Pipeline Changes

TxDOT Pipeline Changes - May 2026

McKenna Wolfe2 min read
TxDOT Pipeline Changes - May 2026
  • The pipeline value has decreased from $5.73B to $5.67B, a drop of $51.09M.
  • Overall project count decreased by 83, with 190 new entries and 273 projects exiting the window.
  • San Antonio shows the largest net cost increase of $84.94M during this period.

Overview

Looking at the May 4, 2026 vs. June 3, 2026 snapshots, across a letting window of June 4, 2026 to June 1, 2029, the pipeline exhibits a decline in overall value and project count. The total pipeline dropped by $51.09M, while the total project count fell by 83. In terms of project classification, the dominant subtype remains roadway, representing 77.7% of the pipeline, with costs primarily concentrated in construction.


Letting Date Shifts (Slippage)

How to read this chart:

The letting dates have seen significant shifts, with a total of 181 projects shifting by 6 months or more. Notably, 123 projects were pushed later and 58 were pulled earlier, indicating a net movement toward later letting dates. This trend suggests that many scheduled developments have experienced delays.

CSJDistrictEst. Letting DateProject EstimateCurrent TypeCurrent SubtypePrev. TypePrev. SubtypePrev. DateLetting Δ (days)Letting Date ΔCost Δ%Cost ΔType/Subtype ΔLifecycle
0750-01-028Atlanta01/01/45$1,600,000.00ConstructionRoadway06/01/28605817 years
2635-03-030Amarillo11/03/26$287,000.00ConstructionRoadwayUnassignedUnassigned11/01/40-5112-14 years$(413,000.00)-59%Unassigned → Construction / Roadway
0251-05-065Brownwood11/01/40$887,885.0011/02/27474813 years
0835-01-030Waco09/01/39$492,300.00ConstructionRoadwayConstructionRoadway09/02/26474713 years
1662-01-016Waco09/01/39$456,000.00ConstructionRoadwayConstructionRoadway09/02/26474713 years
1835-01-030Waco09/01/39$269,401.18ConstructionRoadwayConstructionRoadway09/02/26474713 years
3430-01-007Waco09/01/39$152,700.00ConstructionRoadwayConstructionRoadway09/02/26474713 years
0675-03-108Bryan10/01/39$78,414.00ConstructionRoadway10/06/26474313 years
0675-04-090Bryan10/01/39$30,958.00ConstructionRoadway10/06/26474313 years
1024-01-097Beaumont09/01/38$16,676.00ConstructionRoadway09/01/27401811 years
0836-03-073Waco01/01/40$5,000,000.00ConstructionRoadway01/01/29401711 years
0521-05-144San Antonio09/01/37$589,100,000.00ConstructionRoadway09/01/27365310 years
0182-02-049Brownwood11/01/38$358,064.00ConstructionRoadway11/01/28365210 years
0421-04-035San Antonio10/01/37$657,314.00ConstructionRoadway10/05/27364910 yearsCanceled
3510-04-083Houston11/01/28$66,500,000.00ConstructionRoadwayUnassignedUnassigned01/01/37-2983-8 yearsUnassigned → Construction / Roadway
3510-03-002Houston12/15/28$55,381,565.00Alternative DeliveryDesign BuildUnassignedUnassigned01/15/37-2953-8 yearsUnassigned → Alternative Delivery / Design Build
3510-03-003Houston12/15/28$55,381,565.0001/15/37-2953-8 years
3510-03-004Houston12/15/28$76,000,000.00Alternative DeliveryDesign BuildUnassignedUnassigned01/15/37-2953-8 yearsUnassigned → Alternative Delivery / Design Build
0102-01-124Corpus Christi03/01/29$1,598,373.00ConstructionRoadwayUnassignedUnassigned03/01/37-2922-8 yearsUnassigned → Construction / Roadway
0186-05-050Bryan10/05/27$150,000.00ConstructionRoadwayUnassignedUnassigned10/01/35-2918-8 years$(28,206.00)-16%Unassigned → Construction / Roadway
0985-01-026Abilene03/01/34$5,300,000.00ConstructionRoadway03/03/2725557 years
0558-11-018San Angelo10/01/34$15,474,285.00ConstructionRoadway10/05/2725537 years
2685-01-012Atlanta10/01/34$305,200.00ConstructionRoadway10/05/2725537 years
0289-04-038Brownwood11/01/34$45,721.00ConstructionRoadway11/01/2821916 years$(500,000.00)-92%
1215-02-017Atlanta10/01/34$159,094.64ConstructionRoadway10/04/2821886 years
0535-02-050San Antonio08/05/26$5,699,898.82ConstructionBridgeUnassignedUnassigned09/01/31-1853-5 yearsUnassigned → Construction / Bridge
0054-04-119Brownwood11/01/33$454,880.00ConstructionRoadway11/01/2818265 years
1026-01-013Brownwood11/01/32$205,073.00ConstructionRoadway11/02/2718265 years
2107-01-019Brownwood11/01/32$416,427.00ConstructionRoadway11/02/2718265 years
0079-01-048Brownwood11/01/31$154,509.00ConstructionRoadway11/02/2714604 years
0025-02-229San Antonio01/01/31$972,889.00ConstructionRoadway01/06/2714564 years
0976-03-125Houston04/06/27$2,200,000.00ConstructionRoadwayUnassignedUnassigned07/01/30-1182-3 yearsUnassigned → Construction / Roadway
0157-04-054Abilene12/01/30$105,964.00ConstructionRoadway12/01/2710963 years
0073-13-014San Antonio09/01/30$2,000,000.00ConstructionBridge09/01/2710963 years
0829-01-029San Angelo12/01/29$586,000.00ConstructionRoadway12/01/2610963 years
0003-06-106Odessa11/01/30$37,300,000.00ConstructionRoadway11/02/2710953 years
0127-02-144Brownwood11/01/28$341,972.59ConstructionRoadwayUnassignedUnassigned11/01/31-1095-3 yearsUnassigned → Construction / Roadway
0007-06-279Brownwood11/01/29$15,074.00ConstructionRoadway11/03/2610943 yearsCanceled
0007-06-280Brownwood11/01/29$14,019.00ConstructionRoadway11/03/2610943 yearsCanceled
0088-05-113Yoakum11/01/29$54,941.00ConstructionRoadway11/03/2610943 years
0089-03-101Yoakum11/01/29$55,000.00ConstructionRoadway11/03/2610943 years
0089-11-008Yoakum11/01/29$95,019.00ConstructionRoadway11/03/2610943 years
2350-01-075Yoakum11/01/29$122,965.00ConstructionRoadway11/03/2610943 years
2786-01-021Brownwood11/01/29$17,480.00ConstructionRoadway11/03/2610943 years
2816-01-008Yoakum11/01/29$238,192.50ConstructionRoadway11/03/2610943 years
3509-01-008Yoakum11/01/29$40,861.00ConstructionRoadway11/03/2610943 years
2786-01-020Brownwood11/03/26$23,985.00ConstructionRoadwayUnassignedUnassigned11/01/29-1094-3 yearsUnassigned → Construction / Roadway
2941-02-054Houston09/01/31$1,288,740.00ConstructionRoadway09/06/2810903 years
0367-02-084Houston09/06/28$456,000.00ConstructionRoadwayUnassignedUnassigned09/01/31-1090-3 years$(44,000.00)-9%Unassigned → Construction / Roadway
1003-01-098Houston09/06/28$1,088,146.00ConstructionRoadwayUnassignedUnassigned09/01/31-1090-3 yearsUnassigned → Construction / Roadway
0229-02-050Odessa03/07/28$6,500,000.00ConstructionRoadwayUnassignedUnassigned03/01/31-1089-3 yearsUnassigned → Construction / Roadway
0348-12-017Corpus Christi02/02/28$3,200,000.00ConstructionBridgeUnassignedUnassigned09/01/30-942-3 years$700,000.0028%Unassigned → Construction / Bridge
1392-01-058Dallas09/01/30$11,693,513.35ConstructionRoadway06/01/288222 years
2263-02-110Corpus Christi07/01/27$15,000,000.00ConstructionFerry BoatUnassignedUnassigned09/01/29-793-2 yearsUnassigned → Construction / Ferry Boat
0421-06-024San Antonio10/01/29$4,760,643.00ConstructionRoadway09/01/277612 years
0014-15-077Fort Worth03/03/27$0.00ConstructionRoadwayConstructionRoadway04/01/29-760-2 years
0887-01-044Odessa11/01/29$22,178,571.43ConstructionRoadway10/05/277582 years$(821,428.57)-4%
0902-50-142Fort Worth06/01/29$21,994,051.23ConstructionRoadwayConstructionRoadway05/05/277582 years
0924-06-691El Paso05/02/29$3,716,750.00ConstructionLocal LetConstructionLocal Let05/01/277322 years
0747-05-048Fort Worth12/01/27$200,000.00ConstructionRoadwayUnassignedUnassigned12/01/29-731-2 yearsUnassigned → Construction / Roadway
0152-03-069Austin04/02/31$5,560,000.00ConstructionRoadway04/02/297302 years
0286-03-018Austin04/02/31$1,000,000.00ConstructionRoadway04/02/297302 years
0366-02-104San Antonio02/01/31$2,343,970.00ConstructionRoadway02/01/297302 years
0366-03-076San Antonio02/01/31$9,179,079.00ConstructionRoadway02/01/297302 years
0222-05-053Atlanta01/01/31$9,200,000.00ConstructionRoadway01/01/297302 years
0222-05-056Atlanta01/01/31$8,784,916.00ConstructionRoadway01/01/297302 years
0047-09-040Dallas06/01/30$2,631,970.69ConstructionRoadway06/01/287302 years
0072-05-101San Antonio02/01/30$9,949,148.00ConstructionRoadway02/02/287302 years
0328-08-026Laredo08/01/29$9,551,281.75ConstructionRoadwayConstructionRoadway08/04/277282 years
0483-01-055Laredo08/01/29$4,348,311.50ConstructionRoadwayConstructionRoadway08/04/277282 years
0003-01-068El Paso01/01/30$654,175.00ConstructionRoadway01/05/287272 years$(24,228.70)-4%
0003-02-052El Paso01/01/30$720,642.86ConstructionRoadway01/05/287272 years$(26,690.47)-4%
0003-04-059El Paso01/01/30$637,426.79ConstructionRoadway01/05/287272 years$(23,608.40)-4%
3538-01-067Houston01/01/30$1,000,000.00ConstructionNon Roadway01/05/287272 years
3538-01-071Houston01/01/30$1,000,000.00ConstructionNon Roadway01/05/287272 years
3510-06-020Houston04/01/29$51,058,877.00ConstructionRoadwayConstructionRoadway05/05/276972 years
3510-06-022Houston04/01/29$43,829,461.00ConstructionRoadwayConstructionRoadway05/05/276972 years
0421-01-053San Antonio10/01/29$30,000,000.00ConstructionRoadway12/01/276702 years$4,797,941.0019%
0048-04-111Dallas12/01/26$1,025,160.00ConstructionRoadwayConstructionRoadway08/02/28-610-2 years
1186-01-102Austin04/01/28$10,636,088.00Non-LetRoadwayNon-LetRoadway09/01/265782 years
0116-04-120Bryan10/05/27$77,350.00ConstructionRoadwayConstructionRoadway04/07/265461 year
0249-08-046Fort Worth08/05/26$329,106.80ConstructionRoadwayConstructionRoadway02/02/28-546-1 year
0502-01-243Houston01/15/29$24,000,000.00Non-LetLocalNon-LetLocal08/09/275251 year
0912-72-388Houston02/15/29$40,225,631.00ConstructionLocal LetConstructionLocal Let09/15/275191 year
0912-72-401Houston02/15/29$36,530,369.00ConstructionLocal LetConstructionLocal Let09/15/275191 year
0274-01-046Brownwood01/01/29$1,000,000.00ConstructionRoadwayConstructionRoadway09/01/274881 year
0274-02-033Brownwood01/01/29$2,500,000.00ConstructionRoadwayConstructionRoadway09/01/274881 year
0092-14-111Dallas06/01/27$18,984,267.56ConstructionRoadwayConstructionRoadway09/06/28-463-1 year
0237-06-054Laredo08/05/26$1,000,337.79ConstructionRoadwayConstructionRoadway11/02/27-454-1 year
1982-01-031Laredo08/05/26$123,600.00ConstructionRoadwayConstructionRoadway11/02/27-454-1 year
0912-72-381Houston11/15/28$50,171,694.00ConstructionLocal LetConstructionLocal Let09/15/274271 year
0167-02-098El Paso11/01/28$288,300.00ConstructionRoadwayConstructionRoadway09/01/274271 year$(10,677.78)-4%
1046-03-013El Paso11/01/28$127,550.00ConstructionRoadwayConstructionRoadway09/01/274271 year$(4,724.07)-4%
0168-03-038Lubbock08/05/26$10,186,000.00ConstructionRoadwayConstructionRoadway10/05/27-426-1 year
0168-03-041Lubbock08/05/26$361,462.26ConstructionRoadwayConstructionRoadway10/05/27-426-1 year
2185-01-002Lubbock08/05/26$445,995.11ConstructionRoadwayConstructionRoadway10/05/27-426-1 year
0217-02-037Atlanta12/01/28$18,642,426.36ConstructionRoadwayConstructionRoadway11/01/273961 year
0037-02-060Laredo08/05/26$30,000,000.00ConstructionBridgeConstructionBridge09/01/27-392-1 year
0374-04-032El Paso09/06/28$4,545,805.36ConstructionRoadwayConstructionRoadway09/01/273711 year$(168,363.16)-4%
0720-02-095Houston09/01/27$528,000.00ConstructionRoadwayConstructionRoadway09/06/28-371-1 year$(472,000.00)-47%
0092-04-088Dallas12/01/27$1,281,060.00ConstructionRoadwayConstructionRoadway12/05/28-370-1 year
1311-01-063Dallas12/01/27$801,923.39ConstructionRoadwayConstructionRoadway12/05/28-370-1 year
0580-01-038Yoakum07/03/28$1,239,000.00Non-LetNon RoadwayNon-LetNon Roadway07/03/273661 year
2529-02-017Pharr04/01/30$9,553,719.00ConstructionRoadway04/01/293651 year
0017-14-020San Antonio02/01/30$5,041,793.00ConstructionRoadway02/01/293651 year
0068-02-050Lubbock02/01/30$1,371,261.60ConstructionRoadway02/01/293651 year
0003-02-051El Paso11/01/29$23,459,355.36ConstructionRoadway11/01/283651 year$(868,873.34)-4%
0054-06-116Brownwood11/01/29$597,899.00ConstructionRoadway11/01/283651 year
0129-01-038Brownwood11/01/29$530,939.00ConstructionRoadway11/01/283651 year
0315-06-051Bryan11/01/29$3,000,000.00ConstructionRoadway11/01/283651 year
2436-01-033Brownwood11/01/29$101,000.00ConstructionRoadway11/01/283651 year
0102-07-048Pharr04/01/29$19,094,764.32ConstructionRoadwayUnassignedUnassigned04/01/30-365-1 yearUnassigned → Construction / Roadway
0008-08-085Dallas11/01/28$15,241,283.40ConstructionRoadwayUnassignedUnassigned11/01/29-365-1 yearUnassigned → Construction / Roadway
0776-03-016Brownwood11/01/28$86,544.00ConstructionRoadwayUnassignedUnassigned11/01/29-365-1 yearUnassigned → Construction / Roadway
1242-01-009Brownwood11/01/28$200,408.00ConstructionRoadwayConstructionRoadway11/02/273651 year
0073-02-091San Antonio10/04/28$8,062,084.00ConstructionRoadwayConstructionRoadway10/05/273651 year$4,994,251.00163%
0521-04-305San Antonio10/04/28$30,151,873.00ConstructionRoadwayConstructionRoadway10/05/273651 year
0004-07-143Odessa02/02/28$1,434,593.19ConstructionRoadwayConstructionRoadway02/02/273651 year
0017-03-074San Antonio02/02/28$10,627,384.00ConstructionRoadwayConstructionRoadway02/01/29-365-1 year
0073-08-213San Antonio02/02/28$22,018,694.00ConstructionRoadwayConstructionRoadway02/01/29-365-1 year
0073-09-047San Antonio02/02/28$15,100,930.00ConstructionRoadwayConstructionRoadway02/01/29-365-1 year
0389-11-061Houston02/02/28$3,424,252.00ConstructionRoadwayConstructionRoadway02/02/273651 year
0168-09-198Amarillo12/01/27$900,000.00ConstructionNon RoadwayConstructionNon Roadway12/01/263651 year
0168-10-084Amarillo12/01/27$100,000.00ConstructionNon RoadwayConstructionNon Roadway12/01/263651 year
0001-01-077El Paso10/05/27$331,759.36ConstructionRoadwayConstructionRoadway10/04/28-365-1 year$11,848.554%
0374-02-128El Paso10/05/27$332,783.52ConstructionRoadwayConstructionRoadway10/04/28-365-1 year$11,885.134%
3451-01-051El Paso10/05/27$425,949.07ConstructionRoadwayConstructionRoadway10/04/28-365-1 year$15,212.194%
3451-01-052El Paso10/05/27$343,217.59ConstructionRoadwayConstructionRoadway10/04/28-365-1 year$12,257.504%
0313-08-032Fort Worth12/01/26$450,000.00ConstructionRoadwayConstructionRoadway12/01/27-365-1 year
1853-01-049Fort Worth12/01/26$384,840.66ConstructionRoadwayConstructionRoadway12/01/27-365-1 year
2213-02-012Fort Worth12/01/26$450,000.00ConstructionRoadwayConstructionRoadway12/01/27-365-1 year
2631-01-007Fort Worth12/01/26$450,000.00ConstructionRoadwayConstructionRoadway12/01/27-365-1 year
2631-02-007Fort Worth12/01/26$450,000.00ConstructionRoadwayConstructionRoadway12/01/27-365-1 year
2631-03-007Fort Worth12/01/26$145,928.00ConstructionRoadwayConstructionRoadway12/01/27-365-1 year
1378-01-059Austin08/01/26$5,030,542.52Non-LetBridgeUnassignedUnassigned08/01/253651 year$5,030,541.52503054152%Unassigned → Non-Let / Bridge
2208-02-026Dallas08/02/28$6,590,209.08ConstructionRoadwayConstructionRoadway08/01/29-364-12 months
0143-02-031San Antonio01/05/28$1,064,259.00ConstructionRoadwayConstructionRoadway01/06/2736412 months
0291-05-051San Antonio01/05/28$1,286,888.00ConstructionRoadwayConstructionRoadway01/06/2736412 months
1823-03-016Odessa10/01/27$700,000.00Non-LetRoadwayNon-LetRoadway10/02/2636412 months
0968-04-005Lubbock11/03/26$418,824.00ConstructionRoadwayConstructionRoadway11/02/27-364-12 months
0001-04-105El Paso05/01/29$4,128,778.57ConstructionRoadwayConstructionRoadway05/03/2836312 months$(152,917.73)-4%
0047-04-044Dallas05/01/29$3,502,395.48ConstructionRoadwayConstructionRoadway05/03/2836312 months
0167-03-003El Paso05/01/29$755,593.75ConstructionRoadwayConstructionRoadway05/03/2836312 months$(27,984.95)-4%
2291-01-015Fort Worth10/01/29$6,869,417.15ConstructionRoadway10/04/2836212 months
2291-01-016Fort Worth10/01/29$13,917,409.51ConstructionRoadway10/04/2836212 months
2291-02-010Fort Worth10/01/29$10,252,902.19ConstructionRoadway10/04/2836212 months
0002-14-051El Paso01/01/29$1,468,286.50ConstructionRoadwayConstructionRoadway01/05/2836212 months$(54,380.98)-4%
0179-09-044Yoakum03/01/29$2,200,000.00ConstructionRoadwayConstructionRoadway03/07/2835912 months
1155-05-013Abilene03/01/29$6,000,000.00ConstructionRoadwayConstructionRoadway03/07/2835912 months
0276-09-011Laredo02/01/30$1,921,342.50ConstructionRoadway03/01/2933711 months
0299-04-088Laredo03/01/29$3,004,045.00ConstructionRoadwayUnassignedUnassigned02/01/30-337-11 monthsUnassigned → Construction / Roadway
0254-01-149Corpus Christi08/05/26$12,000,000.00ConstructionRoadwayConstructionRoadway07/01/27-330-11 months$(3,000,000.00)-20%
0271-17-188Houston02/15/27$1,600,000.00Non-LetBridgeNon-LetBridge04/15/2630610 months
0018-05-089Laredo08/05/26$228,583,900.49ConstructionRoadwayConstructionRoadway06/01/27-300-10 months$(27,536,260.27)-11%
2436-01-031Brownwood04/01/29$5,000,000.00ConstructionRoadwayUnassignedUnassigned01/01/30-275-9 monthsUnassigned → Construction / Roadway
0008-09-037Fort Worth06/01/28$17,300,891.50ConstructionRoadwayConstructionRoadway09/01/272749 months
1207-03-012Corpus Christi11/01/28$900,000.00ConstructionBridgeConstructionBridge02/02/282739 months
1207-03-013Corpus Christi11/01/28$800,000.00ConstructionBridgeConstructionBridge02/02/282739 months
0002-04-039El Paso01/05/28$264,745.19ConstructionRoadwayConstructionRoadway09/06/28-245-8 months$9,455.194%
0015-08-430Austin03/03/27$3,534,578.85ConstructionRoadwayConstructionRoadway11/02/27-244-8 months$950,142.7437%
0015-17-030Austin03/03/27$1,862,339.42ConstructionRoadwayConstructionRoadway11/02/27-244-8 months$68,975.534%
0072-08-150San Antonio10/01/29$10,395,088.00ConstructionRoadway02/01/292428 months
0017-08-122Laredo04/01/29$100,000.00ConstructionBridgeConstructionBridge08/02/282428 months
0581-02-168Dallas06/01/29$4,836,600.00ConstructionRoadwayConstructionRoadway10/04/282408 months
0314-01-084Fort Worth06/01/27$14,084,845.19ConstructionBridgeConstructionBridge10/06/262388 months
0080-11-003Fort Worth12/31/26$28,387.63Non-LetNon RoadwayNon-LetNon Roadway05/15/262308 months
1094-03-021Fort Worth01/14/27$650,000.00ConstructionLocal LetConstructionLocal Let06/15/262137 months
0047-07-253Dallas06/01/29$1,118,945.45ConstructionRoadwayConstructionRoadway11/01/282127 months
0005-02-112Odessa05/05/27$6,346,155.00ConstructionRail - SafetyConstructionRail - Safety10/06/262117 months
0912-34-212Houston05/05/27$1,846,148.00ConstructionBridgeConstructionBridge10/06/262117 months
0912-37-247Houston05/05/27$769,262.00ConstructionBridgeConstructionBridge10/06/262117 months
0080-03-049Fort Worth06/01/27$115,461,159.08ConstructionRoadwayConstructionRoadway11/03/262107 months
0092-06-111Dallas08/05/26$2,943,326.59ConstructionRoadwayConstructionRoadway03/03/27-210-7 months$(625,650.29)-18%
0093-01-108Dallas08/05/26$2,373,824.25ConstructionRoadwayConstructionRoadway03/03/27-210-7 months$(871,672.95)-27%
0166-01-060Dallas08/05/26$1,337,640.54ConstructionRoadwayConstructionRoadway03/03/27-210-7 months$(1,623,135.30)-55%
0902-90-296Fort Worth09/15/26$2,573,875.05ConstructionLocal LetConstructionLocal Let02/18/262097 months
0902-90-350Fort Worth09/15/26$1,552,000.00ConstructionLocal LetConstructionLocal Let02/18/262097 months
2266-02-164Fort Worth10/11/27$4,200,000.00ConstructionLocal LetConstructionLocal Let04/01/271936 months
0507-03-055Corpus Christi09/01/29$8,000,000.00ConstructionRoadway03/01/291846 months
0943-04-035Corpus Christi10/01/29$5,500,000.00ConstructionRoadway04/01/291836 months
0916-00-282Corpus Christi04/01/27$9,480,737.00ConstructionLocal LetConstructionLocal Let10/01/261826 months
0001-04-114El Paso05/03/28$740,740.74ConstructionRoadwayConstructionRoadway12/01/271545 months$17,017.482%
0283-02-040Wichita Falls08/05/26$4,248,978.39ConstructionRoadwayConstructionRoadway01/06/27-154-5 months$748,978.3921%
0283-03-023Wichita Falls08/05/26$9,438,454.44ConstructionRoadwayConstructionRoadway01/06/27-154-5 months$538,454.446%
1586-01-085Pharr08/05/26$6,597,423.30ConstructionRoadwayConstructionRoadway01/06/27-154-5 months$(917,408.70)-12%
0281-02-078Dallas04/01/29$774,488.72ConstructionRoadwayConstructionRoadway11/01/281515 months
0204-01-075Austin10/06/26$58,125.00ConstructionBridgeConstructionBridge03/03/27-148-5 months
0320-03-104Austin10/06/26$236,912.50ConstructionBridgeConstructionBridge03/03/27-148-5 months
0321-01-056Austin10/06/26$729,150.00ConstructionBridgeConstructionBridge03/03/27-148-5 months
0030-02-057Amarillo12/05/28$1,800,000.00ConstructionRoadwayConstructionRoadway05/01/29-147-5 months
3176-01-012Corpus Christi11/02/27$10,000,000.00ConstructionRoadwayConstructionRoadway07/01/271244 months$4,830,000.0093%
0047-06-182Dallas08/01/26$1,127,591.83ConstructionLocal LetConstructionLocal Let12/03/26-124-4 months
1014-03-063Dallas08/01/26$1,731,094.70ConstructionLocal LetConstructionLocal Let12/03/26-124-4 months
0912-72-843Houston08/15/26$1,048,217.76Non-LetRoadwayNon-LetRoadway04/15/261224 months
0197-02-141Dallas06/01/29$878,343.00ConstructionRoadwayConstructionRoadway02/01/291204 months
0045-08-039Paris07/01/27$124,861,809.00ConstructionRoadwayConstructionRoadway03/03/271204 months
0915-12-827San Antonio09/01/27$654,893.00ConstructionRoadwayConstructionRoadway05/05/271194 months
0915-12-828San Antonio09/01/27$362,736.00ConstructionRoadwayConstructionRoadway05/05/271194 months
0088-05-115Yoakum05/05/27$250,000.00ConstructionRoadwayConstructionRoadway01/06/271194 months
0371-06-027Yoakum05/05/27$300,000.00ConstructionNon RoadwayConstructionNon Roadway01/06/271194 months
0363-03-061Fort Worth08/05/26$2,924,978.47ConstructionRoadwayConstructionRoadway12/01/26-118-4 months$38,121.421%
0441-09-054Odessa08/05/26$17,048,526.81ConstructionRoadwayConstructionRoadway12/01/26-118-4 months$2,248,526.8115%
1012-03-027Dallas08/05/26$9,867,597.40ConstructionRoadwayConstructionRoadway12/01/26-118-4 months$1,194,303.1514%
1012-03-028Dallas08/05/26$6,866,910.20ConstructionRoadwayConstructionRoadway12/01/26-118-4 months$493,087.908%
1492-01-013Dallas08/05/26$1,878,822.25ConstructionRoadwayConstructionRoadway12/01/26-118-4 months$547,330.8041%
0027-02-034Yoakum01/01/29$21,600,000.00ConstructionRoadwayConstructionRoadway09/06/281174 months$13,400,000.00163%
0025-07-068Yoakum09/06/28$16,500,000.00ConstructionRoadwayConstructionRoadway01/01/29-117-4 months
0134-09-070Dallas09/06/28$998,659.20ConstructionRoadwayConstructionRoadway01/01/29-117-4 months
0918-46-369Dallas09/06/28$782,150.04ConstructionRoadwayConstructionRoadway01/01/29-117-4 months
3138-01-020Bryan10/05/27$100,882,922.00ConstructionRoadwayConstructionRoadway07/01/27963 months
1022-01-037Beaumont05/05/27$730,000.00ConstructionRoadwayConstructionRoadway02/02/27923 months
0151-03-045Austin03/03/27$9,180,769.23ConstructionRoadwayConstructionRoadway12/01/26923 months
1200-02-037Austin02/02/27$2,221,995.59ConstructionRoadwayConstructionRoadway11/03/26913 months
1200-02-038Austin02/02/27$1,783,857.69ConstructionRoadwayConstructionRoadway11/03/26913 months
1200-03-069Austin02/02/27$1,500,782.69ConstructionRoadwayConstructionRoadway11/03/26913 months$(60,031.73)-4%
1047-02-052Dallas10/04/28$1,132,257.00ConstructionRoadwayConstructionRoadway01/01/29-89-3 months
0024-08-152San Antonio01/06/27$14,850,000.00ConstructionRoadwayConstructionRoadway11/03/26642 months
0604-01-047Yoakum01/06/27$766,000.00ConstructionRoadwayConstructionRoadway11/03/26642 months
6493-98-001Houston09/02/26$1,902,980.58MaintenanceRoutine Maintenance ContractMaintenanceRoutine Maintenance Contract07/01/26632 months
0072-12-202San Antonio07/01/26$247,586.98ConstructionRoadwayConstructionRoadway09/02/26-63-2 months
0918-47-569Dallas12/05/28$704,830.00ConstructionRoadwayConstructionRoadway10/04/28622 months
0204-06-072Bryan11/02/27$60,710.00ConstructionRoadwayConstructionRoadway09/01/27622 months
0204-07-058Bryan11/02/27$51,610.00ConstructionRoadwayConstructionRoadway09/01/27622 months
0209-05-055Bryan11/02/27$328,381.00ConstructionRoadwayConstructionRoadway09/01/27622 months
0267-08-009Bryan11/02/27$23,600.00ConstructionRoadwayConstructionRoadway09/01/27622 months
0315-08-052Bryan11/02/27$298,824.00ConstructionRoadwayConstructionRoadway09/01/27622 months
0506-02-027Bryan11/02/27$19,930.00ConstructionRoadwayConstructionRoadway09/01/27622 months
0506-04-028Bryan11/02/27$106,290.12ConstructionRoadwayConstructionRoadway09/01/27622 months
0506-05-011Bryan11/02/27$3,460.00ConstructionRoadwayConstructionRoadway09/01/27622 months
0648-03-085Bryan11/02/27$5,090.00ConstructionRoadwayConstructionRoadway09/01/27622 months
0648-03-086Bryan11/02/27$29,880.00ConstructionRoadwayConstructionRoadway09/01/27622 months
0648-03-087Bryan11/02/27$9,730.00ConstructionRoadwayConstructionRoadway09/01/27622 months
0648-04-006Bryan11/02/27$13,320.00ConstructionRoadwayConstructionRoadway09/01/27622 months
1564-01-040Bryan11/02/27$20,446.00ConstructionRoadwayConstructionRoadway09/01/27622 months
1564-01-041Bryan11/02/27$13,011.20ConstructionRoadwayConstructionRoadway09/01/27622 months
2238-01-016Bryan11/02/27$45,760.71ConstructionRoadwayConstructionRoadway09/01/27622 months
2238-02-028Bryan11/02/27$267,141.00ConstructionRoadwayConstructionRoadway09/01/27622 months
2830-02-015Bryan11/02/27$152,417.00ConstructionRoadwayConstructionRoadway09/01/27622 months
0947-03-034Beaumont11/03/26$2,000,000.00ConstructionRoadwayConstructionRoadway09/02/26622 months
0089-07-166Yoakum09/02/26$229,757,253.50ConstructionRoadwayConstructionRoadway11/03/26-62-2 months
0041-07-121Amarillo08/05/26$26,200,000.00ConstructionRoadwayConstructionRoadway10/06/26-62-2 months
0041-07-123Amarillo08/05/26$4,750,000.00ConstructionRoadwayConstructionRoadway10/06/26-62-2 months
0842-03-037Yoakum08/05/26$33,218,001.00ConstructionRoadwayConstructionRoadway10/06/26-62-2 months
3510-04-070Houston08/05/26$16,878,891.00ConstructionRoadwayConstructionRoadway10/06/26-62-2 months
3510-04-072Houston08/05/26$10,347,404.00ConstructionRoadwayConstructionRoadway10/06/26-62-2 months
0338-03-096Houston06/01/27$7,643,900.00ConstructionRoadwayConstructionRoadway04/06/27562 months
0338-11-061Houston06/01/27$4,316,885.00ConstructionRoadwayConstructionRoadway04/06/27562 months
0229-01-042Odessa07/01/26$46,211,492.52ConstructionRoadwayConstructionRoadway05/06/26562 months$452,908.751%
0908-33-112Abilene06/15/26$1,765,043.00ConstructionLocal LetConstructionLocal Let08/02/26-48-2 months
1743-01-012Houston12/01/26$2,927,659.00ConstructionRoadwayConstructionRoadway01/06/27-36-1 month
0049-14-016Bryan10/05/27$14,050.00ConstructionRoadwayConstructionRoadway09/01/27341 month
0050-03-118Bryan10/05/27$43,890.00ConstructionRoadwayConstructionRoadway09/01/27341 month
0050-03-119Bryan10/05/27$43,890.00ConstructionRoadwayConstructionRoadway09/01/27341 month
0050-07-017Bryan10/05/27$20,410.00ConstructionRoadwayConstructionRoadway09/01/27341 month
0540-01-056Bryan10/05/27$363,242.68ConstructionRoadwayConstructionRoadway09/01/27341 month
0643-05-069Bryan10/05/27$383,498.00ConstructionRoadwayConstructionRoadway09/01/27341 month
0648-02-023Bryan10/05/27$47,670.00ConstructionRoadwayConstructionRoadway09/01/27341 month
0944-01-031Bryan10/05/27$132,899.00ConstructionRoadwayConstructionRoadway09/01/27341 month
0944-01-032Bryan10/05/27$47,060.00ConstructionRoadwayConstructionRoadway09/01/27341 month
1691-01-019Bryan10/05/27$138,200.00ConstructionRoadwayConstructionRoadway09/01/27341 month
2337-02-013Bryan10/05/27$140,500.00ConstructionRoadwayConstructionRoadway09/01/27341 month
2827-01-014Bryan10/05/27$42,070.00ConstructionRoadwayConstructionRoadway09/01/27341 month
3033-02-016Bryan10/05/27$105,670.00ConstructionRoadwayConstructionRoadway09/01/27341 month
0976-03-120Houston09/02/26$484,617.00ConstructionRoadwayConstructionRoadway10/06/26-34-1 month
0981-01-122Houston09/02/26$1,235,700.00ConstructionRoadwayConstructionRoadway10/06/26-34-1 month
0981-02-012Houston09/02/26$678,042.00ConstructionRoadwayConstructionRoadway10/06/26-34-1 month
1414-01-024Houston09/02/26$61,492.00ConstructionRoadwayConstructionRoadway10/06/26-34-1 month
0366-01-085Austin05/05/27$3,501,490.46ConstructionNon RoadwayConstructionNon Roadway04/06/272929 days
2992-01-012Brownwood05/05/27$154,292.00ConstructionRoadwayConstructionRoadway04/06/272929 days
0161-01-033Laredo03/01/29$1,438,067.40ConstructionRoadwayConstructionRoadway02/01/292828 days
0299-13-035Laredo02/01/29$1,789,754.40ConstructionRoadwayConstructionRoadway03/01/29-28-28 days
0918-47-573Dallas11/01/28$418,876.00ConstructionRoadwayConstructionRoadway10/04/282828 days
0238-06-040Amarillo09/06/28$8,000,000.00ConstructionRoadwayConstructionRoadway10/04/28-28-28 days
3416-01-012Houston08/04/27$74,299,327.00ConstructionRoadwayConstructionRoadway09/01/27-28-28 days
0285-03-066Austin11/03/26$1,439,357.92ConstructionNon RoadwayConstructionNon Roadway10/06/262828 days
0276-07-035San Antonio08/05/26$8,601,216.47ConstructionRoadwayConstructionRoadway09/02/26-28-28 days
3510-04-069Houston08/05/26$25,084,165.45ConstructionRoadwayConstructionRoadway09/02/26-28-28 days$8,980,253.4556%
3510-04-071Houston08/05/26$14,072,310.00ConstructionRoadwayConstructionRoadway09/02/26-28-28 days
0338-03-098Houston02/02/27$804,047.00ConstructionBridgeConstructionBridge01/06/272727 days
0338-03-099Houston02/02/27$654,592.00ConstructionBridgeConstructionBridge01/06/272727 days
0338-03-100Houston02/02/27$727,880.00ConstructionBridgeConstructionBridge01/06/272727 days
0338-03-101Houston02/02/27$686,576.00ConstructionBridgeConstructionBridge01/06/272727 days
0675-08-123Houston02/02/27$2,357,388.00ConstructionNon Roadway01/06/272727 daysCanceled
2374-01-199Dallas08/01/27$721,035.00ConstructionRoadwayConstructionRoadway08/04/27-3-3 days
6501-30-001Bryan06/10/26$900,000.00MaintenanceRoutine Maintenance ContractMaintenanceRoutine Maintenance Contract06/09/2611 day
285 rows · download CSV

Project Type & Subtype Changes

The mix of project types shows relative stability, with roadway projects comprising 77.7% of the pipeline, up from 76.1%. There were 26 type/subtype transitions observed, signaling some reclassification activity, although significant churn remains limited.

SubtypeMay 4Jun 3Δ (pp, n)
Roadway76.1% (4,326)77.7% (4,368)+1.6 (+42)
Bridge15.3% (868)13.6% (766)-1.6 (-102)
Local Let3.5% (199)3.4% (189)-0.1 (-10)
Non Roadway2.1% (118)1.9% (109)-0.1 (-9)
Rail - Safety1.3% (75)1.1% (63)-0.2 (-12)
CSJDistrictEst. Letting DateProject EstimateCurrent TypeCurrent SubtypeType/Subtype ΔPrev. TypePrev. SubtypePrev. CostPrev. DateLetting Δ (days)Letting Date ΔCost Δ%Cost ΔLifecycle
1378-01-059Austin08/01/26$5,030,542.52Non-LetBridgeUnassigned → Non-Let / BridgeUnassignedUnassigned$1.0008/01/253651 year$5,030,541.52503054152%
0535-02-050San Antonio08/05/26$5,699,898.82ConstructionBridgeUnassigned → Construction / BridgeUnassignedUnassigned$5,699,898.8209/01/31-1853-5 years
0047-06-178Dallas09/02/26$1,208,060.70ConstructionRoadwayConstruction / Non Roadway → Construction / RoadwayConstructionNon Roadway$1,208,060.7009/02/260
0047-14-092Dallas09/02/26$2,018,779.35ConstructionRoadwayConstruction / Non Roadway → Construction / RoadwayConstructionNon Roadway$2,018,779.3509/02/260
2635-03-030Amarillo11/03/26$287,000.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$700,000.0011/01/40-5112-14 years$(413,000.00)-59%
2786-01-020Brownwood11/03/26$23,985.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$23,985.0011/01/29-1094-3 years
0081-06-050Dallas01/01/27$907,463.00ConstructionLocal LetConstruction / Roadway → Construction / Local LetConstructionRoadway$907,463.0001/01/270
0976-03-125Houston04/06/27$2,200,000.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$2,200,000.0007/01/30-1182-3 years
2263-02-110Corpus Christi07/01/27$15,000,000.00ConstructionFerry BoatUnassigned → Construction / Ferry BoatUnassignedUnassigned$15,000,000.0009/01/29-793-2 years
0186-05-050Bryan10/05/27$150,000.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$178,206.0010/01/35-2918-8 years$(28,206.00)-16%
0747-05-048Fort Worth12/01/27$200,000.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$200,000.0012/01/29-731-2 years
0348-12-017Corpus Christi02/02/28$3,200,000.00ConstructionBridgeUnassigned → Construction / BridgeUnassignedUnassigned$2,500,000.0009/01/30-942-3 years$700,000.0028%
0229-02-050Odessa03/07/28$6,500,000.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$6,500,000.0003/01/31-1089-3 years
0907-00-243San Angelo06/13/28$8,509,000.00ConstructionRoadwayConstruction / Local Let → Construction / RoadwayConstructionLocal Let$8,509,000.0006/13/280
0367-02-084Houston09/06/28$456,000.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$500,000.0009/01/31-1090-3 years$(44,000.00)-9%
1003-01-098Houston09/06/28$1,088,146.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$1,088,146.0009/01/31-1090-3 years
0008-08-085Dallas11/01/28$15,241,283.40ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$15,241,283.4011/01/29-365-1 year
0127-02-144Brownwood11/01/28$341,972.59ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$341,972.5911/01/31-1095-3 years
0776-03-016Brownwood11/01/28$86,544.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$86,544.0011/01/29-365-1 year
3510-04-083Houston11/01/28$66,500,000.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$66,500,000.0001/01/37-2983-8 years
3510-03-002Houston12/15/28$55,381,565.00Alternative DeliveryDesign BuildUnassigned → Alternative Delivery / Design BuildUnassignedUnassigned$55,381,565.0001/15/37-2953-8 years
3510-03-004Houston12/15/28$76,000,000.00Alternative DeliveryDesign BuildUnassigned → Alternative Delivery / Design BuildUnassignedUnassigned$76,000,000.0001/15/37-2953-8 years
0102-01-124Corpus Christi03/01/29$1,598,373.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$1,598,373.0003/01/37-2922-8 years
0299-04-088Laredo03/01/29$3,004,045.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$3,004,045.0002/01/30-337-11 months
0102-07-048Pharr04/01/29$19,094,764.32ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$19,094,764.3204/01/30-365-1 year
2436-01-031Brownwood04/01/29$5,000,000.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$5,000,000.0001/01/30-275-9 months
26 rows · download CSV

Cost Changes

The total pipeline value decreased by $51.09M, moving from $5.73B to $5.67B. Costs concentrated within construction projects saw a net increase of $38.10M overall. Notably, the largest cost increase was in San Antonio, which gained $84.94M, while Austin faced the largest decrease at -$61.19M across the same timeframe, emphasizing adjustments within the existing project framework.

CSJDistrictEst. Letting DateProject EstimateCurrent TypeCurrent SubtypePrev. TypePrev. SubtypePrev. CostCost Δ%Cost ΔLetting Δ (days)Letting Date ΔType/Subtype ΔLifecycle
1378-01-059Austin08/01/26$5,030,542.52Non-LetBridgeUnassignedUnassigned$1.00$5,030,541.52503054152%3651 yearUnassigned → Non-Let / Bridge
0480-04-032Brownwood11/03/26$823,846.00ConstructionRoadwayConstructionRoadway$23,351.00$800,495.003428%0
0257-02-042Brownwood11/03/26$355,605.00ConstructionRoadwayConstructionRoadway$15,928.00$339,677.002133%0
0452-03-036Brownwood11/03/26$547,407.00ConstructionRoadwayConstructionRoadway$25,346.00$522,061.002060%0
2638-01-028Brownwood11/03/26$843,798.00ConstructionRoadwayConstructionRoadway$39,662.00$804,136.002027%0
0869-02-018Brownwood11/03/26$570,977.00ConstructionRoadwayConstructionRoadway$54,276.00$516,701.00952%0
0080-03-063Fort Worth03/03/27$7,312,608.09ConstructionRoadwayConstructionRoadway$1,401,871.88$5,910,736.21422%0
2206-02-009Austin11/03/26$807,488.46ConstructionRoadwayConstructionRoadway$201,768.27$605,720.19300%0
1875-03-023Lufkin09/01/27$16,643,518.52ConstructionRoadwayConstructionRoadway$4,453,125.00$12,190,393.52274%0
0912-56-061Houston02/02/28$662,769.00ConstructionBridgeConstructionBridge$240,000.00$422,769.00176%0
0027-02-034Yoakum01/01/29$21,600,000.00ConstructionRoadwayConstructionRoadway$8,200,000.00$13,400,000.00163%1174 months
0073-02-091San Antonio10/04/28$8,062,084.00ConstructionRoadwayConstructionRoadway$3,067,833.00$4,994,251.00163%3651 year
0912-72-657Houston10/05/27$1,049,626.00ConstructionBridgeConstructionBridge$400,000.00$649,626.00162%0
1219-01-020Waco09/01/27$447,175.93ConstructionRoadwayConstructionRoadway$172,275.00$274,900.93160%0
0314-04-040Fort Worth07/01/26$96,192.93ConstructionBridgeConstructionBridge$43,907.58$52,285.35119%0
2638-05-012Brownwood11/03/26$136,716.00ConstructionRoadwayConstructionRoadway$62,986.00$73,730.00117%0
0213-02-049Lufkin11/03/26$850,000.00ConstructionRoadwayConstructionRoadway$402,349.72$447,650.28111%0
3176-01-012Corpus Christi11/02/27$10,000,000.00ConstructionRoadwayConstructionRoadway$5,170,000.00$4,830,000.0093%1244 months
0056-02-034Waco09/02/26$2,824,625.00ConstructionRoadwayConstructionRoadway$1,468,805.00$1,355,820.0092%0
1192-03-018Waco09/02/26$617,019.23ConstructionRoadwayConstructionRoadway$320,850.00$296,169.2392%0
0289-04-038Brownwood11/01/34$45,721.00ConstructionRoadway$545,721.00$(500,000.00)-92%21916 years
0182-01-020Brownwood11/02/27$100,000.00ConstructionRoadwayConstructionRoadway$1,000,000.00$(900,000.00)-90%0
0912-34-227Houston02/02/28$944,486.00ConstructionBridgeConstructionBridge$500,000.00$444,486.0089%0
0275-02-074Amarillo12/01/27$1,000,000.00ConstructionRoadwayConstructionRoadway$7,900,000.00$(6,900,000.00)-87%0
0519-02-026Waco09/01/27$1,113,787.04ConstructionRoadwayConstructionRoadway$598,000.00$515,787.0486%0
0231-04-066Waco09/01/27$2,821,962.96ConstructionRoadwayConstructionRoadway$1,524,640.00$1,297,322.9685%0
0912-34-226Houston02/02/28$918,026.00ConstructionBridgeConstructionBridge$500,000.00$418,026.0084%0
0192-02-070Houston06/01/28$1,800,000.00ConstructionRoadwayConstructionRoadway$1,000,000.00$800,000.0080%0
0057-04-035Bryan07/01/26$15,720.99ConstructionRoadwayConstructionRoadway$9,072.53$6,648.4673%0
0050-05-071Houston08/05/26$1,971,805.50ConstructionRoadwayConstructionRoadway$1,144,025.00$827,780.5072%0
1971-01-017Bryan07/01/26$86,709.33ConstructionRoadwayConstructionRoadway$272,226.93$(185,517.60)-68%0
0050-06-108Houston08/05/26$1,380,770.05ConstructionBridgeConstructionBridge$4,302,581.00$(2,921,810.95)-68%0
0117-06-053Lufkin11/03/26$380,000.00ConstructionRoadwayConstructionRoadway$1,133,251.43$(753,251.43)-66%0
0413-05-039Bryan07/01/26$180,964.20ConstructionRoadwayConstructionRoadway$525,448.20$(344,484.00)-66%0
1148-02-021Bryan07/01/26$115,251.76ConstructionRoadwayConstructionRoadway$328,623.76$(213,372.00)-65%0
2708-01-036San Antonio02/02/27$8,000,000.00ConstructionRoadwayConstructionRoadway$22,285,674.00$(14,285,674.00)-64%0
0314-04-039Fort Worth07/01/26$41,142.75ConstructionBridgeConstructionBridge$25,160.09$15,982.6664%0
0093-03-027Bryan07/01/26$41,461.35ConstructionRoadwayConstructionRoadway$25,432.11$16,029.2463%0
0185-01-045Waco09/02/26$144,855.77ConstructionRoadwayConstructionRoadway$391,690.00$(246,834.23)-63%0
0050-08-104Houston02/01/29$10,000,000.00ConstructionRoadwayConstructionRoadway$27,031,845.00$(17,031,845.00)-63%0
0042-01-032Amarillo12/01/26$470,000.00ConstructionRoadwayConstructionRoadway$1,268,520.00$(798,520.00)-63%0
0016-09-044Austin02/01/29$2,638,862.50ConstructionRoadwayConstructionRoadway$1,623,159.82$1,015,702.6863%0
0169-09-021Amarillo11/03/26$300,000.00ConstructionRoadwayConstructionRoadway$780,000.00$(480,000.00)-62%0
0262-06-036Bryan07/01/26$211,159.98ConstructionRoadwayConstructionRoadway$535,183.90$(324,023.92)-61%0
0317-01-045Abilene09/01/27$5,250,000.00ConstructionRoadwayConstructionRoadway$3,300,000.00$1,950,000.0059%0
2635-03-030Amarillo11/03/26$287,000.00ConstructionRoadwayUnassignedUnassigned$700,000.00$(413,000.00)-59%-5112-14 yearsUnassigned → Construction / Roadway
3510-04-069Houston08/05/26$25,084,165.45ConstructionRoadwayConstructionRoadway$16,103,912.00$8,980,253.4556%-28-28 days
0169-06-043Amarillo11/03/26$400,000.00ConstructionRoadwayConstructionRoadway$900,000.00$(500,000.00)-56%0
0169-08-029Amarillo11/03/26$550,000.00ConstructionRoadwayConstructionRoadway$1,230,000.00$(680,000.00)-55%0
0109-06-046Lufkin11/03/26$210,000.00ConstructionRoadwayConstructionRoadway$467,751.43$(257,751.43)-55%0
0166-01-060Dallas08/05/26$1,337,640.54ConstructionRoadwayConstructionRoadway$2,960,775.84$(1,623,135.30)-55%-210-7 months
0475-09-041Lufkin11/03/26$450,000.00ConstructionRoadwayConstructionRoadway$958,397.04$(508,397.04)-53%0
0338-03-102Houston09/06/28$151,021.00ConstructionRoadwayConstructionRoadway$313,461.82$(162,440.82)-52%0
0109-06-045Lufkin11/03/26$350,000.00ConstructionRoadwayConstructionRoadway$666,291.14$(316,291.14)-47%0
0720-02-095Houston09/01/27$528,000.00ConstructionRoadwayConstructionRoadway$1,000,000.00$(472,000.00)-47%-371-1 year
0002-14-048El Paso04/02/27$6,166,337.98ConstructionLocal LetConstructionLocal Let$11,667,327.88$(5,500,989.90)-47%0
0617-01-214Corpus Christi03/01/29$2,400,000.00ConstructionRoadwayConstructionRoadway$4,500,000.00$(2,100,000.00)-47%0
0336-07-078Lufkin11/03/26$310,000.00ConstructionRoadwayConstructionRoadway$579,383.60$(269,383.60)-46%0
0791-05-022Amarillo11/03/26$700,000.00ConstructionRoadwayConstructionRoadway$1,300,000.00$(600,000.00)-46%0
0527-02-017Houston09/01/27$888,000.00ConstructionRoadwayConstructionRoadway$1,597,309.00$(709,309.00)-44%0
0834-04-026Waco09/01/27$495,879.63ConstructionRoadwayConstructionRoadway$344,500.00$151,379.6344%0
0714-01-016Fort Worth11/03/26$108,470.00ConstructionRoadwayConstructionRoadway$189,398.00$(80,928.00)-43%0
0810-03-016Lufkin11/03/26$260,000.00ConstructionRoadwayConstructionRoadway$451,145.62$(191,145.62)-42%0
0731-01-058Atlanta07/01/26$1,973,067.92ConstructionRoadwayConstructionRoadway$3,405,908.79$(1,432,840.87)-42%0
0110-06-151Houston10/06/26$1,005,152.06ConstructionRoadwayConstructionRoadway$1,727,740.95$(722,588.89)-42%0
1491-01-020Amarillo11/03/26$1,000,000.00ConstructionRoadwayConstructionRoadway$1,700,000.00$(700,000.00)-41%0
1492-01-013Dallas08/05/26$1,878,822.25ConstructionRoadwayConstructionRoadway$1,331,491.45$547,330.8041%-118-4 months
0151-04-075Austin12/01/27$907,553.70ConstructionRoadwayConstructionRoadway$644,338.89$263,214.8141%0
3538-01-063Houston08/05/26$178,462.50ConstructionRoadwayConstructionRoadway$128,855.00$49,607.5039%0
0199-07-012Lufkin11/03/26$50,000.00ConstructionRoadwayConstructionRoadway$80,469.95$(30,469.95)-38%0
0266-13-019Yoakum03/03/27$4,241,000.00ConstructionRoadwayConstructionRoadway$3,089,000.00$1,152,000.0037%0
0028-01-109Houston08/05/26$171,349.50ConstructionRoadwayConstructionRoadway$271,016.00$(99,666.50)-37%0
0015-08-430Austin03/03/27$3,534,578.85ConstructionRoadwayConstructionRoadway$2,584,436.11$950,142.7437%-244-8 months
0204-06-069Bryan08/05/26$394,845.83ConstructionRoadwayConstructionRoadway$616,000.00$(221,154.17)-36%0
3027-01-007Waco09/02/26$213,317.31ConstructionRoadwayConstructionRoadway$157,000.00$56,317.3136%0
0337-03-020Austin09/02/26$3,257,848.14ConstructionRoadwayConstructionRoadway$5,060,576.92$(1,802,728.78)-36%0
0054-05-027Brownwood11/03/26$98,099.00ConstructionRoadwayConstructionRoadway$72,594.00$25,505.0035%0
2726-01-016Amarillo11/03/26$800,000.00ConstructionRoadwayConstructionRoadway$1,225,000.00$(425,000.00)-35%0
0059-05-048Lufkin11/03/26$560,000.00ConstructionRoadwayConstructionRoadway$848,152.64$(288,152.64)-34%0
1469-01-024Fort Worth11/02/27$1,159,322.75ConstructionRoadwayConstructionRoadway$1,740,013.40$(580,690.65)-33%0
1479-01-029San Antonio09/02/26$1,240,368.40ConstructionRoadwayConstructionRoadway$1,858,522.00$(618,153.60)-33%0
0336-01-071Lufkin11/03/26$350,000.00ConstructionRoadwayConstructionRoadway$520,640.54$(170,640.54)-33%0
1729-01-020San Antonio10/06/26$343,000.00ConstructionRoadwayConstructionRoadway$258,467.00$84,533.0033%0
0364-05-043Fort Worth08/05/26$825,559.00ConstructionRoadwayConstructionRoadway$1,221,633.00$(396,074.00)-32%0
2270-01-030Abilene05/03/28$2,200,000.00ConstructionRoadwayConstructionRoadway$1,666,666.67$533,333.3332%0
3158-01-047Houston08/05/26$338,688.50ConstructionRoadwayConstructionRoadway$496,803.00$(158,114.50)-32%0
0290-02-017Austin03/07/28$1,440,583.33ConstructionRoadwayConstructionRoadway$2,053,907.41$(613,324.08)-30%0
0320-05-018Waco08/05/26$536,405.82ConstructionRoadwayConstructionRoadway$764,436.00$(228,030.18)-30%0
0113-13-193Austin12/01/26$6,183,003.85ConstructionRoadwayConstructionRoadway$8,789,640.38$(2,606,636.53)-30%0
0029-03-057Austin10/05/27$1,177,745.48ConstructionRoadwayConstructionRoadway$1,670,221.30$(492,475.82)-29%0
0348-12-017Corpus Christi02/02/28$3,200,000.00ConstructionBridgeUnassignedUnassigned$2,500,000.00$700,000.0028%-942-3 yearsUnassigned → Construction / Bridge
0001-02-080El Paso09/01/27$416,666.67ConstructionRoadwayConstructionRoadway$326,239.81$90,426.8628%0
0093-01-108Dallas08/05/26$2,373,824.25ConstructionRoadwayConstructionRoadway$3,245,497.20$(871,672.95)-27%-210-7 months
0496-01-025Childress07/01/26$266,196.60ConstructionRoadwayConstructionRoadway$363,849.00$(97,652.40)-27%0
0007-05-016Brownwood11/03/26$10,000,000.00ConstructionRoadwayConstructionRoadway$13,600,000.00$(3,600,000.00)-26%0
0008-08-081Dallas12/02/28$2,417,014.29ConstructionLocal LetConstructionLocal Let$1,920,000.00$497,014.2926%0
0110-07-022Houston10/06/26$349,907.13ConstructionRoadwayConstructionRoadway$464,909.35$(115,002.22)-25%0
0140-05-028Odessa11/03/26$671,189.90ConstructionBridgeConstructionBridge$886,246.00$(215,056.10)-24%0
1510-01-024Lufkin11/03/26$420,000.00ConstructionRoadwayConstructionRoadway$553,142.86$(133,142.86)-24%0
0441-07-079Odessa11/03/26$647,802.80ConstructionBridgeConstructionBridge$848,068.00$(200,265.20)-24%0
0388-06-006Lufkin11/03/26$50,000.00ConstructionRoadwayConstructionRoadway$65,180.65$(15,180.65)-23%0
0990-02-014Corpus Christi11/01/28$8,000,000.00ConstructionRoadwayConstructionRoadway$6,500,000.00$1,500,000.0023%0
0266-05-055Yoakum07/01/26$694,213.00ConstructionRoadwayConstructionRoadway$894,213.00$(200,000.00)-22%0
0314-04-037Fort Worth07/01/26$341,297.51ConstructionBridgeConstructionBridge$437,865.47$(96,567.96)-22%0
0848-01-044San Antonio03/03/27$12,500,000.00ConstructionRoadwayConstructionRoadway$15,977,033.00$(3,477,033.00)-22%0
1809-01-023Bryan07/01/26$1,050.50ConstructionRoadwayConstructionRoadway$862.92$187.5822%0
0366-01-089Austin11/03/26$225,793.27ConstructionRoadwayConstructionRoadway$288,461.54$(62,668.27)-22%0
0283-02-040Wichita Falls08/05/26$4,248,978.39ConstructionRoadwayConstructionRoadway$3,500,000.00$748,978.3921%-154-5 months
3158-01-048Houston04/01/29$2,859,997.00ConstructionRoadwayConstructionRoadway$2,364,536.00$495,461.0021%0
2452-01-079San Antonio01/05/28$15,679,700.00ConstructionRoadwayConstructionRoadway$13,000,000.00$2,679,700.0021%0
1745-01-021Houston09/01/27$1,600,000.00ConstructionRoadwayConstructionRoadway$2,000,000.00$(400,000.00)-20%0
0254-01-149Corpus Christi08/05/26$12,000,000.00ConstructionRoadwayConstructionRoadway$15,000,000.00$(3,000,000.00)-20%-330-11 months
2810-01-014Lufkin11/03/26$210,000.00ConstructionRoadwayConstructionRoadway$261,929.67$(51,929.67)-20%0
0311-01-019Childress07/01/26$545,969.97ConstructionRoadwayConstructionRoadway$678,234.00$(132,264.03)-20%0
0720-02-114Houston04/06/27$724,693.00ConstructionRoadwayConstructionRoadway$900,000.00$(175,307.00)-19%0
0165-02-061Tyler07/01/26$62,823,120.04ConstructionRoadwayConstructionRoadway$77,883,082.55$(15,059,962.51)-19%0
0421-01-053San Antonio10/01/29$30,000,000.00ConstructionRoadway$25,202,059.00$4,797,941.0019%6702 years
0165-03-036Tyler07/01/26$38,029,749.91ConstructionRoadwayConstructionRoadway$46,939,079.29$(8,909,329.38)-19%0
0573-02-009Austin09/01/27$8,935,220.37ConstructionRoadwayConstructionRoadway$7,516,940.74$1,418,279.6319%0
0976-07-019Houston02/01/29$3,734,039.00ConstructionRoadwayConstructionRoadway$4,589,682.24$(855,643.24)-19%0
1812-01-024Houston08/05/26$871,111.50ConstructionRoadwayConstructionRoadway$1,069,424.00$(198,312.50)-19%0
3538-01-064Houston08/05/26$79,614.00ConstructionRoadwayConstructionRoadway$67,491.00$12,123.0018%0
0092-06-111Dallas08/05/26$2,943,326.59ConstructionRoadwayConstructionRoadway$3,568,976.88$(625,650.29)-18%-210-7 months
0573-02-008Austin09/02/26$5,595,395.23ConstructionRoadwayConstructionRoadway$6,754,048.08$(1,158,652.85)-17%0
0327-08-109Pharr08/05/26$224,192.00ConstructionNon RoadwayConstructionNon Roadway$270,001.00$(45,809.00)-17%0
2748-02-015Lufkin11/03/26$110,000.00ConstructionRoadwayConstructionRoadway$132,373.45$(22,373.45)-17%0
0917-16-042Bryan08/05/26$457,508.40ConstructionBridgeConstructionBridge$550,524.90$(93,016.50)-17%0
0610-05-060Atlanta08/05/26$13,081,456.70ConstructionRoadwayConstructionRoadway$11,193,279.34$1,888,177.3617%0
1558-03-114Corpus Christi12/05/28$15,000,000.00ConstructionRoadwayConstructionRoadway$18,000,000.00$(3,000,000.00)-17%0
0258-03-048Waco09/02/26$547,375.00ConstructionRoadwayConstructionRoadway$469,270.00$78,105.0017%0
0211-03-039Austin12/01/26$2,489,243.27ConstructionRoadwayConstructionRoadway$2,983,476.92$(494,233.65)-17%0
0492-04-034Tyler07/01/26$40,176,061.12ConstructionRoadwayConstructionRoadway$48,109,014.53$(7,932,953.41)-16%0
0047-04-041Dallas06/01/27$1,470,022.23ConstructionRoadwayConstructionRoadway$1,749,097.74$(279,075.51)-16%0
0117-09-006Bryan07/01/26$22,306.65ConstructionRoadwayConstructionRoadway$26,530.90$(4,224.25)-16%0
1200-01-029Austin12/01/27$1,192,495.37ConstructionRoadwayConstructionRoadway$1,029,212.96$163,282.4116%0
0186-05-050Bryan10/05/27$150,000.00ConstructionRoadwayUnassignedUnassigned$178,206.00$(28,206.00)-16%-2918-8 yearsUnassigned → Construction / Roadway
1023-01-039Beaumont08/05/26$481,150.01ConstructionRoadwayConstructionRoadway$415,600.00$65,550.0116%0
0917-16-044Bryan08/05/26$509,190.00ConstructionBridgeConstructionBridge$603,666.00$(94,476.00)-16%0
0917-16-040Bryan08/05/26$593,282.20ConstructionBridgeConstructionBridge$702,786.45$(109,504.25)-16%0
0338-02-046Houston09/06/28$587,072.00ConstructionRoadwayConstructionRoadway$508,316.46$78,755.5415%0
2510-01-020Lufkin11/03/26$60,000.00ConstructionRoadwayConstructionRoadway$70,813.55$(10,813.55)-15%0
0441-09-054Odessa08/05/26$17,048,526.81ConstructionRoadwayConstructionRoadway$14,800,000.00$2,248,526.8115%-118-4 months
3417-02-036Austin11/02/27$5,839,377.78ConstructionRoadwayConstructionRoadway$6,882,865.74$(1,043,487.96)-15%0
0720-02-105Houston08/05/26$176,288.25ConstructionRoadwayConstructionRoadway$153,356.00$22,932.2515%0
0496-04-039Childress07/01/26$204,812.17ConstructionRoadwayConstructionRoadway$240,676.00$(35,863.83)-15%0
0917-16-041Bryan08/05/26$518,058.90ConstructionBridgeConstructionBridge$607,979.40$(89,920.50)-15%0
1202-01-021Austin09/01/27$3,808,187.96ConstructionRoadwayConstructionRoadway$3,333,333.33$474,854.6314%0
0918-47-542Dallas11/02/27$902,431.20ConstructionRoadwayConstructionRoadway$790,489.00$111,942.2014%0
1876-01-043Lufkin11/03/26$190,000.00ConstructionRoadwayConstructionRoadway$221,292.35$(31,292.35)-14%0
0014-03-088Fort Worth07/01/26$71,230,243.02ConstructionRoadwayConstructionRoadway$82,826,148.94$(11,595,905.92)-14%0
1801-01-064Pharr09/02/26$469,360.04ConstructionRoadwayConstructionRoadway$411,791.00$57,569.0414%0
0066-03-045Amarillo11/03/26$2,500,000.00ConstructionRoadwayConstructionRoadway$2,900,000.00$(400,000.00)-14%0
1418-03-021Houston11/15/26$431,140.00Non-LetRail - SafetyNon-LetRail - Safety$500,000.00$(68,860.00)-14%0
1012-03-027Dallas08/05/26$9,867,597.40ConstructionRoadwayConstructionRoadway$8,673,294.25$1,194,303.1514%-118-4 months
2317-01-013Amarillo04/05/28$13,000,000.00ConstructionBridgeConstructionBridge$15,000,000.00$(2,000,000.00)-13%0
0185-03-037Bryan07/01/26$80,963.61ConstructionRoadwayConstructionRoadway$71,519.04$9,444.5713%0
0050-06-106Houston08/05/26$666,700.50ConstructionRoadwayConstructionRoadway$589,346.00$77,354.5013%0
0211-10-053Yoakum07/01/26$1,740,773.38ConstructionRoadwayConstructionRoadway$2,000,000.00$(259,226.62)-13%0
0095-04-079Dallas08/05/26$1,166,626.06ConstructionBridgeConstructionBridge$1,338,522.57$(171,896.51)-13%0
0872-04-037Pharr08/05/26$345,165.48ConstructionRoadwayConstructionRoadway$305,999.93$39,165.5513%0
1023-01-040Beaumont08/05/26$2,012,098.18ConstructionRoadwayConstructionRoadway$2,300,000.00$(287,901.82)-13%0
2326-01-033El Paso01/05/28$416,666.67ConstructionRoadwayConstructionRoadway$370,363.89$46,302.7813%0
0016-01-142Austin12/01/26$2,705,164.42ConstructionRoadwayConstructionRoadway$3,087,441.35$(382,276.93)-12%0
0747-01-021Dallas01/01/29$3,269,965.03ConstructionBridgeConstructionBridge$3,727,742.12$(457,777.09)-12%0
1586-01-085Pharr08/05/26$6,597,423.30ConstructionRoadwayConstructionRoadway$7,514,832.00$(917,408.70)-12%-154-5 months
0747-01-020Dallas01/01/29$2,868,310.60ConstructionBridgeConstructionBridge$3,264,405.21$(396,094.61)-12%0
0991-02-014Corpus Christi08/05/26$10,085,299.15ConstructionRoadwayConstructionRoadway$9,000,000.00$1,085,299.1512%0
0420-01-051Yoakum08/05/26$5,670,190.45ConstructionRoadwayConstructionRoadway$6,423,958.00$(753,767.55)-12%0
1377-01-023Austin04/05/28$577,495.37ConstructionRoadwayConstructionRoadway$517,403.70$60,091.6712%0
0912-72-857Houston09/06/28$563,468.00ConstructionRoadwayConstructionRoadway$637,366.33$(73,898.33)-12%0
0521-06-175San Antonio08/05/26$2,977,217.14ConstructionRoadwayConstructionRoadway$2,670,328.38$306,888.7611%0
0553-03-038Lufkin11/03/26$580,000.00ConstructionRoadwayConstructionRoadway$654,220.65$(74,220.65)-11%0
0446-01-056Yoakum07/01/26$1,591,665.95ConstructionRoadwayConstructionRoadway$1,791,665.95$(200,000.00)-11%0
0492-04-048Tyler08/04/27$1,169,985.00ConstructionRoadwayConstructionRoadway$1,052,917.27$117,067.7311%0
1582-01-025Lufkin06/01/29$3,267,117.40ConstructionBridgeConstructionBridge$2,940,386.00$326,731.4011%0
1582-01-026Lufkin06/01/29$3,549,996.50ConstructionBridgeConstructionBridge$3,194,964.00$355,032.5011%0
0520-06-047Tyler08/04/27$1,303,730.00ConstructionRoadwayConstructionRoadway$1,173,357.00$130,373.0011%0
0697-02-067Tyler08/04/27$1,350,352.00ConstructionRoadwayConstructionRoadway$1,215,316.80$135,035.2011%0
0027-10-074Houston08/05/26$3,967,039.00ConstructionBridgeConstructionBridge$4,454,282.00$(487,243.00)-11%0
0018-05-089Laredo08/05/26$228,583,900.49ConstructionRoadwayConstructionRoadway$256,120,160.76$(27,536,260.27)-11%-300-10 months
0492-04-041Tyler07/01/26$24,213,212.87ConstructionRoadwayConstructionRoadway$27,128,231.85$(2,915,018.98)-11%0
0111-08-134Houston01/01/29$340,287.00ConstructionRoadwayConstructionRoadway$381,121.40$(40,834.40)-11%0
0192-03-023Houston01/01/29$448,573.00ConstructionRoadwayConstructionRoadway$502,401.31$(53,828.31)-11%0
0179-01-052Houston12/05/28$518,273.00ConstructionRoadwayConstructionRoadway$580,465.38$(62,192.38)-11%0
0178-03-162Houston11/01/28$296,360.00ConstructionRoadwayConstructionRoadway$331,923.65$(35,563.65)-11%0
0271-16-172Houston11/01/28$1,265,799.00ConstructionRoadwayConstructionRoadway$1,417,694.40$(151,895.40)-11%0
0111-08-133Houston10/04/28$378,799.00ConstructionRoadwayConstructionRoadway$424,254.34$(45,455.34)-11%0
0271-15-106Houston10/04/28$774,390.00ConstructionRoadwayConstructionRoadway$867,317.35$(92,927.35)-11%0
0912-00-774Houston09/06/28$807,880.00ConstructionRoadwayConstructionRoadway$904,825.59$(96,945.59)-11%0
0912-72-851Houston09/06/28$69,173.00ConstructionRoadwayConstructionRoadway$77,474.21$(8,301.21)-11%0
0912-72-853Houston09/06/28$1,312,896.00ConstructionRoadwayConstructionRoadway$1,470,443.30$(157,547.30)-11%0
0912-72-860Houston09/06/28$458,486.00ConstructionRoadwayConstructionRoadway$513,504.24$(55,018.24)-11%0
0912-72-861Houston09/06/28$213,145.00ConstructionRoadwayConstructionRoadway$238,722.77$(25,577.77)-11%0
1003-01-113Houston09/06/28$447,805.00ConstructionRoadwayConstructionRoadway$501,541.67$(53,736.67)-11%0
1524-01-090Houston09/06/28$441,911.00ConstructionRoadwayConstructionRoadway$494,940.77$(53,029.77)-11%0
0192-02-069Houston09/01/27$474,554.00ConstructionRoadwayConstructionRoadway$531,500.26$(56,946.26)-11%0
0384-01-028Austin12/01/27$3,688,967.59ConstructionRoadwayConstructionRoadway$4,129,750.00$(440,782.41)-11%0
2399-01-088Bryan05/05/27$13,110.58ConstructionLocal LetConstructionLocal Let$14,661.00$(1,550.42)-11%0
0014-15-034Fort Worth08/05/26$16,946,001.10ConstructionRoadwayConstructionRoadway$18,925,918.73$(1,979,917.63)-10%0
1378-01-054Austin02/02/28$5,257,091.67ConstructionRoadwayConstructionRoadway$4,762,312.96$494,778.7110%0
0315-02-061Bryan07/01/26$20,672.83ConstructionRoadwayConstructionRoadway$18,748.81$1,924.0210%0
2374-04-099Dallas06/01/27$931,467.08ConstructionRoadwayConstructionRoadway$1,036,691.04$(105,223.96)-10%0
0315-03-073Bryan07/01/26$85,570.95ConstructionRoadwayConstructionRoadway$77,696.54$7,874.4110%0
0712-02-021Fort Worth07/01/26$1,428,638.47ConstructionRoadwayConstructionRoadway$1,297,721.50$130,916.9710%0
1228-03-052Pharr08/05/26$648,520.91ConstructionRoadwayConstructionRoadway$720,842.00$(72,321.09)-10%0
3158-01-050Houston02/01/29$4,954,011.00ConstructionRoadwayConstructionRoadway$5,500,000.00$(545,989.00)-10%0
0718-02-079Fort Worth07/01/26$318,033.50ConstructionRoadwayConstructionRoadway$353,033.50$(35,000.00)-10%0
0014-03-103Fort Worth08/05/26$3,991,946.40ConstructionBridgeConstructionBridge$4,429,192.32$(437,245.92)-10%0
0014-15-033Fort Worth08/05/26$8,282,938.75ConstructionRoadwayConstructionRoadway$9,188,337.11$(905,398.36)-10%0
0047-07-250Dallas06/01/27$742,221.17ConstructionRoadwayConstructionRoadway$822,114.43$(79,893.26)-10%0
0222-03-065Atlanta08/05/26$11,659,080.64ConstructionRoadwayConstructionRoadway$12,904,737.36$(1,245,656.72)-10%0
0320-03-105Austin03/07/28$7,938,860.19ConstructionRoadwayConstructionRoadway$8,763,500.00$(824,639.81)-9%0
0003-02-053El Paso01/05/28$740,740.74ConstructionRoadwayConstructionRoadway$678,403.70$62,337.049%0
0261-02-085Dallas06/01/27$935,327.77ConstructionRoadwayConstructionRoadway$1,030,001.89$(94,674.12)-9%0
0248-03-024Atlanta11/02/27$12,186,040.75ConstructionRoadwayConstructionRoadway$13,405,864.00$(1,219,823.25)-9%0
1194-01-025Lufkin11/03/26$660,000.00ConstructionRoadwayConstructionRoadway$605,938.69$54,061.319%0
0367-02-084Houston09/06/28$456,000.00ConstructionRoadwayUnassignedUnassigned$500,000.00$(44,000.00)-9%-1090-3 yearsUnassigned → Construction / Roadway
0978-01-045Houston07/01/26$1,205,072.40ConstructionRoadwayConstructionRoadway$1,319,719.40$(114,647.00)-9%0
1685-05-140Houston08/05/26$2,645,375.20ConstructionRoadwayConstructionRoadway$2,437,069.00$208,306.209%0
0259-05-086Fort Worth07/01/26$616,970.35ConstructionRoadwayConstructionRoadway$568,444.50$48,525.859%0
0016-09-045Austin11/03/26$213,254.81ConstructionRoadwayConstructionRoadway$233,062.50$(19,807.69)-9%0
0173-04-059Dallas08/05/26$7,203,790.42ConstructionRoadwayConstructionRoadway$6,640,524.42$563,266.008%0
0304-02-042Lufkin11/03/26$840,000.00ConstructionRoadwayConstructionRoadway$916,552.66$(76,552.66)-8%0
0587-01-070Houston07/06/28$4,026,250.00ConstructionNon RoadwayConstructionNon Roadway$4,391,550.00$(365,300.00)-8%0
0587-01-071Houston07/06/28$4,026,250.00ConstructionNon RoadwayConstructionNon Roadway$4,391,550.00$(365,300.00)-8%0
0140-01-083Odessa11/03/26$146,332.10ConstructionBridgeConstructionBridge$159,563.00$(13,230.90)-8%0
1373-01-014Waco09/02/26$347,115.38ConstructionRoadwayConstructionRoadway$320,850.00$26,265.388%0
0057-04-036Bryan07/01/26$41,370.47ConstructionRoadwayConstructionRoadway$38,310.83$3,059.648%0
0261-03-071Dallas06/01/27$977,421.06ConstructionRoadwayConstructionRoadway$1,059,743.69$(82,322.63)-8%0
1012-03-028Dallas08/05/26$6,866,910.20ConstructionRoadwayConstructionRoadway$6,373,822.30$493,087.908%-118-4 months
0014-15-036Fort Worth08/05/26$19,258,280.90ConstructionRoadwayConstructionRoadway$20,865,852.16$(1,607,571.26)-8%0
0151-06-158Austin03/07/28$2,948,634.26ConstructionRoadwayConstructionRoadway$2,740,116.67$208,517.598%0
0014-15-035Fort Worth08/05/26$1,400,739.80ConstructionRoadwayConstructionRoadway$1,515,651.69$(114,911.89)-8%0
0092-02-146Dallas07/01/26$432,029.85ConstructionRoadwayConstructionRoadway$466,949.50$(34,919.65)-7%0
3510-04-066Houston07/01/26$20,082,206.39ConstructionRoadwayConstructionRoadway$21,704,627.94$(1,622,421.55)-7%0
3447-01-008Waco09/01/27$160,416.67ConstructionRoadwayConstructionRoadway$173,300.00$(12,883.33)-7%0
0290-03-031Austin03/07/28$4,474,535.19ConstructionRoadwayConstructionRoadway$4,832,498.15$(357,962.96)-7%0
0015-05-053Waco09/01/27$145,555.56ConstructionRoadwayConstructionRoadway$157,200.00$(11,644.44)-7%0
0055-02-024Waco09/01/27$1,176,851.85ConstructionRoadwayConstructionRoadway$1,271,010.00$(94,158.15)-7%0
0055-05-053Waco09/01/27$774,462.96ConstructionRoadwayConstructionRoadway$836,420.00$(61,957.04)-7%0
0184-03-042Waco09/01/27$172,500.00ConstructionRoadwayConstructionRoadway$186,300.00$(13,800.00)-7%0
0231-03-158Waco09/01/27$1,411,703.70ConstructionRoadwayConstructionRoadway$1,524,640.00$(112,936.30)-7%0
0320-02-048Waco09/01/27$1,710,944.44ConstructionRoadwayConstructionRoadway$1,847,820.00$(136,875.56)-7%0
0382-03-037Waco09/01/27$1,118,361.11ConstructionRoadwayConstructionRoadway$1,207,830.00$(89,468.89)-7%0
0590-03-016Waco09/01/27$56,071.76ConstructionRoadwayConstructionRoadway$60,557.50$(4,485.74)-7%0
0724-01-060Waco09/01/27$2,257,064.82ConstructionRoadwayConstructionRoadway$2,437,630.00$(180,565.18)-7%0
0774-02-018Waco09/01/27$304,768.52ConstructionRoadwayConstructionRoadway$329,150.00$(24,381.48)-7%0
1187-01-033Waco09/01/27$650,277.78ConstructionRoadwayConstructionRoadway$702,300.00$(52,022.22)-7%0
1829-02-015Waco09/01/27$419,212.96ConstructionRoadwayConstructionRoadway$452,750.00$(33,537.04)-7%0
1829-03-006Waco09/01/27$141,296.30ConstructionRoadwayConstructionRoadway$152,600.00$(11,303.70)-7%0
2174-01-017Waco09/01/27$323,009.26ConstructionRoadwayConstructionRoadway$348,850.00$(25,840.74)-7%0
0047-07-248Dallas07/01/26$284,460.75ConstructionRoadwayConstructionRoadway$306,923.00$(22,462.25)-7%0
2964-04-012Dallas06/01/27$978,972.49ConstructionRoadwayConstructionRoadway$1,054,590.35$(75,617.86)-7%0
0260-02-055Dallas07/01/26$503,398.00ConstructionNon RoadwayConstructionNon Roadway$542,093.50$(38,695.50)-7%0
0314-04-038Fort Worth07/01/26$24,872.75ConstructionBridgeConstructionBridge$23,218.09$1,654.667%0
2100-01-075Austin11/01/28$2,920,377.68ConstructionRoadwayConstructionRoadway$2,731,016.96$189,360.727%0
0911-00-142Lufkin05/05/27$1,442,307.69ConstructionNon RoadwayConstructionNon Roadway$1,350,000.00$92,307.697%0
0138-06-047Lufkin07/01/26$63,982,542.40ConstructionRoadwayConstructionRoadway$59,915,665.95$4,066,876.457%0
2374-02-166Dallas07/01/26$263,751.00ConstructionRoadwayConstructionRoadway$282,932.75$(19,181.75)-7%0
0092-06-112Dallas08/05/26$426,254.00ConstructionBridgeConstructionBridge$456,170.72$(29,916.72)-7%0
1973-01-021Dallas07/01/26$1,566,536.49ConstructionRoadwayConstructionRoadway$1,674,101.10$(107,564.61)-6%0
0319-01-073Lufkin11/03/26$1,030,000.00ConstructionRoadwayConstructionRoadway$968,762.66$61,237.346%0
0381-02-022Childress07/01/26$181,040.06ConstructionRoadwayConstructionRoadway$193,214.00$(12,173.94)-6%0
0140-04-049Odessa11/03/26$215,789.50ConstructionBridgeConstructionBridge$230,220.00$(14,430.50)-6%0
0140-05-029Odessa11/03/26$119,942.70ConstructionBridgeConstructionBridge$127,785.00$(7,842.30)-6%0
0706-04-022Lufkin11/03/26$620,000.00ConstructionRoadwayConstructionRoadway$584,211.80$35,788.206%0
0283-03-023Wichita Falls08/05/26$9,438,454.44ConstructionRoadwayConstructionRoadway$8,900,000.00$538,454.446%-154-5 months
1525-02-010Fort Worth11/03/26$250,640.00ConstructionRoadwayConstructionRoadway$266,752.00$(16,112.00)-6%0
0314-04-041Fort Worth07/01/26$24,688.24ConstructionBridgeConstructionBridge$26,222.89$(1,534.65)-6%0
0092-14-107Dallas07/01/26$85,449.00ConstructionRoadwayConstructionRoadway$90,688.50$(5,239.50)-6%0
0054-06-113Brownwood07/01/26$2,463,639.10ConstructionRoadwayConstructionRoadway$2,329,284.20$134,354.906%0
0712-01-052Fort Worth07/01/26$2,200,452.10ConstructionRoadwayConstructionRoadway$2,333,679.07$(133,226.97)-6%0
0005-04-084Odessa07/01/26$5,911,334.34ConstructionRoadwayConstructionRoadway$5,595,705.62$315,628.726%0
0015-13-432Austin11/03/26$239,903,846.15ConstructionBridgeConstructionBridge$254,000,000.00$(14,096,153.85)-6%0
0354-04-043Odessa12/01/26$25,039,685.33ConstructionRoadwayConstructionRoadway$23,731,405.74$1,308,279.596%0
0047-06-175Dallas07/01/26$244,804.00ConstructionRoadwayConstructionRoadway$258,723.00$(13,919.00)-5%0
0693-03-046Abilene11/02/27$13,000,000.00ConstructionRoadwayConstructionRoadway$13,700,000.00$(700,000.00)-5%0
1392-03-017Dallas07/01/26$2,889,906.52ConstructionRoadwayConstructionRoadway$3,043,980.80$(154,074.28)-5%0
0091-06-061Dallas07/01/26$5,451,342.50ConstructionRoadwayConstructionRoadway$5,190,264.90$261,077.605%0
1257-01-057Houston09/06/28$1,792,664.00ConstructionRoadwayConstructionRoadway$1,707,298.56$85,365.445%0
2121-02-186El Paso12/01/27$486,111,111.11ConstructionRoadwayConstructionRoadway$462,962,962.96$23,148,148.155%0
2059-02-014Waco09/02/26$402,596.15ConstructionRoadwayConstructionRoadway$423,400.00$(20,803.85)-5%0
2977-01-011Dallas07/01/26$12,347,605.91ConstructionRoadwayConstructionRoadway$11,777,297.44$570,308.475%0
0047-06-176Dallas07/01/26$143,063.50ConstructionRoadwayConstructionRoadway$150,126.50$(7,063.00)-5%0
0007-06-268Brownwood07/01/26$1,318,735.86ConstructionRoadwayConstructionRoadway$1,261,391.90$57,343.965%0
0902-48-579Fort Worth08/05/26$22,873,538.60ConstructionRoadwayConstructionRoadway$23,961,192.05$(1,087,653.45)-5%0
0327-07-049Pharr08/05/26$329,756.75ConstructionRoadwayConstructionRoadway$315,468.34$14,288.415%0
0327-06-031Pharr08/05/26$372,100.87ConstructionRoadwayConstructionRoadway$356,081.69$16,019.185%0
0327-07-047Pharr08/05/26$324,172.10ConstructionRoadwayConstructionRoadway$310,280.42$13,891.684%0
0327-07-048Pharr08/05/26$350,098.51ConstructionRoadwayConstructionRoadway$335,989.93$14,108.584%0
0178-11-003Houston06/01/29$2,350,084.00ConstructionRoadwayConstructionRoadway$2,450,890.96$(100,806.96)-4%0
0517-01-050San Antonio10/06/26$331,066.00ConstructionRoadwayConstructionRoadway$318,100.00$12,966.004%0
0261-01-052Dallas07/01/26$650,440.25ConstructionNon RoadwayConstructionNon Roadway$677,275.50$(26,835.25)-4%0
0720-01-049Bryan04/06/27$474,183.65ConstructionLocal LetConstructionLocal Let$456,158.65$18,025.004%0
0902-20-238Fort Worth08/05/26$824,349.50ConstructionBridgeConstructionBridge$793,145.80$31,203.704%0
0015-17-030Austin03/03/27$1,862,339.42ConstructionRoadwayConstructionRoadway$1,793,363.89$68,975.534%-244-8 months
1200-03-069Austin02/02/27$1,500,782.69ConstructionRoadwayConstructionRoadway$1,560,814.42$(60,031.73)-4%913 months
0114-01-070Austin11/03/26$596,153.85ConstructionNon RoadwayConstructionNon Roadway$620,000.00$(23,846.15)-4%0
0114-01-071Austin11/03/26$4,038,461.54ConstructionNon RoadwayConstructionNon Roadway$4,200,000.00$(161,538.46)-4%0
0043-17-036Wichita Falls09/02/26$1,442,307.69ConstructionRoadwayConstructionRoadway$1,500,000.00$(57,692.31)-4%0
0093-07-023Waco09/02/26$857,000.00ConstructionRoadwayConstructionRoadway$891,280.00$(34,280.00)-4%0
0185-01-046Waco09/02/26$132,913.46ConstructionRoadwayConstructionRoadway$138,230.00$(5,316.54)-4%0
0231-03-159Waco09/02/26$524,250.00ConstructionRoadwayConstructionRoadway$545,220.00$(20,970.00)-4%0
0231-16-039Waco09/02/26$164,320.26ConstructionRoadwayConstructionRoadway$170,893.07$(6,572.81)-4%0
0386-03-024Waco09/02/26$539,759.62ConstructionRoadwayConstructionRoadway$561,350.00$(21,590.38)-4%0
0398-04-078Waco09/02/26$1,418,625.00ConstructionRoadwayConstructionRoadway$1,475,370.00$(56,745.00)-4%0
0774-03-017Waco09/02/26$349,086.54ConstructionRoadwayConstructionRoadway$363,050.00$(13,963.46)-4%0
0867-03-029Waco09/02/26$486,105.77ConstructionRoadwayConstructionRoadway$505,550.00$(19,444.23)-4%0
1658-01-012Waco09/02/26$250,769.23ConstructionRoadwayConstructionRoadway$260,800.00$(10,030.77)-4%0
1664-01-022Waco09/02/26$1,161,875.00ConstructionRoadwayConstructionRoadway$1,208,350.00$(46,475.00)-4%0
2395-01-014Waco09/02/26$238,798.08ConstructionRoadwayConstructionRoadway$248,350.00$(9,551.92)-4%0
2395-01-015Waco09/02/26$30,625.00ConstructionRoadwayConstructionRoadway$31,850.00$(1,225.00)-4%0
3032-01-008Waco09/02/26$425,384.62ConstructionRoadwayConstructionRoadway$442,400.00$(17,015.38)-4%0
3292-01-017Waco09/02/26$81,894.23ConstructionRoadwayConstructionRoadway$85,170.00$(3,275.77)-4%0
0002-04-039El Paso01/05/28$264,745.19ConstructionRoadwayConstructionRoadway$255,290.00$9,455.194%-245-8 months
0358-03-040El Paso12/01/27$2,360,953.70ConstructionRoadwayConstructionRoadway$2,276,633.93$84,319.774%0
0358-04-019El Paso12/01/27$2,370,162.04ConstructionRoadwayConstructionRoadway$2,285,513.39$84,648.654%0
2552-01-066El Paso11/02/27$4,430,013.02ConstructionBridgeConstructionBridge$4,600,398.13$(170,385.11)-4%0
0001-01-077El Paso10/05/27$331,759.36ConstructionRoadwayConstructionRoadway$319,910.81$11,848.554%-365-1 year
0374-02-128El Paso10/05/27$332,783.52ConstructionRoadwayConstructionRoadway$320,898.39$11,885.134%-365-1 year
3451-01-051El Paso10/05/27$425,949.07ConstructionRoadwayConstructionRoadway$410,736.88$15,212.194%-365-1 year
3451-01-052El Paso10/05/27$343,217.59ConstructionRoadwayConstructionRoadway$330,960.09$12,257.504%-365-1 year
0327-07-050Pharr08/05/26$390,773.44ConstructionRoadwayConstructionRoadway$405,710.18$(14,936.74)-4%0
3510-04-065Houston07/01/26$3,510,808.16ConstructionNon RoadwayConstructionNon Roadway$3,386,248.00$124,560.164%0
0009-11-269Dallas07/01/26$258,360.50ConstructionRoadwayConstructionRoadway$268,029.00$(9,668.50)-4%0
0003-01-068El Paso01/01/30$654,175.00ConstructionRoadway$678,403.70$(24,228.70)-4%7272 years
0003-02-052El Paso01/01/30$720,642.86ConstructionRoadway$747,333.33$(26,690.47)-4%7272 years
0003-04-059El Paso01/01/30$637,426.79ConstructionRoadway$661,035.19$(23,608.40)-4%7272 years
0003-02-051El Paso11/01/29$23,459,355.36ConstructionRoadway$24,328,228.70$(868,873.34)-4%3651 year
0887-01-044Odessa11/01/29$22,178,571.43ConstructionRoadway$23,000,000.00$(821,428.57)-4%7582 years
0001-04-105El Paso05/01/29$4,128,778.57ConstructionRoadwayConstructionRoadway$4,281,696.30$(152,917.73)-4%36312 months
0167-03-003El Paso05/01/29$755,593.75ConstructionRoadwayConstructionRoadway$783,578.70$(27,984.95)-4%36312 months
0002-14-051El Paso01/01/29$1,468,286.50ConstructionRoadwayConstructionRoadway$1,522,667.48$(54,380.98)-4%36212 months
0002-06-063El Paso12/05/28$752,546.43ConstructionRoadwayConstructionRoadway$780,418.52$(27,872.09)-4%0
0002-07-055El Paso12/05/28$618,283.93ConstructionRoadwayConstructionRoadway$641,183.33$(22,899.40)-4%0
0002-08-056El Paso12/05/28$734,700.00ConstructionRoadwayConstructionRoadway$761,911.11$(27,211.11)-4%0
0002-09-041El Paso12/05/28$756,953.57ConstructionRoadwayConstructionRoadway$784,988.89$(28,035.32)-4%0
0002-10-040El Paso12/05/28$484,762.50ConstructionRoadwayConstructionRoadway$502,716.67$(17,954.17)-4%0
0002-11-062El Paso12/05/28$166,486.61ConstructionRoadwayConstructionRoadway$172,652.78$(6,166.17)-4%0
0002-14-049El Paso12/05/28$436,881.25ConstructionRoadwayConstructionRoadway$453,062.04$(16,180.79)-4%0
0002-20-012El Paso12/05/28$255,089.29ConstructionRoadwayConstructionRoadway$264,537.04$(9,447.75)-4%0
0003-01-065El Paso12/05/28$1,101,634.82ConstructionRoadwayConstructionRoadway$1,142,436.11$(40,801.29)-4%0
0003-02-050El Paso12/05/28$527,359.82ConstructionRoadwayConstructionRoadway$546,891.67$(19,531.85)-4%0
0003-03-052El Paso12/05/28$86,606.25ConstructionRoadwayConstructionRoadway$89,813.89$(3,207.64)-4%0
0167-02-096El Paso12/05/28$226,362.50ConstructionRoadwayConstructionRoadway$234,746.30$(8,383.80)-4%0
0374-03-033El Paso12/05/28$357,142.86ConstructionRoadwayConstructionRoadway$370,370.37$(13,227.51)-4%0
0674-01-082El Paso12/05/28$394,387.50ConstructionRoadwayConstructionRoadway$408,994.44$(14,606.94)-4%0
1282-01-017El Paso12/05/28$1,359,875.89ConstructionRoadwayConstructionRoadway$1,410,241.67$(50,365.78)-4%0
2122-01-019El Paso12/05/28$169,891.07ConstructionRoadwayConstructionRoadway$176,183.33$(6,292.26)-4%0
0167-02-098El Paso11/01/28$288,300.00ConstructionRoadwayConstructionRoadway$298,977.78$(10,677.78)-4%4271 year
1046-03-013El Paso11/01/28$127,550.00ConstructionRoadwayConstructionRoadway$132,274.07$(4,724.07)-4%4271 year
0374-04-032El Paso09/06/28$4,545,805.36ConstructionRoadwayConstructionRoadway$4,714,168.52$(168,363.16)-4%3711 year
0121-03-067Waco09/02/26$1,491,250.00ConstructionRoadwayConstructionRoadway$1,546,350.00$(55,100.00)-4%0
0208-01-026Atlanta08/05/26$3,449,866.61ConstructionRoadwayConstructionRoadway$3,335,405.55$114,461.063%0
0500-03-664Houston08/05/26$5,117,903.93ConstructionRoadwayConstructionRoadway$4,948,342.00$169,561.933%0
0086-07-040Pharr08/05/26$380,817.17ConstructionRoadwayConstructionRoadway$368,950.49$11,866.683%0
0261-02-086Dallas07/01/26$654,168.50ConstructionNon RoadwayConstructionNon Roadway$675,870.00$(21,701.50)-3%0
1479-01-028San Antonio09/02/26$2,826,369.36ConstructionRoadwayConstructionRoadway$2,919,925.00$(93,555.64)-3%0
0151-05-122Austin12/01/27$5,688,993.52ConstructionRoadwayConstructionRoadway$5,515,607.41$173,386.113%0
0553-02-019Lufkin11/03/26$200,000.00ConstructionRoadwayConstructionRoadway$193,932.56$6,067.443%0
0022-03-032Odessa11/03/26$1,032,508.84ConstructionBridgeConstructionBridge$1,065,488.54$(32,979.70)-3%0
0019-01-153Fort Worth07/01/26$1,518,165.79ConstructionRoadwayConstructionRoadway$1,566,691.63$(48,525.84)-3%0
0064-02-020Lufkin11/03/26$390,000.00ConstructionRoadwayConstructionRoadway$402,349.72$(12,349.72)-3%0
3000-01-027Dallas07/01/26$504,944.00ConstructionRoadwayConstructionRoadway$520,281.50$(15,337.50)-3%0
1062-03-055Houston01/05/28$6,804,421.00ConstructionRoadwayConstructionRoadway$7,000,000.00$(195,579.00)-3%0
0338-02-045Houston09/06/28$800,183.00ConstructionRoadwayConstructionRoadway$822,392.23$(22,209.23)-3%0
0336-05-067Lufkin11/03/26$460,000.00ConstructionRoadwayConstructionRoadway$472,358.57$(12,358.57)-3%0
0389-02-061Beaumont08/05/26$408,836.45ConstructionRoadwayConstructionRoadway$399,270.00$9,566.452%0
0051-09-128Houston08/05/26$4,039,867.80ConstructionRoadwayConstructionRoadway$4,137,427.00$(97,559.20)-2%0
0001-04-114El Paso05/03/28$740,740.74ConstructionRoadwayConstructionRoadway$723,723.26$17,017.482%1545 months
0143-01-068San Antonio07/01/26$2,571,222.84ConstructionRoadwayConstructionRoadway$2,514,127.89$57,094.952%0
0186-03-074Bryan07/01/26$34,808.08ConstructionRoadwayConstructionRoadway$34,155.43$652.652%0
0115-04-057Austin02/01/29$6,381,700.89ConstructionRoadwayConstructionRoadway$6,500,816.96$(119,116.07)-2%0
0150-02-043Austin08/05/26$2,487,668.03ConstructionRoadwayConstructionRoadway$2,532,219.03$(44,551.00)-2%0
0252-03-056Austin08/05/26$2,495,198.94ConstructionRoadwayConstructionRoadway$2,452,584.79$42,614.152%0
0114-02-111Austin08/05/26$534,779.50ConstructionRoadwayConstructionRoadway$526,301.50$8,478.002%0
1197-01-027Austin08/05/26$3,130,181.38ConstructionRoadwayConstructionRoadway$3,080,501.38$49,680.002%0
0381-03-026Childress07/01/26$382,327.94ConstructionRoadwayConstructionRoadway$388,411.00$(6,083.06)-2%0
0675-08-121Houston07/01/26$4,183,840.68ConstructionNon RoadwayConstructionNon Roadway$4,119,323.00$64,517.682%0
0013-05-046Wichita Falls08/05/26$14,570,882.56ConstructionSafety Rest AreaConstructionSafety Rest Area$14,351,572.00$219,310.562%0
0156-07-115Wichita Falls12/01/27$528,592.00ConstructionRoadwayConstructionRoadway$521,092.00$7,500.001%0
0363-03-061Fort Worth08/05/26$2,924,978.47ConstructionRoadwayConstructionRoadway$2,886,857.05$38,121.421%-118-4 months
0069-07-113San Angelo08/05/26$1,800,039.59ConstructionRoadwayConstructionRoadway$1,777,990.78$22,048.811%0
1582-01-029Lufkin11/03/26$1,060,000.00ConstructionRoadwayConstructionRoadway$1,071,859.66$(11,859.66)-1%0
3510-04-064Houston07/01/26$3,478,453.16ConstructionNon RoadwayConstructionNon Roadway$3,440,293.00$38,160.161%0
0229-01-042Odessa07/01/26$46,211,492.52ConstructionRoadwayConstructionRoadway$45,758,583.77$452,908.751%562 months
0086-07-041Pharr08/05/26$356,777.62ConstructionRoadwayConstructionRoadway$360,110.74$(3,333.12)-1%0
2552-04-055El Paso08/05/26$3,847,548.00ConstructionRoadwayConstructionRoadway$3,879,275.00$(31,727.00)-1%0
0025-02-234San Antonio08/05/26$7,430,961.91ConstructionRoadwayConstructionRoadway$7,487,310.06$(56,348.15)-1%0
0114-02-112Austin08/05/26$619,415.25ConstructionRoadwayConstructionRoadway$615,753.25$3,662.001%0
2552-04-058El Paso08/05/26$3,076,855.00ConstructionRoadwayConstructionRoadway$3,060,085.00$16,770.001%0
0114-02-120Austin08/05/26$3,010,182.20ConstructionRoadwayConstructionRoadway$2,996,561.70$13,620.500%0
3409-01-011Waco05/01/28$6,183,634.26ConstructionRoadwayConstructionRoadway$6,200,000.00$(16,365.74)-0%0
0016-05-128San Antonio07/01/26$12,488,187.55ConstructionRoadwayConstructionRoadway$12,462,037.55$26,150.000%0
3110-01-003Lufkin07/01/26$4,068,795.80ConstructionRoadwayConstructionRoadway$4,060,440.80$8,355.000%0
0051-03-122Houston07/01/26$723,873.60ConstructionRoadwayConstructionRoadway$722,838.60$1,035.000%0
0978-02-085Houston07/01/26$1,327,602.60ConstructionRoadwayConstructionRoadway$1,325,706.60$1,896.000%0
0915-12-782San Antonio07/01/26$381,422.93ConstructionRoadwayConstructionRoadway$380,947.73$475.200%0
0165-01-110Tyler11/02/27$5,005,789.00ConstructionRoadwayConstructionRoadway$5,002,789.25$2,999.750%0
0331-04-074Pharr09/02/26$89,950.48ConstructionRoadwayConstructionRoadway$90,000.00$(49.52)-0%0
0213-03-112Lufkin07/01/26$3,332,948.00ConstructionBridgeConstructionBridge$3,331,418.00$1,530.000%0
2452-03-128San Antonio07/01/26$180,045,142.69ConstructionRoadwayConstructionRoadway$180,125,212.86$(80,070.17)-0%0
0015-09-208Austin07/01/26$2,899,090.65ConstructionRoadwayConstructionRoadway$2,898,081.65$1,009.000%0
0540-03-039Bryan07/01/26$4,315,845.66ConstructionRoadwayConstructionRoadway$4,315,533.66$312.000%0
1502-01-031Lubbock07/01/26$166,957,611.35ConstructionRoadwayConstructionRoadway$166,952,606.35$5,005.000%0
0014-15-090Fort Worth03/03/27$55,912,929.52ConstructionRoadwayConstructionRoadway$0.00$55,912,929.520
406 rows · download CSV

Putting It Together

Overall, while the pipeline has shrunk in both value and project count, the predominant roadway subtype remains stable. Costs have shifted in various directions, reflecting broader trends of delays in project scheduling.


Final Takeaway

This indicates a period of adjustment as agencies navigate evolving project timelines and financial considerations.