TxDOT Pipeline Changes - November 2026
Summary
- The active pipeline decreased slightly to $35.28B, down by $148.01M compared to the last snapshot.
- The number of active projects increased by 190, totaling 5,687 projects in the pipeline.
- Dallas experienced the largest net cost increase of $128.56M, while Houston faced the largest decrease of $392.73M.
Overview
Between October 3 and November 3, 2026, TxDOT's active project pipeline decreased by $148 million (0.4%) to $35.28 billion, while the number of projects grew by 190. Of the 123 projects with letting dates moved by at least six months, 77 shifted earlier and 46 were delayed. Cost estimates fell most in Houston ($392.73 million), partially offset by increases in Dallas ($128.56 million).
Analysis covers projects scheduled to let between November 1, 2026, and November 1, 2029.
Letting Date Shifts (Slippage)
The letting date shifts show a total of 123 projects moved by 6 months or more, with 46 projects pushed later and 77 earlier. Additionally, 71 projects shifted by 12 months, including 31 later and 40 earlier. This suggests a general trend towards more projects being pulled forward in the letting window.
| CSJ | District | Est. Letting Date | Project Estimate | Current Type | Current Subtype | Prev. Type | Prev. Subtype | Prev. Date | Letting Δ (days) | Letting Date Δ | Cost Δ | %Cost Δ | Type/Subtype Δ | Advertised Δ | Lifecycle |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2588-01-027 | Dallas | 12/01/27 | $1,000,000.00 | Construction | Roadway | Unassigned | Unassigned | 10/01/44 | -6149 | -17 years | $999,999.00 | 99999900% | Unassigned → Construction / Roadway | ||
| 3431-01-006 | Waco | 10/01/45 | $3,500,000.00 | Construction | Roadway | 10/01/29 | 5844 | 16 years | |||||||
| 1028-01-031 | Brownwood | 11/01/41 | $758,384.00 | Construction | Roadway | 11/02/27 | 5113 | 14 years | |||||||
| 0912-72-856 | Houston | 08/01/38 | $90,903.40 | Construction | Roadway | 09/06/28 | 3616 | 10 years | |||||||
| 1524-01-091 | Houston | 08/01/38 | $97,775.27 | Construction | Roadway | 10/04/28 | 3588 | 10 years | |||||||
| 2150-03-033 | Laredo | 09/01/38 | $20,000,000.00 | Construction | Roadway | 09/01/29 | 3287 | 9 years | |||||||
| 1416-02-016 | Houston | 08/01/38 | $17,145,444.96 | Construction | Roadway | 08/01/29 | 3287 | 9 years | |||||||
| 0337-03-025 | Austin | 01/01/38 | $9,379,464.29 | Construction | Roadway | 01/01/29 | 3287 | 9 years | |||||||
| 0648-01-034 | Bryan | 01/06/27 | $13,000,000.00 | Construction | Roadway | Unassigned | Unassigned | 09/01/35 | -3160 | -9 years | Unassigned → Construction / Roadway | ||||
| 0146-01-052 | Childress | 03/03/27 | $8,000,000.00 | Construction | Roadway | Unassigned | Unassigned | 11/01/34 | -2800 | -8 years | Unassigned → Construction / Roadway | ||||
| 2008-01-092 | San Angelo | 02/01/36 | $1,128,000.00 | Construction | Roadway | 02/01/29 | 2556 | 7 years | |||||||
| 2008-01-093 | San Angelo | 02/01/36 | $3,582,600.00 | Construction | Roadway | 02/01/29 | 2556 | 7 years | |||||||
| 0274-01-046 | Brownwood | 01/01/36 | $1,000,000.00 | Construction | Roadway | 01/01/29 | 2556 | 7 years | |||||||
| 0274-02-033 | Brownwood | 01/01/36 | $2,500,000.00 | Construction | Roadway | 01/01/29 | 2556 | 7 years | |||||||
| 0120-04-012 | Brownwood | 11/01/34 | $97,734.00 | Construction | Roadway | 11/02/27 | 2556 | 7 years | |||||||
| 1025-04-006 | Brownwood | 11/01/34 | $49,579.00 | Construction | Roadway | 11/02/27 | 2556 | 7 years | |||||||
| 1030-01-024 | Brownwood | 11/01/34 | $313,205.00 | Construction | Roadway | 11/02/27 | 2556 | 7 years | |||||||
| 1241-01-016 | Brownwood | 11/01/34 | $346,833.00 | Construction | Roadway | 11/02/27 | 2556 | 7 years | |||||||
| 3100-02-002 | Pharr | 09/01/35 | $38,538,427.00 | Construction | Roadway | 09/06/28 | 2551 | 7 years | |||||||
| 2502-01-017 | Waco | 01/01/34 | $1.00 | Construction | Roadway | 01/05/28 | 2188 | 6 years | |||||||
| 0805-04-037 | Austin | 06/01/32 | $26,500,000.00 | Non-Let | Roadway | 06/03/27 | 1825 | 5 years | $24,392,000.00 | 1157% | |||||
| 0914-33-121 | Austin | 07/01/32 | $950,155.56 | Construction | Non Roadway | 07/06/28 | 1456 | 4 years | |||||||
| 0337-05-043 | Bryan | 02/02/27 | $3,395,608.82 | Construction | Bridge | Unassigned | Unassigned | 09/01/30 | -1307 | -4 years | Unassigned → Construction / Bridge | ||||
| 0675-02-106 | Bryan | 02/02/27 | $2,500,000.00 | Construction | Roadway | Unassigned | Unassigned | 09/01/30 | -1307 | -4 years | Unassigned → Construction / Roadway | ||||
| 0675-02-107 | Bryan | 02/02/27 | $2,500,000.00 | Construction | Roadway | Unassigned | Unassigned | 09/01/30 | -1307 | -4 years | Unassigned → Construction / Roadway | ||||
| 0133-07-030 | Wichita Falls | 02/02/27 | $13,814,492.00 | Construction | Roadway | Construction | Roadway | 03/01/30 | -1123 | -3 years | |||||
| 0133-08-037 | Wichita Falls | 02/02/27 | $7,285,508.00 | Construction | Roadway | Construction | Roadway | 03/01/30 | -1123 | -3 years | |||||
| 1663-02-013 | Dallas | 02/02/27 | $2,309,392.41 | Construction | Bridge | Construction | Bridge | 03/01/30 | -1123 | -3 years | |||||
| 1663-03-021 | Dallas | 02/02/27 | $3,912,157.25 | Construction | Bridge | Construction | Bridge | 03/01/30 | -1123 | -3 years | $324,667.99 | 9% | |||
| 0495-02-072 | Tyler | 02/02/27 | $12,037,037.04 | Construction | Roadway | Construction | Roadway | 02/01/30 | -1095 | -3 years | |||||
| 0053-07-044 | Abilene | 07/01/27 | $5,900,000.00 | Construction | Roadway | Construction | Roadway | 04/01/30 | -1005 | -3 years | |||||
| 0702-04-011 | Childress | 03/03/27 | $318,240.00 | Construction | Bridge | Construction | Bridge | 09/01/29 | -913 | -3 years | |||||
| 0797-07-033 | Childress | 03/03/27 | $1,650,000.00 | Construction | Bridge | Construction | Bridge | 09/01/29 | -913 | -3 years | |||||
| 2632-01-010 | Childress | 03/03/27 | $1,500,000.00 | Construction | Bridge | Construction | Bridge | 09/01/29 | -913 | -3 years | |||||
| 0044-03-039 | Wichita Falls | 06/01/27 | $45,068,701.70 | Construction | Roadway | Construction | Roadway | 10/01/29 | -853 | -2 years | |||||
| 0444-02-021 | Fort Worth | 01/01/32 | $41,490,637.62 | Construction | Roadway | 09/01/29 | 852 | 2 years | |||||||
| 0066-05-071 | Amarillo | 02/02/27 | $4,240,000.00 | Construction | Bridge | Construction | Bridge | 03/01/29 | -758 | -2 years | |||||
| 0066-05-072 | Amarillo | 02/02/27 | $4,150,000.00 | Construction | Bridge | Construction | Bridge | 03/01/29 | -758 | -2 years | |||||
| 0066-05-076 | Amarillo | 02/02/27 | $3,090,000.00 | Construction | Bridge | Construction | Bridge | 03/01/29 | -758 | -2 years | |||||
| 0066-05-077 | Amarillo | 02/02/27 | $3,150,000.00 | Construction | Bridge | Construction | Bridge | 03/01/29 | -758 | -2 years | |||||
| 2660-01-013 | Laredo | 06/01/27 | $17,165,677.36 | Construction | Roadway | Construction | Roadway | 06/01/29 | -731 | -2 years | |||||
| 0304-08-013 | Beaumont | 04/06/27 | $1,700,000.00 | Construction | Roadway | Construction | Roadway | 04/01/29 | -726 | -2 years | |||||
| 0295-03-037 | Abilene | 04/06/27 | $6,400,000.00 | Construction | Roadway | Construction | Roadway | 03/01/29 | -695 | -2 years | |||||
| 0508-04-196 | Beaumont | 06/01/27 | $5,500,000.00 | Construction | Roadway | Construction | Roadway | 04/01/29 | -670 | -2 years | |||||
| 1533-01-026 | Austin | 12/03/26 | $1,854,787.04 | Non-Let | Roadway | Construction | Local Let | 10/02/28 | -669 | -2 years | $1,854,786.04 | 185478604% | Construction / Local Let → Non-Let / Roadway | ||
| 1191-02-003 | Waco | 04/06/27 | $1,114,968.65 | Construction | Bridge | Construction | Bridge | 01/01/29 | -636 | -2 years | |||||
| 1012-02-043 | Dallas | 02/02/27 | $12,892,438.89 | Construction | Roadway | Construction | Roadway | 09/06/28 | -582 | -2 years | |||||
| 0807-03-040 | Yoakum | 03/03/27 | $3,251,000.00 | Construction | Bridge | Construction | Bridge | 10/04/28 | -581 | -2 years | |||||
| 0075-01-025 | El Paso | 06/01/27 | $4,720,383.33 | Construction | Bridge | Construction | Bridge | 01/01/29 | -580 | -2 years | |||||
| 0921-06-394 | Pharr | 10/22/26 | $430,000.00 | Non-Let | Non Roadway | Non-Let | Non Roadway | 05/02/28 | -558 | -2 years | |||||
| 0091-03-022 | Dallas | 06/01/27 | $37,095,271.43 | Construction | Roadway | Construction | Roadway | 12/05/28 | -553 | -2 years | |||||
| 0912-72-828 | Houston | 11/19/26 | $1,677,345.00 | Construction | Local Let | Construction | Local Let | 05/15/28 | -543 | -1 year | |||||
| 0912-72-625 | Houston | 06/01/29 | $1,448,518.00 | Construction | Bridge | Construction | Bridge | 01/05/28 | 513 | 1 year | |||||
| 0912-72-652 | Houston | 06/01/29 | $1,011,626.00 | Construction | Bridge | Construction | Bridge | 01/05/28 | 513 | 1 year | |||||
| 0912-72-655 | Houston | 06/01/29 | $1,347,297.00 | Construction | Bridge | Construction | Bridge | 01/05/28 | 513 | 1 year | |||||
| 0990-02-014 | Corpus Christi | 07/01/27 | $8,000,000.00 | Construction | Roadway | Construction | Roadway | 11/01/28 | -489 | -1 year | |||||
| 1530-01-012 | Abilene | 01/06/27 | $5,191,835.70 | Construction | Roadway | Construction | Roadway | 03/07/28 | -426 | -1 year | $(664,776.00) | -11% | |||
| 0157-03-052 | Abilene | 06/01/27 | $11,000,000.00 | Construction | Roadway | Construction | Roadway | 07/06/28 | -401 | -1 year | |||||
| 0010-12-078 | Atlanta | 12/01/27 | $2,868,500.00 | Construction | Bridge | Construction | Bridge | 01/01/29 | -397 | -1 year | |||||
| 0912-72-696 | Houston | 09/15/27 | $500,000.00 | Non-Let | Roadway | Unassigned | Unassigned | 08/15/26 | 396 | 1 year | $(25,700,000.00) | -98% | Unassigned → Non-Let / Roadway | ||
| 0019-03-030 | Waco | 11/01/30 | $6,250,000.00 | Construction | Roadway | 11/01/29 | 365 | 1 year | |||||||
| 0418-03-028 | Waco | 11/01/30 | $4,750,000.00 | Construction | Roadway | 11/01/29 | 365 | 1 year | |||||||
| 0833-04-046 | Waco | 11/01/30 | $7,800,000.00 | Construction | Roadway | 11/01/29 | 365 | 1 year | |||||||
| 0833-14-010 | Waco | 11/01/30 | $6,500,000.00 | Construction | Roadway | 11/01/29 | 365 | 1 year | |||||||
| 0833-04-045 | Waco | 10/01/30 | $14,653,850.00 | Construction | Roadway | 10/01/29 | 365 | 1 year | |||||||
| 1077-01-028 | Waco | 10/01/30 | $2,000,000.00 | Construction | Roadway | 10/01/29 | 365 | 1 year | |||||||
| 0912-73-213 | Houston | 09/01/30 | $282,410,714.29 | Construction | Bridge | 09/01/29 | 365 | 1 year | |||||||
| 0354-01-051 | Odessa | 04/05/28 | $5,710,000.00 | Construction | Roadway | Construction | Roadway | 04/06/27 | 365 | 1 year | |||||
| 0314-01-093 | Fort Worth | 02/02/27 | $2,034,999.10 | Construction | Roadway | Construction | Roadway | 02/02/28 | -365 | -1 year | $209,472.16 | 11% | |||
| 0314-07-092 | Fort Worth | 02/02/27 | $12,206,133.03 | Construction | Roadway | Construction | Roadway | 02/02/28 | -365 | -1 year | $419,745.44 | 4% | |||
| 1804-01-090 | Pharr | 02/02/27 | $2,000,000.00 | Construction | Bridge | Construction | Bridge | 02/02/28 | -365 | -1 year | |||||
| 1804-01-091 | Pharr | 02/02/27 | $2,000,000.00 | Construction | Bridge | Construction | Bridge | 02/02/28 | -365 | -1 year | |||||
| 0389-12-096 | Houston | 01/01/29 | $8,893,113.00 | Construction | Roadway | Construction | Roadway | 01/05/28 | 362 | 12 months | |||||
| 0903-15-114 | Wichita Falls | 02/02/27 | $604,500.00 | Construction | Bridge | Construction | Bridge | 01/05/28 | -337 | -11 months | |||||
| 1251-04-008 | Abilene | 02/02/27 | $1,176,493.20 | Construction | Bridge | Construction | Bridge | 01/05/28 | -337 | -11 months | |||||
| 0081-13-071 | Dallas | 09/01/27 | $198,251,363.58 | Construction | Roadway | Construction | Roadway | 08/02/28 | -336 | -11 months | |||||
| 0095-05-061 | Dallas | 07/01/27 | $17,400,554.15 | Construction | Roadway | Construction | Roadway | 06/01/28 | -336 | -11 months | |||||
| 0558-11-018 | San Angelo | 10/01/29 | $15,474,285.00 | Construction | Roadway | Construction | Roadway | 11/01/28 | 334 | 11 months | |||||
| 3417-02-043 | Austin | 10/09/26 | $1,805,976.85 | Non-Let | Roadway | Non-Let | Roadway | 09/03/27 | -329 | -11 months | |||||
| 0385-03-036 | Fort Worth | 10/14/26 | $258,200.00 | Non-Let | Rail | Non-Let | Rail | 09/03/27 | -324 | -11 months | |||||
| 0269-02-074 | Yoakum | 03/03/27 | $968,000.00 | Construction | Roadway | Construction | Roadway | 01/05/28 | -308 | -10 months | |||||
| 0370-01-042 | Yoakum | 03/03/27 | $1,100,000.00 | Construction | Roadway | Construction | Roadway | 01/05/28 | -308 | -10 months | |||||
| 0446-01-057 | Yoakum | 03/03/27 | $1,500,001.00 | Construction | Roadway | Construction | Roadway | 01/05/28 | -308 | -10 months | $1.00 | 0% | |||
| 0019-01-154 | Fort Worth | 05/05/27 | $3,948,317.52 | Construction | Roadway | Construction | Roadway | 03/07/28 | -307 | -10 months | |||||
| 0229-02-050 | Odessa | 05/05/27 | $5,803,571.43 | Construction | Roadway | Construction | Roadway | 03/07/28 | -307 | -10 months | |||||
| 0714-03-029 | Brownwood | 03/07/28 | $2,000,000.00 | Construction | Roadway | Construction | Roadway | 01/01/29 | -300 | -10 months | |||||
| 0028-02-115 | Houston | 06/01/27 | $80,000.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | 272 | 9 months | |||||
| 0177-05-130 | Houston | 06/01/27 | $200,000.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | 272 | 9 months | |||||
| 0177-06-099 | Houston | 06/01/27 | $100,000.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | 272 | 9 months | |||||
| 0177-07-128 | Houston | 06/01/27 | $100,000.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | 272 | 9 months | |||||
| 0177-11-172 | Houston | 06/01/27 | $20,000.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | 272 | 9 months | |||||
| 0271-14-250 | Houston | 06/01/27 | $200,000.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | 272 | 9 months | |||||
| 0376-01-016 | Houston | 06/01/27 | $550,000.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | 272 | 9 months | |||||
| 0502-01-255 | Houston | 06/01/27 | $200,000.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | 272 | 9 months | |||||
| 0508-01-414 | Houston | 06/01/27 | $1,000,000.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | 272 | 9 months | |||||
| 2483-01-017 | Houston | 06/01/27 | $20,000.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | 272 | 9 months | |||||
| 0368-04-035 | Beaumont | 05/05/27 | $6,000,000.00 | Construction | Roadway | Construction | Roadway | 01/05/28 | -245 | -8 months | |||||
| 1978-01-064 | Fort Worth | 05/05/27 | $2,224,419.92 | Construction | Roadway | Construction | Roadway | 01/05/28 | -245 | -8 months | |||||
| 0059-04-053 | Lufkin | 02/02/27 | $230,741.25 | Construction | Roadway | Construction | Roadway | 10/05/27 | -245 | -8 months | |||||
| 0063-06-103 | Lufkin | 02/02/27 | $379,626.25 | Construction | Roadway | Construction | Roadway | 10/05/27 | -245 | -8 months | |||||
| 0064-01-072 | Lufkin | 02/02/27 | $532,472.75 | Construction | Roadway | Construction | Roadway | 10/05/27 | -245 | -8 months | |||||
| 0553-03-040 | Lufkin | 02/02/27 | $585,049.00 | Construction | Roadway | Construction | Roadway | 10/05/27 | -245 | -8 months | |||||
| 0809-02-077 | Lufkin | 02/02/27 | $303,131.75 | Construction | Roadway | Construction | Roadway | 10/05/27 | -245 | -8 months | |||||
| 1310-01-051 | Dallas | 02/02/27 | $8,305,445.16 | Construction | Roadway | Construction | Roadway | 10/05/27 | -245 | -8 months | |||||
| 2590-01-036 | Lufkin | 02/02/27 | $1,481,280.43 | Construction | Roadway | Construction | Roadway | 10/05/27 | -245 | -8 months | |||||
| 0024-08-152 | San Antonio | 01/06/27 | $14,023,511.83 | Construction | Roadway | Construction | Roadway | 09/01/27 | -238 | -8 months | $501,470.54 | 4% | |||
| 0920-39-040 | Beaumont | 10/22/26 | $4,500,000.00 | Non-Let | Local | Non-Let | Local | 06/15/27 | -236 | -8 months | |||||
| 0039-18-126 | Pharr | 06/01/27 | $4,029,878.70 | Construction | Roadway | Construction | Roadway | 01/05/28 | -218 | -7 months | |||||
| 0255-07-154 | Pharr | 06/01/27 | $5,222,606.04 | Construction | Roadway | Construction | Roadway | 01/05/28 | -218 | -7 months | |||||
| 0255-08-112 | Pharr | 06/01/27 | $869,055.98 | Construction | Roadway | Construction | Roadway | 01/05/28 | -218 | -7 months | |||||
| 0252-02-067 | Austin | 09/01/27 | $328,356.73 | Construction | Non Roadway | Construction | Non Roadway | 04/05/28 | -217 | -7 months | |||||
| 0259-05-083 | Fort Worth | 07/01/27 | $8,009,664.43 | Construction | Roadway | Construction | Roadway | 02/02/28 | -216 | -7 months | |||||
| 0114-04-080 | Austin | 02/02/27 | $695,434.70 | Construction | Bridge | Construction | Bridge | 09/01/27 | -211 | -7 months | |||||
| 0114-04-081 | Austin | 02/02/27 | $516,792.60 | Construction | Bridge | Construction | Bridge | 09/01/27 | -211 | -7 months | |||||
| 0114-04-082 | Austin | 02/02/27 | $413,307.72 | Construction | Bridge | Construction | Bridge | 09/01/27 | -211 | -7 months | |||||
| 0743-02-030 | Lufkin | 02/02/27 | $872,692.15 | Construction | Bridge | Construction | Bridge | 09/01/27 | -211 | -7 months | |||||
| 2120-01-029 | Beaumont | 02/02/27 | $2,700,000.00 | Construction | Bridge | Construction | Bridge | 09/01/27 | -211 | -7 months | |||||
| 0092-03-068 | Dallas | 05/05/27 | $710,110.34 | Construction | Roadway | Construction | Roadway | 12/01/27 | -210 | -7 months | |||||
| 0092-04-088 | Dallas | 05/05/27 | $1,281,060.00 | Construction | Roadway | Construction | Roadway | 12/01/27 | -210 | -7 months | |||||
| 0092-05-062 | Dallas | 05/05/27 | $1,725,060.00 | Construction | Roadway | Construction | Roadway | 12/01/27 | -210 | -7 months | |||||
| 1311-01-063 | Dallas | 05/05/27 | $801,923.39 | Construction | Roadway | Construction | Roadway | 12/01/27 | -210 | -7 months | |||||
| 0921-06-398 | Pharr | 11/05/26 | $5,000,000.00 | 05/02/26 | 187 | 6 months | |||||||||
| 0914-33-117 | Austin | 04/01/28 | $2,003,846.15 | Construction | Local Let | Construction | Local Let | 10/01/27 | 183 | 6 months | |||||
| 0604-01-047 | Yoakum | 07/01/27 | $766,000.00 | Construction | Roadway | Construction | Roadway | 01/06/27 | 176 | 6 months | |||||
| 0700-04-056 | Austin | 01/06/27 | $195,983.92 | Construction | Bridge | Construction | Bridge | 07/01/27 | -176 | -6 months | $4,500.17 | 2% | |||
| 0245-19-031 | Tyler | 03/03/27 | $470,000.00 | Construction | Roadway | Construction | Roadway | 08/04/27 | -154 | -5 months | |||||
| 0179-04-112 | Yoakum | 01/06/27 | $335,528.40 | Construction | Roadway | Construction | Roadway | 06/01/27 | -146 | -5 months | $(164,296.20) | -33% | |||
| 2525-01-020 | Yoakum | 01/06/27 | $447,528.40 | Construction | Roadway | Construction | Roadway | 06/01/27 | -146 | -5 months | $(60,035.20) | -12% | |||
| 1175-02-007 | Paris | 09/06/28 | $5,100,000.00 | Construction | Roadway | Construction | Roadway | 05/03/28 | 126 | 4 months | |||||
| 0195-01-111 | Wichita Falls | 04/06/27 | $292,321,693.64 | Construction | Roadway | Construction | Roadway | 12/01/26 | 126 | 4 months | $(68,898,305.36) | -19% | |||
| 0924-06-780 | El Paso | 01/02/30 | $1,699,269.23 | Construction | Local Let | Construction | Local Let | 09/02/29 | 122 | 4 months | |||||
| 1310-03-029 | Fort Worth | 08/04/27 | $1,475,733.75 | Construction | Roadway | Construction | Roadway | 04/06/27 | 120 | 4 months | |||||
| 0909-40-100 | Waco | 05/03/28 | $269,000.00 | Construction | Bridge | Construction | Bridge | 01/05/28 | 119 | 4 months | |||||
| 0909-40-101 | Waco | 05/03/28 | $269,000.00 | Construction | Bridge | Construction | Bridge | 01/05/28 | 119 | 4 months | |||||
| 0909-40-102 | Waco | 05/03/28 | $599,000.00 | Construction | Bridge | Construction | Bridge | 01/05/28 | 119 | 4 months | |||||
| 0909-40-103 | Waco | 05/03/28 | $399,000.00 | Construction | Bridge | Construction | Bridge | 01/05/28 | 119 | 4 months | |||||
| 0131-02-044 | Lubbock | 12/01/27 | $1,622,164.23 | Construction | Roadway | Construction | Roadway | 08/04/27 | 119 | 4 months | |||||
| 0675-06-120 | Bryan | 08/04/27 | $130,017,833.00 | Construction | Roadway | Construction | Roadway | 12/01/27 | -119 | -4 months | |||||
| 0177-11-169 | Houston | 06/28/28 | $40,422,304.70 | Alternative Delivery | Design Build | Alternative Delivery | Design Build | 03/02/28 | 118 | 4 months | |||||
| 0177-11-171 | Houston | 06/28/28 | $29,655,625.00 | Alternative Delivery | Design Build | Alternative Delivery | Design Build | 03/02/28 | 118 | 4 months | |||||
| 0108-11-022 | Paris | 09/06/28 | $15,679,422.00 | Construction | Roadway | Construction | Roadway | 06/01/28 | 97 | 3 months | |||||
| 0079-02-059 | Brownwood | 01/06/27 | $240,000.00 | Non-Let | Local | Non-Let | Local | 11/03/26 | 64 | 2 months | |||||
| 1283-01-012 | El Paso | 05/05/27 | $1,281,294.23 | Construction | Roadway | Construction | Roadway | 03/03/27 | 63 | 2 months | |||||
| 1062-01-218 | Houston | 12/01/26 | $1,271,319.00 | Construction | Roadway | Construction | Roadway | 02/02/27 | -63 | -2 months | |||||
| 1603-01-002 | Fort Worth | 06/01/28 | $105,994,945.79 | Construction | Roadway | Construction | Roadway | 08/02/28 | -62 | -2 months | $10,591,206.48 | 11% | |||
| 0713-01-039 | Bryan | 11/02/27 | $6,370,000.00 | Construction | Bridge | Construction | Bridge | 09/01/27 | 62 | 2 months | |||||
| 0783-01-111 | Lubbock | 09/06/28 | $10,000,000.00 | Construction | Bridge | Construction | Bridge | 11/01/28 | -56 | -2 months | |||||
| 2850-01-020 | Bryan | 12/01/26 | $1,793,072.73 | Construction | Roadway | Construction | Roadway | 10/06/26 | 56 | 2 months | $43,345.19 | 2% | |||
| 6508-60-001 | Dallas | 01/13/27 | $750,000.00 | Maintenance | Bridge Preventive | Maintenance | Bridge Preventive | 02/10/27 | -28 | -28 days | |||||
| 0151-06-148 | Austin | 10/02/28 | $2,127,000.00 | Non-Let | Change Order | Construction | Local Let | 10/01/28 | 1 | 1 day | $(22,165,129.63) | -91% | Construction / Local Let → Non-Let / Change Order |
Project Type & Subtype Changes
The subtype mix remains relatively stable, with roadway projects comprising 78.2% of the total count, down from 79.8%. Bridge projects increased to 14.6%. There were 9 type/subtype transitions noted, indicating ongoing classification adjustments within the active pipeline.
| Subtype | Oct 3 (% of projects) | Nov 3 (% of projects) | Δ projects (pp, n) |
|---|---|---|---|
| Roadway | 79.8% (4,361) | 78.2% (4,402) | -1.7 (+41) |
| Bridge | 13.3% (726) | 14.6% (820) | +1.3 (+94) |
| Local Let | 2.7% (146) | 2.9% (161) | +0.2 (+15) |
| Non Roadway | 1.7% (92) | 1.7% (94) | -0.0 (+2) |
| Rail - Safety | 1.0% (56) | 1.2% (65) | +0.1 (+9) |
| CSJ | District | Est. Letting Date | Project Estimate | Current Type | Current Subtype | Type/Subtype Δ | Prev. Type | Prev. Subtype | Prev. Cost | Prev. Date | Letting Δ (days) | Letting Date Δ | Cost Δ | %Cost Δ | Advertised Δ | Lifecycle |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1533-01-026 | Austin | 12/03/26 | $1,854,787.04 | Non-Let | Roadway | Construction / Local Let → Non-Let / Roadway | Construction | Local Let | $1.00 | 10/02/28 | -669 | -2 years | $1,854,786.04 | 185478604% | ||
| 0648-01-034 | Bryan | 01/06/27 | $13,000,000.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $13,000,000.00 | 09/01/35 | -3160 | -9 years | ||||
| 0337-05-043 | Bryan | 02/02/27 | $3,395,608.82 | Construction | Bridge | Unassigned → Construction / Bridge | Unassigned | Unassigned | $3,395,608.82 | 09/01/30 | -1307 | -4 years | ||||
| 0675-02-106 | Bryan | 02/02/27 | $2,500,000.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $2,500,000.00 | 09/01/30 | -1307 | -4 years | ||||
| 0675-02-107 | Bryan | 02/02/27 | $2,500,000.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $2,500,000.00 | 09/01/30 | -1307 | -4 years | ||||
| 0146-01-052 | Childress | 03/03/27 | $8,000,000.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $8,000,000.00 | 11/01/34 | -2800 | -8 years | ||||
| 0912-72-696 | Houston | 09/15/27 | $500,000.00 | Non-Let | Roadway | Unassigned → Non-Let / Roadway | Unassigned | Unassigned | $26,200,000.00 | 08/15/26 | 396 | 1 year | $(25,700,000.00) | -98% | ||
| 2588-01-027 | Dallas | 12/01/27 | $1,000,000.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $1.00 | 10/01/44 | -6149 | -17 years | $999,999.00 | 99999900% | ||
| 0151-06-148 | Austin | 10/02/28 | $2,127,000.00 | Non-Let | Change Order | Construction / Local Let → Non-Let / Change Order | Construction | Local Let | $24,292,129.63 | 10/01/28 | 1 | 1 day | $(22,165,129.63) | -91% |
Cost Changes
The total active pipeline value decreased from $35.43B to $35.28B, reflecting a decline of $148.01M. Significant cost changes included a net decrease in roadway subtypes totaling -$274.77M, while local let projects increased by $243.68M. District changes saw Houston’s costs drop by $392.73M and Dallas gaining $128.56M, illustrating shifts in budget across the regions.
| CSJ | District | Est. Letting Date | Project Estimate | Current Type | Current Subtype | Prev. Type | Prev. Subtype | Prev. Cost | Cost Δ | %Cost Δ | Letting Δ (days) | Letting Date Δ | Type/Subtype Δ | Advertised Δ | Lifecycle |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1533-01-026 | Austin | 12/03/26 | $1,854,787.04 | Non-Let | Roadway | Construction | Local Let | $1.00 | $1,854,786.04 | 185478604% | -669 | -2 years | Construction / Local Let → Non-Let / Roadway | ||
| 2588-01-027 | Dallas | 12/01/27 | $1,000,000.00 | Construction | Roadway | Unassigned | Unassigned | $1.00 | $999,999.00 | 99999900% | -6149 | -17 years | Unassigned → Construction / Roadway | ||
| 0805-04-037 | Austin | 06/01/32 | $26,500,000.00 | Non-Let | Roadway | $2,108,000.00 | $24,392,000.00 | 1157% | 1825 | 5 years | |||||
| 0045-19-066 | Paris | 01/06/27 | $518,714.02 | Construction | Bridge | Construction | Bridge | $155,000.00 | $363,714.02 | 235% | 0 | ||||
| 0049-09-103 | Bryan | 01/06/27 | $3,054,454.40 | Construction | Bridge | Construction | Bridge | $950,000.00 | $2,104,454.40 | 222% | 0 | ||||
| 0508-01-404 | Houston | 01/06/27 | $304,890.00 | Construction | Bridge | Construction | Bridge | $134,813.00 | $170,077.00 | 126% | 0 | ||||
| 0523-04-021 | Houston | 06/01/28 | $3,852,422.00 | Construction | Bridge | Construction | Bridge | $1,937,328.00 | $1,915,094.00 | 99% | 0 | ||||
| 0912-72-696 | Houston | 09/15/27 | $500,000.00 | Non-Let | Roadway | Unassigned | Unassigned | $26,200,000.00 | $(25,700,000.00) | -98% | 396 | 1 year | Unassigned → Non-Let / Roadway | ||
| 0151-06-148 | Austin | 10/02/28 | $2,127,000.00 | Non-Let | Change Order | Construction | Local Let | $24,292,129.63 | $(22,165,129.63) | -91% | 1 | 1 day | Construction / Local Let → Non-Let / Change Order | ||
| 0008-05-029 | Fort Worth | 06/01/27 | $142,083,912.59 | Construction | Roadway | Construction | Roadway | $75,881,691.65 | $66,202,220.94 | 87% | 0 | ||||
| 0069-10-011 | Abilene | 01/06/27 | $66,290.00 | Construction | Bridge | Construction | Bridge | $512,000.00 | $(445,710.00) | -87% | 0 | ||||
| 0069-10-009 | Abilene | 01/06/27 | $69,020.00 | Construction | Bridge | Construction | Bridge | $394,000.00 | $(324,980.00) | -82% | 0 | ||||
| 0069-10-010 | Abilene | 01/06/27 | $69,020.00 | Construction | Bridge | Construction | Bridge | $390,000.00 | $(320,980.00) | -82% | 0 | ||||
| 0408-01-047 | Yoakum | 04/06/27 | $10,800,000.00 | Construction | Roadway | Construction | Roadway | $6,000,000.00 | $4,800,000.00 | 80% | 0 | ||||
| 0136-04-053 | Paris | 01/06/27 | $1,798,189.39 | Construction | Roadway | Construction | Roadway | $1,000,000.00 | $798,189.39 | 80% | 0 | ||||
| 1392-01-059 | Dallas | 04/06/27 | $530,631.08 | Construction | Roadway | Construction | Roadway | $296,460.37 | $234,170.71 | 79% | 0 | ||||
| 0009-03-052 | Dallas | 04/06/27 | $240,364.32 | Construction | Roadway | Construction | Roadway | $135,000.00 | $105,364.32 | 78% | 0 | ||||
| 0069-10-008 | Abilene | 01/06/27 | $133,360.00 | Construction | Bridge | Construction | Bridge | $565,000.00 | $(431,640.00) | -76% | 0 | ||||
| 0069-10-005 | Abilene | 01/06/27 | $124,090.00 | Construction | Bridge | Construction | Bridge | $515,000.00 | $(390,910.00) | -76% | 0 | ||||
| 0069-10-006 | Abilene | 01/06/27 | $104,265.00 | Construction | Bridge | Construction | Bridge | $397,000.00 | $(292,735.00) | -74% | 0 | ||||
| 0069-01-066 | Abilene | 01/06/27 | $145,510.00 | Construction | Bridge | Construction | Bridge | $554,000.00 | $(408,490.00) | -74% | 0 | ||||
| 0213-01-047 | Bryan | 02/02/27 | $3,821,375.85 | Construction | Roadway | Construction | Roadway | $2,220,000.00 | $1,601,375.85 | 72% | 0 | ||||
| 0069-10-004 | Abilene | 01/06/27 | $54,875.00 | Construction | Bridge | Construction | Bridge | $192,000.00 | $(137,125.00) | -71% | 0 | ||||
| 0007-03-100 | Brownwood | 11/02/27 | $175,000.00 | Construction | Roadway | Construction | Roadway | $590,391.00 | $(415,391.00) | -70% | 0 | ||||
| 0007-03-099 | Brownwood | 11/02/27 | $175,000.00 | Construction | Roadway | Construction | Roadway | $587,822.00 | $(412,822.00) | -70% | 0 | ||||
| 0069-10-007 | Abilene | 01/06/27 | $131,260.00 | Construction | Bridge | Construction | Bridge | $434,000.00 | $(302,740.00) | -70% | 0 | ||||
| 0015-13-452 | Austin | 02/02/27 | $46,204,252.55 | Construction | Roadway | Construction | Roadway | $150,000,000.00 | $(103,795,747.45) | -69% | 0 | ||||
| 1200-02-038 | Austin | 02/02/27 | $641,685.47 | Construction | Roadway | Construction | Roadway | $1,855,212.00 | $(1,213,526.53) | -65% | 0 | ||||
| 0069-01-067 | Abilene | 01/06/27 | $171,635.00 | Construction | Bridge | Construction | Bridge | $490,000.00 | $(318,365.00) | -65% | 0 | ||||
| 3476-02-016 | Dallas | 04/06/27 | $81,867.35 | Construction | Roadway | Construction | Roadway | $49,920.85 | $31,946.50 | 64% | 0 | ||||
| 1196-02-015 | Corpus Christi | 09/06/28 | $871,108.50 | Construction | Bridge | Construction | Bridge | $535,000.00 | $336,108.50 | 63% | 0 | ||||
| 2391-01-011 | Brownwood | 12/01/27 | $5,650,000.00 | Construction | Roadway | Construction | Roadway | $3,500,000.00 | $2,150,000.00 | 61% | 0 | ||||
| 0111-08-131 | Houston | 01/06/27 | $298,772.00 | Construction | Bridge | Construction | Bridge | $773,964.00 | $(475,192.00) | -61% | 0 | ||||
| 0095-07-062 | Tyler | 12/01/26 | $4,829,980.10 | Construction | Roadway | Construction | Roadway | $3,000,967.32 | $1,829,012.78 | 61% | 0 | ||||
| 0523-09-024 | Houston | 12/01/26 | $422,141.50 | Construction | Roadway | Construction | Roadway | $1,080,808.00 | $(658,666.50) | -61% | 0 | ||||
| 0111-08-130 | Houston | 01/06/27 | $349,013.00 | Construction | Bridge | Construction | Bridge | $869,426.00 | $(520,413.00) | -60% | 0 | ||||
| 0675-04-093 | Bryan | 05/05/27 | $3,100,000.00 | Construction | Roadway | Construction | Roadway | $7,100,000.00 | $(4,000,000.00) | -56% | 0 | ||||
| 0675-05-111 | Bryan | 05/05/27 | $3,100,000.00 | Construction | Roadway | Construction | Roadway | $7,100,000.00 | $(4,000,000.00) | -56% | 0 | ||||
| 0675-06-119 | Bryan | 05/05/27 | $3,100,000.00 | Construction | Roadway | Construction | Roadway | $7,100,000.00 | $(4,000,000.00) | -56% | 0 | ||||
| 0675-07-112 | Bryan | 05/05/27 | $3,100,000.00 | Construction | Roadway | Construction | Roadway | $7,100,000.00 | $(4,000,000.00) | -56% | 0 | ||||
| 0649-02-038 | Fort Worth | 02/01/29 | $279,930.20 | Construction | Roadway | Construction | Roadway | $639,960.00 | $(360,029.80) | -56% | 0 | ||||
| 0068-12-014 | Lubbock | 01/05/27 | $997,753.70 | Non-Let | Roadway | Non-Let | Roadway | $640,000.00 | $357,753.70 | 56% | 0 | ||||
| 0421-08-038 | San Antonio | 02/02/27 | $2,339,534.52 | Construction | Roadway | Construction | Roadway | $5,276,879.00 | $(2,937,344.48) | -56% | 0 | ||||
| 0675-01-081 | Bryan | 05/05/27 | $3,200,000.00 | Construction | Roadway | Construction | Roadway | $7,100,000.00 | $(3,900,000.00) | -55% | 0 | ||||
| 0675-02-100 | Bryan | 05/05/27 | $3,200,000.00 | Construction | Roadway | Construction | Roadway | $7,100,000.00 | $(3,900,000.00) | -55% | 0 | ||||
| 0675-03-112 | Bryan | 05/05/27 | $3,200,000.00 | Construction | Roadway | Construction | Roadway | $7,100,000.00 | $(3,900,000.00) | -55% | 0 | ||||
| 0136-06-057 | Paris | 01/06/27 | $2,138,968.38 | Construction | Roadway | Construction | Roadway | $4,500,000.00 | $(2,361,031.62) | -52% | 0 | ||||
| 0009-04-079 | Dallas | 04/06/27 | $120,908.66 | Construction | Roadway | Construction | Roadway | $244,678.45 | $(123,769.79) | -51% | 0 | ||||
| 0069-10-003 | Abilene | 01/06/27 | $286,770.00 | Construction | Bridge | Construction | Bridge | $192,000.00 | $94,770.00 | 49% | 0 | ||||
| 0445-01-072 | Yoakum | 01/06/27 | $10,738,395.60 | Construction | Roadway | Construction | Roadway | $7,200,000.00 | $3,538,395.60 | 49% | 0 | ||||
| 1685-03-112 | Houston | 01/06/27 | $798,505.26 | Construction | Roadway | Construction | Roadway | $1,514,716.00 | $(716,210.74) | -47% | 0 | ||||
| 0054-05-029 | Brownwood | 01/06/27 | $410,244.70 | Construction | Roadway | Construction | Roadway | $280,000.00 | $130,244.70 | 47% | 0 | ||||
| 0057-03-051 | Bryan | 01/06/27 | $2,180,411.95 | Construction | Bridge | Construction | Bridge | $1,500,000.00 | $680,411.95 | 45% | 0 | ||||
| 0213-01-050 | Bryan | 02/02/27 | $2,934,767.90 | Construction | Roadway | Construction | Roadway | $2,050,000.00 | $884,767.90 | 43% | 0 | ||||
| 1685-02-058 | Houston | 01/06/27 | $2,628,329.55 | Construction | Roadway | Construction | Roadway | $4,544,147.00 | $(1,915,817.45) | -42% | 0 | ||||
| 0095-03-113 | Dallas | 08/04/27 | $348,029.94 | Construction | Roadway | Construction | Roadway | $587,307.72 | $(239,277.78) | -41% | 0 | ||||
| 0313-01-066 | Fort Worth | 07/06/28 | $1,708,900.34 | Construction | Roadway | Construction | Roadway | $2,839,685.00 | $(1,130,784.66) | -40% | 0 | ||||
| 0508-01-411 | Houston | 12/01/27 | $1,006,372.00 | Construction | Roadway | Construction | Roadway | $1,640,136.00 | $(633,764.00) | -39% | 0 | ||||
| 0508-01-402 | Houston | 01/06/27 | $211,225.00 | Construction | Bridge | Construction | Bridge | $336,921.00 | $(125,696.00) | -37% | 0 | ||||
| 0180-05-072 | Corpus Christi | 02/02/27 | $1,588,587.30 | Construction | Roadway | Construction | Roadway | $1,161,691.00 | $426,896.30 | 37% | 0 | ||||
| 0495-03-070 | Tyler | 01/06/27 | $7,353,202.12 | Construction | Roadway | Construction | Roadway | $11,500,000.00 | $(4,146,797.88) | -36% | 0 | ||||
| 0095-04-082 | Dallas | 08/04/27 | $335,373.89 | Construction | Roadway | Construction | Roadway | $515,307.72 | $(179,933.83) | -35% | 0 | ||||
| 0179-04-112 | Yoakum | 01/06/27 | $335,528.40 | Construction | Roadway | Construction | Roadway | $499,824.60 | $(164,296.20) | -33% | -146 | -5 months | |||
| 1200-02-037 | Austin | 02/02/27 | $1,510,169.54 | Construction | Roadway | Construction | Roadway | $2,221,995.59 | $(711,826.05) | -32% | 0 | ||||
| 0598-04-030 | Houston | 02/02/27 | $2,075,404.75 | Construction | Roadway | Construction | Roadway | $1,588,196.61 | $487,208.14 | 31% | 0 | ||||
| 0445-02-074 | Yoakum | 01/06/27 | $554,888.59 | Construction | Roadway | Construction | Roadway | $800,000.00 | $(245,111.41) | -31% | 0 | ||||
| 0364-03-107 | Dallas | 05/05/27 | $1,551,022.00 | Construction | Roadway | Construction | Roadway | $2,220,000.00 | $(668,978.00) | -30% | 0 | ||||
| 0045-21-024 | Paris | 01/06/27 | $2,093,174.26 | Construction | Bridge | Construction | Bridge | $2,989,000.00 | $(895,825.74) | -30% | 0 | ||||
| 0007-02-059 | Abilene | 06/01/28 | $12,204,473.00 | Construction | Bridge | Construction | Bridge | $9,414,000.00 | $2,790,473.00 | 30% | 0 | ||||
| 0007-02-060 | Abilene | 06/01/28 | $12,204,473.00 | Construction | Bridge | Construction | Bridge | $9,414,000.00 | $2,790,473.00 | 30% | 0 | ||||
| 0027-03-078 | Yoakum | 01/06/27 | $1,067,115.54 | Construction | Roadway | Construction | Roadway | $1,500,000.00 | $(432,884.46) | -29% | 0 | ||||
| 0380-05-026 | Lubbock | 01/06/27 | $71,873.75 | Construction | Roadway | Construction | Roadway | $100,992.56 | $(29,118.81) | -29% | 0 | ||||
| 0294-03-032 | Lubbock | 01/06/27 | $202,928.75 | Construction | Roadway | Construction | Roadway | $278,187.34 | $(75,258.59) | -27% | 0 | ||||
| 0172-09-047 | Fort Worth | 01/06/27 | $2,944,255.85 | Construction | Roadway | Construction | Roadway | $4,029,170.17 | $(1,084,914.32) | -27% | 0 | ||||
| 0271-06-117 | Houston | 10/04/28 | $30,918,280.00 | Construction | Roadway | Construction | Roadway | $42,074,599.07 | $(11,156,319.07) | -27% | 0 | ||||
| 2552-03-071 | El Paso | 04/06/27 | $5,800,000.00 | Construction | Roadway | Construction | Roadway | $4,593,695.00 | $1,206,305.00 | 26% | 0 | ||||
| 0013-08-147 | Fort Worth | 06/01/27 | $60,802,449.33 | Construction | Roadway | Construction | Roadway | $48,242,652.79 | $12,559,796.54 | 26% | 0 | ||||
| 0912-34-204 | Houston | 02/02/27 | $916,192.68 | Construction | Bridge | Construction | Bridge | $1,218,979.00 | $(302,786.32) | -25% | 0 | ||||
| 1161-02-012 | Tyler | 12/01/26 | $167,398.68 | Construction | Roadway | Construction | Roadway | $222,631.80 | $(55,233.12) | -25% | 0 | ||||
| 0912-34-208 | Houston | 02/02/27 | $1,064,767.28 | Construction | Bridge | Construction | Bridge | $1,410,809.00 | $(346,041.72) | -25% | 0 | ||||
| 0014-15-090 | Fort Worth | 06/01/27 | $49,848,949.25 | Construction | Roadway | Construction | Roadway | $65,863,983.97 | $(16,015,034.72) | -24% | 0 | ||||
| 0574-01-035 | Dallas | 03/03/27 | $5,470,818.35 | Construction | Roadway | Construction | Roadway | $4,402,357.07 | $1,068,461.28 | 24% | 0 | ||||
| 0095-14-040 | Dallas | 08/04/27 | $391,795.31 | Construction | Roadway | Construction | Roadway | $515,307.72 | $(123,512.41) | -24% | 0 | ||||
| 0182-02-041 | Brownwood | 05/03/28 | $16,000,000.00 | Construction | Roadway | Construction | Roadway | $13,000,000.00 | $3,000,000.00 | 23% | 0 | ||||
| 0027-13-259 | Houston | 10/05/27 | $92,606,227.00 | Construction | Bridge | Construction | Bridge | $75,769,230.77 | $16,836,996.23 | 22% | 0 | ||||
| 0227-06-033 | Lubbock | 01/06/27 | $99,961.25 | Construction | Roadway | Construction | Roadway | $128,386.85 | $(28,425.60) | -22% | 0 | ||||
| 1200-03-069 | Austin | 02/02/27 | $1,898,274.10 | Construction | Roadway | Construction | Roadway | $1,560,814.00 | $337,460.10 | 22% | 0 | ||||
| 2170-05-018 | Laredo | 02/02/28 | $10,000,000.00 | Construction | Roadway | Construction | Roadway | $8,269,230.77 | $1,730,769.23 | 21% | 0 | ||||
| 0918-47-497 | Dallas | 03/03/27 | $666,264.59 | Construction | Roadway | Construction | Roadway | $840,687.38 | $(174,422.79) | -21% | 0 | ||||
| 0912-34-214 | Houston | 02/02/27 | $1,097,754.81 | Construction | Bridge | Construction | Bridge | $1,380,910.00 | $(283,155.19) | -21% | 0 | ||||
| 0014-01-032 | Fort Worth | 01/06/27 | $606,394.80 | Construction | Roadway | Construction | Roadway | $758,860.80 | $(152,466.00) | -20% | 0 | ||||
| 0045-20-030 | Paris | 01/06/27 | $496,804.63 | Construction | Bridge | Construction | Bridge | $619,000.00 | $(122,195.37) | -20% | 0 | ||||
| 0657-01-021 | Tyler | 12/01/26 | $403,525.10 | Construction | Roadway | Construction | Roadway | $500,752.60 | $(97,227.50) | -19% | 0 | ||||
| 0285-03-064 | Austin | 02/02/27 | $3,730,505.21 | Construction | Roadway | Construction | Roadway | $3,129,226.05 | $601,279.16 | 19% | 0 | ||||
| 0195-01-111 | Wichita Falls | 04/06/27 | $292,321,693.64 | Construction | Roadway | Construction | Roadway | $361,219,999.00 | $(68,898,305.36) | -19% | 126 | 4 months | |||
| 1161-02-013 | Tyler | 12/01/26 | $334,741.70 | Construction | Roadway | Construction | Roadway | $413,384.10 | $(78,642.40) | -19% | 0 | ||||
| 2374-05-098 | Fort Worth | 08/04/27 | $329,755.73 | Construction | Roadway | Construction | Roadway | $406,000.00 | $(76,244.27) | -19% | 0 | ||||
| 0028-01-116 | Houston | 03/03/27 | $3,689,628.00 | Construction | Roadway | Construction | Roadway | $4,520,787.96 | $(831,159.96) | -18% | 0 | ||||
| 0745-02-015 | Tyler | 12/01/26 | $177,301.97 | Construction | Roadway | Construction | Roadway | $216,804.00 | $(39,502.03) | -18% | 0 | ||||
| 1051-03-001 | Dallas | 12/01/26 | $55,908,780.62 | Construction | Roadway | Construction | Roadway | $47,551,933.78 | $8,356,846.84 | 18% | 0 | ||||
| 0172-09-044 | Fort Worth | 08/02/28 | $3,033,699.60 | Construction | Roadway | Construction | Roadway | $2,582,000.00 | $451,699.60 | 17% | 0 | ||||
| 0118-05-025 | Tyler | 12/01/26 | $376,721.78 | Construction | Roadway | Construction | Roadway | $455,474.60 | $(78,752.82) | -17% | 0 | ||||
| 0718-01-077 | Dallas | 01/06/27 | $504,589.75 | Construction | Roadway | Construction | Roadway | $605,770.20 | $(101,180.45) | -17% | 0 | ||||
| 0172-09-045 | Fort Worth | 02/02/27 | $3,612,156.95 | Construction | Non Roadway | Construction | Non Roadway | $4,306,849.55 | $(694,692.60) | -16% | 0 | ||||
| 2833-01-016 | Tyler | 12/01/26 | $251,643.77 | Construction | Roadway | Construction | Roadway | $299,022.90 | $(47,379.13) | -16% | 0 | ||||
| 2079-01-053 | Fort Worth | 03/07/28 | $4,831,240.90 | Construction | Roadway | Construction | Roadway | $4,178,054.25 | $653,186.65 | 16% | 0 | ||||
| 0013-08-149 | Fort Worth | 03/03/27 | $13,441,810.00 | Construction | Roadway | Construction | Roadway | $15,880,993.12 | $(2,439,183.12) | -15% | 0 | ||||
| 0500-04-145 | Houston | 12/01/26 | $2,277,482.58 | Construction | Roadway | Construction | Roadway | $2,680,825.00 | $(403,342.42) | -15% | 0 | ||||
| 1092-01-033 | Dallas | 05/05/27 | $755,482.00 | Construction | Roadway | Construction | Roadway | $657,018.13 | $98,463.87 | 15% | 0 | ||||
| 0215-09-029 | San Antonio | 04/06/27 | $27,700,000.00 | Construction | Roadway | Construction | Roadway | $24,097,000.00 | $3,603,000.00 | 15% | 0 | ||||
| 0336-03-082 | Lufkin | 01/06/27 | $3,111,129.95 | Construction | Roadway | Construction | Roadway | $2,716,548.07 | $394,581.88 | 15% | 0 | ||||
| 0636-01-042 | Brownwood | 01/06/27 | $595,212.95 | Construction | Roadway | Construction | Roadway | $520,000.00 | $75,212.95 | 14% | 0 | ||||
| 0443-03-024 | Tyler | 12/01/26 | $603,396.91 | Construction | Roadway | Construction | Roadway | $700,461.00 | $(97,064.09) | -14% | 0 | ||||
| 0581-01-175 | Dallas | 05/05/27 | $574,444.09 | Construction | Roadway | Construction | Roadway | $505,800.00 | $68,644.09 | 14% | 0 | ||||
| 0545-03-015 | Tyler | 12/01/26 | $481,374.56 | Construction | Roadway | Construction | Roadway | $556,476.00 | $(75,101.44) | -14% | 0 | ||||
| 0500-03-599 | Houston | 09/01/29 | $558,870,000.00 | Construction | Roadway | Construction | Roadway | $645,315,516.00 | $(86,445,516.00) | -13% | 0 | ||||
| 0500-03-616 | Houston | 09/01/29 | $558,870,000.00 | $645,315,516.00 | $(86,445,516.00) | -13% | 0 | ||||||||
| 0657-03-018 | Tyler | 12/01/26 | $58,050.49 | Construction | Roadway | Construction | Roadway | $66,936.70 | $(8,886.21) | -13% | 0 | ||||
| 1119-01-014 | Corpus Christi | 02/01/29 | $1,736,006.60 | Construction | Bridge | Construction | Bridge | $2,000,000.00 | $(263,993.40) | -13% | 0 | ||||
| 0380-11-031 | Odessa | 02/02/27 | $35,690,449.35 | Construction | Roadway | Construction | Roadway | $41,000,000.00 | $(5,309,550.65) | -13% | 0 | ||||
| 0401-03-029 | Tyler | 12/01/26 | $783,802.87 | Construction | Roadway | Construction | Roadway | $899,501.20 | $(115,698.33) | -13% | 0 | ||||
| 1116-01-024 | Tyler | 12/01/26 | $360,452.69 | Construction | Roadway | Construction | Roadway | $409,691.60 | $(49,238.91) | -12% | 0 | ||||
| 0008-03-140 | Fort Worth | 08/01/29 | $4,406,128.12 | Construction | Roadway | Construction | Roadway | $4,997,966.95 | $(591,838.83) | -12% | 0 | ||||
| 2525-01-020 | Yoakum | 01/06/27 | $447,528.40 | Construction | Roadway | Construction | Roadway | $507,563.60 | $(60,035.20) | -12% | -146 | -5 months | |||
| 1151-01-016 | Tyler | 12/01/26 | $412,785.32 | Construction | Roadway | Construction | Roadway | $467,329.70 | $(54,544.38) | -12% | 0 | ||||
| 3416-01-012 | Houston | 08/04/27 | $63,573,989.50 | Construction | Roadway | Construction | Roadway | $71,912,652.00 | $(8,338,662.50) | -12% | 0 | ||||
| 0430-01-069 | Dallas | 05/05/27 | $472,736.22 | Construction | Roadway | Construction | Roadway | $534,600.00 | $(61,863.78) | -12% | 0 | ||||
| 0111-03-064 | Houston | 08/04/27 | $91,039,029.00 | Construction | Roadway | Construction | Roadway | $102,910,751.00 | $(11,871,722.00) | -12% | 0 | ||||
| 0314-01-093 | Fort Worth | 02/02/27 | $2,034,999.10 | Construction | Roadway | Construction | Roadway | $1,825,526.94 | $209,472.16 | 11% | -365 | -1 year | |||
| 1530-01-012 | Abilene | 01/06/27 | $5,191,835.70 | Construction | Roadway | Construction | Roadway | $5,856,611.70 | $(664,776.00) | -11% | -426 | -1 year | |||
| 1603-01-002 | Fort Worth | 06/01/28 | $105,994,945.79 | Construction | Roadway | Construction | Roadway | $95,403,739.31 | $10,591,206.48 | 11% | -62 | -2 months | |||
| 0508-01-403 | Houston | 01/06/27 | $271,140.00 | Construction | Bridge | Construction | Bridge | $304,528.00 | $(33,388.00) | -11% | 0 | ||||
| 0054-06-109 | Brownwood | 01/06/27 | $1,825,433.80 | Construction | Roadway | Construction | Roadway | $2,050,000.00 | $(224,566.20) | -11% | 0 | ||||
| 0266-08-018 | Yoakum | 01/06/27 | $574,615.40 | Construction | Non Roadway | Construction | Non Roadway | $642,903.60 | $(68,288.20) | -11% | 0 | ||||
| 0322-01-053 | Austin | 01/06/27 | $5,313,235.70 | Construction | Roadway | Construction | Roadway | $5,940,995.20 | $(627,759.50) | -11% | 0 | ||||
| 2426-01-014 | Tyler | 12/01/26 | $366,422.51 | Construction | Roadway | Construction | Roadway | $409,261.90 | $(42,839.39) | -10% | 0 | ||||
| 1394-02-032 | Dallas | 07/01/27 | $1,443,416.21 | Construction | Roadway | Construction | Roadway | $1,311,067.68 | $132,348.53 | 10% | 0 | ||||
| 0912-37-255 | Houston | 06/01/28 | $1,050,303.00 | Construction | Bridge | Construction | Bridge | $955,348.00 | $94,955.00 | 10% | 0 | ||||
| 1057-03-060 | Pharr | 01/06/27 | $5,174,096.72 | Construction | Roadway | Construction | Roadway | $5,728,555.78 | $(554,459.06) | -10% | 0 | ||||
| 1159-01-030 | Dallas | 07/06/28 | $4,418,418.56 | Construction | Bridge | Construction | Bridge | $4,874,070.50 | $(455,651.94) | -9% | 0 | ||||
| 0657-04-014 | Tyler | 12/01/26 | $380,027.42 | Construction | Roadway | Construction | Roadway | $418,464.15 | $(38,436.73) | -9% | 0 | ||||
| 0128-04-045 | Brownwood | 01/06/27 | $3,275,000.00 | Construction | Roadway | Construction | Roadway | $3,000,000.00 | $275,000.00 | 9% | 0 | ||||
| 2079-01-045 | Fort Worth | 05/05/27 | $771,075.34 | Construction | Roadway | Construction | Roadway | $706,730.63 | $64,344.71 | 9% | 0 | ||||
| 1663-03-021 | Dallas | 02/02/27 | $3,912,157.25 | Construction | Bridge | Construction | Bridge | $3,587,489.26 | $324,667.99 | 9% | -1123 | -3 years | |||
| 2377-01-051 | Brownwood | 01/06/27 | $2,094,838.60 | Construction | Roadway | Construction | Roadway | $2,300,000.00 | $(205,161.40) | -9% | 0 | ||||
| 0015-13-437 | Austin | 02/02/27 | $312,947,507.19 | Construction | Roadway | Construction | Roadway | $343,500,000.00 | $(30,552,492.81) | -9% | 0 | ||||
| 0451-01-053 | Dallas | 06/01/27 | $144,355,759.00 | Construction | Roadway | Construction | Roadway | $132,666,019.08 | $11,689,739.92 | 9% | 0 | ||||
| 0265-03-042 | Austin | 01/06/27 | $56,244,903.63 | Construction | Roadway | Construction | Roadway | $61,647,005.38 | $(5,402,101.75) | -9% | 0 | ||||
| 1398-01-014 | Tyler | 12/01/26 | $257,322.68 | Construction | Roadway | Construction | Roadway | $278,757.51 | $(21,434.83) | -8% | 0 | ||||
| 0522-03-028 | Tyler | 12/01/26 | $256,214.90 | Construction | Roadway | Construction | Roadway | $276,895.30 | $(20,680.40) | -7% | 0 | ||||
| 0080-03-063 | Fort Worth | 03/03/27 | $6,781,638.29 | Construction | Roadway | Construction | Roadway | $7,312,608.09 | $(530,969.80) | -7% | 0 | ||||
| 2408-01-012 | Tyler | 12/01/26 | $310,671.87 | Construction | Roadway | Construction | Roadway | $334,633.00 | $(23,961.13) | -7% | 0 | ||||
| 0266-03-033 | Yoakum | 01/06/27 | $165,177.40 | Construction | Non Roadway | Construction | Non Roadway | $177,482.60 | $(12,305.20) | -7% | 0 | ||||
| 0592-02-017 | Tyler | 12/01/26 | $213,956.17 | Construction | Roadway | Construction | Roadway | $229,765.90 | $(15,809.73) | -7% | 0 | ||||
| 0245-19-030 | Tyler | 12/01/26 | $538,525.66 | Construction | Roadway | Construction | Roadway | $504,239.64 | $34,286.02 | 7% | 0 | ||||
| 0136-05-049 | Paris | 01/06/27 | $9,066,933.54 | Construction | Roadway | Construction | Roadway | $8,500,000.00 | $566,933.54 | 7% | 0 | ||||
| 0745-01-025 | Tyler | 12/01/26 | $167,049.61 | Construction | Roadway | Construction | Roadway | $178,711.40 | $(11,661.79) | -7% | 0 | ||||
| 0927-01-036 | Tyler | 12/01/26 | $177,120.67 | Construction | Roadway | Construction | Roadway | $189,051.90 | $(11,931.23) | -6% | 0 | ||||
| 0581-02-163 | Dallas | 05/05/27 | $591,228.99 | Construction | Roadway | Construction | Roadway | $628,320.00 | $(37,091.01) | -6% | 0 | ||||
| 1728-02-069 | San Antonio | 12/01/26 | $3,545,757.56 | Construction | Roadway | Construction | Roadway | $3,761,232.63 | $(215,475.07) | -6% | 0 | ||||
| 0092-03-053 | Dallas | 12/01/26 | $60,363,826.10 | Construction | Roadway | Construction | Roadway | $57,217,915.20 | $3,145,910.90 | 6% | 0 | ||||
| 3049-01-038 | Houston | 11/01/29 | $32,047,030.00 | Construction | Roadway | Construction | Roadway | $33,838,904.00 | $(1,791,874.00) | -5% | 0 | ||||
| 2398-01-063 | Abilene | 03/03/27 | $8,789,358.00 | Construction | Bridge | Construction | Bridge | $9,281,535.00 | $(492,177.00) | -5% | 0 | ||||
| 0918-47-460 | Dallas | 12/01/26 | $4,930,493.30 | Construction | Bridge | Construction | Bridge | $4,682,950.30 | $247,543.00 | 5% | 0 | ||||
| 0179-02-092 | Houston | 01/06/27 | $1,178,014.20 | Construction | Bridge | Construction | Bridge | $1,243,585.53 | $(65,571.33) | -5% | 0 | ||||
| 0089-15-019 | Yoakum | 01/06/27 | $1,298,039.00 | Construction | Non Roadway | Construction | Non Roadway | $1,368,323.50 | $(70,284.50) | -5% | 0 | ||||
| 0179-02-091 | Houston | 01/06/27 | $1,294,562.50 | Construction | Bridge | Construction | Bridge | $1,364,724.13 | $(70,161.63) | -5% | 0 | ||||
| 0892-01-022 | Tyler | 12/01/26 | $312,098.40 | Construction | Roadway | Construction | Roadway | $328,456.90 | $(16,358.50) | -5% | 0 | ||||
| 0598-03-062 | Houston | 02/02/27 | $8,779,395.50 | Construction | Roadway | Construction | Roadway | $9,235,801.26 | $(456,405.76) | -5% | 0 | ||||
| 0627-04-070 | Beaumont | 12/01/26 | $3,184,850.70 | Construction | Roadway | Construction | Roadway | $3,350,490.70 | $(165,640.00) | -5% | 0 | ||||
| 0912-37-256 | Houston | 06/01/28 | $734,269.00 | Construction | Bridge | Construction | Bridge | $699,748.00 | $34,521.00 | 5% | 0 | ||||
| 0601-01-069 | Beaumont | 12/01/26 | $507,907.80 | Construction | Bridge | Construction | Bridge | $532,907.80 | $(25,000.00) | -5% | 0 | ||||
| 1116-02-002 | Tyler | 12/01/26 | $16,806.56 | Construction | Roadway | Construction | Roadway | $17,620.80 | $(814.24) | -5% | 0 | ||||
| 0508-01-401 | Houston | 01/06/27 | $1,183,075.00 | Construction | Bridge | Construction | Bridge | $1,239,553.00 | $(56,478.00) | -5% | 0 | ||||
| 0271-05-025 | Houston | 10/04/28 | $280,459,470.00 | Construction | Roadway | Construction | Roadway | $292,939,920.00 | $(12,480,450.00) | -4% | 0 | ||||
| 2654-01-024 | Tyler | 12/01/26 | $518,054.13 | Construction | Roadway | Construction | Roadway | $540,567.10 | $(22,512.97) | -4% | 0 | ||||
| 0446-03-053 | Yoakum | 02/02/27 | $468,000.00 | Construction | Roadway | Construction | Roadway | $450,000.00 | $18,000.00 | 4% | 0 | ||||
| 0008-06-052 | Fort Worth | 06/01/27 | $16,346,500.55 | Construction | Roadway | Construction | Roadway | $17,006,133.02 | $(659,632.47) | -4% | 0 | ||||
| 0244-05-043 | Beaumont | 12/01/26 | $495,972.20 | Construction | Bridge | Construction | Bridge | $515,972.20 | $(20,000.00) | -4% | 0 | ||||
| 0264-06-044 | San Angelo | 11/02/27 | $32,757,248.59 | Construction | Roadway | Construction | Roadway | $34,067,539.00 | $(1,310,290.41) | -4% | 0 | ||||
| 1310-01-050 | Dallas | 03/03/27 | $32,453,172.85 | Construction | Roadway | Construction | Roadway | $33,719,704.90 | $(1,266,532.05) | -4% | 0 | ||||
| 0024-08-152 | San Antonio | 01/06/27 | $14,023,511.83 | Construction | Roadway | Construction | Roadway | $13,522,041.29 | $501,470.54 | 4% | -238 | -8 months | |||
| 0195-02-091 | Dallas | 08/04/27 | $157,852,515.00 | Construction | Roadway | Construction | Roadway | $163,851,323.75 | $(5,998,808.75) | -4% | 0 | ||||
| 0314-07-092 | Fort Worth | 02/02/27 | $12,206,133.03 | Construction | Roadway | Construction | Roadway | $11,786,387.59 | $419,745.44 | 4% | -365 | -1 year | |||
| 0058-04-023 | Tyler | 12/01/26 | $422,347.82 | Construction | Roadway | Construction | Roadway | $408,175.80 | $14,172.02 | 3% | 0 | ||||
| 0422-05-011 | Fort Worth | 07/01/27 | $12,280,271.33 | Construction | Bridge | Construction | Bridge | $12,707,217.99 | $(426,946.66) | -3% | 0 | ||||
| 0912-34-203 | Houston | 02/02/27 | $1,538,252.39 | Construction | Bridge | Construction | Bridge | $1,490,191.00 | $48,061.39 | 3% | 0 | ||||
| 0594-01-017 | Tyler | 12/01/26 | $440,014.28 | Construction | Roadway | Construction | Roadway | $426,304.00 | $13,710.28 | 3% | 0 | ||||
| 0016-05-133 | San Antonio | 01/06/27 | $16,478,233.90 | Construction | Roadway | Construction | Roadway | $15,966,150.80 | $512,083.10 | 3% | 0 | ||||
| 0118-04-037 | Tyler | 12/01/26 | $392,721.31 | Construction | Roadway | Construction | Roadway | $380,728.00 | $11,993.31 | 3% | 0 | ||||
| 2635-03-028 | Amarillo | 05/05/27 | $162,800,000.00 | Construction | Bridge | Construction | Bridge | $157,862,866.00 | $4,937,134.00 | 3% | 0 | ||||
| 0008-09-041 | Fort Worth | 12/01/26 | $1,557,656.44 | Construction | Roadway | Construction | Roadway | $1,511,025.63 | $46,630.81 | 3% | 0 | ||||
| 0035-01-036 | San Angelo | 12/01/26 | $16,110,577.01 | Construction | Roadway | Construction | Roadway | $16,617,193.03 | $(506,616.02) | -3% | 0 | ||||
| 0178-09-019 | Houston | 05/05/27 | $48,420,128.08 | Construction | Roadway | Construction | Roadway | $49,936,882.00 | $(1,516,753.92) | -3% | 0 | ||||
| 2635-02-034 | Amarillo | 05/05/27 | $29,050,000.00 | Construction | Roadway | Construction | Roadway | $28,208,659.00 | $841,341.00 | 3% | 0 | ||||
| 1513-01-021 | Fort Worth | 12/01/26 | $1,251,232.58 | Construction | Roadway | Construction | Roadway | $1,215,601.96 | $35,630.62 | 3% | 0 | ||||
| 0080-08-028 | Fort Worth | 12/01/26 | $513,373.85 | Construction | Roadway | Construction | Roadway | $498,871.10 | $14,502.75 | 3% | 0 | ||||
| 1853-01-049 | Fort Worth | 12/01/26 | $983,371.44 | Construction | Roadway | Construction | Roadway | $955,925.49 | $27,445.95 | 3% | 0 | ||||
| 2635-03-023 | Amarillo | 05/05/27 | $27,350,000.00 | Construction | Roadway | Construction | Roadway | $26,630,790.57 | $719,209.43 | 3% | 0 | ||||
| 0195-02-092 | Dallas | 11/03/26 | $144,352,231.03 | Construction | Roadway | Construction | Roadway | $140,602,243.13 | $3,749,987.90 | 3% | 0 | ||||
| 0927-01-035 | Tyler | 12/01/26 | $228,984.57 | Construction | Roadway | Construction | Roadway | $223,221.60 | $5,762.97 | 3% | 0 | ||||
| 2850-01-020 | Bryan | 12/01/26 | $1,793,072.73 | Construction | Roadway | Construction | Roadway | $1,749,727.54 | $43,345.19 | 2% | 56 | 2 months | |||
| 1666-02-009 | Tyler | 12/01/26 | $420,380.77 | Construction | Roadway | Construction | Roadway | $430,887.50 | $(10,506.73) | -2% | 0 | ||||
| 0353-01-031 | Fort Worth | 11/03/26 | $620,362.93 | Construction | Roadway | Construction | Roadway | $605,622.93 | $14,740.00 | 2% | 0 | ||||
| 0978-02-092 | Houston | 11/01/29 | $16,948,277.00 | Construction | Roadway | Construction | Roadway | $17,357,933.00 | $(409,656.00) | -2% | 0 | ||||
| 0700-04-056 | Austin | 01/06/27 | $195,983.92 | Construction | Bridge | Construction | Bridge | $191,483.75 | $4,500.17 | 2% | -176 | -6 months | |||
| 0892-03-003 | Tyler | 12/01/26 | $207,530.63 | Construction | Roadway | Construction | Roadway | $212,515.40 | $(4,984.77) | -2% | 0 | ||||
| 0168-09-186 | Amarillo | 05/05/27 | $18,400,000.00 | Construction | Roadway | Construction | Roadway | $17,993,307.00 | $406,693.00 | 2% | 0 | ||||
| 0199-05-014 | Tyler | 12/01/26 | $120,502.61 | Construction | Roadway | Construction | Roadway | $117,892.30 | $2,610.31 | 2% | 0 | ||||
| 0581-02-165 | Dallas | 08/04/27 | $9,350,883.36 | Construction | Roadway | Construction | Roadway | $9,558,816.73 | $(207,933.37) | -2% | 0 | ||||
| 0889-02-017 | Tyler | 12/01/26 | $225,214.50 | Construction | Roadway | Construction | Roadway | $230,064.40 | $(4,849.90) | -2% | 0 | ||||
| 0073-13-014 | San Antonio | 09/01/29 | $3,204,149.62 | Construction | Bridge | Construction | Bridge | $3,270,556.15 | $(66,406.53) | -2% | 0 | ||||
| 1062-02-030 | Houston | 01/06/27 | $724,764.17 | Construction | Roadway | Construction | Roadway | $710,353.56 | $14,410.61 | 2% | 0 | ||||
| 0015-13-441 | Austin | 11/03/26 | $95,422,671.19 | Construction | Roadway | Construction | Roadway | $93,533,783.41 | $1,888,887.78 | 2% | 0 | ||||
| 1469-01-025 | Fort Worth | 12/01/26 | $1,836,395.18 | Construction | Roadway | Construction | Roadway | $1,800,299.18 | $36,096.00 | 2% | 0 | ||||
| 0918-47-461 | Dallas | 12/01/26 | $3,677,415.40 | Construction | Bridge | Construction | Bridge | $3,609,515.40 | $67,900.00 | 2% | 0 | ||||
| 0165-02-069 | Tyler | 12/01/26 | $647,776.97 | Construction | Roadway | Construction | Roadway | $660,055.70 | $(12,278.73) | -2% | 0 | ||||
| 0096-06-076 | Tyler | 12/01/26 | $369,021.59 | Construction | Roadway | Construction | Roadway | $375,934.10 | $(6,912.51) | -2% | 0 | ||||
| 0594-03-029 | Tyler | 01/06/27 | $1,474,875.34 | Construction | Roadway | Construction | Roadway | $1,501,868.70 | $(26,993.36) | -2% | 0 | ||||
| 0001-04-109 | El Paso | 01/06/27 | $1,898,568.91 | Construction | Roadway | Construction | Roadway | $1,865,286.10 | $33,282.81 | 2% | 0 | ||||
| 0114-01-070 | Austin | 11/03/26 | $446,820.20 | Construction | Non Roadway | Construction | Non Roadway | $439,167.52 | $7,652.68 | 2% | 0 | ||||
| 1763-02-033 | Tyler | 12/01/26 | $212,930.50 | Construction | Roadway | Construction | Roadway | $216,429.10 | $(3,498.60) | -2% | 0 | ||||
| 0114-01-071 | Austin | 11/03/26 | $3,822,563.83 | Construction | Non Roadway | Construction | Non Roadway | $3,761,519.77 | $61,044.06 | 2% | 0 | ||||
| 3049-01-037 | Houston | 11/01/29 | $63,703,868.00 | Construction | Roadway | Construction | Roadway | $64,696,185.00 | $(992,317.00) | -2% | 0 | ||||
| 3312-02-019 | Houston | 01/06/27 | $3,861,827.12 | Construction | Roadway | Construction | Roadway | $3,803,740.00 | $58,087.12 | 2% | 0 | ||||
| 0262-01-034 | Bryan | 11/03/26 | $4,759,517.62 | Construction | Roadway | Construction | Roadway | $4,832,339.12 | $(72,821.50) | -2% | 0 | ||||
| 1127-05-024 | Odessa | 12/01/26 | $2,084,736.55 | Construction | Roadway | Construction | Roadway | $2,054,496.55 | $30,240.00 | 1% | 0 | ||||
| 0014-15-077 | Fort Worth | 03/03/27 | $15,336,974.19 | Construction | Roadway | Construction | Roadway | $15,548,985.00 | $(212,010.81) | -1% | 0 | ||||
| 0014-15-087 | Fort Worth | 06/01/27 | $20,950,780.66 | Construction | Roadway | Construction | Roadway | $21,200,000.00 | $(249,219.34) | -1% | 0 | ||||
| 0918-47-498 | Dallas | 03/03/27 | $426,693.49 | Construction | Roadway | Construction | Roadway | $431,230.25 | $(4,536.76) | -1% | 0 | ||||
| 1666-03-007 | Tyler | 12/01/26 | $218,701.01 | Construction | Roadway | Construction | Roadway | $220,964.90 | $(2,263.89) | -1% | 0 | ||||
| 0024-05-104 | San Antonio | 02/02/27 | $9,149,729.61 | Construction | Roadway | Construction | Roadway | $9,241,146.87 | $(91,417.26) | -1.0% | 0 | ||||
| 0527-06-022 | Houston | 01/06/27 | $3,778,339.07 | Construction | Roadway | Construction | Roadway | $3,815,251.00 | $(36,911.93) | -1.0% | 0 | ||||
| 2302-02-009 | Tyler | 12/01/26 | $180,549.33 | Construction | Roadway | Construction | Roadway | $182,226.30 | $(1,676.97) | -0.9% | 0 | ||||
| 0581-02-164 | Dallas | 05/05/27 | $575,161.18 | Construction | Roadway | Construction | Roadway | $580,380.00 | $(5,218.82) | -0.9% | 0 | ||||
| 0889-02-018 | Tyler | 12/01/26 | $143,153.61 | Construction | Roadway | Construction | Roadway | $144,441.30 | $(1,287.69) | -0.9% | 0 | ||||
| 0015-13-432 | Austin | 11/03/26 | $240,825,177.41 | Construction | Bridge | Construction | Bridge | $238,819,685.16 | $2,005,492.25 | 0.8% | 0 | ||||
| 0095-02-128 | Dallas | 09/06/28 | $182,065,849.07 | Construction | Roadway | Construction | Roadway | $183,536,428.70 | $(1,470,579.63) | -0.8% | 0 | ||||
| 0594-02-031 | Tyler | 12/01/26 | $1,103,123.53 | Construction | Roadway | Construction | Roadway | $1,094,681.70 | $8,441.83 | 0.8% | 0 | ||||
| 0262-02-031 | Bryan | 11/03/26 | $5,786,613.40 | Construction | Roadway | Construction | Roadway | $5,744,189.80 | $42,423.60 | 0.7% | 0 | ||||
| 0646-05-043 | Tyler | 12/01/26 | $244,863.57 | Construction | Roadway | Construction | Roadway | $246,521.82 | $(1,658.25) | -0.7% | 0 | ||||
| 2523-02-074 | Houston | 11/01/28 | $79,445,464.00 | Construction | Bridge | Construction | Bridge | $79,972,723.00 | $(527,259.00) | -0.7% | 0 | ||||
| 0495-01-087 | Dallas | 08/04/27 | $518,649.84 | Construction | Roadway | Construction | Roadway | $515,307.72 | $3,342.12 | 0.7% | 0 | ||||
| 1052-02-098 | Corpus Christi | 11/03/26 | $4,792,153.20 | Construction | Roadway | Construction | Roadway | $4,769,574.60 | $22,578.60 | 0.5% | 0 | ||||
| 0405-02-028 | San Angelo | 12/01/26 | $2,351,157.84 | Construction | Roadway | Construction | Roadway | $2,359,157.84 | $(8,000.00) | -0.3% | 0 | ||||
| 0693-03-046 | Abilene | 12/01/26 | $11,054,519.30 | Construction | Roadway | Construction | Roadway | $11,084,519.30 | $(30,000.00) | -0.3% | 0 | ||||
| 0440-06-030 | Austin | 01/06/27 | $24,141,485.59 | Construction | Roadway | Construction | Roadway | $24,087,379.59 | $54,106.00 | 0.2% | 0 | ||||
| 0892-02-009 | Tyler | 12/01/26 | $385,758.69 | Construction | Roadway | Construction | Roadway | $386,586.30 | $(827.61) | -0.2% | 0 | ||||
| 0080-03-049 | Fort Worth | 06/01/27 | $115,268,705.26 | Construction | Roadway | Construction | Roadway | $115,461,159.08 | $(192,453.82) | -0.2% | 0 | ||||
| 1063-01-034 | Corpus Christi | 06/01/27 | $6,007,162.08 | Construction | Roadway | Construction | Roadway | $6,000,000.00 | $7,162.08 | 0.1% | 0 | ||||
| 0916-36-024 | Corpus Christi | 12/01/26 | $3,101,274.40 | Construction | Bridge | Construction | Bridge | $3,097,434.40 | $3,840.00 | 0.1% | 0 | ||||
| 2635-03-031 | Amarillo | 12/01/26 | $3,759,252.85 | Construction | Roadway | Construction | Roadway | $3,755,952.85 | $3,300.00 | 0.1% | 0 | ||||
| 0683-06-035 | Austin | 01/06/27 | $6,332,152.25 | Construction | Roadway | Construction | Roadway | $6,327,909.65 | $4,242.60 | 0.1% | 0 | ||||
| 0683-07-013 | Austin | 01/06/27 | $8,643,004.28 | Construction | Roadway | Construction | Roadway | $8,636,833.28 | $6,171.00 | 0.1% | 0 | ||||
| 2006-03-013 | San Angelo | 12/01/26 | $888,820.07 | Construction | Roadway | Construction | Roadway | $889,405.29 | $(585.22) | -0.1% | 0 | ||||
| 0440-05-015 | Austin | 01/06/27 | $171,684,818.25 | Construction | Roadway | Construction | Roadway | $171,589,275.59 | $95,542.66 | 0.1% | 0 | ||||
| 1743-01-012 | Houston | 12/01/26 | $2,783,534.90 | Construction | Roadway | Construction | Roadway | $2,785,329.90 | $(1,795.00) | -0.1% | 0 | ||||
| 0500-01-158 | Houston | 11/03/26 | $510,426.00 | Construction | Roadway | Construction | Roadway | $510,119.12 | $306.88 | 0.1% | 0 | ||||
| 0508-01-397 | Houston | 07/01/27 | $398,371,930.00 | Construction | Roadway | Construction | Roadway | $398,371,929.00 | $1.00 | 0% | 0 | ||||
| 0842-03-042 | Yoakum | 07/01/27 | $26,245,697.00 | Construction | Roadway | Construction | Roadway | $26,245,701.93 | $(4.93) | 0% | 0 | ||||
| 0446-01-057 | Yoakum | 03/03/27 | $1,500,001.00 | Construction | Roadway | Construction | Roadway | $1,500,000.00 | $1.00 | 0% | -308 | -10 months |
Putting It Together
In summary, the pipeline is seeing a notable increase in active projects despite a slight decline in total value. Project timing reveals a mix of shifts, while cost movements highlight both gains and reductions in different districts and project types.
Final Takeaway
Overall, this situation indicates a dynamic pipeline environment, with adjustments in project timing and cost reflecting ongoing operational responses.