructionRoadwayConstructionRoadway02/02/27-216-7 months$2,750.000%
0700-04-055Austin07/01/26$66,708.00ConstructionBridgeConstructionBridge02/02/27-216-7 months
0700-04-057Austin07/01/26$68,543.50ConstructionBridgeConstructionBridge02/02/27-216-7 months
0700-04-058Austin07/01/26$657,212.50ConstructionBridgeConstructionBridge02/02/27-216-7 months
2024-01-009Corpus Christi01/01/29$886,012.00ConstructionRoadwayConstructionRoadway08/01/29-212-7 months
0912-73-249Houston04/15/27$3,022,870.19ConstructionLocal LetConstructionLocal Let09/15/262127 months
2370-01-009Odessa07/01/26$6,906,220.22ConstructionRoadwayConstructionRoadway01/06/27-189-6 months$(5,293,779.78)-43%
3330-01-011Waco11/03/26$411,155.00ConstructionRoadwayConstructionRoadway05/05/27-183-6 months
1068-01-242Fort Worth02/02/28$3,053,262.00ConstructionRoadwayConstructionRoadway08/02/28-182-6 months
0002-14-048El Paso04/02/27$11,667,327.88ConstructionLocal LetConstructionLocal Let10/02/261826 months
0915-12-691San Antonio03/03/27$250,000.00ConstructionRail - SafetyConstructionRail - Safety09/02/261826 months
3441-01-005Corpus Christi02/01/29$1,026,657.00ConstructionRoadwayConstructionRoadway08/01/29-181-6 months
0363-03-060Fort Worth09/30/26$136,306,104.60Alternative DeliveryDesign Build Finance Operate MaintainAlternative DeliveryDesign Build Finance Operate Maintain04/03/261806 months
0259-05-083Fort Worth02/02/28$8,009,664.43ConstructionRoadwayUnassignedUnassigned09/01/271545 monthsUnassigned → Construction / Roadway
0924-06-691El Paso05/01/27$3,716,750.00ConstructionLocal LetConstructionLocal Let10/02/27-154-5 months
1197-01-027Austin08/05/26$3,080,501.38ConstructionRoadwayConstructionRoadway01/06/27-154-5 months$(30,328.22)-1%
0015-13-437Austin02/02/27$387,000,000.00ConstructionRoadwayConstructionRoadway09/02/261535 months
0026-02-040Yoakum02/02/27$275,000.00ConstructionRoadwayConstructionRoadway09/02/261535 months
0446-03-053Yoakum02/02/27$450,000.00ConstructionRoadwayConstructionRoadway09/02/261535 months
0015-13-461Austin02/01/27$9,400,000.00Non-LetNon RoadwayNon-LetNon Roadway09/01/261535 months
0013-10-098Fort Worth07/01/26$8,676,166.77ConstructionRoadwayConstructionRoadway12/01/26-153-5 months$260,080.063%
2452-03-128San Antonio07/01/26$180,125,212.86ConstructionRoadwayConstructionRoadway12/01/26-153-5 months$(10,189,109.14)-5%
0338-02-045Houston09/06/28$822,392.23ConstructionRoadwayConstructionRoadway02/01/29-148-5 months
0338-02-046Houston09/06/28$508,316.46ConstructionRoadwayConstructionRoadway02/01/29-148-5 months
0338-03-102Houston09/06/28$313,461.82ConstructionRoadwayConstructionRoadway02/01/29-148-5 months
0720-02-095Houston09/06/28$1,000,000.00ConstructionRoadwayConstructionRoadway02/01/29-148-5 months$(15,300,278.00)-94%
1039-04-011Brownwood06/01/28$6,400,000.00ConstructionBridgeConstructionBridge01/05/281485 months
0389-05-134Houston01/06/27$4,892,062.00ConstructionNon RoadwayConstructionNon Roadway09/02/261264 months
0015-13-432Austin11/03/26$254,000,000.00ConstructionBridgeConstructionBridge07/01/261254 months
0015-13-441Austin11/03/26$85,000,000.00ConstructionRoadwayConstructionRoadway07/01/261254 months
0114-01-070Austin11/03/26$620,000.00ConstructionNon RoadwayConstructionNon Roadway07/01/261254 months
0114-01-071Austin11/03/26$4,200,000.00ConstructionNon RoadwayConstructionNon Roadway07/01/261254 months
0054-07-086Brownwood05/01/29$25,000,000.00ConstructionRoadwayConstructionRoadway01/01/291204 months
0015-13-452Austin02/02/27$40,384,615.38ConstructionRoadwayConstructionRoadway10/06/261194 months
0009-13-166Paris05/06/26$173,300,000.00Non-LetRoadwayNon-LetRoadway09/01/26-118-4 months
0471-05-051Austin12/05/28$518,770.79ConstructionRoadwayConstructionRoadway04/01/29-117-4 months
0918-47-520Dallas04/17/26$30,000,000.00Non-LetRoadwayNon-LetRoadway08/02/26-107-4 months
0053-08-077Abilene07/01/26$857,598.00ConstructionRoadwayConstructionRoadway10/06/26-97-3 months$(130,426.00)-13%
0053-09-082Abilene07/01/26$174,438.00ConstructionRoadwayConstructionRoadway10/06/26-97-3 months$(85,068.00)-33%
0068-01-073Lubbock07/01/26$138,352,841.20ConstructionRoadwayConstructionRoadway10/06/26-97-3 months$2,504,958.202%
1502-01-031Lubbock07/01/26$166,952,606.35ConstructionRoadwayConstructionRoadway10/06/26-97-3 months$2,085,314.751%
0693-03-046Abilene11/02/27$13,700,000.00ConstructionRoadwayConstructionRoadway02/02/28-92-3 months
0172-12-007Dallas05/05/27$51,472,754.02ConstructionRoadwayConstructionRoadway02/02/27923 months
1012-03-027Dallas12/01/26$8,673,294.25ConstructionRoadwayConstructionRoadway03/03/27-92-3 months$(433,664.71)-5%
1012-03-028Dallas12/01/26$6,373,822.30ConstructionRoadwayConstructionRoadway03/03/27-92-3 months$(318,691.12)-5%
1492-01-013Dallas12/01/26$1,331,491.45ConstructionRoadwayConstructionRoadway03/03/27-92-3 months$(66,574.57)-5%
0251-03-022Waco08/02/28$11,407,407.41ConstructionRoadwayConstructionRoadway05/03/28913 months
0251-04-023Brownwood08/02/28$111,585,185.19ConstructionRoadwayConstructionRoadway05/03/28913 months
0251-05-066Brownwood08/02/28$15,000,000.00ConstructionRoadwayConstructionRoadway05/03/28913 months
0978-02-090Houston04/05/28$180,015.00ConstructionRoadwayConstructionRoadway01/05/28913 months
0143-02-032San Antonio12/01/27$1,431,302.00ConstructionRoadwayConstructionRoadway09/01/27913 months
0643-01-057Bryan02/02/27$22,973,558.00ConstructionRoadwayConstructionRoadway11/03/26913 months
2635-05-005Amarillo08/05/26$47,259,223.32ConstructionRoadwayConstructionRoadway11/03/26-90-3 months
0024-06-078San Antonio04/06/27$950,000.00ConstructionRoadwayConstructionRoadway07/01/27-86-3 months
0923-09-070Brownwood08/04/27$900,000.00ConstructionBridgeConstructionBridge06/01/27642 months
0923-17-094Brownwood08/04/27$1,100,000.00ConstructionBridgeConstructionBridge06/01/27642 months
1756-01-024Yoakum08/05/26$935,446.45ConstructionRoadwayConstructionRoadway06/02/26642 months
0915-12-827San Antonio05/05/27$654,893.00ConstructionRoadwayConstructionRoadway03/03/27632 months
0915-12-828San Antonio05/05/27$362,736.00ConstructionRoadwayConstructionRoadway03/03/27632 months
0358-03-041El Paso04/06/27$690,056.73ConstructionRoadwayConstructionRoadway02/02/27632 months
0358-04-020El Paso04/06/27$101,021.15ConstructionRoadwayConstructionRoadway02/02/27632 months
0415-03-026El Paso04/06/27$58,509.62ConstructionRoadwayConstructionRoadway02/02/27632 months
0415-04-016El Paso04/06/27$39,006.73ConstructionRoadwayConstructionRoadway02/02/27632 months
0485-01-027El Paso04/06/27$158,944.23ConstructionRoadwayConstructionRoadway02/02/27632 months
0485-02-019El Paso04/06/27$105,963.46ConstructionRoadwayConstructionRoadway02/02/27632 months
0471-04-038Austin12/05/28$833,399.88ConstructionRoadwayConstructionRoadway10/04/28622 months
0807-03-041Yoakum11/02/27$479,241.00ConstructionRoadwayConstructionRoadway09/01/27622 months
0132-03-036Childress08/05/26$13,520,000.00ConstructionRoadwayConstructionRoadway10/06/26-62-2 months
0133-01-055Childress08/05/26$14,000,000.00ConstructionRoadwayConstructionRoadway10/06/26-62-2 months
0783-01-111Lubbock11/01/28$10,000,000.00ConstructionBridgeConstructionBridge01/01/29-61-2 months
0915-12-802San Antonio11/01/26$10,874,765.00ConstructionLocal LetConstructionLocal Let09/01/26612 months
0039-02-081Pharr02/01/29$1,871,711.00ConstructionRoadwayConstructionRoadway04/01/29-59-2 months
0052-07-067Lubbock12/01/27$590,724.69ConstructionRoadwayConstructionRoadway10/05/27572 months
3510-05-062Houston07/01/27$46,000,000.00ConstructionRoadwayConstructionRoadway05/05/27572 months
0976-03-120Houston10/06/26$484,617.00ConstructionRoadwayConstructionRoadway12/01/26-56-2 months
0981-01-122Houston10/06/26$1,235,700.00ConstructionRoadwayConstructionRoadway12/01/26-56-2 months
0981-02-012Houston10/06/26$678,042.00ConstructionRoadwayConstructionRoadway12/01/26-56-2 months
1414-01-024Houston10/06/26$61,492.00ConstructionRoadwayConstructionRoadway12/01/26-56-2 months
2941-02-070Houston12/01/27$51,875.00ConstructionRoadwayConstructionRoadway01/05/28-35-1 month
0079-02-059Brownwood10/06/26$240,000.00Non-LetLocalNon-LetLocal09/01/26351 month
0508-02-140Beaumont07/01/26$3,459,416.41ConstructionRoadwayConstructionRoadway08/05/26-35-1 month$(373,835.98)-10%
1421-01-027Beaumont07/01/26$1,853,387.00ConstructionRoadwayConstructionRoadway08/05/26-35-1 month$(29,957.00)-2%
1421-01-028Beaumont07/01/26$5,038,939.85ConstructionRoadwayConstructionRoadway08/05/26-35-1 month$(488,234.65)-9%
0912-37-259Houston10/15/26$13,200,000.00ConstructionLocal LetConstructionLocal Let09/15/263030 days
0022-08-027Laredo02/01/29$5,729,476.20ConstructionRoadwayConstructionRoadway03/01/29-28-28 days$(1,544,308.42)-21%
0161-03-027Laredo02/01/29$2,562,041.70ConstructionRoadwayConstructionRoadway03/01/29-28-28 days$(372,615.15)-13%
1592-01-017Laredo02/01/29$925,485.75ConstructionRoadwayConstructionRoadway03/01/29-28-28 days$(266,142.87)-22%
0028-01-109Houston08/05/26$271,016.00ConstructionRoadwayConstructionRoadway09/02/26-28-28 days
0050-05-071Houston08/05/26$1,144,025.00ConstructionRoadwayConstructionRoadway09/02/26-28-28 days
0050-06-106Houston08/05/26$589,346.00ConstructionRoadwayConstructionRoadway09/02/26-28-28 days
0320-05-018Waco08/05/26$764,436.00ConstructionRoadwayConstructionRoadway09/02/26-28-28 days
0720-02-105Houston08/05/26$153,356.00ConstructionRoadwayConstructionRoadway09/02/26-28-28 days
0909-00-074Waco08/05/26$1,267,977.00ConstructionRoadwayConstructionRoadway09/02/26-28-28 days
1812-01-024Houston08/05/26$1,069,424.00ConstructionRoadwayConstructionRoadway09/02/26-28-28 days
3538-01-063Houston08/05/26$128,855.00ConstructionRoadwayConstructionRoadway09/02/26-28-28 days
3538-01-064Houston08/05/26$67,491.00ConstructionRoadwayConstructionRoadway09/02/26-28-28 days
0348-04-052Corpus Christi01/01/29$3,500,000.00ConstructionRoadwayConstructionRoadway12/05/282727 days
0348-04-053Corpus Christi01/01/29$9,500,000.00ConstructionRoadwayConstructionRoadway12/05/282727 days
0912-00-750Houston08/15/28$500,000.00Non-LetRail - SafetyNon-LetRail - Safety08/01/281414 days
0912-00-751Houston08/15/28$600,000.00Non-LetRail - SafetyNon-LetRail - Safety08/01/281414 days
0502-01-252Houston10/15/26$600,000.00Non-LetRail - SafetyConstructionRail - Safety10/06/2699 daysConstruction / Rail - Safety → Non-Let / Rail - Safety
300 rows · download CSV

Project Type & Subtype Changes

The subtype mix within the pipeline remained mostly stable, with roadway projects constituting 75.4% of the total on May 4, 2026, up slightly from 75.3% on April 3. Notable transitions included 46 projects undergoing type or subtype changes. A primary transition observed was from unclassified to construction/roadway for 37 projects, indicating some stabilization in project classifications.

SubtypeApr 3May 4Δ (pp, n)
Roadway75.3% (4,284)75.4% (4,392)+0.1 (+108)
Bridge15.9% (905)15.5% (901)-0.4 (-4)
Local Let3.4% (195)3.4% (197)-0.0 (+2)
Non Roadway2.0% (112)2.0% (119)+0.1 (+7)
Rail - Safety1.4% (78)1.3% (78)-0.0 (+0)
CSJDistrictEst. Letting DateProject EstimateCurrent TypeCurrent SubtypeType/Subtype ΔPrev. TypePrev. SubtypePrev. CostPrev. DateLetting Δ (days)Letting Date ΔCost Δ%Cost ΔLifecycle
6501-30-001Bryan06/09/26$900,000.00MaintenanceRoutine Maintenance ContractUnassigned → Maintenance / Routine Maintenance ContractUnassignedUnassigned$900,000.0006/09/260
0364-05-043Fort Worth08/05/26$1,221,633.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$1,221,633.0008/05/260
0228-06-098Odessa09/02/26$691,209.02ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$691,209.0209/02/260
0014-23-042Waco10/06/26$6,000,000.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$10,000,000.0002/01/30-1214-3 years$(4,000,000.00)-40%
0502-01-252Houston10/15/26$600,000.00Non-LetRail - SafetyConstruction / Rail - Safety → Non-Let / Rail - SafetyConstructionRail - Safety$600,000.0010/06/2699 days
0007-06-269Brownwood11/03/26$131,061.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$131,061.0011/01/30-1459-4 years
0007-06-272Brownwood11/03/26$131,061.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$131,061.0011/01/30-1459-4 years
0271-06-141Houston11/03/26$1,300,000.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$1,300,000.0011/03/260
0271-07-359Houston11/03/26$1,300,000.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$1,300,000.0011/03/260
1007-02-020Yoakum11/03/26$662,000.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$662,000.0011/03/260
1685-05-144Houston11/03/26$400,000.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$400,000.0011/03/260
1861-01-014Amarillo11/03/26$23,000.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$23,000.0011/03/260
3128-01-015Waco04/01/27$992,012.50Non-LetRoadwayUnassigned → Non-Let / RoadwayUnassignedUnassigned$992,012.5004/01/270
0027-10-082Houston05/05/27$1,429,810.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$1,429,810.0012/01/29-941-3 years
0176-05-205Lufkin05/05/27$32,000,000.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$1.0005/05/270$31,999,999.003199999900%
0904-11-071Amarillo05/05/27$6,100,000.00ConstructionBridgeUnassigned → Construction / BridgeUnassignedUnassigned$6,100,000.0005/05/270
1092-01-026Dallas05/05/27$12,239,522.17ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$12,239,522.1708/01/35-3010-8 years
2399-01-088Bryan05/05/27$14,661.00ConstructionLocal LetUnassigned → Construction / Local LetUnassignedUnassigned$14,661.0005/05/270
0013-08-147Fort Worth06/01/27$54,615,384.64ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$47,581,373.7601/01/30-945-3 years$7,034,010.8815%
0014-15-087Fort Worth06/01/27$20,384,615.38ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$14,558,233.8001/01/30-945-3 years$5,826,381.5840%
3510-07-022Houston07/01/27$7,574,519.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$7,574,519.0007/01/270
0245-05-054Tyler08/04/27$1,600,000.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$1,600,000.0008/04/270
0245-19-031Tyler08/04/27$470,000.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$470,000.0008/04/270
0521-05-144San Antonio09/01/27$589,100,000.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$589,100,000.0009/01/32-1827-5 years
6487-61-001Houston09/02/27$1,000,000.00MaintenanceRoutine Maintenance ContractUnassigned → Maintenance / Routine Maintenance ContractUnassignedUnassigned$1,000,000.0008/01/263971 year
0912-00-704Houston09/15/27$1,000,000.00ConstructionLocal LetConstruction / Rail - Safety → Construction / Local LetConstructionRail - Safety$1,000,000.0009/02/263781 year
0007-03-099Brownwood11/02/27$587,822.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$587,822.0011/01/34-2556-7 years
0007-03-100Brownwood11/02/27$590,391.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$590,391.0011/01/34-2556-7 years
0109-08-052Lufkin11/02/27$1,126,844.19ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$1,126,844.1911/01/29-730-2 years
0248-03-024Atlanta11/02/27$13,405,864.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$13,160,923.5011/02/270$244,940.502%
0259-05-083Fort Worth02/02/28$8,009,664.43ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$8,009,664.4309/01/271545 months
2170-05-018Laredo02/02/28$2,000,000.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$400,000.0011/01/33-2099-6 years$1,600,000.00400%
2270-01-030Abilene05/03/28$1,666,666.67ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$2,232,143.0005/01/32-1459-4 years$(565,476.33)-25%
0520-05-054Atlanta08/02/28$3,500,000.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$17,500,000.0001/01/35-2343-6 years$(14,000,000.00)-80%
0891-01-017Tyler08/02/28$1,586,530.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$1,586,530.0008/02/280
0273-04-051Austin09/02/28$557,981.88ConstructionLocal LetUnassigned → Construction / Local LetUnassignedUnassigned$557,981.8809/02/280
0143-14-006San Antonio09/06/28$6,540,250.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$6,540,250.0001/01/35-2308-6 years
0912-72-812Houston09/15/28$500,000.00Non-LetRailConstruction / Rail - Safety → Non-Let / RailConstructionRail - Safety$500,000.0012/01/266542 years
2664-01-007Lufkin10/04/28$4,882,572.05ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$4,882,572.0509/01/45-6176-17 years
0054-04-119Brownwood11/01/28$454,880.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$454,880.0011/01/32-1461-4 years
0070-06-053Brownwood11/01/28$263,697.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$263,697.0011/01/32-1461-4 years
0109-07-056Lufkin11/01/28$1,496,424.29ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$1,496,424.2911/01/29-365-1 year
0003-03-055El Paso01/01/29$12,708,817.86ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$12,708,817.8601/01/290
0192-04-110Houston01/01/29$19,417,883.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$19,417,883.0001/01/30-365-1 year
0068-02-050Lubbock02/01/29$1,371,261.60ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$1,371,261.6002/01/30-365-1 year
0843-06-020Atlanta02/01/29$3,751,667.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$3,751,667.0001/01/32-1064-3 years
46 rows · download CSV

Cost Changes

The total pipeline value increased by $163.98 million to $6.71 billion. Cost changes observed include 256 projects with cost movements of 10% or more, 109 project costs increased while 147 decreased. Notably, construction projects saw a price increase of $121.78 million, highlighting areas of repricing within existing projects rather than a complete overhaul of the pipeline.

CSJDistrictEst. Letting DateProject EstimateCurrent TypeCurrent SubtypePrev. TypePrev. SubtypePrev. CostCost Δ%Cost ΔLetting Δ (days)Letting Date ΔType/Subtype ΔLifecycle
0176-05-205Lufkin05/05/27$32,000,000.00ConstructionRoadwayUnassignedUnassigned$1.00$31,999,999.003199999900%0Unassigned → Construction / Roadway
0057-03-052Bryan07/01/26$207,229.26ConstructionRoadwayConstructionRoadway$9,900.00$197,329.261993%0
2552-01-062El Paso11/02/27$11,971,606.48ConstructionRoadwayConstructionRoadway$961,538.46$11,010,068.021145%0
0276-09-011Laredo03/01/29$1,921,342.50ConstructionRoadwayConstructionRoadway$206,526.60$1,714,815.90830%0
0815-03-016Dallas10/01/30$605,163.96ConstructionRoadway$68,850.00$536,313.96779%7272 years
1316-01-068Bryan08/04/27$11,000,000.00ConstructionRoadwayConstructionRoadway$1,500,000.00$9,500,000.00633%0
0918-47-525Dallas08/02/27$8,000,000.00ConstructionRoadwayConstructionRoadway$1,111,111.11$6,888,888.89620%0
2170-05-018Laredo02/02/28$2,000,000.00ConstructionRoadwayUnassignedUnassigned$400,000.00$1,600,000.00400%-2099-6 yearsUnassigned → Construction / Roadway
0117-01-062Bryan07/01/26$266,997.40ConstructionRoadwayConstructionRoadway$77,350.00$189,647.40245%0
0683-07-013Austin01/06/27$8,173,076.92ConstructionRoadwayConstructionRoadway$2,482,355.77$5,690,721.15229%0
0081-16-004Paris07/01/26$272,653.65ConstructionNon RoadwayConstructionNon Roadway$90,000.00$182,653.65203%0
1229-02-019Laredo06/01/28$3,000,000.00ConstructionRoadwayConstructionRoadway$1,000,000.00$2,000,000.00200%0
1895-03-027Atlanta05/03/28$5,690,799.64ConstructionRoadwayConstructionRoadway$1,967,575.00$3,723,224.64189%0
0508-01-409Houston04/06/27$7,000,000.00ConstructionRoadwayConstructionRoadway$2,497,189.00$4,502,811.00180%0
0081-10-057Paris07/01/26$287,785.64ConstructionNon RoadwayConstructionNon Roadway$110,000.00$177,785.64162%0
0440-05-016Austin06/01/27$38,461,538.46ConstructionRoadwayConstructionRoadway$15,120,913.46$23,340,625.00154%0
1148-02-021Bryan07/01/26$328,623.76ConstructionRoadwayConstructionRoadway$130,514.00$198,109.76152%0
0186-03-073Bryan07/01/26$110,385.01ConstructionRoadwayConstructionRoadway$43,920.00$66,465.01151%0
0413-05-039Bryan07/01/26$525,448.20ConstructionRoadwayConstructionRoadway$209,369.00$316,079.20151%0
0907-00-239San Angelo08/05/26$497,748.40ConstructionRoadwayConstructionRoadway$199,305.00$298,443.40150%0
0677-02-017Abilene12/01/26$295,967.00ConstructionRoadwayConstructionRoadway$120,071.00$175,896.00146%0
1971-01-017Bryan07/01/26$272,226.93ConstructionRoadwayConstructionRoadway$113,474.00$158,752.93140%0
0262-06-036Bryan07/01/26$535,183.90ConstructionRoadwayConstructionRoadway$230,595.00$304,588.90132%0
3455-01-011Abilene12/01/26$447,277.00ConstructionRoadwayConstructionRoadway$208,736.00$238,541.00114%0
0683-06-035Austin01/06/27$6,346,153.85ConstructionRoadwayConstructionRoadway$3,033,990.38$3,312,163.47109%0
1210-02-016Bryan07/01/26$740,760.00ConstructionBridgeConstructionBridge$354,261.00$386,499.00109%0
0117-09-006Bryan07/01/26$26,530.90ConstructionRoadwayConstructionRoadway$12,980.00$13,550.90104%0
0022-03-032Odessa11/03/26$1,065,488.54ConstructionBridgeConstructionBridge$530,410.80$535,077.74101%0
1556-01-032Corpus Christi11/02/27$8,000,000.00ConstructionRoadwayConstructionRoadway$4,000,000.00$4,000,000.00100%2448 months
0912-37-265Houston05/15/26$1.00ConstructionLocal LetConstructionLocal Let$9,413,000.00$(9,412,999.00)-100%0
0005-08-107Abilene12/01/26$1,058,935.00ConstructionRoadwayConstructionRoadway$535,593.00$523,342.0098%0
1003-01-098Houston09/01/31$1,088,146.00ConstructionRoadway$24,146,123.00$(23,057,977.00)-95%10903 years
0720-02-095Houston09/06/28$1,000,000.00ConstructionRoadwayConstructionRoadway$16,300,278.00$(15,300,278.00)-94%-148-5 months
0091-06-061Dallas07/01/26$5,190,264.90ConstructionRoadwayConstructionRoadway$2,734,376.72$2,455,888.1890%0
1555-01-009Corpus Christi07/01/26$15,605.17ConstructionRoadwayConstructionRoadway$139,502.00$(123,896.83)-89%0
0005-06-124Abilene12/01/26$1,624,233.00ConstructionRoadwayConstructionRoadway$864,449.00$759,784.0088%0
3116-01-033Corpus Christi07/01/26$25,616.10ConstructionRoadwayConstructionRoadway$151,985.00$(126,368.90)-83%0
0907-00-240San Angelo08/05/26$49,251.00ConstructionRoadwayConstructionRoadway$273,105.00$(223,854.00)-82%0
0092-05-058Dallas10/06/26$4,553,198.71ConstructionRoadwayConstructionRoadway$25,202,541.30$(20,649,342.59)-82%0
0520-05-054Atlanta08/02/28$3,500,000.00ConstructionRoadwayUnassignedUnassigned$17,500,000.00$(14,000,000.00)-80%-2343-6 yearsUnassigned → Construction / Roadway
0675-02-101Bryan07/01/26$1,074.76ConstructionRoadwayConstructionRoadway$5,190.00$(4,115.24)-79%0
0114-02-112Austin08/05/26$615,753.25ConstructionRoadwayConstructionRoadway$2,735,940.00$(2,120,186.75)-77%0
1115-01-010Corpus Christi07/01/26$132,013.59ConstructionRoadwayConstructionRoadway$583,647.00$(451,633.41)-77%0
0296-06-016Abilene12/01/26$128,965.00ConstructionRoadwayConstructionRoadway$72,764.00$56,201.0077%0
0921-26-113Pharr09/03/27$4,200,000.00ConstructionLocal LetConstructionLocal Let$18,000,000.00$(13,800,000.00)-77%0
1294-02-022Corpus Christi07/01/26$173,642.98ConstructionRoadwayConstructionRoadway$723,570.00$(549,927.02)-76%0
0140-05-029Odessa11/03/26$127,785.00ConstructionBridgeConstructionBridge$522,571.68$(394,786.68)-76%0
0332-02-028Abilene12/01/26$123,275.00ConstructionRoadwayConstructionRoadway$70,662.00$52,613.0074%0
0367-02-084Houston09/01/31$500,000.00ConstructionRoadway$1,906,590.00$(1,406,590.00)-74%12733 years
3089-01-013Dallas07/01/26$726,590.00ConstructionRoadwayConstructionRoadway$419,957.48$306,632.5273%0
0371-05-022Corpus Christi07/01/26$88,823.89ConstructionRoadwayConstructionRoadway$314,636.00$(225,812.11)-72%0
0058-04-023Tyler12/01/26$582,678.84ConstructionRoadwayConstructionRoadway$341,403.96$241,274.8871%0
0140-01-083Odessa11/03/26$159,563.00ConstructionBridgeConstructionBridge$536,429.33$(376,866.33)-70%0
0249-01-059Wichita Falls07/01/26$341,741.20ConstructionBridgeConstructionBridge$202,653.00$139,088.2069%-216-7 months
1446-01-016Corpus Christi07/01/26$41,470.22ConstructionRoadwayConstructionRoadway$130,740.00$(89,269.78)-68%0
0791-01-021Amarillo11/02/27$450,730.00ConstructionRoadwayConstructionRoadway$1,363,000.00$(912,270.00)-67%0
0271-14-244Houston02/02/28$1,000,000.00ConstructionRoadwayConstructionRoadway$3,000,000.00$(2,000,000.00)-67%0
2942-02-019Corpus Christi07/01/26$100,233.75ConstructionRoadwayConstructionRoadway$285,222.00$(184,988.25)-65%0
0204-05-046Bryan07/01/26$103,360.42ConstructionRoadwayConstructionRoadway$64,590.00$38,770.4260%0
0677-01-024Abilene12/01/26$429,303.00ConstructionRoadwayConstructionRoadway$271,073.00$158,230.0058%0
0140-04-049Odessa11/03/26$230,220.00ConstructionBridgeConstructionBridge$539,414.40$(309,194.40)-57%0
0521-06-175San Antonio08/05/26$2,670,328.38ConstructionRoadwayConstructionRoadway$6,184,458.00$(3,514,129.62)-57%0
1809-01-023Bryan07/01/26$862.92ConstructionRoadwayConstructionRoadway$1,990.00$(1,127.08)-57%0
1147-01-034Bryan07/01/26$80,027.00ConstructionRoadwayConstructionRoadway$51,110.00$28,917.0057%0
0915-12-829San Antonio09/06/28$2,435,670.00ConstructionRoadwayConstructionRoadway$1,566,606.00$869,064.0055%0
0980-02-020Houston09/01/27$10,000,000.00ConstructionRoadwayConstructionRoadway$21,668,136.00$(11,668,136.00)-54%0
0166-05-009Bryan07/01/26$2,881.00ConstructionRoadwayConstructionRoadway$6,160.00$(3,279.00)-53%0
0520-09-057Tyler07/01/26$84,542.50ConstructionRoadwayConstructionRoadway$180,000.00$(95,457.50)-53%0
0047-03-106Paris08/05/26$1,164,466.93ConstructionRoadwayConstructionRoadway$2,463,364.40$(1,298,897.47)-53%0
1392-03-017Dallas07/01/26$3,043,980.80ConstructionRoadwayConstructionRoadway$2,006,803.41$1,037,177.3952%0
0161-01-033Laredo02/01/29$1,438,067.40ConstructionRoadwayConstructionRoadway$2,934,646.85$(1,496,579.45)-51%33111 months
0598-03-062Houston02/02/27$4,600,000.00ConstructionRoadwayConstructionRoadway$9,268,723.98$(4,668,723.98)-50%0
0315-10-013Bryan07/01/26$777.00ConstructionRoadwayConstructionRoadway$1,560.00$(783.00)-50%0
0254-01-149Corpus Christi07/01/27$15,000,000.00ConstructionRoadwayConstructionRoadway$10,000,000.00$5,000,000.0050%0
0598-04-030Houston02/02/27$4,200,000.00ConstructionRoadwayConstructionRoadway$8,370,328.77$(4,170,328.77)-50%0
0921-06-330Pharr09/03/27$25,435,821.86ConstructionLocal LetConstructionLocal Let$17,023,422.00$8,412,399.8649%0
0047-04-041Dallas06/01/27$1,749,097.74ConstructionRoadwayConstructionRoadway$1,178,505.94$570,591.8048%0
0205-01-052Bryan07/01/26$167,380.00ConstructionBridgeConstructionBridge$112,900.00$54,480.0048%0
0517-02-046San Antonio09/01/27$6,501,914.80ConstructionBridgeConstructionBridge$12,500,000.00$(5,998,085.20)-48%0
1223-03-015Bryan07/01/26$34,452.05ConstructionRoadwayConstructionRoadway$65,230.00$(30,777.95)-47%0
1062-03-055Houston01/05/28$7,000,000.00ConstructionRoadwayConstructionRoadway$13,000,000.00$(6,000,000.00)-46%0
0172-09-047Fort Worth09/02/26$4,029,170.17ConstructionRoadwayConstructionRoadway$7,466,647.62$(3,437,477.45)-46%0
0587-01-070Houston07/06/28$4,391,550.00ConstructionNon RoadwayConstructionNon Roadway$8,058,425.93$(3,666,875.93)-46%0
1558-03-114Corpus Christi12/05/28$18,000,000.00ConstructionRoadwayConstructionRoadway$12,400,000.00$5,600,000.0045%33511 months
0107-02-041Abilene12/01/26$860,160.00ConstructionRoadwayConstructionRoadway$593,609.00$266,551.0045%0
0441-07-079Odessa11/03/26$848,068.00ConstructionBridgeConstructionBridge$588,806.40$259,261.6044%0
2370-01-009Odessa07/01/26$6,906,220.22ConstructionRoadwayConstructionRoadway$12,200,000.00$(5,293,779.78)-43%-189-6 months
0668-03-010Abilene12/01/26$195,558.00ConstructionRoadwayConstructionRoadway$136,591.00$58,967.0043%0
0263-05-025Abilene12/01/26$1,173,898.00ConstructionRoadwayConstructionRoadway$820,585.00$353,313.0043%0
0074-04-049Corpus Christi01/01/30$3,000,000.00ConstructionRoadway$2,100,000.00$900,000.0043%7272 years
0919-02-043Atlanta07/01/26$51,552.00ConstructionRoadwayConstructionRoadway$90,000.00$(38,448.00)-43%0
2170-05-017Laredo08/04/27$10,000,000.00ConstructionRoadwayConstructionRoadway$17,247,810.98$(7,247,810.98)-42%0
1194-02-020Beaumont07/01/26$5,913,739.66ConstructionRoadwayConstructionRoadway$10,174,500.00$(4,260,760.34)-42%0
0187-05-062Houston05/06/26$3,421,687.50ConstructionRoadwayConstructionRoadway$5,871,532.50$(2,449,845.00)-42%0
0074-05-105Corpus Christi01/05/28$12,000,000.00ConstructionRoadwayConstructionRoadway$8,500,000.00$3,500,000.0041%0
0057-04-035Bryan07/01/26$9,072.53ConstructionRoadwayConstructionRoadway$15,310.00$(6,237.47)-41%0
0088-02-063Corpus Christi07/01/26$2,442,845.67ConstructionRoadwayConstructionRoadway$4,100,000.00$(1,657,154.33)-40%0
0092-14-109Dallas08/04/27$11,646,900.00ConstructionRoadwayConstructionRoadway$8,308,500.00$3,338,400.0040%0
0014-15-087Fort Worth06/01/27$20,384,615.38ConstructionRoadwayUnassignedUnassigned$14,558,233.80$5,826,381.5840%-945-3 yearsUnassigned → Construction / Roadway
2150-04-100Laredo02/02/28$7,165,023.60ConstructionRoadwayConstructionRoadway$11,942,000.00$(4,776,976.40)-40%0
0014-23-041Waco10/06/26$6,000,000.00ConstructionRoadwayConstructionRoadway$10,000,000.00$(4,000,000.00)-40%0
0014-23-042Waco10/06/26$6,000,000.00ConstructionRoadwayUnassignedUnassigned$10,000,000.00$(4,000,000.00)-40%-1214-3 yearsUnassigned → Construction / Roadway
0718-02-079Fort Worth07/01/26$353,033.50ConstructionRoadwayConstructionRoadway$578,334.00$(225,300.50)-39%0
2374-04-100Dallas08/02/26$582,613.56ConstructionRoadwayConstructionRoadway$420,000.00$162,613.5639%0
0093-03-027Bryan07/01/26$25,432.11ConstructionRoadwayConstructionRoadway$41,340.00$(15,907.89)-38%0
0299-14-037Laredo03/01/29$1,151,274.60ConstructionRoadwayConstructionRoadway$1,864,633.05$(713,358.45)-38%35912 months
2270-01-029Abilene07/01/26$319,006.50ConstructionRoadwayConstructionRoadway$515,464.00$(196,457.50)-38%0
0114-09-103Bryan07/01/26$224,868.34ConstructionRoadwayConstructionRoadway$163,870.00$60,998.3437%0
0089-09-090Houston06/02/26$1,152,912.75ConstructionRoadwayConstructionRoadway$842,339.39$310,573.3637%0
0140-05-028Odessa11/03/26$886,246.00ConstructionBridgeConstructionBridge$650,262.99$235,983.0136%0
0383-04-065Corpus Christi07/01/30$3,000,000.00ConstructionRoadway$4,600,000.00$(1,600,000.00)-35%5461 year
0088-03-050Corpus Christi07/01/26$328,564.34ConstructionRoadwayConstructionRoadway$500,000.00$(171,435.66)-34%0
0028-04-084Beaumont07/01/26$2,109,576.76ConstructionRoadwayConstructionRoadway$3,200,000.00$(1,090,423.24)-34%0
0370-05-057Yoakum07/01/26$722,928.50ConstructionRoadwayConstructionRoadway$540,000.00$182,928.5034%0
0092-14-107Dallas07/01/26$90,688.50ConstructionRoadwayConstructionRoadway$136,800.30$(46,111.80)-34%0
1020-01-068Atlanta03/03/27$2,400,000.00ConstructionRoadwayConstructionRoadway$1,801,730.00$598,270.0033%-456-1 year
0027-06-062Houston06/02/26$484,375.15ConstructionRoadwayConstructionRoadway$364,239.94$120,135.2133%0
0053-09-082Abilene07/01/26$174,438.00ConstructionRoadwayConstructionRoadway$259,506.00$(85,068.00)-33%-97-3 months
1529-03-010Abilene12/01/26$225,891.00ConstructionRoadwayConstructionRoadway$170,199.28$55,691.7233%0
0074-03-050Corpus Christi01/01/30$4,500,000.00ConstructionRoadway$3,400,000.00$1,100,000.0032%7272 years
0921-06-382Pharr12/05/28$1,383,277.50ConstructionBridgeConstructionBridge$1,045,956.45$337,321.0532%0
0909-40-090Waco07/01/26$360,583.67ConstructionBridgeConstructionBridge$530,000.00$(169,416.33)-32%0
0909-40-095Waco07/01/26$432,052.09ConstructionBridgeConstructionBridge$635,000.00$(202,947.91)-32%0
0914-04-367Austin07/01/26$254,757.70ConstructionRoadwayConstructionRoadway$373,363.00$(118,605.30)-32%0
0315-02-061Bryan07/01/26$18,748.81ConstructionRoadwayConstructionRoadway$27,180.00$(8,431.19)-31%0
0249-01-056Wichita Falls07/01/26$251,218.60ConstructionBridgeConstructionBridge$192,216.00$59,002.6031%-216-7 months
0249-01-053Wichita Falls07/01/26$425,058.58ConstructionBridgeConstructionBridge$326,495.00$98,563.5830%-216-7 months
0902-90-270Fort Worth07/01/26$1,096,961.55ConstructionBridgeConstructionBridge$1,570,540.54$(473,578.99)-30%0
0909-40-094Waco07/01/26$391,376.83ConstructionBridgeConstructionBridge$560,000.00$(168,623.17)-30%0
0578-03-057Bryan07/01/26$8,257.46ConstructionRoadwayConstructionRoadway$11,750.00$(3,492.54)-30%0
0057-04-036Bryan07/01/26$38,310.83ConstructionRoadwayConstructionRoadway$54,500.00$(16,189.17)-30%0
2528-01-006Odessa08/05/26$8,304,083.23ConstructionRoadwayConstructionRoadway$11,800,000.00$(3,495,916.77)-30%0
0187-05-061Houston05/06/26$3,102,767.75ConstructionRoadwayConstructionRoadway$4,378,050.25$(1,275,282.50)-29%0
0990-02-014Corpus Christi11/01/28$6,500,000.00ConstructionRoadwayConstructionRoadway$5,038,199.00$1,461,801.0029%0
0382-05-023Bryan07/01/26$31,660.42ConstructionRoadwayConstructionRoadway$44,470.00$(12,809.58)-29%0
0913-27-094Yoakum07/01/26$785,402.50ConstructionBridgeConstructionBridge$610,270.00$175,132.5029%0
0910-07-103Tyler07/01/26$64,186.00ConstructionRoadwayConstructionRoadway$90,000.00$(25,814.00)-29%0
0902-20-238Fort Worth08/05/26$793,145.80ConstructionBridgeConstructionBridge$1,109,884.81$(316,739.01)-29%0
0047-05-062Dallas06/01/27$2,545,733.42ConstructionRoadwayConstructionRoadway$1,989,602.84$556,130.5828%0
0318-02-028Abilene12/01/26$1,135,643.00ConstructionRoadwayConstructionRoadway$893,219.00$242,424.0027%0
0070-04-041San Angelo07/01/26$175,049.00ConstructionRoadwayConstructionRoadway$138,200.00$36,849.0027%-644-2 years
0921-02-440Pharr05/02/28$6,567,414.39ConstructionLocal LetConstructionLocal Let$5,196,846.00$1,370,568.3926%0
0081-03-065Dallas04/05/28$3,181,271.71ConstructionRoadwayConstructionRoadway$4,276,221.30$(1,094,949.59)-26%0
2270-01-030Abilene05/03/28$1,666,666.67ConstructionRoadwayUnassignedUnassigned$2,232,143.00$(565,476.33)-25%-1459-4 yearsUnassigned → Construction / Roadway
0921-02-532Pharr05/02/27$1,865,601.76ConstructionLocal LetConstructionLocal Let$1,490,283.00$375,318.7625%0
0291-11-023San Antonio07/01/26$32,690.93ConstructionRoadwayConstructionRoadway$26,117.13$6,573.8025%0
0186-04-036Bryan07/01/26$28,291.79ConstructionRoadwayConstructionRoadway$22,690.00$5,601.7925%0
0166-07-073Bryan06/02/26$298,878.00ConstructionBridgeConstructionBridge$240,028.00$58,850.0025%0
0686-02-033Houston02/01/29$1,508,379.00ConstructionRoadwayConstructionRoadway$1,992,603.00$(484,224.00)-24%0
0091-09-019Dallas01/01/30$8,932,684.66ConstructionRoadway$11,795,533.04$(2,862,848.38)-24%3651 year
0914-04-368Austin07/01/26$292,939.00ConstructionNon RoadwayConstructionNon Roadway$386,671.00$(93,732.00)-24%0
0909-40-079Waco07/01/26$530,503.45ConstructionBridgeConstructionBridge$700,000.00$(169,496.55)-24%0
0053-20-007Abilene12/01/26$196,776.00ConstructionRoadwayConstructionRoadway$158,589.00$38,187.0024%0
0249-01-054Wichita Falls07/01/26$181,321.60ConstructionBridgeConstructionBridge$146,154.00$35,167.6024%-216-7 months
0916-35-231Corpus Christi05/06/26$14,038,390.99ConstructionBridgeConstructionBridge$11,336,329.94$2,702,061.0524%0
0817-01-029Dallas10/05/27$335,057.72ConstructionRoadwayConstructionRoadway$270,585.00$64,472.7224%0
3610-01-004Abilene12/01/26$150,278.00ConstructionRoadwayConstructionRoadway$121,611.00$28,667.0024%0
0187-05-066Houston07/01/26$259,921.71ConstructionRoadwayConstructionRoadway$210,344.00$49,577.7124%0
0921-02-535Pharr10/05/27$846,529.43ConstructionBridgeConstructionBridge$688,235.31$158,294.1223%0
0205-02-078Bryan07/01/26$25,938.89ConstructionRoadwayConstructionRoadway$33,480.00$(7,541.11)-23%0
1592-01-017Laredo02/01/29$925,485.75ConstructionRoadwayConstructionRoadway$1,191,628.62$(266,142.87)-22%-28-28 days
1310-01-051Dallas10/05/27$8,305,445.16ConstructionRoadwayConstructionRoadway$10,675,288.39$(2,369,843.23)-22%-365-1 year
0070-03-062San Angelo07/01/26$3,599,697.00ConstructionRoadwayConstructionRoadway$4,626,157.00$(1,026,460.00)-22%-644-2 years
0150-02-043Austin08/05/26$2,532,219.03ConstructionRoadwayConstructionRoadway$3,253,437.15$(721,218.12)-22%0
0008-03-140Fort Worth08/01/29$4,110,095.04ConstructionRoadwayConstructionRoadway$3,375,753.73$734,341.3122%36412 months
0022-08-027Laredo02/01/29$5,729,476.20ConstructionRoadwayConstructionRoadway$7,273,784.62$(1,544,308.42)-21%-28-28 days
0017-08-117Laredo02/02/28$8,699,053.65ConstructionRoadwayConstructionRoadway$11,043,217.50$(2,344,163.85)-21%-365-1 year
0114-02-115Austin08/05/26$432,938.25ConstructionRoadwayConstructionRoadway$546,844.87$(113,906.62)-21%0
0912-72-846Houston06/02/26$6,892,110.25ConstructionRoadwayConstructionRoadway$5,709,769.58$1,182,340.6721%0
0315-03-073Bryan07/01/26$77,696.54ConstructionRoadwayConstructionRoadway$97,980.00$(20,283.46)-21%0
0924-06-780El Paso05/05/27$1,699,269.23ConstructionLocal LetConstructionLocal Let$2,120,687.60$(421,418.37)-20%0
0353-05-136Dallas08/02/28$4,698,537.36ConstructionRoadwayConstructionRoadway$5,840,463.89$(1,141,926.53)-20%0
0262-06-037Bryan07/01/26$90,736.00ConstructionBridgeConstructionBridge$112,636.80$(21,900.80)-19%0
0249-01-055Wichita Falls07/01/26$219,131.60ConstructionBridgeConstructionBridge$183,689.00$35,442.6019%-216-7 months
0266-05-055Yoakum07/01/26$894,213.00ConstructionRoadwayConstructionRoadway$750,000.00$144,213.0019%0
0921-02-399Pharr01/04/27$7,360,853.76ConstructionLocal LetConstructionLocal Let$9,110,000.00$(1,749,146.24)-19%0
0921-06-362Pharr05/02/28$29,953,540.52ConstructionLocal LetConstructionLocal Let$37,018,742.29$(7,065,201.77)-19%0
3022-02-009Dallas02/01/29$5,938,245.17ConstructionRoadwayConstructionRoadway$4,988,234.68$950,010.4919%7302 years
0205-03-059Bryan07/01/26$56,446.02ConstructionRoadwayConstructionRoadway$69,710.00$(13,263.98)-19%0
0440-06-030Austin01/06/27$39,074,038.46ConstructionRoadwayConstructionRoadway$48,076,923.08$(9,002,884.62)-19%0
0165-02-061Tyler07/01/26$77,883,082.55ConstructionRoadwayConstructionRoadway$66,001,500.00$11,881,582.5518%0
0921-02-396Pharr01/02/28$8,213,618.71ConstructionLocal LetConstructionLocal Let$9,987,258.04$(1,773,639.33)-18%0
0281-01-038Dallas10/06/26$1,090,833.41ConstructionRoadwayConstructionRoadway$1,323,157.58$(232,324.17)-18%0
0368-03-042Beaumont07/01/26$1,762,157.35ConstructionRoadwayConstructionRoadway$1,500,000.00$262,157.3517%-644-2 years
1052-01-085Corpus Christi06/02/26$137,533.52ConstructionRoadwayConstructionRoadway$166,276.32$(28,742.80)-17%0
2886-02-018Corpus Christi06/02/26$135,858.09ConstructionRoadwayConstructionRoadway$163,796.82$(27,938.73)-17%0
0998-04-010Bryan07/01/26$1,943.20ConstructionRoadwayConstructionRoadway$2,340.00$(396.80)-17%0
0205-01-053Bryan07/01/26$64,752.84ConstructionRoadwayConstructionRoadway$77,950.00$(13,197.16)-17%0
0291-10-117San Antonio07/01/26$3,328,257.33ConstructionRoadwayConstructionRoadway$2,846,766.70$481,490.6317%0
2461-01-011Dallas10/01/29$1,051,197.00ConstructionRoadway$1,261,796.16$(210,599.16)-17%36212 months
0166-08-064Bryan07/01/26$132,202.02ConstructionRoadwayConstructionRoadway$158,450.00$(26,247.98)-17%0
0054-06-113Brownwood07/01/26$2,329,284.20ConstructionRoadwayConstructionRoadway$2,000,000.00$329,284.2016%-279-9 months
0389-11-061Houston02/02/27$3,424,252.00ConstructionRoadwayConstructionRoadway$4,095,032.00$(670,780.00)-16%-365-1 year
0114-02-120Austin08/05/26$2,996,561.70ConstructionRoadwayConstructionRoadway$3,577,315.00$(580,753.30)-16%0
2266-02-168Fort Worth06/02/26$1,434,972.42ConstructionNon RoadwayConstructionNon Roadway$1,711,952.50$(276,980.08)-16%0
0921-06-377Pharr05/01/27$1,113,545.00ConstructionLocal LetConstructionLocal Let$1,325,118.55$(211,573.55)-16%0
0007-06-268Brownwood07/01/26$1,261,391.90ConstructionRoadwayConstructionRoadway$1,500,000.00$(238,608.10)-16%0
0199-01-091Tyler07/01/26$597,189.65ConstructionRoadwayConstructionRoadway$516,736.73$80,452.9216%0
0902-90-129Fort Worth07/01/26$2,365,443.90ConstructionBridgeConstructionBridge$2,794,310.91$(428,867.01)-15%0
0718-01-078Dallas06/01/27$457,789.20ConstructionBridgeConstructionBridge$540,000.00$(82,210.80)-15%0
0095-05-061Dallas06/01/28$17,400,554.15ConstructionRoadwayConstructionRoadway$20,518,087.04$(3,117,532.89)-15%0
0083-02-060Paris08/05/26$78,448.00ConstructionRoadwayConstructionRoadway$92,448.45$(14,000.45)-15%0
0315-01-040Bryan07/01/26$3,224.76ConstructionRoadwayConstructionRoadway$3,800.00$(575.24)-15%0
1562-03-022Bryan07/01/26$77,194.55ConstructionRoadwayConstructionRoadway$90,970.00$(13,775.45)-15%0
0299-13-035Laredo03/01/29$1,789,754.40ConstructionRoadwayConstructionRoadway$1,554,688.80$235,065.6015%35912 months
0265-03-054Austin07/01/26$745,820.25ConstructionRoadwayConstructionRoadway$877,520.25$(131,700.00)-15%0
0039-10-096Pharr12/01/27$3,579,328.00ConstructionBridgeConstructionBridge$3,112,459.28$466,868.7215%0
0013-08-147Fort Worth06/01/27$54,615,384.64ConstructionRoadwayUnassignedUnassigned$47,581,373.76$7,034,010.8815%-945-3 yearsUnassigned → Construction / Roadway
0039-12-260Pharr09/01/27$11,269,925.14ConstructionBridgeConstructionBridge$9,847,029.39$1,422,895.7514%0
1003-01-112Houston03/07/28$722,090.00ConstructionRoadwayConstructionRoadway$631,223.00$90,867.0014%0
0015-09-208Austin07/01/26$2,898,081.65ConstructionRoadwayConstructionRoadway$3,380,279.55$(482,197.90)-14%0
3510-04-066Houston07/01/26$21,704,627.94ConstructionRoadwayConstructionRoadway$18,997,823.00$2,706,804.9414%0
0920-38-287Beaumont06/02/26$2,540,906.12ConstructionBridgeConstructionBridge$2,960,906.12$(420,000.00)-14%0
2446-01-037Bryan07/01/26$25,652.54ConstructionRoadwayConstructionRoadway$22,470.00$3,182.5414%0
3510-04-065Houston07/01/26$3,386,248.00ConstructionNon RoadwayConstructionNon Roadway$3,942,056.00$(555,808.00)-14%0
0581-01-180Dallas08/02/28$6,032,797.68ConstructionRoadwayConstructionRoadway$7,010,101.85$(977,304.17)-14%0
2859-01-011Abilene12/01/26$487,839.00ConstructionRoadwayConstructionRoadway$428,430.00$59,409.0014%0
0914-04-364Austin06/02/26$516,136.30ConstructionNon RoadwayConstructionNon Roadway$598,936.45$(82,800.15)-14%0
3312-02-019Houston01/06/27$3,803,740.00ConstructionRoadwayConstructionRoadway$4,410,422.00$(606,682.00)-14%0
0581-01-177Dallas08/05/26$1,376,754.86ConstructionRoadwayConstructionRoadway$1,595,632.31$(218,877.45)-14%-300-10 months
0675-05-112Bryan07/01/26$35,202.45ConstructionRoadwayConstructionRoadway$40,780.00$(5,577.55)-14%0
1065-02-045Pharr08/04/27$1,576,228.00ConstructionRoadwayConstructionRoadway$1,824,968.00$(248,740.00)-14%0
0675-08-121Houston07/01/26$4,119,323.00ConstructionNon RoadwayConstructionNon Roadway$3,627,242.00$492,081.0014%0
0027-13-245Houston06/02/26$248,970.25ConstructionRoadwayConstructionRoadway$287,794.37$(38,824.12)-13%0
0072-12-202San Antonio09/02/26$247,586.98ConstructionRoadwayConstructionRoadway$218,366.32$29,220.6613%0
0395-01-036Bryan07/01/26$90,098.80ConstructionRoadwayConstructionRoadway$79,520.00$10,578.8013%0
0047-06-182Dallas12/03/26$1,127,591.83ConstructionLocal LetConstructionLocal Let$1,300,000.00$(172,408.17)-13%0
0053-08-077Abilene07/01/26$857,598.00ConstructionRoadwayConstructionRoadway$988,024.00$(130,426.00)-13%-97-3 months
0053-12-075Abilene12/01/26$799,989.00ConstructionRoadwayConstructionRoadway$708,053.00$91,936.0013%0
0165-03-036Tyler07/01/26$46,939,079.29ConstructionRoadwayConstructionRoadway$53,872,550.00$(6,933,470.71)-13%0
0199-01-090Tyler07/01/26$707,258.21ConstructionRoadwayConstructionRoadway$811,456.44$(104,198.23)-13%0
0919-19-093Atlanta06/02/26$897,068.40ConstructionBridgeConstructionBridge$795,421.40$101,647.0013%0
0161-03-027Laredo02/01/29$2,562,041.70ConstructionRoadwayConstructionRoadway$2,934,656.85$(372,615.15)-13%-28-28 days
0921-02-561Pharr01/02/28$1,917,438.00ConstructionNon RoadwayConstructionNon Roadway$2,191,115.00$(273,677.00)-12%0
0114-02-116Austin08/05/26$3,331,178.85ConstructionRoadwayConstructionRoadway$3,800,845.31$(469,666.46)-12%0
1051-01-065Dallas10/01/29$105,284.34ConstructionRoadway$119,964.97$(14,680.63)-12%36212 months
0249-01-058Wichita Falls07/01/26$166,226.60ConstructionBridgeConstructionBridge$189,348.00$(23,121.40)-12%-216-7 months
0446-01-056Yoakum07/01/26$1,791,665.95ConstructionRoadwayConstructionRoadway$1,600,000.00$191,665.9512%0
2011-02-016Abilene12/01/26$1,002,591.00ConstructionRoadwayConstructionRoadway$1,138,058.00$(135,467.00)-12%0
0006-16-005Abilene12/01/26$132,725.00ConstructionRoadwayConstructionRoadway$150,633.26$(17,908.26)-12%0
0114-02-111Austin08/05/26$526,301.50ConstructionRoadwayConstructionRoadway$596,316.00$(70,014.50)-12%0
1971-02-009Bryan07/01/26$4,311.80ConstructionRoadwayConstructionRoadway$4,880.00$(568.20)-12%0
1095-03-019Corpus Christi06/02/26$136,336.35ConstructionRoadwayConstructionRoadway$154,293.80$(17,957.45)-12%0
0204-09-067Bryan07/01/26$45,448.23ConstructionRoadwayConstructionRoadway$51,400.00$(5,951.77)-12%0
0720-03-154Houston06/02/26$786,744.75ConstructionRoadwayConstructionRoadway$887,926.00$(101,181.25)-11%0
0143-01-068San Antonio07/01/26$2,514,127.89ConstructionRoadwayConstructionRoadway$2,833,055.08$(318,927.19)-11%0
3417-02-039Austin07/01/26$432,477.50ConstructionNon RoadwayConstructionNon Roadway$487,340.00$(54,862.50)-11%0
0543-02-086Houston07/01/26$173,335.46ConstructionRoadwayConstructionRoadway$195,093.00$(21,757.54)-11%0
0171-04-087Fort Worth07/01/26$347,739.50ConstructionRoadwayConstructionRoadway$391,194.00$(43,454.50)-11%0
0542-02-046Laredo02/02/28$6,049,963.50ConstructionRoadwayConstructionRoadway$6,800,000.00$(750,036.50)-11%-365-1 year
1429-01-039Pharr05/06/26$266,656.05ConstructionRoadwayConstructionRoadway$241,056.05$25,600.0011%0
0006-02-126Abilene12/01/26$690,784.00ConstructionRoadwayConstructionRoadway$772,055.00$(81,271.00)-11%0
0266-04-053Yoakum07/01/26$1,798,100.25ConstructionRoadwayConstructionRoadway$2,009,165.00$(211,064.75)-11%0
2130-01-014Bryan07/01/26$59,025.95ConstructionRoadwayConstructionRoadway$65,840.00$(6,814.05)-10%0
0456-02-037Bryan07/01/26$7,492.42ConstructionRoadwayConstructionRoadway$8,340.00$(847.58)-10%0
0915-12-796San Antonio07/01/26$333,380.95ConstructionRoadwayConstructionRoadway$371,096.05$(37,715.10)-10%0
0047-07-248Dallas07/01/26$306,923.00ConstructionRoadwayConstructionRoadway$340,733.40$(33,810.40)-10%0
3110-01-003Lufkin07/01/26$4,060,440.80ConstructionRoadwayConstructionRoadway$4,505,928.36$(445,487.56)-10%0
0918-46-334Dallas06/02/26$1,510,580.00ConstructionBridgeConstructionBridge$1,675,899.60$(165,319.60)-10%0
0333-01-033Abilene12/01/26$1,647,371.00ConstructionRoadwayConstructionRoadway$1,500,000.00$147,371.0010%0
0508-02-140Beaumont07/01/26$3,459,416.41ConstructionRoadwayConstructionRoadway$3,833,252.39$(373,835.98)-10%-35-1 month
0492-04-041Tyler07/01/26$27,128,231.85ConstructionRoadwayConstructionRoadway$30,037,794.85$(2,909,563.00)-10%0
0430-01-070Dallas08/02/28$5,169,642.48ConstructionRoadwayConstructionRoadway$5,719,193.52$(549,551.04)-10%0
1718-05-021Odessa04/05/28$2,153,993.53ConstructionRoadwayConstructionRoadway$2,381,745.00$(227,751.47)-10%0
0213-03-112Lufkin07/01/26$3,331,418.00ConstructionBridgeConstructionBridge$3,682,752.30$(351,334.30)-10%0
0918-46-335Dallas06/02/26$994,466.00ConstructionBridgeConstructionBridge$1,097,504.80$(103,038.80)-9%0
3138-01-039Bryan05/03/28$761,876.00ConstructionRoadwayConstructionRoadway$838,871.00$(76,995.00)-9%33711 months
0921-02-533Pharr05/01/27$1,107,531.00ConstructionLocal LetConstructionLocal Let$1,218,284.10$(110,753.10)-9%0
0025-02-234San Antonio08/05/26$7,487,310.06ConstructionRoadwayConstructionRoadway$8,226,172.00$(738,861.94)-9%0
0110-05-136Houston05/06/26$1,080,682.20ConstructionRoadwayConstructionRoadway$991,742.20$88,940.009%0
0081-04-047Dallas04/05/28$419,452.46ConstructionRoadwayConstructionRoadway$460,407.60$(40,955.14)-9%0
0558-03-026Abilene12/01/26$696,693.00ConstructionRoadwayConstructionRoadway$639,955.86$56,737.149%0
2374-02-166Dallas07/01/26$282,932.75ConstructionRoadwayConstructionRoadway$310,476.60$(27,543.85)-9%0
0990-02-015Corpus Christi06/02/26$30,907.60ConstructionRoadwayConstructionRoadway$33,912.76$(3,005.16)-9%0
0314-04-036Fort Worth07/01/26$346,773.76ConstructionBridgeConstructionBridge$380,384.33$(33,610.57)-9%0
1421-01-028Beaumont07/01/26$5,038,939.85ConstructionRoadwayConstructionRoadway$5,527,174.50$(488,234.65)-9%-35-1 month
0261-01-052Dallas07/01/26$677,275.50ConstructionNon RoadwayConstructionNon Roadway$742,714.35$(65,438.85)-9%0
0446-02-041Yoakum07/01/26$1,118,407.77ConstructionRoadwayConstructionRoadway$1,226,012.00$(107,604.23)-9%0
1315-01-033Dallas10/04/28$3,885,389.78ConstructionRoadwayConstructionRoadway$4,249,387.32$(363,997.54)-9%0
2033-03-011Abilene12/01/26$434,259.00ConstructionRoadwayConstructionRoadway$400,000.00$34,259.009%0
0261-02-086Dallas07/01/26$675,870.00ConstructionNon RoadwayConstructionNon Roadway$737,593.50$(61,723.50)-8%0
1562-04-016Bryan07/01/26$104,568.40ConstructionRoadwayConstructionRoadway$114,100.00$(9,531.60)-8%0
0033-06-130Abilene05/06/26$1,325,572.00ConstructionBridgeConstructionBridge$1,223,572.00$102,000.008%0
0027-08-186Houston06/02/26$311,721.35ConstructionRoadwayConstructionRoadway$287,859.62$23,861.738%0
0919-13-022Atlanta06/02/26$845,060.00ConstructionBridgeConstructionBridge$780,583.00$64,477.008%0
0978-02-085Houston07/01/26$1,325,706.60ConstructionRoadwayConstructionRoadway$1,444,405.82$(118,699.22)-8%0
2851-01-055Bryan07/01/26$50,884.35ConstructionRoadwayConstructionRoadway$47,050.00$3,834.358%0
0166-02-049Bryan07/01/26$137,319.70ConstructionRoadwayConstructionRoadway$149,130.00$(11,810.30)-8%0
0013-08-149Fort Worth07/01/27$15,928,453.33ConstructionRoadwayConstructionRoadway$17,248,438.28$(1,319,984.95)-8%0
0027-07-044Houston06/02/26$170,751.50ConstructionRoadwayConstructionRoadway$184,764.00$(14,012.50)-8%0
0918-47-537Dallas10/05/27$598,483.05ConstructionRoadwayConstructionRoadway$647,328.00$(48,844.95)-8%0
0921-02-537Pharr05/31/28$7,718,488.50ConstructionLocal LetConstructionLocal Let$8,341,667.00$(623,178.50)-7%0
0998-05-013Bryan07/01/26$56,834.35ConstructionRoadwayConstructionRoadway$61,420.00$(4,585.65)-7%0
0919-13-020Atlanta06/02/26$527,087.20ConstructionBridgeConstructionBridge$490,881.20$36,206.007%0
0836-03-075Waco09/02/26$555,819.86ConstructionRoadwayConstructionRoadway$600,000.00$(44,180.14)-7%0
0069-07-113San Angelo08/05/26$1,777,990.78ConstructionRoadwayConstructionRoadway$1,657,431.03$120,559.757%0
0138-06-047Lufkin07/01/26$59,915,665.95ConstructionRoadwayConstructionRoadway$64,563,586.26$(4,647,920.31)-7%0
0978-01-045Houston07/01/26$1,319,719.40ConstructionRoadwayConstructionRoadway$1,421,566.46$(101,847.06)-7%0
2340-02-022Atlanta01/05/28$10,125,634.00ConstructionRoadwayConstructionRoadway$9,453,804.00$671,830.007%0
0027-12-164Houston06/02/26$3,350,035.38ConstructionRoadwayConstructionRoadway$3,603,216.37$(253,180.99)-7%0
0186-03-074Bryan07/01/26$34,155.43ConstructionRoadwayConstructionRoadway$31,920.00$2,235.437%0
1973-01-021Dallas07/01/26$1,674,101.10ConstructionRoadwayConstructionRoadway$1,565,564.19$108,536.917%0
3510-04-064Houston07/01/26$3,440,293.00ConstructionNon RoadwayConstructionNon Roadway$3,693,789.00$(253,496.00)-7%0
0337-05-048Bryan09/01/27$3,278,786.69ConstructionBridgeConstructionBridge$3,518,509.97$(239,723.28)-7%0
2133-02-016Bryan07/01/26$17,500.75ConstructionRoadwayConstructionRoadway$18,780.00$(1,279.25)-7%0
0016-05-128San Antonio07/01/26$12,462,037.55ConstructionRoadwayConstructionRoadway$11,668,795.80$793,241.757%0
0919-13-021Atlanta06/02/26$495,940.80ConstructionBridgeConstructionBridge$464,576.80$31,364.007%0
0009-11-269Dallas07/01/26$268,029.00ConstructionRoadwayConstructionRoadway$287,026.95$(18,997.95)-7%0
0521-06-165San Antonio06/02/26$34,630.20ConstructionBridgeConstructionBridge$32,480.20$2,150.007%0
0492-04-034Tyler07/01/26$48,109,014.53ConstructionRoadwayConstructionRoadway$45,157,109.53$2,951,905.007%0
2993-01-011Paris06/02/26$4,600,210.40ConstructionRoadwayConstructionRoadway$4,321,251.61$278,958.796%0
0185-03-037Bryan07/01/26$71,519.04ConstructionRoadwayConstructionRoadway$76,360.00$(4,840.96)-6%0
0033-06-129Abilene05/06/26$2,130,350.40ConstructionBridgeConstructionBridge$2,003,350.40$127,000.006%0
0440-05-015Austin01/06/27$225,252,884.62ConstructionRoadwayConstructionRoadway$240,384,615.38$(15,131,730.76)-6%0
0067-18-010Lubbock06/02/26$989,073.08ConstructionRoadwayConstructionRoadway$1,054,818.08$(65,745.00)-6%0
3000-01-027Dallas07/01/26$520,281.50ConstructionRoadwayConstructionRoadway$554,545.95$(34,264.45)-6%0
0252-03-056Austin08/05/26$2,452,584.79ConstructionRoadwayConstructionRoadway$2,613,184.34$(160,599.55)-6%0
0051-03-122Houston07/01/26$722,838.60ConstructionRoadwayConstructionRoadway$770,241.06$(47,402.46)-6%0
0047-06-176Dallas07/01/26$150,126.50ConstructionRoadwayConstructionRoadway$159,793.20$(9,666.70)-6%0
0249-01-057Wichita Falls07/01/26$216,315.60ConstructionBridgeConstructionBridge$204,333.00$11,982.606%-216-7 months
0260-02-055Dallas07/01/26$542,093.50ConstructionNon RoadwayConstructionNon Roadway$575,545.95$(33,452.45)-6%0
0006-06-109Abilene06/02/26$126,022,721.70ConstructionRoadwayConstructionRoadway$119,162,496.70$6,860,225.006%0
2353-02-026Dallas05/05/27$7,573,314.29ConstructionRoadwayConstructionRoadway$7,164,411.29$408,903.006%0
0915-12-782San Antonio07/01/26$380,947.73ConstructionRoadwayConstructionRoadway$403,095.46$(22,147.73)-5%0
2452-03-128San Antonio07/01/26$180,125,212.86ConstructionRoadwayConstructionRoadway$190,314,322.00$(10,189,109.14)-5%-153-5 months
0013-08-154Fort Worth08/05/26$1,593,892.79ConstructionRoadwayConstructionRoadway$1,681,823.02$(87,930.23)-5%0
1425-03-075Pharr08/02/28$3,818,764.43ConstructionRoadwayConstructionRoadway$4,026,638.00$(207,873.57)-5%0
0921-02-538Pharr05/31/28$7,239,537.73ConstructionLocal LetConstructionLocal Let$7,626,667.00$(387,129.27)-5%0
0572-01-076Odessa05/06/26$10,581,431.98ConstructionRoadwayConstructionRoadway$11,148,066.98$(566,635.00)-5%0
0816-05-027Dallas03/01/29$10,802,563.00ConstructionRoadwayConstructionRoadway$10,285,271.43$517,291.575%0
0081-02-080Fort Worth07/01/26$459,770.00ConstructionRoadwayConstructionRoadway$483,209.50$(23,439.50)-5%0
0092-02-146Dallas07/01/26$466,949.50ConstructionRoadwayConstructionRoadway$490,515.90$(23,566.40)-5%0
1012-03-027Dallas12/01/26$8,673,294.25ConstructionRoadwayConstructionRoadway$9,106,958.96$(433,664.71)-5%-92-3 months
1012-03-028Dallas12/01/26$6,373,822.30ConstructionRoadwayConstructionRoadway$6,692,513.42$(318,691.12)-5%-92-3 months
1492-01-013Dallas12/01/26$1,331,491.45ConstructionRoadwayConstructionRoadway$1,398,066.02$(66,574.57)-5%-92-3 months
0047-14-092Dallas09/02/26$2,018,779.35ConstructionNon RoadwayConstructionNon Roadway$2,119,100.50$(100,321.15)-5%0
0786-01-095Beaumont07/01/26$4,288,248.61ConstructionRoadwayConstructionRoadway$4,500,000.00$(211,751.39)-5%-644-2 years
0581-01-179Dallas08/05/26$1,725,917.34ConstructionRoadwayConstructionRoadway$1,648,481.54$77,435.805%-300-10 months
0917-16-044Bryan08/05/26$603,666.00ConstructionBridgeConstructionBridge$577,321.07$26,344.935%0
1068-04-183Dallas08/02/28$6,789,193.62ConstructionRoadwayConstructionRoadway$7,111,311.11$(322,117.49)-5%0
0581-02-165Dallas08/04/27$9,558,816.73ConstructionRoadwayConstructionRoadway$9,144,176.22$414,640.515%0
2977-01-011Dallas07/01/26$11,777,297.44ConstructionRoadwayConstructionRoadway$12,330,496.94$(553,199.50)-4%-672-2 years
0007-02-067Abilene05/06/26$850,415.00ConstructionBridgeConstructionBridge$815,415.00$35,000.004%0
0047-06-175Dallas07/01/26$258,723.00ConstructionRoadwayConstructionRoadway$270,219.60$(11,496.60)-4%0
0712-01-052Fort Worth07/01/26$2,333,679.07ConstructionRoadwayConstructionRoadway$2,433,031.32$(99,352.25)-4%0
2846-01-008Dallas12/01/30$6,759,240.62ConstructionRoadway$6,497,917.26$261,323.364%7262 years
0047-06-178Dallas09/02/26$1,208,060.70ConstructionNon RoadwayConstructionNon Roadway$1,161,565.90$46,494.804%0
0921-02-375Pharr05/02/27$14,621,204.29ConstructionLocal LetConstructionLocal Let$15,224,166.43$(602,962.14)-4%0
0909-37-082Waco07/01/26$569,562.17ConstructionBridgeConstructionBridge$593,000.00$(23,437.83)-4%0
0917-29-152Bryan07/01/27$1,591,764.00ConstructionRoadwayConstructionRoadway$1,655,435.00$(63,671.00)-4%0
0924-06-625El Paso05/01/27$17,466,671.15ConstructionLocal LetConstructionLocal Let$18,165,338.00$(698,666.85)-4%0
0005-04-084Odessa07/01/26$5,595,705.62ConstructionRoadwayConstructionRoadway$5,400,000.00$195,705.624%0
0002-02-064El Paso11/01/28$19,632,293.75ConstructionRoadwayConstructionRoadway$20,359,415.74$(727,121.99)-4%3651 year
0915-12-786San Antonio07/01/26$373,502.68ConstructionRoadwayConstructionRoadway$387,275.16$(13,772.48)-4%0
1228-03-057Pharr05/06/26$240,864.85ConstructionRoadwayConstructionRoadway$249,764.25$(8,899.40)-4%0
0915-12-784San Antonio07/01/26$406,866.27ConstructionRoadwayConstructionRoadway$421,541.95$(14,675.68)-3%0
0908-33-115Abilene06/02/26$176,362.29ConstructionRoadwayConstructionRoadway$170,510.29$5,852.003%0
0151-02-026Austin05/06/26$9,952,848.77ConstructionRoadwayConstructionRoadway$10,279,819.07$(326,970.30)-3%0
0151-03-043Austin05/06/26$862,613.17ConstructionRoadwayConstructionRoadway$890,964.62$(28,351.45)-3%0
2121-02-189El Paso12/05/28$1,008,439.25ConstructionRoadwayConstructionRoadway$1,040,554.27$(32,115.02)-3%0
0013-10-098Fort Worth07/01/26$8,676,166.77ConstructionRoadwayConstructionRoadway$8,416,086.71$260,080.063%-153-5 months
0262-07-047Bryan07/01/26$60,498.10ConstructionRoadwayConstructionRoadway$62,410.00$(1,911.90)-3%0
0905-06-121Lubbock07/01/26$376,554.75ConstructionRoadwayConstructionRoadway$388,274.75$(11,720.00)-3%0
0915-12-752San Antonio07/01/26$356,526.40ConstructionBridgeConstructionBridge$346,526.40$10,000.003%0
0712-02-021Fort Worth07/01/26$1,297,721.50ConstructionRoadwayConstructionRoadway$1,261,648.00$36,073.503%0
0686-01-051Houston04/05/28$3,520,607.00ConstructionRoadwayConstructionRoadway$3,424,252.00$96,355.003%0
3272-01-007Lubbock06/02/26$747,382.78ConstructionRoadwayConstructionRoadway$768,682.78$(21,300.00)-3%0
0274-02-032Brownwood06/02/26$5,557,276.85ConstructionRoadwayConstructionRoadway$5,425,674.85$131,602.002%0
0675-08-117Houston05/06/26$204,710.61ConstructionRoadwayConstructionRoadway$209,670.61$(4,960.00)-2%0
0022-04-021Laredo03/01/29$10,763,000.85ConstructionRoadwayConstructionRoadway$11,022,865.35$(259,864.50)-2%35912 months
1014-03-063Dallas12/03/26$1,731,094.70ConstructionLocal LetConstructionLocal Let$1,772,766.00$(41,671.30)-2%0
0018-06-185Laredo06/02/26$63,828,090.68ConstructionRoadwayConstructionRoadway$62,373,725.73$1,454,364.952%0
0313-02-071Fort Worth04/06/27$2,070,015.37ConstructionRoadwayConstructionRoadway$2,027,259.64$42,755.732%0
0110-04-212Houston05/06/26$3,505,666.64ConstructionRoadwayConstructionRoadway$3,435,426.64$70,240.002%0
0327-07-047Pharr08/05/26$310,280.42ConstructionRoadwayConstructionRoadway$316,539.17$(6,258.75)-2%0
0540-03-039Bryan07/01/26$4,315,533.66ConstructionRoadwayConstructionRoadway$4,400,000.00$(84,466.34)-2%0
0143-04-074San Antonio06/02/26$285,741.00ConstructionBridgeConstructionBridge$280,441.00$5,300.002%0
0248-03-024Atlanta11/02/27$13,405,864.00ConstructionRoadwayUnassignedUnassigned$13,160,923.50$244,940.502%0Unassigned → Construction / Roadway
0068-01-073Lubbock07/01/26$138,352,841.20ConstructionRoadwayConstructionRoadway$135,847,883.00$2,504,958.202%-97-3 months
0185-02-042Bryan07/01/26$76,992.76ConstructionRoadwayConstructionRoadway$75,610.00$1,382.762%0
0675-08-116Houston05/06/26$1,533,541.18ConstructionRoadwayConstructionRoadway$1,562,061.18$(28,520.00)-2%0
0327-07-049Pharr08/05/26$315,468.34ConstructionRoadwayConstructionRoadway$321,317.31$(5,848.97)-2%0
0073-08-183San Antonio05/06/26$34,315,721.05ConstructionRoadwayConstructionRoadway$34,945,459.80$(629,738.75)-2%0
0192-01-103Houston06/02/26$553,663.25ConstructionRoadwayConstructionRoadway$563,765.64$(10,102.39)-2%0
0081-03-047Dallas05/06/26$111,391,860.83ConstructionRoadwayConstructionRoadway$109,560,813.58$1,831,047.252%0
0916-37-038Corpus Christi06/02/26$915,014.80ConstructionBridgeConstructionBridge$900,224.80$14,790.002%0
0747-05-043Fort Worth05/06/26$3,042,077.60ConstructionRoadwayConstructionRoadway$2,993,451.70$48,625.902%0
0720-03-153Houston06/02/26$905,283.29ConstructionRoadwayConstructionRoadway$890,994.00$14,289.292%0
1421-01-027Beaumont07/01/26$1,853,387.00ConstructionRoadwayConstructionRoadway$1,883,344.00$(29,957.00)-2%-35-1 month
0872-04-037Pharr08/05/26$305,999.93ConstructionRoadwayConstructionRoadway$310,839.61$(4,839.68)-2%0
0684-01-068Pharr03/01/27$33,950,374.48ConstructionLocal LetConstructionLocal Let$33,433,603.20$516,771.282%0
0581-02-162Dallas06/02/26$17,965,404.75ConstructionRoadwayConstructionRoadway$17,692,389.85$273,014.902%0
0917-16-042Bryan08/05/26$550,524.90ConstructionBridgeConstructionBridge$542,395.11$8,129.792%0
0686-02-030Houston04/05/28$3,267,905.00ConstructionRoadwayConstructionRoadway$3,221,150.00$46,755.001%0
0110-04-213Houston05/06/26$507,480.61ConstructionRoadwayConstructionRoadway$514,920.61$(7,440.00)-1%0
0747-05-042Fort Worth05/06/26$8,540,372.35ConstructionRoadwayConstructionRoadway$8,420,326.85$120,045.501%0
0625-01-001Waco07/01/26$2,150,632.74ConstructionRoadwayConstructionRoadway$2,180,000.00$(29,367.26)-1%0
0747-08-002Fort Worth05/06/26$5,480,400.25ConstructionRoadwayConstructionRoadway$5,554,398.25$(73,998.00)-1%0
0327-07-048Pharr08/05/26$335,989.93ConstructionRoadwayConstructionRoadway$340,335.32$(4,345.39)-1%0
1502-01-031Lubbock07/01/26$166,952,606.35ConstructionRoadwayConstructionRoadway$164,867,291.60$2,085,314.751%-97-3 months
0018-01-102Laredo05/06/26$7,425,536.19ConstructionRoadwayConstructionRoadway$7,333,506.36$92,029.831%0
0177-01-121Lufkin06/02/26$486,501.00ConstructionBridgeConstructionBridge$480,956.00$5,545.001%0
0500-03-655Houston05/06/26$8,850,867.80ConstructionBridgeConstructionBridge$8,750,914.40$99,953.401%0
0249-01-060Wichita Falls07/01/26$261,344.20ConstructionBridgeConstructionBridge$264,332.00$(2,987.80)-1%-216-7 months
1953-01-035Bryan07/01/26$77,796.65ConstructionRoadwayConstructionRoadway$76,940.00$856.651%0
0610-03-095Atlanta05/06/26$11,312,219.23ConstructionNon RoadwayConstructionNon Roadway$11,435,889.23$(123,670.00)-1%0
0110-01-059Bryan07/01/26$127,828.73ConstructionRoadwayConstructionRoadway$129,210.00$(1,381.27)-1%0
1397-01-036Dallas05/03/28$11,552,595.95ConstructionRoadwayConstructionRoadway$11,675,998.15$(123,402.20)-1%0
0327-06-031Pharr08/05/26$356,081.69ConstructionRoadwayConstructionRoadway$359,844.53$(3,762.84)-1%0
0068-01-085Lubbock06/02/26$691,133.93ConstructionRoadwayConstructionRoadway$683,933.93$7,200.001%0
0366-02-089San Antonio06/02/26$44,312,183.47ConstructionRoadwayConstructionRoadway$43,851,269.81$460,913.661%0
0068-01-084Lubbock06/02/26$705,358.23ConstructionRoadwayConstructionRoadway$698,158.23$7,200.001%0
0086-07-040Pharr08/05/26$368,950.49ConstructionRoadwayConstructionRoadway$372,629.79$(3,679.30)-1%0
1197-01-027Austin08/05/26$3,080,501.38ConstructionRoadwayConstructionRoadway$3,110,829.60$(30,328.22)-1%-154-5 months
0177-14-038Houston05/06/26$4,713,675.29ConstructionRoadwayConstructionRoadway$4,757,838.09$(44,162.80)-1%0
0916-26-023Corpus Christi05/06/26$1,200,909.50ConstructionBridgeConstructionBridge$1,189,809.50$11,100.001%0
0086-07-041Pharr08/05/26$360,110.74ConstructionRoadwayConstructionRoadway$363,332.71$(3,221.97)-1%0
0917-16-040Bryan08/05/26$702,786.45ConstructionBridgeConstructionBridge$708,168.67$(5,382.22)-1%0
0190-05-078Tyler06/02/26$1,960,952.00ConstructionRoadwayConstructionRoadway$1,975,005.00$(14,053.00)-1%0
0291-03-077San Antonio06/02/26$618,826.35ConstructionRoadwayConstructionRoadway$622,966.35$(4,140.00)-1%0
0698-03-107Pharr05/06/26$263,173.95ConstructionRoadwayConstructionRoadway$264,761.15$(1,587.20)-1%0
0521-06-166San Antonio06/02/26$396,200.55ConstructionBridgeConstructionBridge$393,900.55$2,300.001%0
0167-01-122El Paso06/02/26$84,676,469.69ConstructionRoadwayConstructionRoadway$84,225,632.19$450,837.501%0
0259-05-086Fort Worth07/01/26$568,444.50ConstructionRoadwayConstructionRoadway$565,694.50$2,750.000%-216-7 months
0167-02-093El Paso05/06/26$592,039.00ConstructionRoadwayConstructionRoadway$594,961.00$(2,922.00)-0%0
0327-07-050Pharr08/05/26$405,710.18ConstructionRoadwayConstructionRoadway$407,530.22$(1,820.04)-0%0
0038-01-104Laredo02/02/28$2,615,401.95ConstructionRoadwayConstructionRoadway$2,604,201.43$11,200.520%-365-1 year
0025-02-230San Antonio06/02/26$504,445.00ConstructionBridgeConstructionBridge$502,495.00$1,950.000%0
1064-01-048Pharr05/06/26$200,859.55ConstructionRoadwayConstructionRoadway$200,135.05$724.500%0
1586-01-093Pharr05/06/26$177,905.35ConstructionRoadwayConstructionRoadway$177,268.35$637.000%0
0220-01-039Pharr05/06/26$293,896.05ConstructionRoadwayConstructionRoadway$293,029.05$867.000%0
0038-07-085Pharr05/06/26$232,444.80ConstructionRoadwayConstructionRoadway$231,845.30$599.500%0
0859-04-018Bryan07/01/26$53,671.70ConstructionRoadwayConstructionRoadway$53,540.00$131.700%0
2094-01-063Pharr05/06/26$33,933,190.86ConstructionRoadwayConstructionRoadway$33,850,470.86$82,720.000%0
1401-01-024Bryan07/01/26$109,702.55ConstructionRoadwayConstructionRoadway$109,910.00$(207.45)-0%0
0018-05-089Laredo06/01/27$256,120,160.76ConstructionRoadwayConstructionRoadway$255,671,664.26$448,496.500%0
0167-01-137El Paso06/02/26$1,188,375.00ConstructionRoadwayConstructionRoadway$1,186,375.00$2,000.000%0
2121-03-167El Paso05/06/26$1,166,135.50ConstructionRoadwayConstructionRoadway$1,167,991.50$(1,856.00)-0%0
0018-06-219Laredo05/06/26$4,845,177.97ConstructionRoadwayConstructionRoadway$4,838,092.97$7,085.000%0
0050-12-002Houston06/02/26$785,715.19ConstructionRoadwayConstructionRoadway$786,825.43$(1,110.24)-0%0
0276-07-035San Antonio09/02/26$8,601,216.47ConstructionRoadwayConstructionRoadway$8,610,648.49$(9,432.02)-0%0
0019-01-153Fort Worth07/01/26$1,566,691.63ConstructionRoadwayConstructionRoadway$1,565,041.53$1,650.100%-216-7 months
0630-01-059Pharr05/06/26$64,925.00ConstructionRoadwayConstructionRoadway$64,985.00$(60.00)-0%0
0521-04-285San Antonio05/06/26$131,056,485.41ConstructionRoadwayConstructionRoadway$131,153,285.41$(96,800.00)-0%0
0521-04-286San Antonio05/06/26$131,056,485.41Joint Bid UtilityRight-of-WayJoint Bid UtilityRight-of-Way$131,153,285.41$(96,800.00)-0%0
0937-01-027Lufkin06/02/26$5,065,573.30ConstructionRoadwayConstructionRoadway$5,062,782.80$2,790.500%0
0255-06-073Pharr05/06/26$73,884,136.67ConstructionRoadwayConstructionRoadway$73,911,736.67$(27,600.00)-0%0
0001-02-081El Paso11/01/28$801,308.04ConstructionRoadwayConstructionRoadway$801,308.00$0.040%0
0207-05-089Atlanta10/05/27$3,526,729.00ConstructionBridgeConstructionBridge$3,526,728.76$0.240%0
0843-07-026Atlanta10/05/27$4,036,208.00ConstructionBridgeConstructionBridge$4,036,207.70$0.300%0
0843-07-027Atlanta10/05/27$5,470,641.00ConstructionBridgeConstructionBridge$5,470,640.94$0.060%0
1575-03-021Atlanta10/05/27$3,576,073.00ConstructionBridgeConstructionBridge$3,576,073.03$(0.03)0%0
0917-16-041Bryan08/05/26$607,979.40ConstructionBridgeConstructionBridge$607,989.40$(10.00)0%0
0880-04-040Lubbock05/06/26$10,274,387.05ConstructionRoadwayConstructionRoadway$10,274,814.05$(427.00)0%0
454 rows · download CSV

Putting It Together

This latest analysis underscores that the TxDOT pipeline is expanding with a growing number of projects and increasing overall costs, despite a drift in project timelines pushing many deadlines further out.


Final Takeaway

This pattern suggests a cautious approach to moving forward with infrastructure projects, emphasizing the importance of careful planning and resource allocation.