  • The active pipeline value fell from $35.89B to $34.00B, a decrease of $1.89B (5.3%).
  • Project count fell by 81. During this period, 40 projects entered and 121 left the letting window.
  • Waco had the largest cost decrease at $727.83M.

Overview

Between the September 3 and October 3, 2026 snapshots, the active pipeline value fell by $1.89B. The latest snapshot includes 5,480 active projects scheduled from October 1, 2026, through October 1, 2029. Project schedules changed across the pipeline. Roadway projects remain the largest group at 79.7%, while several districts saw major cost decreases.


Letting Date Shifts (Slippage)

A total of 139 projects moved by at least six months: 97 moved later and 42 moved earlier. Of those, 107 moved by at least 12 months: 70 moved later and 37 moved earlier. Overall, more projects moved to later dates.

CSJDistrictEst. Letting DateProject EstimateCurrent TypeCurrent SubtypePrev. TypePrev. SubtypePrev. DateLetting Δ (days)Letting Date ΔCost Δ%Cost ΔType/Subtype ΔAdvertised ΔLifecycle
0791-01-022Amarillo11/01/40$899,215.00ConstructionRoadway11/02/27474813 years
0684-01-081Pharr12/02/39$238,000.00Non-LetRail - Safety12/05/27438012 years
0684-01-082Pharr12/02/39$260,400.00Non-LetRail - Safety12/05/27438012 years
2965-01-012Pharr12/02/39$209,200.00Non-LetRail - Safety12/05/27438012 years
1697-02-036Brownwood02/02/28$350,000.00ConstructionBridgeUnassignedUnassigned01/01/40-4351-12 yearsUnassigned → Construction / Bridge
0113-13-180Austin03/01/38$5,599,304.00ConstructionRoadway03/03/27401611 years
0834-04-028Waco09/03/37$1,000,000.00Non-LetRail09/03/27365310 years
0898-03-019Waco09/03/37$1,000,000.00Non-LetRail09/03/27365310 years
2394-02-010Waco09/03/37$1,000,000.00Non-LetRail09/03/27365310 years
3256-01-122Houston11/02/27$3,780,771.71ConstructionRoadwayUnassignedUnassigned03/01/37-3407-9 yearsUnassigned → Construction / Roadway
0014-17-079Waco09/02/37$1,000,000.00Non-LetRail09/02/2832879 years
1308-01-038Waco09/02/37$1,000,000.00Non-LetRail09/02/2832879 years
2061-02-035Waco09/02/37$1,000,000.00Non-LetRail09/02/2832879 years
2389-01-013Waco09/02/37$1,000,000.00Non-LetRail09/02/2832879 years
0183-01-061Brownwood11/01/36$276,000.00ConstructionRoadway11/02/2732879 years
0172-05-134Dallas01/17/36$1,055,097.50ConstructionLocal Let03/01/2732449 years
0918-47-534Dallas08/31/36$19,700,000.00Non-LetNon Roadway08/04/2829498 years
0816-04-114Dallas05/31/36$1,745,287.00ConstructionRoadway05/05/2829488 years
0047-07-251Dallas07/09/36$1,868,055.56ConstructionLocal Let07/02/2829298 years
2208-02-027Dallas06/10/36$31,445,902.00ConstructionRoadway06/03/2829298 years
0918-47-536Dallas08/08/36$21,103,490.00Non-LetNon Roadway08/04/2829268 years
0918-47-535Dallas08/06/36$14,600,000.00Non-LetNon Roadway08/04/2829248 years
0816-05-029Dallas06/05/36$2,000,000.00ConstructionLocal Let06/03/2829248 years
0724-01-062Waco09/02/37$1,000,000.00Non-LetRail09/02/2929228 years
0779-04-025Waco09/02/37$1,000,000.00Non-LetRail09/02/2929228 years
0009-06-058Paris11/01/36$506,769.12ConstructionRoadway11/01/2829228 years
0380-19-003Lubbock11/01/36$1,000,000.00ConstructionRoadway11/01/2829228 years
0749-01-063Paris09/01/36$1,200,000.00ConstructionRoadway01/01/2928008 years
3195-01-019Atlanta06/01/28$9,611,198.00ConstructionRoadwayUnassignedUnassigned01/01/35-2405-7 years$(106,355.00)-1%Unassigned → Construction / Roadway
0134-04-038Fort Worth12/01/32$28,433,082.07ConstructionRoadway12/01/2718275 years$2,584,825.6410%
0228-03-035Lubbock12/01/32$2,000,000.00ConstructionRoadway12/01/2718275 years
0265-13-025Austin12/01/32$1,973,168.27ConstructionRoadway12/01/2718275 years$1,973,168.27Canceled
2032-01-011Abilene12/01/33$250,584.00ConstructionRoadway12/05/2818225 years
2032-02-016Abilene12/01/33$773,738.50ConstructionRoadway12/05/2818225 years
0271-04-077Houston06/01/33$161,018,519.0012/05/2816394 years
0015-09-207Austin04/06/27$14,100,640.00ConstructionNon RoadwayUnassignedUnassigned08/01/31-1578-4 years$8,653,640.00159%Unassigned → Construction / Non Roadway
0902-90-272Fort Worth07/01/31$1,554,512.06ConstructionBridge07/01/2714614 years
0912-72-557Houston05/01/31$20,363,860.00ConstructionBridge09/01/2713384 years
0568-01-060Dallas08/05/29$158,000.00Non-LetRailUnassignedUnassigned08/02/2610993 yearsUnassigned → Non-Let / Rail
2690-01-040Austin09/01/30$6,871,428.57ConstructionRoadway09/01/2710963 years$(528,571.43)-7%
2690-01-046Austin09/01/30$714,285.71ConstructionRail - Safety09/01/2710963 years
0248-03-028Atlanta01/01/32$3,000,000.00ConstructionRoadway01/01/2910953 yearsCanceled
2494-02-011Amarillo07/01/27$16,038,434.50ConstructionRoadwayConstructionRoadway01/01/30-915-3 years$(15,049,497.37)-48%
2635-05-004Amarillo07/01/27$32,125,307.80ConstructionRoadwayConstructionRoadway01/01/30-915-3 years$(5,585,788.00)-15%
0924-06-780El Paso09/02/29$1,699,269.23ConstructionLocal LetConstructionLocal Let05/05/278512 years
0069-03-065San Angelo04/06/27$2,857,408.93ConstructionRoadwayConstructionRoadway08/01/29-848-2 years
0035-04-040San Angelo04/06/27$2,021,219.00ConstructionRoadwayConstructionRoadway06/01/29-787-2 years
0921-02-578Pharr05/02/29$10,824,925.00ConstructionRoadwayConstructionRoadway05/01/277322 years
0088-04-071Yoakum09/01/31$29,882,065.50ConstructionRoadway09/01/297302 years
0088-05-105Yoakum09/01/31$87,129,038.43ConstructionRoadway09/01/297302 years
0088-05-109Yoakum09/01/31$15,741,864.46ConstructionRoadway09/01/297302 years
0089-01-094Yoakum09/01/31$63,564,811.36ConstructionRoadway09/01/297302 years
0374-02-124El Paso09/01/31$1,071,428.57ConstructionRoadway09/01/297302 years
0374-03-034El Paso09/01/31$803,571.43ConstructionRoadway09/01/297302 years
1046-03-012El Paso09/01/31$2,053,571.43ConstructionRoadway09/01/297302 years
2121-04-127El Paso09/01/31$4,017,857.14ConstructionRoadway09/01/297302 years
2121-05-055El Paso09/01/31$2,232,142.86ConstructionRoadway09/01/297302 years
2552-01-063El Paso09/01/31$625,000.00ConstructionRoadway09/01/297302 years
2552-02-039El Paso09/01/31$1,339,285.71ConstructionRoadway09/01/297302 years
2941-01-042Houston09/01/30$3,571,428.57ConstructionRoadway09/01/287302 years$(0.43)0%
0918-00-468Dallas08/01/28$5,000,000.00Non-LetRoadwayUnassignedUnassigned08/02/267302 yearsUnassigned → Non-Let / Roadway
0314-01-093Fort Worth02/02/28$1,825,526.94ConstructionRoadwayConstructionRoadway02/01/30-730-2 years
0314-07-092Fort Worth02/02/28$11,786,387.59ConstructionRoadwayConstructionRoadway02/01/30-730-2 years
0069-02-033San Angelo04/06/27$1,016,839.00ConstructionRoadwayConstructionRoadway04/01/29-726-2 years
0038-04-064Pharr08/01/30$83,428,591.67ConstructionRoadwayConstructionRoadway09/06/286942 years
1227-04-023Pharr09/01/29$21,693,135.50ConstructionRoadwayConstructionRoadway11/02/276692 years$643,135.503%
1103-04-046Pharr04/06/27$13,801,444.80ConstructionRoadwayConstructionRoadway01/01/29-636-2 years$859,655.947%
0408-01-047Yoakum04/06/27$6,000,000.00ConstructionRoadwayConstructionRoadway09/06/28-519-1 year
0187-03-088Yoakum05/05/27$740,000.00ConstructionRoadwayConstructionRoadway10/04/28-518-1 year
0312-02-019Dallas06/01/30$2,500,000.00ConstructionBridgeConstructionBridge01/01/295161 year
0179-04-112Yoakum06/01/27$499,824.60ConstructionRoadwayConstructionRoadway10/04/28-491-1 year$(14,429.20)-3%
2525-01-020Yoakum06/01/27$507,563.60ConstructionRoadwayConstructionRoadway10/04/28-491-1 year$(26,760.20)-5%
0178-04-008Houston05/05/27$1,190,482.00ConstructionRoadwayConstructionRoadway08/02/28-455-1 year
0166-08-061Bryan02/01/29$1,000,000.00ConstructionRoadwayConstructionRoadway12/01/274281 year
0675-06-103Bryan02/01/29$179,769,852.00ConstructionRoadwayConstructionRoadway12/01/274281 year$(133,865,600.00)-43%
0502-01-254Houston04/05/28$4,200,000.00ConstructionRoadwayConstructionRoadway03/03/273991 year
0069-07-123San Angelo03/03/27$183,696.00ConstructionRoadwayConstructionRoadway04/05/28-399-1 year
0158-01-087San Angelo03/03/27$124,140.00ConstructionRoadwayConstructionRoadway04/05/28-399-1 year
0158-02-103San Angelo03/03/27$183,696.00ConstructionRoadwayConstructionRoadway04/05/28-399-1 year
0159-01-048San Angelo03/03/27$114,691.00ConstructionRoadwayConstructionRoadway04/05/28-399-1 year
0463-04-029San Angelo03/03/27$183,696.00ConstructionRoadwayConstructionRoadway04/05/28-399-1 year
0558-09-041San Angelo03/03/27$114,691.00ConstructionRoadwayConstructionRoadway04/05/28-399-1 year
0650-04-035San Angelo03/03/27$114,691.00ConstructionRoadwayConstructionRoadway04/05/28-399-1 year
2410-01-012San Angelo03/03/27$114,691.00ConstructionRoadwayConstructionRoadway04/05/28-399-1 year
0098-05-038Childress06/01/28$100,000.00ConstructionBridgeConstructionBridge05/05/273931 year
1197-01-029Austin09/06/28$4,619,333.33ConstructionRoadwayConstructionRoadway09/01/273711 year$(177,666.67)-4%
0016-05-111San Antonio09/01/27$135,556,841.00ConstructionRoadwayConstructionRoadway09/06/28-371-1 year
0016-06-115San Antonio09/01/27$338,438,190.00ConstructionRoadwayConstructionRoadway09/06/28-371-1 year
0918-47-526Dallas08/04/28$18,050,000.00Non-LetRoadwayNon-LetRoadway08/01/273691 year
0918-47-517Dallas08/04/28$6,090,000.00Non-LetRoadwayNon-LetRoadway08/02/273681 year
0619-03-065Dallas06/04/28$805,000.00ConstructionRoadwayConstructionRoadway06/03/273671 year
0921-02-577Pharr05/01/28$8,621,083.00ConstructionRoadwayConstructionRoadway05/01/273661 year
0918-24-315Dallas08/01/27$1,296,500.00TransferTransferTransferTransfer08/01/28-366-1 year
3629-01-001Pharr10/01/30$326,456,833.00ConstructionRoadway10/01/293651 year$11,509,296.004%
0009-13-174Paris09/01/30$170,605,016.00ConstructionRoadway09/01/293651 year
0651-03-008Lubbock11/01/28$191,889.60ConstructionRoadwayConstructionRoadway11/02/273651 year
1502-01-044Lubbock11/01/28$212,151.00ConstructionRoadwayConstructionRoadway11/02/273651 year
1907-01-008Lubbock11/01/28$227,035.20ConstructionRoadwayConstructionRoadway11/02/273651 year
0016-08-041San Antonio10/04/28$27,000,000.00ConstructionRoadwayConstructionRoadway10/05/273651 year
0016-08-051San Antonio10/04/28$8,541,012.00ConstructionRoadwayConstructionRoadway10/05/273651 year
0500-03-662Houston04/05/28$9,461,756.00ConstructionRoadwayConstructionRoadway04/06/273651 year
3256-01-127Houston04/05/28$11,320,453.00ConstructionRoadwayConstructionRoadway04/06/273651 year
1281-01-021El Paso06/30/27$40,000.00Non-LetRailUnassignedUnassigned06/30/263651 yearUnassigned → Non-Let / Rail
3592-01-013El Paso06/30/27$350,000.00Non-LetRailUnassignedUnassigned06/30/263651 yearUnassigned → Non-Let / Rail
0001-03-062El Paso05/01/27$500,000.00Non-LetRailUnassignedUnassigned05/01/263651 yearUnassigned → Non-Let / Rail
0108-03-046Tyler02/02/27$67,311.00ConstructionRoadwayConstructionRoadway02/02/28-365-1 year
0108-04-045Tyler02/02/27$200,276.00ConstructionRoadwayConstructionRoadway02/02/28-365-1 year
0163-04-067Tyler02/02/27$103,705.00ConstructionRoadwayConstructionRoadway02/02/28-365-1 year
0164-01-080Tyler02/02/27$206,182.00ConstructionRoadwayConstructionRoadway02/02/28-365-1 year
0190-05-075Tyler02/02/27$6,400,000.00ConstructionRoadwayConstructionRoadway02/02/28-365-1 year
0190-08-014Tyler02/02/27$5,970,000.00ConstructionRoadwayConstructionRoadway02/02/28-365-1 year
0495-02-071Tyler02/02/27$8,653,846.15ConstructionRoadwayConstructionRoadway02/02/28-365-1 year
0495-03-076Tyler02/02/27$3,846,153.85ConstructionRoadwayConstructionRoadway02/02/28-365-1 year
1068-01-242Fort Worth02/02/27$3,677,708.65ConstructionRoadwayConstructionRoadway02/02/28-365-1 year
1418-03-019Houston01/05/28$1,048,162.00ConstructionNon RoadwayConstructionNon Roadway01/06/2736412 months
1727-01-019Amarillo11/02/27$673,000.00ConstructionRoadwayConstructionRoadway11/03/2636412 months$42,872.487%
1885-03-013Amarillo11/02/27$1,060,000.00ConstructionRoadwayConstructionRoadway11/03/2636412 months$345,787.5248%
2437-01-028Amarillo11/02/27$969,400.00ConstructionRoadwayConstructionRoadway11/03/2636412 months$613,760.61173%
1068-01-239Fort Worth04/01/29$12,028,411.19ConstructionBridgeConstructionBridge04/05/2836112 months
1273-01-040San Antonio09/08/26$300,000.00Non-LetRail - SafetyNon-LetRail - Safety09/03/27-360-12 months
3586-02-011Laredo05/03/28$1,450,383.27ConstructionRoadwayConstructionRoadway06/01/2733711 months
0222-01-064Atlanta03/07/28$3,290,000.00ConstructionRoadwayConstructionRoadway02/01/29-331-11 months
0924-06-730El Paso04/01/28$2,866,538.46ConstructionLocal LetConstructionLocal Let05/08/2732911 months
0918-25-029Dallas09/08/26$0.00Non-LetRoadwayNon-LetRoadway08/02/27-328-11 months$(12,000,000.00)-100%
2121-02-166El Paso07/01/27$0.00ConstructionRoadwayConstructionRoadway09/02/2630210 months
0157-03-052Abilene07/06/28$11,000,000.00ConstructionRoadwayConstructionRoadway05/01/29-299-10 months$(500,000.00)-4%
0251-03-022Waco05/01/29$11,846,153.85ConstructionRoadwayConstructionRoadway08/02/282729 months
0251-04-023Brownwood05/01/29$106,955,555.55ConstructionRoadwayConstructionRoadway08/02/282729 months$(4,113,675.21)-4%
0251-05-066Brownwood05/01/29$15,000,000.00ConstructionRoadwayConstructionRoadway08/02/282729 months
0912-72-843Houston05/01/27$1,048,217.76Non-LetRoadwayUnassignedUnassigned08/15/262599 monthsUnassigned → Non-Let / Roadway
0342-01-103Pharr10/05/27$7,570,796.10ConstructionRoadwayConstructionRoadway02/02/272458 months
3510-03-009Houston11/15/28$49,800,881.00Alternative DeliveryDesign BuildAlternative DeliveryDesign Build04/05/282247 months
1140-02-041Pharr09/01/27$4,566,344.52ConstructionRoadway04/05/28-217-7 monthsCanceled
0388-03-089Beaumont03/01/27$700,000.00Non-LetConsulting Engineering ContractUnassignedUnassigned08/02/262117 monthsUnassigned → Non-Let / Consulting Engineering Contract
0361-02-049Wichita Falls08/02/28$1,300,000.00ConstructionBridgeConstructionBridge01/05/282107 months
0001-01-076El Paso03/07/28$908,276.82ConstructionRoadwayConstructionRoadway09/01/271886 months
0001-04-110El Paso03/07/28$670,960.76ConstructionRoadwayConstructionRoadway09/01/271886 months
0924-06-625El Paso11/01/27$17,466,671.15ConstructionLocal LetConstructionLocal Let05/01/271846 months
0086-10-059Laredo04/05/28$1,250,000.00ConstructionBridgeConstructionBridge10/05/271836 months
0264-06-044San Angelo11/02/27$34,067,539.00ConstructionRoadwayConstructionRoadway05/05/271816 months
0264-06-047San Angelo11/02/27$25,000,000.00ConstructionBridgeConstructionBridge05/05/271816 months
0187-03-079Yoakum05/05/27$1,650,000.00ConstructionRoadwayConstructionRoadway11/02/27-181-6 months
0248-03-024Atlanta06/01/27$12,186,040.75ConstructionRoadwayConstructionRoadway11/02/27-154-5 months
0233-01-047El Paso02/01/30$11,656,779.46ConstructionRoadwayConstructionRoadway09/01/291535 months
0074-03-050Corpus Christi08/01/29$4,500,000.00ConstructionRoadwayConstructionRoadway01/01/30-153-5 months
0074-04-049Corpus Christi08/01/29$3,000,000.00ConstructionRoadwayConstructionRoadway01/01/30-153-5 months
0342-01-093Pharr10/05/27$34,451,558.18ConstructionRoadwayConstructionRoadway05/05/271535 months
0062-07-106Atlanta08/02/28$550,420.00ConstructionRoadwayConstructionRoadway01/01/29-152-5 months$450,420.00450%
0374-04-032El Paso02/01/29$4,714,168.52ConstructionRoadwayConstructionRoadway09/06/281485 months
0109-09-069Bryan10/05/27$3,500,000.00ConstructionRoadwayConstructionRoadway06/01/271264 months
0172-09-047Fort Worth01/06/27$4,029,170.17ConstructionRoadwayConstructionRoadway09/02/261264 months$515,025.9915%
0915-12-738San Antonio05/05/28$23,361,361.00ConstructionLocal LetConstructionLocal Let01/02/281244 months
0192-01-109Houston11/15/26$515,107.00ConstructionLocal LetUnassignedUnassigned07/15/261234 monthsUnassigned → Construction / Local Let
0014-01-032Fort Worth01/06/27$758,860.80ConstructionRoadwayConstructionRoadway05/05/27-119-4 months
0049-14-016Bryan07/01/27$14,050.00ConstructionRoadwayConstructionRoadway10/05/27-96-3 months
0050-03-118Bryan07/01/27$43,890.00ConstructionRoadwayConstructionRoadway10/05/27-96-3 months
0050-03-119Bryan07/01/27$43,890.00ConstructionRoadwayConstructionRoadway10/05/27-96-3 months
0050-07-017Bryan07/01/27$20,410.00ConstructionRoadwayConstructionRoadway10/05/27-96-3 months
0116-04-120Bryan07/01/27$77,350.00ConstructionRoadwayConstructionRoadway10/05/27-96-3 months
0540-01-056Bryan07/01/27$363,242.68ConstructionRoadwayConstructionRoadway10/05/27-96-3 months
0540-01-057Bryan07/01/27$8,300.00ConstructionRoadwayConstructionRoadway10/05/27-96-3 months
0540-01-058Bryan07/01/27$6,240.00ConstructionRoadwayConstructionRoadway10/05/27-96-3 months
0643-05-069Bryan07/01/27$383,498.00ConstructionRoadwayConstructionRoadway10/05/27-96-3 months
0648-02-023Bryan07/01/27$47,670.00ConstructionRoadwayConstructionRoadway10/05/27-96-3 months
0944-01-031Bryan07/01/27$132,899.00ConstructionRoadwayConstructionRoadway10/05/27-96-3 months
0944-01-032Bryan07/01/27$47,060.00ConstructionRoadwayConstructionRoadway10/05/27-96-3 months
1691-01-019Bryan07/01/27$138,200.00ConstructionRoadwayConstructionRoadway10/05/27-96-3 months
2337-02-013Bryan07/01/27$140,500.00ConstructionRoadwayConstructionRoadway10/05/27-96-3 months
2827-01-014Bryan07/01/27$42,070.00ConstructionRoadwayConstructionRoadway10/05/27-96-3 months
3033-02-016Bryan07/01/27$105,670.00ConstructionRoadwayConstructionRoadway10/05/27-96-3 months
0057-02-043Bryan06/01/27$13,070.00ConstructionRoadwayConstructionRoadway09/01/27-92-3 months
0057-03-053Bryan06/01/27$7,890.00ConstructionRoadwayConstructionRoadway09/01/27-92-3 months
0057-07-019Bryan06/01/27$11,470.00ConstructionRoadwayConstructionRoadway09/01/27-92-3 months
0426-01-015Bryan06/01/27$83,200.00ConstructionRoadwayConstructionRoadway09/01/27-92-3 months
0426-02-024Bryan06/01/27$205,110.86ConstructionRoadwayConstructionRoadway09/01/27-92-3 months
0552-02-036Bryan06/01/27$208,878.00ConstructionRoadwayConstructionRoadway09/01/27-92-3 months
0578-02-052Bryan06/01/27$20,220.00ConstructionRoadwayConstructionRoadway09/01/27-92-3 months
0578-03-059Bryan06/01/27$170,350.00ConstructionRoadwayConstructionRoadway09/01/27-92-3 months
0675-04-095Bryan06/01/27$15,410.00ConstructionRoadwayConstructionRoadway09/01/27-92-3 months
0675-04-096Bryan06/01/27$41,990.00ConstructionRoadwayConstructionRoadway09/01/27-92-3 months
0675-07-111Bryan06/01/27$173,494.00ConstructionRoadwayConstructionRoadway09/01/27-92-3 months
0675-07-115Bryan06/01/27$15,180.00ConstructionRoadwayConstructionRoadway09/01/27-92-3 months
1145-02-025Bryan06/01/27$289,970.27ConstructionRoadwayConstructionRoadway09/01/27-92-3 months
1147-02-030Bryan06/01/27$31,555.00ConstructionRoadwayConstructionRoadway09/01/27-92-3 months
1147-03-018Bryan06/01/27$79,803.00ConstructionRoadwayConstructionRoadway09/01/27-92-3 months
1223-01-051Bryan06/01/27$50,000.00ConstructionRoadwayConstructionRoadway09/01/27-92-3 months
1325-02-018Bryan06/01/27$40,930.00ConstructionRoadwayConstructionRoadway09/01/27-92-3 months
1327-02-027Bryan06/01/27$64,170.00ConstructionRoadwayConstructionRoadway09/01/27-92-3 months
1402-01-042Bryan06/01/27$111,358.00ConstructionRoadwayConstructionRoadway09/01/27-92-3 months
1402-02-023Bryan06/01/27$218,122.00ConstructionRoadwayConstructionRoadway09/01/27-92-3 months
1722-01-021Bryan06/01/27$212,318.91ConstructionRoadwayConstructionRoadway09/01/27-92-3 months
2132-01-015Bryan06/01/27$104,330.00ConstructionRoadwayConstructionRoadway09/01/27-92-3 months
2144-01-017Bryan06/01/27$667,670.00ConstructionRoadwayConstructionRoadway09/01/27-92-3 months
2705-01-018Bryan06/01/27$24,970.00ConstructionRoadwayConstructionRoadway09/01/27-92-3 months
2705-01-019Bryan06/01/27$36,040.00ConstructionRoadwayConstructionRoadway09/01/27-92-3 months
2850-01-022Bryan06/01/27$62,700.00ConstructionRoadwayConstructionRoadway09/01/27-92-3 months
2948-02-016Bryan06/01/27$75,260.00ConstructionRoadwayConstructionRoadway09/01/27-92-3 months
3537-01-008Bryan06/01/27$7,710.00ConstructionRoadwayConstructionRoadway09/01/27-92-3 months
0055-03-029Waco09/08/26$0.00Non-LetBridgeNon-LetBridge12/03/26-86-3 months$(587,968.20)-100%
0055-04-033Waco09/08/26$0.00Non-LetBridgeNon-LetBridge12/03/26-86-3 months$(11,048.60)-100%
0120-03-033Waco09/08/26$0.00Non-LetBridgeNon-LetBridge12/03/26-86-3 months$(13,075.00)-100%
0120-03-034Waco09/08/26$0.00Non-LetBridgeNon-LetBridge12/03/26-86-3 months$(66,664.00)-100%
0183-04-060Waco09/08/26$0.00Non-LetBridgeNon-LetBridge12/03/26-86-3 months$(50,605.29)-100%
0251-02-059Waco09/08/26$0.00Non-LetBridgeNon-LetBridge12/03/26-86-3 months$(29,356.33)-100%
0513-01-021Waco09/08/26$0.00Non-LetBridgeNon-LetBridge12/03/26-86-3 months$(39,995.19)-100%
0867-02-020Waco09/08/26$0.00Non-LetBridgeNon-LetBridge12/03/26-86-3 months$(51,029.31)-100%
0867-02-021Waco09/08/26$0.00Non-LetBridgeNon-LetBridge12/03/26-86-3 months$(140,424.80)-100%
0867-03-030Waco09/08/26$0.00Non-LetBridgeNon-LetBridge12/03/26-86-3 months$(212,457.20)-100%
0867-03-031Waco09/08/26$0.00Non-LetBridgeNon-LetBridge12/03/26-86-3 months$(187,435.30)-100%
0258-07-048Waco09/09/26$0.00Non-LetBridgeNon-LetBridge12/03/26-85-3 months$(13,595.40)-100%
0398-01-047Waco09/09/26$0.00Non-LetBridgeNon-LetBridge12/03/26-85-3 months$(54,816.84)-100%
6495-07-001Houston01/06/27$1,552,000.00MaintenanceRoutine Maintenance ContractMaintenanceRoutine Maintenance Contract11/03/26642 months
0507-03-055Corpus Christi07/01/29$8,000,000.00ConstructionRoadwayConstructionRoadway09/01/29-62-2 months
0146-06-023Childress09/06/28$6,500,000.00ConstructionRoadwayConstructionRoadway07/06/28622 months
0200-04-020Beaumont07/06/28$32,079,629.63ConstructionRoadwayConstructionRoadway09/06/28-62-2 months
0200-05-036Beaumont07/06/28$107,698,149.07ConstructionRoadwayConstructionRoadway09/06/28-62-2 months
0095-05-062Dallas06/03/28$1,200,000.00ConstructionLocal LetConstructionLocal Let08/04/28-62-2 months
0581-01-157Dallas06/03/28$1,000,000.00ConstructionLocal LetConstructionLocal Let08/04/28-62-2 months
0675-08-128Houston03/15/27$1,467,094.23ConstructionLocal LetConstructionLocal Let05/15/27-61-2 months
3256-02-122Houston04/06/27$184,000.00ConstructionBridgeConstructionBridge06/01/27-56-2 months$54,000.0042%
1057-03-060Pharr01/06/27$5,728,555.78ConstructionRoadwayConstructionRoadway03/03/27-56-2 months$84,654.662%
3045-01-010Pharr09/06/28$4,372,480.00ConstructionRoadwayConstructionRoadway08/02/28351 month$468,480.0012%
0912-73-249Houston03/15/27$3,022,870.19ConstructionLocal LetConstructionLocal Let04/15/27-31-1 month
3595-01-027Houston03/15/27$540,000.00ConstructionLocal LetConstructionLocal Let04/15/27-31-1 month
3176-01-012Corpus Christi12/01/27$10,000,000.00ConstructionRoadwayConstructionRoadway11/02/272929 days
0007-04-143Brownwood02/02/28$350,000.00ConstructionBridgeConstructionBridge01/05/282828 days
0007-04-147Brownwood02/02/28$350,000.00ConstructionBridgeConstructionBridge01/05/282828 days
0071-01-062Brownwood02/02/28$339,790.00ConstructionBridgeConstructionBridge01/05/282828 days
0071-01-063Brownwood02/02/28$339,790.00ConstructionBridgeConstructionBridge01/05/282828 days
0128-04-044Brownwood02/02/28$825,000.00ConstructionBridgeConstructionBridge01/05/282828 days
0289-03-029Brownwood02/02/28$300,000.00ConstructionBridgeConstructionBridge01/05/282828 days
1039-03-022Brownwood02/02/28$285,000.00ConstructionBridgeConstructionBridge01/05/282828 days
1239-01-034Brownwood02/02/28$150,000.00ConstructionBridgeConstructionBridge01/05/282828 days
0049-09-106Bryan09/01/27$75,000.00ConstructionRoadwayConstructionRoadway08/04/272828 days
0050-01-100Bryan09/01/27$75,000.00ConstructionRoadwayConstructionRoadway08/04/272828 days
0079-02-059Brownwood11/03/26$240,000.00Non-LetLocalNon-LetLocal10/06/262828 days
236 rows · download CSV

Project Type & Subtype Changes

The mix of project subtypes changed very little. Roadway projects increased from 79.6% to 79.7% of all projects. The shares of bridge and local-let projects stayed nearly the same. There were 15 classification changes, including 13 projects that received a type for the first time.

SubtypeSep 3 (% of projects)Oct 3 (% of projects)Δ projects (pp, n)
Roadway79.6% (4,398)79.7% (4,339)+0.1 (-59)
Bridge13.5% (748)13.5% (733)-0.1 (-15)
Local Let2.6% (142)2.6% (142)+0.0 (+0)
Non Roadway1.7% (94)1.7% (92)-0.0 (-2)
Rail - Safety1.1% (61)1.0% (56)-0.1 (-5)
CSJDistrictEst. Letting DateProject EstimateCurrent TypeCurrent SubtypeType/Subtype ΔPrev. TypePrev. SubtypePrev. CostPrev. DateLetting Δ (days)Letting Date ΔCost Δ%Cost ΔAdvertised ΔLifecycle
0192-01-109Houston11/15/26$515,107.00ConstructionLocal LetUnassigned → Construction / Local LetUnassignedUnassigned$515,107.0007/15/261234 months
6510-40-001Pharr01/06/27$500,000.00MaintenanceRoutine Maintenance ContractUnassigned → Maintenance / Routine Maintenance ContractUnassignedUnassigned$500,000.0001/06/270
0388-03-089Beaumont03/01/27$700,000.00Non-LetConsulting Engineering ContractUnassigned → Non-Let / Consulting Engineering ContractUnassignedUnassigned$700,000.0008/02/262117 months
0015-09-207Austin04/06/27$14,100,640.00ConstructionNon RoadwayUnassigned → Construction / Non RoadwayUnassignedUnassigned$5,447,000.0008/01/31-1578-4 years$8,653,640.00159%
0001-03-062El Paso05/01/27$500,000.00Non-LetRailUnassigned → Non-Let / RailUnassignedUnassigned$500,000.0005/01/263651 year
0912-72-843Houston05/01/27$1,048,217.76Non-LetRoadwayUnassigned → Non-Let / RoadwayUnassignedUnassigned$1,048,217.7608/15/262599 months
1281-01-021El Paso06/30/27$40,000.00Non-LetRailUnassigned → Non-Let / RailUnassignedUnassigned$40,000.0006/30/263651 year
3592-01-013El Paso06/30/27$350,000.00Non-LetRailUnassigned → Non-Let / RailUnassignedUnassigned$350,000.0006/30/263651 year
3256-01-122Houston11/02/27$3,780,771.71ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$3,780,771.7103/01/37-3407-9 years
1697-02-036Brownwood02/02/28$350,000.00ConstructionBridgeUnassigned → Construction / BridgeUnassignedUnassigned$350,000.0001/01/40-4351-12 years
3195-01-019Atlanta06/01/28$9,611,198.00ConstructionRoadwayUnassigned → Construction / RoadwayUnassignedUnassigned$9,717,553.0001/01/35-2405-7 years$(106,355.00)-1%
0015-13-463Austin08/01/28$1,313,000.00Non-LetPublic Transportation NetworkConstruction / Public Transportation Network → Non-Let / Public Transportation NetworkConstructionPublic Transportation Network$1,313,000.0008/01/280
0918-00-468Dallas08/01/28$5,000,000.00Non-LetRoadwayUnassigned → Non-Let / RoadwayUnassignedUnassigned$5,000,000.0008/02/267302 years
0912-00-704Houston09/15/28$1,000,000.00Non-LetRailNon-Let / Local → Non-Let / RailNon-LetLocal$1,000,000.0009/15/280
0568-01-060Dallas08/05/29$158,000.00Non-LetRailUnassigned → Non-Let / RailUnassignedUnassigned$158,000.0008/02/2610993 years
15 rows · download CSV

Cost Changes

The active pipeline value fell from $35.89B to $34.00B, a decrease of $1.89B. Roadway projects accounted for most of this change, with a net decrease of $1.67B. Waco had the largest decrease at $727.83M. Amarillo had a smaller increase of $47.24M. These changes mainly reflect updated project costs rather than major changes to the pipeline.

CSJDistrictEst. Letting DateProject EstimateCurrent TypeCurrent SubtypePrev. TypePrev. SubtypePrev. CostCost Δ%Cost ΔLetting Δ (days)Letting Date ΔType/Subtype ΔAdvertised ΔLifecycle
1041-02-045Lubbock11/02/27$850,000.00ConstructionRoadwayConstructionRoadway$50,000.00$800,000.001600%0
0009-06-056Paris11/03/26$2,621,223.87ConstructionRoadwayConstructionRoadway$380,723.20$2,240,500.67588%0
0062-07-106Atlanta08/02/28$550,420.00ConstructionRoadwayConstructionRoadway$100,000.00$450,420.00450%-152-5 months
1469-01-025Fort Worth12/01/26$1,800,299.18ConstructionRoadwayConstructionRoadway$336,165.16$1,464,134.02436%0
0069-03-064San Angelo12/01/26$119,040.52ConstructionRoadwayConstructionRoadway$25,070.00$93,970.52375%0
0095-07-062Tyler12/01/26$3,000,967.32ConstructionRoadwayConstructionRoadway$647,295.26$2,353,672.06364%0
1392-01-059Dallas04/06/27$296,460.37ConstructionRoadwayConstructionRoadway$65,000.00$231,460.37356%0
0406-02-035San Angelo04/06/27$5,300,000.00ConstructionRoadwayConstructionRoadway$1,250,000.00$4,050,000.00324%0
2170-05-018Laredo02/02/28$8,269,230.77ConstructionRoadwayConstructionRoadway$2,000,000.00$6,269,230.77313%0
1315-02-018Dallas04/06/27$1,002,457.98ConstructionRoadwayConstructionRoadway$250,000.00$752,457.98301%0
0027-09-119Houston10/05/27$71,000.00ConstructionRoadwayConstructionRoadway$20,000.00$51,000.00255%0
1513-01-021Fort Worth12/01/26$1,215,601.96ConstructionRoadwayConstructionRoadway$344,119.60$871,482.36253%0
0080-08-028Fort Worth12/01/26$498,871.10ConstructionRoadwayConstructionRoadway$143,262.25$355,608.85248%0
0683-07-013Austin01/06/27$8,636,833.28ConstructionRoadwayConstructionRoadway$2,581,650.00$6,055,183.28235%0
0070-01-056San Angelo12/01/26$1,629,842.63ConstructionRoadwayConstructionRoadway$524,000.00$1,105,842.63211%0
2437-01-028Amarillo11/02/27$969,400.00ConstructionRoadwayConstructionRoadway$355,639.39$613,760.61173%36412 months
0070-03-060San Angelo12/01/26$3,260,081.16ConstructionRoadwayConstructionRoadway$1,210,000.00$2,050,081.16169%0
0015-09-207Austin04/06/27$14,100,640.00ConstructionNon RoadwayUnassignedUnassigned$5,447,000.00$8,653,640.00159%-1578-4 yearsUnassigned → Construction / Non Roadway
0914-04-329Austin05/01/28$55,673,076.92ConstructionLocal LetConstructionLocal Let$22,000,000.00$33,673,076.92153%0
1853-01-049Fort Worth12/01/26$955,925.49ConstructionRoadwayConstructionRoadway$384,840.66$571,084.83148%0
0745-01-025Tyler12/01/26$178,711.40ConstructionRoadwayConstructionRoadway$74,252.34$104,459.06141%0
0156-07-115Wichita Falls12/01/26$1,210,800.61ConstructionRoadwayConstructionRoadway$528,592.00$682,208.61129%0
0008-09-041Fort Worth12/01/26$1,511,025.63ConstructionRoadwayConstructionRoadway$677,029.47$833,996.16123%0
2635-04-048Amarillo12/01/26$659,628.10ConstructionRoadwayConstructionRoadway$300,000.00$359,628.10120%0
0014-10-080Waco12/01/27$1,314,102.56ConstructionRoadwayConstructionRoadway$600,000.00$714,102.56119%0
0014-10-081Waco12/01/27$2,628,205.13ConstructionRoadwayConstructionRoadway$1,200,000.00$1,428,205.13119%0
0683-06-035Austin01/06/27$6,327,909.65ConstructionRoadwayConstructionRoadway$3,155,350.00$3,172,559.65101%0
0336-01-067Lufkin04/06/27$1,977,500.00ConstructionRoadwayConstructionRoadway$986,678.00$990,822.00100%0
0714-03-029Brownwood01/01/29$2,000,000.00ConstructionRoadwayConstructionRoadway$1,000,000.00$1,000,000.00100%0
0002-14-049El Paso12/05/28$0.00ConstructionRoadwayConstructionRoadway$453,062.04$(453,062.04)-100%0Canceled
0674-01-082El Paso12/05/28$0.00ConstructionRoadwayConstructionRoadway$408,994.44$(408,994.44)-100%0Canceled
0258-07-048Waco09/09/26$0.00Non-LetBridgeNon-LetBridge$13,595.40$(13,595.40)-100%-85-3 months
0398-01-047Waco09/09/26$0.00Non-LetBridgeNon-LetBridge$54,816.84$(54,816.84)-100%-85-3 months
0055-03-029Waco09/08/26$0.00Non-LetBridgeNon-LetBridge$587,968.20$(587,968.20)-100%-86-3 months
0055-04-033Waco09/08/26$0.00Non-LetBridgeNon-LetBridge$11,048.60$(11,048.60)-100%-86-3 months
0120-03-033Waco09/08/26$0.00Non-LetBridgeNon-LetBridge$13,075.00$(13,075.00)-100%-86-3 months
0120-03-034Waco09/08/26$0.00Non-LetBridgeNon-LetBridge$66,664.00$(66,664.00)-100%-86-3 months
0183-04-060Waco09/08/26$0.00Non-LetBridgeNon-LetBridge$50,605.29$(50,605.29)-100%-86-3 months
0251-02-059Waco09/08/26$0.00Non-LetBridgeNon-LetBridge$29,356.33$(29,356.33)-100%-86-3 months
0513-01-021Waco09/08/26$0.00Non-LetBridgeNon-LetBridge$39,995.19$(39,995.19)-100%-86-3 months
0867-02-020Waco09/08/26$0.00Non-LetBridgeNon-LetBridge$51,029.31$(51,029.31)-100%-86-3 months
0867-02-021Waco09/08/26$0.00Non-LetBridgeNon-LetBridge$140,424.80$(140,424.80)-100%-86-3 months
0867-03-030Waco09/08/26$0.00Non-LetBridgeNon-LetBridge$212,457.20$(212,457.20)-100%-86-3 months
0867-03-031Waco09/08/26$0.00Non-LetBridgeNon-LetBridge$187,435.30$(187,435.30)-100%-86-3 months
0918-25-029Dallas09/08/26$0.00Non-LetRoadwayNon-LetRoadway$12,000,000.00$(12,000,000.00)-100%-328-11 months
3510-10-024Beaumont06/01/27$65,377,095.00ConstructionRoadwayConstructionRoadway$33,000,000.00$32,377,095.0098%0
0443-03-024Tyler12/01/26$700,461.00ConstructionRoadwayConstructionRoadway$353,583.31$346,877.6998%0
0002-14-047El Paso12/01/26$60,221.19ConstructionRoadwayConstructionRoadway$31,544.58$28,676.6191%0
0517-02-046San Antonio09/01/27$12,500,000.00ConstructionBridgeConstructionBridge$6,604,270.95$5,895,729.0589%0
2298-03-012San Angelo12/01/26$64,875.63ConstructionRoadwayConstructionRoadway$405,000.00$(340,124.37)-84%0
0274-01-043Brownwood11/03/26$179,472.92ConstructionRoadwayConstructionRoadway$1,000,454.78$(820,981.86)-82%0
0009-04-079Dallas04/06/27$244,678.45ConstructionRoadwayConstructionRoadway$135,000.00$109,678.4581%0
1685-05-144Houston11/03/26$79,090.26ConstructionRoadwayConstructionRoadway$400,000.00$(320,909.74)-80%0
0340-01-042Lufkin04/06/27$154,528.00ConstructionRoadwayConstructionRoadway$722,577.70$(568,049.70)-79%0
2396-02-015Waco02/02/27$12,500,000.00ConstructionRoadwayConstructionRoadway$7,000,000.00$5,500,000.0079%0
0011-05-053Abilene12/01/26$81,658.80ConstructionRoadwayConstructionRoadway$371,542.00$(289,883.20)-78%0
0405-01-027San Angelo12/01/26$3,045,715.92ConstructionRoadwayConstructionRoadway$1,721,000.00$1,324,715.9277%0
1116-02-002Tyler12/01/26$17,620.80ConstructionRoadwayConstructionRoadway$76,484.14$(58,863.34)-77%0
0005-08-107Abilene12/01/26$1,840,365.65ConstructionRoadwayConstructionRoadway$1,058,935.00$781,430.6574%0
1398-01-014Tyler12/01/26$278,757.51ConstructionRoadwayConstructionRoadway$163,041.50$115,716.0171%0
0199-08-029Lufkin04/06/27$544,456.00ConstructionRoadwayConstructionRoadway$1,861,456.73$(1,317,000.73)-71%0
1104-01-024Brownwood11/03/26$394,329.80ConstructionRoadwayConstructionRoadway$231,663.30$162,666.5070%0
0500-01-158Houston11/03/26$510,119.12ConstructionRoadwayConstructionRoadway$1,656,690.05$(1,146,570.93)-69%0
1567-01-047Dallas04/06/27$38,646.36ConstructionRoadwayConstructionRoadway$125,000.00$(86,353.64)-69%0
0826-01-010San Angelo12/01/27$62,076.00ConstructionRoadwayConstructionRoadway$195,000.00$(132,924.00)-68%0
0558-09-042San Angelo12/01/27$66,078.00ConstructionRoadwayConstructionRoadway$199,000.00$(132,922.00)-67%0
0209-05-054Bryan10/06/26$344,488.94ConstructionRoadwayConstructionRoadway$996,837.10$(652,348.16)-65%0
1645-02-004San Angelo12/01/27$80,085.00ConstructionRoadwayConstructionRoadway$213,000.00$(132,915.00)-62%0
3510-03-012Houston12/15/28$19,860,000.00Alternative DeliveryDesign BuildAlternative DeliveryDesign Build$52,257,099.00$(32,397,099.00)-62%0
0700-04-056Austin07/01/27$191,483.75ConstructionBridgeConstructionBridge$500,897.12$(309,413.37)-62%0
0179-02-091Houston01/06/27$1,364,724.13ConstructionBridgeConstructionBridge$3,421,694.00$(2,056,969.87)-60%0
0200-01-094Lufkin05/05/27$7,552,733.50ConstructionRoadwayConstructionRoadway$4,733,603.00$2,819,130.5060%0
1875-02-031Lufkin04/06/27$458,495.00ConstructionRoadwayConstructionRoadway$1,126,458.63$(667,963.63)-59%0
0109-05-045Lufkin04/06/27$404,400.00ConstructionRoadwayConstructionRoadway$990,000.00$(585,600.00)-59%0
1062-01-218Houston02/02/27$1,271,319.00ConstructionRoadwayConstructionRoadway$3,016,292.00$(1,744,973.00)-58%0
1249-01-019Abilene12/01/26$212,533.50ConstructionRoadwayConstructionRoadway$500,000.00$(287,466.50)-57%0
1644-04-006San Angelo12/01/27$102,095.00ConstructionRoadwayConstructionRoadway$235,000.00$(132,905.00)-57%0
0135-06-041Paris11/03/26$131,497.80ConstructionRoadwayConstructionRoadway$84,893.01$46,604.7955%0
0179-02-092Houston01/06/27$1,243,585.53ConstructionBridgeConstructionBridge$2,749,594.00$(1,506,008.47)-55%0
1031-04-023Abilene12/01/26$226,166.94ConstructionRoadwayConstructionRoadway$500,000.00$(273,833.06)-55%0
0008-06-052Fort Worth06/01/27$17,006,133.02ConstructionRoadwayConstructionRoadway$37,500,000.00$(20,493,866.98)-55%0
0265-06-035Austin06/01/28$1,000,000.00ConstructionBridgeConstructionBridge$648,148.15$351,851.8554%0
0440-06-030Austin01/06/27$24,087,379.59ConstructionRoadwayConstructionRoadway$50,000,000.00$(25,912,620.41)-52%0
2163-01-006Austin01/01/29$268,775.00ConstructionBridgeConstructionBridge$548,461.61$(279,686.61)-51%0
0754-03-010Lubbock11/02/27$230,000.00ConstructionRoadwayConstructionRoadway$462,154.00$(232,154.00)-50%0
1567-01-046Dallas04/06/27$62,900.51ConstructionRoadwayConstructionRoadway$125,000.00$(62,099.49)-50%0
0150-05-050Austin06/01/27$1,075,781.00ConstructionNon RoadwayConstructionNon Roadway$2,132,974.13$(1,057,193.13)-50%0
1763-02-033Tyler12/01/26$216,429.10ConstructionRoadwayConstructionRoadway$145,066.52$71,362.5849%0
2552-01-066El Paso11/03/26$2,340,407.52ConstructionBridgeConstructionBridge$4,600,398.13$(2,259,990.61)-49%0
0598-02-134Houston01/06/27$217,696.00ConstructionBridgeConstructionBridge$427,693.00$(209,997.00)-49%0
1885-03-013Amarillo11/02/27$1,060,000.00ConstructionRoadwayConstructionRoadway$714,212.48$345,787.5248%36412 months
2494-02-011Amarillo07/01/27$16,038,434.50ConstructionRoadwayConstructionRoadway$31,087,931.87$(15,049,497.37)-48%-915-3 years
0109-04-030Lufkin04/06/27$1,852,200.00ConstructionRoadwayConstructionRoadway$1,248,237.85$603,962.1548%0
1566-02-022Austin06/03/27$1,568,685.00ConstructionLocal LetConstructionLocal Let$3,019,935.00$(1,451,250.00)-48%0
0111-05-019Houston03/03/27$2,339,174.00ConstructionRoadwayConstructionRoadway$4,480,673.00$(2,141,499.00)-48%0
0598-02-133Houston01/06/27$232,815.00ConstructionBridgeConstructionBridge$442,264.00$(209,449.00)-47%0
0010-02-105Paris11/03/26$601,641.70ConstructionRoadwayConstructionRoadway$1,107,908.27$(506,266.57)-46%0
0086-01-103Laredo11/03/26$143,604.08ConstructionRoadwayConstructionRoadway$261,538.00$(117,933.92)-45%0
0070-05-039San Angelo12/01/26$1,774,014.92ConstructionRoadwayConstructionRoadway$1,223,000.00$551,014.9245%0
0149-03-015San Angelo12/01/27$163,784.00ConstructionRoadwayConstructionRoadway$297,000.00$(133,216.00)-45%0
0008-05-029Fort Worth06/01/27$75,881,691.65ConstructionRoadwayConstructionRoadway$136,069,841.00$(60,188,149.35)-44%0
0245-19-030Tyler12/01/26$504,239.64ConstructionRoadwayConstructionRoadway$902,609.33$(398,369.69)-44%0
0033-08-041Abilene12/01/27$1,415,863.77ConstructionRoadwayConstructionRoadway$2,515,863.77$(1,100,000.00)-44%0
0675-06-103Bryan02/01/29$179,769,852.00ConstructionRoadwayConstructionRoadway$313,635,452.00$(133,865,600.00)-43%4281 year
0271-07-359Houston11/03/26$746,401.09ConstructionRoadwayConstructionRoadway$1,300,000.00$(553,598.91)-43%0
0650-03-037San Angelo07/01/27$6,486,142.45ConstructionRoadwayConstructionRoadway$4,551,887.91$1,934,254.5442%0
0594-01-017Tyler12/01/26$426,304.00ConstructionRoadwayConstructionRoadway$739,366.76$(313,062.76)-42%0
0918-47-460Dallas12/01/26$4,682,950.30ConstructionBridgeConstructionBridge$8,032,280.30$(3,349,330.00)-42%0
3256-02-122Houston04/06/27$184,000.00ConstructionBridgeConstructionBridge$130,000.00$54,000.0042%-56-2 months
1360-01-034Abilene12/01/26$569,854.57ConstructionRoadwayConstructionRoadway$950,000.00$(380,145.43)-40%0
0165-02-069Tyler12/01/26$660,055.70ConstructionRoadwayConstructionRoadway$1,088,953.96$(428,898.26)-39%0
0911-00-142Lufkin05/05/27$2,008,967.00ConstructionNon RoadwayConstructionNon Roadway$1,442,307.69$566,659.3139%0
0096-06-076Tyler12/01/26$375,934.10ConstructionRoadwayConstructionRoadway$619,242.00$(243,307.90)-39%0
0331-02-062Pharr01/01/29$2,563,306.63ConstructionRoadwayConstructionRoadway$4,191,426.00$(1,628,119.37)-39%0
0049-14-015Bryan10/06/26$1,775,526.26ConstructionRoadwayConstructionRoadway$2,893,248.75$(1,117,722.49)-39%0
0322-01-053Austin01/06/27$5,940,995.20ConstructionRoadwayConstructionRoadway$9,580,945.19$(3,639,949.99)-38%0
0265-05-092Austin03/07/28$2,875,586.54ConstructionNon RoadwayConstructionNon Roadway$4,629,629.63$(1,754,043.09)-38%0
2302-02-009Tyler12/01/26$182,226.30ConstructionRoadwayConstructionRoadway$293,309.83$(111,083.53)-38%0
0070-04-044San Angelo12/01/26$399,723.94ConstructionRoadwayConstructionRoadway$290,000.00$109,723.9438%0
0005-06-129Abilene06/01/27$2,500,000.00ConstructionRoadwayConstructionRoadway$4,000,000.00$(1,500,000.00)-38%0
0847-06-013Houston03/03/27$2,452,227.00ConstructionRoadwayConstructionRoadway$3,919,359.00$(1,467,132.00)-37%0
0113-13-162Austin08/01/29$423,611.11ConstructionRoadwayConstructionRoadway$672,884.00$(249,272.89)-37%0
0019-01-154Fort Worth03/07/28$3,948,317.52ConstructionRoadwayConstructionRoadway$6,251,464.12$(2,303,146.60)-37%0
0454-02-059San Angelo12/01/27$232,941.00ConstructionRoadwayConstructionRoadway$367,000.00$(134,059.00)-37%0
0135-07-049Paris11/03/26$480,575.00ConstructionRoadwayConstructionRoadway$753,871.36$(273,296.36)-36%0
0735-01-021Paris11/03/26$439,635.50ConstructionRoadwayConstructionRoadway$323,793.07$115,842.4336%0
0203-01-067Paris11/03/26$282,215.40ConstructionRoadwayConstructionRoadway$436,221.87$(154,006.47)-35%0
0200-01-098Lufkin04/06/27$1,012,400.00ConstructionRoadwayConstructionRoadway$1,564,150.58$(551,750.58)-35%0
0114-09-104Bryan04/06/27$1,300,000.00ConstructionRoadwayConstructionRoadway$2,000,000.00$(700,000.00)-35%0
0904-11-071Amarillo05/05/27$4,000,000.00ConstructionBridgeConstructionBridge$6,114,395.83$(2,114,395.83)-35%0
0646-05-043Tyler12/01/26$246,521.82ConstructionRoadwayConstructionRoadway$376,630.09$(130,108.27)-35%0
0892-02-009Tyler12/01/26$386,586.30ConstructionRoadwayConstructionRoadway$590,520.27$(203,933.97)-35%0
0594-02-031Tyler12/01/26$1,094,681.70ConstructionRoadwayConstructionRoadway$1,664,314.12$(569,632.42)-34%0
0522-03-028Tyler12/01/26$276,895.30ConstructionRoadwayConstructionRoadway$420,612.49$(143,717.19)-34%0
0199-05-014Tyler12/01/26$117,892.30ConstructionRoadwayConstructionRoadway$178,121.18$(60,228.88)-34%0
0342-02-060Pharr12/05/28$530,528.57ConstructionRoadwayConstructionRoadway$397,140.18$133,388.3934%0
0136-03-073Paris11/03/26$1,380,979.82ConstructionRoadwayConstructionRoadway$2,076,861.02$(695,881.20)-34%0
0601-01-069Beaumont12/01/26$532,907.80ConstructionBridgeConstructionBridge$399,644.00$133,263.8033%0
0005-06-128Abilene01/05/28$1,000,000.00ConstructionRoadwayConstructionRoadway$1,500,000.00$(500,000.00)-33%0
0271-06-141Houston11/03/26$867,233.10ConstructionRoadwayConstructionRoadway$1,300,000.00$(432,766.90)-33%0
1651-08-006San Angelo12/01/27$269,175.00ConstructionRoadwayConstructionRoadway$402,000.00$(132,825.00)-33%0
0677-01-024Abilene12/01/26$290,923.55ConstructionRoadwayConstructionRoadway$429,303.00$(138,379.45)-32%0
3545-01-007Austin12/01/28$2,141,851.85ConstructionLocal LetConstructionLocal Let$3,138,164.85$(996,313.00)-32%0
0688-02-065Paris11/03/26$869,736.00ConstructionRoadwayConstructionRoadway$661,928.96$207,807.0431%0
0440-05-015Austin01/06/27$171,589,275.59ConstructionRoadwayConstructionRoadway$250,000,000.00$(78,410,724.41)-31%0
0463-04-028San Angelo12/01/26$2,938,363.28ConstructionRoadwayConstructionRoadway$2,237,000.00$701,363.2831%0
0772-03-023Paris11/03/26$341,782.60ConstructionRoadwayConstructionRoadway$497,577.81$(155,795.21)-31%0
1051-03-001Dallas12/01/26$47,551,933.78ConstructionRoadwayConstructionRoadway$68,964,680.56$(21,412,746.78)-31%0
0045-05-053Paris11/03/26$791,554.20ConstructionRoadwayConstructionRoadway$1,136,612.69$(345,058.49)-30%0
0675-06-120Bryan12/01/27$130,017,833.00ConstructionRoadwayConstructionRoadway$100,000,000.00$30,017,833.0030%0
0314-03-055Fort Worth01/01/29$736,721.43ConstructionBridgeConstructionBridge$566,728.13$169,993.3030%0
2659-02-004Paris11/03/26$134,555.20ConstructionRoadwayConstructionRoadway$192,154.45$(57,599.25)-30%0
0058-04-023Tyler12/01/26$408,175.80ConstructionRoadwayConstructionRoadway$582,678.84$(174,503.04)-30%0
1754-02-035Austin12/01/27$3,391,900.00ConstructionRoadwayConstructionRoadway$4,831,957.00$(1,440,057.00)-30%0
0118-01-021Lufkin04/06/27$881,600.00ConstructionRoadwayConstructionRoadway$1,253,430.00$(371,830.00)-30%0
0892-01-022Tyler12/01/26$328,456.90ConstructionRoadwayConstructionRoadway$465,258.39$(136,801.49)-29%0
1641-02-009San Angelo12/01/27$321,200.00ConstructionRoadwayConstructionRoadway$454,000.00$(132,800.00)-29%0
0048-08-060Dallas12/01/26$3,917,713.77ConstructionRoadwayConstructionRoadway$3,033,308.84$884,404.9329%0
0374-07-027El Paso04/05/28$14,923,468.27ConstructionRoadwayConstructionRoadway$20,941,251.92$(6,017,783.65)-29%0
2640-02-010Paris11/03/26$271,714.80ConstructionRoadwayConstructionRoadway$381,032.96$(109,318.16)-29%0
0042-10-004Amarillo12/01/26$3,021,048.60ConstructionRoadwayConstructionRoadway$2,350,000.00$671,048.6029%0
0861-02-019Pharr09/01/27$2,654,637.37ConstructionRoadwayConstructionRoadway$3,700,000.00$(1,045,362.63)-28%0
0918-47-500Dallas04/06/27$511,638.75ConstructionRoadwayConstructionRoadway$711,104.22$(199,465.47)-28%0
0892-03-003Tyler12/01/26$212,515.40ConstructionRoadwayConstructionRoadway$295,360.67$(82,845.27)-28%0
0028-03-119Beaumont12/01/26$3,196,041.68ConstructionBridgeConstructionBridge$2,500,000.00$696,041.6828%0
1116-01-024Tyler12/01/26$409,691.60ConstructionRoadwayConstructionRoadway$566,815.01$(157,123.41)-28%0
0118-04-037Tyler12/01/26$380,728.00ConstructionRoadwayConstructionRoadway$525,521.82$(144,793.82)-28%0
0927-01-035Tyler12/01/26$223,221.60ConstructionRoadwayConstructionRoadway$306,891.59$(83,669.99)-27%0
0454-01-050San Angelo12/01/26$808,217.05ConstructionRoadwayConstructionRoadway$1,106,000.00$(297,782.95)-27%0
0722-02-052Paris11/03/26$722,419.40ConstructionRoadwayConstructionRoadway$985,140.05$(262,720.65)-27%0
2298-02-007San Angelo12/01/26$44,051.57ConstructionRoadwayConstructionRoadway$60,000.00$(15,948.43)-27%0
2391-01-011Brownwood12/01/27$3,500,000.00ConstructionRoadwayConstructionRoadway$4,750,000.00$(1,250,000.00)-26%0
0642-03-028Paris11/03/26$165,423.20ConstructionRoadwayConstructionRoadway$223,918.93$(58,495.73)-26%0
1690-01-148Paris11/03/26$905,955.70ConstructionRoadwayConstructionRoadway$1,224,076.00$(318,120.30)-26%0
0315-06-050Bryan10/05/27$857,498.00ConstructionRoadwayConstructionRoadway$1,157,498.00$(300,000.00)-26%0
1175-03-002Paris11/03/26$60,427.40ConstructionRoadwayConstructionRoadway$81,509.12$(21,081.72)-26%0
0912-73-247Houston03/15/27$4,486,742.00ConstructionLocal LetConstructionLocal Let$6,043,008.00$(1,556,266.00)-26%0
0405-02-028San Angelo12/01/26$2,359,157.84ConstructionRoadwayConstructionRoadway$1,878,000.00$481,157.8426%0
1645-01-014San Angelo12/01/27$386,231.00ConstructionRoadwayConstructionRoadway$519,000.00$(132,769.00)-26%0
0173-06-058Paris11/03/26$190,984.00ConstructionRoadwayConstructionRoadway$255,552.00$(64,568.00)-25%0
1647-01-006San Angelo12/01/26$282,617.97ConstructionRoadwayConstructionRoadway$378,000.00$(95,382.03)-25%0
0342-01-107Pharr12/05/28$397,140.18ConstructionRoadwayConstructionRoadway$530,528.57$(133,388.39)-25%0
0092-03-053Dallas12/01/26$57,217,915.20ConstructionRoadwayConstructionRoadway$76,245,839.82$(19,027,924.62)-25%0
0598-04-030Houston02/02/27$1,588,196.61ConstructionRoadwayConstructionRoadway$1,276,256.10$311,940.5124%0
0244-05-044Beaumont12/01/26$552,314.20ConstructionBridgeConstructionBridge$731,000.00$(178,685.80)-24%0
0792-02-021San Angelo12/01/27$414,385.00ConstructionRoadwayConstructionRoadway$548,000.00$(133,615.00)-24%0
0344-02-052San Angelo12/01/26$866,602.18ConstructionRoadwayConstructionRoadway$1,142,000.00$(275,397.82)-24%0
0081-07-029Paris11/03/26$532,304.90ConstructionRoadwayConstructionRoadway$701,399.89$(169,094.99)-24%0
2408-01-012Tyler12/01/26$334,633.00ConstructionRoadwayConstructionRoadway$440,688.57$(106,055.57)-24%0
1486-02-011San Angelo12/01/26$439,736.32ConstructionRoadwayConstructionRoadway$579,000.00$(139,263.68)-24%0
0045-10-023Paris11/03/26$378,876.80ConstructionRoadwayConstructionRoadway$305,592.32$73,284.4824%0
2033-03-011Abilene12/01/26$330,974.40ConstructionRoadwayConstructionRoadway$434,259.00$(103,284.60)-24%0
0861-02-020Pharr08/04/27$2,711,468.05ConstructionRoadwayConstructionRoadway$3,546,105.58$(834,637.53)-24%0
2843-01-014San Angelo12/01/26$485,810.53ConstructionRoadwayConstructionRoadway$635,000.00$(149,189.47)-23%0
2426-01-014Tyler12/01/26$409,261.90ConstructionRoadwayConstructionRoadway$331,692.64$77,569.2623%0
1647-02-005San Angelo12/01/26$35,324.47ConstructionRoadwayConstructionRoadway$46,000.00$(10,675.53)-23%0
0174-04-046Paris11/03/26$311,145.10ConstructionRoadwayConstructionRoadway$252,538.88$58,606.2223%0
3476-02-016Dallas04/06/27$49,920.85ConstructionRoadwayConstructionRoadway$65,000.00$(15,079.15)-23%0
2468-01-018San Angelo12/01/27$954,990.00ConstructionRoadwayConstructionRoadway$1,240,000.00$(285,010.00)-23%0
1147-02-029Bryan10/06/26$110,259.51ConstructionRoadwayConstructionRoadway$142,919.00$(32,659.49)-23%0
0265-06-036Austin03/07/28$3,573,601.92ConstructionNon RoadwayConstructionNon Roadway$4,629,629.63$(1,056,027.71)-23%0
0598-03-062Houston02/02/27$9,235,801.26ConstructionRoadwayConstructionRoadway$7,526,529.40$1,709,271.8623%0
2705-01-016Bryan10/06/26$86,027.69ConstructionRoadwayConstructionRoadway$111,242.80$(25,215.11)-23%0
0050-07-016Bryan10/06/26$65,155.24ConstructionRoadwayConstructionRoadway$84,161.25$(19,006.01)-23%0
0916-36-024Corpus Christi12/01/26$3,097,434.40ConstructionBridgeConstructionBridge$4,000,000.00$(902,565.60)-23%0
1147-03-017Bryan10/06/26$286,628.93ConstructionRoadwayConstructionRoadway$369,887.95$(83,259.02)-23%0
2830-02-014Bryan10/06/26$238,945.42ConstructionRoadwayConstructionRoadway$308,332.35$(69,386.93)-23%0
2705-01-017Bryan10/06/26$126,294.87ConstructionRoadwayConstructionRoadway$162,910.80$(36,615.93)-22%0
2827-01-013Bryan10/06/26$155,496.29ConstructionRoadwayConstructionRoadway$200,579.10$(45,082.81)-22%0
1145-02-023Bryan10/06/26$493,719.39ConstructionRoadwayConstructionRoadway$636,717.80$(142,998.41)-22%0
2144-01-016Bryan10/06/26$230,621.46ConstructionRoadwayConstructionRoadway$297,416.25$(66,794.79)-22%0
2132-01-014Bryan10/06/26$383,232.44ConstructionRoadwayConstructionRoadway$493,814.90$(110,582.46)-22%0
1327-02-026Bryan10/06/26$251,298.45ConstructionRoadwayConstructionRoadway$323,599.25$(72,300.80)-22%0
1325-02-017Bryan10/06/26$160,427.53ConstructionRoadwayConstructionRoadway$206,462.55$(46,035.02)-22%0
2467-01-017San Angelo12/01/27$470,000.00ConstructionRoadwayConstructionRoadway$603,000.00$(133,000.00)-22%0
0918-47-461Dallas12/01/26$3,609,515.40ConstructionBridgeConstructionBridge$4,613,582.40$(1,004,067.00)-22%0
2140-01-015San Angelo12/01/27$478,276.00ConstructionRoadwayConstructionRoadway$611,000.00$(132,724.00)-22%0
1722-01-020Bryan10/06/26$370,387.37ConstructionRoadwayConstructionRoadway$472,621.30$(102,233.93)-22%0
0252-01-084Austin12/01/26$6,953,263.29ConstructionRoadwayConstructionRoadway$8,827,944.32$(1,874,681.03)-21%0
0375-05-063San Angelo12/01/27$1,003,386.21ConstructionRoadwayConstructionRoadway$1,273,000.00$(269,613.79)-21%0
2654-01-024Tyler12/01/26$540,567.10ConstructionRoadwayConstructionRoadway$685,773.58$(145,206.48)-21%0
1364-01-017San Angelo12/01/27$498,285.00ConstructionRoadwayConstructionRoadway$631,000.00$(132,715.00)-21%0
0045-04-072Paris11/03/26$1,016,914.90ConstructionRoadwayConstructionRoadway$1,283,743.69$(266,828.79)-21%0
0244-05-043Beaumont12/01/26$515,972.20ConstructionBridgeConstructionBridge$650,000.00$(134,027.80)-21%0
0148-03-029San Angelo12/01/26$373,372.94ConstructionRoadwayConstructionRoadway$470,000.00$(96,627.06)-21%0
0576-02-077Lufkin04/06/27$659,500.00ConstructionRoadwayConstructionRoadway$828,822.12$(169,322.12)-20%0
0921-02-560Pharr05/01/27$606,180.00ConstructionNon RoadwayConstructionNon Roadway$760,614.00$(154,434.00)-20%0
0399-03-043Paris11/03/26$295,239.10ConstructionRoadwayConstructionRoadway$370,360.32$(75,121.22)-20%0
0053-12-075Abilene12/01/26$638,122.05ConstructionRoadwayConstructionRoadway$799,989.00$(161,866.95)-20%0
0016-01-142Austin12/01/26$2,159,011.50ConstructionRoadwayConstructionRoadway$2,705,164.42$(546,152.92)-20%0
2844-02-010San Angelo12/01/26$233,157.34ConstructionRoadwayConstructionRoadway$292,000.00$(58,842.66)-20%0
0545-03-015Tyler12/01/26$556,476.00ConstructionRoadwayConstructionRoadway$695,716.21$(139,240.21)-20%0
0149-02-019San Angelo12/01/27$536,303.46ConstructionRoadwayConstructionRoadway$669,000.00$(132,696.54)-20%0
0828-02-011San Angelo12/01/27$545,173.00ConstructionRoadwayConstructionRoadway$679,000.00$(133,827.00)-20%0
0022-01-034Odessa10/06/26$7,285,905.67ConstructionBridgeConstructionBridge$6,089,616.17$1,196,289.5020%0
0201-05-026San Angelo12/01/26$463,432.03ConstructionRoadwayConstructionRoadway$575,000.00$(111,567.97)-19%0
0174-04-047Paris11/03/26$299,837.00ConstructionRoadwayConstructionRoadway$251,863.04$47,973.9619%0
0730-04-020Paris11/03/26$708,206.40ConstructionRoadwayConstructionRoadway$874,752.85$(166,546.45)-19%0
1361-03-030Abilene12/01/26$959,114.59ConstructionRoadwayConstructionRoadway$806,245.00$152,869.5919%0
0042-01-032Amarillo12/01/26$2,493,339.55ConstructionRoadwayConstructionRoadway$2,100,000.00$393,339.5519%0
0314-03-054Fort Worth01/01/29$664,458.80ConstructionBridgeConstructionBridge$559,768.75$104,690.0519%0
0159-08-004San Angelo12/01/26$61,788.38ConstructionRoadwayConstructionRoadway$76,000.00$(14,211.62)-19%0
0657-01-021Tyler12/01/26$500,752.60ConstructionRoadwayConstructionRoadway$615,954.66$(115,202.06)-19%0
0048-04-111Dallas12/01/26$1,668,972.20ConstructionRoadwayConstructionRoadway$1,409,093.91$259,878.2918%0
0619-03-068Dallas11/03/26$1,313,710.00ConstructionRoadwayConstructionRoadway$1,606,585.00$(292,875.00)-18%0
0921-02-559Pharr05/01/27$824,730.29ConstructionNon RoadwayConstructionNon Roadway$698,113.00$126,617.2918%0
0006-16-005Abilene12/01/26$108,755.40ConstructionRoadwayConstructionRoadway$132,725.00$(23,969.60)-18%0
0038-01-107Laredo11/03/26$1,447,005.09ConstructionRoadwayConstructionRoadway$1,763,393.00$(316,387.91)-18%0
0016-03-125Austin11/03/26$2,325,204.96ConstructionRoadwayConstructionRoadway$2,826,631.57$(501,426.61)-18%0
0918-47-515Dallas08/04/28$575,000.00TransferTransferTransferTransfer$488,934.00$86,066.0018%0
0336-05-071Lufkin04/06/27$1,100,408.00ConstructionRoadwayConstructionRoadway$1,334,970.19$(234,562.19)-18%0
0202-04-029Paris11/03/26$385,115.00ConstructionRoadwayConstructionRoadway$467,221.33$(82,106.33)-18%0
0149-01-019San Angelo12/01/27$632,000.00ConstructionRoadwayConstructionRoadway$765,000.00$(133,000.00)-17%0
2278-01-012San Angelo12/01/27$632,350.00ConstructionRoadwayConstructionRoadway$765,000.00$(132,650.00)-17%0
0117-07-046Lufkin04/06/27$670,903.00ConstructionRoadwayConstructionRoadway$811,501.22$(140,598.22)-17%0
0081-10-053Paris11/03/26$148,733.10ConstructionRoadwayConstructionRoadway$179,700.00$(30,966.90)-17%0
0005-06-124Abilene12/01/26$1,344,623.95ConstructionRoadwayConstructionRoadway$1,624,233.00$(279,609.05)-17%0
0396-03-029San Angelo12/01/26$1,560,959.28ConstructionRoadwayConstructionRoadway$1,884,000.00$(323,040.72)-17%0
0870-04-043San Angelo12/01/27$1,290,712.00ConstructionRoadwayConstructionRoadway$1,556,000.00$(265,288.00)-17%0
1606-01-037Fort Worth10/04/28$12,119,430.43ConstructionBridgeConstructionBridge$10,377,099.98$1,742,330.4517%0
2713-01-004San Angelo12/01/26$73,302.71ConstructionRoadwayConstructionRoadway$88,000.00$(14,697.29)-17%0
1092-01-033Dallas05/05/27$657,018.13ConstructionRoadwayConstructionRoadway$788,421.76$(131,403.63)-17%0
0314-03-053Fort Worth01/01/29$884,795.50ConstructionBridgeConstructionBridge$758,771.88$126,023.6217%0
0263-05-025Abilene12/01/26$980,309.00ConstructionRoadwayConstructionRoadway$1,173,898.00$(193,589.00)-16%0
0730-01-013Paris11/03/26$113,805.80ConstructionRoadwayConstructionRoadway$136,144.21$(22,338.41)-16%0
0011-06-050Abilene12/01/26$1,254,621.67ConstructionRoadwayConstructionRoadway$1,500,000.00$(245,378.33)-16%0
0006-02-126Abilene12/01/26$577,912.00ConstructionRoadwayConstructionRoadway$690,784.00$(112,872.00)-16%0
0116-01-041Austin03/07/28$219,644.23ConstructionRoadwayConstructionRoadway$188,847.56$30,796.6716%0
0830-02-023San Angelo12/01/26$179,523.44ConstructionRoadwayConstructionRoadway$214,000.00$(34,476.56)-16%0
0552-02-034Bryan10/06/26$335,580.82ConstructionRoadwayConstructionRoadway$399,509.95$(63,929.13)-16%0
2948-02-015Bryan10/06/26$342,244.29ConstructionRoadwayConstructionRoadway$406,879.55$(64,635.26)-16%0
0201-06-033San Angelo12/01/26$928,279.24ConstructionRoadwayConstructionRoadway$1,102,000.00$(173,720.76)-16%0
0675-07-107Bryan10/06/26$415,172.01ConstructionRoadwayConstructionRoadway$492,511.55$(77,339.54)-16%0
0035-03-056San Angelo12/01/27$765,500.00ConstructionRoadwayConstructionRoadway$907,000.00$(141,500.00)-16%0
1564-01-037Bryan10/06/26$45,813.36ConstructionRoadwayConstructionRoadway$54,246.90$(8,433.54)-16%0
1092-01-026Dallas05/05/27$10,339,045.00ConstructionRoadwayConstructionRoadway$12,239,522.17$(1,900,477.17)-16%0
0792-01-033San Angelo12/01/27$729,396.00ConstructionRoadwayConstructionRoadway$862,000.00$(132,604.00)-15%0
0333-01-033Abilene12/01/26$1,395,768.20ConstructionRoadwayConstructionRoadway$1,647,371.00$(251,602.80)-15%0
0374-02-125El Paso12/01/26$659,800.39ConstructionRoadwayConstructionRoadway$572,382.51$87,417.8815%0
0204-06-068Bryan10/06/26$397,841.81ConstructionRoadwayConstructionRoadway$469,399.50$(71,557.69)-15%0
0204-07-057Bryan10/06/26$378,543.40ConstructionRoadwayConstructionRoadway$445,864.90$(67,321.50)-15%0
0013-08-147Fort Worth06/01/27$48,242,652.79ConstructionRoadwayConstructionRoadway$56,800,000.00$(8,557,347.21)-15%0
2011-02-016Abilene12/01/26$851,460.75ConstructionRoadwayConstructionRoadway$1,002,591.00$(151,130.25)-15%0
0314-03-056Fort Worth01/01/29$724,705.46ConstructionBridgeConstructionBridge$630,000.00$94,705.4615%0
0506-05-010Bryan10/06/26$11,354.80ConstructionRoadwayConstructionRoadway$13,363.50$(2,008.70)-15%0
2850-01-019Bryan10/06/26$321,623.02ConstructionRoadwayConstructionRoadway$378,523.00$(56,899.98)-15%0
0558-07-020San Angelo12/01/27$766,817.00ConstructionRoadwayConstructionRoadway$901,000.00$(134,183.00)-15%0
0002-02-065El Paso12/01/26$285,118.47ConstructionRoadwayConstructionRoadway$248,202.21$36,916.2615%0
2635-05-004Amarillo07/01/27$32,125,307.80ConstructionRoadwayConstructionRoadway$37,711,095.80$(5,585,788.00)-15%-915-3 years
0314-03-058Fort Worth01/01/29$843,205.50ConstructionBridgeConstructionBridge$735,341.88$107,863.6215%0
0172-09-047Fort Worth01/06/27$4,029,170.17ConstructionRoadwayConstructionRoadway$3,514,144.18$515,025.9915%1264 months
0610-01-053Paris11/03/26$80,661.00ConstructionRoadwayConstructionRoadway$94,476.80$(13,815.80)-15%0
3209-01-008San Angelo12/01/26$257,909.47ConstructionRoadwayConstructionRoadway$302,000.00$(44,090.53)-15%0
0578-02-050Bryan10/06/26$131,503.82ConstructionRoadwayConstructionRoadway$153,975.90$(22,472.08)-15%0
0506-02-026Bryan10/06/26$275,623.36ConstructionRoadwayConstructionRoadway$322,440.25$(46,816.89)-15%0
0181-02-033Abilene09/06/28$10,158,245.73ConstructionRoadwayConstructionRoadway$11,871,252.80$(1,713,007.07)-14%0
0444-02-021Fort Worth09/01/29$41,490,637.62ConstructionRoadwayConstructionRoadway$36,265,680.20$5,224,957.4214%0
1705-01-028Paris11/03/26$137,626.00ConstructionRoadwayConstructionRoadway$160,784.21$(23,158.21)-14%0
0116-04-113Bryan10/06/26$1,432,370.61ConstructionRoadwayConstructionRoadway$1,673,290.05$(240,919.44)-14%0
0668-03-010Abilene12/01/26$167,441.90ConstructionRoadwayConstructionRoadway$195,558.00$(28,116.10)-14%0
0648-03-081Bryan10/06/26$478,284.33ConstructionRoadwayConstructionRoadway$558,497.65$(80,213.32)-14%0
0648-04-005Bryan10/06/26$193,507.80ConstructionRoadwayConstructionRoadway$225,818.85$(32,311.05)-14%0
0442-03-050Dallas12/01/26$420,995.69ConstructionRoadwayConstructionRoadway$491,217.88$(70,222.19)-14%0
0592-02-017Tyler12/01/26$229,765.90ConstructionRoadwayConstructionRoadway$267,453.20$(37,687.30)-14%0
0947-03-034Beaumont11/03/26$2,281,773.00ConstructionRoadwayConstructionRoadway$2,000,000.00$281,773.0014%0
1644-03-019San Angelo12/01/27$823,726.00ConstructionRoadwayConstructionRoadway$958,000.00$(134,274.00)-14%0
0558-03-026Abilene12/01/26$599,114.95ConstructionRoadwayConstructionRoadway$696,693.00$(97,578.05)-14%0
0754-04-013Lubbock11/03/26$476,915.26ConstructionRoadwayConstructionRoadway$418,526.34$58,388.9214%0
0918-47-501Dallas04/06/27$596,105.21ConstructionRail - SafetyConstructionRail - Safety$691,754.82$(95,649.61)-14%0
0648-03-084Bryan10/06/26$153,961.35ConstructionRoadwayConstructionRoadway$178,377.00$(24,415.65)-14%0
0927-01-036Tyler12/01/26$189,051.90ConstructionRoadwayConstructionRoadway$218,474.40$(29,422.50)-13%0
1979-01-016Paris11/03/26$402,135.40ConstructionRoadwayConstructionRoadway$354,421.76$47,713.6413%0
0558-08-015San Angelo12/01/27$868,654.00ConstructionRoadwayConstructionRoadway$1,003,000.00$(134,346.00)-13%0
2859-01-011Abilene12/01/26$422,663.30ConstructionRoadwayConstructionRoadway$487,839.00$(65,175.70)-13%0
1127-05-024Odessa12/01/26$2,054,496.55ConstructionRoadwayConstructionRoadway$1,815,251.00$239,245.5513%0
0182-02-041Brownwood05/03/28$13,000,000.00ConstructionRoadwayConstructionRoadway$11,500,000.00$1,500,000.0013%0
2141-02-020San Angelo12/01/27$888,500.00ConstructionRoadwayConstructionRoadway$1,021,000.00$(132,500.00)-13%0
1031-05-020Abilene12/01/26$436,568.20ConstructionRoadwayConstructionRoadway$500,000.00$(63,431.80)-13%0
0015-13-457Austin01/01/29$7,777,777.78ConstructionNon RoadwayConstructionNon Roadway$6,927,606.51$850,171.2712%0
3045-01-010Pharr09/06/28$4,372,480.00ConstructionRoadwayConstructionRoadway$3,904,000.00$468,480.0012%351 month
3045-01-011Pharr08/02/28$4,948,831.44ConstructionRoadwayConstructionRoadway$4,418,599.50$530,231.9412%0
0039-07-279Pharr09/01/27$1,014,519.00ConstructionRoadwayConstructionRoadway$905,821.00$108,698.0012%0
0220-02-029Pharr09/01/27$260,963.00ConstructionRoadwayConstructionRoadway$233,003.00$27,960.0012%0
0327-08-112Pharr09/01/27$1,218,957.00ConstructionRoadwayConstructionRoadway$1,088,354.00$130,603.0012%0
0327-10-072Pharr09/01/27$534,230.00ConstructionRoadwayConstructionRoadway$476,991.00$57,239.0012%0
0433-04-036Pharr09/01/27$885,187.55ConstructionRoadwayConstructionRoadway$790,346.00$94,841.5512%0
0698-03-111Pharr09/01/27$121,009.81ConstructionRoadwayConstructionRoadway$108,044.00$12,965.8112%0
0698-04-010Pharr09/01/27$475,955.00ConstructionRoadwayConstructionRoadway$424,960.00$50,995.0012%0
0921-02-544Pharr09/01/27$556,662.50ConstructionRoadwayConstructionRoadway$497,020.09$59,642.4112%0
0921-02-545Pharr09/01/27$556,662.50ConstructionRoadwayConstructionRoadway$497,020.98$59,641.5212%0
0921-06-387Pharr09/01/27$449,877.00ConstructionRoadwayConstructionRoadway$401,675.89$48,201.1112%0
1057-02-034Pharr09/01/27$880,469.00ConstructionRoadwayConstructionRoadway$786,133.00$94,336.0012%0
1138-01-044Pharr09/01/27$373,139.00ConstructionRoadwayConstructionRoadway$333,159.82$39,979.1812%0
2094-01-077Pharr09/01/27$43,297.00ConstructionRoadwayConstructionRoadway$38,658.00$4,639.0012%0
0683-03-043Austin03/03/27$2,057,899.00ConstructionRoadwayConstructionRoadway$1,837,409.82$220,489.1812%0
1776-01-039Austin03/01/27$1,266,630.00ConstructionLocal LetConstructionLocal Let$1,130,919.64$135,710.3612%0
0889-02-018Tyler12/01/26$144,441.30ConstructionRoadwayConstructionRoadway$164,131.97$(19,690.67)-12%0
1012-02-043Dallas09/06/28$12,892,438.89ConstructionRoadwayConstructionRoadway$14,646,117.86$(1,753,678.97)-12%0
0558-06-019San Angelo12/01/27$959,496.00ConstructionRoadwayConstructionRoadway$1,090,000.00$(130,504.00)-12%0
3610-01-004Abilene12/01/26$132,284.90ConstructionRoadwayConstructionRoadway$150,278.00$(17,993.10)-12%0
0366-01-080Austin11/03/26$348,684.47ConstructionRoadwayConstructionRoadway$396,072.86$(47,388.39)-12%0
3066-01-005Brownwood11/03/26$16,673.73ConstructionRoadwayConstructionRoadway$18,932.11$(2,258.38)-12%0
0275-01-258Amarillo12/01/26$396,646.30ConstructionRoadwayConstructionRoadway$450,000.00$(53,353.70)-12%0
0765-03-029Paris11/03/26$392,147.20ConstructionRoadwayConstructionRoadway$350,704.64$41,442.5612%0
1666-02-009Tyler12/01/26$430,887.50ConstructionRoadwayConstructionRoadway$488,300.12$(57,412.62)-12%0
0627-04-070Beaumont12/01/26$3,350,490.70ConstructionRoadwayConstructionRoadway$3,000,000.00$350,490.7012%0
0657-04-014Tyler12/01/26$418,464.15ConstructionRoadwayConstructionRoadway$375,102.01$43,362.1412%0
0059-05-048Lufkin11/03/26$491,291.80ConstructionRoadwayConstructionRoadway$555,436.80$(64,145.00)-12%0
1103-04-045Pharr02/02/27$20,823,095.44ConstructionRoadwayConstructionRoadway$18,669,141.29$2,153,954.1512%0
0902-90-354Fort Worth01/05/28$609,013.00ConstructionRoadwayConstructionRoadway$688,399.50$(79,386.50)-12%0
0354-04-043Odessa12/01/26$23,065,860.83ConstructionRoadwayConstructionRoadway$26,065,517.45$(2,999,656.62)-12%0
1161-02-013Tyler12/01/26$413,384.10ConstructionRoadwayConstructionRoadway$466,384.34$(53,000.24)-11%0
3455-01-011Abilene12/01/26$397,007.50ConstructionRoadwayConstructionRoadway$447,277.00$(50,269.50)-11%0
0921-02-396Pharr05/01/28$7,304,155.76ConstructionLocal LetConstructionLocal Let$8,213,618.71$(909,462.95)-11%0
1055-01-014Lubbock11/03/26$209,175.25ConstructionRoadwayConstructionRoadway$188,648.82$20,526.4311%0
0200-13-013Lufkin04/06/27$490,508.00ConstructionRoadwayConstructionRoadway$550,272.12$(59,764.12)-11%0
0366-01-089Austin11/03/26$202,538.38ConstructionRoadwayConstructionRoadway$227,222.93$(24,684.55)-11%0
0426-02-023Bryan10/06/26$221,225.35ConstructionRoadwayConstructionRoadway$247,877.40$(26,652.05)-11%0
1728-02-069San Antonio12/01/26$3,761,232.63ConstructionRoadwayConstructionRoadway$4,204,671.06$(443,438.43)-11%0
0057-03-049Bryan10/06/26$11,802.46ConstructionRoadwayConstructionRoadway$13,184.20$(1,381.74)-10%0
0893-04-015Lufkin12/01/26$147,598.65ConstructionRoadwayConstructionRoadway$164,641.00$(17,042.35)-10%0
0024-05-104San Antonio02/02/27$9,241,146.87ConstructionRoadwayConstructionRoadway$10,288,080.00$(1,046,933.13)-10%0
0342-04-036Pharr11/01/28$29,283,929.50ConstructionRoadwayConstructionRoadway$32,596,524.00$(3,312,594.50)-10%0
0677-02-017Abilene12/01/26$266,345.82ConstructionRoadwayConstructionRoadway$295,967.00$(29,621.18)-10%0
0016-09-045Austin11/03/26$192,093.97ConstructionRoadwayConstructionRoadway$213,459.69$(21,365.72)-10%0
0134-04-038Fort Worth12/01/32$28,433,082.07ConstructionRoadway$25,848,256.43$2,584,825.6410%18275 years
0332-02-028Abilene12/01/26$111,145.50ConstructionRoadwayConstructionRoadway$123,275.00$(12,129.50)-10%0
0014-15-090Fort Worth06/01/27$65,863,983.97ConstructionRoadwayConstructionRoadway$60,000,000.00$5,863,983.9710%0
0174-04-048Paris11/03/26$219,208.60ConstructionRoadwayConstructionRoadway$200,555.52$18,653.089%0
0296-06-016Abilene12/01/26$117,085.40ConstructionRoadwayConstructionRoadway$128,965.00$(11,879.60)-9%0
0080-03-049Fort Worth06/01/27$115,461,159.08ConstructionRoadwayConstructionRoadway$127,000,000.00$(11,538,840.92)-9%0
2444-01-011Lubbock11/03/26$220,532.89ConstructionRoadwayConstructionRoadway$202,268.58$18,264.319%0
0024-08-152San Antonio09/01/27$13,522,041.29ConstructionRoadwayConstructionRoadway$14,850,000.00$(1,327,958.71)-9%0
1879-01-025Lufkin12/01/26$299,863.35ConstructionRoadwayConstructionRoadway$328,927.00$(29,063.65)-9%0
2561-01-014Brownwood11/03/26$128,982.63ConstructionRoadwayConstructionRoadway$118,505.94$10,476.699%0
0107-02-041Abilene12/01/26$784,652.85ConstructionRoadwayConstructionRoadway$860,160.00$(75,507.15)-9%0
1564-01-038Bryan10/06/26$28,280.28ConstructionRoadwayConstructionRoadway$30,998.60$(2,718.32)-9%0
0924-06-719El Paso12/01/26$179,482.07ConstructionRoadwayConstructionRoadway$196,694.75$(17,212.68)-9%0
1666-03-007Tyler12/01/26$220,964.90ConstructionRoadwayConstructionRoadway$241,989.44$(21,024.54)-9%0
0042-02-021Amarillo12/01/26$226,008.40ConstructionRoadwayConstructionRoadway$247,138.00$(21,129.60)-9%0
0380-02-028Lubbock11/03/26$1,143,488.13ConstructionRoadwayConstructionRoadway$1,054,219.47$89,268.668%0
0288-01-043Brownwood11/03/26$150,498.07ConstructionRoadwayConstructionRoadway$164,283.50$(13,785.43)-8%0
0315-08-051Bryan10/06/26$457,639.89ConstructionRoadwayConstructionRoadway$499,467.35$(41,827.46)-8%0
1223-01-050Bryan10/06/26$208,720.49ConstructionRoadwayConstructionRoadway$227,749.95$(19,029.46)-8%0
1041-01-027Lubbock11/03/26$110,206.77ConstructionRoadwayConstructionRoadway$101,787.21$8,419.568%0
0007-05-016Brownwood11/03/26$539,958.06ConstructionRoadwayConstructionRoadway$498,742.26$41,215.808%0
1425-03-075Pharr08/02/28$3,508,649.94ConstructionRoadwayConstructionRoadway$3,818,764.43$(310,114.49)-8%0
0151-06-152Austin03/03/27$15,000,000.00ConstructionBridgeConstructionBridge$13,875,681.00$1,124,319.008%0
1691-01-018Bryan10/06/26$564,078.20ConstructionRoadwayConstructionRoadway$613,560.95$(49,482.75)-8%0
0933-03-007Lubbock11/03/26$394,760.84ConstructionRoadwayConstructionRoadway$365,385.19$29,375.658%0
2337-02-012Bryan10/06/26$539,220.96ConstructionRoadwayConstructionRoadway$586,040.60$(46,819.64)-8%0
0944-01-030Bryan10/06/26$218,000.71ConstructionRoadwayConstructionRoadway$236,822.70$(18,821.99)-8%0
2238-01-015Bryan10/06/26$80,115.10ConstructionRoadwayConstructionRoadway$87,034.55$(6,919.45)-8%0
0578-03-054Bryan10/06/26$756,560.62ConstructionRoadwayConstructionRoadway$821,766.65$(65,206.03)-8%0
0082-02-022Paris11/03/26$562,730.40ConstructionRoadwayConstructionRoadway$611,006.29$(48,275.89)-8%0
0211-03-039Austin12/01/26$1,977,989.53ConstructionRoadwayConstructionRoadway$1,833,490.08$144,499.458%0
0266-03-033Yoakum01/06/27$177,482.60ConstructionNon RoadwayConstructionNon Roadway$192,415.80$(14,933.20)-8%0
2238-02-027Bryan10/06/26$534,169.18ConstructionRoadwayConstructionRoadway$578,915.00$(44,745.82)-8%0
0643-05-066Bryan10/06/26$713,827.97ConstructionRoadwayConstructionRoadway$773,518.65$(59,690.68)-8%0
1378-03-041Austin10/04/28$3,748,719.15ConstructionRoadwayConstructionRoadway$3,480,953.50$267,765.658%0
0374-05-026El Paso02/02/28$22,392,241.35ConstructionRoadwayConstructionRoadway$20,792,795.54$1,599,445.818%0
1402-02-020Bryan10/06/26$393,195.40ConstructionRoadwayConstructionRoadway$425,658.95$(32,463.55)-8%0
0151-03-046Austin08/01/29$1,388,888.89ConstructionRoadwayConstructionRoadway$1,500,000.00$(111,111.11)-7%0
0151-04-076Austin08/01/29$1,388,888.89ConstructionRoadwayConstructionRoadway$1,500,000.00$(111,111.11)-7%0
0071-04-058Austin05/01/29$1,203,703.70ConstructionNon RoadwayConstructionNon Roadway$1,300,000.00$(96,296.30)-7%0
0152-03-071Austin04/02/29$452,777.78ConstructionRoadwayConstructionRoadway$489,000.00$(36,222.22)-7%0
3006-01-009Austin04/02/29$301,851.85ConstructionRoadwayConstructionRoadway$326,000.00$(24,148.15)-7%0
0471-02-085Austin12/02/28$1,433,876.08ConstructionLocal LetConstructionLocal Let$1,548,586.17$(114,710.09)-7%0
0380-01-096Lubbock11/03/26$498,880.99ConstructionRoadwayConstructionRoadway$464,494.09$34,386.907%0
0052-05-052Lubbock11/03/26$651,295.27ConstructionRoadwayConstructionRoadway$606,482.59$44,812.687%0
0227-04-023Lubbock11/03/26$580,813.43ConstructionRoadwayConstructionRoadway$541,439.04$39,374.397%0
0039-10-091Pharr07/01/27$206,357,149.40ConstructionRoadwayConstructionRoadway$192,400,000.00$13,957,149.407%0
0267-08-008Bryan10/06/26$106,073.72ConstructionRoadwayConstructionRoadway$114,284.75$(8,211.03)-7%0
0228-03-033Lubbock11/03/26$1,716,078.41ConstructionRoadwayConstructionRoadway$1,601,474.26$114,604.157%0
2690-01-040Austin09/01/30$6,871,428.57ConstructionRoadway$7,400,000.00$(528,571.43)-7%10963 years
0645-01-017Lubbock11/03/26$640,577.91ConstructionRoadwayConstructionRoadway$598,209.26$42,368.657%0
2470-01-007San Angelo12/01/26$76,208.39ConstructionRoadwayConstructionRoadway$82,000.00$(5,791.61)-7%0
0924-06-722El Paso12/01/26$185,561.43ConstructionRoadwayConstructionRoadway$199,560.58$(13,999.15)-7%0
0177-01-123Lufkin07/01/27$2,865,217.68ConstructionRoadwayConstructionRoadway$2,677,773.44$187,444.247%0
1794-01-029Lufkin07/01/27$1,587,575.15ConstructionRoadwayConstructionRoadway$1,483,715.74$103,859.417%0
1810-01-033Lufkin06/01/27$9,808,945.74ConstructionRoadwayConstructionRoadway$9,167,239.01$641,706.737%0
1875-03-023Lufkin06/01/27$8,483,834.00ConstructionRoadwayConstructionRoadway$7,928,817.00$555,017.007%0
0199-04-081Lufkin04/06/27$771,644.00ConstructionRoadwayConstructionRoadway$721,153.85$50,490.157%0
0009-09-114Paris11/03/26$1,445,456.60ConstructionRoadwayConstructionRoadway$1,553,859.41$(108,402.81)-7%0
3485-01-009Lubbock11/03/26$57,120.66ConstructionRoadwayConstructionRoadway$53,461.15$3,659.517%0
1727-01-019Amarillo11/02/27$673,000.00ConstructionRoadwayConstructionRoadway$630,127.52$42,872.487%36412 months
0401-03-029Tyler12/01/26$899,501.20ConstructionRoadwayConstructionRoadway$965,099.52$(65,598.32)-7%0
0074-06-256Corpus Christi11/03/26$1,598,349.00ConstructionBridgeConstructionBridge$1,496,610.00$101,739.007%0
0249-07-072Fort Worth01/06/27$40,670,277.46ConstructionBridgeConstructionBridge$38,104,650.90$2,565,626.567%0
1103-04-046Pharr04/06/27$13,801,444.80ConstructionRoadwayConstructionRoadway$12,941,788.86$859,655.947%-636-2 years
2444-02-010Lubbock11/03/26$393,773.32ConstructionRoadwayConstructionRoadway$369,348.05$24,425.277%0
0145-07-039Lubbock11/03/26$1,481,319.30ConstructionRoadwayConstructionRoadway$1,389,918.86$91,400.447%0
0130-01-022Lubbock11/03/26$1,179,596.51ConstructionRoadwayConstructionRoadway$1,107,315.10$72,281.417%0
0422-05-011Fort Worth07/01/27$12,707,217.99ConstructionBridgeConstructionBridge$13,592,874.18$(885,656.19)-7%0
0675-07-113Bryan10/06/26$80,808.32ConstructionRoadwayConstructionRoadway$86,385.15$(5,576.83)-6%0
0583-03-018Lubbock11/03/26$34,424.08ConstructionRoadwayConstructionRoadway$32,347.30$2,076.786%0
2932-03-004Lubbock11/03/26$188,960.16ConstructionRoadwayConstructionRoadway$177,580.31$11,379.856%0
2833-01-016Tyler12/01/26$299,022.90ConstructionRoadwayConstructionRoadway$281,205.87$17,817.036%0
0143-03-049San Antonio10/06/26$50,415,711.02ConstructionRoadwayConstructionRoadway$47,441,025.10$2,974,685.926%0
0052-04-054Lubbock11/03/26$2,371,420.58ConstructionRoadwayConstructionRoadway$2,234,347.68$137,072.906%0
2635-03-031Amarillo12/01/26$3,755,952.85ConstructionRoadwayConstructionRoadway$4,000,000.00$(244,047.15)-6%0
0435-01-086Paris11/03/26$587,101.20ConstructionRoadwayConstructionRoadway$624,969.52$(37,868.32)-6%0
0089-15-019Yoakum01/06/27$1,368,323.50ConstructionNon RoadwayConstructionNon Roadway$1,454,192.50$(85,869.00)-6%0
0148-04-025San Angelo12/01/26$561,079.73ConstructionRoadwayConstructionRoadway$530,000.00$31,079.736%0
1530-01-012Abilene03/07/28$5,856,611.70ConstructionRoadwayConstructionRoadway$6,218,588.70$(361,977.00)-6%0
0721-01-024Lubbock11/03/26$347,207.96ConstructionRoadwayConstructionRoadway$328,382.32$18,825.646%0
0054-05-027Brownwood11/03/26$118,887.84ConstructionRoadwayConstructionRoadway$112,542.84$6,345.006%0
0987-03-017Austin11/03/26$116,625.81ConstructionRoadwayConstructionRoadway$123,522.92$(6,897.11)-6%0
0052-07-076Lubbock11/03/26$795,434.20ConstructionRoadwayConstructionRoadway$753,458.95$41,975.256%0
0921-02-395Pharr05/02/29$13,290,284.70ConstructionLocal LetConstructionLocal Let$12,592,097.00$698,187.706%0
0880-04-041Lubbock11/03/26$298,563.98ConstructionRoadwayConstructionRoadway$282,898.48$15,665.506%0
2777-01-007Lubbock11/03/26$446,708.20ConstructionRoadwayConstructionRoadway$423,370.18$23,338.026%0
0095-02-129Dallas09/06/28$1,588,224.75ConstructionRoadwayConstructionRoadway$1,680,659.43$(92,434.68)-6%0
1529-03-010Abilene12/01/26$213,492.90ConstructionRoadwayConstructionRoadway$225,891.00$(12,398.10)-5%0
0057-02-040Bryan10/06/26$78,962.45ConstructionRoadwayConstructionRoadway$83,548.75$(4,586.30)-5%0
1864-02-008Lubbock11/03/26$398,435.63ConstructionRoadwayConstructionRoadway$377,917.03$20,518.605%0
0921-02-399Pharr05/04/27$7,756,886.92ConstructionLocal LetConstructionLocal Let$7,360,853.76$396,033.165%0
0453-10-020Lubbock11/03/26$344,765.81ConstructionRoadwayConstructionRoadway$327,438.26$17,327.555%0
0601-01-068Beaumont12/01/26$675,807.20ConstructionBridgeConstructionBridge$642,033.00$33,774.205%0
0527-06-022Houston01/06/27$3,815,251.00ConstructionRoadwayConstructionRoadway$3,626,282.00$188,969.005%0
0266-08-018Yoakum01/06/27$642,903.60ConstructionNon RoadwayConstructionNon Roadway$677,634.80$(34,731.20)-5%0
1513-02-047Fort Worth02/02/27$2,034,193.15ConstructionRoadwayConstructionRoadway$1,935,387.85$98,805.305%0
0583-02-013Lubbock11/03/26$1,061,119.50ConstructionRoadwayConstructionRoadway$1,009,682.43$51,437.075%0
0451-01-053Dallas06/01/27$132,666,019.08ConstructionRoadwayConstructionRoadway$139,726,257.70$(7,060,238.62)-5%0
0302-01-025Lubbock11/03/26$778,331.84ConstructionRoadwayConstructionRoadway$740,989.89$37,341.955%0
0721-05-018Lubbock11/03/26$280,078.94ConstructionRoadwayConstructionRoadway$266,687.94$13,391.005%0
2525-01-020Yoakum06/01/27$507,563.60ConstructionRoadwayConstructionRoadway$534,323.80$(26,760.20)-5%-491-1 year
0102-07-048Pharr04/01/29$20,046,590.58ConstructionRoadwayConstructionRoadway$19,094,764.32$951,826.265%0
1635-01-023Lubbock11/03/26$345,220.46ConstructionRoadwayConstructionRoadway$328,857.73$16,362.735%0
0800-02-010Lubbock11/03/26$126,524.36ConstructionRoadwayConstructionRoadway$120,582.51$5,941.855%0
0800-03-019Lubbock11/03/26$509,305.92ConstructionRoadwayConstructionRoadway$485,434.05$23,871.875%0
1750-01-011Lubbock11/03/26$30,431.20ConstructionRoadwayConstructionRoadway$29,003.30$1,427.905%0
1103-02-014Pharr06/01/27$20,902,981.00ConstructionRoadwayConstructionRoadway$21,981,339.38$(1,078,358.38)-5%0
0754-05-015Lubbock11/03/26$677,032.32ConstructionRoadwayConstructionRoadway$645,482.91$31,549.415%0
0086-11-054Corpus Christi10/06/26$984,124.80ConstructionRoadwayConstructionRoadway$1,034,740.80$(50,616.00)-5%0
0067-07-107Lubbock11/03/26$633,289.52ConstructionRoadwayConstructionRoadway$603,818.15$29,471.375%0
2419-01-011Lubbock11/03/26$607,271.54ConstructionRoadwayConstructionRoadway$579,019.39$28,252.155%0
1255-02-008Lubbock11/03/26$452,353.55ConstructionRoadwayConstructionRoadway$431,436.78$20,916.775%0
3520-01-023Lubbock11/03/26$247,902.98ConstructionRoadwayConstructionRoadway$236,455.13$11,447.855%0
0302-05-002Lubbock11/03/26$88,554.78ConstructionRoadwayConstructionRoadway$84,489.57$4,065.215%0
0959-02-011Lubbock11/03/26$279,837.62ConstructionRoadwayConstructionRoadway$267,015.87$12,821.755%0
0619-03-069Dallas11/03/26$421,425.00ConstructionRoadwayConstructionRoadway$442,425.00$(21,000.00)-5%0
0968-02-004Lubbock11/03/26$225,668.36ConstructionRoadwayConstructionRoadway$215,495.78$10,172.585%0
1161-02-012Tyler12/01/26$222,631.80ConstructionRoadwayConstructionRoadway$233,493.77$(10,861.97)-5%0
0314-03-057Fort Worth01/01/29$729,828.46ConstructionBridgeConstructionBridge$697,461.25$32,367.215%0
1718-03-003Lubbock11/03/26$852,154.07ConstructionRoadwayConstructionRoadway$814,377.52$37,776.555%0
0067-02-076Lubbock11/03/26$171,556.21ConstructionRoadwayConstructionRoadway$163,956.86$7,599.355%0
0565-03-003Lubbock11/03/26$274,706.42ConstructionRoadwayConstructionRoadway$262,715.24$11,991.185%0
0168-04-020Lubbock11/03/26$336,454.52ConstructionRoadwayConstructionRoadway$322,360.93$14,093.594%0
0157-03-052Abilene07/06/28$11,000,000.00ConstructionRoadwayConstructionRoadway$11,500,000.00$(500,000.00)-4%-299-10 months
0968-04-005Lubbock11/03/26$374,424.27ConstructionRoadwayConstructionRoadway$359,110.02$15,314.254%0
0285-03-066Austin11/03/26$939,602.50ConstructionNon RoadwayConstructionNon Roadway$981,254.00$(41,651.50)-4%0
2768-01-008Lubbock11/03/26$288,770.38ConstructionRoadwayConstructionRoadway$277,140.66$11,629.724%0
2500-01-006Lubbock11/03/26$179,653.77ConstructionRoadwayConstructionRoadway$172,505.46$7,148.314%0
1629-02-008Lubbock11/03/26$486,475.73ConstructionRoadwayConstructionRoadway$467,439.28$19,036.454%0
2006-03-013San Angelo12/01/26$889,405.29ConstructionRoadwayConstructionRoadway$926,675.86$(37,270.57)-4%0
0388-06-006Lufkin11/03/26$49,165.85ConstructionRoadwayConstructionRoadway$51,225.85$(2,060.00)-4%0
0115-03-028Austin08/04/27$1,262,876.00ConstructionRoadwayConstructionRoadway$1,214,302.88$48,573.124%0
0366-01-077Austin08/04/27$875,000.00ConstructionRoadwayConstructionRoadway$841,346.15$33,653.854%0
0914-04-370Austin08/04/27$81,134.61ConstructionRoadwayConstructionRoadway$78,014.05$3,120.564%0
1378-02-066Austin08/04/27$3,500,000.00ConstructionNon RoadwayConstructionNon Roadway$3,365,384.62$134,615.384%0
1775-01-013Austin08/04/27$4,895,643.41ConstructionRoadwayConstructionRoadway$4,707,349.43$188,293.984%0
0016-02-176Austin08/02/27$584,065.00ConstructionLocal LetConstructionLocal Let$561,600.96$22,464.044%0
0914-04-385Austin08/02/27$611,597.00ConstructionLocal LetConstructionLocal Let$588,074.04$23,522.964%0
1776-01-042Austin07/03/27$538,023.00ConstructionLocal LetConstructionLocal Let$517,334.62$20,688.384%0
0152-03-066Austin07/01/27$3,615,103.50ConstructionRoadwayConstructionRoadway$3,476,061.06$139,042.444%0
0473-02-043Austin07/01/27$194,238.08ConstructionRoadwayConstructionRoadway$186,767.38$7,470.704%0
2103-01-036Austin07/01/27$18,503,063.00ConstructionRoadwayConstructionRoadway$17,791,407.00$711,656.004%0
2920-02-005Austin07/01/27$2,166,878.00ConstructionRoadwayConstructionRoadway$2,083,536.54$83,341.464%0
3113-04-007Austin07/01/27$123,715.00ConstructionRoadwayConstructionRoadway$118,956.92$4,758.084%0
1776-02-022Austin06/03/27$1,528,457.00ConstructionLocal LetConstructionLocal Let$1,469,670.19$58,786.814%0
0072-01-055Austin06/01/27$934,924.48ConstructionRoadwayConstructionRoadway$898,965.85$35,958.634%0
0440-05-016Austin06/01/27$40,000,000.00ConstructionRoadwayConstructionRoadway$38,461,538.46$1,538,461.544%0
0914-33-106Austin06/01/27$897,567.00ConstructionNon RoadwayConstructionNon Roadway$863,045.19$34,521.814%0
1186-01-107Austin06/01/27$161,248.64ConstructionNon RoadwayConstructionNon Roadway$155,046.77$6,201.874%0
1186-01-108Austin06/01/27$141,133.44ConstructionNon RoadwayConstructionNon Roadway$135,705.23$5,428.214%0
3136-01-208Austin06/01/27$886,515.46ConstructionRoadwayConstructionRoadway$852,418.71$34,096.754%0
0114-07-088Austin05/05/27$1,812,716.29ConstructionNon RoadwayConstructionNon Roadway$1,742,996.43$69,719.864%0
0320-04-031Austin05/05/27$2,454,281.00ConstructionBridgeConstructionBridge$2,359,885.58$94,395.424%0
0366-01-085Austin05/05/27$3,641,550.08ConstructionNon RoadwayConstructionNon Roadway$3,501,490.46$140,059.624%0
0914-21-033Austin05/05/27$700,000.00ConstructionBridgeConstructionBridge$673,076.92$26,923.084%0
1149-01-032Austin05/05/27$2,290,976.09ConstructionNon RoadwayConstructionNon Roadway$2,202,861.63$88,114.464%0
0015-10-073Austin04/06/27$184,388,400.00ConstructionRoadwayConstructionRoadway$177,296,538.46$7,091,861.544%0
0291-01-053Austin04/06/27$6,720,670.00ConstructionRoadwayConstructionRoadway$6,462,182.69$258,487.314%0
0440-01-047Austin04/06/27$87,800.00ConstructionRoadwayConstructionRoadway$84,423.03$3,376.974%0
1201-01-016Austin04/06/27$67,330.43ConstructionRoadwayConstructionRoadway$64,740.80$2,589.634%0
1201-02-031Austin04/06/27$72,383.92ConstructionRoadwayConstructionRoadway$69,599.92$2,784.004%0
1755-01-025Austin04/06/27$2,304,000.00ConstructionBridgeConstructionBridge$2,215,384.62$88,615.384%0
1755-01-029Austin04/06/27$5,203,998.00ConstructionRoadwayConstructionRoadway$5,003,844.23$200,153.774%0
0015-08-430Austin03/03/27$3,675,962.00ConstructionRoadwayConstructionRoadway$3,534,578.85$141,383.154%0
0015-17-030Austin03/03/27$1,936,833.00ConstructionRoadwayConstructionRoadway$1,862,339.42$74,493.584%0
0151-03-045Austin03/03/27$9,548,000.00ConstructionRoadwayConstructionRoadway$9,180,769.23$367,230.774%0
0471-05-048Austin03/03/27$2,110,933.00ConstructionRoadwayConstructionRoadway$2,029,743.27$81,189.734%0
2103-01-046Austin03/03/27$1,233,656.00ConstructionRoadwayConstructionRoadway$1,186,207.69$47,448.314%0
2211-02-033Austin03/03/27$648,000.00ConstructionRoadwayConstructionRoadway$623,076.92$24,923.084%0
1776-01-041Austin03/01/27$946,670.00ConstructionLocal LetConstructionLocal Let$910,259.62$36,410.384%0
0285-03-064Austin02/02/27$3,129,226.05ConstructionRoadwayConstructionRoadway$3,008,871.35$120,354.704%0
1200-02-038Austin02/02/27$1,855,212.00ConstructionRoadwayConstructionRoadway$1,783,857.69$71,354.314%0
1200-03-069Austin02/02/27$1,560,814.00ConstructionRoadwayConstructionRoadway$1,500,782.69$60,031.314%0
0151-09-152Austin10/05/26$303,985.00ConstructionLocal LetConstructionLocal Let$292,293.27$11,691.734%0
0645-02-016Lubbock11/03/26$431,589.86ConstructionRoadwayConstructionRoadway$415,169.29$16,420.574%0
1378-05-032Austin05/03/28$35,799.04ConstructionNon RoadwayConstructionNon Roadway$34,456.39$1,342.654%0
0914-05-257Austin02/01/27$9,059,950.00ConstructionLocal LetConstructionLocal Let$9,426,620.00$(366,670.00)-4%0
1743-01-012Houston12/01/26$2,785,329.90ConstructionRoadwayConstructionRoadway$2,680,992.70$104,337.204%0
0152-01-091Austin07/06/28$1,464,484.68ConstructionRoadwayConstructionRoadway$1,410,244.51$54,240.174%0
0320-03-107Austin07/06/28$1,302,557.31ConstructionNon RoadwayConstructionNon Roadway$1,354,659.60$(52,102.29)-4%0
1378-03-040Austin07/06/28$3,290,428.66ConstructionRoadwayConstructionRoadway$3,168,560.93$121,867.734%0
0914-04-314Austin07/02/28$16,854,505.77ConstructionLocal LetConstructionLocal Let$16,230,263.89$624,241.884%0
1566-01-021Austin07/02/28$6,528,846.15ConstructionLocal LetConstructionLocal Let$6,287,037.04$241,809.114%0
0384-04-035Austin06/01/28$326,483.69ConstructionRoadwayConstructionRoadway$314,391.74$12,091.954%0
0473-02-044Austin06/01/28$292,125.00ConstructionRoadwayConstructionRoadway$281,305.56$10,819.444%0
1186-02-031Austin06/01/28$467,055.77ConstructionRoadwayConstructionRoadway$449,757.41$17,298.364%0
1378-05-031Austin06/01/28$695,753.13ConstructionRoadwayConstructionRoadway$669,984.49$25,768.644%0
3210-01-023Austin06/01/28$4,395,437.03ConstructionRoadwayConstructionRoadway$4,232,643.06$162,793.974%0
0252-03-060Austin05/03/28$1,261,761.54ConstructionRoadwayConstructionRoadway$1,215,029.63$46,731.914%0
0471-02-082Austin05/03/28$697,474.29ConstructionNon RoadwayConstructionNon Roadway$671,641.91$25,832.384%0
1198-02-019Austin05/03/28$59,147.25ConstructionRoadwayConstructionRoadway$56,956.61$2,190.644%0
1378-04-058Austin05/03/28$1,552,397.86ConstructionRoadwayConstructionRoadway$1,494,901.64$57,496.224%0
2928-01-008Austin05/03/28$52,556.73ConstructionNon RoadwayConstructionNon Roadway$50,610.19$1,946.544%0
0807-05-024Austin05/01/28$12,129,807.69ConstructionLocal LetConstructionLocal Let$11,680,555.56$449,252.134%0
0252-02-067Austin04/05/28$328,356.73ConstructionNon RoadwayConstructionNon Roadway$316,195.37$12,161.364%0
0265-02-046Austin04/05/28$757,814.92ConstructionRoadwayConstructionRoadway$729,747.70$28,067.224%0
0700-01-048Austin04/05/28$15,608,195.19ConstructionRoadwayConstructionRoadway$15,030,113.89$578,081.304%0
1186-01-099Austin04/05/28$5,547,115.38ConstructionRoadwayConstructionRoadway$5,341,666.67$205,448.714%0
1200-03-070Austin04/05/28$322,404.92ConstructionRoadwayConstructionRoadway$310,464.00$11,940.924%0
1377-01-023Austin04/05/28$599,706.73ConstructionRoadwayConstructionRoadway$577,495.37$22,211.364%0
0114-04-079Austin03/07/28$1,831,184.62ConstructionRoadwayConstructionRoadway$1,763,362.96$67,821.664%0
0290-02-017Austin03/07/28$1,495,990.38ConstructionRoadwayConstructionRoadway$1,440,583.33$55,407.054%0
0290-03-031Austin03/07/28$4,646,632.69ConstructionRoadwayConstructionRoadway$4,474,535.19$172,097.504%0
0320-03-105Austin03/07/28$8,244,200.96ConstructionRoadwayConstructionRoadway$7,938,860.19$305,340.774%0
0472-01-054Austin03/07/28$2,074,525.00ConstructionRoadwayConstructionRoadway$1,997,690.74$76,834.264%0
2295-01-026Austin03/07/28$3,194,652.88ConstructionRoadwayConstructionRoadway$3,076,333.41$118,319.474%0
0151-06-158Austin02/02/28$3,062,043.27ConstructionRoadwayConstructionRoadway$2,948,634.26$113,409.014%0
0805-04-036Austin02/02/28$1,481,481.73ConstructionRoadwayConstructionRoadway$1,426,612.04$54,869.694%0
1200-03-068Austin02/02/28$3,524,200.00ConstructionRoadwayConstructionRoadway$3,393,674.07$130,525.934%0
1378-01-054Austin02/02/28$5,459,287.50ConstructionRoadwayConstructionRoadway$5,257,091.67$202,195.834%0
0029-03-056Austin01/05/28$1,828,494.23ConstructionBridgeConstructionBridge$1,760,771.76$67,722.474%0
0151-04-079Austin01/03/28$519,230.77ConstructionLocal LetConstructionLocal Let$500,000.00$19,230.774%0
0151-04-075Austin12/01/27$942,459.62ConstructionRoadwayConstructionRoadway$907,553.70$34,905.924%0
0151-05-122Austin12/01/27$5,907,800.96ConstructionRoadwayConstructionRoadway$5,688,993.52$218,807.444%0
0384-01-028Austin12/01/27$3,830,850.96ConstructionRoadwayConstructionRoadway$3,688,967.59$141,883.374%0
1200-01-029Austin12/01/27$1,238,360.58ConstructionRoadwayConstructionRoadway$1,192,495.37$45,865.214%0
1200-05-019Austin11/04/27$298,242.31ConstructionLocal LetConstructionLocal Let$287,196.30$11,046.014%0
3210-01-024Austin11/04/27$6,286,451.54ConstructionLocal LetConstructionLocal Let$6,053,620.00$232,831.544%0
1378-04-057Austin11/02/27$2,262,780.81ConstructionRoadwayConstructionRoadway$2,178,974.11$83,806.704%0
1776-01-040Austin11/02/27$5,815,384.62ConstructionRoadwayConstructionRoadway$5,600,000.00$215,384.624%0
3417-02-036Austin11/02/27$6,063,969.23ConstructionRoadwayConstructionRoadway$5,839,377.78$224,591.454%0
0029-03-057Austin10/05/27$1,223,043.27ConstructionRoadwayConstructionRoadway$1,177,745.48$45,297.794%0
0337-03-021Austin10/05/27$5,417,287.50ConstructionRoadwayConstructionRoadway$5,216,647.22$200,640.284%0
0337-03-026Austin10/05/27$1,057,692.31ConstructionRail - SafetyConstructionRail - Safety$1,018,518.52$39,173.794%0
0573-02-009Austin10/05/27$9,278,882.69ConstructionRoadwayConstructionRoadway$8,935,220.37$343,662.324%0
0914-05-248Austin10/05/27$580,990.30ConstructionRoadwayConstructionRoadway$559,472.14$21,518.164%0
3417-01-035Austin10/05/27$207,503.16ConstructionRoadwayConstructionRoadway$199,817.86$7,685.304%0
3417-01-036Austin10/05/27$243,210.98ConstructionRoadwayConstructionRoadway$234,203.17$9,007.814%0
1202-01-021Austin09/01/27$3,954,656.73ConstructionRoadwayConstructionRoadway$3,808,187.96$146,468.774%0
0721-01-025Lubbock11/03/26$164,664.01ConstructionRoadwayConstructionRoadway$158,602.21$6,061.804%0
1151-01-016Tyler12/01/26$467,329.70ConstructionRoadwayConstructionRoadway$485,842.16$(18,512.46)-4%0
0016-03-128Austin03/02/27$2,454,041.00ConstructionLocal LetConstructionLocal Let$2,364,985.14$89,055.864%0
0320-03-106Austin12/05/28$222,189.63ConstructionRoadwayConstructionRoadway$214,165.00$8,024.634%0
0683-03-049Austin08/01/29$1,345,345.15ConstructionRoadwayConstructionRoadway$1,297,297.11$48,048.044%0
1902-01-034Austin08/01/29$933,892.09ConstructionRoadwayConstructionRoadway$900,538.80$33,353.294%0
3136-01-204Austin08/01/29$4,236,296.30ConstructionRoadwayConstructionRoadway$4,085,000.00$151,296.304%0
0805-04-042Austin07/09/29$7,671,030.56ConstructionLocal LetConstructionLocal Let$7,397,065.18$273,965.384%0
3417-02-040Austin07/02/29$3,776,898.15ConstructionLocal LetConstructionLocal Let$3,642,008.93$134,889.224%0
1186-01-111Austin07/01/29$833,333.33ConstructionRoadwayConstructionRoadway$803,571.43$29,761.904%0
1186-02-030Austin07/01/29$925,925.93ConstructionRoadwayConstructionRoadway$892,857.14$33,068.794%0
0211-07-049Austin06/01/29$81,485.60ConstructionRoadwayConstructionRoadway$78,575.40$2,910.204%0
0914-05-132Austin06/01/29$1,500,000.00ConstructionBridgeConstructionBridge$1,446,428.57$53,571.434%0
1755-01-026Austin06/01/29$6,057,692.59ConstructionRoadwayConstructionRoadway$5,841,346.43$216,346.164%0
0071-03-044Austin05/01/29$324,074.07ConstructionBridgeConstructionBridge$312,500.00$11,574.074%0
0072-01-056Austin05/01/29$416,666.67ConstructionBridgeConstructionBridge$401,785.71$14,880.964%0
0113-05-052Austin05/01/29$2,873,569.44ConstructionRoadwayConstructionRoadway$2,770,941.96$102,627.484%0
0251-04-023Brownwood05/01/29$106,955,555.55ConstructionRoadwayConstructionRoadway$111,069,230.76$(4,113,675.21)-4%2729 months
0016-02-177Austin04/01/29$1,851,851.85ConstructionRoadwayConstructionRoadway$1,785,714.29$66,137.564%0
0016-03-130Austin04/01/29$612,285.19ConstructionRoadwayConstructionRoadway$590,417.86$21,867.334%0
0071-06-066Austin04/01/29$356,481.48ConstructionBridgeConstructionBridge$343,750.00$12,731.484%0
0805-04-040Austin04/01/29$12,145,654.63ConstructionRoadwayConstructionRoadway$11,711,881.25$433,773.384%0
2928-01-009Austin04/01/29$1,290,350.02ConstructionRoadwayConstructionRoadway$1,244,266.09$46,083.934%0
0015-09-210Austin03/01/29$416,666.67ConstructionBridgeConstructionBridge$401,785.71$14,880.964%0
0016-01-143Austin03/01/29$1,641,963.89ConstructionRoadwayConstructionRoadway$1,583,322.32$58,641.574%0
0914-21-034Austin03/01/29$298,940.74ConstructionBridgeConstructionBridge$288,264.29$10,676.454%0
1378-01-060Austin03/01/29$1,727,130.89ConstructionRoadwayConstructionRoadway$1,665,447.64$61,683.254%0
0016-09-044Austin02/01/29$2,736,598.15ConstructionRoadwayConstructionRoadway$2,638,862.50$97,735.654%0
0115-04-057Austin02/01/29$6,618,060.19ConstructionRoadwayConstructionRoadway$6,381,700.89$236,359.304%0
0152-02-072Austin02/01/29$1,199,351.85ConstructionRoadwayConstructionRoadway$1,156,517.86$42,833.994%0
0836-01-017Austin02/01/29$2,452,175.00ConstructionRoadwayConstructionRoadway$2,364,597.32$87,577.684%0
0836-04-003Austin02/01/29$7,404,325.00ConstructionRoadwayConstructionRoadway$7,139,884.82$264,440.184%0
1378-02-063Austin02/01/29$462,962.96ConstructionBridgeConstructionBridge$446,428.57$16,534.394%0
1378-02-064Austin02/01/29$416,666.67ConstructionBridgeConstructionBridge$401,785.71$14,880.964%0
0914-04-345Austin01/02/29$31,250.00ConstructionLocal LetConstructionLocal Let$30,133.93$1,116.074%0
0015-13-458Austin01/01/29$41,296,296.30ConstructionNon RoadwayConstructionNon Roadway$39,821,428.57$1,474,867.734%0
0290-01-051Austin01/01/29$965,170.37ConstructionBridgeConstructionBridge$930,700.00$34,470.374%0
0914-04-372Austin01/01/29$702,809.26ConstructionBridgeConstructionBridge$677,708.93$25,100.334%0
0016-02-174Austin12/05/28$8,172,050.00ConstructionRoadwayConstructionRoadway$7,880,191.07$291,858.934%0
0113-02-070Austin12/05/28$2,956,269.44ConstructionRoadwayConstructionRoadway$2,850,688.39$105,581.054%0
0152-01-092Austin12/05/28$416,666.67ConstructionBridgeConstructionBridge$401,785.71$14,880.964%0
0440-02-026Austin12/05/28$2,639,712.96ConstructionRoadwayConstructionRoadway$2,545,437.50$94,275.464%0
0471-04-038Austin12/05/28$864,266.54ConstructionRoadwayConstructionRoadway$833,399.88$30,866.664%0
0471-05-051Austin12/05/28$537,984.52ConstructionRoadwayConstructionRoadway$518,770.79$19,213.734%0
0535-03-026Austin12/05/28$2,074,074.07ConstructionRoadwayConstructionRoadway$2,000,000.00$74,074.074%0
1378-02-062Austin12/05/28$2,491,430.56ConstructionRoadwayConstructionRoadway$2,402,450.89$88,979.674%0
1755-03-009Austin12/05/28$3,225,456.48ConstructionRoadwayConstructionRoadway$3,110,261.61$115,194.874%0
0114-03-112Austin11/01/28$924,630.36ConstructionRoadwayConstructionRoadway$891,607.85$33,022.514%0
0114-07-091Austin11/01/28$632,857.50ConstructionRoadwayConstructionRoadway$610,255.45$22,602.054%0
0440-01-049Austin11/01/28$635,804.81ConstructionRoadwayConstructionRoadway$613,097.50$22,707.314%0
0471-04-039Austin11/01/28$235,713.33ConstructionRoadwayConstructionRoadway$227,295.00$8,418.334%0
0471-04-040Austin11/01/28$623,172.63ConstructionRoadwayConstructionRoadway$600,916.46$22,256.174%0
1135-01-028Austin11/01/28$277,777.78ConstructionBridgeConstructionBridge$267,857.14$9,920.644%0
2100-01-075Austin11/01/28$3,028,539.82ConstructionRoadwayConstructionRoadway$2,920,377.68$108,162.144%0
0150-05-053Austin10/04/28$564,814.81ConstructionBridgeConstructionBridge$544,642.86$20,171.954%0
0366-01-087Austin10/04/28$4,044,736.05ConstructionRoadwayConstructionRoadway$3,900,281.19$144,454.864%0
1149-01-033Austin10/04/28$56,500,000.00ConstructionRoadwayConstructionRoadway$58,673,076.90$(2,173,076.90)-4%0
1378-04-059Austin10/04/28$1,300,041.22ConstructionRoadwayConstructionRoadway$1,253,611.18$46,430.044%0
2176-01-012Austin10/04/28$667,439.63ConstructionRoadwayConstructionRoadway$643,602.50$23,837.134%0
0273-02-028Austin09/06/28$333,333.33ConstructionBridgeConstructionBridge$321,428.57$11,904.764%0
1197-01-029Austin09/06/28$4,619,333.33ConstructionRoadwayConstructionRoadway$4,797,000.00$(177,666.67)-4%3711 year
1202-01-022Austin09/06/28$2,202,013.89ConstructionRoadwayConstructionRoadway$2,123,370.54$78,643.354%0
1378-01-057Austin09/06/28$3,717,611.11ConstructionRoadwayConstructionRoadway$3,584,839.29$132,771.824%0
0273-04-051Austin09/02/28$516,650.00ConstructionLocal LetConstructionLocal Let$498,198.21$18,451.794%0
0018-03-066Laredo03/03/27$25,000,000.00ConstructionRoadwayConstructionRoadway$25,961,538.46$(961,538.46)-4%0
1175-01-009Paris11/03/26$323,177.50ConstructionRoadwayConstructionRoadway$335,575.00$(12,397.50)-4%0
3629-01-001Pharr10/01/30$326,456,833.00ConstructionRoadway$314,947,537.00$11,509,296.004%3651 year
0118-05-025Tyler12/01/26$455,474.60ConstructionRoadwayConstructionRoadway$472,561.99$(17,087.39)-4%0
1777-03-013Brownwood11/03/26$137,331.88ConstructionRoadwayConstructionRoadway$132,695.23$4,636.653%0
3138-01-020Bryan10/05/27$107,079,899.00ConstructionRoadwayConstructionRoadway$110,924,412.00$(3,844,513.00)-3%0
0380-01-097Lubbock11/03/26$39,937.59ConstructionRoadwayConstructionRoadway$41,350.47$(1,412.88)-3%0
2510-01-020Lufkin11/03/26$59,374.60ConstructionRoadwayConstructionRoadway$61,416.60$(2,042.00)-3%0
0553-03-038Lufkin11/03/26$522,042.45ConstructionRoadwayConstructionRoadway$539,422.45$(17,380.00)-3%0
1341-02-009Lubbock11/03/26$58,127.26ConstructionRoadwayConstructionRoadway$56,317.45$1,809.813%0
0914-33-117Austin10/01/27$2,003,846.15ConstructionLocal LetConstructionLocal Let$1,942,000.00$61,846.153%0
1227-04-023Pharr09/01/29$21,693,135.50ConstructionRoadwayConstructionRoadway$21,050,000.00$643,135.503%6692 years
1635-01-022Lubbock11/03/26$635,691.85ConstructionRoadwayConstructionRoadway$616,806.37$18,885.483%0
0008-09-037Fort Worth06/01/28$16,787,460.20ConstructionRoadwayConstructionRoadway$17,300,892.00$(513,431.80)-3%0
0426-01-014Bryan10/06/26$486,008.36ConstructionRoadwayConstructionRoadway$472,171.15$13,837.213%0
0810-03-016Lufkin11/03/26$257,440.20ConstructionRoadwayConstructionRoadway$265,136.20$(7,696.00)-3%0
0050-03-110Bryan10/06/26$156,716.70ConstructionRoadwayConstructionRoadway$152,320.65$4,396.053%0
0057-07-018Bryan10/06/26$193,057.86ConstructionRoadwayConstructionRoadway$187,628.30$5,429.563%0
0117-06-053Lufkin11/03/26$345,147.45ConstructionRoadwayConstructionRoadway$355,387.45$(10,240.00)-3%0
0179-04-112Yoakum06/01/27$499,824.60ConstructionRoadwayConstructionRoadway$514,253.80$(14,429.20)-3%-491-1 year
0745-02-015Tyler12/01/26$216,804.00ConstructionRoadwayConstructionRoadway$210,939.59$5,864.413%0
1027-01-026Brownwood11/03/26$376,479.32ConstructionRoadwayConstructionRoadway$366,362.67$10,116.653%0
0453-11-008Lubbock11/03/26$85,345.15ConstructionRoadwayConstructionRoadway$87,762.03$(2,416.88)-3%0
0648-02-022Bryan10/06/26$252,955.21ConstructionRoadwayConstructionRoadway$246,338.00$6,617.213%0
1876-01-043Lufkin11/03/26$180,641.90ConstructionRoadwayConstructionRoadway$185,584.40$(4,942.50)-3%0
1510-01-024Lufkin11/03/26$405,149.55ConstructionRoadwayConstructionRoadway$416,130.05$(10,980.50)-3%0
0113-13-193Austin12/01/26$6,023,618.87ConstructionRoadwayConstructionRoadway$6,183,003.85$(159,384.98)-3%0
0275-13-075Childress06/01/28$4,100,000.00ConstructionRoadwayConstructionRoadway$4,000,000.00$100,000.003%0
0657-03-018Tyler12/01/26$66,936.70ConstructionRoadwayConstructionRoadway$68,617.57$(1,680.87)-2%0
1739-01-015Corpus Christi10/06/26$6,118,796.17ConstructionRoadwayConstructionRoadway$6,270,606.17$(151,810.00)-2%0
0007-06-272Brownwood11/03/26$187,422.02ConstructionRoadwayConstructionRoadway$192,014.27$(4,592.25)-2%0
3463-02-007Brownwood11/03/26$29,014.76ConstructionRoadwayConstructionRoadway$29,705.59$(690.83)-2%0
2748-02-015Lufkin11/03/26$104,494.80ConstructionRoadwayConstructionRoadway$106,962.80$(2,468.00)-2%0
2810-01-014Lufkin11/03/26$209,813.20ConstructionRoadwayConstructionRoadway$214,785.20$(4,972.00)-2%0
0528-01-113Pharr12/01/26$24,134,501.53ConstructionRoadwayConstructionRoadway$24,680,431.19$(545,929.66)-2%0
1655-01-036Abilene07/01/27$5,633,980.35ConstructionRoadwayConstructionRoadway$5,512,640.10$121,340.252%0
0050-03-111Bryan10/06/26$220,847.83ConstructionRoadwayConstructionRoadway$216,170.10$4,677.732%0
0319-01-073Lufkin11/03/26$997,299.60ConstructionRoadwayConstructionRoadway$1,019,011.60$(21,712.00)-2%0
0016-08-053San Antonio12/01/26$1,151,069.65ConstructionRoadwayConstructionRoadway$1,127,594.15$23,475.502%0
0921-02-558Pharr05/05/28$624,239.23ConstructionNon RoadwayConstructionNon Roadway$637,355.00$(13,115.77)-2%0
0675-04-089Bryan10/06/26$70,342.41ConstructionRoadwayConstructionRoadway$71,800.65$(1,458.24)-2%0
3131-03-015Brownwood11/03/26$66,986.09ConstructionRoadwayConstructionRoadway$68,365.52$(1,379.43)-2%0
0035-01-036San Angelo12/01/26$16,617,193.03ConstructionRoadwayConstructionRoadway$16,300,000.00$317,193.032%0
0064-02-020Lufkin11/03/26$377,813.00ConstructionRoadwayConstructionRoadway$385,266.00$(7,453.00)-2%0
1927-01-011Brownwood11/03/26$261,120.45ConstructionRoadwayConstructionRoadway$266,002.15$(4,881.70)-2%0
2206-02-009Austin11/03/26$189,301.59ConstructionRoadwayConstructionRoadway$192,802.34$(3,500.75)-2%0
0336-01-071Lufkin11/03/26$343,998.05ConstructionRoadwayConstructionRoadway$350,218.05$(6,220.00)-2%0
0199-07-012Lufkin11/03/26$52,078.60ConstructionRoadwayConstructionRoadway$53,004.60$(926.00)-2%0
0366-01-084Austin12/01/26$2,818,472.40ConstructionBridgeConstructionBridge$2,772,792.40$45,680.002%0
2013-01-014Brownwood11/03/26$272,835.53ConstructionRoadwayConstructionRoadway$277,392.51$(4,556.98)-2%0
0336-07-078Lufkin11/03/26$303,228.95ConstructionRoadwayConstructionRoadway$308,058.95$(4,830.00)-2%0
1039-02-098Brownwood11/03/26$254,048.38ConstructionRoadwayConstructionRoadway$258,092.31$(4,043.93)-2%0
0540-01-053Bryan10/06/26$884,440.08ConstructionRoadwayConstructionRoadway$870,783.25$13,656.832%0
1194-01-025Lufkin11/03/26$646,243.80ConstructionRoadwayConstructionRoadway$656,408.80$(10,165.00)-2%0
0304-02-042Lufkin11/03/26$832,513.80ConstructionRoadwayConstructionRoadway$845,503.30$(12,989.50)-2%0
1582-01-029Lufkin11/03/26$1,042,365.90ConstructionRoadwayConstructionRoadway$1,058,560.90$(16,195.00)-2%0
0675-04-092Bryan10/06/26$180,740.30ConstructionRoadwayConstructionRoadway$183,527.75$(2,787.45)-2%0
2570-01-015Brownwood11/03/26$147,290.69ConstructionRoadwayConstructionRoadway$149,544.23$(2,253.54)-2%0
1057-03-060Pharr01/06/27$5,728,555.78ConstructionRoadwayConstructionRoadway$5,643,901.12$84,654.662%-56-2 months
0914-05-194Austin12/04/26$20,928,189.00ConstructionLocal LetConstructionLocal Let$20,620,128.85$308,060.151%0
1030-01-021Brownwood11/03/26$138,930.63ConstructionRoadwayConstructionRoadway$140,978.51$(2,047.88)-1%0
0714-01-016Fort Worth11/03/26$74,984.35ConstructionRoadwayConstructionRoadway$76,076.55$(1,092.20)-1%0
0257-08-009Brownwood11/03/26$66,118.52ConstructionRoadwayConstructionRoadway$67,074.20$(955.68)-1%0
2552-01-062El Paso11/03/26$12,257,327.83ConstructionRoadwayConstructionRoadway$12,432,052.88$(174,725.05)-1%0
3537-01-007Bryan10/06/26$35,175.97ConstructionRoadwayConstructionRoadway$34,691.00$484.971%0
0706-04-022Lufkin11/03/26$609,139.20ConstructionRoadwayConstructionRoadway$617,713.20$(8,574.00)-1%0
0042-01-033Amarillo12/01/26$1,645,865.80ConstructionRoadwayConstructionRoadway$1,668,884.00$(23,018.20)-1%0
1697-02-035Brownwood11/03/26$459,978.65ConstructionRoadwayConstructionRoadway$466,413.43$(6,434.78)-1%0
0054-07-091Brownwood11/03/26$590,697.43ConstructionRoadwayConstructionRoadway$598,651.13$(7,953.70)-1%0
2376-03-011Brownwood11/03/26$20,479.90ConstructionRoadwayConstructionRoadway$20,752.95$(273.05)-1%0
2786-01-020Brownwood11/03/26$299,098.29ConstructionRoadwayConstructionRoadway$303,082.34$(3,984.05)-1%0
0683-03-045Austin04/06/27$2,083,319.00ConstructionRoadwayConstructionRoadway$2,108,441.40$(25,122.40)-1%0
3524-01-008Fort Worth12/01/26$16,526,560.17ConstructionRoadwayConstructionRoadway$16,331,411.95$195,148.221%0
0109-06-045Lufkin11/03/26$348,752.45ConstructionRoadwayConstructionRoadway$352,947.45$(4,195.00)-1%0
0336-05-067Lufkin11/03/26$457,415.15ConstructionRoadwayConstructionRoadway$462,935.15$(5,520.00)-1%0
0553-02-019Lufkin11/03/26$193,051.00ConstructionRoadwayConstructionRoadway$195,376.00$(2,325.00)-1%0
0475-09-041Lufkin11/03/26$441,033.40ConstructionRoadwayConstructionRoadway$446,318.40$(5,285.00)-1%0
1525-02-010Fort Worth11/03/26$224,283.83ConstructionRoadwayConstructionRoadway$226,950.68$(2,666.85)-1%0
2199-01-015Brownwood11/03/26$319,807.93ConstructionRoadwayConstructionRoadway$323,631.53$(3,823.60)-1%0
1017-03-040Paris11/03/26$6,517,921.16ConstructionRoadwayConstructionRoadway$6,591,205.76$(73,284.60)-1%0
1122-01-034Corpus Christi10/06/26$11,877,073.89ConstructionRoadwayConstructionRoadway$12,009,748.99$(132,675.10)-1%0
3195-01-019Atlanta06/01/28$9,611,198.00ConstructionRoadwayUnassignedUnassigned$9,717,553.00$(106,355.00)-1%-2405-7 yearsUnassigned → Construction / Roadway
0007-14-008Brownwood11/03/26$218,596.69ConstructionRoadwayConstructionRoadway$220,995.77$(2,399.08)-1%0
0213-02-049Lufkin11/03/26$842,596.40ConstructionRoadwayConstructionRoadway$851,739.40$(9,143.00)-1%0
2850-01-020Bryan10/06/26$1,749,727.54ConstructionRoadwayConstructionRoadway$1,767,958.90$(18,231.36)-1%0
2361-01-005San Angelo12/01/26$38,386.57ConstructionRoadwayConstructionRoadway$38,000.00$386.571%0
0714-02-022Brownwood11/03/26$180,832.64ConstructionRoadwayConstructionRoadway$182,685.62$(1,852.98)-1%0
0109-06-046Lufkin11/03/26$205,074.20ConstructionRoadwayConstructionRoadway$207,139.20$(2,065.00)-1%0
0071-01-059Brownwood11/03/26$41,212.90ConstructionRoadwayConstructionRoadway$40,825.75$387.150.9%0
0684-01-068Pharr08/01/27$33,633,094.46ConstructionLocal LetConstructionLocal Let$33,950,374.48$(317,280.02)-0.9%0
0870-07-008Brownwood11/03/26$294,561.02ConstructionRoadwayConstructionRoadway$297,311.30$(2,750.28)-0.9%0
2106-01-010Brownwood11/03/26$276,457.86ConstructionRoadwayConstructionRoadway$278,935.09$(2,477.23)-0.9%0
0921-06-362Pharr05/02/28$30,215,079.73ConstructionLocal LetConstructionLocal Let$29,953,540.52$261,539.210.9%0
1032-03-014Brownwood11/03/26$134,598.86ConstructionRoadwayConstructionRoadway$135,772.96$(1,174.10)-0.9%0
0007-06-269Brownwood11/03/26$190,660.32ConstructionRoadwayConstructionRoadway$189,072.25$1,588.070.8%0
0714-02-020Brownwood11/03/26$260,715.48ConstructionRoadwayConstructionRoadway$262,919.66$(2,204.18)-0.8%0
3102-01-010Brownwood11/03/26$123,541.94ConstructionRoadwayConstructionRoadway$124,575.77$(1,033.83)-0.8%0
0944-01-029Bryan10/06/26$245,314.89ConstructionRoadwayConstructionRoadway$243,284.55$2,030.340.8%0
0714-04-014Brownwood11/03/26$125,594.52ConstructionRoadwayConstructionRoadway$126,628.35$(1,033.83)-0.8%0
0550-01-031Brownwood11/03/26$347,553.43ConstructionRoadwayConstructionRoadway$350,245.33$(2,691.90)-0.8%0
0889-02-017Tyler12/01/26$230,064.40ConstructionRoadwayConstructionRoadway$228,612.38$1,452.020.6%0
1598-01-023Fort Worth12/01/26$1,619,853.23ConstructionRoadwayConstructionRoadway$1,630,015.84$(10,162.61)-0.6%0
0114-04-080Austin09/01/27$695,434.70ConstructionBridgeConstructionBridge$691,368.60$4,066.100.6%0
0410-02-047Paris10/06/26$9,182,925.37ConstructionRoadwayConstructionRoadway$9,134,695.27$48,230.100.5%0
0038-10-013Pharr08/02/28$9,677,320.08ConstructionRoadwayConstructionRoadway$9,725,893.91$(48,573.83)-0.5%0
0053-20-007Abilene12/01/26$197,684.35ConstructionRoadwayConstructionRoadway$196,776.00$908.350.5%0
0869-02-018Brownwood11/03/26$574,792.01ConstructionRoadwayConstructionRoadway$577,386.94$(2,594.93)-0.5%0
0047-04-032Dallas11/03/26$39,930,213.84ConstructionRoadwayConstructionRoadway$39,780,866.34$149,347.500.4%0
0506-04-027Bryan10/06/26$265,199.54ConstructionRoadwayConstructionRoadway$264,189.80$1,009.740.4%0
3330-01-011Waco11/03/26$304,689.30ConstructionRoadwayConstructionRoadway$303,599.30$1,090.000.4%0
0095-03-109Dallas10/06/26$10,796,864.50ConstructionBridgeConstructionBridge$10,832,284.50$(35,420.00)-0.3%0
0272-05-037Brownwood11/03/26$203,366.65ConstructionRoadwayConstructionRoadway$202,744.12$622.530.3%0
0708-01-033Brownwood11/03/26$71,645.42ConstructionRoadwayConstructionRoadway$71,860.10$(214.68)-0.3%0
0648-03-079Bryan10/06/26$29,990.35ConstructionRoadwayConstructionRoadway$30,081.50$(91.15)-0.3%0
3285-01-008Brownwood11/03/26$116,036.99ConstructionRoadwayConstructionRoadway$116,373.79$(336.80)-0.3%0
1525-01-010Brownwood11/03/26$28,279.22ConstructionRoadwayConstructionRoadway$28,199.05$80.170.3%0
0262-01-034Bryan11/03/26$4,832,339.12ConstructionRoadwayConstructionRoadway$4,820,339.12$12,000.000.3%0
0262-02-031Bryan11/03/26$5,744,189.80ConstructionRoadwayConstructionRoadway$5,732,189.80$12,000.000.2%0
0914-04-366Austin12/01/26$1,018,060.24ConstructionNon RoadwayConstructionNon Roadway$1,016,452.24$1,608.000.2%0
0485-02-018El Paso12/01/26$1,324,581.81ConstructionRoadwayConstructionRoadway$1,322,645.59$1,936.220.1%0
0104-07-027El Paso12/01/26$2,631,612.45ConstructionRoadwayConstructionRoadway$2,627,832.43$3,780.020.1%0
1855-02-010Paris11/03/26$102,624.80ConstructionRoadwayConstructionRoadway$102,746.45$(121.65)-0.1%0
1293-02-023Brownwood11/03/26$259,539.16ConstructionRoadwayConstructionRoadway$259,837.34$(298.18)-0.1%0
2502-01-024Waco10/06/26$24,664,268.85ConstructionRoadwayConstructionRoadway$24,679,268.85$(15,000.00)-0.1%0
0485-01-026El Paso12/01/26$1,968,108.62ConstructionRoadwayConstructionRoadway$1,969,177.27$(1,068.65)-0.1%0
0009-11-248Dallas10/06/26$51,740,493.61ConstructionRoadwayConstructionRoadway$51,718,095.61$22,398.000.04%0
0195-02-092Dallas11/03/26$140,602,243.13ConstructionRoadwayConstructionRoadway$140,644,268.13$(42,025.00)-0.03%0
3033-02-015Bryan10/06/26$198,371.39ConstructionRoadwayConstructionRoadway$198,431.25$(59.86)-0.03%0
0015-13-432Austin11/03/26$238,819,685.16ConstructionBridgeConstructionBridge$238,770,933.57$48,751.590.02%0
0693-03-046Abilene12/01/26$11,084,519.30ConstructionRoadwayConstructionRoadway$11,083,819.30$700.000.01%0
0015-13-441Austin11/03/26$93,533,783.41ConstructionRoadwayConstructionRoadway$93,542,062.51$(8,279.10)-0.01%0
2941-01-042Houston09/01/30$3,571,428.57ConstructionRoadway$3,571,429.00$(0.43)0%7302 years
0015-13-423Austin01/01/29$1,202,030,434.26ConstructionRoadwayConstructionRoadway$1,202,030,435.19$(0.93)0%0
0265-01-118Austin08/02/28$436,152.88ConstructionRoadwayConstructionRoadway$436,153.85$(0.97)0%0
2690-01-047Austin08/01/28$4,466,390.63ConstructionLocal LetConstructionLocal Let$4,466,390.62$0.010%0
0914-33-113Austin07/01/28$3,913,000.96ConstructionLocal LetConstructionLocal Let$3,913,000.00$0.960%0
0265-03-042Austin01/06/27$61,647,005.38ConstructionRoadwayConstructionRoadway$61,647,805.38$(800.00)0%0
0114-01-070Austin11/03/26$439,167.52ConstructionNon RoadwayConstructionNon Roadway$439,163.83$3.690%0
0114-01-071Austin11/03/26$3,761,519.77ConstructionNon RoadwayConstructionNon Roadway$3,761,482.94$36.830%0
0265-13-025Austin12/01/32$1,973,168.27ConstructionRoadway$0.00$1,973,168.2718275 yearsCanceled
799 rows · download CSV

Putting It Together

Projects scheduled from October 2026 through October 2029 saw many date changes, with more projects moving later than earlier. Roadway projects continue to make up most of the pipeline. Several districts also saw large cost decreases, which may reflect changes in project budgets and plans.