Put bids in the order your team needs
Product updates for September 1, 2026–September 7, 2026
Producto ·
Asphalt paving
Drilled shafts
Cap pour
Driveway tie-insWeather6:00 AM72°Wind 5 MPH | Rain 0.00 in12:00 PM89°Wind 8 MPH | Rain 0.00 in4:00 PM93°Wind 11 MPH | Rain 0.00 inWork LogsCrewDescription / LocationWorkersLabor HrsPavingPlaced 1,144 TON SP-B on the EB lane.880DrillingDrilled 37 LF 60-in shaft at Bent 3 piers 1–4.550ConcretePoured 42 CY Cl C at Bent 2 cap and abut 1.660DrivewayPlaced 234 SY ACP in driveways, north side.440Total23230Equipment & ProductionEquipment HoursPaver + 2 rollers • 30 hrs combinedDrill rig • 10 hrsPump truck • 8 hrsInstalled TodaySP MIXES SP-B PG64-22 • 1,144 TONDRILL SHAFT (60 IN) • 37 LFCL C CONC (CAP) • 27 CYDRIVEWAYS (ACP) • 234 SYCL C CONC (ABUT) • 15 CYSite NotesQuality: SP-B density cores passed; cap pour inspected and accepted.Safety / Delays: No incidents. No weather delays. Lane reopened at 5:30 PM.Daily Progress Report | Smith Widen Road | Page 1 of 1
Denton Widen Road - Add Lanes - ID: 0195-02-092TXDOT11/4/2026Bidding
Tarrant Bridge Replacement - ID: 0363-03-060TXDOT9/30/2026InterestedGarver Project No.: W07- 2401219 - NORTH FORK WWTPCity of Liberty Hill10/1/2026Calcasieu River and Pass, LA, Maintenance Dredging FY26, Mile 5.0 to Mile 17.0DEPT OF DEFENSE9/16/2026
Starr Construct Rio Grande City/Roma Relief Route - ID: 3632-01-002TXDOT9/2/2026
Kaufman Bridge Replacement - ID: 0095-03-100TXDOT10/6/2026
Dallas Interchange Improvement - ID: 0009-11-248TXDOT10/6/2026Put bids in the order your team needs
Product updates for September 1, 2026–September 7, 2026
Build automations with Flows
Product updates for August 11, 2026–August 17, 2026
Build custom apps inside Bidlo
Product updates for August 4, 2026–August 10, 2026
En sus propias palabras.