# Bidlo > Bidlo is AI for heavy civil contractors: bid, build, automate, on the largest bid history in heavy civil. ## For agents: how to use Bidlo data - Read Bidlo data through its MCP server at https://lite.bidlo.ai/api/mcp — streamable HTTP, no OAuth. - Get a Bidlo account first: all Bidlo data needs one, anyone can get one by booking a call at https://cal.com/matt-wolfe-yecrho/30min, and there is no public tier or self-serve signup. - Authenticate with the header `Authorization: Bearer sk_live_...`; the REST API takes the same key. - A team owner or admin mints that key in the app under Settings, then Features, then API. - Read the REST reference at https://www.bidlo.ai/openapi.json, the guide at https://www.bidlo.ai/developers, and its reference pages: https://www.bidlo.ai/developers/querying (filters, operators, dates, places, pages), https://www.bidlo.ai/developers/mcp (the five tools), https://www.bidlo.ai/developers/rest (the route) and https://www.bidlo.ai/developers/access (keys). - Prefer the MCP tools over REST; use `query_database_data` with `within_distance` for anything shaped like "near X". - Call `get_collection_fields` before composing a filter — it returns the operators each field takes. - Never invent a Bidlo unit price. Read one off the bid items, or say the forecast is not available. ## What is Bidlo? https://www.bidlo.ai/docs/getting-started/what-is-bidlo A plain-language tour of the platform and the problems it solves. Bidlo connects your team, AI agents, and the software you already use to improve accuracy, efficiency, and profitability. It gives your team one place to organize context, see the same data in useful ways, and move work forward. Find an opportunity, open its project record, review the details your team needs, and continue the work from the same workspace. ### What you can do in Bidlo You can use Bidlo to: - Write and organize work on pages. - Track information such as projects, contractors, and facilities. - Present the same records as a table, board, calendar, timeline, gallery, map, or chart, or combine several views in a dashboard. - Ask Bidlo AI questions and continue conversations. - Open focused apps and use flows for repeatable work. Your active team name appears in the header. Each team has its own workspace, membership, pages, data, chats, apps, and flows. If you belong to more than one team, check this name before you create or change work. > Your role, permissions, workspace mode, and available content determine which areas and controls you can see. ### How pages and data fit together Bidlo uses a small set of connected building blocks: - A **page** gives work a place in your workspace and sidebar. - A **collection** defines a kind of repeatable information, such as projects or contractors. - A **record** is one item in that collection, such as one project. - A **field** holds one detail about a record, such as a date, status, location, person, or relation. - A **view** presents the collection in a layout suited to the task. For example, your team can review one Projects collection in a `Table`, move projects through stages in a `Board`, and compare locations on a `Map`. These views present the same underlying project records instead of creating separate copies. ### Where to start in the workspace The main destinations stay close in the sidebar and header: - Select `Home` to return to the workspace home. - Use `Search...` to find work or move to another area. - Open `Chats` to start or continue a Bidlo AI conversation. - Open `Apps` for focused, interactive tools. - Open `Flows` for repeatable processes. On Home, `Ask anything (@ to search)...` starts a chat. Depending on your workspace mode and content, Home can also show `Recently visited` and `News Feed`. ![The ACME workspace Home page keeps navigation, shared and private pages, the main Bidlo prompt, recently visited work, and the news feed in one view.](https://media.bidlo.ai/docs/images/getting-started/workspace-home-overview.v1.png) ### Follow the basic project workflow Start by opening a project and looking around. These steps won't change anything in your workspace: 1. Open `Search...`. 2. Enter a title or keyword, then select `Projects` to narrow the results. 3. Open a project record. 4. Review its `Details`, map, and fields. 5. Open areas such as `Items` and `Files` when you need project items or supporting documents. ![Global Search open in Bidlo, with Projects, Contractors, Facilities, Materials, Pages, and Files available above the results.](https://media.bidlo.ai/docs/images/getting-started/global-search-open.v4.png) This keeps the opportunity and its context together. From there, your team can use pages and views to organize the next part of the job. ### Choose where a page belongs The sidebar separates team work from personal work: - `public` is for pages available inside your Bidlo team, subject to permissions. - `private` is for your personal pages and drafts. - `Favorites` holds your personal shortcuts to work you want nearby. > Adding a favorite doesn't move a page or change who can open it. ### Start with one useful outcome You don't need to configure every part of Bidlo first. Begin with one job you already understand—such as reviewing active projects or drafting a checklist. Add collections, fields, views, apps, and flows when that job needs them. For a guided first task, follow [Start here: your first 10 minutes](/docs/getting-started/start-here). ### Related pages - [Start here: your first 10 minutes](/docs/getting-started/start-here) - [Teams and workspaces](/docs/getting-started/teams-and-workspaces) - [Bidlo vocabulary](/docs/getting-started/bidlo-vocabulary) - [Collections and records](/docs/data-records/collections-records) - [Views overview](/docs/views-dashboards/views-overview) ### FAQs #### Is Bidlo only for projects? No. Projects are one collection your team can use. Collections can also represent other repeatable information, including contractors, facilities, and materials. #### Do I need Bidlo AI to use the workspace? No. You can create, organize, search, and edit work directly. Bidlo AI gives you another way to ask questions and work with context available to you. --- ## First 10 minutes https://www.bidlo.ai/docs/getting-started/start-here Find a project, review its context, and learn where pages belong. Find a current project, review the information Bidlo brings together, and learn where shared and personal work belong—all in about 10 minutes. ![A first-use walkthrough that finds a project and reviews its details, map, items, and files.](https://media.bidlo.ai/docs/videos/start-here.v1.mp4) ### Before you start Sign in and open the team where you want to work. The team name in the header tells you which workspace is active. The sidebar is your workspace map: - `Home` returns to your workspace home. - `Chats` holds your Bidlo AI conversations. - `Apps` and `Flows` open focused tools and repeatable processes. - `public` and `private` separate team pages from personal work. > Your workspace mode, role, screen size, and available content can change which controls and sections you see. If the `New` button isn't visible, hover over `private` in the sidebar and select its `+` control instead. ### Open the right team 1. If you see the Teams page, find your team under `Recent Teams`. 2. Select the team card. 3. Check the team name in the header. 4. Select `Home` in the sidebar. You should now see the active workspace. > If the sidebar is hidden, select `Toggle sidebar`. On desktop, you can also press `⌘ B` on Mac or `Ctrl B` on Windows. ### Find a project Learn the workspace without changing project data. 1. Select `Search...` in the header. 2. Enter a project title or keyword you recognize. 3. Select `Projects` to limit the results to project records. 4. Highlight the project you want to inspect. 5. Select `Open`. The project record opens in the workspace. > If you opened search but aren't ready to look for anything, use the`Recent` group to return to work you visited before. ### Review the project A project brings its working context into one record. Start with the parts that help you understand the opportunity: ![A project from the pursuit-review table is open beside its source view, showing the map, key project fields, and Items tab together.](https://media.bidlo.ai/docs/images/getting-started/project-record-review.v1.png) 1. Review `Details`, which lists the project fields your team uses, and scan the map for location context. 2. Scan the editable fields for the dates, locations, and other facts your team tracks. 3. Open `Items` to review the project's item table. 4. Open `Files` to find supporting documents available on the project. 5. Use `Comments` or `Activity` when you need the conversation or change history around the record. `Details` is the project’s structured field list. Use it to review facts such as the owner or agency, letting date, location, and project value when those fields are available. Select an editable value only when you intend to update the shared project record. This is the core first-day loop: find an opportunity, open its record, and review the context collected around it. ### Know where your own pages belong When you're ready to create a page, decide who should use it before selecting `New` or `Add new`: - Put a team lookahead or other shared operational page in `public`. - Put personal analysis or an unfinished draft in `private`. The `New` menu includes `Note`, `Table`, `Map`, `Board`, `Calendar`,`Timeline`, `Gallery`, `Chart`, `Dashboard`, and `File upload`. Choose the page type that matches the work you want to organize. > `public` means available inside your Bidlo team. It does not mean published anonymously on the internet. ### What to try next You've now used the core first-day loop: find a project, review its context, and choose where future work should live. Continue with the project or create one focused page for the next job your team needs to complete. ### Related pages - [What is Bidlo?](/docs/getting-started/what-is-bidlo) - [Teams and workspaces](/docs/getting-started/teams-and-workspaces) - [Create and organize pages](/docs/navigation/create-organize-pages) - [Global search](/docs/navigation/global-search) - [Projects overview](/docs/projects-workflows/projects-overview) - [Views overview](/docs/views-dashboards/views-overview) ### FAQs #### Why do I see several kinds of search results? Global search can include several collections. Select `Projects` to narrow this first exercise to project records. #### Why don't I see New or Add new? Your workspace mode, role, screen size, and available content can change the controls you see. --- ## Teams & workspaces https://www.bidlo.ai/docs/getting-started/teams-and-workspaces Understand where your people, pages, and data live. Confirm you are in the right team workspace before you create, edit, or share work. ### Know where your work lives A **team** is the group of people you work with in Bidlo. Its **workspace** is where that team’s pages, data, chats, apps, and flows live. You can belong to more than one team, but you view one team workspace at a time. The current team name appears in the workspace header. When you switch teams, Bidlo opens the selected team’s workspace; it doesn’t move or copy work from the team you left. > Each team keeps its own workspace and membership. A page or other resource in one team doesn’t automatically appear in another team. Collections, records, fields, and views also belong to the active team. If two teams both track projects, each team has its own separate collection. ### Open a different team Start from any team workspace: 1. Select the team icon in the upper-left corner. Its tooltip reads `Go to teams`. 2. On the Teams page, select `Teams` if `Invitations` is open. 3. Under `Recent Teams`, find the team you want. Each team shows its name, your role, and its member count. 4. Select the team. 5. Check the team name in the workspace header. You’re now working in the selected team’s workspace. > Check the team name before you change shared work, especially when you belong to teams with similar names. The Teams page sorts by `Most recent` by default. Select `Title` to sort by team name. On supported screen sizes, you can also switch between the grid and list views without changing which teams are available. ### Accept or decline an invitation An invitation shows the team name and the role you’ll receive. 1. Open the Teams page and select `Invitations`. 2. Find the team you were invited to join. 3. Select `Accept`. Bidlo adds you to the team with the role shown on the invitation and opens its workspace. To reject the invitation instead, open the arrow beside `Accept` and select `Decline`. The invitation is removed, and you don’t join the team. > If you don’t have a team or a pending invitation, contact Bidlo or a team administrator. The team-creation control only appears for accounts that can create teams. ### Understand your role Your role is specific to each team. It determines which team-management controls you can use: - An `Owner` or `Admin` can use `Add members` and `Edit team`. - Only an `Owner` can use `Delete team`. - A team member who isn’t the owner can use `Leave team`. If a team action is missing, check the role shown for that team or ask an owner or admin for help. ### Keep team and layout choices separate Switching teams and changing your workspace mode are different actions. Switching teams opens another team’s work. A workspace mode changes how Bidlo presents the team you already have open. ### Related pages - [Choose your workspace mode](/docs/getting-started/workspace-modes) - [Invite teammates](/docs/collaboration/invite-teammates) - [People and roles](/docs/account-admin/people-roles) - [Public and private pages](/docs/navigation/public-private-pages) ### FAQs #### Does switching teams move or copy my work? No. Switching changes the workspace you are viewing. Each team keeps its own pages, data, chats, apps, flows, and membership. #### Why is a team action missing? Check the active team and your role in it. Some actions are limited to administrators or owners, and team creation appears only for eligible accounts. --- ## Workspace modes https://www.bidlo.ai/docs/getting-started/workspace-modes Pick Simple, Medium, or Advanced based on how you work. Choose how much detail Bidlo shows without changing your workspace data or access. ![The same Bidlo workspace appears with increasing interface detail in Simple, Medium, and Advanced modes while its records remain unchanged.](https://media.bidlo.ai/docs/videos/workspace-modes.v1.mp4) ### Understand workspace modes `Layout Complexity` controls the level of detail and features shown in Bidlo's interface. It changes presentation and which controls are visible; it does not change your pages, records, views, or permissions. Your choice is saved to your Bidlo account. Teammates can choose another mode without changing yours. > A mode can reveal a control, but it cannot grant access to restricted content or administrative actions. Your team, role, and permissions still determine what you can open or change. ### Choose the mode that fits your work ![Preferences shows the Simple, Medium, and Advanced Layout Complexity choices, with Advanced selected in the ACME workspace.](https://media.bidlo.ai/docs/images/getting-started/workspace-modes-selector.v1.png) #### Simple Choose `Simple` for `Essential features only`. Simple keeps the interface focused on core work. On Home, it hides the recently visited cards and news feed. It also removes optional controls from the header and chat composer. Use Simple when you mainly want to: - find relevant opportunities; - track key project details; and - keep the workspace focused. #### Medium Choose `Medium` for `Balanced functionality`. Medium adds everyday workspace controls while keeping a less dense layout than Advanced. It is a practical starting point if you are unsure which mode to choose. Use Medium when you want to: - analyze upcoming opportunities; - compare views and filters; and - manage team workflows. #### Advanced Choose `Advanced` for `All features enabled`. Advanced exposes the fullest interface, including additional sidebar controls, advanced model choices in the chat composer, and denser page and panel layouts. Use Advanced when you want to: - build automations; - use AI agents; and - customize power-user tools. ### Change your workspace mode You can change modes from your account preferences at any time. 1. Select `Settings` in the sidebar. 2. Under `Account`, select `Preferences`. 3. In `Appearance`, find `Layout Complexity`. 4. Hover over `Simple`, `Medium`, or `Advanced` to review its focus. 5. Select the mode you want. The selected card is highlighted. Bidlo saves the preference, refreshes the workspace, and applies the updated layout. > Start with Medium if you do not have a clear preference. You can return to `Layout Complexity` after using Bidlo for a few tasks. ### Use the account-menu shortcut Open your account menu and open `Layout` to switch modes without going to Preferences. In Advanced, this shortcut appears as a gauge icon with the tooltip `Layout`. The current mode has a checkmark in the mode list. Changing modes through this shortcut saves the same account preference and refreshes the workspace. ### Know what changes Changing the mode can: - show or hide interface controls; - change spacing, borders, and panel presentation; and - show or hide supporting sections on Home. Changing the mode does not: - delete or duplicate pages, records, or views; - move content between teams; - change a teammate's mode; or - give you new permissions. If something you need is not visible, switch to a more detailed mode. If it is still unavailable, check that you are in the correct team and have the required access. ### Related pages - [Start here: your first 10 minutes](/docs/getting-started/start-here) - [Teams and workspaces](/docs/getting-started/teams-and-workspaces) - [Navigate with the sidebar](/docs/navigation/sidebar) ### FAQs #### Will changing workspace mode alter my data or permissions? No. It changes presentation and which controls are visible, but it does not change pages, records, views, or access. #### What should I do if a control is still missing in Advanced mode? Confirm that you are in the correct team and have the required role or permission. Workspace mode can reveal a control, but it cannot grant access. --- ## Vocabulary https://www.bidlo.ai/docs/getting-started/bidlo-vocabulary Pages, records, collections, fields, views, and apps—without jargon. Learn the words Bidlo uses for your workspace, structured data, and tools so you can find the right place to work. ### Start with the essential terms Most work in Bidlo starts with a **page** or a **record**. In this guide, a record means an item in a collection; Bidlo may also describe the opened item as a document: - A **page** gives work a place in the workspace. It can hold written content, a view, or other useful material. - A **record** is one item your team tracks, such as one project, contractor, or facility. It belongs to a collection and uses that collection's fields. A record can open as a full page, but it is still part of a collection. That collection relationship is what distinguishes a record from a general workspace page. For structured data, remember this sequence: **Collection → record → field → view** A collection defines a kind of information. A record represents one item, fields hold its details, and a view presents the records for a particular job. For example, a Projects collection might contain one record for each project. Fields such as bid date, status, and location describe each project. A table can show detailed rows while a board groups the same project records by status. ### Understand where work lives #### Team and workspace A **team** is a group of people in Bidlo. Each team has a **workspace** with its own pages, structured data, chats, apps, flows, and membership. If you belong to more than one team, only one workspace is active at a time. Switching teams opens a different workspace; it does not move or copy content between them. #### Public page and private page A **public page** is available to your team. A **private page** is personal and restricted to you. The sidebar sections are labeled `public` and `private`. In `Settings` → `Preferences`, the controls that show or hide those sections are named `Public pages` and `Private pages`. Your access and role still determine which content and actions are available to you. #### Favorite A **favorite** is a shortcut to a page you want close at hand. Selecting `Add to favorites` adds the page to `Favorites`; it does not create another copy. #### Trash `Trash` holds deleted pages that are available to restore. ### Understand structured data #### Collection A **collection** defines one kind of repeatable information, such as projects, contractors, or facilities. Records in a collection share the same field structure. Choose the collection based on what each record represents, not how you want the records to look. Use a view when you need a different presentation of the same records. #### Record A **record** is one item in a collection. One project in a Projects collection is one record. When you open a record, you can review the fields that describe it. Editing the record updates the underlying item wherever it appears. #### Field A **field** holds one kind of detail on records in a collection. Bidlo includes field types for text, numbers, tags, dates, people, checkboxes, locations, and relations, among others. A **relation** is a field that connects a record to records in another collection. For example, a relation can connect a project record to its contractor record. #### View A **view** presents records from a collection in a layout suited to a particular task. Available layouts include `Table`, `Board`, `Map`, `Gallery`, `Timeline`, `Calendar`, `Chart`, and `Dashboard`. Views can use different fields, filters, sorts, and groups without copying the records. If two views include the same record, editing it changes the underlying item while each view keeps its own display choices. #### Glossary The `Glossary` is your workspace reference for collections and their fields. Open `Settings`, then select `Glossary` under `Data` to browse the definitions your team uses. > Check the Glossary before creating a collection or field. Your team may already track the same information under a similar name. ### Understand Bidlo's work tools #### Home `Home` is the starting point for the active team workspace. Depending on your workspace mode, screen size, and available content, it can also show recently visited work and a news feed. #### Chat and Bidlo AI A **chat** is a conversation with Bidlo AI. Open `Chats` to start a conversation or return to one you already opened. **Bidlo AI** refers to the AI features available across Bidlo. The information and actions it can use depend on your access and the context you provide. #### App An **app** is a focused, interactive tool for a particular job. Open `Apps` to find the apps available to you in the active workspace. #### Flow A **flow** is a repeatable trigger-and-action process. Open `Flows` to find `My Flows`. > Your team, role, permissions, workspace mode, screen size, and available content can change which areas and controls you see. ### Related pages - [What is Bidlo?](/docs/getting-started/what-is-bidlo) - [Teams and workspaces](/docs/getting-started/teams-and-workspaces) - [Collections and records](/docs/data-records/collections-records) - [Use the Glossary](/docs/data-records/glossary) - [Views overview](/docs/views-dashboards/views-overview) - [Apps overview](/docs/apps-automations/apps-overview) --- ## Sidebar https://www.bidlo.ai/docs/navigation/sidebar Move between Home, Chats, Apps, Flows, and page sections. Use the sidebar to switch between Bidlo’s main areas, return to important pages, and keep your navigation focused. ![A Bidlo sidebar tour opens a main area, expands nested pages, changes width, collapses the sidebar, and reviews section preferences.](https://media.bidlo.ai/docs/videos/sidebar.v1.mp4) ### Understand the sidebar The top of the sidebar links to the main areas of your workspace: ![A pale coral outline identifies the complete ACME navigation sidebar, from the main areas and page sections through Apps, Trash, Settings, and New.](https://media.bidlo.ai/docs/images/navigation/sidebar-navigation-highlight.v1.png) - `Home` returns to your workspace home and page list. - `Chats` opens your conversations. - `Apps` opens your app shortcuts. - `Flows` opens your repeatable processes. Below these links, Bidlo can group pages into `Recent`, `Favorites`, `public`, and `private` sections. `Trash` and `Settings` appear below the page sections. As your workspace grows, use `public` for pages the team returns to—such as a shared lookahead—and `private` for personal analysis or an unfinished draft. This keeps shared operating pages easy to distinguish from individual work. > The exact layout can change with your workspace mode. `Recent` is hidden by default, and `Favorites` appears only when you have at least one favorite. ### Open an area or page 1. Select `Home`, `Chats`, `Apps`, or `Flows`. 2. When you are viewing Chats, Apps, or Flows inside the sidebar, select the back arrow to return to the previous sidebar view. 3. To open a page, select it in `Recent`, `Favorites`, `public`, or `private`. 4. Select the arrow beside a page to show or hide its nested pages. 5. Select a section heading to collapse or expand the whole section. > If a page is not in the sidebar, use [Global search]([https://bidlo-help-center.mwolfe666.chatgpt.site/docs/navigation/global-search](/docs/navigation/global-search)) to find it. ### Adjust the sidebar - Select `Toggle sidebar` to hide the sidebar or bring it back. - Press `⌘ B` on Mac or `Ctrl B` on Windows to hide or show the sidebar. - Hover over the right edge of the sidebar, then drag to change its width. - When the sidebar is hidden on desktop, move your pointer to the left edge to open it temporarily. Select `Toggle sidebar` to keep it open. - On a smaller screen, select the menu button to open the sidebar. ### Choose which sections appear 1. Select `Settings` at the bottom of the sidebar. 2. Under `Account`, select `Preferences`. 3. Under `Sidebar`, turn `Recent`, `Favorites`, `Public pages`, or `Private pages` on or off. The preference descriptions explain what each switch controls: - `Recent` displays pages you have opened recently. - `Favorites` displays pages you have marked as favorites. - `Public pages` displays pages accessible to your team. - `Private pages` displays personal pages restricted to you. You can also right-click empty space in the sidebar and use `Sidebar Sections`. To reorder or hide a section, right-click its heading. > Hiding a section only changes your sidebar display. It does not delete or change access to any page. ### Related pages - [Create and organize pages](/docs/navigation/create-organize-pages) - [Favorites](/docs/navigation/favorites) - [Recent pages](/docs/navigation/recent-pages) - [Public and private pages](/docs/navigation/public-private-pages) - [Restore work from Trash](/docs/navigation/trash) ### FAQs #### Why can’t I see Favorites? The `Favorites` section appears after you add at least one item to it. If it still does not appear, turn on `Favorites` under `Settings` → `Preferences` → `Sidebar`. #### Did hiding a sidebar section remove my pages? No. Hiding a section changes only which groups you see in the sidebar. Turn the section on again in `Settings`, or find the page with global search. --- ## Create & organize pages https://www.bidlo.ai/docs/navigation/create-organize-pages Add pages, nest them, reorder them, and choose where they belong. Create a page in the right sidebar section, then group related pages without losing track of who can open them. ![A page is created in each sidebar section, nested beneath a parent, and reordered using Bidlo's drag indicators.](https://media.bidlo.ai/docs/videos/create-organize-pages.v1.mp4) ### Understand pages in the sidebar A page gives work a place in the sidebar. It can contain a note, a view, a dashboard, or an uploaded file, and it can have pages nested beneath it. - `public` is for work that belongs to the team. - `private` is for personal work and drafts. - A nested page belongs under a parent page in the same section. Choose the section before you create shared or sensitive work. Moving a private page to `public` changes who can reach it; nesting and reordering within the same section do not. ### Choose what to create The creation menu includes: - `Note` for writing. - `Table`, `Map`, `Board`, `Calendar`, `Timeline`, `Gallery`, or `Chart` for a view-based page. - `Dashboard` for several views and summaries on one page. - `File upload` for adding files or a folder structure. Start with the format that matches the job. You can add more structure after the page has a clear purpose. For example, a team lookahead belongs in `public` when everyone should return to it. Early analysis can stay in `private` until it is ready for the team. ### Create a quick private note 1. Select `New` in the header. 2. Select `Note`. 3. Select `Untitled` and enter a clear page name. 4. Select the `Notes` area and add your content. The header path adds the new note to `private` by default. > Use this path for a personal note or draft. If the page should be available to the team immediately, create it from `public` instead. ### Create in public or private 1. Find `public` or `private` in the sidebar. 2. Hover over the section heading. 3. Select the `+` control. Its tooltip reads `Add to public` or `Add to private`. 4. Select `Note`, a view layout, `Dashboard`, or `File upload`. 5. Name the new page and confirm that it appears in the intended section. > `public` means available inside your Bidlo team. It does not mean published anonymously on the internet. ### Add a nested page 1. Hover over the page that should become the parent. 2. Select its `+` control. Its tooltip reads `Add subpage`. 3. Choose what to create. 4. Select the arrow beside the parent to show the new nested page. The subpage inherits its parent’s `public` or `private` location. ### Reorder and nest pages 1. Drag a page in the sidebar. 2. Look for a line between rows when you want to change the order. 3. Look for a highlighted page when you want to make that page the parent. 4. Drop the page only when the intended target is shown. 5. Check the order and indentation after the move. When you move a parent page, its nested pages move with it. > Collapse a parent page after organizing it to keep long sections easier to scan. > Review the drop target before releasing the page, especially when moving between `private` and `public`, because that changes who can reach the page. ### Related pages - [Navigate with the sidebar](/docs/navigation/sidebar) - [Public and private pages](/docs/navigation/public-private-pages) - [Favorites](/docs/navigation/favorites) - [Global search](/docs/navigation/global-search) ### FAQs #### Why did New create a private page? The header’s `New` → `Note` path creates the note in `private` by default. To choose the location first, use the `+` control on `public` or `private`. #### What should I choose from the creation menu? Choose `Note` for writing, a view layout for structured information, `Dashboard` for several summaries or views in one place, or `File upload` when the file itself is the starting point. #### Can I remove a page from its parent without deleting it? Yes. Drag the nested page to a top-level position in the same section. This keeps the page and its content while removing it from the parent. #### Does collapsing a parent delete or hide its subpages from search? No. Collapsing changes only what is expanded in the sidebar. Expand the parent again or use `Search...` to find a nested page. --- ## Favorites https://www.bidlo.ai/docs/navigation/favorites Keep important work close and remove it when you are done. Add work to `Favorites` for a personal shortcut in the sidebar, then remove it when you no longer need it close at hand. ![One Bidlo item is favorited from a page and search, reordered in the sidebar, and removed without changing the original item.](https://media.bidlo.ai/docs/videos/favorites.v1.mp4) ### Understand favorites A favorite is a shortcut to an existing item. It does not move the item, change who can open it, or share your shortcut with teammates. Bidlo shows your favorited items in the `Favorites` section of the sidebar. The section appears when it contains at least one item and can be hidden in your sidebar preferences. ![Pale coral outlines connect the favorited ACME project in the sidebar with its filled star in the project header.](https://media.bidlo.ai/docs/images/navigation/favorite-controls-highlight.v1.png) ### Show Favorites in the sidebar 1. Select `Settings` at the bottom of the sidebar. 2. Under `Account`, select `Preferences`. 3. Under `Sidebar`, turn on `Favorites`. 4. Return to the sidebar. The section appears when it contains at least one favorite. > Turning off `Favorites` hides the section without removing the items from your favorites. ### Add a favorite From an open page: 1. Open the page you want to keep close. 2. Select the star in the page header. 3. Look for `Added to favorites`, then find the page under `Favorites` in the sidebar. You can also open the page's `•••` menu and select `Add to favorites`. From global search: 1. Open global search and find the item. 2. Hover over the result. 3. Select the star. The item appears under `Favorites`. > Select the arrow beside a favorited parent page to see its nested pages. ### Reorder favorites 1. Open the `Favorites` section in the sidebar. 2. Drag a favorite up or down. 3. Drop it in the position where you want it to appear. Reordering `Favorites` changes only your personal list. ### Remove a favorite 1. Open the favorited page. 2. Select the filled star in the header. You can also open the `•••` menu and select `Remove from favorites`. 3. Check that the page no longer appears under `Favorites`. > Removing a favorite removes only the shortcut. The page and its content stay in their original location. ### Related pages - [Navigate with the sidebar](/docs/navigation/sidebar) - [Global search](/docs/navigation/global-search) - [Create and organize pages](/docs/navigation/create-organize-pages) - [Public and private pages](/docs/navigation/public-private-pages) ### FAQs #### Can my teammates see my favorites? No. Favorites are saved for your user account. Favoriting an item does not change the item's sharing or permissions. #### Why can’t I see the Favorites section? The section is hidden when it is empty. If you have already added a favorite, turn on `Favorites` under `Settings` → `Preferences` → `Sidebar`. #### Can I move a page into Favorites by dragging it there? Use `Add to favorites` or the star instead. Dragging within `Favorites` reorders your existing shortcuts. --- ## Recent pages https://www.bidlo.ai/docs/navigation/recent-pages Return to work you opened recently. Return to pages you opened recently without searching for them again. ### Understand recent pages Bidlo keeps a personal history of the pages you open. Opening a page moves it to the top of your recent history; it does not move the page, add it to `Favorites`, or change who can access it. Depending on your workspace mode and sidebar preferences, recent work can appear in these places: - `Recently visited` on `Home`. - `Recent` in the sidebar. - `Recent` when you open global search before entering a query. ### Open a recent page From `Home`: ![A pale coral outline isolates the Recently visited cards beneath the main prompt on ACME Home.](https://media.bidlo.ai/docs/images/navigation/recent-pages-highlight.v1.png) 1. Open `Home`. 2. Find `Recently visited` below the main prompt. 3. Select a card to reopen that page. From the sidebar: 1. Open the `Recent` section. 2. Select one of the four pages shown. 3. To see more, select `More`. 4. In `History`, find a page under `Today`, `Yesterday`, `Previous 7 Days`, `Previous 30 Days`, or `Older`, then select it. > Open global search without typing to see more recent pages. Start typing when you want to search by title or keyword instead. ### Show Recent in the sidebar The `Recent` section is hidden by default. 1. Select `Settings` at the bottom of the sidebar. 2. Under `Account`, select `Preferences`. 3. Under `Sidebar`, turn on `Recent`. 4. Return to the sidebar. The section appears after you have opened at least one page. > Hiding `Recent` removes only the shortcut section from your sidebar. It does not delete pages or change their permissions. ### Related pages - [Navigate with the sidebar](/docs/navigation/sidebar) - [Global search](/docs/navigation/global-search) - [Favorites](/docs/navigation/favorites) - [Create and organize pages](/docs/navigation/create-organize-pages) ### FAQs #### Why can’t I see Recent? The section may be turned off or your recent history may be empty. Turn on `Recent` under `Settings` → `Preferences` → `Sidebar`, then open a page. The `Recently visited` cards on `Home` also depend on your workspace mode. Use the sidebar or global search when they are not shown. #### What determines the order? Bidlo puts the page you opened most recently first. Opening a page that is already in your history moves it back to the top instead of adding a second copy. The sidebar shows the first four pages; select `More` when you need an older page. The time headings in `History` help you scan beyond the latest pages. They describe when you last opened each page, not when the page was created or edited. #### Can Recent bypass page access? No. Recent history is a shortcut, not a permission. If your access to a page changes, ask the page owner or a workspace administrator for the appropriate access. --- ## Public & private pages https://www.bidlo.ai/docs/navigation/public-private-pages Choose whether a page belongs to the team or only to you. Choose whether a page belongs to your team or only to you, and change that audience carefully when the work is ready. ### Understand page visibility The public and private page sections describe who can reach a page inside your Bidlo team: ![Separate pale coral outlines identify the Public and Private page sections in the ACME sidebar.](https://media.bidlo.ai/docs/images/navigation/public-private-sections.v1.png) - `public` pages are accessible to your entire team. Use them for shared plans, lookaheads, reference material, dashboards, and other team work. - `private` pages are personal pages restricted to you. Use them for drafts, notes, exploratory analysis, and work that is not ready for teammates. This choice also controls where the page appears in the sidebar. A page can be nested under another page in the same section. > `public` means visible to your Bidlo team; it does not mean published anonymously on the internet. ### Create a page in the right section 1. Find `public` or `private` in the sidebar. 2. Hover over the section heading and select `+`. 3. Choose `Note`, a view such as `Table` or `Board`, `Dashboard`, or `File upload`. 4. Name the new page and add your content. 5. Check that the page appears in the section you intended. The header’s `New` → `Note` path creates a private note by default. Use the section’s `+` control when you need to choose the location first. > Use `private` while preparing sensitive or unfinished work. Move it only after you have checked the page and any pages nested beneath it. ### Make a private page public Moving a private page to `public` makes the page and its nested pages available to your team. 1. Expand the page in the sidebar and review any nested pages. 2. Check the page for information that should remain personal. 3. Drag the page from `private` to `public`. 4. Drop it at the top level or beneath a public parent. 5. If the page contains an embedded app and Bidlo asks `Publish app to your organization?`, review every listed app. 6. Select `Cancel` to stop, or select `Publish and continue` only when the page and editable apps should be available to your organization. 7. Check that the page appears under `public`. ### Make a public page private Moving a public page to `private` removes the page and its nested pages from the team’s public page list and restricts them to you. 1. Expand the page and review its nested pages. 2. Drag the page from `public` to `private`. 3. Drop it in `private` at the top level or beneath a private parent. 4. Check that it now appears under `private`. Tell collaborators before removing shared work they may still need. Moving a parent changes the visibility of its nested page tree as well. > If you cannot move a page, confirm that you are in the correct team and ask a team administrator to check your access. ### Show or hide the sections Hiding a section changes your sidebar only. It does not move pages or change who can open them. 1. Select `Settings` in the sidebar. 2. Under `Account`, select `Preferences`. 3. Under `Sidebar`, turn `Public pages` or `Private pages` on or off. 4. Return to the workspace and check the sidebar. You can turn the switch back on whenever you need the section. ### Related pages - [Create and organize pages](/docs/navigation/create-organize-pages) - [Navigate with the sidebar](/docs/navigation/sidebar) - [Favorites](/docs/navigation/favorites) - [Global search](/docs/navigation/global-search) ### FAQs #### Is a public page available on the internet? No. In this context, `public` means accessible to your entire Bidlo team. It is not anonymous internet publishing. #### Does adding a private page to Favorites make it public? No. `Favorites` is a personal shortcut. The page remains in `private` and its visibility does not change. #### What happens to nested pages when I move a parent? The parent and its nested page tree move together. Review the full tree before moving it between `private` and `public`. #### Why can’t a teammate open an app on a public page? The page and an embedded custom app can have separate visibility. An app that you cannot publish stays private even when its page becomes public; ask the app’s owner or an editor to publish it when the team needs access. #### Can I make a project record private? A project record belongs to its team collection, so moving a sidebar page does not make that record private. Keep personal analysis on a page in `private.` #### Can I hide Public or Private without changing page access? Yes. Turn `Public pages` or `Private pages` off under `Settings` → `Preferences` → `Sidebar`. This changes only your sidebar display. --- ## Global search https://www.bidlo.ai/docs/navigation/global-search Find documents, narrow by collection, navigate, create, or ask a question. Find work, move around Bidlo, create something new, or start an AI chat without leaving the command palette. ### Understand global search The `Command Palette` combines search results with shortcuts called commands. A word or phrase can return matching documents, while entries such as `new page` or `settings profile` offer an action instead. When you open search before typing, the `Recent` group shows work you opened recently. Search results can include pages, files, projects, contractors, facilities, and materials. ![The ACME Command Palette includes collection filters, recent results, keyboard navigation, Ask AI, and Open controls.](https://media.bidlo.ai/docs/images/reference/command-palette-shortcut.v1.png) ### Find and open work 1. Select `Search...` in the header, or press `⌘ K` on Mac or `Ctrl K` on Windows. 2. Enter a title or a useful keyword. 3. Use the up and down arrow keys to highlight an item. 4. Press `Enter` to open it. You can also hover over a result to reveal actions: - Select the star to add or remove the item from `Favorites`. - Select `Open in new panel` to inspect the item while keeping your current page visible. - Select `Open` to replace the current page with the result. Press `Esc` or select `Close` to dismiss search. The footer summarizes the keyboard controls: use the arrow keys to `Navigate`, select `Open` or press `Enter` to open the highlighted item, and use `Tab` for `Ask AI`. > Search is a shortcut to work you can reach in Bidlo. It does not change a document's location, visibility, or permissions. ### Narrow results by collection Use the collection buttons to limit results to `Projects`, `Contractors`, `Facilities`, `Materials`, `Pages`, or `Files`. Select the active collection again to remove the filter. This is especially useful during project review. When the result list contains several kinds of workspace data, select `Projects` to focus on project records. You can also start typing a collection name or enter `!` to see `Search in` suggestions. Choose a suggestion, then continue typing your query. Bidlo shows the active collection as a prefix, such as `Projects: bridge`. > Press Backspace when the cursor is directly after a collection prefix to remove the prefix and search across all collections again. ### Run commands Type the beginning of a command, then choose the matching suggestion: - Enter `home` to choose `Go to Home`. - Enter `settings` to open `Settings` or choose a specific settings page. - Enter `new` to choose `New Page`, `New Chat`, `New Project`, `New Contractor`, `New Facility`, or `New File`. - Enter a layout name, such as `table` or `board`, to create that kind of page. - Enter `new` or `create` followed by a collection name to create a page for that collection. Available collections and settings pages depend on your workspace. Review the highlighted suggestion before pressing `Enter`, especially when the command creates new work. ### Ask AI from search Enter a question, then select `Ask AI` to start a chat with your text. You can paste files into the search field when the question needs their context; the palette accepts up to five files of 20 MB each. Press `Tab` to send the question to an AI chat in the side panel and keep your current page visible. You can also use the microphone in the search field, or press `⌘ E` on Mac or `Ctrl E` on Windows to open search and begin dictating. ### Related pages - [Recent pages](/docs/navigation/recent-pages) - [Favorites](/docs/navigation/favorites) - [Open work in the side panel](/docs/navigation/side-panel) - [Voice dictation](/docs/bidlo-ai/voice-dictation) ### FAQs #### Why do I see Recent instead of search results? `Recent` appears when the search field is empty. Start typing to replace it with matching results and commands. #### Why does Enter start an AI chat? When Bidlo has no selectable result or command for your text, `Ask AI` can become the default action. Check the footer before pressing `Enter`; use `Esc` if you only wanted to close search. #### Can I search only for files? Yes. Select `Files`, or choose `Search in Files` after typing `!`, then enter your query. --- ## Side panel https://www.bidlo.ai/docs/navigation/side-panel Keep your current page visible while you inspect another item. Keep one page in view while you inspect another page or record beside it. ### Understand the side panel The side panel divides your workspace into two areas. Your current page stays in the main area, and the item you choose opens beside it in a panel. Opening an item in the side panel is a navigation action. It does not move, duplicate, or change access to either item. ![A project record opens beside its pursuit-review table, keeping the source page visible while showing the project map, fields, and tabs.](https://media.bidlo.ai/docs/images/getting-started/project-record-review.v1.png) ### Open a search result in the side panel 1. Select `Search...` in the header, or press `⌘ K` on Mac or `Ctrl K` on Windows. 2. Enter a title or keyword. 3. Highlight or hover over the result you want to inspect. 4. Select `Open in new panel`. 5. Verify that the result appears beside the page you were already viewing. > Use the side panel when you need to compare a project with a contractor, facility, file, or other supporting record. ### Open an item from its actions menu 1. Open the item’s actions menu where the option is available. 2. Select `Open in side panel`. 3. Verify that the item opens beside your current page. For example, from a project you can open a related contractor or facility in the side panel and compare it without leaving the project. Some relation fields provide an `Open in side panel` action for the linked record. Available actions depend on the item and the part of Bidlo you are using. > You can open only work you have access to. If Bidlo cannot load the item because it was deleted, moved, or is unavailable to you, the panel shows a message and a `Close panel` action. ### Adjust or leave the panel - Drag the divider between the main page and the panel to change the panel width. Bidlo remembers the width for later. - Select `Open in full page` in the panel header to make the panel item your main page. This leaves the side-by-side view. - Select `Close panel` to dismiss the panel and keep the underlying main page open. > Close the panel when you finish inspecting the supporting item so the main page has the full workspace width again. ### Related pages - [Global search](/docs/navigation/global-search) - [Rename, duplicate, move, and delete](/docs/navigation/page-actions) - [Collections and records](/docs/data-records/collections-records) - [Views overview](/docs/views-dashboards/views-overview) - [Ask AI about a page](/docs/bidlo-ai/ask-about-page) ### FAQs #### Does opening an item in the side panel change the original? No. The panel displays the existing item beside your current page. It does not move, copy, or change the item’s permissions. #### What is the difference between Open in full page and Close panel? `Open in full page` makes the panel item your main page. `Close panel` removes the panel and leaves the page underneath it open. #### Why don’t I see Open in side panel? The action is available only in supported menus and item contexts. Use [Global search](/docs/navigation/global-search) and look for `Open in new panel`, or open the item normally if the panel action is not available. --- ## Page actions https://www.bidlo.ai/docs/navigation/page-actions Use common page actions safely. Update a page without losing track of its location, audience, or nested pages. ### Understand page actions Open a page’s action menu from its row in the sidebar. Hover over the page, then select the button whose tooltip reads `Remove, rename, and more...`. ![A normal ACME workspace page has its actions menu open with Duplicate, Rename, Delete, Copy link, and panel options visible.](https://media.bidlo.ai/docs/images/navigation/page-actions-menu.v2.png) The current menu includes `Duplicate`, `Rename`, and `Delete`. Moving a page uses drag-and-drop in the sidebar rather than a `Move` menu item. > Available actions can vary by page type, location, and your access. If an action is missing, confirm that you are in the correct team and ask a team administrator about your permissions. ### Rename a page Renaming changes the page title without changing its content, location, or visibility. 1. Find the page in the sidebar. 2. Hover over it and open `Remove, rename, and more...`. 3. Select `Rename`. 4. Enter the new title. 5. Press `Enter` or select outside the title field to save it. > Use a name that distinguishes the page in `Search...`, especially when several pages track similar work. ### Duplicate a page Duplicating creates a separate page in the same `public` or `private` section. If the original is nested, its duplicate stays under the same parent and appears after the original. 1. Find the page in the sidebar. 2. Open `Remove, rename, and more...`. 3. Select `Duplicate`. 4. Look for `Page duplicated`. 5. Review the opened copy, whose title ends in `(copy)`, then rename it. The copy has its own page identity. Changes to it do not rename or update the original page. > The source confirms that Bidlo copies the page’s document fields and view configuration. Rich notes, embedded apps, and other specialized content were not independently verified for every page type, so review the duplicate before relying on it. ### Move or reorder a page Use drag-and-drop to change a page’s order, parent, or sidebar section. 1. Expand the page first if it has nested pages. 2. Drag the page in the sidebar. 3. Look for a line between rows to reorder it, or a highlighted page to make that page the new parent. 4. Drop the page only when the intended target is visible. 5. Check the page’s section, parent, and indentation after the move. Moving a parent moves its nested page tree with it. > Moving a page between `private` and `public` changes who can reach the page and its nested pages. A private-to-public move can also ask `Publish app to your organization?` for embedded custom apps. Review the full page tree and choose `Publish and continue` only when the content and editable apps should be available to the organization. The drag targets and move results were verified from source but were not tested in the live production workspace for this draft. ### Delete a page without subpages Deleting removes the page from the active workspace and places the deleted document in `Trash` in the current implementation. 1. Open `Remove, rename, and more...` for the page. 2. Select `Delete`. 3. In `Are you sure?`, review the page name and deletion warning. 4. Select `Delete` only when you intend to remove the page. 5. Check `Trash` if you need to restore it. > Treat deletion as destructive. The confirmation currently warns that the action cannot be undone, while the implementation supports restoring deleted documents from `Trash`. Permanently deleting an eligible item from Trash cannot be undone. ### Delete a page with subpages When a page contains subpages, Bidlo opens `Delete page?` and lists the affected pages. Decide what should happen to the subpages before confirming: - `Keep sub-pages` deletes only the selected parent and moves its subpages up one level. - `Delete all` deletes the parent and its complete nested page tree. To complete the action: 1. Expand the parent and review its nested pages. 2. Open `Remove, rename, and more...`. 3. Select `Delete`. 4. In `Delete page?`, review the listed subpages. 5. Select `Keep sub-pages` or `Delete all` based on the result you need. 6. Check the sidebar and `Trash` after the deletion finishes. > Never choose `Delete all` until you have reviewed the entire nested tree. The live deletion flow and restored position of a deleted page tree were not tested for this draft. ### Related pages - [Create and organize pages](/docs/navigation/create-organize-pages) - [Public and private pages](/docs/navigation/public-private-pages) - [Navigate with the sidebar](/docs/navigation/sidebar) - [Restore work from Trash](/docs/navigation/trash) ### FAQs #### Why don’t I see Rename, Duplicate, or Delete? Some contexts hide actions that do not apply. Check the page in its `public` or `private` sidebar section and confirm that your role allows you to change it. #### Does Duplicate keep the copy in the same place? Yes. The current source places the copy after the original in the same section and under the same parent when the original is nested. #### Can I delete a parent but keep its subpages? Yes. Choose `Keep sub-pages` in `Delete page?`. Bidlo deletes the parent and moves its subpages up one level. #### Can I undo a move? There is no separate undo control for sidebar moves in the current implementation. Drag the page back to its previous section, parent, or position, and recheck visibility if the move crossed `public` and `private`. #### Can I restore a deleted page? `Trash` supports restoring deleted documents. The exact restored hierarchy and position of a page tree were not verified in the live product for this draft. --- ## Trash https://www.bidlo.ai/docs/navigation/trash Find deleted documents, filter them, and restore what you need. Find a deleted document and return it to your workspace. ### Understand Trash `Trash` holds deleted documents that you can still recover. Deleted items appear with their collection and deletion date, with the most recently deleted items first. The list includes deleted work available to you in the current team. It does not give you access to another person’s private work. ![The ACME Trash list shows deleted pages with search, collection filtering, deletion dates, Restore controls, and permanent-delete controls.](https://media.bidlo.ai/docs/images/navigation/trash-recovery-list.v1.png) > Bidlo does not show a retention countdown in `Trash`. Restore work you need rather than treating Trash as long-term storage. ### Find a deleted document 1. Select `Trash` near the bottom of the sidebar. 2. Enter part of the document title in `Search deleted documents`. 3. To narrow the list, select `All collections`, then choose a collection. 4. Review the document title, collection, and `Deleted` date. 5. Scroll to load older results when the document is not in the first group. To find a collection in a long filter list, enter its name in `Search collections...`. Select `All collections` again to remove the collection filter. > If you are unsure which document is correct, compare both its title and collection before restoring it. ### Restore a document 1. Find the document in `Trash`. 2. Select `Restore` on its row. 3. Look for `Document restored`. 4. Confirm that the document disappears from the Trash list. 5. Find the restored document in the sidebar or with [Global search]([https://bidlo-help-center.mwolfe666.chatgpt.site/docs/navigation/global-search](/docs/navigation/global-search). > Restoration begins immediately; there is no confirmation dialog. Selecting the document row also restores it. If the restored page is not where you expected in the sidebar, use `Search...` to find it, then move it to the correct section or parent. ### Permanently delete a document Permanent deletion removes an eligible document from Bidlo and cannot be undone. 1. Find the document in `Trash`. 2. Select `Delete permanently` on its row. 3. In `Permanently delete?`, review the document name and the warning that the action cannot be undone. 4. Select `Delete permanently` only when you no longer need the document. 5. Look for `Document permanently deleted`. > `Delete permanently` appears only for eligible team-owned documents. Some shared documents can be restored but cannot be permanently deleted, so the action is hidden. Bidlo currently handles permanent deletion one document at a time. ### Related pages - [Rename, duplicate, move, and delete](/docs/navigation/page-actions) - [Navigate with the sidebar](/docs/navigation/sidebar) - [Create and organize pages](/docs/navigation/create-organize-pages) - [Public and private pages](/docs/navigation/public-private-pages) - [Permissions](/docs/collaboration/permissions) ### FAQs #### Why can’t I find a deleted document? Clear the title search and choose `All collections`. You can see only deleted work available to you in the current team; another person’s private document does not appear in your Trash. #### Why don’t I see Delete permanently? The document is not eligible for permanent deletion. Restore it if you need it again, or leave it in `Trash`. #### Can I empty Trash all at once? No bulk `Empty Trash` action appears in the current interface. Permanently delete eligible documents one at a time. #### How long do deleted documents stay in Trash? Bidlo does not display an expiration date or retention window in `Trash`. Restore important work promptly. --- ## Collections & records https://www.bidlo.ai/docs/data-records/collections-records How Bidlo stores repeatable things such as projects, contractors, and facilities. ### Overview Organize repeatable work in collections, then use records to track each individual project, contractor, facility, or other item. ### Understand collections and records A **collection** is a shared structure for one kind of information. For example, a Projects collection can define fields such as project name, bid date, location, and status. A **record** is one item in that collection. Each project is a separate record that uses the Projects collection's fields. Keeping similar items in one collection makes them easier to search, filter, connect, and display consistently. A **view** controls how records from a collection appear. A table, board, calendar, or map can present the same underlying records in a layout suited to the job. Changing the layout does not create another copy of the records. For example, a project record can bring its title, notes, project fields, related lists, and files together on one page. This gives you a focused place to understand one project while the Projects collection keeps the shared structure consistent across project records. > Choose a collection based on what each record represents, not how you want the records to look. Use views when you need a different layout. ### Browse your team's collections 1. Open `Settings`. 2. Under `Data`, select `Glossary`. 3. Browse the alphabetical list or enter a name in `Search collections...`. 4. Select a collection to see the fields that define its records. Each collection in the Glossary shows its description and field count. A clear description helps teammates understand what belongs in the collection. ### Create a collection Create a collection when the items you need to track do not fit an existing one. The Glossary is the clearest path for a standalone collection. You can also create a related collection while setting up a new `Relation` field. 1. Open `Settings` and select `Glossary` under `Data`. 2. Select `New collection`. 3. Enter a `Name`. 4. Optionally choose an icon and enter a `Description`. 5. Select `Create`. Bidlo creates the collection with a `Name` field. Open the collection from the Glossary to add the other fields its records need. > Before creating a collection, search the Glossary for a similar name. Reusing an existing collection avoids splitting related records across competing structures. ### Add a record 1. Open a page with a view connected to the collection you want to use. 2. Select `New` in the view, or select `New {collection}` at the bottom of a table. 3. Enter a name for the record. 4. Complete the fields relevant to the item. The new record opens so you can add its details. In a table, you can also edit visible field values directly in the row. > A view can hide fields or exclude records with filters. Open the record when you need to review its complete details. ### Keep the structure useful - Add a field when the same kind of detail should be available on every record in the collection. - Create another view when you need a different layout, filter, sort, or group for the same records. - Create a relation when records in one collection need to connect to records in another collection. - Use a separate collection when the items have a meaning and set of fields that are genuinely different. ### Related pages - [Use the Glossary](/docs/data-records/glossary) - [Add and manage fields](/docs/data-records/fields) - [Connect records with relations](/docs/data-records/relations) - [Views overview](/docs/views-dashboards/views-overview) ### FAQs #### Is a collection the same as a view? No. A collection stores records and defines their shared fields. A view presents records from a collection in a chosen layout with its own display settings. #### Should I create a new collection or a new view? Create a view when you want another way to display the same kind of records. Create a collection when you need to track a different kind of item with its own structure. #### What happens when I edit a record in a view? You are editing the record in its collection. Another view that includes the same record can reflect the updated value; its filters and visible fields still control what you see there. #### Why do I not see a collection or record? First check that you are in the correct team workspace. A view's filters can also exclude a record, and some collections or actions may not be available with your current access. Ask a team administrator if the item is still missing. --- ## Glossary https://www.bidlo.ai/docs/data-records/glossary Browse collections, descriptions, and the fields that define them. Use the Glossary to understand how your team organizes data and what each collection and field means. ### Understand the Glossary The Glossary is a reference for the collections available in your team workspace. A collection represents one kind of repeatable information, such as projects, contractors, or facilities. Each collection entry shows its name, description, and number of fields. Open a collection to review the fields that define its records. ![The Project collection open in the Glossary with searchable field definitions.](https://media.bidlo.ai/docs/images/data-records/glossary-project-fields.v2.png) ### Find a collection 1. Open `Settings`, or open a view's field settings when you want to work with that view's collection. 2. Under `Data`, select `Glossary`. From field settings, select `Glossary` from the available field controls. 3. Browse the alphabetical list, or enter a term in `Search collections...`. 4. Select a collection or its field-count button to open its fields. Search checks collection names and descriptions, then places the most relevant matches first. > Search before creating a collection. Your team may already track the same kind of information under a similar name. ### Read a collection's fields The fields page lists the details that records in the selected collection can store. Depending on the field, an entry can include: - its name and field type; - a description of what the field is for; - `AKA` names that teammates may also use; - an `Example` taken from existing records; and - `Related` fields that represent similar information. Select a field under `Related` to open it. If the field belongs to another collection, the Glossary switches to that collection and brings the field into view. > An example is illustrative, not a required value or a complete list of the values stored in that field. ### Search for a field 1. Open a collection in the Glossary. 2. Enter a name, alternate name, or descriptive term in `Search fields...`. 3. Review matches from the current collection. 4. If shown, review `From other collections` for matching fields elsewhere in the workspace. 5. Select a collection badge or a related field to move to the collection that owns it. Clear the search to return to the collection's alphabetical field list. Select `Glossary` above the collection name when you want to return to all collections. ### Keep definitions useful Use descriptions to explain what belongs in a collection or field, especially when its name could have more than one meaning. Use alternate names to help teammates find a field using familiar terminology. Changes to a collection or field definition affect the shared structure your team uses. If edit controls are available to you, confirm the intended meaning with your team before renaming or redefining an established item. ### Related pages - [Collections and records](/docs/data-records/collections-records) - [Add and manage fields](/docs/data-records/fields) - [Field types](/docs/data-records/field-types) - [Connect records with relations](/docs/data-records/relations) ### FAQs #### Why does a field have no example? The Glossary may not have an example to show when the field has no populated values available. If examples cannot be loaded, the field displays `Unable to load examples` instead. #### Why does a field search show another collection? Field search also checks fields in other visible collections. These matches can help you find an existing definition instead of creating a duplicate field. #### Can the Glossary change fields in a view? When you open the Glossary from a view's field settings, fields from that view's collection can include `Add` or `Remove` controls. Opening the Glossary from `Settings` is primarily for browsing and maintaining the shared collection structure. --- ## Manage fields https://www.bidlo.ai/docs/data-records/fields Create, reorder, show, hide, duplicate, and remove fields. Add the details your records need, then choose which fields appear in each view and in what order. ### Understand fields and views A field defines one kind of information that records in a collection can store, such as a date, number, person, location, or status. Adding, renaming, duplicating, or deleting a field changes the collection's shared structure. Each view keeps its own list and order of visible fields. Hiding a field from a view does not delete the field or its values. > Every collection has a title field. Bidlo keeps this field visible so each record can be identified. ### Open field settings 1. Open a view connected to the collection you want to change. 2. Open the view settings. 3. Select `Columns` in a table view or `Fields` in another layout. `Visible in {layout}` lists fields shown in the current layout. `Not in {layout}` lists fields that belong to the collection but are hidden from this view. ![The Fields panel in a table showing visible and hidden fields.](https://media.bidlo.ai/docs/images/data-records/table-fields-panel.v2.png) > Use the search box when the collection has many fields. Search can find an existing field or suggest a matching type for a new field. ### Add an existing field to a view 1. Open `Columns` or `Fields`. 2. Find the field under `Not in {layout}`, or search for it by name. 3. Select the field to add it to the current view. Select `Show all` to add every available collection field to the current view. ### Create a field 1. Open `Columns` or `Fields`. 2. Select `New field`. 3. Choose a field type. 4. Replace the default name with a clear, specific name. 5. Optionally choose an icon, add a description, and complete settings for the selected type. The field belongs to the view's collection and is added to the current view. Other views can add it from `Not in {layout}`. > Before creating a field, search the existing fields or open `Glossary` from the field settings. Reusing a shared field keeps the collection consistent and avoids two fields for the same detail. ### Reorder fields in a view 1. Open `Columns` or `Fields`. 2. Under `Visible in {layout}`, drag a field by its handle. 3. Drop it where you want it to appear. The order applies to the current view. It does not reorder the field in every view that uses the collection. ### Hide or show fields 1. Open `Columns` or `Fields`. 2. Under `Visible in {layout}`, select the eye control beside the field. To show it again, select the field under `Not in {layout}`. You can also select `Hide all` or `Show all` to update the list in one action. `Hide all` leaves the required title field visible. In a table, `Remove from table` in a column header menu also hides that field from the table without deleting it. ### Edit, duplicate, or delete a field Hover over a field in `Columns` or `Fields`, then select `Edit field` to change its name, icon, description, visibility, or type-specific settings. To make a similar field: 1. Open `Edit field` for the field you want to copy. 2. Select `Duplicate`. 3. Rename the copy and review its settings. Duplicating copies the field definition, not the values stored in the original field. If the copy is hidden, choose `Show in {layout}`. To permanently remove a field: 1. Open `Edit field`. 2. Select `Delete`. 3. Read the confirmation, then select `Delete` only when the field is no longer needed. > Deleting is permanent and removes the field and its stored values from all views, pages, and widgets that use it. The title field and some system-managed fields cannot be deleted. ### Related pages - [Collections and records](/docs/data-records/collections-records) - [Use the Glossary](/docs/data-records/glossary) - [Field types](/docs/data-records/field-types) - [Connect records with relations](/docs/data-records/relations) ### FAQs #### Why does a field appear in one view but not another? Each view has its own visible-field list. Open `Columns` or `Fields` in the view where the field is missing, then add it from `Not in {layout}`. #### Does hiding a field delete its values? No. Hiding or removing a field changes only the current view. The field and its stored values remain part of the collection. #### Should I duplicate a field when I want another view? No. Create another view when you want a different layout, order, or set of visible fields for the same records. Duplicate a field only when the collection needs another, separate place to store similar information. --- ## Field types https://www.bidlo.ai/docs/data-records/field-types Choose the right type for text, numbers, dates, tags, people, locations, relations, and more. Choose a field type that matches the information you want people to enter, display, and use in views. ### Understand field types A field type controls the kind of value a field accepts and the controls used to edit it. For example, a `Date` field opens a date control, while a `Checkbox` field stores a yes-or-no choice. Choose carefully when you create a field. Bidlo keeps an existing field's type locked. If the structure changes later, create a new field and move or re-enter the values you still need. ![The New field menu showing the available field types.](https://media.bidlo.ai/docs/images/data-records/field-type-picker.v2.png) > Start with the simplest type that describes the information. Use a relation only when the value should point to a record in another collection. ### Choose a field type #### Enter text and numbers - `Text` — Names, descriptions, reference codes, and other free-form words or characters. - `Number` — Quantities, costs, percentages, distances, and other values you may want to calculate or summarize. Number settings can control formatting, decimal places, and visual displays such as a bar or ring. #### Choose from consistent options - `Tag` — One reusable label from a defined set, such as a project status. - `Multi tag` — Several reusable labels on the same record, such as work categories or capabilities. - `Checkbox` — A yes-or-no value for questions such as “Approved?” or “Site visit complete?” - `State` — A consistent state selection for records that should not use free-form text. - `County` — A consistent county value for county-based work and filtering. #### Track dates, people, and places - `Date` — A calendar date, with optional display settings for the date and time. - `People` — One or more members of your Bidlo team. You can limit the field to one person or allow multiple people. - `Location` — A place or address that can support map views and location-based work. #### Connect and calculate - `Relation` — Links a record to one or more records in another collection. - `Formula` — A calculated value based on other fields. Use it when the result should update from a defined expression instead of being entered manually. Every collection also has a required title field, usually named `Name`. It identifies each record and is created with the collection, so it does not appear as a choice in the new-field list. ### Create a field with the chosen type 1. Open a view connected to the collection you want to update. 2. Open the view settings. 3. Select `Columns` in a table or `Fields` in another layout. 4. Select `New field`. 5. Choose the field type. 6. Enter a clear name and review the settings shown for that type. Bidlo adds the new field to the collection and the current view. Type-specific choices appear in `Edit field`. For example, you can adjust number formatting, date and time display, people limits, tag options, or relation behavior. > `Tag`, `Multi tag`, `Relation`, and `Formula` need additional setup. Define the available labels, select the collection to connect, or create the calculation before relying on the field in a workflow. ### Related pages - [Add and manage fields](/docs/data-records/fields) - [Connect records with relations](/docs/data-records/relations) - [Formula fields](/docs/data-records/formulas) - [Tags and auto-tags](/docs/data-records/tags-auto-tags) ### FAQs #### Can I change a field's type later? No. The field editor keeps the type locked. Create a new field with the correct type, confirm that its values are complete, and delete the old field only when it is no longer needed. #### Should a status be a tag or text field? Use `Tag` when each record should have one value from a consistent set, such as Planned, Active, or Complete. Use `Text` when the value is open-ended and does not need a controlled list. #### When should I use a relation instead of a tag? Use a relation when the selection is another Bidlo record with its own fields, such as a contractor, facility, or project. Use a tag when you only need a reusable label. --- ## Relations https://www.bidlo.ai/docs/data-records/relations Link one collection to another and understand reverse relationships. Link records across collections so related information stays connected without being copied. ### Understand relations A relation field connects a record in one collection to records in another collection. For example, a `Contractor` relation on Projects can link each project to the appropriate record in the Contractors collection. The linked contractor remains its own record. The relation stores the connection, so you can open the contractor, show selected details in the relation picker, and use the connection in views or formulas. A relation is one-way by default. Turn on `Two-way relation` when the related collection should also show the connection. In the example above, Bidlo adds a relation field to Contractors that points back to Projects. > Use a relation when the selected item needs its own record and details. Use a tag when you only need a reusable label. ### Create a relation field 1. Open a view connected to the collection where you want the relation. 2. Open the view settings. 3. Select `Columns` in a table or `Fields` in another layout. 4. Select `New field`, then choose `Relation`. 5. Under `Link existing`, choose the collection you want to connect. 6. Rename the field so its purpose is clear. ![The new relation field flow in the Pursuit Review Table, showing options to link an existing collection or create a new one.](https://media.bidlo.ai/docs/images/data-records/relation-link-existing.v4.png) If the related collection does not exist, enter its name under `Create new`. For example, while adding a `Contractor` relation to Projects, enter `Contractors` and choose the create option. Bidlo creates the Contractors collection and connects the new relation field to it. > Choose the related collection carefully. After a relation is connected, `Related to` identifies that collection but is not editable in the field settings. ### Choose one or many linked records Open `Edit field` for the relation, then use `Limit`: - `No limit` lets each record connect to multiple records. - `Only one` limits the field to a single linked record. For example, set a project's `Primary facility` relation to `Only one`, because each project should select one primary facility. Set its `Bidders` relation to `No limit`, because several contractor records can be connected to the same project. ### Add or remove linked records 1. Open the record or select its relation cell in a table. 2. Select the relation field. 3. Search for a record in the related collection. 4. Select a result to link it. With `No limit`, select additional results to create more links. Select an already linked result or its remove control to remove that connection. With `Only one`, choosing another result replaces the current selection. If the record you need does not exist, enter its name and select `Create`. Bidlo creates it in the related collection and links it to the current record. > Choose which details appear beside each result. Fields such as location or status can distinguish records with similar names. ### Add a reverse relation 1. Open `Edit field` for the original relation. 2. Select `Two-way relation`. 3. Turn on `Enable`. 4. Enter a clear `Related property name` for the field that Bidlo adds to the related collection. The reverse field reflects the same connections from the other collection. If a Project links to a Contractor, the contractor's reverse field can show that project. To remove the reverse field, open `Two-way relation`, turn off `Enable`, and review the confirmation. Removing it deletes the named reverse field from the related collection. > Creating, renaming, or removing fields changes a collection's shared structure. If these controls are unavailable, ask a team administrator or workspace manager for help. ### Related pages - [Collections and records](/docs/data-records/collections-records) - [Add and manage fields](/docs/data-records/fields) - [Field types](/docs/data-records/field-types) - [Formula fields](/docs/data-records/formulas) ### FAQs #### Does a relation copy the related record? No. The field points to the existing record in the related collection. Edit the related record when its own details need to change. #### Why can I not select more than one record? The relation's `Limit` is probably set to `Only one`. Change it to `No limit` if the relationship should allow several records. #### What does a two-way relation add? A one-way relation shows the connection on the collection where you created the field. A two-way relation also adds a field to the related collection so you can see the same connection from either side. --- ## Formulas https://www.bidlo.ai/docs/data-records/formulas Calculate a value from other fields, preview the result, and keep it current as records change. Use a formula field when Bidlo should calculate a value from information that already exists on a record. ### Understand formula fields A formula is a shared field in a collection. You define its expression once, and Bidlo evaluates that expression for every record in the collection. For example, a Projects collection could use a formula to flag overdue bids: `if({Bid date} < today(), "Overdue", "Upcoming")` The fields inside braces are references to other fields in the same collection. When a referenced value changes, Bidlo recalculates the formula result. Every view that shows the formula field reads the same result. > A formula result is calculated. You can't type directly into a formula cell as you would with a text or number field. ### Create a formula field 1. Open a view connected to the collection you want to update. 2. Open the view settings. 3. Select `Columns` in a table or `Fields` in another layout. 4. Select `New field`, or select the `+` at the end of the table's column headers. 5. Choose `Formula`. 6. Give the field a name that describes its result. 7. Open `Edit formula`. The `Edit formula` window opens with an expression editor, field and function suggestions, and a preview. ![The formula editor, including the expression area, record preview, fields, and examples.](https://media.bidlo.ai/docs/images/data-records/formula-editor-preview.v2.png) ### Write and preview a formula 1. Enter an expression in the formula editor. Bidlo displays the leading `=` for you. 2. Select fields, operators, or functions from the suggestion list as you type. 3. Under `Preview with`, choose a record that has representative values. 4. Check the previewed result and its output type. 5. Close the editor to save the expression. The formula is applied to the collection. Bidlo recalculates its values and shows progress while a larger update is running. > Preview with a record that includes the edge cases you expect, such as an empty date, a zero quantity, or several related records. ### Ask Bidlo AI for help Use the prompt at the top of `Edit formula` when you know the outcome you want but not the exact expression. 1. Enter a concrete request in `Write, fix, or explain a formula...`. 2. Include the intended result and the fields the formula should use. 3. Submit the request. 4. Review the generated expression and preview before you close the editor. For example: “If Bid date is before today and Status isn't Submitted, return Overdue. Otherwise return the current Status.” Bidlo AI places a generated formula in the active editor for your review. It doesn't remove the need to check the output against a real record. ### Edit or discard a formula Open the formula field's settings and select `Edit formula`. - Close the editor to save the current expression. - Select `Discard all changes` to return to the expression that was present when you opened the editor. - If the preview shows an error, use the highlighted message to correct the field reference, function, value type, or expression structure. Changing the expression recalculates the field for the collection. Views, filters, groups, charts, and dashboards that use the field will then read the new results. > Before you change a formula used by a shared workflow, check where the field appears. The expression belongs to the collection, not only to the view where you opened it. ### Use formulas with relations A formula can inspect or summarize connected records through a relation field. For example, a Projects formula might count related bidders or calculate a value from related project items. Create and populate the relation first. Then reference it from the formula editor and preview with a record whose related data is complete. ### FAQs #### Can I type directly into a formula field? No. Edit the fields used by the formula or change the expression in `Edit formula`; Bidlo calculates the result. #### Why does my formula show an error? Check the highlighted message for a missing field reference, incompatible value type, unsupported function, or incomplete expression. Then preview the formula with a representative record. #### What happens when I change a shared formula? Bidlo recalculates the formula for the collection. Any view, filter, group, chart, or dashboard that uses that field reads the updated result. ### Related pages - [Add and manage fields](/docs/data-records/fields) - [Field types](/docs/data-records/field-types) - [Connect records with relations](/docs/data-records/relations) - [Calculations and summaries](/docs/views-dashboards/calculations) --- ## Tags & auto-tags https://www.bidlo.ai/docs/data-records/tags-auto-tags Create reusable labels, apply one or many tags, and define rules that update matching records. Use tags to classify records with consistent labels, then use auto-tags when a repeatable rule should apply a label to matching records. ### Choose Tag or Multi tag Both field types use a controlled list of reusable options: - `Tag` allows one selected label on each record. - `Multi tag` allows several selected labels on the same record. Use `Tag` for a single state such as Bid decision. Use `Multi tag` for categories that can overlap, such as Scopes or Certifications. Tags are stored as options connected to the field. Renaming an option updates the label wherever that option is used; it doesn't create a second tag. > Use a relation instead when the selected item needs its own record, fields, notes, files, or relationships. ### Create a tag field 1. Open a view connected to the collection you want to classify. 2. Open the view settings. 3. Select `Columns` in a table or `Fields` in another layout. 4. Select `New field`. 5. Choose `Tag` or `Multi tag`. 6. Name the field. 7. Add the options teammates should use. The field belongs to the collection and is available to every view connected to that collection. Each view can decide whether to show it. ### Add and manage tag options Open the field's settings, then use `Options` to work with its labels. You can: - add an option; - search a long option list; - rename an option; - change its color or image; - reorder options; or - remove an option that is no longer needed. Choose short, distinct names that match the language your team already uses. Before adding a near-duplicate, search the existing options. ![The Estimator Auto Tag panel open from the Pursuit Review Table, showing three rules and the update action.](https://media.bidlo.ai/docs/images/data-records/tag-auto-tag-settings.v2.png) > Removing a tag option can remove that classification from records that use it. Confirm the option is no longer needed before deleting it. ### Apply tags to a record 1. Open a record or select its tag cell in a table. 2. Open the tag field. 3. Search for the option you want. 4. Select it. With `Multi tag`, select more options to add them. Select an applied option again, or use its remove control, to remove it from the record. ### Understand auto-tags An auto-tag rule connects one tag option to filters on the collection being classified. When you run the rule, Bidlo applies that option to records that match its filters. For example, an `Upcoming` tag could apply to Projects where Bid date is within the next 30 days and Status is not Submitted. Each rule has three parts: - the tag option to apply; - the filters records must match; and - the `Update {collection}` action that runs the rule. Rules can be reordered. If several rules apply to the same single-select `Tag` field, their order can affect which option is left on the record. ### Create and run an auto-tag rule 1. Open the settings for a `Tag` or `Multi tag` field. 2. Select `Auto-tag`. 3. If auto-tagging is off, use the primary action to create the first rule. 4. Select the tag option the rule should apply. 5. Add one or more filters that define matching records. 6. Select `Update {collection}`. Bidlo runs the rule and reports how many rows were updated. The saved rule remains available for future updates. > Editing filters saves the rule's definition. Select `Update > {collection}` to apply the current rule to records. ### Turn off or remove auto-tagging Turn off `Auto tagging` to stop using the field's rules without removing the field or its tag options. To delete one rule, open it and select `Remove auto tag`. This removes the rule configuration; it doesn't delete the tag field itself. Review existing tagged records after changing or removing a rule. Changing or removing a rule does not remove classifications the rule already wrote to records. Update those records separately when the existing tags should change. ### Related pages - [Add and manage fields](/docs/data-records/fields) - [Field types](/docs/data-records/field-types) - [Connect records with relations](/docs/data-records/relations) - [Filter, sort, and group](/docs/views-dashboards/filter-sort-group) ### FAQs #### Should I use a tag or a relation? Use a tag for a controlled label. Use a relation when the selected item needs its own record, fields, notes, files, or relationships. #### Does removing an auto-tag rule remove tags it already applied? No. Removing the rule stops that configuration, but existing classifications remain on records until you update them separately. --- ## Record notes https://www.bidlo.ai/docs/data-records/record-notes Capture working context on a record with formatted text, lists, links, media, and mentions. Use a record's `Notes` area to keep decisions, context, and working details beside the structured fields and views they explain. ### Understand record notes Notes are rich text attached to one record. Project, contractor, and facility records can show the notes editor near the top of the page, while structured fields and related views remain available around it. ![A project record with its Notes editor outlined above the related views.](https://media.bidlo.ai/docs/images/data-records/record-notes-area.v1.png) Use notes for information that benefits from explanation or formatting. Use a field when the value needs to be filtered, sorted, grouped, calculated, or shown consistently across many records. For example, keep a bid date in a Date field and use Notes to explain why the date changed. ### Write a note 1. Open the record. 2. Select the `Notes` area. 3. Enter your text. 4. Click elsewhere when you're done. Bidlo saves content automatically after you stop typing. Return to the record to continue editing the same note. > Wait for your latest edit to settle before closing the browser or navigating away, especially after pasting a large amount of content. ### Format the note Highlight text to open formatting controls. You can add emphasis, change block styles, or create a link. Type `/` on an empty line to open the content menu. Available choices include: - headings and paragraphs; - bulleted, numbered, and checklist items; - callouts, quotes, dividers, and collapsible toggles; - tables; - images and file attachments; - bookmarks and videos; and - page mentions. Continue typing after `/` to narrow the list, then choose the content type you want. ### Mention another page Use a page mention when the note should point to another Bidlo document without copying its contents. 1. Place the cursor where the reference should appear. 2. Type `/` and choose the page or mention option. 3. Search for the document. 4. Select the result. The note displays a linked mention. Readers still need access to the mentioned document to open it. ### Add media or a file Choose the relevant option from the `/` menu: - `Image` opens a local image picker. - `Bookmark` saves a web address as a visual link. - `Video` embeds a supported video URL. - `File` attaches an uploaded file. Use a short line of text before the media to explain why it's relevant. For project plans, specifications, and other source documents that teammates need to find independently, also consider the record's `Files` area. ### Choose Notes, a field, or a view Use this rule of thumb: - Choose `Notes` for narrative context and formatted working content. - Choose a field for one consistent value that should travel with every record. - Choose a view to compare, filter, group, or summarize records from a collection. The three surfaces complement each other. A project can use fields for bid status, Notes for the review narrative, and an Items table for related work. ### Related pages - [Collections and records](/docs/data-records/collections-records) - [Add and manage fields](/docs/data-records/fields) - [Files and linked content](/docs/data-records/files-links) - [Views overview](/docs/views-dashboards/views-overview) ### FAQs #### When should I use Notes instead of a field? Use Notes for narrative context, decisions, and working details. Use a field when the value should be structured, filtered, sorted, grouped, or reported across records. #### Can everyone who opens the note follow a mentioned page? Only if they already have access to that page. A mention creates a link; it does not grant permission. --- ## Files & links https://www.bidlo.ai/docs/data-records/files-links Upload source files or save useful web links with the records they support. Keep plans, specifications, bid sheets, reference documents, and useful links close to the Bidlo work they support. ### Understand file documents An uploaded file or embedded link becomes a file document in Bidlo. A record's `Files` view keeps those documents with the project, contractor, facility, or other record they support. > A link points to content outside Bidlo. The reader's access to that destination still depends on the external service's sharing settings. ### Add files to a record 1. Open the record that the files support. 2. Select its `Files` tab. 3. Select `New File` at the end of the file list. 4. Choose one or more files from your device. ![A project's Files tab scrolled to show the complete file table, search, sorting, filtering, and New file controls.](https://media.bidlo.ai/docs/images/data-records/record-files-tab.v2.png) `New File` opens your device's file picker immediately and accepts multiple files. Bidlo creates a file document for each file you choose and shows upload progress without first opening a blank document. The uploaded files appear in the record's `Files` view. Select a file to open it in the side panel without losing the record behind it. Use `Search` when you need to find a file in a longer list. ### Attach a file to a new file document If you create or open a file document before attaching a source, the document asks you to choose a file. Select the file from your device to begin the upload. ### Upload a folder The workspace `File upload` menu can also show `Choose a folder`. 1. Open the workspace file upload menu. 2. Select `Choose a folder`. 3. Choose the folder from your device. Bidlo recreates the folder structure as nested pages and places each uploaded file under its corresponding parent. > Review the destination section before choosing a folder. The new page tree is created where you opened the upload menu. ### Save a linked file or webpage 1. Open a file upload dialog that provides `Upload` and `Link` tabs. 2. Select the `Link` tab. 3. Enter the address in `Paste a file link...`. 4. Select `Embed link`. Bidlo adds `https://` when the address doesn't already include a web protocol. The saved link opens as a file document. The link flow supports common destinations such as PDFs, Google Drive, and Google Maps. Access and preview behavior depend on the destination. ### Open or download a file To review a file without leaving its record: 1. Open the record and find its `Files` area. 2. Select the file name. 3. Review the file in the side panel. 4. Select `Open in full page` when you need more space, or `Close panel` to return to the record. To save a copy to your device, open the file's action menu and choose the available download action. For example, download a bid sheet when you need to work with it in its original spreadsheet application; open a PDF in the side panel when you only need to check a specification beside the project. ### Choose between a file, link, and note embed - Add a file document when teammates need a durable source they can find, open, or download. - Add a linked file when the source is maintained elsewhere. - Embed media in `Notes` when it supports the narrative and doesn't need its own place in the record's file list. ### Related pages - [Add notes to a record](/docs/data-records/record-notes) - [Create and organize pages](/docs/navigation/create-organize-pages) - [Open work in the side panel](/docs/navigation/side-panel) - [Global search](/docs/navigation/global-search) ### FAQs #### Does uploading a file guarantee that Bidlo can preview or read it? No. Storage, preview, import, and AI-readable content are separate capabilities and can vary by file type. #### Why can someone open the Bidlo file document but not its external link? Access to an external destination still depends on that service’s sharing settings. Sharing the Bidlo record does not change the linked service’s permissions. --- ## Overview https://www.bidlo.ai/docs/views-dashboards/views-overview Choose a layout, switch between project views, and understand how each view organizes shared records. Use views to work with the same structured records in the layout that best fits your task. ### Understand how views work A view presents records from a collection in a particular layout. Views that use the same collection show the same underlying records, so you can compare them in a table, place them on a map, or summarize them in a chart without creating separate copies. Each view keeps its own layout and organization. Its visible fields, filters, sorts, groups, and other display settings can differ from another view of the same collection. On a project, the view strip sits below `Notes`. A standalone view page keeps the selected layout and its controls in the page header. The Bid list example below uses a table grouped by `Agency` so related records stay together. ![The Bid list table groups project records by Agency and shows each record's visible fields.](https://media.bidlo.ai/docs/images/views-dashboards/views-overview-items-table.v1.png) > Project view names and available data depend on how your team has configured that project. Names such as `Items`, `Bid Tabs`, and `Plants` are examples, not a fixed list for every project. ### Choose a layout Open `New` from the team toolbar when you want to create a separate view page. Choose the layout that matches the question you need to answer: - `Table` compares many records and fields in a grid. - `Map` places records by location. - `Board` organizes records as cards in columns. - `Calendar` places records by date. - `Timeline` shows work across a date range. - `Gallery` emphasizes records as visual cards. - `Chart` summarizes records visually. - `Dashboard` arranges several views and summaries together. ![The Bidlo New menu over a Demo Account project, with Table, Map, Board, Calendar, Timeline, Gallery, Chart, and Dashboard choices.](https://media.bidlo.ai/docs/images/views-dashboards/views-overview-new-menu.v1.png) To create a view page: 1. Select `New` in the team toolbar. 2. Choose the layout you want. 3. Give the new page a clear name. 4. Complete the data setup shown on the new page. The new page opens in the layout you selected. You can refine its fields, filters, sorts, and groups after its data is connected. > Start with `Table` when you need to inspect unfamiliar data. Rows and columns make it easier to see which records and fields are available before you choose a more specialized layout. ### Switch between project views A project can keep several related views in one strip. Switching tabs changes the view below while keeping the same project open. 1. Open a project. 2. Scroll to the view strip below `Notes`. 3. Select the view you want, such as `Items` or `Files`. 4. If the strip is crowded, open the view overflow control, such as `7 more...`, to find the remaining views. The selected tab is highlighted, and its records or content appear below the strip. ### Add and manage a project view Use `New view` when you want another way to present existing project data. `New data source` creates a separate source of records instead. 1. Open the project view menu from the view strip. 2. Select `New view`. 3. Choose a layout. 4. In `Dataset`, choose the collection the view should use. 5. Rename the view so teammates can recognize its purpose. The new view appears in the project view strip. When several views use the same dataset, changes to a record remain visible wherever that record appears. Open a view's menu to change `View name...`, choose `Display as`, edit the view, duplicate it, copy its link, or delete it. `Display as` supports `Text and icon`, `Text only`, and `Icon only`. After selecting `Edit view`, open `Layout` to change the layout-specific controls. The map example shows how marker, style, clustering, and boundary choices stay scoped to that view. ![Map layout settings show marker type, location field, map styles, clustering, and boundary controls beside the Bid list map.](https://media.bidlo.ai/docs/images/views-dashboards/view-tab-menu-map.v1.png) > A project must keep at least one view tab. Bidlo disables view deletion when only one tab remains. ### Understand view settings Open the view settings menu to control how the selected view works. The exact options depend on its layout, but common settings include: - `Layout` changes layout-specific behavior. - `Columns` in a table, or `Fields` in other layouts, controls which record fields appear. - `Filters` limits the records shown. - `Sort` controls their order. - `Group` organizes records into sections. - `Conditional color` adds rules that make matching records stand out. - `Dataset` controls the collection the view reads from. These settings belong to the selected view. Another view can show the same records with a different set of fields, filters, or groups. ![The Bid list Page settings show Layout, Columns, Filters, Sort, Group, More, and dataset actions.](https://media.bidlo.ai/docs/images/views-dashboards/view-settings-items.v1.png) ### Related pages - [Table view](/docs/views-dashboards/table-view) - [Collections and records](/docs/data-records/collections-records) - [Projects overview](/docs/projects-workflows/projects-overview) - [Filter, sort, and group](/docs/views-dashboards/filter-sort-group) --- ## Filter, sort & group https://www.bidlo.ai/docs/views-dashboards/filter-sort-group Focus a view on the right records, put them in a useful order, and organize them into sections. Use filters, sorts, and groups to shape a view around the question you need to answer without changing the records in its collection. ### Understand the three controls Each control changes a different part of the selected view: | Control | What it changes | Example | | --- | --- | --- | | Filter | Which records appear | Show items due this month | | Sort | The order records appear in | Put the earliest due date first | | Group | How records are divided into sections | Gather items by status | These settings belong to the view. Another view of the same collection can use different filters, sorts, and groups. > Search narrows the current results temporarily. Filters, sorts, and groups are view settings and remain with the view. ### Filter records A filter tests one field against a condition. The available conditions depend on the field: text can contain a word, numbers can be above or below a value, dates can be before, after, between, or relative to today, and locations can be inside or outside a distance, area, or travel-time range. To add a filter: 1. Open the view settings menu. 2. Select `Filters`. 3. Select `Add filter`. 4. Choose the field you want to test. 5. Choose a condition, then enter or select its value. The view updates to show the records that match. The active filter also appears in the sort and filter bar, where you can reopen it and change its condition. > You can also select the filter icon above a view. If the view has no filters yet, Bidlo opens the field picker. If filters already exist, the icon shows or hides the sort and filter bar. #### Combine filters Filters require all conditions by default. For example, `Status` is `Open` and `Due date` is `Is on or before` Friday shows records that meet both conditions. Turn on `Match any` inside a filter when that condition should join an either/or set with other `Match any` filters. Bidlo then includes a record when it matches any condition in that set. ![The Bid list Filter field picker is open over the grouped table and lists the available project fields.](https://media.bidlo.ai/docs/images/views-dashboards/filter-menu-project-status.v1.png) To manage active filters: - Drag filters in `Filters` to reorder them. - Select `Clear filter` to reset a filter but keep its field available. - Select `Remove filter` to remove one condition. - Select `Remove all filters` to clear every filter from the view. ### Sort records A sort orders records by one field. Bidlo uses labels that match the field, such as `A → Z`, `Low → High`, `Oldest first`, or `Near → Far`. To add a sort: 1. Open the view settings menu. 2. Select `Sort`. 3. Select `Add sort`. 4. Choose a field. 5. Choose its direction. The view rearranges its records. To change the direction later, open the sort in the sort and filter bar or return to `Sort` in view settings. #### Use more than one sort When you add several sorts, their order sets their priority. Bidlo applies the first sort, then uses the next one to order records with the same first value. Drag sorts into the order you want. Use the remove button beside one sort, or select `Remove all sorts` to return to the view's manual order. > A table can't be manually reordered while a sort is active. Remove the sorts when you want to drag rows into your own order. ![The Bid list table shows two active sorts and a Status Open filter above the grouped records.](https://media.bidlo.ai/docs/images/views-dashboards/filter-sort-table-project-status.v1.png) ### Group records Grouping divides records into sections based on a field. It changes the presentation of the view, not the values on the records. To create a group: 1. Open the view settings menu. 2. Select `Group`. 3. Select `Group by`. 4. Choose a field. 5. Set the grouping options that appear for that field. The view creates a section for each value, including a no-value section when records have no value in the grouped field. ![The Bid list Page settings show Layout, Columns, Filters, Sort, Group, and More.](https://media.bidlo.ai/docs/images/views-dashboards/view-settings-items.v1.png) Grouping options depend on the field: - Text can group by `Exact` value or `Alphabetical` first character. - Dates can group by `Relative`, `Day`, `Week`, `Month`, or `Year`. - Numbers use ranges that you configure under `Number by`. - Tags, people, relations, states, and counties group by their options or linked records. - Checkboxes create checked and unchecked groups. You can also change `Order`, turn on `Hide empty groups`, hide or show individual groups, or use `Hide all` and `Show all`. Choose `Manual` order, when available, to drag groups into a custom sequence. > `Group` isn't available for calendar or map layouts. Board views can add a second level with `Sub-group` after the first group is set. #### Remove grouping Open `Group` in view settings and select `Remove Grouping`. Bidlo returns the records to one ungrouped view; it doesn't remove or change the field values that created the groups. ### Save filters and sorts on a public page When you change filters or sorts on a public page, the changes are visible only to you at first. Other people continue to see the current shared setup until you select `Save for everyone`. This lets you explore a different slice of the same records without changing the page for everyone else. #### Share your changes with everyone 1. Add or update the filters and sorts you want. 2. Review the records that remain and the order in which they appear. 3. Select `Save for everyone`. The current filter and sort setup becomes the shared version of that public page. > `Save for everyone` updates the current view. It doesn't create a reusable view template or change any records in the collection. #### Discard your personal draft Select `Reset` when you want to remove your personal filter and sort changes. The page returns to the current shared setup. Your active search isn't part of the saved setup. Clear the search separately when you want to see all records allowed by the shared filters. ### Related pages - [Views overview](/docs/views-dashboards/views-overview) - [Table view](/docs/views-dashboards/table-view) - [Search inside a view](/docs/views-dashboards/search-a-view) - [Calculations and summaries](/docs/views-dashboards/calculations) - [Public and private pages](/docs/navigation/public-private-pages) ### FAQs #### Do filters, sorts, and groups change the underlying records? No. They change how the selected view presents its collection. Removing a group, for example, does not remove the field values that created it. #### Why can’t I manually reorder a table? You cannot manually reorder a table when a field-based sort is active. Remove the sort when you want row position to be controlled manually. --- ## Table https://www.bidlo.ai/docs/views-dashboards/table-view Read and edit records in a grid, manage columns, select rows, and add useful summaries. Use a table to compare records field by field, make focused edits, and summarize a large set of work. ![The production 3mo Lookahead table keeps the Bidlo sidebar open, opens the Name column menu, and highlights Midland project rows with table search.](https://media.bidlo.ai/docs/videos/table-view.v1.mp4) ### Understand a table A table turns a structured set of records into a familiar grid: - Each row is one record. - Each column is one field shown for those records. - A group heading gathers records with a shared value. - A calculation summarizes the records or values in a column. The Bid list below groups project records by `Agency`, keeping each group's field columns and record count together in one scannable table. ![The Bid list table groups project records by Agency and displays record names, dates, agencies, values, and counties in columns.](https://media.bidlo.ai/docs/images/views-dashboards/views-overview-items-table.v1.png) ### Open and edit a record Select a record's name to open its details. Depending on the table's `Open page in` setting, the record opens in `Side peek`, `Center peek`, or `Full page`. To edit a value without leaving the table: 1. Find the record and field you want to change. 2. Select the cell. 3. Enter or choose the new value in the editor that appears. 4. Move to another cell or close the editor. The table shows the saved value in that cell. The available editor depends on the field type, such as text, number, date, tag, relation, or person. > Some connected fields can't be edited in the table. When a value comes from a connection that can't be edited here, Bidlo explains that in the cell instead of opening an editor. ### Add a record Tables provide a `New` button above the records and a `New {collection}` row inside the table, such as `New project items`. 1. Select `New` or `New {collection}`. 2. Enter the record's name. 3. Complete the fields needed for your workflow. 4. Close the record when you're done. The new record appears in the current table when it matches the view's active filters. ### Work with columns Select a column header to open the actions for that field. From this menu, you can edit its properties, filter, sort, group, calculate, freeze columns, hide estimates, or remove the field from the table. ![The Name column menu shows Edit properties, Filter, Sort, Group, Calculate, Unfreeze, Hide estimates, and the protected title-field removal action.](https://media.bidlo.ai/docs/images/views-dashboards/table-column-menu.v1.png) #### Show, hide, and reorder columns Use `Add column` at the right edge of the header row when you need a field that isn't currently visible. The column settings divide fields into `Visible in table` and `Not in table`. From there, you can: - Search for a field. - Drag visible fields into a new order. - Use `Hide all` or `Show all`. - Open the `Glossary`. - Select `New field` to create a field. The table's title field can't be removed. Its menu shows `Can't remove title` when that restriction applies. > Keep only the fields that answer the question this view is designed for. You can show the same collection in another table with a different column set. #### Freeze columns Use `Freeze up to here` in a column menu to keep that column and every column to its left visible while you scroll horizontally. Open a frozen column's menu and select `Unfreeze` to release it. ### Customize the table layout Open the view settings menu, then select `Layout`. Table layout settings include: - `Show vertical lines` - `Wrap text` - `Show page icon` - `Show row numbers` - `Open page in` `Open page in` supports `Side peek`, `Center peek`, and `Full page`. Choose the option that gives you enough record detail without losing the context you need from the table. ### Select and update several rows Hover over a row to reveal its checkbox. Select several rows to open bulk actions for those records. 1. Select the checkbox beside each record you want to include. 2. To select a continuous range, select the first row, hold `Shift`, and select the last row. 3. Use the bulk actions to update a visible field or choose another supported action. Bulk actions can include `Copy`, `Copy as CSV`, `Download as CSV`, `Add to favorites`, and `Delete selected items`. > `Delete selected items` permanently deletes the selected records, not just their rows in this view. Check the selection before you confirm. ### Reorder rows Drag a row to change its manual order when the table has no active sort or search. If drag-to-reorder isn't available, check whether the view has an explicit sort, an active search, or sub-items. Those states control row order, so Bidlo disables manual reordering. ### Add calculations Calculations appear at the bottom of a table or group and summarize the records currently included there. 1. Select the column header. 2. Select `Calculate`. 3. Choose the calculation you need. Available calculations depend on the field: - Any supported field can use `Count all`, `Count values`, `Count unique`, `Count empty`, `Count not empty`, `Percent empty`, or `Percent not empty`. - Number fields can also use `Sum`, `Average`, `Median`, `Min`, `Max`, or `Range`. - Date fields can also use `Earliest date`, `Latest date`, or `Date range`. The result appears in the calculation row. In a grouped table, each group can show its own result. > A calculation reflects the table context around it, including the current group and the records that remain after filters. ### Related pages - [Views overview](/docs/views-dashboards/views-overview) - [Add and manage fields](/docs/data-records/fields) - [Filter, sort, and group](/docs/views-dashboards/filter-sort-group) - [Calculations and summaries](/docs/views-dashboards/calculations) ### FAQs #### Why can’t I edit a value directly in the table? Some connected fields are read-only in that location. Open the record or review the source connection instead of creating a duplicate field. #### Does deleting selected rows remove only those rows from the view? No. `Delete selected items` permanently deletes the selected records, not just their appearance in the current table. --- ## Board https://www.bidlo.ai/docs/views-dashboards/board-view Organize records into columns, move work between groups, and choose what each card shows. Use a board to organize records into columns and move work through stages, owners, categories, or other grouped values. ### Understand a board A board shows each record as a card. Columns come from the field selected for the view's group, so a board grouped by status might have columns such as `Not started`, `In progress`, and `Complete`. Moving a card to another column changes that record's value for the grouped field. The same update appears anywhere else that uses the collection. > A board needs a group before it can display columns. If no group is selected, Bidlo shows `Group this view to use Board`. ![The Pursuit Review Table board groups project cards into Fayette, Guadalupe, and McLennan county columns.](https://media.bidlo.ai/docs/images/views-dashboards/board-view-grouped-by-county.v1.png) ### Choose the board columns Use a field whose values match the stages or categories you want to see across the board. 1. Open the view settings menu. 2. Select `Layout`. 3. Confirm that `Board` is selected. 4. Select `Group by`. 5. Choose the field that should define the columns. The board redraws with one column for each visible group value. You can also open `Group` from the main view settings to manage the same grouping. If the board shows `No groups to show`, check the grouping, filters, and view search. > Group by a single-value field when each record should belong to one clear column. That makes moving cards between columns predictable. ### Add and open cards Each column has a `New {collection}` action, such as `New project`. Creating from a column starts the new record with that column's grouped value. 1. Find the column where the record belongs. 2. Select `New {collection}`. 3. Enter the record name. 4. Complete any other fields shown on the card. The new card appears in that column. Select a card to open the record. The `Open page in` layout setting controls whether it opens in `Side peek`, `Center peek`, or `Full page`. When available, `New group` creates another value for the grouped field and adds a column for it. This action only appears for group fields that support creating a new referenced value. ### Move and reorder cards Drag a card to change its place on the board. - Drag within a column to change its manual order. - Drag to another column to update the grouped field. - Select several visible cards before dragging to move them together. - When the board has a supported sub-group, drag a card into the matching section inside its destination column. The drop line shows where the card will land. ![Dragging Montgomery Civic Center Renovation from Alabama to Alaska updates its board grouping.](https://media.bidlo.ai/docs/videos/board-view.v1.mp4) > Search and some grouping configurations disable card dragging. When the board has an active sort, dropping a card prompts `Would you like to remove sorting?` because manual order and field-based sorting can't both control the same placement. Select `Continue` to remove the sort, or `Don't remove` to keep the sort and cancel the move. You can also drag column headings when the group is using manual order. ### Choose what cards show Open the view settings menu, select `Layout`, and adjust the card settings: | Setting | What it controls | | --- | --- | | `Show page icon` | Shows or hides each record's icon. | | `Card preview` | Uses `None`, `Icon`, `Banner`, `Street View`, or `Map Marker` above the card details. | | `Location field` | Chooses the location used by `Street View` or `Map Marker` previews. | | `Card size` | Sets cards to `Small`, `Medium`, or `Large`. | | `Wrap text` | Allows longer card text to continue onto more than one line. | | `Color columns` | Uses supported group colors to distinguish columns and their cards. | | `Open page in` | Opens records in `Side peek`, `Center peek`, or `Full page`. | | `Load limit` | Controls how many records the view requests at once. | ![Board layout settings show Group by, Card preview, Card size, Wrap text, Color columns, and opening behavior beside the project cards.](https://media.bidlo.ai/docs/images/views-dashboards/board-layout-settings.v1.png) Use `Fields` in the main view settings to choose which record fields appear on each card and drag them into the order you want. Empty fields stay hidden until you edit the card. ### Filter, sort, and sub-group a board Board views support the same view-level organization tools as other layouts: - `Fields` controls the information shown on every card. - `Filters` limits which records reach the board. - `Sort` orders cards by one or more fields. - `Group` controls the columns. - `Sub-group` divides every column into a second set of horizontal sections when a supported grouping is active. - `Conditional color` can make matching records stand out. These settings belong to this view. Another view of the same collection can use different columns, fields, filters, and sorts without changing the board. ### Related pages - [Views overview](/docs/views-dashboards/views-overview) - [Filter, sort, and group](/docs/views-dashboards/filter-sort-group) - [Gallery view](/docs/views-dashboards/gallery-view) - [Add and manage fields](/docs/data-records/fields) ### FAQs #### Why can’t I drag a card? Search, some grouping configurations, or an active sort can disable manual movement. Clear search and review the view’s group and sort settings. #### What happens when I move a card to another column? The record’s value for the grouped field changes. Other views that use that field will reflect the new value. --- ## Calendar https://www.bidlo.ai/docs/views-dashboards/calendar-view Schedule records by a date field, switch calendar ranges, and move work to a new date. Use a calendar to place records on dates, review a schedule at different scales, and reschedule work by dragging it. ### Understand a calendar A calendar places each record according to one date field. That field might be a letting date, due date, start date, or any other date your collection uses. Records with a value in the selected field appear on the calendar. Records without one stay available under `No date` so you can schedule them without leaving the view. ![The Crew Schedule Month calendar shows August 2026, Today and range controls, and project cards placed on their scheduled dates.](https://media.bidlo.ai/docs/images/views-dashboards/calendar-month-view.v1.png) ### Choose the date field The selected date field determines where every record appears. 1. Open the view settings menu. 2. Select `Layout`. 3. Confirm that `Calendar` is selected. 4. Open `Show calendar by`. 5. Choose a date field from the collection. The calendar redraws using that field. If a record doesn't have a value for the selected field, it moves to `No date`. > When a calendar doesn't have a usable date field, Bidlo can create a date field for the collection. ### Choose a calendar range Use the range selector in the calendar header or `Show calendar as` in `Layout` settings. | Range | Best for | | --- | --- | | `Schedule` | Reading upcoming records as a chronological list, with all-day and timed items ordered within each date. | | `Week` | Planning timed work across a seven-day, hour-by-hour grid. | | `Month` | Scanning dates and multi-day ranges across several weeks. | | `Year` | Seeing longer-range timing across months in a compact grid. | Use the left and right arrows to move through time. Select `Today` to return to the current date. ### Add a record on a date In `Month` or `Year`, hover over a date to reveal its add control. 1. Find the date you want. 2. Select the `+` control in that date. 3. Enter the record name. 4. Add any other fields needed for the work. The new record appears on the chosen date because Bidlo fills the calendar's selected date field. In `Week`, select empty space at the time where work should begin. The new record starts there with a short time range that you can resize. ### Schedule records from No date `No date` lists records that don't yet have a value in the selected date field. 1. Select `No date`. 2. Search for the record if needed. 3. Drag the record from the list onto a date or time in the calendar. Bidlo saves the drop location to the calendar's date field, and the record moves out of `No date`. ### Move or extend scheduled work Drag a calendar card to reschedule it. If the card covers a date range, Bidlo keeps its duration when you move it. Use the range handles on a multi-day card to change its start or end date. In `Week`, drag a timed card to another day or time, or drag its lower handle to change the end time. When you select several visible cards, dragging one of the selected cards moves the selection together. > Dragging changes the record's underlying date value. Other views that show the same field will reflect the new date. ### Choose what calendar cards show Use `Fields` in the view settings to choose the details shown on calendar cards. Then open `Layout` for calendar-specific controls: - `Show page icon` shows or hides each record's icon. - `Wrap page titles` allows longer record names to continue onto another line. - `Show calendar by` chooses the date field. - `Show calendar as` chooses `Schedule`, `Week`, `Month`, or `Year`. - `Open page in` uses `Side peek`, `Center peek`, or `Full page`. - `Load limit` controls how many records the view requests at once. Select a card to open its record using the chosen `Open page in` behavior. ### Related pages - [Views overview](/docs/views-dashboards/views-overview) - [Timeline view](/docs/views-dashboards/timeline-view) - [Add and manage fields](/docs/data-records/fields) - [Filter, sort, and group](/docs/views-dashboards/filter-sort-group) ### FAQs #### Why is a record listed under No date? It does not have a value in the date field selected for the calendar. Add a date or choose the intended date field. #### Does dragging a card change the record? Yes. Dragging updates the underlying date value, so other views using that field will show the new date. --- ## Timeline https://www.bidlo.ai/docs/views-dashboards/timeline-view Plot records across date ranges, adjust their timing, and zoom from days to years. Use a timeline to compare record schedules across a continuous date range and adjust start and end dates in place. ### Understand a timeline A timeline plots each record as a horizontal bar. The bar's position shows its start, and its width shows how long the record lasts. You can build those bars from one date field that includes an end date, or from separate start and end date fields. A red vertical line marks today. ![The Crew Schedule timeline spans August and September with scheduled project bars, a red today line, Month zoom, and a Today control.](https://media.bidlo.ai/docs/images/views-dashboards/timeline-view-crew-schedule.v1.png) ### Choose the timeline dates Use one date field when that field already stores a date range. Use separate fields when your collection has distinct values such as `Start date` and `End date`. #### Use one date field 1. Open the view settings menu. 2. Select `Layout`. 3. Confirm that `Timeline` is selected. 4. Turn off `Separate start & end dates`. 5. Under `Show timeline by`, choose the date field. The timeline uses the field's date as the beginning of the bar and its saved end date as the end. #### Use separate start and end fields 1. Open `Layout` for the timeline. 2. Turn on `Separate start & end dates`. 3. Under `Start date`, choose the field that begins the bar. 4. Under `End date`, choose the field that ends it. The timeline redraws using both fields. > A record needs a usable start date to appear as a bar. With the name table shown, records without plotted dates remain listed but have no bar. ![Timeline layout settings use Start Date and Estimated End Date with Separate start and end dates enabled and Show table available.](https://media.bidlo.ai/docs/images/views-dashboards/timeline-layout-settings.v1.png) ### Change the time scale Use the zoom selector above the timeline to choose how much time each portion of the canvas represents: - `Day` - `Week` - `Bi-week` - `Month` - `Quarter` - `Year` The timeline keeps the visible date near the center when you change zoom. Use the left and right arrows to move through the timeline, or select `Today` to return to the current date. > Use `Month` for general scheduling, then move to `Day` or `Week` when you need precise placement. Use `Quarter` or `Year` to compare longer programs. ### Add a scheduled record The final row in each timeline section creates records. 1. Move your pointer across the empty creation row. 2. Position the preview bar on the date where the record should start. 3. Select the canvas. 4. Enter the record name. Bidlo creates the record with dates based on the selected position and current zoom. If the name table is visible, you can also select `New` there to create a record beginning around today. When the timeline is grouped, creating in a section also assigns that section's group value. ### Move and resize a bar Drag a bar left or right to move the full date range while keeping its duration. To change only one edge: 1. Hover over the bar. 2. Drag the handle on the left edge to change the start. 3. Drag the handle on the right edge to change the end. A date tooltip follows the pointer while you drag. Bidlo prevents the start from moving after the end and the end from moving before the start. > Moving or resizing a bar updates its underlying date field or fields. The change appears in other views that use those fields. ### Show the name table and fields The name table keeps record names visible at the left of the timeline. - Select the table toggle above the timeline to `Hide table` or `Show table`. - Open the view settings and select `Fields` to control the information used by the record cards. - Turn `Show page icon` on or off in `Layout`. - Use `Open page in` to choose `Side peek`, `Center peek`, or `Full page`. When a bar is outside the visible date range, an arrow appears at the edge of its row. Select the arrow to jump to that record's dates. ### Group a timeline into sections Use `Group` in the view settings to create timeline sections from a field. Each section keeps its own records and `New` row. Select a section heading to collapse or expand it. Filters and sorts continue to control which records appear and how the rows are ordered. These settings affect this timeline without changing other views of the same collection. ### Related pages - [Views overview](/docs/views-dashboards/views-overview) - [Calendar view](/docs/views-dashboards/calendar-view) - [Filter, sort, and group](/docs/views-dashboards/filter-sort-group) - [Add and manage fields](/docs/data-records/fields) ### FAQs #### Why does a record have no timeline bar? It needs a usable start date in the field selected for the timeline. Records without plotted dates can remain in the name table without a bar. #### Does moving or resizing a bar update the record? Yes. It changes the underlying date field or fields, and other views using those dates will reflect the change. --- ## Gallery https://www.bidlo.ai/docs/views-dashboards/gallery-view Browse records as visual cards, choose card previews, and edit the fields that matter. Use a gallery to browse records as cards when images, locations, icons, and a small set of details matter more than a dense grid. ### Understand a gallery Each gallery card represents one record. The card can include a preview, its name, its icon, and the visible fields you choose for the view. Card width comes from the `Card size` setting, and the grid automatically fits as many cards as the available space allows. ![The Bid list gallery groups project cards by Agency and shows a preview area, project name, visible fields, and New Project actions.](https://media.bidlo.ai/docs/images/views-dashboards/gallery-view.v1.png) ### Choose the fields on each card Use `Fields` in the view settings to keep the gallery focused. 1. Open the view settings menu. 2. Select `Fields`. 3. Show the fields readers need to compare. 4. Hide fields that add noise. 5. Drag the visible fields into the order you want. The record name remains the card's main label. Other visible fields appear below it when they have a value. > Gallery cards work best with a small number of fields. Keep the fields that help someone decide which record to open, then move the complete detail into the record page. ### Choose a card preview Open the view settings, select `Layout`, and choose `Card preview`. | Preview | What the card shows | | --- | --- | | `None` | No preview area. | | `Icon` | A large version of the record's icon. | | `Banner` | The banner saved on the record. | | `Street View` | A street-level image for the selected location field. | | `Map Marker` | A small map centered on the selected location field. | When you select `Street View` or `Map Marker`, use `Location field` to choose which location supplies the preview. If the field isn't configured, the card shows `No Location Field`. If the field exists but a record has no coordinates, the card shows `No Location`. ### Adjust the card layout Gallery `Layout` settings include: - `Show page icon` shows or hides the small icon beside the record name. - `Wrap all content` allows longer card text to continue onto more lines. - `Open pages in` uses `Side peek`, `Center peek`, or `Full page`. - `Card preview` chooses the visual shown above the fields. - `Location field` appears for location-based previews. - `Card size` uses `Small`, `Medium`, or `Large`. - `Load limit` controls how many records the view requests at once. ![Gallery layout settings show Wrap all content, Open pages in, Card preview, Card size, Fit media, and Load limit beside the project cards.](https://media.bidlo.ai/docs/images/views-dashboards/gallery-layout-settings.v1.png) ### Add, open, and edit a record To add a record: 1. Select `New {collection}` at the end of the gallery, such as `New project`. 2. Enter the record name. 3. Add any other visible field values. The new card appears in the gallery when it matches the view's filters. Select a card to open the record using the view's `Open pages in` setting. To make a focused edit without leaving the gallery: 1. Hover over the card. 2. Select the pencil action. 3. Change the record name or another visible field. 4. Select outside the card when you're done. The updated value remains on the card and appears in other views of the same collection. ### Reorder and select cards When the gallery has no active sort or view search, drag cards to change their manual order. If an explicit sort or search is active, that rule controls the order, so manual dragging isn't available. You can select several cards by dragging a selection box across empty gallery space. Hold `Shift`, `Command`, or `Control` while selecting to add to the current selection. ### Group and refine a gallery Use the common view settings to shape the gallery: - `Filters` limits which cards appear. - `Sort` controls card order. - `Group` divides the gallery into sections. - `Conditional color` can make matching cards stand out. These choices belong to the gallery view. They don't change how another view of the collection is organized. ### Related pages - [Views overview](/docs/views-dashboards/views-overview) - [Board view](/docs/views-dashboards/board-view) - [Filter, sort, and group](/docs/views-dashboards/filter-sort-group) - [Add and manage fields](/docs/data-records/fields) ### FAQs #### Why does a gallery card have no image? Check the card preview setting and confirm the selected source contains an image or supported preview for that record. #### Does changing the fields visible on a card change the record? No. It changes which existing fields the gallery displays. Editing a field value from the record itself still updates the underlying record. --- ## Map https://www.bidlo.ai/docs/views-dashboards/map-view Plot records by location, place missing records, and add layers and spatial tools. Use a map to see where records are located, place records that don't have coordinates, and compare several location-based datasets in one workspace. ### Understand a map A map plots records from a collection using one location field. A record with coordinates appears as a marker or shape. A record without coordinates stays under `No place` until you assign it a location. The map can also pin records from other collections and add collection layers without changing the map's main dataset. ![The Bid list map is centered on Texas with view controls, No place, layer and tool buttons, and a New action visible.](https://media.bidlo.ai/docs/images/views-dashboards/map-view-plants.v1.png) ### Choose what the map plots Open the view settings menu, select `Layout`, and configure: 1. Under `Marker type`, choose `Point only` or `Shape (Polygon/Route)`. 2. Under `Marker by`, choose the location field. 3. Under `Map style`, choose `Mono`, `Terrain`, `Satellite`, or `Soil`. 4. Choose `Clustering` when several point markers overlap. The map redraws from the selected location field. > `Marker by` is the location source for the map. Changing it can move records into or out of `No place` because the new field may contain different coordinates. Map layout settings also include `County lines`, `District lines`, `Card preview`, `Card size`, `Open page in`, and `Load limit`. ![Map layout settings show Marker type, Marker by, Mono, Terrain, Satellite and Soil styles, Clustering, County lines, and District lines.](https://media.bidlo.ai/docs/images/views-dashboards/map-layout-settings.v2.png) ### Place a record from No place `No place` lists records that are part of the view but don't have coordinates in `Marker by`. 1. Select `No place`. 2. Search for the record if needed. 3. Drag the record from the list onto the map. 4. Drop it where the marker belongs. Bidlo saves those coordinates in the selected location field. The record leaves `No place` and appears on the map. ### Add records, shapes, lines, and pins Select `New` in the map action bar to open `Add to Map`. - `New {collection}` creates a record and lets you place it on the map. - `Draw shape` creates a polygon annotation. - `Add line` creates a route or line annotation. - `Drop pin` creates a point annotation. - `Search things to add...` finds an existing record. If it already has coordinates, Bidlo pins it immediately; otherwise, Bidlo asks you to place it. After choosing a new point, select the map to place it. Shape and line modes open drawing controls so you can finish the geometry. > A pinned record can come from another collection. Pinning adds it to this map without adding it to the map's main dataset. ### Open, pin, and move a marker Hover over a marker to preview its record. Select the marker or its preview to open the record according to `Open page in`. For map-specific actions, open the marker's context menu: - `Move marker` arms the marker for dragging. - `Pin` keeps the record on this map. - `Unpin` removes that explicit pin from the map. - `View Street View` opens the location at street level. - `Measure from here`, `Soil survey here`, and `Travel range from here` start a tool at that marker. Markers are fixed until you choose `Move marker`. After the action is armed, drag the marker to its new location. ### Change the map style and density Use the map-style thumbnail at the lower left to switch between `Mono`, `Terrain`, `Satellite`, and `Soil`. The same menu controls: - `Heatmap` to show location density or weight records by `Measure by`. - `Clustering` with `None`, `Lite`, or `Aggressive` when heatmap is off. - `County lines` and `District lines`. > Heatmap changes the point display and can use a higher `Load limit`. Pinned markers remain visible while the heatmap is on. ### Add and manage layers Layers place another configured set of records on top of the current map. 1. Open `Layers` at the lower left. 2. Select `Add layer`. 3. Choose a collection, a saved layer, or `New empty layer`. 4. Configure the layer's fields, filters, sorts, and load limit. The layer appears alongside the map's main records. Open `Layers` again to: - Hide or show a layer without removing its setup. - Rename the layer or change its icon. - Add a new record to the layer. - Save the layer for reuse. - Remove the layer from this map. - Select `Save this map as a layer` to reuse the main map configuration. ### Use map tools Open `Map tools` at the lower left to choose: - `Soil Survey` - `Measure distance` - `Travel Range` - `Haul Advantage` Use the separate `Street View` control at the lower right, then select a point on the map. The `Zoom out` and `Zoom in` controls sit beside it. Each tool opens its own on-map controls or work card. Close the tool when you're ready to return to normal marker interaction. ### Keep the map centered on your work `Auto search this area` keeps the map's location sort aligned with the area you move to. When it is on and you pan the map far enough, Bidlo updates the location used by the sort. Turn it off when you want to explore the map without changing the sorted search area. ### Related pages - [Views overview](/docs/views-dashboards/views-overview) - [Filter, sort, and group](/docs/views-dashboards/filter-sort-group) - [Export map data as KML](/docs/connections-export/export-map-kml) - [Compare nearby projects and facilities on a map](/docs/projects-workflows/estimating-maps) ### FAQs #### Why is a record under No place? The field selected under `Marker by` does not contain usable coordinates for that record. Add a location or choose the correct location field. #### Does pinning a record add it to the map’s main collection? No. A pinned record can come from another collection and is displayed on the map without being added to the main dataset. --- ## Charts https://www.bidlo.ai/docs/views-dashboards/chart-view Turn records into a column, bar, line, donut, or number chart and configure what the chart measures. Use a chart to summarize records, compare categories, show change over time, or surface one important number. ### Understand a chart A chart is another view of a dataset. It summarizes the records that match the view's filters; it doesn't create a separate copy of those records. Every chart answers two basic questions: - What should Bidlo measure, such as a record count, sum, or average? - How should Bidlo divide that result, such as by status, contractor, or month? ![The Project Value By County column chart compares project estimate totals across Texas counties, with the settings control identified in the header.](https://media.bidlo.ai/docs/images/views-dashboards/chart-view.v2.png) ### Create a chart Create a chart page when you want a standalone visual that teammates can open from the sidebar. 1. Select `New` in the team toolbar. 2. Select `Chart`. 3. On `Fill your Chart with`, choose a suggested dataset, a template, or a dataset under `Datasets`. 4. Rename the page so its question is clear, such as `Projects by letting month`. 5. Open the view settings to configure the chart. The chart opens with the selected dataset. Bidlo starts with a column chart, and the settings panel tells you when another field is needed before the chart can render. > You can also open an existing view's `Layout` settings and choose `Chart`. This keeps the view connected to its current dataset. ### Choose a chart type Open the view settings and use `Chart type` to choose a format. | Chart type | Use it to | | --- | --- | | `Column` | Compare values across categories with vertical columns. | | `Bar` | Compare values across categories with horizontal bars, especially when labels are long. | | `Line` | Show a sequence or trend, including values grouped by a date field. | | `Donut` | Show how categories contribute to a total. | | `Number` | Display one calculation as a large summary value. | Open `More chart types` to find `Number`, `Scatterplot`, and `Dial`. `Heat map` and `Funnel` appear there but are currently disabled. > Changing the chart type can change which data controls appear. A donut needs a field under `Slice by`, while column, bar, and line charts use category and value axes. ![Project Value By County has More chart types open, listing Column, Bar, Line, Donut, Number, Scatterplot, and Dial, with Heat map and Funnel disabled.](https://media.bidlo.ai/docs/images/views-dashboards/chart-types.v2.png) ### Choose what the chart shows The data controls adapt to the selected chart type. #### Configure a column, bar, or line chart Column and line charts put categories on the `X axis` and calculated values on the `Y axis`. A bar chart reverses those labels because its bars run horizontally. 1. Under the category axis, select `What to show`. 2. Choose the field that should divide the records into categories. 3. If you choose a date field, choose `Relative`, `Day`, `Week`, `Month`, or `Year`. 4. Under the value axis, select `What to show`. 5. Choose `Count`, or choose a field and a supported calculation. 6. To compare several series within each category, select `Group by` and choose another field. Number fields can use `Sum`, `Average`, `Min`, `Max`, or `Distinct values`. Other fields can be counted. The chart redraws as you change the category, calculation, or grouping. Use `Sort by` to control category order. Turn on `Omit zero values` when empty categories would distract from the comparison. #### Configure a donut chart 1. Under `Data`, select `What to show` and choose the field to calculate. 2. Select `Slice by` and choose the field that defines each segment. 3. Open `Sort by` to order segments by name or value. 4. In the `Groups` list, hide any segment you don't want to display. Use `Show value` and `Show value label` under `More style options` to control the number and label in the donut's center. #### Configure a number chart 1. Under `Data`, select `What to show`. 2. Select `Calculate` and choose the summary you need. 3. Use `Format` to choose a number format and decimal places. 4. Turn on `Chart title` and enter a title when the number needs more context. A number chart is most useful for a compact total, count, average, minimum, or maximum. Add it to a dashboard when you want several key numbers beside other views. ### Format the chart Use the `Style` section after the chart measures the right data. - `Color` changes the chart's color or palette. - `More style options` controls the legend, data labels, and caption. - Cartesian charts can also control `Group style`, `Grid line`, and `Axis name`. - Line charts add `Smooth line` and `Gradient area`. - Donut charts can place the `Legend` at the `Bottom` or `Side`, or turn it `Off`. Use `Format` beside an axis or calculation to choose `Number`, `Number with commas`, `Number (abbreviated)`, `Percent`, `US dollars`, or `US dollars (abbreviated)`. `Inherit` keeps the field's existing format. > Finish the data choices before styling. A clear category and calculation do more for readability than extra labels or color changes. ### Inspect the records behind a chart value Select a donut segment or a category in a column, bar, or line chart to open the matching records in a table. The table keeps the chart's filters and shows the fields that shaped that chart value. Use search inside the dialog to find a particular record, then close the dialog to return to the chart. ### Fix an empty chart The message in the chart area identifies the next setting to check: - `Select a field before rendering this chart.` means the calculation doesn't have a source field. - `Select a field to slice this donut chart.` means `Slice by` is empty. - `Select a field for the category axis before rendering this chart.` means a column, bar, or line chart has no category field. - `No matching chart data.` means the current fields and filters return no values to plot. If the required fields are selected, review the view's filters and any hidden groups. ### Related pages - [Views overview](/docs/views-dashboards/views-overview) - [Build a dashboard](/docs/views-dashboards/dashboards) - [Filter, sort, and group](/docs/views-dashboards/filter-sort-group) - [Calculations and summaries](/docs/views-dashboards/calculations) ### FAQs #### Does a chart create a separate copy of the data? No. It summarizes records from its connected dataset and current filters. #### Why is the chart empty? Confirm that the view contains matching records and that the chart has the required category, value, slice, or calculation field for its type. --- ## Dashboards https://www.bidlo.ai/docs/views-dashboards/dashboards Combine several views in one page, arrange the cards, and filter related data together. Build a dashboard to place tables, boards, charts, maps, and other views side by side around one workflow or decision. ### Understand dashboard cards A dashboard is a grid of view cards. Each card has its own dataset, layout, fields, filters, sorts, groups, and display settings. For example, a bid-planning dashboard could combine: - a number chart that counts upcoming projects; - a table of bids due this week; - a board grouped by bid status; - a map of project locations. The cards remain connected to their source records. A dashboard arranges and filters those views; it doesn't make copies of their data. ### Create an empty dashboard Use this path when you want to choose every card deliberately. 1. Select `New` in the team toolbar. 2. Select `Dashboard`. 3. Rename the new page. 4. Select `Add view` in the empty dashboard. 5. On `Choose data source`, choose the dataset for the first card. 6. On `Choose layout`, choose a recently visited view, a layout, or a template. The first card fills the dashboard width. Its title comes from the selected view or dataset, and you can rename it from the card header. The `Choose layout` screen offers: - `Recently visited views` for reusing a view you opened recently; - `Layouts` for configuring a fresh table, board, map, gallery, timeline, calendar, chart, or other available view; - `Templates` connected to the selected dataset. > A dashboard can't be placed inside another dashboard card, so `Dashboard` isn't offered as a card layout. ### Turn an existing view into a dashboard Use this path when an existing table, board, map, or chart should become the starting point. 1. Open the view. 2. Select the `Dashboard` control in the page header. 3. Review the existing view, which now appears as the first dashboard card. 4. Select `Add` to add more cards. 5. Select `Done` when the dashboard is arranged the way you want. While the first conversion is still open, `Cancel` returns the page to its previous layout. Selecting `Done` finishes the conversion. > You can also open the view settings, select `Layout`, and choose `Dashboard`. ![The Pursuit Review Dashboard combines project value by district, a Texas project map, and a pursuit table in one workspace.](https://media.bidlo.ai/docs/images/views-dashboards/pursuit-review-dashboard.v1.png) #### Return a dashboard to a single view After you select `Done`, use the layout settings to change the page back to a single view: 1. Move the card whose data and view settings you want to keep to the first position in the dashboard—the top-left card in the grid. 2. Open the dashboard's view settings. 3. Select `Layout`. 4. Choose `Table`, `Board`, `Map`, `Gallery`, `Timeline`, `Calendar`, `Chart`, or another non-dashboard layout. Bidlo uses the first dashboard card as the page's view and applies the layout you chose. The dashboard configuration remains saved, so choosing `Dashboard` again restores its cards and global filters. > Changing the layout doesn't delete the source datasets or their records. Cards other than the first disappear from the current single-view layout, so confirm that the card you want to keep is first before switching. ### Add another card 1. Select `Edit dashboard` to enter editing mode if the dashboard is not already being edited. 2. Select `Add`. 3. Choose a data source. 4. Choose a recent view, layout, or template. 5. Rename the card from its title field. 6. Select `Done`. New cards start on their own full-width row. You can resize and place them beside other cards while editing. > Reuse a recently visited view when it already has the fields, filters, and grouping you need. Choose a layout when the dashboard card needs different settings. ### Arrange and resize cards Dashboard layout changes are available in editing mode. 1. Select `Edit dashboard`. 2. Drag a card by its header to move it. 3. Drag a lower corner to resize it. 4. Repeat until the most important information appears first. 5. Select `Done`. Bidlo saves the resulting grid. In a narrow dashboard, cards stack in their saved reading order and drag or resize controls are unavailable. ### Configure a card Select `Edit dashboard`, then open a card's settings to change only that card. Available settings depend on its layout and can include: - `Layout` - `Columns` or `Fields` - `Filters` - `Sort` - `Group` - `Conditional color` - `Dataset` Card-level filters and sorts stay with that card. Search is available from the card header for supported layouts; charts use their chart settings instead. You can edit the title directly in the card header. At the bottom of the card settings, use: - `Duplicate` to add a copy on a new row; - `Remove` to take the card off the dashboard. > `Remove` removes the card from this dashboard. It doesn't delete the source dataset or its records. ### Filter the whole dashboard Global filters let one choice update every card that uses the same dataset. This is useful for questions such as “Show only projects in this district” or “Show bids due this month.” 1. Select the dashboard's global filter control. 2. Under the dataset you want to filter, add a filter. 3. Choose the field, condition, and value. 4. Add another filter when the dashboard needs a narrower result. 5. Close the settings. The filter bar appears above the cards. Use the global filter control to show or hide that bar after filters have been configured. When a dashboard contains cards from several datasets, Bidlo keeps global filters in separate sections for each dataset. A Projects filter applies to cards that use Projects; it doesn't automatically filter a Contractors card. > A card's own filters still apply. The records shown in that card must match both its card-level filters and the dashboard's global filters for the same dataset. ### Related pages - [Views overview](/docs/views-dashboards/views-overview) - [Chart view](/docs/views-dashboards/chart-view) - [Filter, sort, and group](/docs/views-dashboards/filter-sort-group) - [Search inside a view](/docs/views-dashboards/search-a-view) ### FAQs #### Does adding or removing a dashboard card copy or delete records? No. Cards remain connected to their source data. Removing a card removes it from the dashboard, not from its dataset. #### Why doesn’t a dashboard filter affect every card? Global filters are scoped by dataset. A Projects filter applies to cards using Projects and does not automatically filter a Contractors card. --- ## View search https://www.bidlo.ai/docs/views-dashboards/search-a-view Find matching records in the view you already have open without changing its saved setup. Use view search to narrow the records in the view you already have open. ### Understand what view search covers View search checks the record title and the fields included in the current view. It matches text anywhere in a value, without requiring the same capitalization. Search works together with the view's filters. A record must be inside the filtered result set and match your search to remain visible. In a grouped view, Bidlo also updates the groups and their counts to the matching records. > View search is temporary. It isn't saved as part of the view and starts blank the next time the view is opened. ### Search the current view 1. Open the view you want to search. 2. Select the search icon in the view header. 3. Enter a word, number, or phrase in the `Search table...` box. 4. Review the matching records. Bidlo updates the view as you type. Calculations and grouped summaries also refresh to reflect the matching records. ![The Bid list table has the Search table box expanded above its grouped project records.](https://media.bidlo.ai/docs/images/views-dashboards/search-inside-table.v1.png) > If you need a condition that teammates should find when they return to the view, create a filter instead. Use search for a quick lookup. ### Clear a search Select the `×` in the search box to clear the query and restore the records allowed by the view's filters. The search box stays open so you can enter another query. If a table has no matches, select `Clear search` in its empty state. You can also clear the text in the search box yourself. ### Search a view in a dashboard A dashboard doesn't have one search box for every widget. Use the search control in an individual view tile to narrow that tile's records. The query applies only to that view. It doesn't change the other tiles or the dashboard's saved filters. ### Related pages - [Views overview](/docs/views-dashboards/views-overview) - [Filter, sort, and group](/docs/views-dashboards/filter-sort-group) - [Calculations and summaries](/docs/views-dashboards/calculations) - [Global search](/docs/navigation/global-search) ### FAQs #### Why does view search miss a value I know exists? View search checks the record title and fields included in the current view. Show the relevant field or use global search when you need a broader lookup. #### Is view search saved for teammates? No. It is temporary and begins blank when the view is opened again. Use a filter when the condition should remain with the view. --- ## Calculations & summaries https://www.bidlo.ai/docs/views-dashboards/calculations Add totals, counts, percentages, and group-level summaries that stay in sync with the records in a view. Add calculations to a table or grouped view to answer common questions without exporting the records. ### Understand calculation scope A calculation summarizes the records currently included in its part of the view: - A table footer summarizes the records in that table. - A footer inside a group summarizes only that group's records. - A group-header summary uses the same calculation across each visible group. Filters and view search change the records being summarized, so the results update with the view. ### Add a calculation to a table To add the first calculation for a field: 1. Open the field's column menu. 2. Select `Calculate`. 3. Open a calculation family. 4. Choose the calculation. Bidlo adds a calculation row to the bottom of the table and shows the result in that field's column. After the calculation row appears, hover over another field's footer and select `Calculate` to add a second result. Select an existing calculation in the footer to change it, or choose `None` to remove it. ![The Current Project Value column menu has Calculate and More options expanded to show Sum, Average, Median, Min, Max, and Range.](https://media.bidlo.ai/docs/images/views-dashboards/calculation-options-value.v1.png) ### Choose a calculation Table footer options depend on the field: | Family | Calculation | What it shows | | --- | --- | --- | | `Count` | `Count all` | All records in scope | | `Count` | `Count values` | Records with a value in the field | | `Count` | `Count unique` | Distinct values in the field | | `Count` | `Count empty` | Records without a value | | `Count` | `Count not empty` | Records with a value | | `Percent` | `Percent empty` | Share of records without a value | | `Percent` | `Percent not empty` | Share of records with a value | | `More options` | `Sum` | Total of a number field | | `More options` | `Average` | Mean of a number field | | `More options` | `Median` | Middle number after sorting the values | | `More options` | `Min` | Smallest number | | `More options` | `Max` | Largest number | | `More options` | `Range` | Difference between the largest and smallest number | `Count` and `Percent` work on supported fields. `More options` appears for number and material fields, including formulas whose output is a number. Bidlo formats numeric results to match the field where possible, including number separators, percentages, and currency. > A value can appear blank while a formula result is still being prepared. Bidlo shows a loading placeholder instead of treating that pending value as an exact zero. ### Change the summary shown in group headers A grouped view shows the record count beside each group by default. You can replace it with another calculation: 1. Select the number beside any group heading. 2. Open `Count`, `Percent`, `More options`, or `Date`. 3. Choose a calculation. 4. Choose the field to summarize. The same calculation appears for every group, using only the records in that group. Group-header summaries include the table calculation families plus: - `Earliest date` - `Latest date` - `Date range` `Date range` shows the span in days. Open a group's actions menu and select `Hide aggregation` to hide the summary from the group headers. Select `Show aggregation` to restore it. ### Related pages - [Table view](/docs/views-dashboards/table-view) - [Filter, sort, and group](/docs/views-dashboards/filter-sort-group) - [Search inside a view](/docs/views-dashboards/search-a-view) - [Views overview](/docs/views-dashboards/views-overview) ### FAQs #### Which records does a calculation include? It summarizes records in its current view context. A group footer uses only that group’s records, and filters can reduce the included set. #### Does a blank formula result mean zero? Not always. A value can remain blank while a formula result is still being prepared, so wait for it to finish before treating it as an exact zero. --- ## Conditional formatting https://www.bidlo.ai/docs/views-dashboards/conditional-formatting Color records when their field values match rules, so important work stands out in a view. Use `Conditional color` rules to make records stand out when their field values meet conditions you choose. ### Understand conditional color Each rule has four parts: 1. A field to evaluate. 2. A condition, such as `Contains`, `Greater than`, or `Is empty`. 3. A value, when the condition needs one. 4. A color to apply when the condition matches. The colored area depends on the layout: - A table can color the entire row or only the rule's field. - Card-based layouts color the record's card background. - A map colors the matching record's marker. Rules belong to the selected view. They don't change the record's field value or the appearance of another view. ### Create a color rule When the view has no color rules yet: 1. Open the view settings menu. 2. Open the layout's `More` menu. 3. Select `Conditional color`. 4. Select `New color setting`. 5. Choose the field you want to evaluate. 6. Choose the condition and enter or select its value. 7. Choose the color. 8. In a table, choose `Entire row` or `This property` under `Apply to`. The view applies the color to matching records. Once a rule exists, `Conditional color` appears directly in view settings with the number of rules. > A new table rule starts with `Entire row`. A field doesn't have to be visible in the view for its rule to be evaluated. ![The Conditional color settings panel is open over the Bid list table with an explanation and the New color setting button.](https://media.bidlo.ai/docs/images/views-dashboards/conditional-color-settings.v1.png) ### Add and prioritize rules Select `Add another` to create more rules. Drag the rule cards to change their order. Rule order matters: Bidlo uses the first matching rule for a record. Put the most specific conditions above broader conditions. For example, place `Priority` is `Critical` above a general `Status` is not empty rule. In a table, a matching `This property` rule takes visual priority over a matching `Entire row` rule in that cell. The row color still appears in the other cells. ### Edit or remove rules Open `Conditional color` in view settings to manage the rules: - Select the field, condition, value, or color in a rule card to change it. - Change `Apply to` between `Entire row` and `This property` in a table. - Drag a rule to change its priority. - Select the trash button on a rule to remove only that rule. - Select `Clear` to remove every color rule from the view. Removing a rule removes the automatic color it supplied. It doesn't delete or edit any records. ### Choose useful rules Use a small set of colors with consistent meaning. For example: - Red for work that needs immediate attention. - Orange or yellow for approaching dates or incomplete values. - Green for ready or complete work. - One neutral color for records that need review but aren't urgent. Color should reinforce the field value, not replace it. Readers still need the written status or date to understand the record without relying on color. ### Related pages - [Views overview](/docs/views-dashboards/views-overview) - [Table view](/docs/views-dashboards/table-view) - [Filter, sort, and group](/docs/views-dashboards/filter-sort-group) - [Calculations and summaries](/docs/views-dashboards/calculations) ### FAQs #### What happens when more than one color rule matches? Rule order matters: Bidlo uses the first matching rule for a record. Put specific conditions above broader ones. #### Does removing a color rule delete or edit records? No. It removes the automatic color supplied by that rule and leaves the records and their field values unchanged. --- ## Overview https://www.bidlo.ai/docs/projects-workflows/projects-overview Find a project and review its current details, items, files, and activity. Open one project record to review the structured details and related work your team has available. ![An Acme project record showing its map, title, letting date, owner, estimate, and related Items table.](https://media.bidlo.ai/docs/images/projects-workflows/project-record-overview.v1.png) ### Find a project 1. Select `Search...` in the header. 2. Enter a project title, identifier, or useful keyword. 3. Select `Projects` to narrow the results. 4. Highlight the project you want. 5. Select `Open`. When the search field is empty, the `Recent` group can help you return to a project you opened before. ### Review the project record Begin with the record header and `Details`. The current project experience can bring together: - the project title and icon; - a map when location context is available; - visible project fields; - `Notes`; - `Comments` and `Activity`; - related areas such as `Items` and `Files`. The exact fields and related areas depend on the project and the team's configuration. > Start by reading. A project record can contain many fields, so focus first on the dates, location, status, and other details your team uses for the current decision. ### Open project items Select `Items` when you need the project's item records. In the current project view, items appear in a table with rows, columns, optional group headings, and column summaries such as `Count all`. Use the existing structure during your first review. Change columns or add records only when you understand the team's current setup. ### Open project files Select `Files` to review the documents currently attached to the project. File availability varies by project. Use a file when it provides the supporting context for the question you are answering. Return to the project record for the structured details and related work around that document. ### Check discussion and history Use `Comments` for the conversation attached to the record. Use `Activity` to review the record's available activity history. These areas keep discussion and recent context close to the project instead of scattering it across unrelated pages. ### Related pages - [Build a lookahead and bid schedule](/docs/projects-workflows/build-lookahead-bid-schedule) - [Collections and records](/docs/data-records/collections-records) - [Views overview](/docs/views-dashboards/views-overview) - [Table view](/docs/views-dashboards/table-view) - [Global search](/docs/navigation/global-search) --- ## Lookahead & bid schedule https://www.bidlo.ai/docs/projects-workflows/build-lookahead-bid-schedule Create shared project views for near-term bids, upcoming lettings, and pursuit follow-through. Create a set of shared Projects collection views that carries opportunities from early review through the bid decision and post-letting follow-through. ### Plan a small set of working views A useful bid schedule can contain more than one table. Give each stage of the workflow its own saved view while keeping every view connected to the same Projects collection. - **Near-term lookahead:** Projects with a bid or letting date inside the team's immediate review window and work that matches the team's scope. - **Upcoming lettings:** A broader window for assigning an owner, confirming scope, and deciding which opportunities deserve attention next. - **Post-letting views:** Saved views for outcomes such as submitted, awarded, no-bid, missed, or bid results. Place the views in a shared section that follows the team's lifecycle—for example, `Pre-letting` and `Post-letting`. This gives the team one predictable place to work before and after each bid date. ### Create the first Projects view 1. Select `New` in the workspace header. 2. Choose `Table`. 3. In `Select a Dataset`, choose `Projects`. 4. Replace `Untitled` with a name that describes the window, such as `30-day lookahead`. 5. Confirm that project records appear in the table. 6. Keep the page private while you configure it, then move it to the team's shared pre-letting section. The page is another view of the Projects collection—not a separate list of projects. Editing a project in the schedule updates the shared project record, and opening that project shows the same details everywhere else in Bidlo. > In Bidlo, `Public` means available to the current team. It doesn't publish the page anonymously on the internet. ### Show the fields the team uses to decide The strongest working schedules combine project context, scope fit, and pursuit ownership. Show existing Projects fields such as: - **Identify the work:** Project name, location, route, owner or letting agency - **Understand timing:** Bid or letting date, proposal published date, and working days - **Confirm scope fit:** Quantity fields for the team's major work types, with their units - **Manage the pursuit:** Pursuit status, assigned teammate, and notes - **Check bid context:** Planholders or bidders and current project value Hide fields that don't help the review. If the needed information doesn't already exist on Projects, confirm the team's data model before creating a new field so the schedule doesn't duplicate an existing date, quantity, status, or assignment. ### Filter the near-term lookahead 1. Select `Filter`. 2. Add the bid or letting date field and choose the team's immediate relative window—for example, `Next month`. 3. If the team works from a particular project owner, letting agency, market, or source, add that as another condition. 4. Add a condition for each scope quantity field that makes a project relevant, such as `Scope quantity — barrier is greater than 0`. 5. Configure the scope conditions so a project can match **any** of them. A project should qualify when at least one relevant work quantity is present. 6. Select `Sort`, sort the bid date by `Oldest first`, then add a second sort such as location from `A → Z`. The view now answers two questions at once: which bids are coming soon, and which of those bids contain work the team performs. > Date, owner, and market filters are normally required together. Scope quantity filters are different: requiring every scope quantity to be greater than zero can hide valid projects. Use any-match logic for that set. ### Create the broader upcoming view Create another `Table` backed by `Projects`, then give it a broader window—for example, the next 45 or 60 days. Use this view to make assignments and pursuit decisions before projects reach the near-term lookahead. 1. Filter the bid or letting date to the broader upcoming window. 2. Add the owner, agency, market, or source condition used by the team. 3. Filter the pursuit status to the active stages used before bid day—for example, `Review`, `Bidding`, or `Ready`. 4. Sort by bid date `Oldest first`, then by location `A → Z`. 5. Include assignment and notes fields alongside the scope quantities and bid context used during review. When a project field changes, the project appears or stops appearing according to each view's saved filters. The team can maintain the project once while the near-term, upcoming, and outcome views stay focused on their own stage. ### Review the underlying project Select the project's name in the schedule to open its shared project record. Review `Details`, `Items`, and `Files` as needed. Return to the schedule with the pursuit status, assignment, or note that helps the next person act. Keep supporting project detail on the project record. ### Run the bid review from the schedule During a review: 1. Start with the near-term view and work from the earliest bid date forward. 2. Confirm that the owner, date, and scope quantities are current. 3. Update pursuit status, assignment, and notes on the shared project. 4. Use planholder, bidder, value, and working-day fields when they affect the decision. 5. Open the project record when the team needs files, items, or deeper context. 6. Review the broader upcoming view and assign work before it enters the immediate window. 7. Use the appropriate post-letting view to record the outcome after bid day. This creates a rolling bid workflow: the upcoming view supports preparation, the near-term view supports final pursuit decisions, and the post-letting views support follow-through. ### Related pages - [Projects overview](/docs/projects-workflows/projects-overview) - [Table view](/docs/views-dashboards/table-view) - [Add and manage fields](/docs/data-records/fields) - [Public and private pages](/docs/navigation/public-private-pages) - [Global search](/docs/navigation/global-search) ### FAQs #### Do separate schedule views create copies of a project? No. Each view can use different filters, fields, and sorting while remaining connected to the same Projects collection. #### Why is an expected project missing from the schedule? Check the view’s filters and the project’s date and status fields. Avoid creating a duplicate until you confirm the original record does not exist. --- ## Project items https://www.bidlo.ai/docs/projects-workflows/project-items Review project materials, quantities, unit prices, and calculated values in one connected table. Review project materials, quantities, unit prices, and calculated values in one connected table. ![The Ellis CABLE BARRIER REPAIR project Items table showing item codes, quantities, unit prices, and estimated values with the Details sidebar closed.](https://media.bidlo.ai/docs/images/projects-workflows/project-items-table.v2.png) ### Complete the task 1. Open a project and scroll to its working views. 2. Open `Items`. 3. Review `Code`, `Name`, `Unit`, `Scope`, `Initial Quantity`, `Unit Price`, and `Value` where those columns are present. 4. Use `Filter` to narrow the item list or `Add column` to expose another field. 5. Select an item name to open its record. Use `New` or `New project items` only when your role and workflow allow item creation. > A project's item fields can come from a connected source or team configuration. Confirm which values are editable before changing quantities or prices. The footer can show `Count all` and a `Sum` of the visible values. ### Related pages - [Table view](/docs/views-dashboards/table-view) - [Calculations](/docs/views-dashboards/calculations) - [Projects overview](/docs/projects-workflows/projects-overview) --- ## Contractors & bidders https://www.bidlo.ai/docs/projects-workflows/contractors-bidders Move from a project bidder list to a contractor's current and historical work. Use a project's `Bidders` field to review both recorded bidders and model-estimated bidder relationships, then open a contractor to compare its connected work. ### Review bidders on a project 1. Open the project you are reviewing. 2. Find the `Bidders` relation field. 3. Review the linked contractors. Bidlo marks model-estimated relationships as `Estimated`; recorded relationships remain unmarked. 4. Select a contractor to open its record and review the relationship in context. The same `Bidders` field can contain recorded and estimated relationships. ### Show only recorded bidders in a view 1. Open a Projects view that includes the `Bidders` field. 2. Open the `Bidders` field menu. 3. Select `Hide estimates`. The view removes estimated bidder relationships from that field while keeping recorded relationships visible. ### Review contractor context On the contractor record, use the available views to compare work such as: - `Won` for recorded winning results; - `Lost` for recorded non-winning results; - `Bidding` for current bid relationships; - `Sub` for subcontractor context; - `People` for connected contacts. Open a related project when you need the original dates, owner, items, bid tabs, or files. Return to the contractor record to compare like-for-like history rather than relying on one project. ### Use the information to review competitors Bidlo can help you review recorded bidders and model-estimated bidder relationships alongside a contractor's connected work. It does not automatically establish competitor rank, market share, capacity, intent, or an alerting model. Treat estimated relationships as leads to verify, not confirmed bids. ### If a bidder or contractor is missing - Confirm that you are looking at the correct project. - If you expected an estimated bidder, check whether `Hide estimates` is enabled for the `Bidders` field in the current view. - Search globally for the contractor to rule out a naming difference. - Check whether bidder results have been recorded for the project. - Report a missing relationship instead of creating a duplicate contractor. ### Related pages - [Projects overview](/docs/projects-workflows/projects-overview) - [Open work in the side panel](/docs/navigation/side-panel) - [Compare nearby projects and facilities on a map](/docs/projects-workflows/estimating-maps) ### FAQs #### Are estimated bidders confirmed bids? No. Treat estimated relationships as leads to verify. They do not establish bid intent, competitor rank, market share, or capacity. --- ## Project & facility maps https://www.bidlo.ai/docs/projects-workflows/estimating-maps Use nearby project and facility locations as planning context without treating the map as a cost estimate. Use a project's location to understand nearby work and facilities before you plan coverage, travel, or material sourcing. ### Before you start Open a project that has a mapped location. Nearby results depend on the project and comparison records having valid locations. ### Open the project map 1. Open the project you want to review. 2. Find the project map and select `Interact`. 3. Select `Map layers`. 4. Select `Add layer`. The layer picker suggests both `Projects` and `Facilities`. Each layer adds located records alongside the current project without changing the underlying records. ![A project map with Facility and Project layers enabled around the current project.](https://media.bidlo.ai/docs/images/projects-workflows/project-map-projects-facilities-layers.v1.png) ### Compare nearby projects 1. In the layer picker, select `Projects`. 2. Use the layer filters to narrow the comparison to the dates, geography, or other project fields that matter to your review. 3. Pan or zoom the map to inspect the area around the current project. 4. Open a project marker when you need its dates, owner, items, or bidder details. 5. Return to the original project before making a project-specific decision. Nearby projects are useful for recognizing work in the same area. They do not rank opportunities or determine whether your team should bid. ### Compare nearby facilities 1. Select `Map layers` → `Add layer`. 2. Select `Facilities`. 3. Use the layer filters when you need a specific facility type, company, or other available field. 4. Review the facilities shown around the project. 5. Open a facility when you need the details stored on its record. 6. Confirm the facility location and current operating details through your team's normal process before using it in an estimate. Facilities and Materials are separate collections in Bidlo. This map brings location context into the project workflow; it does not combine those collections or create a separate facilities workflow. ### Use a full Map view for a broader comparison Open or create a Map view when you need to filter a larger set of records, add saved layers, or work across an area rather than from one project. A Map view can show only records with usable location data. > Straight-line distance, map position, and travel-range tools are planning aids. They are not promised haul routes, travel times, material availability, or costs. Verify the source record and route assumptions before relying on them in an estimate. ### If nearby results are missing - Confirm that the current project has a valid location. - Check whether the comparison records also have locations. - Clear filters that may exclude the records you expect. - Use a full Map view to confirm whether the records can be plotted. ### Related pages - [Map view](/docs/views-dashboards/map-view) - [Projects overview](/docs/projects-workflows/projects-overview) - [Contractors and bidders](/docs/projects-workflows/contractors-bidders) ### FAQs #### Why are nearby projects or facilities missing? Nearby results require usable locations on both the current project and the comparison records. Check their location fields first. #### Does adding a map layer combine the underlying collections? No. A layer displays located records together for comparison without merging collections or changing their records. --- ## Opportunities page https://www.bidlo.ai/docs/projects-workflows/create-opportunities-page Build a reusable Projects table and focus it on the work your team wants to review. Create one Projects-backed table, then filter and sort it into a useful list of upcoming work. ### Create the page 1. Select `New` in the workspace header. 2. Choose `Table`. 3. In `Select a Dataset`, choose `Projects`. 4. Replace `Untitled` with `Opportunities` or another title your team will recognize. 5. Confirm that project records appear before you add filters. `Opportunities` is the page name. `Projects` is the shared collection that supplies its records. Editing a project here changes the shared project record; the page is not a separate copy of the data. > Keep the page private while you experiment. Move it to `Public` when the setup is ready for the team. ### Narrow the table Available fields are specific to your team workspace. Use the Projects fields your team relies on for the project date, location, and owner or agency. 1. Select ≡ `Filter`. 2. Add the `Letting Date` field. 3. Choose a condition such as `Is after` → `Today`, or use a relative date condition for the next few weeks or months. 4. Add a location filter, such as county or state, when geography matters. 5. Add an owner or agency filter when you are reviewing a specific source of work. 6. Select `Sort`, add the `Letting Date` field, and choose `Oldest first`. Combine only the conditions your team needs. Too many filters can hide a useful project and make an empty table difficult to diagnose. ![An Opportunities table with letting-date, owner, and bidder filters and a visible Owner column showing TXDOT.](https://media.bidlo.ai/docs/images/projects-workflows/opportunities-filtered-projects-table.v2.png) ### Make the result easy to review - Show the fields people use to decide what to inspect next. - Hide columns that do not help the review. - Open a project for its complete Items, Files, bidder, and map context. - On a public page, save filters for everyone only when they should become the shared setup. ### Check your result A useful Opportunities page should show the expected geography and date range in a predictable order. Open one project and confirm that its details match the row before sharing the page. If no records appear, remove one filter at a time. Also confirm that the table is connected to `Projects` and that your workspace uses the values you entered. ### Related pages - [Filter, sort, and group](/docs/views-dashboards/filter-sort-group) - [Table view](/docs/views-dashboards/table-view) - [Public and private pages](/docs/navigation/public-private-pages) - [Projects overview](/docs/projects-workflows/projects-overview) ### FAQs #### Why is the Opportunities table I created empty? Review the filters one at a time. Too many conditions—or a field value that does not match them—can hide useful projects. #### Are my filter changes immediately shared with everyone? Not on a public page. They begin as your personal changes; use `Save for everyone` only when the setup should become shared. --- ## Create & edit projects https://www.bidlo.ai/docs/projects-workflows/create-edit-project Add a project to the Projects collection and safely update editable details. Create a project from a Projects-backed view, then confirm which details your team can safely maintain. ### Before you start Use global search to check whether the project already exists. Creating a second record can split items, files, notes, and bidder history across two projects. Some project values come from connected sources. Your role, the collection configuration, and the field can determine whether a value is editable. ### Create a project 1. Open a table connected to the `Projects` collection. 2. Select `New` or `New project`. 3. Enter the project name. 4. Add the location, dates, owner, and other details your team is responsible for maintaining. 5. Open the new project and confirm that the record belongs to `Projects`. If the new project does not remain visible in the table, check the view's filters. The record may exist without matching the current view. ### Update a project 1. Open the project, or select an editable cell in a Projects table. 2. Change one field at a time. 3. Move focus away from the field and wait for the updated value to remain visible. 4. Open another view of `Projects` and confirm the same value appears there. A view is a lens over shared records. You are updating the project, not a private copy of the row. ### Treat sourced fields carefully Don't create a duplicate field or project just because a connected value can't be edited. When a connected value appears wrong: - record the project name and the field; - note the value you expected and the value shown; - check for a visible source or updated date; - ask your team administrator or Bidlo contact to confirm the supported correction path. ### Related pages - [Collections and records](/docs/data-records/collections-records) - [Projects overview](/docs/projects-workflows/projects-overview) - [Table view](/docs/views-dashboards/table-view) - [Add and manage fields](/docs/data-records/fields) ### FAQs #### Why did a new project disappear after I created it? The record may not match the current view’s filters. Search the Projects collection before creating it again. #### Why can’t I edit a project field? Some values come from connected sources and are not editable in that location. Do not create a duplicate field or project just to work around a connected value. --- ## Invite teammates https://www.bidlo.ai/docs/collaboration/invite-teammates Invite people to the correct team with the least access they need. Invite one or more people to your Bidlo team and confirm that each person can open the intended workspace. ### Before you invite someone Confirm the person's work email, the team, and the role they need. Invitations can affect access and paid seats. ### Send an invitation 1. Open `Settings` → `People`. 2. Select `Add members`. 3. Enter one or more email addresses. Separate multiple addresses with commas. 4. At `Invite as`, choose the least privileged role each person needs. 5. Review the addresses and select `Invite`. The `Invites` count on the People page shows invitations that have not yet become active memberships. ![The Add members dialog with a safe example address and the Owner, Admin, Member, and Viewer role choices open.](https://media.bidlo.ai/docs/images/collaboration/invite-members-role-picker.v1.png) ### Confirm access Ask the teammate to open the invitation while signed in with the invited email address. They should confirm that the intended team appears and that they can open the work their role allows. If the invitation remains pending: - confirm that the email address is correct; - ask the teammate to check filtered or junk mail; - make sure they are signing in with the invited account; - review the pending invitation before sending another one. > Team membership does not automatically make every private page or custom app available. Page location and app roles can add separate access requirements. ### Related pages - [People and roles](/docs/account-admin/people-roles) - [Permissions](/docs/collaboration/permissions) - [Share pages](/docs/collaboration/share-pages) - [Teams and workspaces](/docs/getting-started/teams-and-workspaces) ### FAQs #### Does inviting someone to the team expose every private page and app? No. Private pages and custom apps can have separate access requirements that you must review independently. #### Why can’t the invited person see the team? Confirm the invitation used the same work email they used to sign in, that it was accepted, and that they opened the intended team. --- ## Share pages https://www.bidlo.ai/docs/collaboration/share-pages Choose whether a page is private, shared with specific teammates, available to your team, or published as a website. Use the `Share` button to give specific teammates access, open a page to your whole Bidlo team, copy its internal link, or publish a supported view as a read-only website. ### Choose the right audience Before you share a link, decide who should be able to open the page. | Audience | Choose this when | Where the page appears | | --- | --- | --- | | Only you | The page is a draft or contains personal work. | `private` | | Specific teammates | A smaller group needs the page. Give each person `Can view` or `Can edit`. | `Shared` | | Everyone on your team | The page should be available to every member of the current team. | `public` | | Website visitors | People need a read-only site instead of access to the Bidlo workspace. | The page stays in Bidlo and gains a separate published site. | > In Bidlo, `public` means available to everyone on your team. It does not mean publicly available on the internet. Use the `Publish` tab when you need a website. ### Share with specific teammates Use individual sharing when only selected people should have access. 1. Open the page you want to share. 2. Select `Share` in the page header. 3. On the `Share` tab, select `Search people or emails...`. 4. Enter a teammate's name or email address, then select the person. 5. Choose `Can view` when the person only needs to read the page, or `Can edit` when they should be able to change it. 6. Repeat for each person who needs access. 7. Select `Copy link`, then send the link to the people you added. 8. Select `Done`. The people you invited appear under `People with access`. The page moves to the `Shared` section for you and the invited teammates. If the page was in `public`, inviting specific people moves it out of `public` and into `Shared`. If Bidlo does not find the email address, the search field can offer to invite that person to the team. Team invitations may depend on your role. > `Copy link` copies the page address; it does not grant access. Add the person or change `General access` before sending the link. ### Share with everyone on your team Use team access for plans, dashboards, reference material, and other work that every member of the current team should be able to open. 1. Open the page and select `Share`. 2. Under `General access`, select the current access setting. 3. Select `Everyone at [team name]`. In the ACME workspace, for example, the option reads `Everyone at ACME`. 4. Confirm that the panel says `Anyone on the team can open it`. 5. Select `Copy link`, then share it with your teammates. 6. Select `Done`. The page appears under `public`. The Share panel also explains that everyone on the team can see it. > Changing a page from individual access to team access broadens its audience. Review the page before choosing `Everyone at [team name]`. ### Change or remove someone's access 1. Open the page and select `Share`. 2. Find the person under `People with access`. 3. Open the access control beside their name. 4. Choose the new access level, or remove the person. 5. Select `Done`. The change takes effect immediately. When you remove the last individually invited person, the page returns to `private`. The owner remains listed under `People with access`. ### Publish a page as a website Some page types include a `Publish` tab in the Share panel. Publishing creates a separate, standalone site for viewing the page without opening the Bidlo workspace. 1. Open the page and select `Share`. 2. Select the `Publish` tab. If the tab is not present, that page type does not offer website publishing from this panel. 3. Under `Who can view`, choose one of the available audiences: - `Anyone with the link` allows anyone who has the site link to open it. - `Team members must sign in` requires viewers to authenticate as members of your team. 4. Select `Publish`. 5. Copy the published site link and test it in the same way your intended audience will open it. The published website is read-only and stays in sync with the Bidlo page. Data, layout, filters, and the title update on the site when they change in Bidlo. A published page also shows a pulsing indicator on its `Share` button. > `Anyone with the link` can expose the published page outside your team. Review the page's data and filters before publishing, and do not send the site link to a broader audience than intended. To change a published page, return to `Share` → `Publish`. From there, you can copy the site link, change who can view it, or unpublish the website. ### Check access before you send the link Before sharing sensitive or important work: - Reopen `Share` and review `People with access` and `General access`. - Confirm that each editor needs permission to change the page. - Check whether the page contains embedded custom apps. Page access and app access are separate, so a teammate may be able to open the page but not the app. - Open nested pages that collaborators will need and check their sharing state. - Test the internal or published link as the intended audience when possible. ### Related pages - [Permissions](/docs/collaboration/permissions) - [Invite teammates](/docs/collaboration/invite-teammates) - [Public and private pages](/docs/navigation/public-private-pages) - [Version, publish, and share an app](/docs/apps-automations/publish-share-app) ### FAQs #### Does moving a page to Public publish it on the internet? No. In Bidlo, `public` means available to the current team. Use the `Publish` tab when you need a read-only website. #### Why can someone open a shared page but not its embedded app? The page and app have separate access settings. Give the person an appropriate role on the custom app as well. --- ## Permissions https://www.bidlo.ai/docs/collaboration/permissions View and manage team roles, page access, and custom-app permissions. Check who can view or change work in Bidlo, then update the correct permission layer: the person's team role, the page's access list, or the custom app's separate sharing settings. ### Understand where access comes from Bidlo permissions are layered. Giving someone access in one place does not automatically give them access everywhere else. | Permission layer | Controls | Where to check it | | --- | --- | --- | | Team role | What a person can do across the current team. | `Settings` → `People` | | Page access | Who can open or edit one page. | The page's `Share` panel | | Custom-app access | Who can open, edit, or manage one custom app. | The app's `Share` panel and `People` tab | Start by confirming the active team. Membership and roles are specific to each team, so a person can have access in one Bidlo team and no access in another. > Page access and app access are separate. Someone may be able to open a page but still see an access error for a custom app embedded in it. ### View team members and their roles Use the People settings to check whether someone belongs to the current team and what team-level role they have. 1. Select `Settings` in the sidebar. 2. Under `Team`, select `People`. 3. Select `Members` to view active team members. 4. Find the person and review the value in their `Role` control. 5. Select `Invites` when the person has been invited but has not joined yet. The People page also shows `Paid seats`, `Current members`, and the plan expiration information available to your team. #### Team roles | Role | What the role can do | | --- | --- | | `Owner` | Edit team settings, delete the team, and manage members. | | `Admin` | Edit team settings and manage members. | | `Member` | Access team pages, but not edit team settings. | | `Viewer` | View team pages and chat with the agent, but not make changes. | Team roles do not override narrower page or app access. For example, a `Member` can access team pages, but cannot open another person's private page unless that page is shared with them. ### Change a team member's role You need a team role that can manage members. The control may be unavailable when you do not have that access. 1. Open `Settings` → `People`. 2. Select `Members`. 3. Find the person whose role needs to change. 4. Open their current `Role` control. 5. Select `Owner`, `Admin`, `Member`, or `Viewer`. 6. Check that the new role appears beside the person's name. > `Owner` can manage members and delete the team. Grant that role only when the person needs full control of the team. To add someone who is not a member, select `Add members`, enter their work email, choose the role under `Invite as`, and select `Invite`. Review the team and seat information before sending the invitation. ### View permissions for a page The Share panel shows both individual access and the page's broader team audience. 1. Open the page. 2. Select `Share` in the page header. 3. Under `People with access`, review the owner and everyone invited individually. 4. Review the access level beside each person, such as `Can view` or `Can edit`. 5. Under `General access`, check whether the page says `Only people invited` or `Everyone at [team name]`. 6. Select `Done` when you have finished reviewing access. `Only people invited` restricts the page to its owner and listed people. `Everyone at [team name]` means anyone in the current team can open it. ### Change permissions for a page #### Give someone access 1. Open the page and select `Share`. 2. Select `Search people or emails...`. 3. Enter the person's name or email address, then select the correct person. 4. Choose `Can view` for read access or `Can edit` when the person should be able to change the page. 5. Confirm that the person appears under `People with access`. 6. Select `Copy link` and send the link to them. 7. Select `Done`. > `Copy link` does not grant permission. Add the person or change `General access` before sending the link. #### Make the page available to the team 1. Open the page and select `Share`. 2. Under `General access`, select the current access setting. 3. Select `Everyone at [team name]`. 4. Confirm that the panel says `Anyone on the team can open it`. 5. Select `Done`. This moves the page to `public`. In Bidlo, `public` means available to the current team; it does not mean published on the internet. #### Change or remove someone's page access 1. Open the page and select `Share`. 2. Find the person under `People with access`. 3. Open the access control beside their name. 4. Choose a different access level, or remove the person. 5. Confirm that the person or role is updated, then select `Done`. The change takes effect immediately. If you remove the last individually invited person, the page returns to `private`. The owner remains listed. ### View permissions for a custom app Custom apps have their own access list, even when they appear inside a page. 1. Select `Apps` in the sidebar. 2. Open the custom app. 3. Select the app's `Share` control. 4. Open the `People` tab. 5. Review the owner, teammates, outside collaborators, and public-link status. If you can open an app but do not see its sharing control, you can use the app but do not have permission to manage its audience. Ask the app owner to review your access. #### Custom-app roles - `Viewer` can open and use the version of the app shared with them. - `Editor` can edit the app as well as use it. - `Owner` controls the app and its sharing settings. Only the app owner can grant editor access. ### Change permissions for a custom app 1. Open `Apps` and select the app. 2. Select `Share`. 3. Search for a teammate by name or email address. You can also enter the email address of an outside collaborator when that audience is appropriate. 4. Select the person and choose the access they need. 5. Confirm that the person appears on the app's `People` tab. 6. Use `Copy link` when you want to send the app directly, or publish it to the team when everyone should be able to find it. Return to the `People` tab to change a person's role or revoke their access. People invited to an app can find it from their Bidlo home page. Someone who is not on a team lands on the apps shared with them. > Publishing an app to your team does not publish it as an anonymous website. App publication, page visibility, and website publishing are separate settings. ### Troubleshoot missing access If someone cannot open or edit something, check these in order: 1. Confirm that they used the intended work account. 2. Confirm that both of you opened the correct Bidlo team. 3. In `Settings` → `People`, verify that they are an active member rather than a pending invite. 4. Check whether their team role permits the action. Then check the item itself: 1. In the page's `Share` panel, review `People with access` and `General access`. 2. For an embedded custom app, check the app's separate `People` tab. 3. Ask the person to reopen the link and confirm what they can see or change. ### Related pages - [Share pages](/docs/collaboration/share-pages) - [Invite teammates](/docs/collaboration/invite-teammates) - [People and roles](/docs/account-admin/people-roles) - [Public and private pages](/docs/navigation/public-private-pages) - [Version, publish, and share an app](/docs/apps-automations/publish-share-app) ### FAQs #### Which permission should I check first when someone cannot open something? Confirm the active team, then check team membership, the page’s access, and any custom-app access separately. Access at one layer does not guarantee access at another. #### Does a team role override private-page permissions? No. A team role controls team-level capabilities, but a private page still needs to be shared with that person. --- ## Live presence https://www.bidlo.ai/docs/collaboration/live-presence Interpret presence indicators and coordinate with teammates viewing the same work. When another teammate has the same document open, Bidlo shows their avatar in the document header. Hover over an avatar to see the person's name, email when available, local time when available, and `Viewing this page`. ### What presence tells you A presence indicator means another signed-in teammate is currently connected to that document. Use it as a cue to coordinate when you are both reviewing or editing the same work. Presence does not confirm that the other person is editing, that every change has saved, or that two simultaneous changes cannot conflict. ### Coordinate while someone else is present 1. Check the document header before making a consequential change. 2. If another teammate is present, agree who will update the record or which fields each person will handle. 3. After editing, wait for the updated value to remain visible. 4. Reopen or refresh the record if the visible state does not match what your teammate sees. Use comments or your team's normal communication channel when the work needs an explicit decision trail. Presence itself is not a comment or approval. ### If the indicator looks stale Network interruptions and background tabs can delay presence changes. Refresh or reopen the document before assuming a teammate is still active. Do not use presence as an audit log; use team activity when you need recorded history. ### Related pages - [Share pages](/docs/collaboration/share-pages) - [Team activity and usage](/docs/account-admin/activity-usage) - [Permissions](/docs/collaboration/permissions) ### FAQs #### Does an avatar mean the other person is editing? No. It shows that the teammate is connected to the document, not that they are actively changing it or that every change has saved. #### What should we do if we see different values? Pause overlapping edits, compare the field or section in question, and refresh or reopen the record before continuing. --- ## Notifications & digests https://www.bidlo.ai/docs/collaboration/notifications-digests Subscribe to important pages and choose how Bidlo delivers updates. Subscribe to the pages you care about, then choose how summaries and alerts reach you. ### Subscribe to a page 1. Open the page you want to follow. 2. Open the page settings or `More` menu. 3. Choose `Notify me` when it is available. 4. Select the notification method or changes you want to follow. Subscriptions are page-specific. Following one page does not subscribe you to every page in the collection or team. ![The Pursuit Review Table page settings with Notify me choices for new projects, project updates, comments, or everything.](https://media.bidlo.ai/docs/images/collaboration/page-notify-me-options.v1.png) ### Choose delivery settings 1. Open `Settings` → `Notifications`. 2. Under `Emails`, set the `Bidlo digest` cadence you want. Choose `Never` if you do not want the digest. 3. For a scheduled cadence, choose `Send at`. Bidlo shows the available times in Central Time. Hourly digests do not use a single send time. 4. Review `Platform alerts`, which can include email when someone shares a page or chat with you. 5. Review the optional research and product email topics shown below the platform settings. 6. Under `This device`, turn on `Notify on this device` only if you want local notifications and your browser allows them. ![Notification settings showing the Bidlo digest cadence, send time, platform alerts, optional topics, and device controls.](https://media.bidlo.ai/docs/images/collaboration/notification-delivery-settings.v1.png) The settings page can also show the pages you follow. To change what a page sends, return to that page's `Notify me` control. ### If you do not receive an update - Confirm that you subscribed to the specific page. - Check the digest cadence and platform-alert settings. - For device alerts, check the browser and operating-system notification permissions. - Check filtered or junk email. - Ask a teammate to confirm that the expected change actually happened on the subscribed page. > A subscription is not a task assignment, approval, or audit log. Use the page itself to confirm the current state of the work. ### Related pages - [Favorites](/docs/navigation/favorites) - [Share pages](/docs/collaboration/share-pages) - [Team activity and usage](/docs/account-admin/activity-usage) ### FAQs #### Does following one record subscribe me to its entire collection? No. Subscriptions are page-specific. Follow each page you want to receive updates about. #### Why am I not receiving device notifications? Confirm that `Notify on this device` is enabled and that your browser allows Bidlo to send notifications. Email and device delivery are configured separately. --- ## Overview https://www.bidlo.ai/docs/bidlo-ai/ai-overview Understand how chat, context, web access, memory, and skills work together. Use Bidlo AI to ask questions, work with files and Bidlo records, and apply repeatable instructions from one conversation. ### Start with a clear request The Home prompt displays `Ask anything (@ to search)...`. Enter the outcome you want and include enough context for Bidlo AI to understand the job. Useful requests often include: - the record, page, or file you want to use; - the decision or output you need; - any limits, format, or audience that should shape the answer. For example, ask for a checklist based on a project file rather than asking only for a checklist. When the answer needs a specific Bidlo record, add it as context instead of relying on the title in your prompt. ### Choose the right source of context Bidlo AI can receive context in several ways: - **Add file** attaches a file to the current prompt. - **Add Context** lets you reference Bidlo documents and records with `@`. - **Files** in AI personalization are documents you want available across chats. - **Memory** stores durable facts and preferences about you. - **Skills** provide reusable team-authored instructions. - **Web access** lets the assistant use current information from the web. These sources serve different jobs. Attach or mention something when it matters to the current request. Use personalization for context that should continue across conversations. > Available records and actions still depend on your team access. Adding context to a prompt does not grant new access. ### Keep control of changes Ask Bidlo AI to explain what it found before requesting a change. For a high-impact task, identify the exact records and fields involved and review the proposed scope. Some tools use an approval step before a protected action runs. Read the request carefully and approve only when the named action and target match your intent. ### Check an answer Treat an AI response as a working result that you can inspect and refine. 1. Check that the response used the record, file, or time period you intended. 2. Ask which source supports an important statement. 3. Open the named Bidlo record or source link when the decision matters. 4. Correct missing context and ask the question again. If the answer should use current outside information, turn on `Web access` and say that the request requires current research. ### Related pages - [Start a chat](/docs/bidlo-ai/start-chat) - [Attach files and mention documents](/docs/bidlo-ai/attachments-mentions) - [Web search and research](/docs/bidlo-ai/web-research) - [Memory and personalization](/docs/bidlo-ai/memory) - [Use skills](/docs/bidlo-ai/skills) --- ## Chat https://www.bidlo.ai/docs/bidlo-ai/start-chat Ask a focused question and continue the conversation with the right context. Start a Bidlo AI conversation from Home, then add context and refine the result without rebuilding the request from scratch. ### Ask your first question 1. Open `Home`. 2. Select `Ask anything (@ to search)...`. 3. Enter a focused request. 4. Review the selected model when your workspace shows the model selector. 5. Send the message. Your conversation opens as a chat. Continue in the same thread when the next request depends on the earlier messages. > Include the desired output in the first message. For example, ask for a three-step review checklist, a comparison table, or a concise summary. ### Add context before sending Use the `+` menu beside the prompt when the answer needs more than your typed request: - Select `Add file` to attach a file. - Select `Add Context` or type `@` to find a Bidlo document or record. - Select `Add Skill` or type `/` to use a reusable team instruction. - Turn `Web access` on when current outside information is required. The prompt shows selected context before you send it. Remove anything unrelated so the assistant can focus on the correct sources. ### Continue and steer the chat Use a follow-up message to: - correct an assumption; - narrow the time period or record set; - request a different format; - ask the assistant to identify its sources; - add a missing file or record. When the subject changes completely, start a new chat so unrelated context does not shape the next task. ### Return to a conversation Open `Chats` in the sidebar to find your conversations. Select the conversation you want to continue, then enter the next message in its prompt. ### Related pages - [Bidlo AI overview](/docs/bidlo-ai/ai-overview) - [Attach files and mention documents](/docs/bidlo-ai/attachments-mentions) - [Ask AI about a page](/docs/bidlo-ai/ask-about-page) - [Web search and research](/docs/bidlo-ai/web-research) --- ## Ask about a page https://www.bidlo.ai/docs/bidlo-ai/ask-about-page Give Bidlo AI the current page as focused context for a question. Give Bidlo AI a page or record as focused context so it can answer questions, summarize details, or turn the content into a useful output. ### Ask a question about a page 1. Open the page or record you want to discuss. 2. Select `New chat` in the top bar. The chat opens beside the page so you can keep the source in view. 3. In the prompt, type `@`. 4. Choose the page from `Recent`, or select `Pages` to find it. 5. After the page appears in the prompt, enter your question and the format you want. 6. Select `Submit`. The answer appears in the chat beside the page. Check important details against the source before acting on them. > Starting a chat from a page does not automatically add that page as context. Mention it with `@` before you submit your question. ### Example question `@Documentation Notes What work is still outstanding? Return a short checklist and distinguish completed items from incomplete ones.` This question identifies the source, asks for a specific task, and names the desired output. > Mentioning a page narrows the chat's context; it doesn't make every answer authoritative. Add files or web access separately when the question depends on them. ### Related pages - [Start chat](/docs/bidlo-ai/start-chat) - [Attachments mentions](/docs/bidlo-ai/attachments-mentions) - [Verify ai answer](/docs/bidlo-ai/verify-ai-answer) ### FAQs #### Does opening a chat from a page automatically add that page as context? No. Mention the page with `@` before submitting your question so Bidlo AI knows which source to use. #### Does mentioning a page make the answer authoritative? No. A mention narrows the context. Verify important details against the source, and add files or web access when the question depends on them. --- ## Attachments & mentions https://www.bidlo.ai/docs/bidlo-ai/attachments-mentions Give Bidlo AI the exact files, pages, and records it should use. Add a file or reference a Bidlo document when your question depends on a specific source. ### Choose an attachment or a mention Use the option that matches where the information lives: - **Add file** uploads a file with the current prompt. - **Add Context** references an existing Bidlo document or record. - Typing `@` opens the same context search inside the prompt. An attachment is useful for a file that is not already available as the Bidlo record you need. A mention is useful when the source already lives in your workspace and should remain connected to its Bidlo identity. ### Attach a file 1. Open a chat prompt. 2. Select the `+` menu. 3. Select `Add file`. 4. Choose the file. 5. Check that the file appears with the prompt. 6. Enter the question you want answered from that file. 7. Send the message. If an upload fails, the prompt keeps the attachment so you can retry or remove it. ### Mention a Bidlo document or record 1. Place the cursor where you want to add the reference. 2. Type `@`, or select `+` and then `Add Context`. 3. Enter part of the document or record name. 4. Choose the matching result. 5. Add the task you want Bidlo AI to complete. 6. Send the message. The reference appears in the prompt before the message is sent. > A mention identifies the source to use. It does not change the source's visibility or your access. ### Make the request specific Tell Bidlo AI what to inspect and what to produce. For example: `Using @Project Name, list the bid date, owner, and three open questions.` When you attach several sources, name the role each source should play. Ask the assistant to say when a requested fact is not present rather than filling the gap with an assumption. ### Related pages - [Start a chat](/docs/bidlo-ai/start-chat) - [Ask AI about a page](/docs/bidlo-ai/ask-about-page) - [Web search and research](/docs/bidlo-ai/web-research) ### FAQs #### Should I attach a file or mention a Bidlo document? Attach a file when the source is on your device. Use an `@` mention when the source already exists as a Bidlo page, record, or document. #### Does mentioning a document change who can access it? No. A mention identifies context for the chat; it does not change the document’s visibility or permissions. --- ## Voice dictation https://www.bidlo.ai/docs/bidlo-ai/voice-dictation Speak a prompt in Home, chat, or global search instead of typing it. Use dictation to enter a search or AI prompt when speaking is faster than typing. ### Start dictation from a prompt 1. Open Home or a chat. 2. Select the microphone icon (`Start dictation`) on the right side of the prompt. 3. Speak your request. 4. Select the red square (`Stop dictation`) when you are finished. 5. Review the transcript before sending it. While Bidlo is listening, the microphone icon becomes a red square and an animated waveform appears beside it. > Your browser may ask for microphone access. Bidlo cannot transcribe speech until the browser allows the site to use the microphone. ### Dictate into global search Use the microphone in global search when you want to find a record or turn the spoken request into an AI question. On desktop, press and hold `⌘ E` on Mac or `Ctrl E` on Windows to open search and begin dictating. Release the shortcut to stop. ### Review names and project identifiers Before sending or opening a result, check: - company and person names; - route, county, and project identifiers; - dates, quantities, and units; - specialized company terminology. Edit any transcription error in the text field. ### Related pages - [Start a chat](/docs/bidlo-ai/start-chat) - [Global search](/docs/navigation/global-search) - [Keyboard shortcuts](/docs/reference/keyboard-shortcuts) ### FAQs #### Why isn’t dictation starting? Check whether your browser has permission to use the microphone for Bidlo. Dictation cannot transcribe speech until that permission is allowed. --- ## Web research https://www.bidlo.ai/docs/bidlo-ai/web-research Let Bidlo AI use current web information when workspace context is not enough. Turn on web access when your request requires current outside information, then state what you want researched and how you will use it. ### Decide when web access is needed Use workspace context for information already stored in Bidlo. Use web access for information that may have changed or does not live in your workspace. Examples include: - a current agency notice; - a recent market or company update; - an outside reference needed to compare with Bidlo data. For a task that needs both, mention the Bidlo record and explain which part requires outside research. ### Turn on web access 1. Open a chat prompt. 2. Select the `+` menu. 3. Find `Web access`. 4. Toggle it on. 5. Enter a request that identifies the topic, location, and timeframe. 6. Ask the assistant to include the supporting sources. 7. Send the message. The setting applies to the chat prompt where you enabled it. ### Write a research request Include boundaries that make the answer useful: - what should be researched; - which geography, agency, or company matters; - how current the information must be; - which Bidlo record or file should be compared; - what format the answer should use. For example: `Using @Project Name as context, research current public notices from the owner and summarize anything that could affect the bid date. Include the source links.` ### Verify the result Open important source links and check their dates before using the result for a decision. If the assistant cannot find a source, narrow the request or provide the known website or document as context. ### Related pages - [Bidlo AI overview](/docs/bidlo-ai/ai-overview) - [Start a chat](/docs/bidlo-ai/start-chat) - [Attach files and mention documents](/docs/bidlo-ai/attachments-mentions) ### FAQs #### When should I use web access instead of workspace context? Use web access for current or outside information. Use workspace context for facts already stored in Bidlo. #### How should I verify a research answer? Ask for supporting sources, open the important links, and check their dates and claims before using the answer for a decision. --- ## Agents https://www.bidlo.ai/docs/bidlo-ai/agents Create a reusable AI setup with its own instructions, context, and model, then use it to start focused chats. Create a reusable AI setup with its own instructions, context, and model, then use it to start focused chats. ### Understand what an agent saves An agent packages the setup for a repeatable kind of work. Each agent can save: - a name, icon, and description that help people recognize it; - instructions that define its job, method, and expected output; - Bidlo pages, records, or files for it to reference; and - the model and reasoning level it should use. For example, you could create an agent that reviews project information, identifies missing bid details, and always returns the same checklist format. You would supply the current project when you start each chat. > Running an agent starts a chat. An agent doesn't run on a schedule or continue working as a background automation. ### Create an agent 1. From `Home`, select `Chats` in the left sidebar. 2. In the `Chats` panel, find `Agents` and select `New`. 3. In `New agent`, enter a short, recognizable `Name`. 4. Optional: select `Change agent icon` to choose a different icon and color. 5. Add a `Description` that tells teammates when to use the agent. 6. In `Instructions`, describe the agent's role, the steps it should follow, and the format it should return. 7. Under `Context`, select `Add information for your agent to reference`. Search for a Bidlo page or record and select it, or choose `Upload new file`. 8. Under `Model`, select `Choose model`. Use the provider tabs or search box to choose a model, then set its reasoning level if that option is available. 9. In `Preview`, enter a representative request to check how the agent responds. 10. When the setup produces the result you want, select `Save`. The saved agent appears under `Agents` in the `Chats` panel for the current team. > Start with only the context the agent needs repeatedly. Add the project, file, date range, or other run-specific details in the chat so the saved setup stays useful for more than one job. ### Write instructions that are easy to reuse Strong instructions answer four questions: - **Role:** What kind of assistant is this? - **Task:** What should it do each time? - **Method:** What steps or checks should it follow? - **Output:** What should the finished answer look like? For example: > Review the supplied project context for bid readiness. Identify missing due dates, owner requirements, and scope details. Return a table with the issue, supporting source, and recommended follow-up. Do not guess when a detail is missing. Use the `Preview` panel to test a normal request, an incomplete request, and an edge case before saving. If the output varies too much, make the method or output format more explicit in `Instructions`. ### Add useful context Saved context gives the agent reference material it should use across chats. In the context picker, you can search the current Bidlo workspace for pages and records or select `Upload new file`. Use saved context for stable material such as a standard operating procedure, approved template, or reference page. Supply changing material, such as the project being reviewed today, in the chat where you run the agent. > An agent can only use context that you can access. Adding a page, record, or file to an agent doesn't grant access to other people. ### Choose a model Select `Choose model` to browse available providers, search for a model, and set a reasoning level. The menu can include provider tabs such as `OpenAI`, `Anthropic`, `xAI`, `Google`, and `Z.AI`; the exact models available can change. Keep the default when you don't have a specific model requirement. Change the model or reasoning level when the agent's task calls for a different balance of speed and depth, then compare the result in `Preview` before saving. ### Start a chat with an agent 1. Select `Chats` in the left sidebar. 2. In the `Chats` panel, select the saved agent under `Agents`. 3. Enter the current request in the chat prompt. 4. Add or mention any page, record, or file that is specific to this run. 5. Send the request and review the result before using it in your work. The new chat uses the agent's saved instructions, context, model, and reasoning setting. Your prompt supplies the goal and details for this particular run. ### Improve an agent's results If an agent's answer is incomplete or inconsistent, check the setup in this order: 1. Make the requested outcome more specific in the current chat. 2. Add the missing page, record, or file as context. 3. Clarify the required checks or output format in the agent's instructions. 4. Test the revised setup in `Preview` with the same representative request. 5. Save only after the preview returns the structure and level of detail you expect. For high-impact work, verify the source records and any generated files before approving, sharing, or submitting the result. ### Agents and skills serve different purposes Use an agent when you want a saved AI configuration that starts a focused chat with its own context and model. Use a skill when you want to insert a reusable set of team instructions into another AI request. ### Related pages - Create and run a bid-bond agent - [Use skills](/docs/bidlo-ai/skills) - [Bidlo AI overview](/docs/bidlo-ai/ai-overview) ### FAQs #### When should I create an agent instead of starting a normal chat? Create an agent when the same role, instructions, tools, and context should be reused. Use a normal chat for a one-time request. #### What should I change when an agent’s results are inconsistent? Tighten the instructions, add the missing source context, and define the expected output and boundaries more precisely. Test the revised agent on a representative task. --- ## Skills https://www.bidlo.ai/docs/bidlo-ai/skills Create reusable team instructions and use them from an AI prompt. Use a skill when your team wants Bidlo AI to follow the same specialized instructions repeatedly. ### Understand skills A skill is a named set of team-authored instructions. Skills are useful for workflows that need a repeatable method, format, or decision rule. In the prompt menu, `Add Skill` inserts a skill into the current request. In AI settings, the `Skills` section is where the team creates and manages its instructions. ### Find team skills 1. Open `Settings`. 2. Under `Features`, select `Bidlo AI`. 3. Select `Personalization`. 4. Find `Skills`. If the team has not created a skill, the page displays `No team skills yet`. ### Create a skill 1. In `Skills`, select `New skill`. 2. Enter a name that describes the job. 3. Add a short description. 4. Write the reusable instructions. 5. Save the skill. Use a name that a teammate will recognize in a prompt, such as a report or review workflow rather than a person's name. ### Use a skill 1. Open an AI prompt. 2. Select `+`, then `Add Skill`, or type `/`. 3. Choose the skill. 4. Add the record, file, and outcome for this run. 5. Send the request. The skill supplies the reusable method; your prompt supplies the current job and context. ### Related pages - [Bidlo AI overview](/docs/bidlo-ai/ai-overview) - [Start a chat](/docs/bidlo-ai/start-chat) - [Memory and personalization](/docs/bidlo-ai/memory) ### FAQs #### When is a skill more useful than instructions in one prompt? Use a skill when the team needs the same method, format, or decision rule across many requests. Keep one-time instructions in the current prompt. #### Does using a skill give Bidlo AI additional access? No. A skill supplies instructions; available information and actions still depend on the current user, team, and permissions. --- ## Memory & personalization https://www.bidlo.ai/docs/bidlo-ai/memory Set durable preferences, reference files, instructions, and memory for Bidlo AI. Use AI personalization to keep your preferred name, reference files, instructions, and durable memory available across chats. ### Open personalization 1. Open `Settings`. 2. Under `Features`, select `Bidlo AI`. 3. Select `Personalization`. The page groups your options under `Preferences`, `Memory`, and `Skills`. ### Choose the right kind of personalization | Setting | Use it for | | --- | --- | | `Name` | What Bidlo AI should call you. | | `Files` | Documents the assistant should be able to reference across chats. | | `Instructions` | Writing style, working preferences, and context to apply across chats. | | `Memory` | Durable facts and preferences Bidlo AI has remembered about you. | | `Skills` | Reusable team-authored instructions for a specialized workflow. | Use a prompt attachment or `@` mention instead when the context belongs only to the current request. ### Review memory The `Memory` field shows what Bidlo AI remembers about you. Review it periodically and remove information that is no longer accurate or useful. > Memory and instructions affect later responses. Keep them concise, current, and appropriate for use across conversations. ### Add company terminology Use `Instructions` for terms or preferences that should shape many chats. Give each term a short definition and, when useful, one example. For a large reference document, add the document under `Files` instead of pasting the entire source into instructions. ### Related pages - [Bidlo AI overview](/docs/bidlo-ai/ai-overview) - [Attach files and mention documents](/docs/bidlo-ai/attachments-mentions) - [Use skills](/docs/bidlo-ai/skills) ### FAQs #### What belongs in memory instead of the current prompt? Use memory for information you want Bidlo AI to apply repeatedly. For example: “Our team focuses on Texas civil projects, uses USD, and prefers bid summaries in a table.” For a one-time request, such as reviewing the plans for a specific project, attach the plans or `@` mention the project in your prompt. #### Should sensitive or temporary details be saved in memory? No. Keep memory concise, current, and appropriate for reuse across future conversations. --- ## Approvals https://www.bidlo.ai/docs/bidlo-ai/approvals Inspect a proposed AI action before it changes team data. Stay in control when Bidlo AI proposes an action that can change team data. An approval request gives you a final decision point for a protected action; it doesn't replace a careful prompt or a check of the result. ### Prepare a change you can review Give Bidlo AI a narrow, inspectable request before it starts working. 1. Open `Home` or an existing conversation in `Chats`. 2. Name the page, record, or collection the change should affect. 3. Use `@` or `Add Context` when the target already exists in Bidlo. 4. State the exact fields, values, and record set that may change. 5. Add a boundary such as “do not change any other records.” For example, “Set `Status` to `Review` on the three mentioned projects; do not change dates, assignees, or any other projects” is safer to review than “clean up these projects.” > Mentioning a page gives the chat context; it doesn't grant new access or authorize a change. The tools available to Bidlo AI still depend on your workspace access and the action it is trying to perform. ### Review an approval request When Bidlo requires approval, the request appears in the conversation where the action was proposed. Review the request before choosing its allow or decline option. 1. Confirm the **action** matches your request, such as creating, updating, or deleting data. 2. Confirm the **target** is the intended page, collection, record, or external destination. 3. Confirm the **scope** includes only the expected records and fields. 4. Confirm the **new values** are complete and correctly formatted. 5. Consider the **consequence**, including whether the action changes access, removes data, affects many records, or sends information outside Bidlo. 6. Continue only when every part matches your intent. Otherwise, decline the action and send a narrower or corrected request. After you continue, keep the chat open until Bidlo reports whether the action completed or failed. > Treat deletions, bulk changes, access changes, and external sends as high-impact actions. Check the full target and scope before allowing them. ### Understand approval and the thinking trace While Bidlo AI works, you can use `Show thinking` to inspect the visible work trace. Depending on the request, this can include steps such as `Check capabilities`, `Search notes`, or `Query mentioned document`. The thinking trace explains what the assistant tried to do. It is not the same as an approval request, and a capability check is not evidence that you approved a change. Not every request produces an approval step. A request may return an answer, complete an allowed action, or explain that the requested action isn't available. If you no longer want the current run to continue, select `Stop`. ### Verify the saved result Approval confirms the proposed action, not the accuracy of the final data. Check the destination separately after the run finishes. 1. Open the affected page, record, or collection from the sidebar or search. 2. Confirm that the intended records contain the expected values. 3. Check that unrelated fields and records did not change. 4. Open `Activity` when it is available and you need to review the record's recent history. 5. Return to the chat with any correction, naming the exact value that needs to change. For a bulk change, spot-check representative records and compare the total number of affected records with the scope you approved. ### If the request is too broad Decline the proposed action and rewrite the request with a smaller boundary. Useful corrections include: - “Show me the proposed values first; don't save anything yet.” - “Apply this only to the two records I mentioned.” - “Update `Status` only. Leave every other field unchanged.” - “Create a draft, but don't publish or send it.” - “Explain what you cannot verify before asking me to approve a change.” If the assistant says an action is unavailable, don't treat the message as a pending approval. Choose a supported action or complete the change directly in the relevant Bidlo page. ### Related pages - [Verify a Bidlo AI answer](/docs/bidlo-ai/verify-ai-answer) - [Bidlo AI overview](/docs/bidlo-ai/ai-overview) - [Restore work from Trash](/docs/navigation/trash) ### FAQs #### Does mentioning a page authorize Bidlo AI to change it? No. A mention provides context. The available action still depends on your access, and protected changes may require a separate approval. #### What should I check before approving a change? Confirm the exact action, target, scope, and consequence. Take extra care with deletions, bulk updates, permission changes, and external sends. --- ## Verify AI answers https://www.bidlo.ai/docs/bidlo-ai/verify-ai-answer Check source, scope, and consequential details before relying on an answer. Treat a Bidlo AI response as a working result. Check what it used, what it may have missed, and the facts that matter before you use the answer to make a decision or change team data. ### Start with inspectable context Verification begins before you send the question. Give the chat a source you can open and compare with the answer. 1. Open `Home` or select `Chat` from `Chats`. 2. Select the prompt labeled `Ask anything (@ to search)...`. 3. Type `@` and search for the relevant Bidlo page or record, or use `Add Context` from the prompt menu. 4. Select the intended result so its reference appears with the prompt. 5. Ask a focused question and request the source in the answer. For example: “Using the mentioned project, list the bid date and project estimate. State the page you used and flag anything you couldn't verify.” ![The Archer Widen Road project is mentioned in Bidlo AI with the revised documentation prompt, followed by its bid date, project estimate, and the source fields used.](https://media.bidlo.ai/docs/images/bidlo-ai/answer-with-source-context.v4.png) Attach a file separately when the answer depends on a specification, bid form, or other document. Turn on `Web access` when the question requires current outside information. > A page mention narrows the context, but it doesn't guarantee that every claim in the response came from that page. Ask the assistant to identify the source for each consequential claim. ### Check the answer against its source Read the answer once for usefulness, then review it again for evidence. 1. Identify every Bidlo page, file, or web source named in the response. 2. Open the most important source independently. 3. Find the original field, row, paragraph, or section that supports the claim. 4. Compare the source wording, date, and surrounding context with the answer. 5. Repeat for any fact that would change a bid, schedule, price, assignment, or external communication. A source reference in the response is a useful starting point, not proof by itself. Make sure the reference opens the expected object and actually supports the statement beside it. > A source reference may appear as `[blocked]` when Bidlo cannot open it as a normal link. In that case, open the named page from the sidebar or search and compare the answer there. Until you can inspect the source, treat the claim as unverified. ### Inspect how Bidlo reached the answer Select `Show thinking` when it appears beneath your message. The expanded trace can show visible steps such as `Searching for document context`, `Search notes`, `Clarifying document access`, and `Query mentioned document`. Use the trace to answer two questions: - Did Bidlo look in the source you intended? - Did a search, access, or tool step fail or use a fallback? The trace helps explain the route to the answer, but it doesn't validate the answer's facts. Always compare important claims with the underlying source. ### Check the details that carry risk Use this checklist before relying on an answer: | Check | What to compare | | --- | --- | | Source | The named page, record, file, or website is the one you intended | | Scope | The answer covers the correct project, records, geography, and time period | | Identity | Project names, IDs, agencies, people, and locations match the source | | Numbers | Dates, quantities, units, currency, totals, and percentages are exact | | Status | Current state is distinguished from historical, proposed, or inferred information | | Completeness | Missing fields, conflicting sources, and uncertainty are stated instead of filled in silently | For summaries and recommendations, also separate facts copied from a source from conclusions generated by the assistant. ### Correct an answer in the same chat When the source and answer disagree, keep the relevant context attached and send a precise correction. For example: - “Use the `Bid date` field, not the date mentioned in the notes.” - “Limit the answer to the three records I mentioned.” - “The source is from last quarter. Recheck the current record.” - “Quote the field name and value for each project, and mark missing values as unknown.” - “Separate source facts from your recommendation.” Review the revised answer from the beginning. A correction to one claim does not automatically validate the rest of the response. ### Verify changes separately If the conversation results in a data change, open the destination page or record after Bidlo reports completion. Confirm the saved values, the number of affected records, and any unchanged fields that matter. When an action requires approval, review the proposed target and scope before it runs, then perform this source check again on the saved result. ### Related pages - [Attach files and mention documents](/docs/bidlo-ai/attachments-mentions) - [Web search and research](/docs/bidlo-ai/web-research) - [Review and approve changes](/docs/bidlo-ai/approvals) --- ## Overview https://www.bidlo.ai/docs/apps-automations/apps-overview Understand native apps, custom apps, and where to find them. Use an app when a repeatable workflow benefits from its own focused interface. Open an existing app from the Apps area or start a new one with the app builder. ### Choose between chat and an app Chat and apps begin with a prompt, but they are useful for different outcomes: - Use **chat** for a question, analysis, or one-time output. - Use an **app** when people should return to a purpose-built interface for the same kind of work. For example, use chat to summarize one project file. Consider an app when the same inputs and review steps should be presented consistently each time. ### Open the Apps area 1. Open `Apps` from the sidebar. 2. Select `Search` to find an available app, or choose an app from the list. 3. Select `New app` when you want to start a new app-builder conversation. If the list is empty, the Apps section displays `No apps`. ### Start in the app builder Selecting `New app` opens `App builder`. The builder includes: - an app title; - an AI prompt; - a model selector and dictation control; - controls for team members and connections. Use the prompt to describe the outcome, users, inputs, and primary action. Add files or Bidlo context from the prompt menu when the app needs a concrete example. > Start with one complete workflow and one clear success condition. Add secondary features only after the primary path works. ### Related pages - [Build an app with AI](/docs/apps-automations/build-app) - [Edit a custom app](/docs/apps-automations/edit-app) - [Start a chat](/docs/bidlo-ai/start-chat) ### FAQs #### Why does the Apps area say No apps? The current list has no apps available to display. Select `New app` to open the builder, or use `Search` to check for an app by name. #### Is an app the same as a chat? No. A chat is a conversation. An app gives a recurring workflow its own interface. #### What should I include in the first app prompt? Name the user, the job they are trying to complete, the information the app needs, and the result it should produce. Include an example file or record when it clarifies the workflow. --- ## Build with AI https://www.bidlo.ai/docs/apps-automations/build-app Turn one clearly defined workflow into an app-builder request. Start a new app from the Apps area, then give the app builder a focused description of the workflow. ### Define the first version Before opening the builder, write down: - who will use the app; - the job they need to complete; - the information they will provide; - the result they should see; - one condition that tells you the workflow worked. Keep the first version narrow. A small workflow is easier to describe, review, and refine. ### Open the app builder 1. Open `Apps` from the sidebar. 2. Select `New app`. 3. Confirm that the page is labeled `App builder`. 4. Give the app a recognizable title. The builder provides an AI prompt, model selector, dictation control, and controls for team members and connections. ### Write the first prompt Describe the workflow as an outcome instead of listing disconnected features. For example: > Build a project review app for an estimator. Let the estimator choose a project, review its key details and files, and record a go/no-go decision. > The workflow is successful when the saved decision remains connected to the selected project. A useful first prompt includes: - **User:** who completes the workflow. - **Input:** the Bidlo record, file, or value the app needs. - **Action:** the main thing the user does. - **Result:** what the app should display or produce. - **Constraint:** anything the app must not change. ### Add concrete context Use the prompt's `+` menu when an example will reduce ambiguity: - `Add file` for a sample document; - `Add Context` or `@` for a Bidlo page or record; - `Add Skill` or `/` for reusable team instructions; - `Web access` only when the workflow needs current outside information. Remove unrelated context before submitting the request. ### Review before expanding the scope Check the primary path against the success condition you defined. If the result needs refinement, ask for one focused change at a time and restate the expected behavior. Do not add sharing, publishing, or automation requirements until the core workflow has been tested in the current builder. ### Related pages - [Apps overview](/docs/apps-automations/apps-overview) - [Start a chat](/docs/bidlo-ai/start-chat) - [Attach files and mention documents](/docs/bidlo-ai/attachments-mentions) - [Use skills](/docs/bidlo-ai/skills) ### FAQs #### What should I include in the first app prompt? Describe one user, one workflow, the required data, and a clear success condition. Build the smallest useful version before adding more screens or automation. #### When should I enable web access? Enable it only when the app needs current information from outside Bidlo. Keep it off when the workflow can use workspace data and context you provide. --- ## Edit apps https://www.bidlo.ai/docs/apps-automations/edit-app Refine an existing app through its builder chat and preview. Open an existing custom app, describe a focused change in its app-specific chat, and check the live result before other people use it. ### Open an app for editing 1. Select `Apps` in the sidebar. 2. Hover over the app and select `More` (`•••`). 3. Open `Edit`, then choose `New chat` to start a fresh editing conversation or `Chat history` to continue an earlier one. 4. Confirm that the app remains open and an app-specific `Chat bar` appears on the right. ![The Pursuit Decisions app open beside its app-specific Build mode chat and change prompt.](https://media.bidlo.ai/docs/images/apps-automations/edit-custom-app-panel.v1.png) The `Builder mode` bar sits above the prompt. Use `Version history` to review earlier versions and `App settings` to manage the app's configuration. Select `Close and stop editing` when you want to leave edit mode. ### Describe one focused change 1. In `What would you like to build...`, explain what should change and what should stay the same. 2. Name the screen, action, or data involved. For example: `Add a required Notes field after Pursuit status. Keep the project name field and save the note with the decision.` 3. Add a sample file or Bidlo record from the prompt menu when the change depends on a concrete example. 4. Send the request and follow the builder's progress in the conversation. A focused request is easier to review than several unrelated changes at once. ### Review the updated app 1. Wait for the preview to show the builder's latest change. 2. Repeat the exact action you asked it to change. 3. Check the success result and the main empty, validation, or error state. 4. If the app creates or updates Bidlo data, use a disposable record and confirm that the change was saved to the correct place. 5. If anything is wrong, describe what you observed in the same app chat and ask for one correction at a time. > A correct-looking preview doesn't prove that a data write is safe. Test record creation, updates, permissions, validation, and error recovery when the app uses them. ### Wait for the change to go live Bidlo publishes app-builder changes in the background. 1. Watch the status in `Builder mode` after the builder finishes editing. 2. Wait for `Publishing` to change to `Live`. 3. Test the changed path again after the live version loads. 4. If publishing fails, describe the failure in the app chat and ask the builder to repair it. ### Return to an earlier version 1. In `Builder mode`, select `Version history`. 2. Review versions from newest to oldest and select one to inspect it. 3. Restore the version you want to use. 4. Wait for the restored version to become live, then test the affected workflow. ### Related pages - [Build an app with AI](/docs/apps-automations/build-app) - [Version, publish, and share an app](/docs/apps-automations/publish-share-app) - [Apps overview](/docs/apps-automations/apps-overview) --- ## Publish & share apps https://www.bidlo.ai/docs/apps-automations/publish-share-app Choose what teammates can open and which version they see. Review the live version of a custom app, share it with specific people, and create the stable app link people use to open it. ### Understand versions and access Bidlo publishes changes made by the app builder in the background. `Builder mode` shows `Publishing` while a change is being deployed and `Live` when the current version is ready to use. Sharing controls who can open the app and whether a collaborator can edit it. The app link is one stable URL: people who already belong to the team open the app in that team, while invited outside collaborators land on the apps shared with them. ### Check which version is live 1. Select `Apps` in the sidebar. 2. Hover over the app, select `More` (`•••`), then open `Edit`. 3. Choose `New chat` or an existing conversation under `Chat history`. 4. Wait for `Builder mode` to show `Live`. 5. Select `Version history` and review the versions from newest to oldest. 6. Select a version to inspect it before you share the app. ### Restore an earlier version Use this when a previous version worked better than the current one. 1. Open the app in editing mode and select `Version history`. 2. Select the earlier version you want to use. 3. Review the preview so you know which behavior will return. 4. Restore the version. 5. Wait for it to become live, then test the affected workflow. ### Share the app with a specific person 1. Open the app and select `Share`. 2. On the `Share` tab, enter a teammate's name or email address in `Search people or emails...`. You can also enter the email address of someone outside your team. 3. Select the person and choose the access they need: - `Viewer` can open and use the app. - `Editor` can also change the app. - `Owner` controls the app and its sharing settings. 4. Confirm that the person appears under `People with access` with the intended role. 5. Select `Copy link`, then send the link to that person. ![The Pursuit Decisions Share tab showing People with access, the owner, general access, and Copy link.](https://media.bidlo.ai/docs/images/apps-automations/share-app-access.v1.png) > `Copy link` copies the app's address; it doesn't grant access by itself. Add the person before sending the link. > Only the app owner can grant editor access. ### Create an app link 1. Open the app and select `Share`. 2. Select the `Publish` tab. 3. Review the explanation under `Share with an app link`. 4. Select `Create app link`. 5. Review the access shown for the new link before distributing it. The app uses one stable link. Creating that link doesn't turn the app into a separate anonymous website. ![The Publish tab explains app-link behavior and offers the Create app link action.](https://media.bidlo.ai/docs/images/apps-automations/create-app-link.v1.png) ### Review or change access later 1. Open the app and select `Share`. 2. On the `Share` tab, review the owner and everyone listed under `People with access`. 3. Change a person's role or revoke their access when needed. 4. Use the `Publish` tab to review the app-link status. Access changes take effect immediately. Outside collaborators can use the shared app without gaining access to the rest of your team. ### Related pages - [Edit a custom app](/docs/apps-automations/edit-app) - [Permissions](/docs/collaboration/permissions) - [Apps overview](/docs/apps-automations/apps-overview) ### FAQs #### Does sharing an app link give someone permission to use the app? No. The link opens the app, but the person still needs the appropriate app access. #### What happens when I restore an earlier version of an app? The selected version becomes the live version. Review the app after restoring it so you can confirm the expected behavior is available to users. --- ## Find & organize apps https://www.bidlo.ai/docs/apps-automations/find-apps Open, search, and return to the custom apps available in your team. Use the Apps area to find the custom tools available in your current team, open the right one, and keep the list recognizable as it grows. ### Open an app from the sidebar 1. Select `Apps` in the sidebar. 2. If the app list is collapsed, select the `Apps` section heading to expand it. 3. Find the app by name. Bidlo lists the apps you can access in alphabetical order. 4. Select the app. It opens in the main area. The Apps area is team-specific. If you belong to more than one team, switch to the team that owns the app before looking for it. ### Search for an app 1. Open `Apps` in the sidebar. 2. Select `Search`. 3. Enter the app's name in the command palette. 4. Review the matches and select the app you want to open. > `Search` opens Bidlo's workspace-wide command palette, so results can also include pages and records. Check the result's name and icon before opening it. ### Rename an app Use a name that describes the app's job. For example, `Weekly project risk review` is easier to recognize than `Project app`. 1. Open `Apps` in the sidebar. 2. Hover over the app and select `More` (`•••`). 3. Select `Rename`. 4. Enter the new name. 5. Press `Enter`, or select outside the name field, to save it. The renamed app moves to its new alphabetical position. > `Rename` appears only when you can edit the app. If the option is missing, ask the app's owner to rename it or give you the required access. ### Keep the Apps section compact The Apps area uses one flat, alphabetical list. It doesn't provide folders or manual drag-and-drop ordering. Select the `Apps` section heading to collapse the list. Select it again to expand the list. ### Copy a direct link 1. Open `Apps` in the sidebar. 2. Hover over the app and select `More` (`•••`). 3. Select `Copy link`. 4. Paste the link into the place where you keep work references, or send it to an intended collaborator. Copying a link doesn't change who can access the app. ### Start a new app Select `New app` when no existing app fits the job. Bidlo opens an app-builder chat where you can describe the interface and workflow you want. The app appears in the list after the builder saves it for the first time. ### If an app is missing 1. Confirm that you're working in the team where the app was created. 2. Select `Search` and search for the exact app name. 3. Ask the owner whether the app is private, shared with selected users, or available through an app link. 4. If the app opens but shows older behavior than the editor sees, ask the editor to confirm that the latest version is `Live`. ### Related pages - [Apps overview](/docs/apps-automations/apps-overview) - [Build an app with AI](/docs/apps-automations/build-app) - [Version, publish, and share an app](/docs/apps-automations/publish-share-app) --- ## Upload files & folders https://www.bidlo.ai/docs/connections-export/upload-files-folders Upload files to a record or import a supported spreadsheet or map, then confirm the content appears correctly. Upload files to the record they support, or import a supported spreadsheet or map into your workspace. ### Upload one or more files to a record Use a record's `Files` tab when the files belong with a specific project, contractor, facility, or other record. 1. Open the record the files support. 2. Select the `Files` tab. 3. Select `New File` at the end of the file list. 4. Choose one or more files from your device. 5. Keep Bidlo open while the upload is in progress. Bidlo creates a file document for each file you choose. When the upload finishes, the files appear in the record's `Files` view. Select an uploaded file to preview it in the side panel. Select `Open in full page` when you need more room, or `Close panel` to return to the record. ### Add a file to an empty file document 1. Open the empty file document. 2. Select the prompt to choose a file. 3. Choose the file from your device. 4. Wait for the upload to finish. 5. Confirm that the file name and content appear. ### Import a spreadsheet or map Use `Import` when a spreadsheet or map file should create structured content in Bidlo. 1. Select `New` in the upper-right corner of Bidlo. 2. Select `Import` at the bottom of the New page screen. 3. Choose the matching import type: - Select `Spreadsheet` for a `.csv` or `.xlsx` file. - Select `Map` for a `.kmz` file. 4. Choose the file from your device. 5. Follow the prompts to review and finish the import. 6. Open the resulting page and confirm that the expected data appears. > Folder upload is not currently available in the live Bidlo interface. The `New` → `Import` menu does not include `File upload` or `Choose a folder`. Upload files through a record's `Files` tab instead. ### Check uploaded or imported content 1. Confirm that each uploaded file appears in the intended record. 2. Open a representative file and check its name and preview. 3. For an imported spreadsheet, check the column headings and a representative set of rows. 4. For an imported map, confirm that the expected locations appear. 5. Correct the source file and import it again if the resulting data is incomplete or incorrectly structured. > Upload only files your team is authorized to store. A file may upload successfully even when Bidlo cannot preview or read its contents. ### Related pages - [Files and linked content](/docs/data-records/files-links) - [Supported file types](/docs/reference/supported-files) - [Troubleshoot Bidlo](/docs/reference/troubleshoot) --- ## Import data https://www.bidlo.ai/docs/connections-export/import-data Import a spreadsheet or map file into a new Bidlo page and verify the result before relying on it. Create a page from a spreadsheet or map file, then inspect a small sample before using the imported records in team work. ### Prepare the file For a spreadsheet: - use `.csv` or `.xlsx`; - keep one header row; - give every column a clear name; - use one row per record; - remove totals, merged cells, and decorative headings; - choose the column that should identify each record. For a map, the current import menu presents `.kmz`. Use a representative test file before importing a large geographic dataset. ### Start the import 1. Select `New` in the workspace header. 2. Select `Import`. 3. Choose `Spreadsheet` for `.csv` or `.xlsx`, or `Map` for `.kmz`. 4. Select the file from your computer. 5. Review the preview before continuing. ### Review the field mapping For each source column, confirm the destination name and field type. Create a field when the information should become part of the new collection; ignore a column when it should not be imported. Pay particular attention to: - the title or name field; - dates and time zones; - numbers, currency, and percentages; - addresses or coordinates; - repeated categories that should use consistent selectable values; - identifiers with leading zeroes. Do not map a column to an existing field only because the names look similar. Confirm that the meaning and field type match. ### Verify the imported result 1. Finish the import and wait for the new page to open. 2. Compare several records with the source file, including the first and last rows. 3. Check names, dates, numbers, locations, and blank values. 4. Confirm the record count is plausible. 5. Open one record to make sure its fields were created as intended. Use a small disposable file first when duplicate handling, relations, or rollback behavior matters. Do not repeat a production import to troubleshoot it until you know whether the first attempt created records. ### If the import fails - Save the spreadsheet as a clean `.csv` and try the small sample again. - Remove formulas, merged cells, and unsupported formatting. - Confirm that the file is not password-protected. - For maps, confirm that the file contains usable geographic features. - Record the visible error and file type before contacting support. ### Related pages - [Collections and records](/docs/data-records/collections-records) - [Field types](/docs/data-records/field-types) - [Supported file types](/docs/reference/supported-files) ### FAQs #### Why should I review a small sample before using imported records? A sample helps you catch incorrect field mappings, date formats, duplicates, and missing values before the imported data becomes part of team work. #### What should I do if an imported record is not visible? Check the current view’s filters before importing again. The record may exist without matching the view. --- ## Export views https://www.bidlo.ai/docs/connections-export/export-view Download the records represented by a supported view. Download the records in a table view as an Excel or CSV file, or save the visible page as a PDF or website. ### Prepare the view The export uses the current view, so set up the data before downloading it. 1. Open the table view you want to export. 2. Apply the filters and sorts that define the records you need. 3. Show the columns you want included and arrange them in the order you want. 4. Review the visible rows and column headings. ### Export the view 1. Select More (⋮) in the top-right corner of the view to open `Page settings`. 2. Under `Data & actions`, select `Export`. 3. In the Export dialog, choose a format: - `Excel` downloads an `.xlsx` spreadsheet. - `CSV` under Data downloads a `.csv` data file. - `PDF` downloads the visible page as a `.pdf`. - `Website` exports the page for viewing as a website. 4. Save the downloaded file when your browser prompts you. `KML` appears in the Export dialog but is unavailable for a table view. Use a Map view when you need a KML export. ### Check the exported file 1. Open the downloaded file in a compatible application. 2. Confirm that the expected records and columns are present. 3. Check dates, numbers, and other formatted values before sharing or editing the file. 4. Return to Bidlo, adjust the current view, and export again if the file contains the wrong scope. > An export is a separate copy of the current view, not a live connection or a complete backup of the underlying collection. Later changes in Bidlo don't update a file you've already downloaded. ### Copy data for an API or JSON workflow The Export dialog also provides `Copy API request` and `Copy to JSON`. Use these options when you need to move the view data into a technical workflow instead of downloading a document or spreadsheet. ### Related pages - [Filter, sort, and group](/docs/views-dashboards/filter-sort-group) - [Table view](/docs/views-dashboards/table-view) - [Export map data as KML](/docs/connections-export/export-map-kml) ### FAQs #### Does an export include the entire collection? It uses the current view and its scope. Check the visible fields, filters, grouping, and records before exporting. #### Will the exported file update when Bidlo changes? No. An export is a separate snapshot, not a live connection or a complete backup of the underlying collection. --- ## Export KML https://www.bidlo.ai/docs/connections-export/export-map-kml Download the current map area and pinned located records for use in a compatible mapping tool. Export a Map view when you need to inspect its pinned locations in another KML-compatible mapping tool. ### Before you export KML export is available for Map views. Position the map over the area you need and confirm that the intended located records are pinned and visible. ### Export the map 1. Open the Map view. 2. Open the view settings. 3. Select `Export`. 4. Choose `Export KML`. 5. Save the downloaded `.kml` file. The export uses the current map area and pinned located documents. A record without a usable location cannot appear as a mapped feature. ### Verify the file 1. Open the `.kml` in a compatible mapping tool. 2. Confirm that the expected area opens. 3. Compare several points with the Bidlo Map view. 4. Check that sensitive locations are appropriate for the people who will receive the file. KML is a portable copy. Changes made in the external tool do not update the Bidlo records, and later Bidlo changes do not update an earlier export. ### If the export is incomplete - Return to Bidlo and confirm that each missing record has a location. - Check the map filters and current area. - Pin the records you intend to export. - Export again and compare the new file before sharing it. ### Related pages - [Map view](/docs/views-dashboards/map-view) - [Export a view](/docs/connections-export/export-view) - [Troubleshoot Bidlo](/docs/reference/troubleshoot) ### FAQs #### Why is a record missing from the KML file? The export uses the current map area and pinned records with usable locations. Confirm the record is located, pinned, and inside the area you intend to export. #### Does KML export change the map or its records? No. It creates a file for use in another mapping tool and does not edit the Bidlo view or its underlying records. --- ## API keys https://www.bidlo.ai/docs/connections-export/api-keys Create the least-privileged team API key, save its secret once, and revoke it when it is no longer needed. Use an API key only when an approved script, integration, or client needs programmatic access to your Bidlo team. ### Create a key You need the appropriate team-management access to create or remove keys. 1. Open `Settings` → `API`. 2. Select `New key`. 3. Enter a label that identifies the owner and purpose, such as `Estimating export - production`. 4. At `Access`, choose `Read only` unless the integration must change data. 5. Select `Create key`. 6. Copy the secret immediately and store it in an approved secret manager. The secret is shown for you to save at creation time. Do not assume you can recover the same value later. ### Use the least access required - Choose `Read only` for search, reporting, and retrieval. - Choose read/write access only when the integration has a reviewed need to create or change Bidlo data. - Create separate keys for separate tools or environments so one can be revoked without disrupting the others. ### Check and revoke a key Return to `Settings` → `API` to review a key's label and usage information. Remove a key when the tool is retired, the owner changes, or the secret may have been exposed. Then verify that the integration can no longer connect. > Treat an API key like a password. Never place it in chat, screenshots, source control, browser code, support messages, or public documentation. ### Related pages - [Connect with Bidlo MCP](/docs/connections-export/mcp) - [Security and access](/docs/account-admin/security-access) - [Team settings](/docs/account-admin/team-settings) ### FAQs #### Should I create one API key for several integrations? Use a separate key for each approved integration. That makes access easier to audit and revoke without interrupting other tools. #### When does an integration need read/write access? Only when its reviewed workflow must create or change Bidlo data. Use `Read only` for search, reporting, and retrieval. --- ## Bidlo MCP https://www.bidlo.ai/docs/connections-export/mcp Generate the current Bidlo MCP configuration and confirm that a compatible client can find information in the intended team. Connect a compatible Model Context Protocol client to the Bidlo team you are currently using. ### Generate the configuration 1. Open `Settings` → `MCP`. 2. Under `Configuration`, select `Generate key` if no usable key is available. 3. Copy the complete configuration shown by Bidlo. 4. Store the key securely while you configure the client. Use the generated configuration exactly as shown. Bidlo builds the MCP endpoint from the current product environment, so do not replace it with a hard-coded host from an older guide. ### Add it to your MCP client Follow the compatible client's instructions for adding an MCP server. Paste the generated server configuration into the client's MCP settings, save it, and restart or reconnect the client if required. The current configuration uses `mcp-remote` and sends the Bidlo key in an authorization header. Anyone who can read that configuration may be able to use the key. ### Verify the connection First, ask the client to find a known project in the current team. This confirms the connection works without creating or changing anything. Confirm that: - the client reports the Bidlo server as connected; - results come from the intended team; - a known record can be found; - the test doesn't create or change any data. If a saved key no longer exposes a copyable secret, generate a new key rather than trying to reconstruct the old one. Remove the unused key after the new connection works. ### If the connection fails - Copy the current configuration again from `Settings` → `MCP`. - Check that the client supports remote MCP servers. - Confirm that the JSON or settings format is valid. - Restart the client after saving its configuration. - Revoke and replace a key that may have been exposed. ### Related pages - [API keys](/docs/connections-export/api-keys) - [Security and access](/docs/account-admin/security-access) - [Troubleshoot Bidlo](/docs/reference/troubleshoot) ### FAQs #### Which team can an MCP client access? The configuration connects to the Bidlo team that was active when you generated it. Confirm the team before copying the configuration. #### How should I test a new connection safely? Ask the client to find a known project first. A read-only lookup confirms the connection and scope without creating or changing data. --- ## Profile https://www.bidlo.ai/docs/account-admin/profile Update your preferred name, profile image, and phone number, and find your account identifiers. Keep the personal details teammates see in Bidlo current. ### Update your profile 1. Open `Settings` → `Profile`. 2. Select your profile icon to upload a new image, or remove the current image when needed. 3. Edit `Preferred name`. 4. Add or update `Phone number` if your organization uses it. 5. Click outside the box and make sure the new value remains. Profile fields save as you finish editing them; there is no separate Save button on this page. ### Understand the account information Your email is displayed as account information and is not edited from this profile form. `User ID` is a stable identifier you can copy when support asks for it. Do not publish your user ID or include personal account details in a public screenshot. ### If a change does not remain - Reopen `Settings` → `Profile` and try one field at a time. - Confirm that the uploaded image uses a common supported format. - Refresh once and check the value again. - Capture the visible error without exposing personal details before contacting support. ### Related pages - [Sign in and resolve account-access problems](/docs/account-admin/sign-in-account-access) - [Security and access](/docs/account-admin/security-access) - [Teams and workspaces](/docs/getting-started/teams-and-workspaces) --- ## Appearance https://www.bidlo.ai/docs/account-admin/appearance-preferences Choose the visual theme, interface detail, dictation stop word, and sidebar sections that suit your work. Personalize how Bidlo looks and how much interface detail it shows on this device. ![Preferences in the ACME team show the Light theme, default primary color, and Advanced layout complexity selected.](https://media.bidlo.ai/docs/images/account-admin/preferences-settings.v2.png) ### Open Preferences Open `Settings` → `Preferences`. Changes here affect your experience; they do not change the team's records or grant additional permissions. ### Choose appearance - `Theme` follows your device or uses the light or dark option available in the selector. - `Primary color` changes the interface accent color. Theme is device-specific, so another device may use a different appearance. ### Choose layout complexity Select `Simple`, `Medium`, or `Advanced` under `Layout Complexity`. - Use `Simple` when you want the fewest visible controls. - Use `Medium` for a balance of guidance and editing tools. - Use `Advanced` when you regularly manage views, fields, and other detailed controls. Changing complexity does not remove data. It changes how much interface detail is visible. ### Set dictation and sidebar preferences Set the dictation stop word if you use voice input. Under `Sidebar`, choose whether sections such as `Recent`, `Favorites`, `Shared pages`, `Public pages`, and `Private pages` appear. Hiding a sidebar section does not delete or unshare its pages. You can turn the section on again from Preferences. ### Related pages - [Choose your workspace mode](/docs/getting-started/workspace-modes) - [Navigate with the sidebar](/docs/navigation/sidebar) - [Voice dictation](/docs/bidlo-ai/voice-dictation) --- ## Team settings https://www.bidlo.ai/docs/account-admin/team-settings Update team identity and understand the access consequences of leaving or deleting a team. Use General settings to keep the team's name and icon recognizable. Treat the danger-zone actions as separate account-lifecycle decisions. ### Update the team name or icon You need the team access required to manage these settings. 1. Open `Settings` → `General`. 2. Edit `Team name`. The current field allows up to 65 characters. 3. Under `Icon`, select `Edit` to upload an image or choose an emoji. 4. Confirm the updated identity in the sidebar. The icon can also appear in team notifications, so choose one teammates can recognize at a small size. ### Leave a team `Leave team` removes your access to the team and its content, including pages you created inside that team. Before leaving, confirm that the team has another appropriate owner or administrator and that any work you are responsible for has been handed off. Leaving is not a way to hide a team temporarily. ### Delete a team `Delete team` permanently deletes the team and its pages and files. Use it only when the team itself should cease to exist and after the required people have confirmed the decision. > Do not use `Leave team` or `Delete team` while changing a name, icon, or other routine setting. These actions can remove access or data. ### Find the team ID The General page also shows `Team ID`. Copy it when support or an approved integration asks you to identify the workspace. Do not treat it as an API key. ### Related pages - [People and roles](/docs/account-admin/people-roles) - [Permissions](/docs/collaboration/permissions) - [Security and access](/docs/account-admin/security-access) ### FAQs #### Why can’t I change the team name, icon, or other settings? You must be a team `Owner` or `Admin` to change the team name, icon, or other settings. If the controls are unavailable, ask an owner or admin to make the change or update your role. #### What is the difference between leaving and deleting a team? Leaving removes only your access to the team and its content. Deleting permanently removes the team, including its pages and files, and should be used only after the decision and handoff have been confirmed. --- ## People & roles https://www.bidlo.ai/docs/account-admin/people-roles View team members and pending invitations, choose the right role, and update team-level access. Use the People settings to see who belongs to the current team, who still has a pending invitation, and what each person can do at the team level. ### View team members and their roles 1. Confirm that you are working in the intended Bidlo team. 2. Open `Settings` → `People`. 3. Select `Members`. 4. Find the person you want to review. 5. Check their `Role` to see their team-level permissions. 6. Review `Activity` when you need to confirm whether they have recently used the team. Use the period selector, such as `Last 90 days`, to change the activity window. The top of the People page also shows `Paid seats`, `Current members`, and the team's plan expiration information. Use these totals to understand whether an invitation may affect seat usage. If `Members` is empty, the page shows `No members found`. ### Choose the right team role Assign the least privilegedaccess the person needs. The role picker describes the four available team roles: | Role | Team-level access | | --- | --- | | `Owner` | Can edit team settings, delete the team, and manage members. | | `Admin` | Can edit team settings and manage members. | | `Member` | Can access team pages, but cannot edit team settings. | | `Viewer` | Can view team pages and chat with the agent, but cannot make changes. | ![The Add members role menu compares Owner, Admin, Member, and Viewer permissions before an invitation is sent.](https://media.bidlo.ai/docs/images/account-admin/people-role-choices.v1.png) > An `Owner` can delete the team. Grant this role only to someone who needs full control of the team. Team roles and item permissions solve different problems. A person's team role controls what they can do across the team. A private page or a custom app can still have its own access list. ### View pending invitations 1. Open `Settings` → `People`. 2. Select `Invites`. 3. Review the people who have been invited but have not joined the team. 4. Check the invitation's email address and assigned role before sending a replacement invitation. The number beside `Invites` is the current pending-invitation count. When there are no outstanding invitations, the page shows `No pending invites`. ### Invite people to the team Before inviting someone, confirm their work email address, the current team, and the role they need. Invitations can affect paid seats. 1. Open `Settings` → `People`. 2. Select `Add members`. 3. Enter one or more email addresses. Separate multiple addresses with commas. 4. Open `Invite as` and choose `Owner`, `Admin`, `Member`, or `Viewer`. 5. Review the addresses and role, then select `Invite`. 6. Return to `Invites` and confirm that the invitation is pending. The invitation becomes an active membership after the recipient accepts it using the invited email address. > Adding someone to the team does not automatically give them access to every private page or custom app. Review those permissions separately. ### Change a member's role You need permission to manage members. If the role control is unavailable, ask a team owner or administrator to make the change. 1. Open `Settings` → `People`. 2. Select `Members`. 3. Find the person whose access needs to change. 4. Open their current `Role` control. 5. Select the new role. 6. Confirm that the new role appears beside the person's name. Role changes affect the person's team-level access immediately. After reducing a role, also review any page or custom-app access granted directly to that person. ### Confirm that someone has the intended access 1. In `Settings` → `People`, confirm that the person appears under `Members` rather than `Invites`. 2. Check that their team role permits the action they need to take. 3. Open the relevant page's `Share` panel and review its individual and general access. 4. If the page contains a custom app, review the app's separate sharing settings. 5. Ask the person to reopen the item while signed in with the work account that belongs to the team. ### Related pages - [Invite teammates](/docs/collaboration/invite-teammates) - [Permissions](/docs/collaboration/permissions) - [Security and access](/docs/account-admin/security-access) - [Team activity and usage](/docs/account-admin/activity-usage) ### FAQs #### Does joining a team give someone access to every page and app? No. Joining a team gives someone access to pages shared with `Everyone at [team name]`. Pages set to `Only people invited` remain limited to the owner and people added with `Can view` or `Can edit` access. Custom apps have separate permissions and must be published to the team or shared directly with the person as a `Viewer`, `Editor`, or `Owner`. #### Why can’t I change another person’s role? You must be a team `Owner` or `Admin` to change another person’s role. `Member` and `Viewer` roles can’t manage team members. If the role control is unavailable, ask an owner or admin to make the change or update your access. --- ## Activity & usage https://www.bidlo.ai/docs/account-admin/activity-usage Review team adoption, flow activity, and a member's recent changes without treating usage as performance scoring. Use the Activity report to understand how the team is using Bidlo and where someone may need onboarding or access help. ### Review the report 1. Open `Settings` → `Activity`. 2. Choose `Users` or `Flows` when both tabs are available. 3. Select the reporting period, such as `Last 12 months`. 4. Review the activity heatmap and total event count. 5. Select a member to inspect the activity details available for that person. Depending on the data available, the report can include sessions, time in the platform, and recent changes. A blank report can mean there is no activity in the chosen period, not that access is broken. ### Interpret activity carefully Use the report to answer operational questions such as: - Has the team started using the workspace? - Does a teammate need help getting signed in? - Did activity occur around a recent rollout? - Which recent changes should an administrator inspect? Usage volume does not measure work quality, productivity, or work completed outside Bidlo. Do not use a single metric as a performance score. ### If activity looks incomplete - Confirm the reporting period. - Check the `Users` and `Flows` tabs separately. - Confirm that the person belongs to the current team. - Allow recent activity time to appear before treating it as missing. - Use the underlying page or record when you need to verify its current value. ### Related pages - [People and roles](/docs/account-admin/people-roles) - [Invite teammates](/docs/collaboration/invite-teammates) - [Security and access](/docs/account-admin/security-access) ### FAQs #### Does a blank activity report mean someone has lost access? Not necessarily. It can mean there was no activity in the selected period or that recent activity has not appeared yet. Confirm the person belongs to the current team before treating it as an access problem. --- ## Security & access https://www.bidlo.ai/docs/account-admin/security-access Review who can access a team, page, custom app, or integration and reduce access that is no longer needed. Review access at the level where it was granted: the team, an individual page, a custom app, or an API or MCP key. Checking only one level can miss access that was granted somewhere else. ### Understand the access layers | Access layer | What it controls | Where to review it | | --- | --- | --- | | Team membership and role | Whether a person belongs to the team and what they can do across it. | `Settings` → `People` | | Page access | Who can open or edit one page and whether the whole team can open it. | The page's `Share` panel | | Custom-app access | Who can use, edit, or manage one custom app. | The app's `Share` panel and `People` tab | | Programmatic access | Which scripts, integrations, or MCP clients can access team data. | `Settings` → `API`, `MCP`, and `Connections` | Use individual accounts for people and separate keys for separate tools. This makes access easier to review and revoke without disrupting someone else. ### Review who can access the team 1. Open the team you want to audit. 2. Open `Settings` → `People`. 3. Select `Members` and review each person's `Role`. 4. Select `Invites` and review invitations that have not become active memberships. 5. Compare `Paid seats` and `Current members` so you understand the seat impact before adding anyone. 6. Change a person's role when they need less or more team-level access. Choose the least role that supports the person's work. `Owner` and `Admin` can manage members and team settings; `Member` cannot edit team settings; `Viewer` cannot make changes. > Team membership does not override private-page or custom-app access. Review the item itself when someone can enter the team but cannot open or edit a particular item. ### Review who can access a page 1. Open the page. 2. Select `Share` in the page header. 3. Under `People with access`, review the owner and anyone invited individually. 4. Check the access level beside each person, such as `Can view` or `Can edit`. 5. Under `General access`, check whether the page is limited to invited people or available to `Everyone at [team name]`. 6. Select `Done` after you finish the review. When `General access` says `Everyone at [team name]`, anyone in the current team can open the page. This is team-wide access; it does not publish the page as an anonymous website. ### Give someone access to a page 1. Open the page and select `Share`. 2. Select `Search people or emails...`. 3. Enter the person's name or email address and select the correct person. 4. Choose `Can view` when they only need to read the page, or `Can edit` when they need to change it. 5. Confirm that the person appears under `People with access`. 6. Select `Copy link` if you want to send them the page URL. 7. Select `Done`. > `Copy link` copies the address but does not grant access. Add the person or change `General access` before sending the link. To change or remove someone's page access, return to `People with access`, open the control beside their name, and choose the new access level or removal option. Confirm the result before closing the panel. ### Make a page available to the team 1. Open the page and select `Share`. 2. Under `General access`, open the current audience setting. 3. Select `Everyone at [team name]`. 4. Confirm that the panel says `Anyone on the team can open it`. 5. Select `Done`. Adding specific people to a team-wide page can move it from `Public` to `Shared`. Review the message in the Share panel before changing the audience. ### Review custom-app access Custom apps have their own access list, including when an app appears inside a page. 1. Select `Apps` in the sidebar. 2. Open the custom app. 3. Select the app's `Share` control. 4. Open the `People` tab. 5. Review the owner and everyone who has app access. 6. Check whether each person is a `Viewer`, `Editor`, or `Owner`. Use `Viewer` for someone who only needs to use the shared version of the app. Use `Editor` only when they need to change the app. The `Owner` controls the app and its sharing settings, and only the owner can grant editor access. If you can open an app but cannot see its sharing control, ask the app owner to review your access. ### Change custom-app access 1. Open `Apps` and select the app. 2. Select `Share` and open `People`. 3. Search for a teammate by name or email address. 4. Select the person and choose the access they need. 5. Confirm that the person appears in the app's access list. 6. Return to `People` later to change their role or revoke their access. Publishing an app to the team does not publish it as an anonymous website. App publication, page visibility, and website publishing are separate settings. ### Review API, MCP, and connection access 1. Open `Settings` → `API`. 2. Review every key's label and usage information. Each label should identify the tool, owner, or purpose. 3. Revoke keys for retired tools, departed owners, or secrets that may have been exposed. 4. Open `Settings` → `MCP` and review the servers and keys used by MCP clients. 5. Open `Settings` → `Connections` and review services that still have access to the team. 6. After removing access, verify that the retired integration can no longer connect. Create separate keys for separate tools or environments, and choose read-only access unless the integration has a reviewed need to change Bidlo data. > Treat API and MCP keys like passwords. Do not place them in chat, screenshots, source control, support messages, or public documentation. ### Troubleshoot unexpected access If someone cannot open or edit an item, check the layers in this order: 1. Confirm that they are signed in with the intended work account. 2. Confirm that they opened the correct Bidlo team. 3. In `Settings` → `People`, confirm that they are a member rather than a pending invite and that their role permits the action. 4. Open the page's `Share` panel and review `People with access` and `General access`. 5. If the page contains a custom app, review the app's separate `People` tab. 6. Ask the person to reopen the item and confirm what they can now see or change. ### Related pages - [People and roles](/docs/account-admin/people-roles) - [Permissions](/docs/collaboration/permissions) - [Share pages](/docs/collaboration/share-pages) - [API keys](/docs/connections-export/api-keys) - [Connect with Bidlo MCP](/docs/connections-export/mcp) ### FAQs #### Why can someone open a page but not the app embedded in it? Page access and custom-app access are separate. Review the app’s sharing settings and give the person the appropriate app role. #### What should I revoke when a tool should no longer access Bidlo? Revoke the specific API or MCP key used by that tool. Separate keys for separate integrations make this possible without interrupting unrelated access. --- ## Sign-in & access https://www.bidlo.ai/docs/account-admin/sign-in-account-access Distinguish a sign-in problem from an invitation, account, team, or permission problem. Start with what you can see. A failed sign-in, a missing team, and a page you cannot open have different fixes. ### You cannot complete sign-in If your password is not working, reset it from the Bidlo sign-in screen: 1. Enter the email associated with your Bidlo account. 2. Select the password-reset option. 3. Check your inbox for the password-reset email. Check filtered or junk mail if it does not appear. 4. Open the newest reset email, follow its link, and create a new password. 5. Return to Bidlo and sign in with the new password. If the link has expired, request one new reset email and use the newest message. If your organization uses single sign-on instead of a Bidlo password, reset your password through that account provider or contact your administrator. > Do not share passwords, one-time codes, or recovery links with Bidlo teammates or support. ### Your invitation is pending or missing - Open the newest invitation while signed in with the exact invited email. - Check filtered and junk mail. - Ask a team owner to confirm the address under `Settings` → `People` → `Invites`. - Avoid requesting several duplicate invitations before the owner checks the pending one. ### You signed in but the team is missing Confirm that you used the correct work account. Ask a team owner to verify that you are an active member of the intended team, not only a member of another workspace. ### The team opens but a page or app does not This is usually an access-scope problem rather than sign-in. Check: - whether the page is private or public; - whether it belongs to the current team; - whether your team role permits the action; - whether an embedded custom app has separate viewer access. ### Escalate with useful evidence If the problem remains, provide the time, invited email domain, team name, browser, page or app name, and the exact visible error. Include a cropped screenshot only after removing one-time codes, secrets, and unrelated data. ### Related pages - [Teams and workspaces](/docs/getting-started/teams-and-workspaces) - [People and roles](/docs/account-admin/people-roles) - [Permissions](/docs/collaboration/permissions) - [Troubleshoot Bidlo](/docs/reference/troubleshoot) ### FAQs #### I can sign in, so why is a team, page, or app still missing? Sign-in confirms your account, but access is scoped separately. Check that you used the invited email, opened the correct team, and have access to the specific page or app. --- ## AI usage https://www.bidlo.ai/docs/account-admin/ai-usage Review your team's Bidlo credit use, chats, custom apps, custom agents, and completed runs by month. Use the Bidlo AI report to understand how your team is using AI features during a selected month. The report brings credit use, chats, custom apps, custom agents, and completed agent runs into one place. ![The ACME Bidlo AI report shows the selected month, credit total, reset date, cumulative usage chart, and monthly agent-activity summary.](https://media.bidlo.ai/docs/images/account-admin/bidlo-ai-usage.v1.png) ### Review AI usage 1. Open `Settings` → `Bidlo AI`. 2. Stay on the `General` tab. 3. Review the Bidlo credits used and the current allowance shown at the top. 4. Use `Previous month` or `Next month` to move between available months. 5. Check the date range above the cumulative usage chart to confirm which days are included. 6. Review `This month's usage`, then choose `Team`, `Custom apps`, or `Custom agents` for a detailed breakdown. The current month can show a partial date range through today. `Next month` is unavailable when you're already viewing the current month. ### Understand the report The summary at the top shows credits used, the allowance available to the team, and the date when the displayed usage period resets. The chart shows cumulative credit use across the selected month. The three summary metrics describe custom-agent activity: - `Agent builders` shows how many members are creating Custom Agents. - `Agents in action` shows how many Custom Agents were live during the month. - `Agents driving value` shows completed agent runs. Use the detail tabs to answer different questions: - `Team` compares each member's credits used, chats, and custom apps. - `Custom apps` compares each app's credits used and version count. - `Custom agents` shows usage after a custom agent has been used in chats. ### If usage looks incomplete - Confirm the selected month and the date range above the chart. - Check all three detail tabs; each one reports a different type of activity. - Remember that a zero can mean the feature wasn't used during that month. - If `Custom agents` is empty, use an agent in a chat before expecting usage to appear. - Treat the allowance and reset date shown in Bidlo as the current source of truth for your team. ### Related pages - [Bidlo AI overview](/docs/bidlo-ai/ai-overview) - [Create and use agents](/docs/bidlo-ai/agents) - [Team activity and usage](/docs/account-admin/activity-usage) ### FAQs #### Why does AI usage look lower than expected? Confirm that you’re viewing the correct month and team. The report only includes Bidlo AI activity within that selection, and recent activity may take time to appear. It doesn’t count activity from other teams, other months, non-AI Bidlo features, or external tools. #### Does higher credit use mean better results? No. Credit use measures consumption, not quality. Review the underlying chats, apps, agents, and completed runs when you need to understand the work behind the total. --- ## Keyboard shortcuts https://www.bidlo.ai/docs/reference/keyboard-shortcuts Use current shortcuts for search, dictation, and the sidebar. Use these shortcuts to reach common Bidlo controls without leaving the keyboard. | Action | Mac | Windows | | --- | --- | --- | | Open global search | `⌘ K` | `Ctrl K` | | Start dictation | `⌘ E` | `Ctrl E` | | Toggle the current sidebar | `⌘ B` | `Ctrl B` | ### Search from anywhere Press `⌘ K` on Mac or `Ctrl K` on Windows to open the `Command Palette`. ![The ACME Command Palette is open for global search, with controls to navigate results, switch to Ask AI, or open the selected item.](https://media.bidlo.ai/docs/images/reference/command-palette-shortcut.v1.png) Inside global search: - press `Esc` to close; - use the arrow keys to move through results; - press `Tab` to switch to `Ask AI`; - press `Enter` to open the selected result. ### Dictate a prompt Press `⌘ E` on Mac or `Ctrl E` on Windows while a Bidlo prompt is focused. Review the transcription before sending it, especially names, dates, project identifiers, quantities, and units. ### Toggle the sidebar Press `⌘ B` on Mac or `Ctrl B` on Windows to hide or restore the current sidebar. ### Related pages - [Global search](/docs/navigation/global-search) - [Voice dictation](/docs/bidlo-ai/voice-dictation) - [Navigate with the sidebar](/docs/navigation/sidebar) --- ## Supported files https://www.bidlo.ai/docs/reference/supported-files See which file types work for storage, imports, previews, AI context, and exports—and where to use each one. Use this page to check which file types work for storage, imports, previews, AI context, and exports—and where each workflow starts. ### File type reference | Purpose | File types | Where to use them | What to expect | | --- | --- | --- | --- | | Store files with a record | The file picker doesn't restrict extensions | Open the record's `Files` tab, then select `New File` | Bidlo creates a file document for each selected file. Upload support doesn't guarantee a preview or AI-readable content. | | Import a spreadsheet | `.csv`, `.xlsx` | Select `New` → `Import` → `Spreadsheet` | Bidlo uses the file to create a new page and collection. Review the preview and field mapping before completing the import. | | Import map data | `.kmz` | Select `New` → `Import` → `Map` | Use a representative file first and confirm that its geographic features appear correctly. | | Preview file content on cards | PDFs and image files | In view settings, set `Card preview` to `Content` | PDFs show a thumbnail of the first page; image files show the image itself. | | Give a file to Bidlo AI | The `Add file` picker doesn't restrict extensions | In a chat prompt, select `Add file` | Confirm the attachment appears before sending. A successful attachment doesn't guarantee that Bidlo AI can extract every format. | | Fill a PDF template with AI | `.pdf` with fillable AcroForm fields | Attach the PDF in the relevant chat or agent workflow | Scanned or flattened PDFs may not be fillable. | | Export a table or view | `.csv` or Excel | Open the view or selection actions and choose the available download option | The export reflects the visible or selected scope, not necessarily the entire collection. | | Export a map | `.kml` | Use the map export action | Open the downloaded file in a compatible mapping application and verify its contents. | ### Understand the differences - **Upload** stores a file in Bidlo. It doesn't promise that the file can be previewed, imported, or read by AI. - **Import** turns a supported spreadsheet or map file into structured Bidlo data. - **Preview** shows supported content visually without changing the original file. - **AI context** gives Bidlo AI a source to inspect. Test one representative file when extraction or generation matters. - **Export** downloads Bidlo data for use in another application. > `.kmz` is used for map imports, while `.kml` is used for map exports. ### Related pages - [Upload files and folders](/docs/connections-export/upload-files-folders) - [Import data](/docs/connections-export/import-data) - [Attach files and mention documents](/docs/bidlo-ai/attachments-mentions) - [Troubleshoot Bidlo](/docs/reference/troubleshoot) ### FAQs #### If a file uploads successfully, can Bidlo always preview or read it? No. Uploading stores the file, but preview, import, and AI extraction support can differ by format. #### What is the difference between KML and KMZ in Bidlo? Use `.kmz` for supported map imports and `.kml` for map exports. --- ## Troubleshooting https://www.bidlo.ai/docs/reference/troubleshoot Start with the safest checks for loading, search, uploads, and access. Start with the safest checks for loading, search, uploads, and access. ### If something isn’t working 1. Confirm the correct account and team. 2. Refresh the current page once and wait for data to finish loading. 3. Try the same record from global `Search...`. 4. Check page location, membership, role, and browser permissions. 5. For an upload, retry one supported test file and verify the destination. 6. Capture the visible error, time, team, page name, and steps before contacting support. > Don't delete, duplicate, or bulk-edit records as a troubleshooting step. Preserve the failing state when it helps support reproduce the issue. ### Related pages - [Sign in account access](/docs/account-admin/sign-in-account-access) - [Security access](/docs/account-admin/security-access) - [Global search](/docs/navigation/global-search) --- ## Put bids in the order your team needs https://www.bidlo.ai/research/put-bids-in-the-order-your-team-needs Product updates for September 1, 2026–September 7, 2026 This week: put bids in the order your team needs, connect HCSS estimates to project line items, and edit your apps through chat. ### Put bids in the order your team needs Drag rows and cards into the order you want across tables, lists, boards, galleries, and calendars. Move a bid into another status group to update it, or select several records and move them together. Your order stays with the team after a reload. If the view is sorted, Bidlo asks before switching to manual order. ### Connect HCSS estimates to project line items When an HCSS estimate item has a project and pay-item code, Bidlo links it to the matching project item or creates one when needed. New items carry the available description, takeoff quantity, unit, and material. The import's finishing pass also fills eligible missing links from earlier imports, so priced work can appear under the project without a fresh import. ### Edit your apps through chat Open an app and choose Edit, or ask a chat to change it. Describe the change in the chat bar and review the updated preview while Bidlo publishes it in the background. The Builder mode strip keeps publication status, History, and Settings nearby. Open History to inspect an earlier version or restore it when needed. ### What else changed - [Shared views update live across app tabs, while different simultaneous edits can both be preserved.](https://app.notion.com/p/Show-view-changes-live-in-app-tabs-and-stop-edits-overwriting-each-other-3cfdad00a1dc813183a6f69190bbf8de) - [Add plans and photos directly from Files views or empty file pages.](https://app.notion.com/p/Add-a-file-from-a-files-view-or-an-empty-file-page-3cfdad00a1dc81a4b43bdcfc39c50df8) - [Reuse custom colors across tags, icons, note highlights, and formatting.](https://app.notion.com/p/Let-people-pick-any-custom-color-not-just-the-ten-named-ones-3d0dad00a1dc81ac9917c08eb0af5cc7) - [Keep bulk actions and view tabs within reach while scrolling long tables.](https://app.notion.com/p/Keep-bulk-actions-and-view-tabs-in-reach-while-scrolling-3cfdad00a1dc81f692f3d16b83b89713) - [Published apps keep showing their Bidlo data after saves and refreshes.](https://app.notion.com/p/Serve-published-apps-against-the-public-domain-not-the-protected-deploy-URL-3d0dad00a1dc81b5ab73e7d50a2b6f24) - [Keep your selected Views tab and scroll position when refreshing or opening a page in full.](https://app.notion.com/p/Keep-your-Views-tab-and-spot-when-refreshing-or-opening-a-page-in-full-3cfdad00a1dc819f8a20d7e984b7d67a) - [Timeline side tables inherit your table columns, and resizing a bar avoids accidental dependencies.](https://app.notion.com/p/Views-improvements-3d2dad00a1dc81b588e3d2781675802c) - [Table rows stay visible after closing the side panel, and failed view saves show a clear error.](https://app.notion.com/p/Views-improvements-3d0dad00a1dc817b89f7c49cd296b52b) - [Reapplying an auto tag updates projects without the previous relation error.](https://app.notion.com/p/Auto-tag-update-restoring-a-relation-no-longer-trips-the-live-unique-index-3d2dad00a1dc81b59234ee04088d1f21) - [Finished chats notify you on other pages, and new chats open without a misleading missing-page message.](https://app.notion.com/p/Notes-improvements-3d2dad00a1dc81d48dd9d3b571a69a19) - [App previews show your latest changes reliably, with builder controls below the chat input.](https://app.notion.com/p/Custom-app-improvements-3d3dad00a1dc8172b400f013c87f0a4f) - [The app builder remembers your model choice and carries your request when switching into editing.](https://app.notion.com/p/Custom-app-improvements-3d2dad00a1dc81429339ed99b0e0d7fa) - [Canvas collaboration stays connected as you move around the board.](https://app.notion.com/p/General-improvements-3d2dad00a1dc8183a47cc81dc476c248) - [See queued, running, and finished flow totals at a glance.](https://app.notion.com/p/General-improvements-3d1dad00a1dc81f6bc2ddd5f08ce5c0d) - [Formula cells update more reliably after row deletions and large imports.](https://app.notion.com/p/General-improvements-3cfdad00a1dc81f7bc99ff7cb9d7fa5d) --- ## TxDOT Pipeline Changes - August 2026 https://www.bidlo.ai/research/txdot-pipeline-changes-august-2026 Project changes in August added $2.55B and 64 net projects to the active pipeline, led by significant growth in Houston. - The active pipeline value increased from $30.79B to $33.34B, a change of +$2.55B (+8.3%). - The project count also rose, with 5,523 active projects increasing to 5,587, marking a net gain of 64 projects. - Houston saw the largest net cost increase at +$2.27B during the latest changes. --- ## Overview Looking at the August 3 vs. September 3, 2026 snapshots, across a letting window of August 1, 2026 to August 1, 2029, the pipeline shows growth in value and project numbers. The active pipeline value rose to $33.34B, reflecting a shift in cost structure as rebuilt projects unveil new classifications. Further, a slight drift in letting dates indicates changes in project timing, while the dominant roadway subtype remains stable at 78.7% of total projects. --- ## Letting Date Shifts (Slippage) [https://info.bidlo.ai/embed/letting-slippage-bubble?publication_id=30273b66-a78b-4a7b-bed8-42be1449522c&style=v2](https://info.bidlo.ai/embed/letting-slippage-bubble?publication_id=30273b66-a78b-4a7b-bed8-42be1449522c&style=v2) > How to read this chart: In total, 134 projects experienced shifts of six months or more in their letting dates, with 93 moving later and 41 moving earlier. Looking at shifts of 12 months or more, 82 projects shifted their letting dates, 58 moving later and 24 earlier. Overall, this suggests a trend of projects generally being pushed out. | CSJ | District | Est. Letting Date | Project Estimate | Current Type | Current Subtype | Prev. Type | Prev. Subtype | Prev. Date | Letting Δ (days) | Letting Date Δ | Cost Δ | %Cost Δ | Type/Subtype Δ | Lifecycle | | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | | 1024-01-092 | Beaumont | 01/01/45 | $91,879.00 | | | Construction | Roadway | 01/06/27 | 6570 | 18 years | | | | | | 0921-02-537 | Pharr | 05/02/45 | $7,718,488.50 | | | Construction | Local Let | 05/31/28 | 6180 | 17 years | | | | | | 0921-02-538 | Pharr | 05/02/45 | $7,239,537.73 | | | Construction | Local Let | 05/31/28 | 6180 | 17 years | | | | | | 0095-02-096 | Dallas | 09/01/44 | $315,730,103.05 | | | Construction | Roadway | 09/06/28 | 5839 | 16 years | $(31,949,205.46) | -9% | | | | 0190-05-076 | Tyler | 08/01/40 | $3,804,363.61 | | | Construction | Roadway | 08/04/27 | 4746 | 13 years | | | | | | 1026-01-014 | Brownwood | 01/01/40 | $138,304.00 | | | Construction | Bridge | 02/02/27 | 4716 | 13 years | | | | | | 1697-02-036 | Brownwood | 01/01/40 | $350,000.00 | | | Construction | Bridge | 02/02/27 | 4716 | 13 years | | | | | | 0914-05-211 | Austin | 08/02/40 | $1,211,853.00 | | | Construction | Local Let | 08/04/28 | 4381 | 12 years | | | | Canceled | | 0231-01-071 | Brownwood | 01/01/40 | $1,039,426.56 | | | Construction | Roadway | 05/03/28 | 4260 | 12 years | | | | | | 0173-04-063 | Dallas | 08/01/37 | $949,220.25 | Construction | Roadway | Construction | Roadway | 09/02/26 | 3986 | 11 years | | | | | | 0187-02-079 | Yoakum | 11/01/37 | $602,064.00 | | | Construction | Roadway | 11/01/28 | 3287 | 9 years | | | | | | 0187-03-084 | Yoakum | 11/01/37 | $725,678.00 | | | Construction | Roadway | 11/01/28 | 3287 | 9 years | | | | | | 3510-04-038 | Houston | 04/05/28 | $101,000,000.00 | Construction | Roadway | Unassigned | Unassigned | 01/15/37 | -3207 | -9 years | $61,200,000.00 | 154% | Unassigned → Construction / Roadway | | | 0921-02-562 | Pharr | 05/02/35 | $1,319,040.00 | | | Construction | Non Roadway | 01/02/27 | 3042 | 8 years | | | | | | 0015-08-152 | Austin | 08/21/26 | $2,500,000.00 | | | | | 12/01/18 | 2820 | 8 years | | | | | | 0159-02-079 | San Angelo | 10/01/35 | $5,675,000.00 | | | Construction | Roadway | 10/04/28 | 2553 | 7 years | | | | | | 0299-13-037 | Laredo | 09/10/33 | $212,400.00 | | | Non-Let | Rail - Safety | 09/10/27 | 2192 | 6 years | | | | | | 0006-08-057 | Abilene | 12/01/27 | $36,872.13 | Construction | Roadway | Unassigned | Unassigned | 12/01/33 | -2192 | -6 years | $(26,375.87) | -42% | Unassigned → Construction / Roadway | | | 0518-01-018 | Abilene | 12/01/27 | $114,851.26 | Construction | Roadway | Unassigned | Unassigned | 12/01/33 | -2192 | -6 years | $38,050.26 | 50% | Unassigned → Construction / Roadway | | | 1651-07-012 | San Angelo | 10/01/34 | $14,748,880.16 | | | Construction | Roadway | 11/01/28 | 2160 | 6 years | | | | | | 0558-11-018 | San Angelo | 11/01/28 | $15,474,285.00 | Construction | Roadway | Unassigned | Unassigned | 10/01/34 | -2160 | -6 years | | | Unassigned → Construction / Roadway | | | 0081-06-050 | Dallas | 01/05/32 | $907,463.00 | | | Construction | Local Let | 01/01/27 | 1830 | 5 years | | | | | | 0921-02-375 | Pharr | 05/02/32 | $14,621,204.29 | | | Construction | Local Let | 05/02/27 | 1827 | 5 years | | | | | | 0213-05-042 | Lufkin | 01/05/28 | $28,571,428.57 | Construction | Roadway | Unassigned | Unassigned | 01/01/33 | -1823 | -5 years | | | Unassigned → Construction / Roadway | | | 0271-04-070 | Houston | 06/01/33 | $161,018,519.00 | | | Construction | Roadway | 12/05/28 | 1639 | 4 years | $(33,980,478.72) | -17% | | | | 0271-04-093 | Houston | 06/01/33 | $56,574,074.00 | | | Construction | Roadway | 12/05/28 | 1639 | 4 years | $10,287,707.72 | 22% | | | | 0921-02-395 | Pharr | 05/02/29 | $12,592,097.00 | Construction | Local Let | Unassigned | Unassigned | 05/05/33 | -1464 | -4 years | | | Unassigned → Construction / Local Let | | | 0033-08-041 | Abilene | 12/01/27 | $2,515,863.77 | Construction | Roadway | Unassigned | Unassigned | 12/01/31 | -1461 | -4 years | $2,197,650.77 | 691% | Unassigned → Construction / Roadway | | | 2941-01-042 | Houston | 09/01/28 | $3,571,429.00 | Construction | Roadway | Unassigned | Unassigned | 08/01/32 | -1430 | -4 years | | | Unassigned → Construction / Roadway | | | 1651-02-025 | San Angelo | 11/01/32 | $5,286,458.33 | | | Construction | Roadway | 05/01/29 | 1280 | 4 years | | | | | | 0168-02-029 | Lubbock | 06/01/28 | $33,340,000.00 | Construction | Roadway | Unassigned | Unassigned | 09/01/31 | -1187 | -3 years | | | Unassigned → Construction / Roadway | | | 0921-02-440 | Pharr | 05/08/31 | $6,567,414.39 | | | Construction | Local Let | 05/02/28 | 1101 | 3 years | | | | | | 0921-02-561 | Pharr | 01/02/31 | $1,917,438.00 | | | Construction | Non Roadway | 01/02/28 | 1096 | 3 years | | | | | | 0015-13-462 | Austin | 05/01/30 | $11,440,000.00 | Construction | Roadway | Construction | Roadway | 08/04/27 | 1001 | 3 years | $440,000.00 | 4% | | | | 0921-06-330 | Pharr | 05/02/30 | $25,435,821.86 | Construction | Local Let | Construction | Local Let | 09/03/27 | 972 | 3 years | | | | | | 0921-26-113 | Pharr | 05/02/30 | $4,200,000.00 | Construction | Local Let | Construction | Local Let | 09/03/27 | 972 | 3 years | | | | | | 0252-02-068 | Austin | 07/01/30 | $370,370.37 | Construction | Roadway | Construction | Roadway | 12/01/27 | 943 | 3 years | | | | | | 0463-02-081 | Odessa | 07/01/27 | $5,000,000.00 | Construction | Roadway | Construction | Roadway | 01/01/30 | -915 | -3 years | | | | | | 0683-03-042 | Austin | 01/01/30 | $1,977,714.81 | Construction | Roadway | Construction | Roadway | 09/01/27 | 853 | 2 years | | | | | | 1201-01-015 | Austin | 01/01/30 | $120,000.00 | Construction | Bridge | Construction | Bridge | 09/01/27 | 853 | 2 years | | | | | | 0252-03-055 | Austin | 01/01/31 | $479,818.75 | | | Construction | Roadway | 09/06/28 | 847 | 2 years | | | | | | 0258-09-154 | Waco | 05/05/27 | $882,000.00 | Construction | Roadway | Construction | Roadway | 08/01/29 | -819 | -2 years | | | | | | 6392-55-001 | Pharr | 12/05/28 | $2,100,000.00 | Maintenance | Bridge Preventive | Maintenance | Bridge Preventive | 10/06/26 | 791 | 2 years | | | | | | 3510-10-026 | Beaumont | 01/15/30 | $170,000.00 | Non-Let | Roadway | Non-Let | Roadway | 01/15/28 | 731 | 2 years | | | | | | 0518-02-017 | Abilene | 12/01/27 | $221,912.45 | Construction | Roadway | Unassigned | Unassigned | 12/01/29 | -731 | -2 years | $(101,760.55) | -31% | Unassigned → Construction / Roadway | | | 2537-01-006 | Abilene | 12/01/27 | $72,121.00 | | | | | 12/01/29 | -731 | -2 years | | | | | | 0196-07-036 | Dallas | 08/04/30 | $6,500,000.00 | Construction | Local Let | Construction | Local Let | 08/04/28 | 730 | 2 years | | | | | | 0921-26-115 | Pharr | 05/02/30 | $18,044,879.00 | Construction | Local Let | Construction | Local Let | 05/02/28 | 730 | 2 years | | | | | | 0598-02-135 | Houston | 03/01/29 | $8,600,000.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | 729 | 2 years | | | | | | 0088-05-112 | Yoakum | 11/01/28 | $132,441.00 | Construction | Roadway | Construction | Roadway | 11/03/26 | 729 | 2 years | | | | | | 0179-09-040 | Yoakum | 11/01/28 | $426,202.00 | Construction | Roadway | Construction | Roadway | 11/03/26 | 729 | 2 years | | | | | | 0371-01-095 | Yoakum | 11/01/28 | $49,236.00 | Construction | Roadway | Construction | Roadway | 11/03/26 | 729 | 2 years | | | | | | 0371-06-026 | Yoakum | 11/01/28 | $38,353.00 | Construction | Roadway | Construction | Roadway | 11/03/26 | 729 | 2 years | | | | | | 0503-01-002 | Yoakum | 11/01/28 | $40,695.00 | Construction | Roadway | Construction | Roadway | 11/03/26 | 729 | 2 years | | | | | | 1090-03-023 | Yoakum | 11/01/28 | $262,936.00 | Construction | Roadway | Construction | Roadway | 11/03/26 | 729 | 2 years | | | | | | 1425-03-074 | Pharr | 08/01/29 | $591,287.00 | Construction | Roadway | Construction | Roadway | 08/04/27 | 728 | 2 years | | | | | | 0910-07-095 | Tyler | 10/01/29 | $689,515.00 | Construction | Non Roadway | Construction | Non Roadway | 11/02/27 | 699 | 2 years | | | | | | 0038-01-110 | Laredo | 09/06/28 | $300,000.00 | Construction | Roadway | Construction | Roadway | 11/03/26 | 673 | 2 years | | | | | | 1227-04-023 | Pharr | 11/02/27 | $21,050,000.00 | Construction | Roadway | Construction | Roadway | 09/01/29 | -669 | -2 years | $(870,000.00) | -4% | | | | 0306-01-072 | Beaumont | 12/05/28 | $600,000.00 | Construction | Bridge | Construction | Bridge | 03/03/27 | 643 | 2 years | | | | | | 0374-05-026 | El Paso | 02/02/28 | $20,792,795.54 | Construction | Roadway | Construction | Roadway | 09/01/29 | -577 | -2 years | | | | | | 0007-10-068 | Fort Worth | 06/01/28 | $24,133,472.00 | Construction | Bridge | Construction | Bridge | 12/01/29 | -548 | -2 years | | | | | | 3510-04-077 | Houston | 07/06/28 | $38,278,900.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | 491 | 1 year | | | | | | 3510-05-054 | Houston | 07/06/28 | $698,935.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | 491 | 1 year | | | | | | 2311-01-045 | Waco | 06/01/28 | $14,400,000.00 | Construction | Roadway | Construction | Roadway | 02/02/27 | 485 | 1 year | | | | | | 0022-04-021 | Laredo | 11/02/27 | $11,464,725.00 | Construction | Roadway | Construction | Roadway | 03/01/29 | -485 | -1 year | | | | | | 0161-01-033 | Laredo | 11/02/27 | $1,595,078.57 | Construction | Roadway | Construction | Roadway | 03/01/29 | -485 | -1 year | | | | | | 0299-04-088 | Laredo | 11/02/27 | $3,870,348.21 | Construction | Roadway | Construction | Roadway | 03/01/29 | -485 | -1 year | | | | | | 0299-14-037 | Laredo | 11/02/27 | $1,559,186.61 | Construction | Roadway | Construction | Roadway | 03/01/29 | -485 | -1 year | | | | | | 0842-03-042 | Yoakum | 07/01/27 | $26,245,701.93 | Construction | Roadway | Construction | Roadway | 09/06/28 | -433 | -1 year | $8,827,262.93 | 51% | | | | 0414-01-002 | Austin | 08/14/26 | $129,807.69 | | | Construction | Local Let | 10/04/27 | -416 | -1 year | | | | | | 1149-01-033 | Austin | 10/04/28 | $58,673,076.90 | Construction | Roadway | Construction | Roadway | 09/01/27 | 399 | 1 year | $2,173,076.90 | 4% | | | | 0089-07-145 | Yoakum | 12/01/27 | $223,653,606.50 | Construction | Roadway | Construction | Roadway | 12/05/28 | -370 | -1 year | $10,000,000.93 | 5% | | | | 3271-01-021 | Beaumont | 08/20/26 | $108,590.00 | | | | | 08/15/25 | 370 | 1 year | | | | | | 0915-12-724 | San Antonio | 09/03/28 | $12,700,323.00 | Construction | Local Let | Construction | Local Let | 09/03/27 | 366 | 1 year | | | | | | 0168-09-197 | Amarillo | 06/01/28 | $847,000.00 | Construction | Non Roadway | Construction | Non Roadway | 06/01/27 | 366 | 1 year | | | | | | 0168-10-083 | Amarillo | 06/01/28 | $300,000.00 | Construction | Roadway | Construction | Roadway | 06/01/27 | 366 | 1 year | | | | | | 0168-10-084 | Amarillo | 06/01/28 | $100,000.00 | Construction | Non Roadway | Construction | Non Roadway | 06/01/27 | 366 | 1 year | | | | | | 0331-02-062 | Pharr | 01/01/29 | $4,191,426.00 | Construction | Roadway | Construction | Roadway | 01/01/30 | -365 | -1 year | | | | | | 0151-05-124 | Austin | 11/03/28 | $342,592.59 | Construction | Local Let | Construction | Local Let | 11/04/27 | 365 | 1 year | | | | | | 0151-06-148 | Austin | 10/01/28 | $24,292,129.63 | Construction | Local Let | Construction | Local Let | 10/02/27 | 365 | 1 year | | | | | | 0005-07-060 | Abilene | 12/01/27 | $445,343.00 | Construction | Roadway | Unassigned | Unassigned | 12/01/26 | 365 | 1 year | | | Unassigned → Construction / Roadway | | | 0006-01-105 | Abilene | 12/01/27 | $447,776.57 | Construction | Roadway | Unassigned | Unassigned | 12/01/26 | 365 | 1 year | $(34,634.43) | -7% | Unassigned → Construction / Roadway | | | 0220-04-050 | Pharr | 12/01/27 | $20,418,004.16 | Construction | Roadway | Construction | Roadway | 12/01/26 | 365 | 1 year | $(3,039,802.84) | -13% | | | | 0563-05-017 | Lubbock | 11/02/27 | $589,172.20 | Construction | Roadway | Construction | Roadway | 11/01/28 | -365 | -1 year | | | | | | 0879-04-014 | Lubbock | 11/02/27 | $1,233,086.00 | Construction | Roadway | Construction | Roadway | 11/01/28 | -365 | -1 year | | | | | | 0879-05-007 | Lubbock | 11/02/27 | $640,433.00 | Construction | Roadway | Construction | Roadway | 11/01/28 | -365 | -1 year | | | | | | 2687-01-014 | Austin | 12/01/28 | $195,394.44 | Construction | Roadway | Construction | Roadway | 12/03/27 | 364 | 12 months | | | | | | 0038-10-013 | Pharr | 08/02/28 | $9,725,893.91 | Construction | Roadway | Construction | Roadway | 08/04/27 | 364 | 12 months | | | | | | 1065-02-045 | Pharr | 08/02/28 | $1,576,228.00 | Construction | Roadway | Construction | Roadway | 08/04/27 | 364 | 12 months | | | | | | 6504-04-001 | Beaumont | 10/05/27 | $1,000,000.00 | Maintenance | Routine Maintenance Contract | Maintenance | Routine Maintenance Contract | 10/06/26 | 364 | 12 months | | | | | | 1727-01-019 | Amarillo | 11/03/26 | $630,127.52 | Construction | Roadway | Construction | Roadway | 11/02/27 | -364 | -12 months | $(42,872.48) | -6% | | | | 1885-03-013 | Amarillo | 11/03/26 | $714,212.48 | Construction | Roadway | Construction | Roadway | 11/02/27 | -364 | -12 months | $(345,787.52) | -33% | | | | 2437-01-028 | Amarillo | 11/03/26 | $355,639.39 | Construction | Roadway | Construction | Roadway | 11/02/27 | -364 | -12 months | $(613,760.61) | -63% | | | | 2552-01-062 | El Paso | 11/03/26 | $12,432,052.88 | Construction | Roadway | Construction | Roadway | 11/02/27 | -364 | -12 months | $460,446.40 | 4% | | | | 2552-01-066 | El Paso | 11/03/26 | $4,600,398.13 | Construction | Bridge | Construction | Bridge | 11/02/27 | -364 | -12 months | $170,385.11 | 4% | | | | 2121-02-166 | El Paso | 09/02/26 | $0.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | -364 | -12 months | | | | | | 2350-01-076 | Yoakum | 04/05/28 | $6,230,000.00 | Construction | Roadway | Construction | Roadway | 04/01/29 | -361 | -12 months | | | | | | 0143-10-059 | Yoakum | 03/01/29 | $9,280,000.00 | Construction | Roadway | Construction | Roadway | 03/07/28 | 359 | 12 months | | | | | | 0071-01-062 | Brownwood | 01/05/28 | $339,790.00 | Construction | Bridge | Construction | Bridge | 02/02/27 | 337 | 11 months | | | | | | 0071-01-063 | Brownwood | 01/05/28 | $339,790.00 | Construction | Bridge | Construction | Bridge | 02/02/27 | 337 | 11 months | | | | | | 0004-03-055 | Odessa | 11/02/27 | $26,785,714.29 | Construction | Roadway | Construction | Roadway | 10/04/28 | -337 | -11 months | | | | | | 0231-01-070 | Brownwood | 02/02/27 | $680,000.00 | Construction | Bridge | Construction | Bridge | 01/05/28 | -337 | -11 months | | | | | | 0164-04-167 | Tyler | 08/02/28 | $366,110.50 | Construction | Roadway | Construction | Roadway | 09/01/27 | 336 | 11 months | | | | | | 0424-02-050 | Tyler | 08/02/28 | $413,477.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 336 | 11 months | | | | | | 0520-06-048 | Tyler | 08/02/28 | $445,638.50 | Construction | Roadway | Construction | Roadway | 09/01/27 | 336 | 11 months | | | | | | 0914-33-113 | Austin | 07/01/28 | $3,913,000.00 | Construction | Local Let | Construction | Local Let | 08/02/27 | 334 | 11 months | | | | | | 2879-01-011 | Atlanta | 10/05/27 | $2,563,215.00 | Construction | Roadway | Construction | Roadway | 12/01/26 | 308 | 10 months | $(24,805.00) | -1% | | | | 2879-01-012 | Atlanta | 10/05/27 | $433,241.85 | Construction | Roadway | Construction | Roadway | 12/01/26 | 308 | 10 months | | | | | | 0342-04-036 | Pharr | 11/01/28 | $32,596,524.00 | Construction | Roadway | Construction | Roadway | 01/05/28 | 301 | 10 months | | | | | | 0254-03-083 | Corpus Christi | 06/01/27 | $900,000.00 | Construction | Roadway | Construction | Roadway | 03/07/28 | -280 | -9 months | | | | | | 0255-01-097 | Corpus Christi | 06/01/27 | $800,000.00 | Construction | Roadway | Construction | Roadway | 03/07/28 | -280 | -9 months | | | | | | 0924-06-669 | El Paso | 08/31/26 | $1,959,929.00 | | | Construction | Local Let | 12/17/25 | 257 | 8 months | | | | | | 0921-02-560 | Pharr | 05/01/27 | $760,614.00 | Construction | Non Roadway | Construction | Non Roadway | 01/02/28 | -246 | -8 months | | | | | | 0915-15-087 | San Antonio | 05/03/28 | $728,000.00 | Construction | Bridge | Construction | Bridge | 09/01/27 | 245 | 8 months | | | | | | 1198-02-019 | Austin | 05/03/28 | $56,956.61 | Construction | Roadway | Construction | Roadway | 09/01/27 | 245 | 8 months | | | | | | 0463-02-090 | Odessa | 07/01/27 | $6,626,189.00 | Construction | Roadway | Construction | Roadway | 12/01/26 | 212 | 7 months | | | | | | 0047-09-034 | Dallas | 03/01/29 | $24,203,553.90 | Construction | Roadway | Construction | Roadway | 08/02/28 | 211 | 7 months | $8,926,490.22 | 58% | | | | 3417-01-035 | Austin | 10/05/27 | $199,817.86 | Construction | Roadway | Construction | Roadway | 05/03/28 | -211 | -7 months | | | | | | 3417-01-036 | Austin | 10/05/27 | $234,203.17 | Construction | Roadway | Construction | Roadway | 05/03/28 | -211 | -7 months | | | | | | 1754-02-033 | Austin | 12/01/27 | $13,817,307.69 | Construction | Roadway | Construction | Roadway | 05/05/27 | 210 | 7 months | | | | | | 1754-02-035 | Austin | 12/01/27 | $4,831,957.00 | Construction | Roadway | Construction | Roadway | 05/05/27 | 210 | 7 months | | | | | | 0306-03-137 | Beaumont | 08/04/27 | $145,270.83 | Construction | Roadway | Construction | Roadway | 01/06/27 | 210 | 7 months | | | | | | 0307-01-156 | Beaumont | 08/04/27 | $120,000.00 | Construction | Roadway | Construction | Roadway | 01/06/27 | 210 | 7 months | | | | | | 0341-04-075 | Beaumont | 08/04/27 | $104,910.00 | Construction | Roadway | Construction | Roadway | 01/06/27 | 210 | 7 months | | | | | | 0366-01-077 | Austin | 08/04/27 | $841,346.15 | Construction | Roadway | Construction | Roadway | 01/06/27 | 210 | 7 months | | | | | | 0508-04-192 | Beaumont | 08/04/27 | $206,249.00 | Construction | Roadway | Construction | Roadway | 01/06/27 | 210 | 7 months | | | | | | 0883-02-097 | Beaumont | 08/04/27 | $61,394.00 | Construction | Roadway | Construction | Roadway | 01/06/27 | 210 | 7 months | | | | | | 1790-02-049 | Tyler | 03/07/28 | $2,023,746.10 | Construction | Roadway | Construction | Roadway | 09/01/27 | 188 | 6 months | | | | | | 0741-01-026 | Abilene | 07/03/27 | $61,892,390.49 | Non-Let | Local | Non-Let | Local | 01/01/27 | 183 | 6 months | | | | | | 0972-06-018 | Abilene | 07/03/27 | $12,330,152.97 | Non-Let | Local | Non-Let | Local | 01/01/27 | 183 | 6 months | | | | | | 0972-07-008 | Abilene | 07/03/27 | $19,139,950.31 | Non-Let | Local | Non-Let | Local | 01/01/27 | 183 | 6 months | | | | | | 2032-01-012 | Abilene | 07/03/27 | $1,854,893.24 | Non-Let | Local | Non-Let | Local | 01/01/27 | 183 | 6 months | | | | | | 2170-05-017 | Laredo | 02/02/28 | $10,000,000.00 | Construction | Roadway | Construction | Roadway | 08/04/27 | 182 | 6 months | | | | | | 0295-02-031 | Abilene | 07/03/27 | $13,650,000.00 | Non-Let | Local | Non-Let | Local | 01/02/27 | 182 | 6 months | | | | | | 0172-12-007 | Dallas | 11/02/27 | $51,363,055.90 | Construction | Roadway | Construction | Roadway | 05/05/27 | 181 | 6 months | $(109,698.12) | -0% | | | | 1776-01-039 | Austin | 03/01/27 | $1,130,919.64 | Construction | Local Let | Construction | Local Let | 09/04/26 | 178 | 6 months | | | | | | 0371-04-062 | Corpus Christi | 07/01/27 | $64,769,601.51 | Construction | Roadway | Construction | Roadway | 01/06/27 | 176 | 6 months | $13,769,601.51 | 27% | | | | 0372-01-101 | Corpus Christi | 07/01/27 | $92,390,400.49 | Construction | Roadway | Construction | Roadway | 01/06/27 | 176 | 6 months | $(9,609,599.51) | -9% | | | | 6487-66-001 | Houston | 01/06/27 | $1,000,000.00 | Maintenance | Routine Maintenance Contract | Unassigned | Unassigned | 08/01/26 | 158 | 5 months | | | Unassigned → Maintenance / Routine Maintenance Contract | | | 0910-34-038 | Tyler | 03/07/28 | $500,000.00 | Construction | Bridge | Construction | Bridge | 10/05/27 | 154 | 5 months | | | | | | 1229-01-081 | Laredo | 08/04/27 | $350,085.00 | Construction | Bridge | Construction | Bridge | 01/05/28 | -154 | -5 months | | | | | | 0684-01-068 | Pharr | 08/01/27 | $33,950,374.48 | Construction | Local Let | Construction | Local Let | 03/01/27 | 153 | 5 months | | | | | | 0700-04-056 | Austin | 07/01/27 | $500,897.12 | Construction | Bridge | Construction | Bridge | 02/02/27 | 149 | 5 months | | | | | | 0917-29-151 | Bryan | 07/01/27 | $285,496.00 | Construction | Roadway | Construction | Roadway | 02/02/27 | 149 | 5 months | | | | | | 1099-05-048 | Tyler | 07/01/27 | $14,919,102.59 | Construction | Roadway | Construction | Roadway | 02/02/27 | 149 | 5 months | | | | | | 1437-01-042 | San Antonio | 07/01/27 | $8,482,129.00 | Construction | Roadway | Construction | Roadway | 02/02/27 | 149 | 5 months | | | | | | 1197-01-029 | Austin | 09/01/27 | $4,797,000.00 | Construction | Roadway | Construction | Roadway | 04/06/27 | 148 | 5 months | | | | | | 1755-01-025 | Austin | 04/06/27 | $2,215,384.62 | Construction | Bridge | Construction | Bridge | 12/01/26 | 126 | 4 months | | | | | | 1755-01-029 | Austin | 04/06/27 | $5,003,844.23 | Construction | Roadway | Construction | Roadway | 12/01/26 | 126 | 4 months | | | | | | 0186-02-036 | Bryan | 08/02/28 | $3,000,000.00 | Construction | Roadway | Construction | Roadway | 12/05/28 | -125 | -4 months | $(1,400,000.00) | -32% | | | | 0757-01-026 | Austin | 08/04/26 | $1,346,153.85 | | | Construction | Local Let | 04/01/26 | 125 | 4 months | | | | | | 2201-01-013 | El Paso | 09/02/29 | $4,927,410.00 | Construction | Local Let | Construction | Local Let | 05/01/29 | 124 | 4 months | | | | | | 2240-01-021 | Atlanta | 11/02/27 | $746,753.00 | Construction | Bridge | Construction | Bridge | 07/01/27 | 124 | 4 months | | | | | | 2211-01-028 | Austin | 09/01/26 | $3,057,744.64 | Construction | Local Let | Construction | Local Let | 05/01/26 | 123 | 4 months | | | | | | 0339-04-036 | Beaumont | 09/01/28 | $118,318,519.44 | Construction | Roadway | Construction | Roadway | 01/01/29 | -122 | -4 months | $3,218,519.44 | 3% | | | | 1566-02-022 | Austin | 06/03/27 | $3,019,935.00 | Construction | Local Let | Construction | Local Let | 02/01/27 | 122 | 4 months | | | | | | 1566-02-030 | Austin | 06/03/27 | $800,000.00 | Construction | Local Let | Construction | Local Let | 02/01/27 | 122 | 4 months | | | | | | 3271-01-020 | Beaumont | 12/15/26 | $415,000.00 | Non-Let | Local | Construction | Local Let | 08/15/26 | 122 | 4 months | | | Construction / Local Let → Non-Let / Local | | | 0910-08-084 | Tyler | 03/07/28 | $349,800.00 | Construction | Bridge | Construction | Bridge | 07/06/28 | -121 | -4 months | | | | | | 0910-16-197 | Tyler | 03/07/28 | $750,000.00 | Construction | Bridge | Construction | Bridge | 07/06/28 | -121 | -4 months | | | | | | 0914-33-107 | Austin | 08/31/26 | $8,520,056.00 | | | Construction | Local Let | 05/02/26 | 121 | 4 months | | | | | | 0098-03-041 | Childress | 05/01/29 | $790,000.00 | Construction | Bridge | Construction | Bridge | 01/01/29 | 120 | 4 months | | | | | | 0157-02-059 | Childress | 05/01/29 | $225,000.00 | Construction | Bridge | Construction | Bridge | 01/01/29 | 120 | 4 months | | | | | | 0157-02-060 | Childress | 05/01/29 | $225,000.00 | Construction | Bridge | Construction | Bridge | 01/01/29 | 120 | 4 months | | | | | | 0157-10-004 | Childress | 05/01/29 | $200,000.00 | Construction | Bridge | Construction | Bridge | 01/01/29 | 120 | 4 months | | | | | | 0157-10-005 | Childress | 05/01/29 | $175,000.00 | Construction | Bridge | Construction | Bridge | 01/01/29 | 120 | 4 months | | | | | | 0711-02-046 | Childress | 05/01/29 | $125,000.00 | Construction | Bridge | Construction | Bridge | 01/01/29 | 120 | 4 months | | | | | | 0949-01-018 | Childress | 05/01/29 | $160,000.00 | Construction | Bridge | Construction | Bridge | 01/01/29 | 120 | 4 months | | | | | | 0950-01-030 | Childress | 05/01/29 | $120,000.00 | Construction | Bridge | Construction | Bridge | 01/01/29 | 120 | 4 months | | | | | | 0970-03-025 | Childress | 05/01/29 | $450,000.00 | Construction | Bridge | Construction | Bridge | 01/01/29 | 120 | 4 months | | | | | | 0971-03-011 | Childress | 05/01/29 | $570,000.00 | Construction | Bridge | Construction | Bridge | 01/01/29 | 120 | 4 months | | | | | | 1225-01-014 | Childress | 05/01/29 | $230,000.00 | Construction | Bridge | Construction | Bridge | 01/01/29 | 120 | 4 months | | | | | | 2011-01-010 | Childress | 05/01/29 | $240,000.00 | Construction | Bridge | Construction | Bridge | 01/01/29 | 120 | 4 months | | | | | | 0025-03-109 | San Antonio | 06/01/28 | $8,975,159.00 | Construction | Roadway | Construction | Roadway | 02/02/28 | 120 | 4 months | | | | | | 0535-01-082 | San Antonio | 06/01/28 | $2,316,576.00 | Construction | Roadway | Construction | Roadway | 02/02/28 | 120 | 4 months | | | | | | 0921-02-396 | Pharr | 05/01/28 | $8,213,618.71 | Construction | Local Let | Construction | Local Let | 01/02/28 | 120 | 4 months | | | | | | 0258-08-035 | Waco | 07/01/27 | $9,200,000.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | 120 | 4 months | $353,846.15 | 4% | | | | 0473-02-043 | Austin | 07/01/27 | $186,767.38 | Construction | Roadway | Construction | Roadway | 03/03/27 | 120 | 4 months | | | | | | 3113-04-007 | Austin | 07/01/27 | $118,956.92 | Construction | Roadway | Construction | Roadway | 03/03/27 | 120 | 4 months | | | | | | 0921-02-399 | Pharr | 05/04/27 | $7,360,853.76 | Construction | Local Let | Construction | Local Let | 01/04/27 | 120 | 4 months | | | | | | 1057-03-060 | Pharr | 03/03/27 | $5,643,901.12 | Construction | Roadway | Construction | Roadway | 07/01/27 | -120 | -4 months | | | | | | 2263-03-053 | Corpus Christi | 03/03/27 | $10,500,000.00 | Construction | Roadway | Construction | Roadway | 07/01/27 | -120 | -4 months | | | | | | 1377-01-022 | Austin | 04/05/28 | $829,629.63 | Construction | Roadway | Construction | Roadway | 08/02/28 | -119 | -4 months | | | | | | 0088-05-115 | Yoakum | 09/01/27 | $250,000.00 | Construction | Roadway | Construction | Roadway | 05/05/27 | 119 | 4 months | | | | | | 0371-06-027 | Yoakum | 09/01/27 | $300,000.00 | Construction | Non Roadway | Construction | Non Roadway | 05/05/27 | 119 | 4 months | | | | | | 3510-10-024 | Beaumont | 06/01/27 | $33,000,000.00 | Construction | Roadway | Construction | Roadway | 02/02/27 | 119 | 4 months | | | | | | 0921-02-559 | Pharr | 05/01/27 | $698,113.00 | Construction | Non Roadway | Construction | Non Roadway | 01/05/27 | 116 | 4 months | | | | | | 0909-36-200 | Waco | 08/18/26 | $1,155,635.00 | | | Construction | Local Let | 05/02/26 | 108 | 4 months | | | | | | 0724-01-061 | Waco | 08/18/26 | $167,032.30 | | | Non-Let | Bridge | 12/03/26 | -107 | -4 months | | | | | | 0039-11-002 | Pharr | 08/13/26 | $5,454,249.00 | | | Construction | Roadway | 05/02/26 | 103 | 3 months | | | | | | 0914-05-240 | Austin | 08/10/26 | $6,916,506.00 | | | Construction | Local Let | 05/02/26 | 100 | 3 months | | | | | | 0917-29-152 | Bryan | 10/05/27 | $1,591,764.00 | Construction | Roadway | Construction | Roadway | 07/01/27 | 96 | 3 months | | | | | | 0921-06-290 | Pharr | 08/04/26 | $34,665,879.75 | | | Construction | Local Let | 05/01/26 | 95 | 3 months | | | | | | 0921-06-378 | Pharr | 08/04/26 | $4,116,950.00 | | | Construction | Local Let | 05/01/26 | 95 | 3 months | | | | | | 0065-06-067 | Beaumont | 11/02/27 | $46,476,175.96 | Construction | Roadway | Construction | Roadway | 02/02/28 | -92 | -3 months | $(1,859,046.04) | -4% | | | | 0065-07-065 | Beaumont | 11/02/27 | $32,423,076.92 | Construction | Roadway | Construction | Roadway | 02/02/28 | -92 | -3 months | $18,793,447.92 | 138% | | | | 0342-01-105 | Pharr | 06/01/27 | $195,531.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | -92 | -3 months | | | | | | 1586-01-097 | Pharr | 06/01/27 | $270,525.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | -92 | -3 months | | | | | | 0017-16-008 | San Antonio | 04/05/28 | $828,335.00 | Construction | Roadway | Construction | Roadway | 01/05/28 | 91 | 3 months | | | | | | 2690-01-040 | Austin | 09/01/27 | $7,400,000.00 | Construction | Roadway | Construction | Roadway | 12/01/27 | -91 | -3 months | $(274,074.07) | -4% | | | | 2690-01-046 | Austin | 09/01/27 | $714,285.71 | Construction | Rail - Safety | Construction | Rail - Safety | 12/01/27 | -91 | -3 months | | | | | | 0256-01-061 | Wichita Falls | 08/04/27 | $200,000.00 | Construction | Bridge | Construction | Bridge | 05/05/27 | 91 | 3 months | | | | | | 0922-33-226 | Laredo | 09/01/28 | $1,000,000.00 | Construction | Local Let | Construction | Local Let | 06/03/28 | 90 | 3 months | | | | | | 0643-01-057 | Bryan | 11/02/27 | $22,973,558.00 | Construction | Roadway | Construction | Roadway | 08/04/27 | 90 | 3 months | | | | | | 0306-01-069 | Beaumont | 06/01/27 | $9,000,000.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | 90 | 3 months | | | | | | 0306-01-070 | Beaumont | 06/01/27 | $2,000,000.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | 90 | 3 months | | | | | | 0909-36-183 | Waco | 08/31/26 | $1,800,000.00 | | | Construction | Roadway | 06/04/26 | 88 | 3 months | | | | | | 0015-05-051 | Waco | 07/01/27 | $637,620.00 | Construction | Roadway | Construction | Roadway | 04/06/27 | 86 | 3 months | | | | | | 0015-05-052 | Waco | 07/01/27 | $2,600,000.00 | Construction | Roadway | Construction | Roadway | 04/06/27 | 86 | 3 months | $100,000.00 | 4% | | | | 0015-18-007 | Waco | 07/01/27 | $1,912,861.00 | Construction | Roadway | Construction | Roadway | 04/06/27 | 86 | 3 months | $382,573.00 | 25% | | | | 0015-18-008 | Waco | 07/01/27 | $1,560,000.00 | Construction | Roadway | Construction | Roadway | 04/06/27 | 86 | 3 months | $60,000.00 | 4% | | | | 1835-02-062 | Waco | 07/01/27 | $308,666.00 | Construction | Roadway | Construction | Roadway | 04/06/27 | 86 | 3 months | | | | | | 0081-02-079 | Fort Worth | 09/01/26 | $531,625.25 | Construction | Local Let | Construction | Local Let | 06/11/26 | 82 | 3 months | | | | | | 0912-72-818 | Houston | 08/31/26 | $19,440,000.00 | | | Construction | Local Let | 06/15/26 | 77 | 3 months | | | | | | 0915-12-726 | San Antonio | 08/12/26 | $6,762,055.00 | | | Construction | Local Let | 06/01/26 | 72 | 2 months | | | | | | 0262-06-032 | Bryan | 08/04/27 | $2,350,000.00 | Construction | Bridge | Construction | Bridge | 06/01/27 | 64 | 2 months | | | | | | 0262-06-034 | Bryan | 08/04/27 | $2,350,000.00 | | | | | 06/01/27 | 64 | 2 months | | | | | | 0909-22-208 | Waco | 08/04/27 | $419,000.00 | Construction | Bridge | Construction | Bridge | 06/01/27 | 64 | 2 months | | | | | | 0917-18-087 | Bryan | 08/04/27 | $950,000.00 | Construction | Bridge | Construction | Bridge | 06/01/27 | 64 | 2 months | | | | | | 0315-01-041 | Bryan | 09/30/26 | $0.00 | Non-Let | Non Roadway | Non-Let | Non Roadway | 07/28/26 | 64 | 2 months | $(490,901.31) | -100% | | | | 0173-11-003 | Dallas | 06/03/27 | $1,676,400.00 | Construction | Local Let | Construction | Local Let | 04/01/27 | 63 | 2 months | | | | | | 0683-03-045 | Austin | 04/06/27 | $2,108,441.40 | Construction | Roadway | Construction | Roadway | 02/02/27 | 63 | 2 months | | | | | | 0050-06-110 | Houston | 02/02/27 | $1,846,179.07 | Construction | Roadway | Construction | Roadway | 12/01/26 | 63 | 2 months | $50,084.07 | 3% | | | | 0200-14-104 | Beaumont | 02/02/27 | $13,175,000.00 | Construction | Roadway | Construction | Roadway | 12/01/26 | 63 | 2 months | | | | | | 0200-14-105 | Beaumont | 02/02/27 | $4,675,000.00 | Construction | Roadway | Construction | Roadway | 12/01/26 | 63 | 2 months | | | | | | 0200-14-106 | Beaumont | 02/02/27 | $15,673,076.92 | Construction | Roadway | Construction | Roadway | 12/01/26 | 63 | 2 months | | | | | | 0285-03-064 | Austin | 02/02/27 | $3,008,871.35 | Construction | Roadway | Construction | Roadway | 12/01/26 | 63 | 2 months | | | | | | 1717-02-026 | Odessa | 11/02/27 | $553,950.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 62 | 2 months | | | | | | 1717-02-027 | Odessa | 11/02/27 | $217,967.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 62 | 2 months | | | | | | 0380-09-106 | Odessa | 06/01/29 | $300,000.00 | Construction | Roadway | Construction | Roadway | 04/01/29 | 61 | 2 months | | | | | | 0463-02-100 | Odessa | 06/01/29 | $350,165.00 | Construction | Roadway | Construction | Roadway | 04/01/29 | 61 | 2 months | | | | | | 2296-01-061 | Odessa | 06/01/29 | $1,050,493.00 | Construction | Roadway | Construction | Roadway | 04/01/29 | 61 | 2 months | | | | | | 2296-02-034 | Odessa | 06/01/29 | $4,435,415.00 | Construction | Roadway | Construction | Roadway | 04/01/29 | 61 | 2 months | | | | | | 0095-13-050 | Dallas | 08/04/26 | $1,364,275.00 | | | Construction | Local Let | 06/04/26 | 61 | 2 months | | | | | | 0196-02-139 | Dallas | 06/03/27 | $1,200,000.00 | Construction | Roadway | Construction | Roadway | 08/01/27 | -59 | -2 months | | | | | | 0196-03-298 | Dallas | 06/03/27 | $2,311,100.00 | Construction | Roadway | Construction | Roadway | 08/01/27 | -59 | -2 months | | | | | | 2374-01-199 | Dallas | 06/03/27 | $721,035.00 | Construction | Roadway | Construction | Roadway | 08/01/27 | -59 | -2 months | | | | | | 0180-06-118 | Corpus Christi | 06/01/28 | $59,115,480.77 | Construction | Roadway | Construction | Roadway | 04/05/28 | 57 | 2 months | $2,207,980.77 | 4% | | | | 0180-10-082 | Corpus Christi | 06/01/28 | $73,509,615.38 | Construction | Roadway | Construction | Roadway | 04/05/28 | 57 | 2 months | $2,759,615.38 | 4% | | | | 0180-11-016 | Corpus Christi | 06/01/28 | $2,596,153.85 | Construction | Roadway | Construction | Roadway | 04/05/28 | 57 | 2 months | $(3,846.15) | -0% | | | | 1378-05-031 | Austin | 06/01/28 | $669,984.49 | Construction | Roadway | Construction | Roadway | 04/05/28 | 57 | 2 months | | | | | | 3586-02-009 | Laredo | 05/05/27 | $20,000,000.00 | Construction | Roadway | Construction | Roadway | 07/01/27 | -57 | -2 months | | | | | | 1188-02-130 | Odessa | 11/01/28 | $433,182.82 | Construction | Roadway | Construction | Roadway | 09/06/28 | 56 | 2 months | | | | | | 1188-02-131 | Odessa | 11/01/28 | $1,568,788.63 | Construction | Roadway | Construction | Roadway | 09/06/28 | 56 | 2 months | | | | | | 3571-01-007 | Odessa | 11/01/28 | $57,565.82 | Construction | Roadway | Construction | Roadway | 09/06/28 | 56 | 2 months | | | | | | 3571-02-009 | Odessa | 11/01/28 | $206,517.39 | Construction | Roadway | Construction | Roadway | 09/06/28 | 56 | 2 months | | | | | | 1063-01-034 | Corpus Christi | 06/01/27 | $6,000,000.00 | Construction | Roadway | Construction | Roadway | 04/06/27 | 56 | 2 months | | | | | | 2103-01-046 | Austin | 03/03/27 | $1,186,207.69 | Construction | Roadway | Construction | Roadway | 01/06/27 | 56 | 2 months | | | | | | 2211-02-033 | Austin | 03/03/27 | $623,076.92 | Construction | Roadway | Construction | Roadway | 01/06/27 | 56 | 2 months | | | | | | 2304-03-016 | Waco | 03/03/27 | $19,300,000.00 | Construction | Roadway | Construction | Roadway | 01/06/27 | 56 | 2 months | | | | | | 0363-01-153 | Fort Worth | 08/12/26 | $201,801.05 | | | Construction | Local Let | 06/17/26 | 56 | 2 months | | | | | | 0364-01-166 | Fort Worth | 08/12/26 | $414,264.00 | | | Construction | Local Let | 06/17/26 | 56 | 2 months | | | | | | 0353-03-117 | Fort Worth | 08/12/26 | $516,490.30 | | | Construction | Local Let | 06/18/26 | 55 | 2 months | | | | | | 0081-13-071 | Dallas | 08/02/28 | $198,251,363.58 | Construction | Roadway | Construction | Roadway | 09/06/28 | -35 | -1 month | $(34,528,295.53) | -15% | | | | 0151-06-158 | Austin | 02/02/28 | $2,948,634.26 | Construction | Roadway | Construction | Roadway | 03/07/28 | -34 | -1 month | | | | | | 0005-16-019 | Odessa | 10/05/27 | $289,627.99 | Construction | Roadway | Construction | Roadway | 09/01/27 | 34 | 1 month | | | | | | 0139-05-053 | Odessa | 10/05/27 | $1,476,494.79 | Construction | Roadway | Construction | Roadway | 09/01/27 | 34 | 1 month | | | | | | 0573-02-009 | Austin | 10/05/27 | $8,935,220.37 | Construction | Roadway | Construction | Roadway | 09/01/27 | 34 | 1 month | | | | | | 1718-08-015 | Odessa | 10/05/27 | $97,840.28 | Construction | Roadway | Construction | Roadway | 09/01/27 | 34 | 1 month | | | | | | 0018-05-110 | Laredo | 07/01/27 | $33,110.00 | Construction | Roadway | Construction | Roadway | 08/04/27 | -34 | -1 month | | | | | | 0018-06-223 | Laredo | 07/01/27 | $871,519.00 | Construction | Roadway | Construction | Roadway | 08/04/27 | -34 | -1 month | | | | | | 0086-14-108 | Laredo | 07/01/27 | $197,420.69 | Construction | Non Roadway | Construction | Non Roadway | 08/04/27 | -34 | -1 month | | | | | | 2150-04-102 | Laredo | 07/01/27 | $1,651,000.00 | Construction | Roadway | Construction | Roadway | 08/04/27 | -34 | -1 month | | | | | | 2150-04-096 | Laredo | 04/06/27 | $500,000.00 | Construction | Bridge | Construction | Bridge | 03/03/27 | 34 | 1 month | | | | | | 2150-04-097 | Laredo | 04/06/27 | $330,000.00 | Construction | Bridge | Construction | Bridge | 03/03/27 | 34 | 1 month | | | | | | 2150-04-098 | Laredo | 04/06/27 | $690,000.00 | Construction | Bridge | Construction | Bridge | 03/03/27 | 34 | 1 month | | | | | | 0005-01-119 | Odessa | 03/01/29 | $805,274.00 | Construction | Roadway | Construction | Roadway | 04/01/29 | -31 | -1 month | | | | | | 0005-02-131 | Odessa | 03/01/29 | $300,000.00 | Construction | Roadway | Construction | Roadway | 04/01/29 | -31 | -1 month | | | | | | 0463-03-058 | Odessa | 03/01/29 | $500,000.00 | Construction | Roadway | Construction | Roadway | 04/01/29 | -31 | -1 month | | | | | | 1001-01-015 | Odessa | 02/01/29 | $33,700,649.00 | Construction | Roadway | Construction | Roadway | 01/01/29 | 31 | 1 month | | | | | | 1001-01-017 | Odessa | 02/01/29 | $3,326,298.00 | Construction | Roadway | Construction | Roadway | 01/01/29 | 31 | 1 month | | | | | | 1001-01-019 | Odessa | 02/01/29 | $600,000.00 | Construction | Bridge | Construction | Bridge | 01/01/29 | 31 | 1 month | | | | | | 1001-02-006 | Odessa | 02/01/29 | $9,573,053.00 | Construction | Roadway | Construction | Roadway | 01/01/29 | 31 | 1 month | | | | | | 0463-02-101 | Odessa | 05/01/29 | $301,970.00 | Construction | Roadway | Construction | Roadway | 04/01/29 | 30 | 30 days | | | | | | 1188-02-134 | Odessa | 05/01/29 | $721,663.00 | Construction | Roadway | Construction | Roadway | 04/01/29 | 30 | 30 days | | | | | | 1188-02-135 | Odessa | 05/01/29 | $147,810.00 | Construction | Roadway | Construction | Roadway | 04/01/29 | 30 | 30 days | | | | | | 2296-01-062 | Odessa | 05/01/29 | $301,969.00 | Construction | Roadway | Construction | Roadway | 04/01/29 | 30 | 30 days | | | | | | 2296-02-035 | Odessa | 05/01/29 | $301,969.00 | Construction | Roadway | Construction | Roadway | 04/01/29 | 30 | 30 days | | | | | | 0917-12-089 | Bryan | 07/01/27 | $900,000.00 | Construction | Bridge | Construction | Bridge | 06/01/27 | 30 | 30 days | | | | | | 0917-19-060 | Bryan | 07/01/27 | $600,000.00 | Construction | Bridge | Construction | Bridge | 06/01/27 | 30 | 30 days | | | | | | 0917-30-064 | Bryan | 07/01/27 | $500,000.00 | Construction | Bridge | Construction | Bridge | 06/01/27 | 30 | 30 days | | | | | | 3586-02-011 | Laredo | 06/01/27 | $1,450,383.27 | Construction | Roadway | Construction | Roadway | 07/01/27 | -30 | -30 days | | | | | | 1014-03-063 | Dallas | 08/31/26 | $1,731,094.70 | | | Construction | Local Let | 08/01/26 | 30 | 30 days | | | | | | 0014-07-112 | Waco | 05/05/27 | $500,000.00 | Construction | Bridge | Construction | Bridge | 04/06/27 | 29 | 29 days | | | | | | 0014-08-091 | Waco | 05/05/27 | $528,000.00 | Construction | Bridge | Construction | Bridge | 04/06/27 | 29 | 29 days | | | | | | 0014-08-092 | Waco | 05/05/27 | $670,000.00 | Construction | Bridge | Construction | Bridge | 04/06/27 | 29 | 29 days | | | | | | 0014-24-067 | Waco | 05/05/27 | $300,000.00 | Construction | Bridge | Construction | Bridge | 04/06/27 | 29 | 29 days | | | | | | 0015-01-261 | Waco | 05/05/27 | $250,000.00 | Construction | Bridge | Construction | Bridge | 04/06/27 | 29 | 29 days | | | | | | 0015-01-262 | Waco | 05/05/27 | $325,000.00 | Construction | Bridge | Construction | Bridge | 04/06/27 | 29 | 29 days | | | | | | 0015-02-063 | Waco | 05/05/27 | $500,000.00 | Construction | Bridge | Construction | Bridge | 04/06/27 | 29 | 29 days | | | | | | 0015-02-064 | Waco | 05/05/27 | $625,000.00 | Construction | Bridge | Construction | Bridge | 04/06/27 | 29 | 29 days | | | | | | 0015-04-090 | Waco | 05/05/27 | $260,000.00 | Construction | Bridge | Construction | Bridge | 04/06/27 | 29 | 29 days | | | | | | 0015-04-091 | Waco | 05/05/27 | $527,000.00 | Construction | Bridge | Construction | Bridge | 04/06/27 | 29 | 29 days | | | | | | 0015-07-088 | Waco | 05/05/27 | $500,000.00 | Construction | Bridge | Construction | Bridge | 04/06/27 | 29 | 29 days | | | | | | 0024-06-070 | San Antonio | 05/05/27 | $45,000,000.00 | Construction | Roadway | Construction | Roadway | 04/06/27 | 29 | 29 days | | | | | | 0024-06-078 | San Antonio | 05/05/27 | $950,000.00 | Construction | Roadway | Construction | Roadway | 04/06/27 | 29 | 29 days | | | | | | 0050-06-113 | Houston | 02/02/27 | $300,000.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | -29 | -29 days | | | | | | 0050-08-107 | Houston | 02/02/27 | $40,000.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | -29 | -29 days | | | | | | 0050-09-100 | Houston | 02/02/27 | $350,000.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | -29 | -29 days | | | | | | 0110-04-229 | Houston | 02/02/27 | $400,000.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | -29 | -29 days | | | | | | 0110-05-145 | Houston | 02/02/27 | $500,000.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | -29 | -29 days | | | | | | 0110-06-164 | Houston | 02/02/27 | $300,000.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | -29 | -29 days | | | | | | 0114-11-103 | Houston | 02/02/27 | $40,000.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | -29 | -29 days | | | | | | 0114-12-019 | Houston | 02/02/27 | $300,000.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | -29 | -29 days | | | | | | 0271-07-360 | Houston | 02/02/27 | $50,000.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | -29 | -29 days | | | | | | 0271-14-249 | Houston | 02/02/27 | $100,000.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | -29 | -29 days | | | | | | 0271-17-192 | Houston | 02/02/27 | $40,000.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | -29 | -29 days | | | | | | 0338-11-063 | Houston | 02/02/27 | $60,000.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | -29 | -29 days | | | | | | 0500-03-668 | Houston | 02/02/27 | $180,000.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | -29 | -29 days | | | | | | 0523-10-050 | Houston | 02/02/27 | $100,000.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | -29 | -29 days | | | | | | 0675-08-130 | Houston | 02/02/27 | $400,000.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | -29 | -29 days | | | | | | 1685-02-062 | Houston | 02/02/27 | $150,000.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | -29 | -29 days | | | | | | 1685-05-145 | Houston | 02/02/27 | $150,000.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | -29 | -29 days | | | | | | 3050-02-039 | Houston | 02/02/27 | $60,000.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | -29 | -29 days | | | | | | 3050-03-029 | Houston | 02/02/27 | $145,000.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | -29 | -29 days | | | | | | 3538-01-073 | Houston | 02/02/27 | $250,000.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | -29 | -29 days | | | | | | 1718-07-050 | Odessa | 05/03/28 | $294,661.00 | Construction | Roadway | Construction | Roadway | 04/05/28 | 28 | 28 days | | | | | | 0619-03-068 | Dallas | 11/03/26 | $1,606,585.00 | Construction | Roadway | Construction | Roadway | 12/01/26 | -28 | -28 days | $(196,761.39) | -11% | | | | 0619-03-069 | Dallas | 11/03/26 | $442,425.00 | Construction | Roadway | Construction | Roadway | 12/01/26 | -28 | -28 days | $(146,065.88) | -25% | | | | 0014-06-047 | Waco | 02/02/27 | $240,348.00 | Construction | Bridge | Construction | Bridge | 01/06/27 | 27 | 27 days | | | | | | 0014-06-048 | Waco | 02/02/27 | $389,508.00 | Construction | Bridge | Construction | Bridge | 01/06/27 | 27 | 27 days | | | | | | 0014-06-049 | Waco | 02/02/27 | $240,348.00 | Construction | Bridge | Construction | Bridge | 01/06/27 | 27 | 27 days | | | | | | 0014-06-050 | Waco | 02/02/27 | $150,216.00 | Construction | Bridge | Construction | Bridge | 01/06/27 | 27 | 27 days | | | | | | 0382-02-040 | Waco | 02/02/27 | $137,880.00 | Construction | Bridge | Construction | Bridge | 01/06/27 | 27 | 27 days | | | | | | 0590-03-015 | Waco | 02/02/27 | $475,848.00 | Construction | Bridge | Construction | Bridge | 01/06/27 | 27 | 27 days | | | | | | 2868-01-014 | Waco | 02/02/27 | $296,100.00 | Construction | Bridge | Construction | Bridge | 01/06/27 | 27 | 27 days | | | | | | 2868-01-015 | Waco | 02/02/27 | $247,971.00 | Construction | Bridge | Construction | Bridge | 01/06/27 | 27 | 27 days | | | | | | 0912-72-727 | Houston | 08/20/26 | $418,655.00 | | | Construction | Local Let | 07/27/26 | 24 | 24 days | | | | | | 1590-01-024 | San Antonio | 08/20/26 | $3,057,574.27 | | | Non-Let | Bridge | 07/27/26 | 24 | 24 days | $3,057,564.27 | 30575643% | | | | 2374-04-100 | Dallas | 08/20/26 | $582,613.56 | | | Construction | Roadway | 08/02/26 | 18 | 18 days | | | | | | 0902-20-243 | Fort Worth | 08/17/26 | $6,742.50 | | | Non-Let | Non Roadway | 07/30/26 | 18 | 18 days | | | | | | 0912-72-709 | Houston | 08/31/26 | $570,213.00 | | | Construction | Local Let | 08/15/26 | 16 | 16 days | | | | | | 0912-72-713 | Houston | 08/31/26 | $582,888.00 | | | Construction | Local Let | 08/15/26 | 16 | 16 days | | | | | | 0912-72-715 | Houston | 08/31/26 | $328,175.00 | | | Construction | Local Let | 08/15/26 | 16 | 16 days | | | | | | 0047-06-182 | Dallas | 08/12/26 | $1,127,591.83 | | | Construction | Local Let | 08/01/26 | 11 | 11 days | | | | | | 0912-72-707 | Houston | 08/20/26 | $110,381.00 | | | Construction | Local Let | 08/15/26 | 5 | 5 days | | | | | | 0912-72-711 | Houston | 08/20/26 | $101,445.00 | | | Construction | Local Let | 08/15/26 | 5 | 5 days | | | | | | 0912-72-726 | Houston | 08/20/26 | $65,691.00 | | | Construction | Local Let | 08/15/26 | 5 | 5 days | | | | | | 0912-72-758 | Houston | 08/20/26 | $115,370.00 | | | Construction | Local Let | 08/15/26 | 5 | 5 days | | | | | | 0205-05-056 | Bryan | 07/03/27 | $1,320,333.00 | Non-Let | Roadway | Construction | Local Let | 07/01/27 | 2 | 2 days | | | Construction / Local Let → Non-Let / Roadway | | --- ## Project Type & Subtype Changes The subtype mix remains stable, with roadway projects comprising 78.7% of all projects as of the latest snapshot. Additionally, there were 18 instances of type and subtype changes, with 13 projects newly classified, while the predominant transition remained from unclassified to construction types. | Subtype | Aug 3 (% of projects) | Sep 3 (% of projects) | Δ projects (pp, n) | | --- | --- | --- | --- | | Roadway | 78.7% (4,154) | 78.7% (4,180) | +0.0 (+26) | | Bridge | 13.8% (727) | 13.8% (735) | +0.1 (+8) | | Local Let | 3.0% (158) | 2.8% (149) | -0.2 (-9) | | Non Roadway | 1.8% (94) | 1.7% (91) | -0.1 (-3) | | Rail - Safety | 1.2% (64) | 1.2% (65) | +0.0 (+1) | | CSJ | District | Est. Letting Date | Project Estimate | Current Type | Current Subtype | Type/Subtype Δ | Prev. Type | Prev. Subtype | Prev. Cost | Prev. Date | Letting Δ (days) | Letting Date Δ | Cost Δ | %Cost Δ | Lifecycle | | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | | 3271-01-020 | Beaumont | 12/15/26 | $415,000.00 | Non-Let | Local | Construction / Local Let → Non-Let / Local | Construction | Local Let | $415,000.00 | 08/15/26 | 122 | 4 months | | | | | 6487-66-001 | Houston | 01/06/27 | $1,000,000.00 | Maintenance | Routine Maintenance Contract | Unassigned → Maintenance / Routine Maintenance Contract | Unassigned | Unassigned | $1,000,000.00 | 08/01/26 | 158 | 5 months | | | | | 0205-05-056 | Bryan | 07/03/27 | $1,320,333.00 | Non-Let | Roadway | Construction / Local Let → Non-Let / Roadway | Construction | Local Let | $1,320,333.00 | 07/01/27 | 2 | 2 days | | | | | 0272-04-037 | Brownwood | 10/05/27 | $220,000.00 | Construction | Roadway | Construction / Non Roadway → Construction / Roadway | Construction | Non Roadway | $220,000.00 | 10/05/27 | 0 | | | | | | 0005-07-060 | Abilene | 12/01/27 | $445,343.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $445,343.00 | 12/01/26 | 365 | 1 year | | | | | 0006-01-105 | Abilene | 12/01/27 | $447,776.57 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $482,411.00 | 12/01/26 | 365 | 1 year | $(34,634.43) | -7% | | | 0006-08-057 | Abilene | 12/01/27 | $36,872.13 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $63,248.00 | 12/01/33 | -2192 | -6 years | $(26,375.87) | -42% | | | 0033-08-041 | Abilene | 12/01/27 | $2,515,863.77 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $318,213.00 | 12/01/31 | -1461 | -4 years | $2,197,650.77 | 691% | | | 0518-01-018 | Abilene | 12/01/27 | $114,851.26 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $76,801.00 | 12/01/33 | -2192 | -6 years | $38,050.26 | 50% | | | 0518-02-017 | Abilene | 12/01/27 | $221,912.45 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $323,673.00 | 12/01/29 | -731 | -2 years | $(101,760.55) | -31% | | | 0213-05-042 | Lufkin | 01/05/28 | $28,571,428.57 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $28,571,428.57 | 01/01/33 | -1823 | -5 years | | | | | 3510-03-009 | Houston | 04/05/28 | $49,800,881.00 | Alternative Delivery | Design Build | Construction / Roadway → Alternative Delivery / Design Build | Construction | Roadway | $52,000,000.00 | 04/05/28 | 0 | | $(2,199,119.00) | -4% | | | 3510-04-038 | Houston | 04/05/28 | $101,000,000.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $39,800,000.00 | 01/15/37 | -3207 | -9 years | $61,200,000.00 | 154% | | | 0168-02-029 | Lubbock | 06/01/28 | $33,340,000.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $33,340,000.00 | 09/01/31 | -1187 | -3 years | | | | | 2941-01-042 | Houston | 09/01/28 | $3,571,429.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $3,571,429.00 | 08/01/32 | -1430 | -4 years | | | | | 0912-00-704 | Houston | 09/15/28 | $1,000,000.00 | Non-Let | Local | Construction / Local Let → Non-Let / Local | Construction | Local Let | $1,000,000.00 | 09/15/28 | 0 | | | | | | 0558-11-018 | San Angelo | 11/01/28 | $15,474,285.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $15,474,285.00 | 10/01/34 | -2160 | -6 years | | | | | 0921-02-395 | Pharr | 05/02/29 | $12,592,097.00 | Construction | Local Let | Unassigned → Construction / Local Let | Unassigned | Unassigned | $12,592,097.00 | 05/05/33 | -1464 | -4 years | | | | --- ## Cost Changes The total active pipeline value increased by $2.55B from $30.79B to $33.34B. Costs concentrated in roadway and design build subtypes, contributing to a net change of +$317.19M for roadway projects and +$1.15B for design build projects. District-level movements show Houston leading with a net increase of +$2.27B, while Dallas faced a decrease of -$288.84M. Overall, this indicates a repricing of existing projects rather than a structural rewrite of the pipeline. | CSJ | District | Est. Letting Date | Project Estimate | Current Type | Current Subtype | Prev. Type | Prev. Subtype | Prev. Cost | Cost Δ | %Cost Δ | Letting Δ (days) | Letting Date Δ | Type/Subtype Δ | Lifecycle | | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | | 1590-01-024 | San Antonio | 08/20/26 | $3,057,574.27 | | | Non-Let | Bridge | $10.00 | $3,057,564.27 | 30575643% | 24 | 24 days | | | | 2208-02-027 | Dallas | 06/03/28 | $31,445,902.00 | Construction | Roadway | Construction | Roadway | $850,000.00 | $30,595,902.00 | 3600% | 0 | | | | | 1697-02-035 | Brownwood | 11/03/26 | $466,413.43 | Construction | Roadway | Construction | Roadway | $26,675.00 | $439,738.43 | 1649% | 0 | | | | | 3510-03-002 | Houston | 12/15/28 | $928,944,620.00 | Alternative Delivery | Design Build | Alternative Delivery | Design Build | $55,381,565.00 | $873,563,055.00 | 1577% | 0 | | | | | 3510-03-003 | Houston | 12/15/28 | $928,944,620.00 | | | | | $55,381,565.00 | $873,563,055.00 | 1577% | 0 | | | | | 0288-01-043 | Brownwood | 11/03/26 | $164,283.50 | Construction | Roadway | Construction | Roadway | $10,653.00 | $153,630.50 | 1442% | 0 | | | | | 3285-01-008 | Brownwood | 11/03/26 | $116,373.79 | Construction | Roadway | Construction | Roadway | $9,058.00 | $107,315.79 | 1185% | 0 | | | | | 2786-01-020 | Brownwood | 11/03/26 | $303,082.34 | Construction | Roadway | Construction | Roadway | $23,985.00 | $279,097.34 | 1164% | 0 | | | | | 0714-04-014 | Brownwood | 11/03/26 | $126,628.35 | Construction | Roadway | Construction | Roadway | $10,724.00 | $115,904.35 | 1081% | 0 | | | | | 2106-01-010 | Brownwood | 11/03/26 | $278,935.09 | Construction | Roadway | Construction | Roadway | $23,943.00 | $254,992.09 | 1065% | 0 | | | | | 3102-01-010 | Brownwood | 11/03/26 | $124,575.77 | Construction | Roadway | Construction | Roadway | $11,207.00 | $113,368.77 | 1012% | 0 | | | | | 0007-14-008 | Brownwood | 11/03/26 | $220,995.77 | Construction | Roadway | Construction | Roadway | $19,982.00 | $201,013.77 | 1006% | 0 | | | | | 1777-03-013 | Brownwood | 11/03/26 | $132,695.23 | Construction | Roadway | Construction | Roadway | $12,538.00 | $120,157.23 | 958% | 0 | | | | | 2013-01-014 | Brownwood | 11/03/26 | $277,392.51 | Construction | Roadway | Construction | Roadway | $26,323.00 | $251,069.51 | 954% | 0 | | | | | 0550-01-031 | Brownwood | 11/03/26 | $350,245.33 | Construction | Roadway | Construction | Roadway | $33,255.00 | $316,990.33 | 953% | 0 | | | | | 0274-01-043 | Brownwood | 11/03/26 | $1,000,454.78 | Construction | Roadway | Construction | Roadway | $95,344.00 | $905,110.78 | 949% | 0 | | | | | 2561-01-014 | Brownwood | 11/03/26 | $118,505.94 | Construction | Roadway | Construction | Roadway | $11,554.00 | $106,951.94 | 926% | 0 | | | | | 1030-01-021 | Brownwood | 11/03/26 | $140,978.51 | Construction | Roadway | Construction | Roadway | $13,997.00 | $126,981.51 | 907% | 0 | | | | | 0870-07-008 | Brownwood | 11/03/26 | $297,311.30 | Construction | Roadway | Construction | Roadway | $29,637.00 | $267,674.30 | 903% | 0 | | | | | 2199-01-015 | Brownwood | 11/03/26 | $323,631.53 | Construction | Roadway | Construction | Roadway | $32,400.00 | $291,231.53 | 899% | 0 | | | | | 1027-01-026 | Brownwood | 11/03/26 | $366,362.67 | Construction | Roadway | Construction | Roadway | $37,320.00 | $329,042.67 | 882% | 0 | | | | | 1293-02-023 | Brownwood | 11/03/26 | $259,837.34 | Construction | Roadway | Construction | Roadway | $27,103.00 | $232,734.34 | 859% | 0 | | | | | 0054-07-091 | Brownwood | 11/03/26 | $598,651.13 | Construction | Roadway | Construction | Roadway | $63,040.00 | $535,611.13 | 850% | 0 | | | | | 0027-03-077 | Yoakum | 11/03/26 | $2,014,989.00 | Construction | Roadway | Construction | Roadway | $221,276.00 | $1,793,713.00 | 811% | 0 | | | | | 0714-02-020 | Brownwood | 11/03/26 | $262,919.66 | Construction | Roadway | Construction | Roadway | $29,943.00 | $232,976.66 | 778% | 0 | | | | | 2570-01-015 | Brownwood | 11/03/26 | $149,544.23 | Construction | Roadway | Construction | Roadway | $17,427.00 | $132,117.23 | 758% | 0 | | | | | 0033-08-041 | Abilene | 12/01/27 | $2,515,863.77 | Construction | Roadway | Unassigned | Unassigned | $318,213.00 | $2,197,650.77 | 691% | -1461 | -4 years | Unassigned → Construction / Roadway | | | 1032-03-014 | Brownwood | 11/03/26 | $135,772.96 | Construction | Roadway | Construction | Roadway | $18,972.00 | $116,800.96 | 616% | 0 | | | | | 0032-01-036 | Childress | 09/06/28 | $5,181,100.00 | Construction | Bridge | Construction | Bridge | $739,200.00 | $4,441,900.00 | 601% | 0 | | | | | 0755-04-002 | Lubbock | 12/01/27 | $10,320,000.00 | Construction | Roadway | Construction | Roadway | $1,497,915.00 | $8,822,085.00 | 589% | 0 | | | | | 1104-01-024 | Brownwood | 11/03/26 | $231,663.30 | Construction | Roadway | Construction | Roadway | $39,331.00 | $192,332.30 | 489% | 0 | | | | | 3510-03-004 | Houston | 12/15/28 | $412,433,844.00 | Alternative Delivery | Design Build | Alternative Delivery | Design Build | $76,000,000.00 | $336,433,844.00 | 443% | 0 | | | | | 0044-06-079 | Wichita Falls | 11/03/26 | $1,173,291.24 | Construction | Roadway | Construction | Roadway | $225,735.00 | $947,556.24 | 420% | 0 | | | | | 0272-05-037 | Brownwood | 11/03/26 | $202,744.12 | Construction | Roadway | Construction | Roadway | $39,122.00 | $163,622.12 | 418% | 0 | | | | | 0179-10-118 | Yoakum | 11/03/26 | $391,926.95 | Construction | Roadway | Construction | Roadway | $76,508.00 | $315,418.95 | 412% | 0 | | | | | 0224-04-007 | Wichita Falls | 11/03/26 | $283,050.03 | Construction | Roadway | Construction | Roadway | $74,769.00 | $208,281.03 | 279% | 0 | | | | | 0508-01-410 | Houston | 03/01/29 | $157,407,407.00 | Construction | Roadway | Construction | Roadway | $42,867,000.00 | $114,540,407.00 | 267% | 0 | | | | | 0010-08-061 | Atlanta | 10/06/26 | $1,613,285.30 | Construction | Roadway | Construction | Roadway | $471,744.00 | $1,141,541.30 | 242% | 0 | | | | | 1068-01-239 | Fort Worth | 04/05/28 | $12,028,411.19 | Construction | Bridge | Construction | Bridge | $4,028,411.19 | $8,000,000.00 | 199% | 0 | | | | | 1227-02-016 | Pharr | 10/06/26 | $33,444.96 | Construction | Roadway | Construction | Roadway | $11,357.00 | $22,087.96 | 194% | 0 | | | | | 3510-03-012 | Houston | 12/15/28 | $52,257,099.00 | Alternative Delivery | Design Build | Alternative Delivery | Design Build | $19,860,000.00 | $32,397,099.00 | 163% | 0 | | | | | 1598-01-023 | Fort Worth | 12/01/26 | $1,630,015.84 | Construction | Roadway | Construction | Roadway | $641,145.47 | $988,870.37 | 154% | 0 | | | | | 3510-04-038 | Houston | 04/05/28 | $101,000,000.00 | Construction | Roadway | Unassigned | Unassigned | $39,800,000.00 | $61,200,000.00 | 154% | -3207 | -9 years | Unassigned → Construction / Roadway | | | 0052-04-054 | Lubbock | 11/03/26 | $2,234,347.68 | Construction | Roadway | Construction | Roadway | $922,592.00 | $1,311,755.68 | 142% | 0 | | | | | 0065-07-065 | Beaumont | 11/02/27 | $32,423,076.92 | Construction | Roadway | Construction | Roadway | $13,629,629.00 | $18,793,447.92 | 138% | -92 | -3 months | | | | 2103-01-045 | Austin | 07/01/27 | $5,703,841.00 | Construction | Roadway | Construction | Roadway | $2,400,000.00 | $3,303,841.00 | 138% | 0 | | | | | 3098-01-022 | Pharr | 09/06/28 | $52,212,609.20 | Construction | Roadway | Construction | Roadway | $23,644,598.00 | $28,568,011.20 | 121% | 0 | | | | | 0380-01-096 | Lubbock | 11/03/26 | $464,494.09 | Construction | Roadway | Construction | Roadway | $210,360.00 | $254,134.09 | 121% | 0 | | | | | 0187-03-086 | Yoakum | 11/03/26 | $535,668.20 | Construction | Roadway | Construction | Roadway | $250,000.00 | $285,668.20 | 114% | 0 | | | | | 0089-15-019 | Yoakum | 01/06/27 | $1,454,192.50 | Construction | Non Roadway | Construction | Non Roadway | $690,000.00 | $764,192.50 | 111% | 0 | | | | | 0197-05-065 | Dallas | 06/01/27 | $7,149,973.31 | Construction | Roadway | Construction | Roadway | $3,393,518.40 | $3,756,454.91 | 111% | 0 | | | | | 0966-03-030 | Abilene | 12/01/27 | $428,122.76 | Construction | Roadway | Construction | Roadway | $206,361.00 | $221,761.76 | 107% | 0 | | | | | 0265-13-025 | Austin | 12/01/27 | $0.00 | Construction | Roadway | Construction | Roadway | $1,900,087.96 | $(1,900,087.96) | -100% | 0 | | | | | 0315-01-041 | Bryan | 09/30/26 | $0.00 | Non-Let | Non Roadway | Non-Let | Non Roadway | $490,901.31 | $(490,901.31) | -100% | 64 | 2 months | | | | 0187-02-080 | Yoakum | 11/03/26 | $390,848.95 | Construction | Roadway | Construction | Roadway | $200,000.00 | $190,848.95 | 95% | 0 | | | | | 0007-05-016 | Brownwood | 11/03/26 | $498,742.26 | Construction | Roadway | Construction | Roadway | $10,000,000.00 | $(9,501,257.74) | -95% | 0 | | | | | 0366-01-084 | Austin | 12/01/26 | $2,772,792.40 | Construction | Bridge | Construction | Bridge | $1,442,307.69 | $1,330,484.71 | 92% | 0 | | | | | 0002-14-047 | El Paso | 12/01/26 | $31,544.58 | Construction | Roadway | Construction | Roadway | $396,637.10 | $(365,092.52) | -92% | 0 | | | | | 0271-06-117 | Houston | 10/04/28 | $42,074,599.07 | Construction | Roadway | Construction | Roadway | $21,987,988.48 | $20,086,610.59 | 91% | 0 | | | | | 2631-02-007 | Fort Worth | 12/01/26 | $49,922.66 | Construction | Roadway | Construction | Roadway | $450,000.00 | $(400,077.34) | -89% | 0 | | | | | 1039-02-098 | Brownwood | 11/03/26 | $258,092.31 | Construction | Roadway | Construction | Roadway | $137,225.00 | $120,867.31 | 88% | 0 | | | | | 0033-06-127 | Abilene | 12/01/27 | $178,053.80 | Construction | Roadway | Construction | Roadway | $930,000.00 | $(751,946.20) | -81% | 0 | | | | | 0114-04-082 | Austin | 09/01/27 | $413,307.72 | Construction | Bridge | Construction | Bridge | $2,092,592.59 | $(1,679,284.87) | -80% | 0 | | | | | 0313-02-070 | Fort Worth | 12/01/26 | $145,590.77 | Construction | Roadway | Construction | Roadway | $81,400.88 | $64,189.89 | 79% | 0 | | | | | 0200-04-020 | Beaumont | 09/06/28 | $32,079,629.63 | Construction | Roadway | Construction | Roadway | $18,000,000.00 | $14,079,629.63 | 78% | 0 | | | | | 2910-02-002 | Pharr | 09/02/26 | $102,705.27 | Construction | Roadway | Construction | Roadway | $455,029.15 | $(352,323.88) | -77% | 0 | | | | | 2206-02-009 | Austin | 11/03/26 | $192,802.34 | Construction | Roadway | Construction | Roadway | $807,488.46 | $(614,686.12) | -76% | 0 | | | | | 2094-01-076 | Pharr | 10/06/26 | $38,406.76 | Construction | Roadway | Construction | Roadway | $154,048.00 | $(115,641.24) | -75% | 0 | | | | | 0008-06-052 | Fort Worth | 06/01/27 | $37,500,000.00 | Construction | Roadway | Construction | Roadway | $21,629,185.61 | $15,870,814.39 | 73% | 0 | | | | | 0313-08-032 | Fort Worth | 12/01/26 | $120,204.60 | Construction | Roadway | Construction | Roadway | $450,000.00 | $(329,795.40) | -73% | 0 | | | | | 0071-01-059 | Brownwood | 11/03/26 | $40,825.75 | Construction | Roadway | Construction | Roadway | $23,627.00 | $17,198.75 | 73% | 0 | | | | | 0627-03-029 | Beaumont | 09/02/26 | $272,155.00 | Construction | Roadway | Construction | Roadway | $904,174.21 | $(632,019.21) | -70% | 0 | | | | | 0912-34-229 | Houston | 01/05/28 | $1,100,000.00 | Construction | Bridge | Construction | Bridge | $652,839.00 | $447,161.00 | 68% | 0 | | | | | 0683-07-013 | Austin | 01/06/27 | $2,581,650.00 | Construction | Roadway | Construction | Roadway | $8,173,076.92 | $(5,591,426.92) | -68% | 0 | | | | | 2631-01-007 | Fort Worth | 12/01/26 | $144,552.64 | Construction | Roadway | Construction | Roadway | $450,000.00 | $(305,447.36) | -68% | 0 | | | | | 0156-05-066 | Wichita Falls | 11/03/26 | $110,222.45 | Construction | Roadway | Construction | Roadway | $336,963.00 | $(226,740.55) | -67% | 0 | | | | | 0843-02-031 | Atlanta | 10/06/26 | $67,975.85 | Construction | Roadway | Construction | Roadway | $198,036.00 | $(130,060.15) | -66% | 0 | | | | | 0500-01-158 | Houston | 11/03/26 | $1,656,690.05 | Construction | Roadway | Construction | Roadway | $1,000,000.00 | $656,690.05 | 66% | 0 | | | | | 0067-07-107 | Lubbock | 11/03/26 | $603,818.15 | Construction | Roadway | Construction | Roadway | $1,758,008.00 | $(1,154,189.85) | -66% | 0 | | | | | 0721-05-018 | Lubbock | 11/03/26 | $266,687.94 | Construction | Roadway | Construction | Roadway | $762,023.00 | $(495,335.06) | -65% | 0 | | | | | 0113-13-162 | Austin | 08/01/29 | $672,884.00 | Construction | Roadway | Construction | Roadway | $408,482.14 | $264,401.86 | 65% | 0 | | | | | 0104-07-027 | El Paso | 12/01/26 | $2,627,832.43 | Construction | Roadway | Construction | Roadway | $1,601,075.00 | $1,026,757.43 | 64% | 0 | | | | | 2437-01-028 | Amarillo | 11/03/26 | $355,639.39 | Construction | Roadway | Construction | Roadway | $969,400.00 | $(613,760.61) | -63% | -364 | -12 months | | | | 0510-06-024 | Paris | 10/06/26 | $10,924,688.49 | Construction | Roadway | Construction | Roadway | $6,710,000.00 | $4,214,688.49 | 63% | 0 | | | | | 0132-01-058 | Childress | 10/06/26 | $97,835.09 | Construction | Roadway | Construction | Roadway | $60,311.00 | $37,524.09 | 62% | 0 | | | | | 1006-01-079 | Houston | 09/06/28 | $68,806,344.00 | Construction | Roadway | Construction | Roadway | $42,835,489.94 | $25,970,854.06 | 61% | 0 | | | | | 0239-08-002 | Wichita Falls | 11/03/26 | $14,951.10 | Construction | Roadway | Construction | Roadway | $9,318.00 | $5,633.10 | 60% | 0 | | | | | 0144-03-046 | Yoakum | 11/03/26 | $609,258.35 | Construction | Roadway | Construction | Roadway | $1,500,000.00 | $(890,741.65) | -59% | 0 | | | | | 0616-01-021 | Corpus Christi | 11/03/26 | $122,537.50 | Construction | Roadway | Construction | Roadway | $300,000.00 | $(177,462.50) | -59% | 0 | | | | | 0714-02-022 | Brownwood | 11/03/26 | $182,685.62 | Construction | Roadway | Construction | Roadway | $445,147.00 | $(262,461.38) | -59% | 0 | | | | | 0912-34-224 | Houston | 01/05/28 | $925,000.00 | Construction | Bridge | Construction | Bridge | $582,146.00 | $342,854.00 | 59% | 0 | | | | | 0918-47-368 | Dallas | 08/04/28 | $2,879,629.63 | Construction | Local Let | Construction | Local Let | $7,000,000.00 | $(4,120,370.37) | -59% | 0 | | | | | 0912-31-336 | Houston | 10/04/28 | $311,918.62 | Construction | Bridge | Construction | Bridge | $756,690.00 | $(444,771.38) | -59% | 0 | | | | | 3632-01-003 | Pharr | 02/02/28 | $143,460,600.00 | Construction | Roadway | Construction | Roadway | $90,352,435.00 | $53,108,165.00 | 59% | 0 | | | | | 0047-09-034 | Dallas | 03/01/29 | $24,203,553.90 | Construction | Roadway | Construction | Roadway | $15,277,063.68 | $8,926,490.22 | 58% | 211 | 7 months | | | | 0912-31-326 | Houston | 10/04/28 | $324,932.04 | Construction | Bridge | Construction | Bridge | $753,823.00 | $(428,890.96) | -57% | 0 | | | | | 1015-01-082 | Dallas | 10/06/26 | $532,361.81 | Construction | Roadway | Construction | Roadway | $339,360.27 | $193,001.54 | 57% | 0 | | | | | 1041-01-027 | Lubbock | 11/03/26 | $101,787.21 | Construction | Roadway | Construction | Roadway | $64,974.00 | $36,813.21 | 57% | 0 | | | | | 0246-02-056 | Atlanta | 10/06/26 | $544,143.42 | Construction | Roadway | Construction | Roadway | $1,252,080.00 | $(707,936.58) | -57% | 0 | | | | | 0016-05-133 | San Antonio | 01/06/27 | $15,966,150.80 | Construction | Roadway | Construction | Roadway | $35,821,264.00 | $(19,855,113.20) | -55% | 0 | | | | | 1156-02-026 | Abilene | 12/01/27 | $371,667.54 | Construction | Roadway | Construction | Roadway | $817,172.00 | $(445,504.46) | -55% | 0 | | | | | 0114-09-091 | Bryan | 06/14/28 | $131,038,962.00 | Alternative Delivery | Design Build | Alternative Delivery | Design Build | $84,922,091.00 | $46,116,871.00 | 54% | 0 | | | | | 1413-01-020 | Houston | 10/04/28 | $897,625.39 | Construction | Bridge | Construction | Bridge | $1,960,979.00 | $(1,063,353.61) | -54% | 0 | | | | | 0912-73-231 | Houston | 12/01/27 | $1,321,035.00 | Construction | Bridge | Construction | Bridge | $2,866,356.00 | $(1,545,321.00) | -54% | 0 | | | | | 0095-03-101 | Dallas | 10/06/26 | $5,499,985.50 | Construction | Bridge | Construction | Bridge | $11,827,282.00 | $(6,327,296.50) | -54% | 0 | | | | | 1055-01-014 | Lubbock | 11/03/26 | $188,648.82 | Construction | Roadway | Construction | Roadway | $404,264.00 | $(215,615.18) | -53% | 0 | | | | | 1068-02-160 | Fort Worth | 12/05/28 | $12,864,571.49 | Construction | Roadway | Construction | Roadway | $27,467,857.00 | $(14,603,285.51) | -53% | 0 | | | | | 2706-02-018 | Wichita Falls | 11/03/26 | $165,826.50 | Construction | Roadway | Construction | Roadway | $108,280.00 | $57,546.50 | 53% | 0 | | | | | 0912-31-330 | Houston | 10/04/28 | $330,167.33 | Construction | Bridge | Construction | Bridge | $704,085.00 | $(373,917.67) | -53% | 0 | | | | | 3123-02-014 | Fort Worth | 12/01/26 | $190,584.89 | Construction | Roadway | Construction | Roadway | $402,000.00 | $(211,415.11) | -53% | 0 | | | | | 0346-01-042 | Yoakum | 11/03/26 | $104,192.50 | Construction | Roadway | Construction | Roadway | $219,284.00 | $(115,091.50) | -52% | 0 | | | | | 1875-03-023 | Lufkin | 06/01/27 | $7,928,817.00 | Construction | Roadway | Construction | Roadway | $16,643,518.52 | $(8,714,701.52) | -52% | 0 | | | | | 1491-02-013 | Amarillo | 11/03/26 | $202,269.14 | Construction | Roadway | Construction | Roadway | $420,000.00 | $(217,730.86) | -52% | 0 | | | | | 0933-03-007 | Lubbock | 11/03/26 | $365,385.19 | Construction | Roadway | Construction | Roadway | $757,081.00 | $(391,695.81) | -52% | 0 | | | | | 0508-01-397 | Houston | 07/01/27 | $398,371,929.00 | Construction | Roadway | Construction | Roadway | $262,691,400.96 | $135,680,528.04 | 52% | 0 | | | | | 0880-04-041 | Lubbock | 11/03/26 | $282,898.48 | Construction | Roadway | Construction | Roadway | $187,658.00 | $95,240.48 | 51% | 0 | | | | | 0842-03-042 | Yoakum | 07/01/27 | $26,245,701.93 | Construction | Roadway | Construction | Roadway | $17,418,439.00 | $8,827,262.93 | 51% | -433 | -1 year | | | | 1491-01-020 | Amarillo | 11/03/26 | $838,618.18 | Construction | Roadway | Construction | Roadway | $1,700,000.00 | $(861,381.82) | -51% | 0 | | | | | 0052-07-076 | Lubbock | 11/03/26 | $753,458.95 | Construction | Roadway | Construction | Roadway | $500,980.00 | $252,478.95 | 50% | 0 | | | | | 0590-05-057 | Bryan | 10/06/26 | $235,741.96 | Construction | Roadway | Construction | Roadway | $475,198.00 | $(239,456.04) | -50% | 0 | | | | | 0683-06-035 | Austin | 01/06/27 | $3,155,350.00 | Construction | Roadway | Construction | Roadway | $6,346,153.85 | $(3,190,803.85) | -50% | 0 | | | | | 0453-11-008 | Lubbock | 11/03/26 | $87,762.03 | Construction | Roadway | Construction | Roadway | $175,090.00 | $(87,327.97) | -50% | 0 | | | | | 0518-01-018 | Abilene | 12/01/27 | $114,851.26 | Construction | Roadway | Unassigned | Unassigned | $76,801.00 | $38,050.26 | 50% | -2192 | -6 years | Unassigned → Construction / Roadway | | | 0423-02-026 | Wichita Falls | 11/03/26 | $283,497.95 | Construction | Roadway | Construction | Roadway | $189,651.00 | $93,846.95 | 49% | 0 | | | | | 0010-10-031 | Atlanta | 10/06/26 | $108,532.95 | Construction | Roadway | Construction | Roadway | $210,279.60 | $(101,746.65) | -48% | 0 | | | | | 0453-10-020 | Lubbock | 11/03/26 | $327,438.26 | Construction | Roadway | Construction | Roadway | $632,820.00 | $(305,381.74) | -48% | 0 | | | | | 0211-10-048 | Yoakum | 11/03/26 | $532,846.65 | Construction | Roadway | Construction | Roadway | $360,133.00 | $172,713.65 | 48% | 0 | | | | | 1255-02-008 | Lubbock | 11/03/26 | $431,436.78 | Construction | Roadway | Construction | Roadway | $827,904.00 | $(396,467.22) | -48% | 0 | | | | | 0616-01-020 | Corpus Christi | 11/03/26 | $366,718.10 | Construction | Roadway | Construction | Roadway | $700,000.00 | $(333,281.90) | -48% | 0 | | | | | 0179-09-045 | Yoakum | 11/03/26 | $94,842.45 | Construction | Roadway | Construction | Roadway | $180,621.00 | $(85,778.55) | -47% | 0 | | | | | 0007-06-272 | Brownwood | 11/03/26 | $192,014.27 | Construction | Roadway | Construction | Roadway | $131,061.00 | $60,953.27 | 47% | 0 | | | | | 2529-01-026 | Pharr | 10/06/26 | $49,326.84 | Construction | Roadway | Construction | Roadway | $33,800.00 | $15,526.84 | 46% | 0 | | | | | 0062-01-045 | Atlanta | 10/06/26 | $241,623.65 | Construction | Roadway | Construction | Roadway | $441,288.00 | $(199,664.35) | -45% | 0 | | | | | 1621-02-007 | Amarillo | 11/03/26 | $60,785.41 | Construction | Roadway | Construction | Roadway | $110,000.00 | $(49,214.59) | -45% | 0 | | | | | 0007-06-269 | Brownwood | 11/03/26 | $189,072.25 | Construction | Roadway | Construction | Roadway | $131,061.00 | $58,011.25 | 44% | 0 | | | | | 1621-01-017 | Amarillo | 11/03/26 | $414,091.50 | Construction | Roadway | Construction | Roadway | $742,000.00 | $(327,908.50) | -44% | 0 | | | | | 0696-02-004 | Pharr | 10/06/26 | $27,806.47 | Construction | Roadway | Construction | Roadway | $49,132.00 | $(21,325.53) | -43% | 0 | | | | | 0067-02-076 | Lubbock | 11/03/26 | $163,956.86 | Construction | Roadway | Construction | Roadway | $114,778.00 | $49,178.86 | 43% | 0 | | | | | 0976-02-086 | Houston | 08/02/28 | $101,155,221.00 | Construction | Roadway | Construction | Roadway | $70,907,942.00 | $30,247,279.00 | 43% | 0 | | | | | 0002-02-065 | El Paso | 12/01/26 | $248,202.21 | Construction | Roadway | Construction | Roadway | $174,697.63 | $73,504.58 | 42% | 0 | | | | | 1236-02-018 | Pharr | 10/06/26 | $33,663.76 | Construction | Roadway | Construction | Roadway | $58,084.00 | $(24,420.24) | -42% | 0 | | | | | 2899-01-013 | Amarillo | 11/03/26 | $157,269.29 | Construction | Roadway | Construction | Roadway | $270,000.00 | $(112,730.71) | -42% | 0 | | | | | 0006-08-057 | Abilene | 12/01/27 | $36,872.13 | Construction | Roadway | Unassigned | Unassigned | $63,248.00 | $(26,375.87) | -42% | -2192 | -6 years | Unassigned → Construction / Roadway | | | 0168-09-194 | Amarillo | 11/03/26 | $641,547.14 | Construction | Bridge | Construction | Bridge | $1,100,000.00 | $(458,452.86) | -42% | 0 | | | | | 0278-01-065 | Atlanta | 10/06/26 | $458,024.54 | Construction | Roadway | Construction | Roadway | $782,640.00 | $(324,615.46) | -41% | 0 | | | | | 0303-04-039 | Childress | 10/06/26 | $1,343,645.02 | Construction | Roadway | Construction | Roadway | $950,400.00 | $393,245.02 | 41% | 0 | | | | | 0355-05-048 | Amarillo | 11/03/26 | $818,721.04 | Construction | Roadway | Construction | Roadway | $580,000.00 | $238,721.04 | 41% | 0 | | | | | 3063-01-013 | Yoakum | 11/03/26 | $76,923.40 | Construction | Roadway | Construction | Roadway | $130,000.00 | $(53,076.60) | -41% | 0 | | | | | 0640-01-052 | Atlanta | 10/06/26 | $206,187.59 | Construction | Roadway | Construction | Roadway | $346,428.00 | $(140,240.41) | -40% | 0 | | | | | 0022-03-032 | Odessa | 11/03/26 | $1,350,925.50 | Construction | Bridge | Construction | Bridge | $963,525.31 | $387,400.19 | 40% | 0 | | | | | 0912-34-225 | Houston | 01/05/28 | $1,100,000.00 | Construction | Bridge | Construction | Bridge | $785,976.00 | $314,024.00 | 40% | 0 | | | | | 0085-01-052 | Atlanta | 10/06/26 | $545,392.02 | Construction | Roadway | Construction | Roadway | $904,946.40 | $(359,554.38) | -40% | 0 | | | | | 0022-01-034 | Odessa | 10/06/26 | $6,089,616.17 | Construction | Bridge | Construction | Bridge | $10,000,000.00 | $(3,910,383.83) | -39% | 0 | | | | | 0750-01-027 | Atlanta | 10/06/26 | $18,556.74 | Construction | Roadway | Construction | Roadway | $30,412.80 | $(11,856.06) | -39% | 0 | | | | | 0084-01-095 | Atlanta | 10/06/26 | $361,010.81 | Construction | Roadway | Construction | Roadway | $591,498.00 | $(230,487.19) | -39% | 0 | | | | | 0684-02-031 | Pharr | 10/06/26 | $27,151.47 | Construction | Roadway | Construction | Roadway | $44,452.00 | $(17,300.53) | -39% | 0 | | | | | 0583-02-013 | Lubbock | 11/03/26 | $1,009,682.43 | Construction | Roadway | Construction | Roadway | $1,647,075.00 | $(637,392.57) | -39% | 0 | | | | | 0095-03-102 | Dallas | 10/06/26 | $9,538,842.50 | Construction | Bridge | Construction | Bridge | $15,558,783.75 | $(6,019,941.25) | -39% | 0 | | | | | 0310-04-028 | Amarillo | 11/03/26 | $207,442.33 | Construction | Roadway | Construction | Roadway | $150,000.00 | $57,442.33 | 38% | 0 | | | | | 0094-08-008 | Fort Worth | 09/06/28 | $2,110,558.30 | Construction | Bridge | Construction | Bridge | $3,413,675.90 | $(1,303,117.60) | -38% | 0 | | | | | 0125-03-057 | Wichita Falls | 11/03/26 | $235,660.06 | Construction | Roadway | Construction | Roadway | $380,494.00 | $(144,833.94) | -38% | 0 | | | | | 0645-02-016 | Lubbock | 11/03/26 | $415,169.29 | Construction | Roadway | Construction | Roadway | $668,088.00 | $(252,918.71) | -38% | 0 | | | | | 0402-03-045 | Atlanta | 10/06/26 | $166,625.35 | Construction | Roadway | Construction | Roadway | $265,644.00 | $(99,018.65) | -37% | 0 | | | | | 0342-01-103 | Pharr | 02/02/27 | $7,570,796.10 | Construction | Roadway | Construction | Roadway | $12,043,275.00 | $(4,472,478.90) | -37% | 0 | | | | | 0846-03-050 | Yoakum | 11/03/26 | $436,768.00 | Construction | Roadway | Construction | Roadway | $318,518.00 | $118,250.00 | 37% | 0 | | | | | 1583-02-020 | Beaumont | 09/02/26 | $227,437.70 | Construction | Roadway | Construction | Roadway | $357,904.07 | $(130,466.37) | -36% | 0 | | | | | 1159-02-041 | Dallas | 10/06/26 | $778,049.81 | Construction | Roadway | Construction | Roadway | $570,893.19 | $207,156.62 | 36% | 0 | | | | | 0114-08-037 | Yoakum | 11/03/26 | $630,224.60 | Construction | Roadway | Construction | Roadway | $985,295.00 | $(355,070.40) | -36% | 0 | | | | | 0681-05-019 | Wichita Falls | 11/03/26 | $645,599.45 | Construction | Roadway | Construction | Roadway | $475,177.00 | $170,422.45 | 36% | 0 | | | | | 0959-02-011 | Lubbock | 11/03/26 | $267,015.87 | Construction | Roadway | Construction | Roadway | $415,579.00 | $(148,563.13) | -36% | 0 | | | | | 0179-04-112 | Yoakum | 10/04/28 | $514,253.80 | Construction | Roadway | Construction | Roadway | $800,000.00 | $(285,746.20) | -36% | 0 | | | | | 1803-01-092 | Pharr | 01/05/28 | $20,070,328.00 | Construction | Roadway | Construction | Roadway | $14,796,701.00 | $5,273,627.00 | 36% | 0 | | | | | 3066-01-005 | Brownwood | 11/03/26 | $18,932.11 | Construction | Roadway | Construction | Roadway | $13,961.00 | $4,971.11 | 36% | 0 | | | | | 3510-03-013 | Houston | 12/15/28 | $182,987,469.00 | Alternative Delivery | Design Build | Alternative Delivery | Design Build | $282,610,000.00 | $(99,622,531.00) | -35% | 0 | | | | | 0716-01-049 | Yoakum | 11/03/26 | $634,248.35 | Construction | Roadway | Construction | Roadway | $469,875.00 | $164,373.35 | 35% | 0 | | | | | 0026-02-040 | Yoakum | 02/02/27 | $370,648.75 | Construction | Roadway | Construction | Roadway | $275,000.00 | $95,648.75 | 35% | 0 | | | | | 0402-04-037 | Atlanta | 10/06/26 | $378,092.48 | Construction | Roadway | Construction | Roadway | $577,800.00 | $(199,707.52) | -35% | 0 | | | | | 0269-02-069 | Yoakum | 11/03/26 | $708,196.60 | Construction | Roadway | Construction | Roadway | $1,080,276.00 | $(372,079.40) | -34% | 0 | | | | | 0214-03-032 | Beaumont | 11/02/27 | $12,500,000.00 | Construction | Bridge | Construction | Bridge | $19,000,000.00 | $(6,500,000.00) | -34% | 0 | | | | | 0302-05-002 | Lubbock | 11/03/26 | $84,489.57 | Construction | Roadway | Construction | Roadway | $128,206.00 | $(43,716.43) | -34% | 0 | | | | | 0154-01-069 | Yoakum | 11/03/26 | $172,390.25 | Construction | Roadway | Construction | Roadway | $260,005.00 | $(87,614.75) | -34% | 0 | | | | | 0249-07-071 | Fort Worth | 06/01/28 | $96,153,846.15 | Construction | Bridge | Construction | Bridge | $71,927,225.18 | $24,226,620.97 | 34% | 0 | | | | | 0249-07-080 | Fort Worth | 01/05/28 | $6,393,898.13 | Construction | Roadway | Construction | Roadway | $9,585,746.08 | $(3,191,847.95) | -33% | 0 | | | | | 0918-47-460 | Dallas | 12/01/26 | $8,032,280.30 | Construction | Bridge | Construction | Bridge | $6,025,768.30 | $2,006,512.00 | 33% | 0 | | | | | 2525-01-020 | Yoakum | 10/04/28 | $534,323.80 | Construction | Roadway | Construction | Roadway | $800,000.00 | $(265,676.20) | -33% | 0 | | | | | 0008-05-029 | Fort Worth | 06/01/27 | $136,069,841.00 | Construction | Roadway | Construction | Roadway | $102,309,774.79 | $33,760,066.21 | 33% | 0 | | | | | 0964-02-035 | Atlanta | 10/06/26 | $466,254.07 | Construction | Roadway | Construction | Roadway | $694,152.00 | $(227,897.93) | -33% | 0 | | | | | 0562-03-013 | Wichita Falls | 11/03/26 | $261,751.95 | Construction | Roadway | Construction | Roadway | $197,362.00 | $64,389.95 | 33% | 0 | | | | | 1885-03-013 | Amarillo | 11/03/26 | $714,212.48 | Construction | Roadway | Construction | Roadway | $1,060,000.00 | $(345,787.52) | -33% | -364 | -12 months | | | | 2726-01-016 | Amarillo | 11/03/26 | $831,208.32 | Construction | Roadway | Construction | Roadway | $1,230,000.00 | $(398,791.68) | -32% | 0 | | | | | 2896-01-011 | Yoakum | 11/03/26 | $471,214.10 | Construction | Roadway | Construction | Roadway | $356,405.00 | $114,809.10 | 32% | 0 | | | | | 0823-03-008 | Wichita Falls | 11/03/26 | $126,408.12 | Construction | Roadway | Construction | Roadway | $95,880.00 | $30,528.12 | 32% | 0 | | | | | 0186-02-036 | Bryan | 08/02/28 | $3,000,000.00 | Construction | Roadway | Construction | Roadway | $4,400,000.00 | $(1,400,000.00) | -32% | -125 | -4 months | | | | 0924-06-722 | El Paso | 12/01/26 | $199,560.58 | Construction | Roadway | Construction | Roadway | $151,557.35 | $48,003.23 | 32% | 0 | | | | | 0518-02-017 | Abilene | 12/01/27 | $221,912.45 | Construction | Roadway | Unassigned | Unassigned | $323,673.00 | $(101,760.55) | -31% | -731 | -2 years | Unassigned → Construction / Roadway | | | 0645-01-017 | Lubbock | 11/03/26 | $598,209.26 | Construction | Roadway | Construction | Roadway | $872,570.00 | $(274,360.74) | -31% | 0 | | | | | 1015-02-017 | Dallas | 10/06/26 | $216,654.70 | Construction | Roadway | Construction | Roadway | $165,018.52 | $51,636.18 | 31% | 0 | | | | | 1439-02-016 | Yoakum | 11/03/26 | $181,694.15 | Construction | Roadway | Construction | Roadway | $138,495.00 | $43,199.15 | 31% | 0 | | | | | 0168-09-193 | Amarillo | 11/03/26 | $722,714.98 | Construction | Bridge | Construction | Bridge | $1,050,000.00 | $(327,285.02) | -31% | 0 | | | | | 3123-01-017 | Fort Worth | 12/01/26 | $229,955.95 | Construction | Roadway | Construction | Roadway | $175,601.00 | $54,354.95 | 31% | 0 | | | | | 0669-01-070 | Pharr | 10/06/26 | $22,399.17 | Construction | Roadway | Construction | Roadway | $32,348.00 | $(9,948.83) | -31% | 0 | | | | | 2126-03-009 | Amarillo | 11/03/26 | $125,452.61 | Construction | Roadway | Construction | Roadway | $180,500.00 | $(55,047.39) | -31% | 0 | | | | | 0912-73-228 | Houston | 12/01/27 | $796,131.00 | Construction | Bridge | Construction | Bridge | $1,144,810.00 | $(348,679.00) | -30% | 0 | | | | | 1412-01-023 | Yoakum | 11/03/26 | $39,944.45 | Construction | Roadway | Construction | Roadway | $30,625.00 | $9,319.45 | 30% | 0 | | | | | 0549-02-038 | Paris | 09/02/26 | $1,829,363.32 | Construction | Roadway | Construction | Roadway | $2,626,356.93 | $(796,993.61) | -30% | 0 | | | | | 0843-02-030 | Atlanta | 10/06/26 | $149,968.47 | Construction | Roadway | Construction | Roadway | $214,776.00 | $(64,807.53) | -30% | 0 | | | | | 0714-01-016 | Fort Worth | 11/03/26 | $76,076.55 | Construction | Roadway | Construction | Roadway | $108,470.00 | $(32,393.45) | -30% | 0 | | | | | 0356-02-050 | Amarillo | 11/03/26 | $142,427.10 | Construction | Roadway | Construction | Roadway | $202,000.00 | $(59,572.90) | -29% | 0 | | | | | 0168-09-200 | Amarillo | 11/03/26 | $848,781.30 | Construction | Roadway | Construction | Roadway | $1,200,000.00 | $(351,218.70) | -29% | 0 | | | | | 1451-01-032 | Dallas | 10/06/26 | $956,229.83 | Construction | Roadway | Construction | Roadway | $740,028.52 | $216,201.31 | 29% | 0 | | | | | 0420-10-020 | Yoakum | 11/03/26 | $429,631.55 | Construction | Roadway | Construction | Roadway | $333,576.00 | $96,055.55 | 29% | 0 | | | | | 0173-05-044 | Dallas | 10/06/26 | $687,003.67 | Construction | Roadway | Construction | Roadway | $533,456.92 | $153,546.75 | 29% | 0 | | | | | 2213-02-012 | Fort Worth | 12/01/26 | $321,528.38 | Construction | Roadway | Construction | Roadway | $450,000.00 | $(128,471.62) | -29% | 0 | | | | | 3510-07-012 | Houston | 08/04/27 | $81,894,039.00 | Construction | Roadway | Construction | Roadway | $63,904,122.00 | $17,989,917.00 | 28% | 0 | | | | | 0440-06-030 | Austin | 01/06/27 | $50,000,000.00 | Construction | Roadway | Construction | Roadway | $39,074,038.46 | $10,925,961.54 | 28% | 0 | | | | | 1947-01-021 | Beaumont | 09/02/26 | $756,980.80 | Construction | Roadway | Construction | Roadway | $1,048,785.06 | $(291,804.26) | -28% | 0 | | | | | 0352-02-052 | Fort Worth | 01/05/28 | $9,580,820.57 | Construction | Roadway | Construction | Roadway | $13,254,306.88 | $(3,673,486.31) | -28% | 0 | | | | | 1051-03-001 | Dallas | 12/01/26 | $68,964,680.56 | Construction | Roadway | Construction | Roadway | $54,002,986.08 | $14,961,694.48 | 28% | 0 | | | | | 0574-01-034 | Dallas | 10/06/26 | $633,520.12 | Construction | Roadway | Construction | Roadway | $496,905.09 | $136,615.03 | 27% | 0 | | | | | 0266-03-033 | Yoakum | 01/06/27 | $192,415.80 | Construction | Non Roadway | Construction | Non Roadway | $265,000.00 | $(72,584.20) | -27% | 0 | | | | | 1260-03-016 | Yoakum | 11/03/26 | $114,984.50 | Construction | Roadway | Construction | Roadway | $90,335.00 | $24,649.50 | 27% | 0 | | | | | 2350-01-074 | Yoakum | 11/03/26 | $354,089.35 | Construction | Roadway | Construction | Roadway | $278,345.00 | $75,744.35 | 27% | 0 | | | | | 0371-04-062 | Corpus Christi | 07/01/27 | $64,769,601.51 | Construction | Roadway | Construction | Roadway | $51,000,000.00 | $13,769,601.51 | 27% | 176 | 6 months | | | | 0697-03-034 | Dallas | 10/06/26 | $346,029.34 | Construction | Roadway | Construction | Roadway | $272,745.38 | $73,283.96 | 27% | 0 | | | | | 1947-02-017 | Beaumont | 09/02/26 | $449,838.10 | Construction | Roadway | Construction | Roadway | $614,931.12 | $(165,093.02) | -27% | 0 | | | | | 0265-02-043 | Austin | 08/02/28 | $1,661,538.46 | Construction | Roadway | Construction | Roadway | $2,270,411.00 | $(608,872.54) | -27% | 0 | | | | | 1629-02-008 | Lubbock | 11/03/26 | $467,439.28 | Construction | Roadway | Construction | Roadway | $369,482.00 | $97,957.28 | 27% | 0 | | | | | 0172-09-047 | Fort Worth | 09/02/26 | $3,514,144.18 | Construction | Roadway | Construction | Roadway | $4,776,312.18 | $(1,262,168.00) | -26% | 0 | | | | | 0211-03-039 | Austin | 12/01/26 | $1,833,490.08 | Construction | Roadway | Construction | Roadway | $2,489,243.27 | $(655,753.19) | -26% | 0 | | | | | 2815-01-010 | Dallas | 10/06/26 | $281,061.68 | Construction | Roadway | Construction | Roadway | $222,479.71 | $58,581.97 | 26% | 0 | | | | | 0280-04-009 | Dallas | 10/06/26 | $89,276.40 | Construction | Roadway | Construction | Roadway | $70,773.60 | $18,502.80 | 26% | 0 | | | | | 0668-02-021 | Abilene | 12/01/27 | $454,483.54 | Construction | Roadway | Construction | Roadway | $360,441.00 | $94,042.54 | 26% | 0 | | | | | 0010-08-063 | Atlanta | 10/06/26 | $435,558.98 | Construction | Roadway | Construction | Roadway | $588,445.20 | $(152,886.22) | -26% | 0 | | | | | 2614-01-031 | Amarillo | 11/03/26 | $27,712.59 | Construction | Roadway | Construction | Roadway | $22,000.00 | $5,712.59 | 26% | 0 | | | | | 1960-02-010 | Yoakum | 11/03/26 | $91,689.65 | Construction | Roadway | Construction | Roadway | $123,750.00 | $(32,060.35) | -26% | 0 | | | | | 0195-02-091 | Dallas | 08/04/27 | $163,851,323.75 | Construction | Roadway | Construction | Roadway | $130,262,376.64 | $33,588,947.11 | 26% | 0 | | | | | 0681-06-015 | Wichita Falls | 11/03/26 | $600,011.85 | Construction | Roadway | Construction | Roadway | $477,659.00 | $122,352.85 | 26% | 0 | | | | | 1227-01-029 | Pharr | 10/06/26 | $87,344.30 | Construction | Roadway | Construction | Roadway | $117,367.00 | $(30,022.70) | -26% | 0 | | | | | 2353-02-026 | Dallas | 05/05/27 | $9,505,718.00 | Construction | Roadway | Construction | Roadway | $7,573,314.29 | $1,932,403.71 | 26% | 0 | | | | | 3041-02-021 | Atlanta | 10/06/26 | $251,690.45 | Construction | Roadway | Construction | Roadway | $337,644.00 | $(85,953.55) | -25% | 0 | | | | | 0137-07-026 | Wichita Falls | 11/03/26 | $698,985.81 | Construction | Roadway | Construction | Roadway | $935,639.00 | $(236,653.19) | -25% | 0 | | | | | 0794-06-023 | Amarillo | 11/03/26 | $898,793.63 | Construction | Roadway | Construction | Roadway | $1,200,000.00 | $(301,206.37) | -25% | 0 | | | | | 0410-03-020 | Dallas | 10/06/26 | $155,431.79 | Construction | Roadway | Construction | Roadway | $124,285.46 | $31,146.33 | 25% | 0 | | | | | 1988-01-025 | Atlanta | 10/06/26 | $316,216.41 | Construction | Roadway | Construction | Roadway | $421,725.60 | $(105,509.19) | -25% | 0 | | | | | 0015-18-007 | Waco | 07/01/27 | $1,912,861.00 | Construction | Roadway | Construction | Roadway | $1,530,288.00 | $382,573.00 | 25% | 86 | 3 months | | | | 0619-03-069 | Dallas | 11/03/26 | $442,425.00 | Construction | Roadway | Construction | Roadway | $588,490.88 | $(146,065.88) | -25% | -28 | -28 days | | | | 1974-01-013 | Dallas | 10/06/26 | $355,891.97 | Construction | Roadway | Construction | Roadway | $285,309.49 | $70,582.48 | 25% | 0 | | | | | 0212-03-059 | Bryan | 11/03/26 | $11,162,673.25 | Construction | Bridge | Construction | Bridge | $14,811,612.00 | $(3,648,938.75) | -25% | 0 | | | | | 0095-03-099 | Dallas | 10/06/26 | $5,383,731.50 | Construction | Bridge | Construction | Bridge | $7,142,577.25 | $(1,758,845.75) | -25% | 0 | | | | | 0095-03-098 | Dallas | 10/06/26 | $3,570,273.00 | Construction | Bridge | Construction | Bridge | $4,724,338.30 | $(1,154,065.30) | -24% | 0 | | | | | 0280-03-005 | Dallas | 10/06/26 | $208,242.16 | Construction | Roadway | Construction | Roadway | $167,428.56 | $40,813.60 | 24% | 0 | | | | | 1575-03-019 | Atlanta | 10/06/26 | $406,886.52 | Construction | Roadway | Construction | Roadway | $535,860.00 | $(128,973.48) | -24% | 0 | | | | | 2417-02-019 | Fort Worth | 12/01/26 | $483,666.99 | Construction | Roadway | Construction | Roadway | $390,000.00 | $93,666.99 | 24% | 0 | | | | | 0269-09-020 | Yoakum | 11/03/26 | $104,920.55 | Construction | Roadway | Construction | Roadway | $138,095.00 | $(33,174.45) | -24% | 0 | | | | | 0091-06-063 | Dallas | 08/04/28 | $3,800,000.00 | Construction | Roadway | Construction | Roadway | $5,000,000.00 | $(1,200,000.00) | -24% | 0 | | | | | 0095-12-003 | Dallas | 10/06/26 | $24,392.62 | Construction | Roadway | Construction | Roadway | $19,676.50 | $4,716.12 | 24% | 0 | | | | | 0212-03-058 | Bryan | 11/03/26 | $10,451,994.90 | Construction | Bridge | Construction | Bridge | $13,742,128.00 | $(3,290,133.10) | -24% | 0 | | | | | 0580-02-014 | Yoakum | 11/03/26 | $148,543.10 | Construction | Roadway | Construction | Roadway | $195,059.00 | $(46,515.90) | -24% | 0 | | | | | 2738-01-018 | Fort Worth | 12/01/26 | $443,811.77 | Construction | Roadway | Construction | Roadway | $581,433.18 | $(137,621.41) | -24% | 0 | | | | | 0197-12-008 | Dallas | 10/06/26 | $295,898.13 | Construction | Roadway | Construction | Roadway | $239,271.24 | $56,626.89 | 24% | 0 | | | | | 0169-09-021 | Amarillo | 11/03/26 | $740,513.45 | Construction | Roadway | Construction | Roadway | $600,000.00 | $140,513.45 | 23% | 0 | | | | | 0280-02-046 | Dallas | 10/06/26 | $1,329,905.30 | Construction | Roadway | Construction | Roadway | $1,078,383.96 | $251,521.34 | 23% | 0 | | | | | 0146-07-034 | Wichita Falls | 11/03/26 | $755,985.78 | Construction | Roadway | Construction | Roadway | $984,903.00 | $(228,917.22) | -23% | 0 | | | | | 1506-01-015 | Pharr | 10/06/26 | $69,258.32 | Construction | Roadway | Construction | Roadway | $90,223.00 | $(20,964.68) | -23% | 0 | | | | | 1012-02-045 | Dallas | 10/06/26 | $84,746.32 | Construction | Roadway | Construction | Roadway | $68,826.14 | $15,920.18 | 23% | 0 | | | | | 0135-04-043 | Dallas | 10/06/26 | $74,488.20 | Construction | Roadway | Construction | Roadway | $60,503.14 | $13,985.06 | 23% | 0 | | | | | 0092-03-053 | Dallas | 12/01/26 | $76,245,839.82 | Construction | Roadway | Construction | Roadway | $62,131,255.85 | $14,114,583.97 | 23% | 0 | | | | | 0122-01-047 | Dallas | 10/06/26 | $867,320.71 | Construction | Roadway | Construction | Roadway | $706,835.31 | $160,485.40 | 23% | 0 | | | | | 0640-04-015 | Atlanta | 10/06/26 | $332,811.18 | Construction | Roadway | Construction | Roadway | $430,200.00 | $(97,388.82) | -23% | 0 | | | | | 0197-13-007 | Dallas | 10/06/26 | $242,202.23 | Construction | Roadway | Construction | Roadway | $197,779.93 | $44,422.30 | 22% | 0 | | | | | 0271-04-093 | Houston | 06/01/33 | $56,574,074.00 | | | Construction | Roadway | $46,286,366.28 | $10,287,707.72 | 22% | 1639 | 4 years | | | | 1861-01-014 | Amarillo | 11/03/26 | $17,919.14 | Construction | Roadway | Construction | Roadway | $23,000.00 | $(5,080.86) | -22% | 0 | | | | | 0066-03-045 | Amarillo | 11/03/26 | $3,658,772.15 | Construction | Roadway | Construction | Roadway | $3,000,000.00 | $658,772.15 | 22% | 0 | | | | | 0045-08-039 | Paris | 07/01/27 | $151,785,996.00 | Construction | Roadway | Construction | Roadway | $124,861,809.00 | $26,924,187.00 | 22% | 0 | | | | | 0173-04-062 | Dallas | 10/06/26 | $83,929.47 | Construction | Roadway | Construction | Roadway | $69,047.73 | $14,881.74 | 22% | 0 | | | | | 0092-05-058 | Dallas | 10/06/26 | $3,944,536.07 | Construction | Roadway | Construction | Roadway | $3,246,330.95 | $698,205.12 | 22% | 0 | | | | | 0313-01-064 | Fort Worth | 12/01/26 | $544,447.53 | Construction | Roadway | Construction | Roadway | $693,522.64 | $(149,075.11) | -22% | 0 | | | | | 0095-03-108 | Dallas | 10/06/26 | $5,807,189.50 | Construction | Bridge | Construction | Bridge | $7,397,762.80 | $(1,590,573.30) | -22% | 0 | | | | | 0197-05-066 | Dallas | 10/06/26 | $39,646.21 | Construction | Roadway | Construction | Roadway | $32,650.38 | $6,995.83 | 21% | 0 | | | | | 0912-31-338 | Houston | 12/01/27 | $1,251,838.00 | Construction | Bridge | Construction | Bridge | $1,592,420.00 | $(340,582.00) | -21% | 0 | | | | | 1318-01-022 | Dallas | 10/06/26 | $612,594.34 | Construction | Roadway | Construction | Roadway | $505,148.53 | $107,445.81 | 21% | 0 | | | | | 0257-02-042 | Brownwood | 11/03/26 | $280,071.71 | Construction | Roadway | Construction | Roadway | $355,605.00 | $(75,533.29) | -21% | 0 | | | | | 0095-03-103 | Dallas | 10/06/26 | $7,710,438.50 | Construction | Bridge | Construction | Bridge | $9,784,408.00 | $(2,073,969.50) | -21% | 0 | | | | | 0162-09-043 | Dallas | 10/06/26 | $1,166,880.57 | Construction | Roadway | Construction | Roadway | $964,677.94 | $202,202.63 | 21% | 0 | | | | | 0918-47-497 | Dallas | 03/03/27 | $840,687.38 | Construction | Roadway | Construction | Roadway | $696,600.00 | $144,087.38 | 21% | 0 | | | | | 1968-01-012 | Atlanta | 10/06/26 | $237,109.21 | Construction | Roadway | Construction | Roadway | $298,836.00 | $(61,726.79) | -21% | 0 | | | | | 0095-03-109 | Dallas | 10/06/26 | $10,832,284.50 | Construction | Bridge | Construction | Bridge | $13,641,956.75 | $(2,809,672.25) | -21% | 0 | | | | | 0380-01-097 | Lubbock | 11/03/26 | $41,350.47 | Construction | Roadway | Construction | Roadway | $34,332.00 | $7,018.47 | 20% | 0 | | | | | 1068-01-242 | Fort Worth | 02/02/28 | $3,677,708.65 | Construction | Roadway | Construction | Roadway | $3,057,330.65 | $620,378.00 | 20% | 0 | | | | | 0727-04-021 | Amarillo | 11/03/26 | $901,418.52 | Construction | Roadway | Construction | Roadway | $1,130,000.00 | $(228,581.48) | -20% | 0 | | | | | 1441-01-016 | Yoakum | 11/03/26 | $252,114.55 | Construction | Roadway | Construction | Roadway | $316,033.00 | $(63,918.45) | -20% | 0 | | | | | 1222-02-027 | Atlanta | 10/06/26 | $129,532.50 | Construction | Roadway | Construction | Roadway | $162,360.00 | $(32,827.50) | -20% | 0 | | | | | 2398-01-063 | Abilene | 03/03/27 | $9,281,535.00 | Construction | Bridge | Construction | Bridge | $11,607,143.00 | $(2,325,608.00) | -20% | 0 | | | | | 1105-01-018 | Yoakum | 11/03/26 | $430,635.05 | Construction | Roadway | Construction | Roadway | $538,511.00 | $(107,875.95) | -20% | 0 | | | | | 0404-01-033 | Wichita Falls | 11/03/26 | $787,235.84 | Construction | Roadway | Construction | Roadway | $984,335.00 | $(197,099.16) | -20% | 0 | | | | | 0015-13-423 | Austin | 01/01/29 | $1,202,030,435.19 | Construction | Roadway | Construction | Roadway | $1,502,285,712.50 | $(300,255,277.31) | -20% | 0 | | | | | 2676-01-008 | Yoakum | 11/03/26 | $207,686.85 | Construction | Roadway | Construction | Roadway | $173,180.00 | $34,506.85 | 20% | 0 | | | | | 1341-02-009 | Lubbock | 11/03/26 | $56,317.45 | Construction | Roadway | Construction | Roadway | $46,986.61 | $9,330.84 | 20% | 0 | | | | | 1396-01-016 | Dallas | 10/06/26 | $457,675.44 | Construction | Roadway | Construction | Roadway | $381,875.89 | $75,799.55 | 20% | 0 | | | | | 3510-07-017 | Houston | 09/01/27 | $3,350,904.00 | Construction | Roadway | Construction | Roadway | $2,799,907.00 | $550,997.00 | 20% | 0 | | | | | 0200-05-036 | Beaumont | 09/06/28 | $107,698,149.07 | Construction | Roadway | Construction | Roadway | $90,000,000.00 | $17,698,149.07 | 20% | 0 | | | | | 3426-01-005 | Dallas | 10/06/26 | $329,433.23 | Construction | Roadway | Construction | Roadway | $275,353.38 | $54,079.85 | 20% | 0 | | | | | 0385-04-055 | Fort Worth | 12/01/26 | $499,088.52 | Construction | Roadway | Construction | Roadway | $621,003.75 | $(121,915.23) | -20% | 0 | | | | | 2512-03-010 | Dallas | 10/06/26 | $408,415.96 | Construction | Roadway | Construction | Roadway | $341,389.85 | $67,026.11 | 20% | 0 | | | | | 0153-02-047 | Yoakum | 11/03/26 | $79,467.10 | Construction | Roadway | Construction | Roadway | $98,736.00 | $(19,268.90) | -20% | 0 | | | | | 0924-06-719 | El Paso | 12/01/26 | $196,694.75 | Construction | Roadway | Construction | Roadway | $244,297.44 | $(47,602.69) | -19% | 0 | | | | | 3333-01-005 | Yoakum | 11/03/26 | $120,944.10 | Construction | Roadway | Construction | Roadway | $150,212.00 | $(29,267.90) | -19% | 0 | | | | | 0045-09-103 | Paris | 03/03/27 | $75,480,004.00 | Construction | Roadway | Construction | Roadway | $93,663,191.00 | $(18,183,187.00) | -19% | 0 | | | | | 0281-01-038 | Dallas | 10/06/26 | $624,564.34 | Construction | Roadway | Construction | Roadway | $523,382.75 | $101,181.59 | 19% | 0 | | | | | 0140-01-083 | Odessa | 11/03/26 | $118,112.40 | Construction | Bridge | Construction | Bridge | $146,332.10 | $(28,219.70) | -19% | 0 | | | | | 2631-03-007 | Fort Worth | 12/01/26 | $174,039.48 | Construction | Roadway | Construction | Roadway | $145,928.00 | $28,111.48 | 19% | 0 | | | | | 2638-05-012 | Brownwood | 11/03/26 | $110,473.20 | Construction | Roadway | Construction | Roadway | $136,716.00 | $(26,242.80) | -19% | 0 | | | | | 0538-02-024 | Childress | 10/06/26 | $288,861.92 | Construction | Roadway | Construction | Roadway | $357,153.00 | $(68,291.08) | -19% | 0 | | | | | 0169-06-043 | Amarillo | 11/03/26 | $1,131,498.50 | Construction | Roadway | Construction | Roadway | $950,000.00 | $181,498.50 | 19% | 0 | | | | | 0083-08-061 | Atlanta | 10/06/26 | $422,242.00 | Construction | Roadway | Construction | Roadway | $354,528.00 | $67,714.00 | 19% | 0 | | | | | 0015-13-452 | Austin | 02/02/27 | $150,000,000.00 | Construction | Roadway | Construction | Roadway | $125,961,538.46 | $24,038,461.54 | 19% | 0 | | | | | 0114-04-081 | Austin | 09/01/27 | $516,792.60 | Construction | Bridge | Construction | Bridge | $638,420.37 | $(121,627.77) | -19% | 0 | | | | | 0356-03-020 | Amarillo | 11/03/26 | $744,087.55 | Construction | Roadway | Construction | Roadway | $625,000.00 | $119,087.55 | 19% | 0 | | | | | 0212-04-041 | Bryan | 11/03/26 | $10,117,449.00 | Construction | Bridge | Construction | Bridge | $12,490,493.00 | $(2,373,044.00) | -19% | 0 | | | | | 2697-01-037 | Yoakum | 11/03/26 | $198,635.70 | Construction | Roadway | Construction | Roadway | $167,102.00 | $31,533.70 | 19% | 0 | | | | | 0451-01-053 | Dallas | 06/01/27 | $139,726,257.70 | Construction | Roadway | Construction | Roadway | $117,610,100.89 | $22,116,156.81 | 19% | 0 | | | | | 0754-04-013 | Lubbock | 11/03/26 | $418,526.34 | Construction | Roadway | Construction | Roadway | $515,371.00 | $(96,844.66) | -19% | 0 | | | | | 2855-01-032 | Fort Worth | 12/01/26 | $171,050.19 | Construction | Roadway | Construction | Roadway | $144,000.00 | $27,050.19 | 19% | 0 | | | | | 1227-04-025 | Pharr | 10/06/26 | $38,511.46 | Construction | Roadway | Construction | Roadway | $47,410.00 | $(8,898.54) | -19% | 0 | | | | | 0252-01-084 | Austin | 12/01/26 | $8,827,944.32 | Construction | Roadway | Construction | Roadway | $10,866,345.19 | $(2,038,400.87) | -19% | 0 | | | | | 0269-10-027 | Yoakum | 11/03/26 | $439,573.75 | Construction | Roadway | Construction | Roadway | $541,028.00 | $(101,454.25) | -19% | 0 | | | | | 1092-01-025 | Dallas | 10/06/26 | $203,267.10 | Construction | Roadway | Construction | Roadway | $171,416.88 | $31,850.22 | 19% | 0 | | | | | 0005-05-115 | Abilene | 12/01/27 | $626,974.33 | Construction | Roadway | Construction | Roadway | $769,821.00 | $(142,846.67) | -19% | 0 | | | | | 0342-01-093 | Pharr | 05/05/27 | $34,451,558.18 | Construction | Roadway | Construction | Roadway | $29,063,727.00 | $5,387,831.18 | 19% | 0 | | | | | 0362-04-049 | Fort Worth | 12/01/26 | $565,103.85 | Construction | Roadway | Construction | Roadway | $476,876.40 | $88,227.45 | 19% | 0 | | | | | 3108-01-005 | Yoakum | 11/03/26 | $125,382.05 | Construction | Roadway | Construction | Roadway | $153,651.00 | $(28,268.95) | -18% | 0 | | | | | 0816-03-025 | Dallas | 10/06/26 | $146,947.80 | Construction | Roadway | Construction | Roadway | $124,183.31 | $22,764.49 | 18% | 0 | | | | | 0800-03-019 | Lubbock | 11/03/26 | $485,434.05 | Construction | Roadway | Construction | Roadway | $410,623.00 | $74,811.05 | 18% | 0 | | | | | 0708-01-033 | Brownwood | 11/03/26 | $71,860.10 | Construction | Roadway | Construction | Roadway | $60,805.00 | $11,055.10 | 18% | 0 | | | | | 0007-07-028 | Fort Worth | 12/01/26 | $186,171.80 | Construction | Roadway | Construction | Roadway | $227,476.47 | $(41,304.67) | -18% | 0 | | | | | 1302-03-012 | Yoakum | 11/03/26 | $147,164.15 | Construction | Roadway | Construction | Roadway | $179,700.00 | $(32,535.85) | -18% | 0 | | | | | 0816-03-026 | Dallas | 10/06/26 | $263,816.55 | Construction | Roadway | Construction | Roadway | $223,461.31 | $40,355.24 | 18% | 0 | | | | | 0220-01-038 | Pharr | 11/03/26 | $8,329,537.21 | Construction | Roadway | Construction | Roadway | $7,056,372.13 | $1,273,165.08 | 18% | 0 | | | | | 0732-01-032 | Atlanta | 10/06/26 | $293,192.23 | Construction | Roadway | Construction | Roadway | $357,660.00 | $(64,467.77) | -18% | 0 | | | | | 1894-01-024 | Atlanta | 10/06/26 | $343,654.91 | Construction | Roadway | Construction | Roadway | $418,788.00 | $(75,133.09) | -18% | 0 | | | | | 0669-01-071 | Pharr | 10/06/26 | $16,951.88 | Construction | Roadway | Construction | Roadway | $20,650.00 | $(3,698.12) | -18% | 0 | | | | | 2850-01-020 | Bryan | 10/06/26 | $1,767,958.90 | Construction | Roadway | Construction | Roadway | $1,500,000.00 | $267,958.90 | 18% | 0 | | | | | 0560-05-008 | Amarillo | 11/03/26 | $92,020.64 | Construction | Roadway | Construction | Roadway | $112,000.00 | $(19,979.36) | -18% | 0 | | | | | 0186-06-082 | Bryan | 06/14/28 | $164,094,463.00 | Alternative Delivery | Design Build | Alternative Delivery | Design Build | $199,548,797.00 | $(35,454,334.00) | -18% | 0 | | | | | 2208-01-074 | Fort Worth | 03/03/27 | $3,219,397.84 | Construction | Roadway | Construction | Roadway | $3,905,479.41 | $(686,081.57) | -18% | 0 | | | | | 0750-02-021 | Atlanta | 10/06/26 | $353,528.36 | Construction | Roadway | Construction | Roadway | $428,688.00 | $(75,159.64) | -18% | 0 | | | | | 0733-03-061 | Abilene | 12/01/27 | $659,306.62 | Construction | Roadway | Construction | Roadway | $561,000.00 | $98,306.62 | 18% | 0 | | | | | 0220-04-049 | Pharr | 08/04/27 | $27,388,925.00 | Construction | Roadway | Construction | Roadway | $23,319,932.34 | $4,068,992.66 | 17% | 0 | | | | | 0271-04-070 | Houston | 06/01/33 | $161,018,519.00 | | | Construction | Roadway | $194,998,997.72 | $(33,980,478.72) | -17% | 1639 | 4 years | | | | 0271-04-077 | Houston | 12/05/28 | $161,018,519.00 | | | | | $194,998,997.72 | $(33,980,478.72) | -17% | 0 | | | | | 0683-02-072 | Austin | 08/01/29 | $97,980,816.67 | Construction | Roadway | Construction | Roadway | $83,619,134.82 | $14,361,681.85 | 17% | 0 | | | | | 3131-03-015 | Brownwood | 11/03/26 | $68,365.52 | Construction | Roadway | Construction | Roadway | $58,390.00 | $9,975.52 | 17% | 0 | | | | | 0086-14-077 | Laredo | 10/04/28 | $38,936,927.80 | Construction | Roadway | Construction | Roadway | $33,330,081.25 | $5,606,846.55 | 17% | 0 | | | | | 2213-01-016 | Fort Worth | 12/01/26 | $247,330.83 | Construction | Roadway | Construction | Roadway | $297,095.74 | $(49,764.91) | -17% | 0 | | | | | 0861-02-022 | Pharr | 10/06/26 | $65,061.92 | Construction | Roadway | Construction | Roadway | $55,739.00 | $9,322.92 | 17% | 0 | | | | | 0140-05-029 | Odessa | 11/03/26 | $100,016.20 | Construction | Bridge | Construction | Bridge | $119,753.30 | $(19,737.10) | -16% | 0 | | | | | 0211-12-011 | Yoakum | 11/03/26 | $182,635.45 | Construction | Roadway | Construction | Roadway | $217,781.00 | $(35,145.55) | -16% | 0 | | | | | 1007-02-020 | Yoakum | 11/03/26 | $555,923.35 | Construction | Roadway | Construction | Roadway | $662,000.00 | $(106,076.65) | -16% | 0 | | | | | 0241-02-061 | Yoakum | 11/03/26 | $345,241.85 | Construction | Roadway | Construction | Roadway | $298,000.00 | $47,241.85 | 16% | 0 | | | | | 0140-05-028 | Odessa | 11/03/26 | $776,785.50 | Construction | Bridge | Construction | Bridge | $671,189.90 | $105,595.60 | 16% | 0 | | | | | 0168-09-192 | Amarillo | 11/03/26 | $1,821,007.20 | Construction | Bridge | Construction | Bridge | $2,160,000.00 | $(338,992.80) | -16% | 0 | | | | | 0823-01-040 | Wichita Falls | 11/03/26 | $313,002.50 | Construction | Roadway | Construction | Roadway | $270,592.00 | $42,410.50 | 16% | 0 | | | | | 0381-01-018 | Childress | 10/06/26 | $711,034.93 | Construction | Roadway | Construction | Roadway | $842,547.00 | $(131,512.07) | -16% | 0 | | | | | 3256-01-127 | Houston | 04/06/27 | $11,320,453.00 | Construction | Roadway | Construction | Roadway | $9,798,415.00 | $1,522,038.00 | 16% | 0 | | | | | 0044-07-077 | Wichita Falls | 11/03/26 | $605,538.86 | Construction | Roadway | Construction | Roadway | $716,433.00 | $(110,894.14) | -15% | 0 | | | | | 0047-04-032 | Dallas | 11/03/26 | $39,780,866.34 | Construction | Roadway | Construction | Roadway | $46,922,696.42 | $(7,141,830.08) | -15% | 0 | | | | | 0275-11-092 | Amarillo | 09/06/28 | $14,400,000.00 | Construction | Roadway | Construction | Roadway | $12,500,000.00 | $1,900,000.00 | 15% | 0 | | | | | 0445-03-029 | Yoakum | 11/03/26 | $310,881.80 | Construction | Roadway | Construction | Roadway | $366,550.00 | $(55,668.20) | -15% | 0 | | | | | 2516-01-012 | Yoakum | 11/03/26 | $203,609.05 | Construction | Roadway | Construction | Roadway | $240,000.00 | $(36,390.95) | -15% | 0 | | | | | 0168-09-191 | Amarillo | 11/03/26 | $1,782,502.92 | Construction | Bridge | Construction | Bridge | $2,100,000.00 | $(317,497.08) | -15% | 0 | | | | | 0140-04-049 | Odessa | 11/03/26 | $183,227.20 | Construction | Bridge | Construction | Bridge | $215,789.50 | $(32,562.30) | -15% | 0 | | | | | 0912-72-381 | Houston | 11/15/28 | $57,700,000.00 | Construction | Local Let | Construction | Local Let | $50,171,694.00 | $7,528,306.00 | 15% | 0 | | | | | 0480-04-032 | Brownwood | 11/03/26 | $700,292.18 | Construction | Roadway | Construction | Roadway | $823,846.00 | $(123,553.82) | -15% | 0 | | | | | 2932-03-004 | Lubbock | 11/03/26 | $177,580.31 | Construction | Roadway | Construction | Roadway | $208,553.00 | $(30,972.69) | -15% | 0 | | | | | 0081-13-071 | Dallas | 08/02/28 | $198,251,363.58 | Construction | Roadway | Construction | Roadway | $232,779,659.11 | $(34,528,295.53) | -15% | -35 | -1 month | | | | 0721-01-025 | Lubbock | 11/03/26 | $158,602.21 | Construction | Roadway | Construction | Roadway | $138,214.00 | $20,388.21 | 15% | 0 | | | | | 0918-47-498 | Dallas | 03/03/27 | $431,230.25 | Construction | Roadway | Construction | Roadway | $505,800.00 | $(74,569.75) | -15% | 0 | | | | | 0693-03-046 | Abilene | 12/01/26 | $11,083,819.30 | Construction | Roadway | Construction | Roadway | $13,000,000.00 | $(1,916,180.70) | -15% | 0 | | | | | 2376-03-011 | Brownwood | 11/03/26 | $20,752.95 | Construction | Roadway | Construction | Roadway | $18,087.00 | $2,665.95 | 15% | 0 | | | | | 0054-05-027 | Brownwood | 11/03/26 | $112,542.84 | Construction | Roadway | Construction | Roadway | $98,099.00 | $14,443.84 | 15% | 0 | | | | | 0371-02-083 | Corpus Christi | 09/02/26 | $1,367,466.20 | Construction | Roadway | Construction | Roadway | $1,603,267.91 | $(235,801.71) | -15% | 0 | | | | | 2759-01-012 | Wichita Falls | 11/03/26 | $151,049.50 | Construction | Roadway | Construction | Roadway | $176,993.00 | $(25,943.50) | -15% | 0 | | | | | 0791-05-022 | Amarillo | 11/03/26 | $1,087,171.51 | Construction | Roadway | Construction | Roadway | $1,270,000.00 | $(182,828.49) | -14% | 0 | | | | | 0968-04-005 | Lubbock | 11/03/26 | $359,110.02 | Construction | Roadway | Construction | Roadway | $418,824.00 | $(59,713.98) | -14% | 0 | | | | | 0101-01-070 | Corpus Christi | 09/02/26 | $103,530.32 | Construction | Roadway | Construction | Roadway | $120,610.80 | $(17,080.48) | -14% | 0 | | | | | 0387-01-016 | Dallas | 10/06/26 | $5,938,082.20 | Construction | Roadway | Construction | Roadway | $6,915,964.31 | $(977,882.11) | -14% | 0 | | | | | 1267-01-009 | Yoakum | 11/03/26 | $165,372.90 | Construction | Roadway | Construction | Roadway | $192,410.00 | $(27,037.10) | -14% | 0 | | | | | 1686-01-018 | Yoakum | 11/03/26 | $335,842.70 | Construction | Roadway | Construction | Roadway | $294,735.00 | $41,107.70 | 14% | 0 | | | | | 0560-01-034 | Amarillo | 11/03/26 | $936,330.15 | Construction | Roadway | Construction | Roadway | $822,000.00 | $114,330.15 | 14% | 0 | | | | | 0098-04-040 | Childress | 10/06/26 | $500,424.13 | Construction | Roadway | Construction | Roadway | $580,923.00 | $(80,498.87) | -14% | 0 | | | | | 0114-04-080 | Austin | 09/01/27 | $691,368.60 | Construction | Bridge | Construction | Bridge | $607,605.56 | $83,763.04 | 14% | 0 | | | | | 0049-09-092 | Bryan | 04/05/28 | $6,437,177.00 | Construction | Roadway | Construction | Roadway | $5,658,269.00 | $778,908.00 | 14% | 0 | | | | | 0051-09-127 | Houston | 09/02/26 | $2,179,545.80 | Construction | Non Roadway | Construction | Non Roadway | $2,526,048.60 | $(346,502.80) | -14% | 0 | | | | | 1017-03-040 | Paris | 11/03/26 | $6,591,205.76 | Construction | Roadway | Construction | Roadway | $5,800,000.00 | $791,205.76 | 14% | 0 | | | | | 0312-04-037 | Fort Worth | 12/01/26 | $638,814.45 | Construction | Roadway | Construction | Roadway | $739,036.14 | $(100,221.69) | -14% | 0 | | | | | 1855-01-031 | Wichita Falls | 11/03/26 | $339,781.28 | Construction | Roadway | Construction | Roadway | $299,273.00 | $40,508.28 | 14% | 0 | | | | | 0028-05-057 | Beaumont | 09/02/26 | $2,410,432.60 | Construction | Roadway | Construction | Roadway | $2,125,317.21 | $285,115.39 | 13% | 0 | | | | | 0271-05-025 | Houston | 10/04/28 | $292,939,920.00 | Construction | Roadway | Construction | Roadway | $258,400,000.00 | $34,539,920.00 | 13% | 0 | | | | | 0804-04-030 | Wichita Falls | 11/03/26 | $97,857.75 | Construction | Roadway | Construction | Roadway | $112,903.00 | $(15,045.25) | -13% | 0 | | | | | 0315-09-013 | Yoakum | 11/03/26 | $214,641.10 | Construction | Roadway | Construction | Roadway | $247,500.00 | $(32,858.90) | -13% | 0 | | | | | 1307-02-010 | Yoakum | 11/03/26 | $257,021.15 | Construction | Roadway | Construction | Roadway | $296,000.00 | $(38,978.85) | -13% | 0 | | | | | 0318-02-028 | Abilene | 12/01/27 | $987,812.60 | Construction | Roadway | Construction | Roadway | $1,135,643.00 | $(147,830.40) | -13% | 0 | | | | | 0220-04-050 | Pharr | 12/01/27 | $20,418,004.16 | Construction | Roadway | Construction | Roadway | $23,457,807.00 | $(3,039,802.84) | -13% | 365 | 1 year | | | | 0195-01-111 | Wichita Falls | 12/01/26 | $361,219,999.00 | Construction | Roadway | Construction | Roadway | $320,000,000.00 | $41,219,999.00 | 13% | 0 | | | | | 0092-03-064 | Dallas | 10/06/26 | $4,533,561.52 | Construction | Roadway | Construction | Roadway | $4,017,336.55 | $516,224.97 | 13% | 0 | | | | | 1076-02-048 | Wichita Falls | 11/03/26 | $245,809.05 | Construction | Roadway | Construction | Roadway | $218,022.00 | $27,787.05 | 13% | 0 | | | | | 0089-03-100 | Yoakum | 11/03/26 | $227,930.25 | Construction | Roadway | Construction | Roadway | $261,163.00 | $(33,232.75) | -13% | 0 | | | | | 0047-05-061 | Dallas | 03/07/28 | $58,697,319.72 | Construction | Roadway | Construction | Roadway | $52,099,915.91 | $6,597,403.81 | 13% | 0 | | | | | 0420-09-027 | Yoakum | 11/03/26 | $193,340.10 | Construction | Roadway | Construction | Roadway | $220,580.00 | $(27,239.90) | -12% | 0 | | | | | 2635-03-030 | Amarillo | 11/03/26 | $322,366.88 | Construction | Roadway | Construction | Roadway | $287,000.00 | $35,366.88 | 12% | 0 | | | | | 0055-08-120 | Waco | 04/06/27 | $44,739,109.67 | Construction | Roadway | Construction | Roadway | $39,892,364.56 | $4,846,745.11 | 12% | 0 | | | | | 0640-03-032 | Atlanta | 10/06/26 | $295,560.88 | Construction | Roadway | Construction | Roadway | $336,384.00 | $(40,823.12) | -12% | 0 | | | | | 2126-02-021 | Amarillo | 11/03/26 | $615,295.25 | Construction | Roadway | Construction | Roadway | $700,000.00 | $(84,704.75) | -12% | 0 | | | | | 0151-03-046 | Austin | 08/01/29 | $1,500,000.00 | Construction | Roadway | Construction | Roadway | $1,339,285.71 | $160,714.29 | 12% | 0 | | | | | 0151-04-076 | Austin | 08/01/29 | $1,500,000.00 | Construction | Roadway | Construction | Roadway | $1,339,285.71 | $160,714.29 | 12% | 0 | | | | | 0909-36-210 | Waco | 08/02/27 | $4,695,000.00 | Construction | Local Let | Construction | Local Let | $4,191,964.29 | $503,035.71 | 12% | 0 | | | | | 0138-11-034 | Atlanta | 10/06/26 | $329,754.52 | Construction | Roadway | Construction | Roadway | $373,824.00 | $(44,069.48) | -12% | 0 | | | | | 0145-07-039 | Lubbock | 11/03/26 | $1,389,918.86 | Construction | Roadway | Construction | Roadway | $1,572,012.00 | $(182,093.14) | -12% | 0 | | | | | 3569-01-007 | Wichita Falls | 11/03/26 | $193,499.25 | Construction | Roadway | Construction | Roadway | $173,679.00 | $19,820.25 | 11% | 0 | | | | | 0754-05-015 | Lubbock | 11/03/26 | $645,482.91 | Construction | Roadway | Construction | Roadway | $727,871.00 | $(82,388.09) | -11% | 0 | | | | | 0357-05-027 | Amarillo | 11/03/26 | $1,112,885.45 | Construction | Roadway | Construction | Roadway | $1,000,000.00 | $112,885.45 | 11% | 0 | | | | | 0015-13-437 | Austin | 02/02/27 | $343,500,000.00 | Construction | Roadway | Construction | Roadway | $387,000,000.00 | $(43,500,000.00) | -11% | 0 | | | | | 0452-03-036 | Brownwood | 11/03/26 | $486,303.41 | Construction | Roadway | Construction | Roadway | $547,407.00 | $(61,103.59) | -11% | 0 | | | | | 1513-02-046 | Fort Worth | 12/01/26 | $446,454.13 | Construction | Roadway | Construction | Roadway | $402,000.00 | $44,454.13 | 11% | 0 | | | | | 0440-05-015 | Austin | 01/06/27 | $250,000,000.00 | Construction | Roadway | Construction | Roadway | $225,252,884.62 | $24,747,115.38 | 11% | 0 | | | | | 0249-07-072 | Fort Worth | 01/06/27 | $38,104,650.90 | Construction | Bridge | Construction | Bridge | $42,784,246.29 | $(4,679,595.39) | -11% | 0 | | | | | 0619-03-068 | Dallas | 11/03/26 | $1,606,585.00 | Construction | Roadway | Construction | Roadway | $1,803,346.39 | $(196,761.39) | -11% | -28 | -28 days | | | | 0217-02-037 | Atlanta | 12/01/28 | $19,332,886.44 | Construction | Roadway | Construction | Roadway | $17,442,427.00 | $1,890,459.44 | 11% | 0 | | | | | 0441-07-079 | Odessa | 11/03/26 | $717,837.10 | Construction | Bridge | Construction | Bridge | $647,802.80 | $70,034.30 | 11% | 0 | | | | | 2638-01-028 | Brownwood | 11/03/26 | $752,754.21 | Construction | Roadway | Construction | Roadway | $843,798.00 | $(91,043.79) | -11% | 0 | | | | | 0195-02-092 | Dallas | 11/03/26 | $140,644,268.13 | Construction | Roadway | Construction | Roadway | $157,580,992.94 | $(16,936,724.81) | -11% | 0 | | | | | 0844-04-011 | Childress | 09/02/26 | $2,956,985.78 | Construction | Bridge | Construction | Bridge | $2,670,739.78 | $286,246.00 | 11% | 0 | | | | | 0912-72-858 | Houston | 09/06/28 | $1,367,979.92 | Construction | Roadway | Construction | Roadway | $1,532,137.51 | $(164,157.59) | -11% | 0 | | | | | 0912-72-859 | Houston | 09/06/28 | $191,024.20 | Construction | Roadway | Construction | Roadway | $213,947.10 | $(22,922.90) | -11% | 0 | | | | | 0229-02-050 | Odessa | 03/07/28 | $5,803,571.43 | Construction | Roadway | Construction | Roadway | $6,500,000.00 | $(696,428.57) | -11% | 0 | | | | | 0215-06-051 | San Antonio | 12/01/27 | $2,202,808.00 | Construction | Roadway | Construction | Roadway | $1,992,307.00 | $210,501.00 | 11% | 0 | | | | | 0045-09-113 | Paris | 11/03/26 | $3,685,990.71 | Construction | Roadway | Construction | Roadway | $3,335,124.00 | $350,866.71 | 11% | 0 | | | | | 0583-03-018 | Lubbock | 11/03/26 | $32,347.30 | Construction | Roadway | Construction | Roadway | $29,270.96 | $3,076.34 | 11% | 0 | | | | | 1635-01-023 | Lubbock | 11/03/26 | $328,857.73 | Construction | Roadway | Construction | Roadway | $297,651.00 | $31,206.73 | 10% | 0 | | | | | 0171-11-003 | Bryan | 08/04/27 | $130,780,979.00 | Construction | Roadway | Construction | Roadway | $118,439,867.00 | $12,341,112.00 | 10% | 0 | | | | | 3073-01-010 | Wichita Falls | 11/03/26 | $208,164.01 | Construction | Roadway | Construction | Roadway | $232,171.00 | $(24,006.99) | -10% | 0 | | | | | 0001-04-109 | El Paso | 01/06/27 | $1,865,286.10 | Construction | Roadway | Construction | Roadway | $1,691,661.52 | $173,624.58 | 10% | 0 | | | | | 2523-02-074 | Houston | 11/01/28 | $79,972,723.00 | Construction | Bridge | Construction | Bridge | $72,541,920.00 | $7,430,803.00 | 10% | 0 | | | | | 0169-08-029 | Amarillo | 11/03/26 | $1,149,728.31 | Construction | Roadway | Construction | Roadway | $1,280,000.00 | $(130,271.69) | -10% | 0 | | | | | 0914-04-366 | Austin | 12/01/26 | $1,016,452.24 | Construction | Non Roadway | Construction | Non Roadway | $922,740.09 | $93,712.15 | 10% | 0 | | | | | 0239-04-024 | Wichita Falls | 11/03/26 | $585,289.05 | Construction | Roadway | Construction | Roadway | $531,657.00 | $53,632.05 | 10% | 0 | | | | | 0134-05-040 | Fort Worth | 12/01/26 | $568,076.73 | Construction | Roadway | Construction | Roadway | $516,074.59 | $52,002.14 | 10% | 0 | | | | | 3463-02-007 | Brownwood | 11/03/26 | $29,705.59 | Construction | Roadway | Construction | Roadway | $27,000.00 | $2,705.59 | 10% | 0 | | | | | 0132-03-041 | Childress | 02/02/28 | $6,300,000.00 | Construction | Roadway | Construction | Roadway | $7,000,000.00 | $(700,000.00) | -10% | 0 | | | | | 0080-03-049 | Fort Worth | 06/01/27 | $127,000,000.00 | Construction | Roadway | Construction | Roadway | $115,461,159.08 | $11,538,840.92 | 10% | 0 | | | | | 3138-01-020 | Bryan | 10/05/27 | $110,924,412.00 | Construction | Roadway | Construction | Roadway | $100,882,922.00 | $10,041,490.00 | 10% | 0 | | | | | 0574-01-035 | Dallas | 03/03/27 | $4,402,357.07 | Construction | Roadway | Construction | Roadway | $4,005,386.56 | $396,970.51 | 10% | 0 | | | | | 0912-56-059 | Houston | 10/06/26 | $1,019,293.93 | Construction | Bridge | Construction | Bridge | $1,131,295.70 | $(112,001.77) | -10% | 0 | | | | | 0338-02-032 | Houston | 09/06/28 | $101,669,151.64 | Construction | Roadway | Construction | Roadway | $92,559,593.00 | $9,109,558.64 | 10% | 0 | | | | | 0338-02-043 | Houston | 09/06/28 | $101,669,151.64 | | | | | $92,559,593.00 | $9,109,558.64 | 10% | 0 | | | | | 0083-09-038 | Atlanta | 10/06/26 | $317,622.02 | Construction | Roadway | Construction | Roadway | $352,224.00 | $(34,601.98) | -10% | 0 | | | | | 2599-02-012 | Yoakum | 11/03/26 | $123,570.55 | Construction | Roadway | Construction | Roadway | $136,974.00 | $(13,403.45) | -10% | 0 | | | | | 0462-03-051 | Atlanta | 10/06/26 | $108,092.50 | Construction | Roadway | Construction | Roadway | $119,412.00 | $(11,319.50) | -9% | 0 | | | | | 1525-02-010 | Fort Worth | 11/03/26 | $226,950.68 | Construction | Roadway | Construction | Roadway | $250,640.00 | $(23,689.32) | -9% | 0 | | | | | 0372-01-101 | Corpus Christi | 07/01/27 | $92,390,400.49 | Construction | Roadway | Construction | Roadway | $102,000,000.00 | $(9,609,599.51) | -9% | 176 | 6 months | | | | 1864-02-008 | Lubbock | 11/03/26 | $377,917.03 | Construction | Roadway | Construction | Roadway | $417,136.00 | $(39,218.97) | -9% | 0 | | | | | 1718-03-003 | Lubbock | 11/03/26 | $814,377.52 | Construction | Roadway | Construction | Roadway | $745,202.50 | $69,175.02 | 9% | 0 | | | | | 0095-02-096 | Dallas | 09/01/44 | $315,730,103.05 | | | Construction | Roadway | $347,679,308.51 | $(31,949,205.46) | -9% | 5839 | 16 years | | | | 0334-08-039 | Yoakum | 11/03/26 | $265,063.35 | Construction | Roadway | Construction | Roadway | $291,572.00 | $(26,508.65) | -9% | 0 | | | | | 0227-04-023 | Lubbock | 11/03/26 | $541,439.04 | Construction | Roadway | Construction | Roadway | $496,544.00 | $44,895.04 | 9% | 0 | | | | | 0528-01-113 | Pharr | 12/01/26 | $24,680,431.19 | Construction | Roadway | Construction | Roadway | $27,120,566.00 | $(2,440,134.81) | -9% | 0 | | | | | 0845-03-069 | Wichita Falls | 11/03/26 | $379,631.56 | Construction | Roadway | Construction | Roadway | $417,042.00 | $(37,410.44) | -9% | 0 | | | | | 0257-08-009 | Brownwood | 11/03/26 | $67,074.20 | Construction | Roadway | Construction | Roadway | $61,629.00 | $5,445.20 | 9% | 0 | | | | | 0228-03-033 | Lubbock | 11/03/26 | $1,601,474.26 | Construction | Roadway | Construction | Roadway | $1,756,636.00 | $(155,161.74) | -9% | 0 | | | | | 0030-08-040 | Childress | 10/06/26 | $1,041,310.14 | Construction | Roadway | Construction | Roadway | $1,141,360.00 | $(100,049.86) | -9% | 0 | | | | | 0275-01-263 | Amarillo | 11/03/26 | $182,729.93 | Construction | Roadway | Construction | Roadway | $200,000.00 | $(17,270.07) | -9% | 0 | | | | | 0137-08-013 | Wichita Falls | 11/03/26 | $571,711.79 | Construction | Roadway | Construction | Roadway | $526,300.00 | $45,411.79 | 9% | 0 | | | | | 0942-01-023 | Yoakum | 11/03/26 | $158,718.60 | Construction | Roadway | Construction | Roadway | $173,702.00 | $(14,983.40) | -9% | 0 | | | | | 0113-13-169 | Austin | 08/01/29 | $60,000,000.00 | Construction | Roadway | Construction | Roadway | $65,659,999.11 | $(5,659,999.11) | -9% | 0 | | | | | 3510-06-038 | Houston | 08/04/27 | $21,913,559.00 | Construction | Roadway | Construction | Roadway | $23,978,813.00 | $(2,065,254.00) | -9% | 0 | | | | | 1635-01-022 | Lubbock | 11/03/26 | $616,806.37 | Construction | Roadway | Construction | Roadway | $674,428.00 | $(57,621.63) | -9% | 0 | | | | | 1696-01-018 | Yoakum | 11/03/26 | $245,444.35 | Construction | Roadway | Construction | Roadway | $226,280.00 | $19,164.35 | 8% | 0 | | | | | 1743-01-012 | Houston | 12/01/26 | $2,680,992.70 | Construction | Roadway | Construction | Roadway | $2,927,659.00 | $(246,666.30) | -8% | 0 | | | | | 0374-02-125 | El Paso | 12/01/26 | $572,382.51 | Construction | Roadway | Construction | Roadway | $528,320.80 | $44,061.71 | 8% | 0 | | | | | 1265-01-020 | Yoakum | 11/03/26 | $455,776.85 | Construction | Roadway | Construction | Roadway | $497,068.00 | $(41,291.15) | -8% | 0 | | | | | 2635-03-023 | Amarillo | 05/05/27 | $26,630,790.57 | Construction | Roadway | Construction | Roadway | $24,592,354.00 | $2,038,436.57 | 8% | 0 | | | | | 2635-03-028 | Amarillo | 05/05/27 | $157,862,866.00 | Construction | Bridge | Construction | Bridge | $145,779,362.00 | $12,083,504.00 | 8% | 0 | | | | | 0168-09-186 | Amarillo | 05/05/27 | $17,993,307.00 | Construction | Roadway | Construction | Roadway | $16,617,549.00 | $1,375,758.00 | 8% | 0 | | | | | 2635-02-034 | Amarillo | 05/05/27 | $28,208,659.00 | Construction | Roadway | Construction | Roadway | $26,052,115.48 | $2,156,543.52 | 8% | 0 | | | | | 0239-07-022 | Fort Worth | 12/01/26 | $886,168.30 | Construction | Roadway | Construction | Roadway | $819,179.33 | $66,988.97 | 8% | 0 | | | | | 0840-01-019 | Yoakum | 11/03/26 | $215,948.05 | Construction | Roadway | Construction | Roadway | $235,000.00 | $(19,051.95) | -8% | 0 | | | | | 0092-02-145 | Dallas | 10/06/26 | $1,059,685.00 | Construction | Roadway | Construction | Roadway | $981,366.75 | $78,318.25 | 8% | 0 | | | | | 3582-01-003 | Amarillo | 11/03/26 | $69,096.89 | Construction | Roadway | Construction | Roadway | $75,000.00 | $(5,903.11) | -8% | 0 | | | | | 0262-01-034 | Bryan | 11/03/26 | $4,820,339.12 | Construction | Roadway | Construction | Roadway | $5,231,425.00 | $(411,085.88) | -8% | 0 | | | | | 0610-06-098 | Atlanta | 09/01/27 | $15,680,000.00 | Construction | Roadway | Construction | Roadway | $14,560,000.00 | $1,120,000.00 | 8% | 0 | | | | | 2819-02-012 | Yoakum | 11/03/26 | $133,887.75 | Construction | Roadway | Construction | Roadway | $145,043.00 | $(11,155.25) | -8% | 0 | | | | | 0353-01-031 | Fort Worth | 11/03/26 | $605,622.93 | Construction | Roadway | Construction | Roadway | $654,905.19 | $(49,282.26) | -8% | 0 | | | | | 0912-72-657 | Houston | 10/05/27 | $971,048.00 | Construction | Bridge | Construction | Bridge | $1,049,626.00 | $(78,578.00) | -7% | 0 | | | | | 0095-03-100 | Dallas | 10/06/26 | $7,333,221.00 | Construction | Bridge | Construction | Bridge | $7,924,367.30 | $(591,146.30) | -7% | 0 | | | | | 0014-10-067 | Waco | 09/06/28 | $8,333,333.33 | Construction | Bridge | Construction | Bridge | $9,000,000.00 | $(666,666.67) | -7% | 0 | | | | | 0014-10-076 | Waco | 09/06/28 | $8,333,333.33 | Construction | Bridge | Construction | Bridge | $9,000,000.00 | $(666,666.67) | -7% | 0 | | | | | 2941-02-056 | Houston | 09/06/28 | $29,629,629.63 | Construction | Roadway | Construction | Roadway | $32,000,000.00 | $(2,370,370.37) | -7% | 0 | | | | | 0014-15-090 | Fort Worth | 06/01/27 | $60,000,000.00 | Construction | Roadway | Construction | Roadway | $55,912,929.52 | $4,087,070.48 | 7% | 0 | | | | | 0131-06-058 | Childress | 10/06/26 | $813,531.44 | Construction | Roadway | Construction | Roadway | $877,466.00 | $(63,934.56) | -7% | 0 | | | | | 0515-02-006 | Yoakum | 11/03/26 | $250,422.40 | Construction | Roadway | Construction | Roadway | $270,000.00 | $(19,577.60) | -7% | 0 | | | | | 2166-02-009 | Yoakum | 11/03/26 | $111,268.25 | Construction | Roadway | Construction | Roadway | $119,916.00 | $(8,647.75) | -7% | 0 | | | | | 2444-01-011 | Lubbock | 11/03/26 | $202,268.58 | Construction | Roadway | Construction | Roadway | $217,946.00 | $(15,677.42) | -7% | 0 | | | | | 0006-01-105 | Abilene | 12/01/27 | $447,776.57 | Construction | Roadway | Unassigned | Unassigned | $482,411.00 | $(34,634.43) | -7% | 365 | 1 year | Unassigned → Construction / Roadway | | | 0006-05-123 | Abilene | 12/01/27 | $571,509.29 | Construction | Roadway | Construction | Roadway | $615,714.00 | $(44,204.71) | -7% | 0 | | | | | 0006-07-086 | Abilene | 12/01/27 | $664,676.44 | Construction | Roadway | Construction | Roadway | $716,088.00 | $(51,411.56) | -7% | 0 | | | | | 0318-05-026 | Abilene | 12/01/27 | $273,763.47 | Construction | Roadway | Construction | Roadway | $294,939.00 | $(21,175.53) | -7% | 0 | | | | | 0332-02-030 | Abilene | 12/01/27 | $348,087.19 | Construction | Roadway | Construction | Roadway | $375,011.00 | $(26,923.81) | -7% | 0 | | | | | 0360-06-011 | Abilene | 12/01/27 | $53,495.74 | Construction | Roadway | Construction | Roadway | $57,634.00 | $(4,138.26) | -7% | 0 | | | | | 0360-07-028 | Abilene | 12/01/27 | $470,349.47 | Construction | Roadway | Construction | Roadway | $506,730.00 | $(36,380.53) | -7% | 0 | | | | | 0488-01-016 | Abilene | 12/01/27 | $238,956.49 | Construction | Roadway | Construction | Roadway | $257,439.00 | $(18,482.51) | -7% | 0 | | | | | 0668-04-006 | Abilene | 12/01/27 | $87,747.22 | Construction | Roadway | Construction | Roadway | $94,534.00 | $(6,786.78) | -7% | 0 | | | | | 0966-01-013 | Abilene | 12/01/27 | $243,576.95 | Construction | Roadway | Construction | Roadway | $262,417.00 | $(18,840.05) | -7% | 0 | | | | | 0973-01-026 | Abilene | 12/01/27 | $410,104.95 | Construction | Roadway | Construction | Roadway | $441,826.00 | $(31,721.05) | -7% | 0 | | | | | 1653-04-009 | Abilene | 12/01/27 | $170,963.29 | Construction | Roadway | Construction | Roadway | $184,187.00 | $(13,223.71) | -7% | 0 | | | | | 2109-01-011 | Abilene | 12/01/27 | $180,788.02 | Construction | Roadway | Construction | Roadway | $194,772.00 | $(13,983.98) | -7% | 0 | | | | | 3311-01-007 | Abilene | 12/01/27 | $128,056.90 | Construction | Roadway | Construction | Roadway | $137,962.00 | $(9,905.10) | -7% | 0 | | | | | 3423-01-008 | Abilene | 12/01/27 | $90,546.50 | Construction | Roadway | Construction | Roadway | $97,550.00 | $(7,003.50) | -7% | 0 | | | | | 0181-01-071 | Abilene | 09/02/26 | $307,957.60 | Construction | Roadway | Construction | Roadway | $331,750.00 | $(23,792.40) | -7% | 0 | | | | | 0128-04-045 | Brownwood | 01/06/27 | $3,000,000.00 | Construction | Roadway | Construction | Roadway | $2,800,000.00 | $200,000.00 | 7% | 0 | | | | | 0917-30-068 | Bryan | 11/03/26 | $712,231.00 | Construction | Bridge | Construction | Bridge | $664,775.00 | $47,456.00 | 7% | 0 | | | | | 3044-01-017 | Pharr | 09/02/26 | $455,029.15 | Construction | Roadway | Construction | Roadway | $424,749.15 | $30,280.00 | 7% | 0 | | | | | 2444-02-010 | Lubbock | 11/03/26 | $369,348.05 | Construction | Roadway | Construction | Roadway | $397,222.00 | $(27,873.95) | -7% | 0 | | | | | 0553-03-038 | Lufkin | 11/03/26 | $539,422.45 | Construction | Roadway | Construction | Roadway | $580,000.00 | $(40,577.55) | -7% | 0 | | | | | 1523-01-021 | Wichita Falls | 11/03/26 | $871,816.05 | Construction | Roadway | Construction | Roadway | $814,908.00 | $56,908.05 | 7% | 0 | | | | | 2768-01-008 | Lubbock | 11/03/26 | $277,140.66 | Construction | Roadway | Construction | Roadway | $297,914.00 | $(20,773.34) | -7% | 0 | | | | | 1525-01-010 | Brownwood | 11/03/26 | $28,199.05 | Construction | Roadway | Construction | Roadway | $26,376.00 | $1,823.05 | 7% | 0 | | | | | 0365-01-056 | Fort Worth | 12/01/26 | $1,285,439.56 | Construction | Roadway | Construction | Roadway | $1,202,665.09 | $82,774.47 | 7% | 0 | | | | | 0337-03-020 | Austin | 09/02/26 | $2,537,276.20 | Construction | Roadway | Construction | Roadway | $2,723,608.24 | $(186,332.04) | -7% | 0 | | | | | 1687-01-019 | Houston | 09/02/26 | $391,090.71 | Construction | Roadway | Construction | Roadway | $366,039.44 | $25,051.27 | 7% | 0 | | | | | 1439-01-010 | Yoakum | 11/03/26 | $214,319.30 | Construction | Roadway | Construction | Roadway | $230,035.00 | $(15,715.70) | -7% | 0 | | | | | 0941-01-027 | Yoakum | 11/03/26 | $398,501.60 | Construction | Roadway | Construction | Roadway | $426,933.00 | $(28,431.40) | -7% | 0 | | | | | 0180-01-086 | Yoakum | 05/05/27 | $37,124,334.79 | Construction | Bridge | Construction | Bridge | $39,769,715.00 | $(2,645,380.21) | -7% | 0 | | | | | 0117-06-053 | Lufkin | 11/03/26 | $355,387.45 | Construction | Roadway | Construction | Roadway | $380,000.00 | $(24,612.55) | -6% | 0 | | | | | 0025-06-059 | Yoakum | 11/03/26 | $21,294.85 | Construction | Roadway | Construction | Roadway | $20,000.00 | $1,294.85 | 6% | 0 | | | | | 1122-01-034 | Corpus Christi | 10/06/26 | $12,009,748.99 | Construction | Roadway | Construction | Roadway | $12,832,486.60 | $(822,737.61) | -6% | 0 | | | | | 1727-01-019 | Amarillo | 11/03/26 | $630,127.52 | Construction | Roadway | Construction | Roadway | $673,000.00 | $(42,872.48) | -6% | -364 | -12 months | | | | 1739-01-015 | Corpus Christi | 10/06/26 | $6,270,606.17 | Construction | Roadway | Construction | Roadway | $6,691,123.84 | $(420,517.67) | -6% | 0 | | | | | 0199-07-012 | Lufkin | 11/03/26 | $53,004.60 | Construction | Roadway | Construction | Roadway | $50,000.00 | $3,004.60 | 6% | 0 | | | | | 0157-04-058 | Abilene | 11/03/26 | $7,519,837.49 | Construction | Roadway | Construction | Roadway | $8,000,000.00 | $(480,162.51) | -6% | 0 | | | | | 0134-05-041 | Fort Worth | 12/01/26 | $423,060.36 | Construction | Roadway | Construction | Roadway | $450,000.00 | $(26,939.64) | -6% | 0 | | | | | 0168-04-020 | Lubbock | 11/03/26 | $322,360.93 | Construction | Roadway | Construction | Roadway | $304,254.00 | $18,106.93 | 6% | 0 | | | | | 0196-03-288 | Dallas | 10/06/26 | $1,273,638.00 | Construction | Roadway | Construction | Roadway | $1,202,186.00 | $71,452.00 | 6% | 0 | | | | | 1626-01-013 | Amarillo | 11/03/26 | $734,199.30 | Construction | Roadway | Construction | Roadway | $780,000.00 | $(45,800.70) | -6% | 0 | | | | | 1043-02-005 | Houston | 09/02/26 | $81,454.01 | Construction | Roadway | Construction | Roadway | $76,953.87 | $4,500.14 | 6% | 0 | | | | | 0195-02-090 | Dallas | 06/01/29 | $168,967,622.22 | Construction | Roadway | Construction | Roadway | $159,894,765.10 | $9,072,857.12 | 6% | 0 | | | | | 0565-03-003 | Lubbock | 11/03/26 | $262,715.24 | Construction | Roadway | Construction | Roadway | $277,654.00 | $(14,938.76) | -5% | 0 | | | | | 2094-01-062 | Pharr | 08/01/29 | $37,064,434.30 | Construction | Roadway | Construction | Roadway | $39,151,312.00 | $(2,086,877.70) | -5% | 0 | | | | | 0495-09-065 | Atlanta | 09/06/28 | $131,985,559.00 | Construction | Roadway | Construction | Roadway | $125,439,075.27 | $6,546,483.73 | 5% | 0 | | | | | 0111-03-064 | Houston | 08/04/27 | $102,910,751.00 | Construction | Roadway | Construction | Roadway | $108,568,030.00 | $(5,657,279.00) | -5% | 0 | | | | | 0289-04-037 | Brownwood | 01/05/28 | $3,750,000.00 | Construction | Roadway | Construction | Roadway | $3,568,950.00 | $181,050.00 | 5% | 0 | | | | | 0302-01-025 | Lubbock | 11/03/26 | $740,989.89 | Construction | Roadway | Construction | Roadway | $705,762.00 | $35,227.89 | 5% | 0 | | | | | 0865-01-108 | Pharr | 05/05/27 | $22,407,904.00 | Construction | Roadway | Construction | Roadway | $21,354,188.00 | $1,053,716.00 | 5% | 0 | | | | | 0529-02-016 | Wichita Falls | 11/03/26 | $221,304.76 | Construction | Roadway | Construction | Roadway | $232,295.00 | $(10,990.24) | -5% | 0 | | | | | 0912-72-852 | Houston | 09/06/28 | $1,010,886.13 | Construction | Roadway | Construction | Roadway | $1,060,990.00 | $(50,103.87) | -5% | 0 | | | | | 0089-07-145 | Yoakum | 12/01/27 | $223,653,606.50 | Construction | Roadway | Construction | Roadway | $213,653,605.57 | $10,000,000.93 | 5% | -370 | -1 year | | | | 2502-01-024 | Waco | 10/06/26 | $24,679,268.85 | Construction | Roadway | Construction | Roadway | $23,600,000.00 | $1,079,268.85 | 5% | 0 | | | | | 0027-13-201 | Houston | 10/05/27 | $742,080,747.88 | Construction | Roadway | Construction | Roadway | $710,022,858.04 | $32,057,889.84 | 5% | 0 | | | | | 0027-13-227 | Houston | 10/05/27 | $742,080,747.88 | Joint Bid Utility | Right-of-Way | Joint Bid Utility | Right-of-Way | $710,022,858.04 | $32,057,889.84 | 5% | 0 | | | | | 0804-03-026 | Wichita Falls | 11/03/26 | $583,343.13 | Construction | Roadway | Construction | Roadway | $610,745.00 | $(27,401.87) | -4% | 0 | | | | | 0262-02-031 | Bryan | 11/03/26 | $5,732,189.80 | Construction | Roadway | Construction | Roadway | $6,000,000.00 | $(267,810.20) | -4% | 0 | | | | | 0080-08-028 | Fort Worth | 12/01/26 | $143,262.25 | Construction | Roadway | Construction | Roadway | $137,158.74 | $6,103.51 | 4% | 0 | | | | | 1703-01-019 | Pharr | 10/06/26 | $48,695.64 | Construction | Roadway | Construction | Roadway | $50,937.00 | $(2,241.36) | -4% | 0 | | | | | 0675-05-105 | Bryan | 08/04/27 | $93,077,241.00 | Construction | Roadway | Construction | Roadway | $89,176,337.00 | $3,900,904.00 | 4% | 0 | | | | | 3510-03-009 | Houston | 04/05/28 | $49,800,881.00 | Alternative Delivery | Design Build | Construction | Roadway | $52,000,000.00 | $(2,199,119.00) | -4% | 0 | | Construction / Roadway → Alternative Delivery / Design Build | | | 0092-03-067 | Dallas | 10/06/26 | $3,067,165.50 | Construction | Roadway | Construction | Roadway | $3,202,034.00 | $(134,868.50) | -4% | 0 | | | | | 1043-01-012 | Houston | 09/02/26 | $356,653.28 | Construction | Roadway | Construction | Roadway | $342,330.90 | $14,322.38 | 4% | 0 | | | | | 0166-01-061 | Dallas | 10/06/26 | $3,608,354.25 | Construction | Roadway | Construction | Roadway | $3,764,545.50 | $(156,191.25) | -4% | 0 | | | | | 0721-01-024 | Lubbock | 11/03/26 | $328,382.32 | Construction | Roadway | Construction | Roadway | $342,479.00 | $(14,096.68) | -4% | 0 | | | | | 0015-13-462 | Austin | 05/01/30 | $11,440,000.00 | Construction | Roadway | Construction | Roadway | $11,000,000.00 | $440,000.00 | 4% | 1001 | 3 years | | | | 0909-36-185 | Waco | 06/03/28 | $3,240,000.00 | Construction | Roadway | Construction | Roadway | $3,115,384.62 | $124,615.38 | 4% | 0 | | | | | 0233-05-039 | El Paso | 08/04/27 | $75,000.00 | Construction | Rail | Construction | Rail | $72,115.38 | $2,884.62 | 4% | 0 | | | | | 0674-01-077 | El Paso | 08/04/27 | $75,000.00 | Construction | Rail | Construction | Rail | $72,115.38 | $2,884.62 | 4% | 0 | | | | | 1281-01-020 | El Paso | 08/04/27 | $75,000.00 | Construction | Rail | Construction | Rail | $72,115.38 | $2,884.62 | 4% | 0 | | | | | 0015-05-052 | Waco | 07/01/27 | $2,600,000.00 | Construction | Roadway | Construction | Roadway | $2,500,000.00 | $100,000.00 | 4% | 86 | 3 months | | | | 0015-18-008 | Waco | 07/01/27 | $1,560,000.00 | Construction | Roadway | Construction | Roadway | $1,500,000.00 | $60,000.00 | 4% | 86 | 3 months | | | | 0039-10-091 | Pharr | 07/01/27 | $192,400,000.00 | Construction | Roadway | Construction | Roadway | $185,000,000.00 | $7,400,000.00 | 4% | 0 | | | | | 0258-08-035 | Waco | 07/01/27 | $9,200,000.00 | Construction | Roadway | Construction | Roadway | $8,846,153.85 | $353,846.15 | 4% | 120 | 4 months | | | | 2121-02-167 | El Paso | 07/01/27 | $31,323,571.00 | Construction | Roadway | Construction | Roadway | $30,118,818.27 | $1,204,752.73 | 4% | 0 | | | | | 0013-08-147 | Fort Worth | 06/01/27 | $56,800,000.00 | Construction | Roadway | Construction | Roadway | $54,615,384.64 | $2,184,615.36 | 4% | 0 | | | | | 0014-15-087 | Fort Worth | 06/01/27 | $21,200,000.00 | Construction | Roadway | Construction | Roadway | $20,384,615.38 | $815,384.62 | 4% | 0 | | | | | 2121-03-172 | El Paso | 06/01/27 | $5,588,826.00 | Construction | Bridge | Construction | Bridge | $5,373,871.15 | $214,954.85 | 4% | 0 | | | | | 0002-04-039 | El Paso | 05/05/27 | $285,924.80 | Construction | Roadway | Construction | Roadway | $274,927.69 | $10,997.11 | 4% | 0 | | | | | 0005-02-112 | Odessa | 05/05/27 | $6,600,001.00 | Construction | Rail - Safety | Construction | Rail - Safety | $6,346,155.00 | $253,846.00 | 4% | 0 | | | | | 0178-09-019 | Houston | 05/05/27 | $49,936,882.00 | Construction | Roadway | Construction | Roadway | $48,016,232.69 | $1,920,649.31 | 4% | 0 | | | | | 0264-06-044 | San Angelo | 05/05/27 | $34,067,539.00 | Construction | Roadway | Construction | Roadway | $32,757,248.59 | $1,310,290.41 | 4% | 0 | | | | | 0924-06-579 | El Paso | 05/05/27 | $1,639,924.20 | Construction | Bridge | Construction | Bridge | $1,576,850.19 | $63,074.01 | 4% | 0 | | | | | 0924-06-658 | El Paso | 05/05/27 | $1,980,000.00 | Construction | Bridge | Construction | Bridge | $1,903,846.15 | $76,153.85 | 4% | 0 | | | | | 2398-01-062 | Abilene | 05/05/27 | $10,800,000.00 | Construction | Roadway | Construction | Roadway | $10,384,616.00 | $415,384.00 | 4% | 0 | | | | | 0358-03-041 | El Paso | 04/06/27 | $717,659.00 | Construction | Roadway | Construction | Roadway | $690,056.73 | $27,602.27 | 4% | 0 | | | | | 0358-04-020 | El Paso | 04/06/27 | $105,062.00 | Construction | Roadway | Construction | Roadway | $101,021.15 | $4,040.85 | 4% | 0 | | | | | 0415-03-026 | El Paso | 04/06/27 | $60,850.00 | Construction | Roadway | Construction | Roadway | $58,509.62 | $2,340.38 | 4% | 0 | | | | | 0415-04-016 | El Paso | 04/06/27 | $40,567.00 | Construction | Roadway | Construction | Roadway | $39,006.73 | $1,560.27 | 4% | 0 | | | | | 0485-01-027 | El Paso | 04/06/27 | $165,302.00 | Construction | Roadway | Construction | Roadway | $158,944.23 | $6,357.77 | 4% | 0 | | | | | 0485-02-019 | El Paso | 04/06/27 | $110,202.00 | Construction | Roadway | Construction | Roadway | $105,963.46 | $4,238.54 | 4% | 0 | | | | | 2552-03-071 | El Paso | 04/06/27 | $4,593,695.00 | Construction | Roadway | Construction | Roadway | $4,417,014.42 | $176,680.58 | 4% | 0 | | | | | 0005-14-092 | Odessa | 03/03/27 | $222,538,627.80 | Construction | Roadway | Construction | Roadway | $213,979,449.81 | $8,559,177.99 | 4% | 0 | | | | | 0495-03-070 | Tyler | 01/06/27 | $11,500,000.00 | Construction | Roadway | Construction | Roadway | $11,057,692.31 | $442,307.69 | 4% | 0 | | | | | 1803-01-094 | Pharr | 01/05/28 | $53,783,237.00 | Construction | Roadway | Construction | Roadway | $56,017,974.00 | $(2,234,737.00) | -4% | 0 | | | | | 1227-04-023 | Pharr | 11/02/27 | $21,050,000.00 | Construction | Roadway | Construction | Roadway | $21,920,000.00 | $(870,000.00) | -4% | -669 | -2 years | | | | 0130-01-022 | Lubbock | 11/03/26 | $1,107,315.10 | Construction | Roadway | Construction | Roadway | $1,152,424.00 | $(45,108.90) | -4% | 0 | | | | | 0180-10-082 | Corpus Christi | 06/01/28 | $73,509,615.38 | Construction | Roadway | Construction | Roadway | $70,750,000.00 | $2,759,615.38 | 4% | 57 | 2 months | | | | 1182-01-013 | Wichita Falls | 11/03/26 | $164,694.60 | Construction | Roadway | Construction | Roadway | $158,515.00 | $6,179.60 | 4% | 0 | | | | | 0180-06-118 | Corpus Christi | 06/01/28 | $59,115,480.77 | Construction | Roadway | Construction | Roadway | $56,907,500.00 | $2,207,980.77 | 4% | 57 | 2 months | | | | 1149-01-033 | Austin | 10/04/28 | $58,673,076.90 | Construction | Roadway | Construction | Roadway | $56,500,000.00 | $2,173,076.90 | 4% | 399 | 1 year | | | | 0251-03-022 | Waco | 08/02/28 | $11,846,153.85 | Construction | Roadway | Construction | Roadway | $11,407,407.41 | $438,746.44 | 4% | 0 | | | | | 0265-01-118 | Austin | 08/02/28 | $436,153.85 | Construction | Roadway | Construction | Roadway | $419,999.07 | $16,154.78 | 4% | 0 | | | | | 0909-36-175 | Waco | 07/02/28 | $31,615,384.62 | Construction | Local Let | Construction | Local Let | $30,444,444.44 | $1,170,940.18 | 4% | 0 | | | | | 0909-36-205 | Waco | 06/03/28 | $812,500.00 | Construction | Local Let | Construction | Local Let | $782,407.41 | $30,092.59 | 4% | 0 | | | | | 0001-04-114 | El Paso | 05/03/28 | $769,230.77 | Construction | Roadway | Construction | Roadway | $740,740.74 | $28,490.03 | 4% | 0 | | | | | 3409-01-011 | Waco | 05/01/28 | $6,421,466.35 | Construction | Roadway | Construction | Roadway | $6,183,634.26 | $237,832.09 | 4% | 0 | | | | | 1690-01-131 | Paris | 04/05/28 | $149,763,717.27 | Construction | Roadway | Construction | Roadway | $144,217,308.00 | $5,546,409.27 | 4% | 0 | | | | | 0002-05-053 | El Paso | 02/02/28 | $26,105.15 | Construction | Roadway | Construction | Roadway | $25,138.30 | $966.85 | 4% | 0 | | | | | 0002-06-065 | El Paso | 02/02/28 | $17,403.43 | Construction | Roadway | Construction | Roadway | $16,758.86 | $644.57 | 4% | 0 | | | | | 0002-07-059 | El Paso | 02/02/28 | $52,210.31 | Construction | Roadway | Construction | Roadway | $50,276.59 | $1,933.72 | 4% | 0 | | | | | 0002-08-058 | El Paso | 02/02/28 | $26,105.15 | Construction | Roadway | Construction | Roadway | $25,138.30 | $966.85 | 4% | 0 | | | | | 0002-09-042 | El Paso | 02/02/28 | $17,403.43 | Construction | Roadway | Construction | Roadway | $16,758.86 | $644.57 | 4% | 0 | | | | | 0002-10-041 | El Paso | 02/02/28 | $69,613.75 | Construction | Roadway | Construction | Roadway | $67,035.46 | $2,578.29 | 4% | 0 | | | | | 0002-11-063 | El Paso | 02/02/28 | $43,508.60 | Construction | Roadway | Construction | Roadway | $41,897.17 | $1,611.43 | 4% | 0 | | | | | 0003-01-069 | El Paso | 02/02/28 | $17,403.43 | Construction | Roadway | Construction | Roadway | $16,758.86 | $644.57 | 4% | 0 | | | | | 0003-02-054 | El Paso | 02/02/28 | $17,403.43 | Construction | Roadway | Construction | Roadway | $16,758.86 | $644.57 | 4% | 0 | | | | | 0003-03-050 | El Paso | 02/02/28 | $13,686,419.23 | Construction | Roadway | Construction | Roadway | $13,179,514.81 | $506,904.42 | 4% | 0 | | | | | 0003-03-053 | El Paso | 02/02/28 | $17,403.43 | Construction | Roadway | Construction | Roadway | $16,758.86 | $644.57 | 4% | 0 | | | | | 0003-04-060 | El Paso | 02/02/28 | $52,210.31 | Construction | Roadway | Construction | Roadway | $50,276.59 | $1,933.72 | 4% | 0 | | | | | 0358-01-033 | El Paso | 02/02/28 | $54,853.16 | Construction | Roadway | Construction | Roadway | $52,821.56 | $2,031.60 | 4% | 0 | | | | | 0358-05-019 | El Paso | 02/02/28 | $326,039.42 | Construction | Roadway | Construction | Roadway | $313,963.89 | $12,075.53 | 4% | 0 | | | | | 0415-01-028 | El Paso | 02/02/28 | $173,220.53 | Construction | Roadway | Construction | Roadway | $166,804.95 | $6,415.58 | 4% | 0 | | | | | 0415-02-033 | El Paso | 02/02/28 | $129,915.39 | Construction | Roadway | Construction | Roadway | $125,103.71 | $4,811.68 | 4% | 0 | | | | | 0512-02-017 | El Paso | 02/02/28 | $43,305.13 | Construction | Roadway | Construction | Roadway | $41,701.24 | $1,603.89 | 4% | 0 | | | | | 0924-06-749 | El Paso | 02/02/28 | $91,785.08 | Construction | Roadway | Construction | Roadway | $88,385.63 | $3,399.45 | 4% | 0 | | | | | 0924-06-750 | El Paso | 02/02/28 | $38,202.77 | Construction | Roadway | Construction | Roadway | $36,787.85 | $1,414.92 | 4% | 0 | | | | | 2121-05-058 | El Paso | 02/02/28 | $34,806.88 | Construction | Roadway | Construction | Roadway | $33,517.73 | $1,289.15 | 4% | 0 | | | | | 2121-06-061 | El Paso | 02/02/28 | $17,403.43 | Construction | Roadway | Construction | Roadway | $16,758.86 | $644.57 | 4% | 0 | | | | | 0035-04-043 | San Angelo | 01/05/28 | $480,769.00 | Construction | Roadway | Construction | Roadway | $500,000.00 | $(19,231.00) | -4% | 0 | | | | | 0001-04-115 | El Paso | 12/01/27 | $387,187.98 | Construction | Roadway | Construction | Roadway | $372,846.76 | $14,341.22 | 4% | 0 | | | | | 0167-02-097 | El Paso | 12/01/27 | $376,931.15 | Construction | Roadway | Construction | Roadway | $362,970.74 | $13,960.41 | 4% | 0 | | | | | 0675-06-103 | Bryan | 12/01/27 | $313,635,452.00 | Construction | Roadway | Construction | Roadway | $302,019,326.00 | $11,616,126.00 | 4% | 0 | | | | | 2121-02-186 | El Paso | 12/01/27 | $504,807,692.31 | Construction | Roadway | Construction | Roadway | $486,111,111.11 | $18,696,581.20 | 4% | 0 | | | | | 0065-06-067 | Beaumont | 11/02/27 | $46,476,175.96 | Construction | Roadway | Construction | Roadway | $48,335,222.00 | $(1,859,046.04) | -4% | -92 | -3 months | | | | 0214-03-035 | Beaumont | 11/02/27 | $26,584,615.39 | Construction | Bridge | Construction | Bridge | $25,600,000.00 | $984,615.39 | 4% | 0 | | | | | 0924-06-694 | El Paso | 11/02/27 | $72,115.38 | Construction | Rail | Construction | Rail | $69,444.44 | $2,670.94 | 4% | 0 | | | | | 0001-01-077 | El Paso | 10/05/27 | $344,519.34 | Construction | Roadway | Construction | Roadway | $331,759.36 | $12,759.98 | 4% | 0 | | | | | 0027-13-259 | Houston | 10/05/27 | $75,769,230.77 | Construction | Bridge | Construction | Bridge | $78,800,000.00 | $(3,030,769.23) | -4% | 0 | | | | | 0374-02-128 | El Paso | 10/05/27 | $345,582.88 | Construction | Roadway | Construction | Roadway | $332,783.52 | $12,799.36 | 4% | 0 | | | | | 3451-01-051 | El Paso | 10/05/27 | $442,331.73 | Construction | Roadway | Construction | Roadway | $425,949.07 | $16,382.66 | 4% | 0 | | | | | 3451-01-052 | El Paso | 10/05/27 | $356,418.27 | Construction | Roadway | Construction | Roadway | $343,217.59 | $13,200.68 | 4% | 0 | | | | | 2696-02-010 | Waco | 10/02/27 | $1,163,461.54 | Construction | Local Let | Construction | Local Let | $1,120,370.37 | $43,091.17 | 4% | 0 | | | | | 0909-22-235 | Waco | 09/03/27 | $3,335,576.92 | Construction | Roadway | Construction | Roadway | $3,212,000.00 | $123,576.92 | 4% | 0 | | | | | 0001-01-076 | El Paso | 09/01/27 | $908,276.82 | Construction | Roadway | Construction | Roadway | $874,636.93 | $33,639.89 | 4% | 0 | | | | | 0001-02-080 | El Paso | 09/01/27 | $432,692.31 | Construction | Roadway | Construction | Roadway | $416,666.67 | $16,025.64 | 4% | 0 | | | | | 0001-04-110 | El Paso | 09/01/27 | $670,960.76 | Construction | Roadway | Construction | Roadway | $646,110.36 | $24,850.40 | 4% | 0 | | | | | 0002-14-052 | El Paso | 09/01/27 | $302,528.10 | Construction | Roadway | Construction | Roadway | $291,323.35 | $11,204.75 | 4% | 0 | | | | | 0545-04-048 | Tyler | 09/01/27 | $156,807,692.31 | Construction | Roadway | Construction | Roadway | $151,000,000.00 | $5,807,692.31 | 4% | 0 | | | | | 0674-01-067 | El Paso | 09/01/27 | $19,015,959.62 | Construction | Bridge | Construction | Bridge | $18,311,664.81 | $704,294.81 | 4% | 0 | | | | | 0924-06-746 | El Paso | 09/01/27 | $307,297.30 | Construction | Roadway | Construction | Roadway | $295,915.92 | $11,381.38 | 4% | 0 | | | | | 0924-06-748 | El Paso | 09/01/27 | $62,709.77 | Construction | Roadway | Construction | Roadway | $60,387.19 | $2,322.58 | 4% | 0 | | | | | 0002-07-058 | El Paso | 05/05/27 | $1,753,868.55 | Construction | Roadway | Construction | Roadway | $1,688,910.45 | $64,958.10 | 4% | 0 | | | | | 0003-02-053 | El Paso | 05/05/27 | $769,230.77 | Construction | Roadway | Construction | Roadway | $740,740.74 | $28,490.03 | 4% | 0 | | | | | 2326-01-033 | El Paso | 05/05/27 | $432,692.31 | Construction | Roadway | Construction | Roadway | $416,666.67 | $16,025.64 | 4% | 0 | | | | | 2552-01-062 | El Paso | 11/03/26 | $12,432,052.88 | Construction | Roadway | Construction | Roadway | $11,971,606.48 | $460,446.40 | 4% | -364 | -12 months | | | | 2552-01-066 | El Paso | 11/03/26 | $4,600,398.13 | Construction | Bridge | Construction | Bridge | $4,430,013.02 | $170,385.11 | 4% | -364 | -12 months | | | | 1061-01-039 | Beaumont | 09/02/26 | $67,558.60 | Construction | Roadway | Construction | Roadway | $65,066.30 | $2,492.30 | 4% | 0 | | | | | 1575-05-024 | Atlanta | 09/06/28 | $246,272,901.00 | Construction | Roadway | Construction | Roadway | $237,272,901.00 | $9,000,000.00 | 4% | 0 | | | | | 3485-01-009 | Lubbock | 11/03/26 | $53,461.15 | Construction | Roadway | Construction | Roadway | $51,534.00 | $1,927.15 | 4% | 0 | | | | | 0424-01-057 | Tyler | 06/01/29 | $116,148,148.15 | Construction | Roadway | Construction | Roadway | $112,000,000.00 | $4,148,148.15 | 4% | 0 | | | | | 0424-02-045 | Tyler | 06/01/29 | $58,696,296.30 | Construction | Roadway | Construction | Roadway | $56,600,000.00 | $2,096,296.30 | 4% | 0 | | | | | 0001-04-105 | El Paso | 05/01/29 | $4,281,696.30 | Construction | Roadway | Construction | Roadway | $4,128,778.57 | $152,917.73 | 4% | 0 | | | | | 0002-01-110 | El Paso | 05/01/29 | $2,863,853.56 | Construction | Roadway | Construction | Roadway | $2,761,573.07 | $102,280.49 | 4% | 0 | | | | | 0054-07-086 | Brownwood | 05/01/29 | $25,925,925.93 | Construction | Roadway | Construction | Roadway | $25,000,000.00 | $925,925.93 | 4% | 0 | | | | | 0167-03-003 | El Paso | 05/01/29 | $783,578.70 | Construction | Roadway | Construction | Roadway | $755,593.75 | $27,984.95 | 4% | 0 | | | | | 2121-04-125 | El Paso | 05/01/29 | $894,151.85 | Construction | Roadway | Construction | Roadway | $862,217.86 | $31,933.99 | 4% | 0 | | | | | 0001-04-104 | El Paso | 03/01/29 | $2,521,962.04 | Construction | Roadway | Construction | Roadway | $2,431,891.96 | $90,070.08 | 4% | 0 | | | | | 0001-05-018 | El Paso | 02/01/29 | $1,111,111.11 | Construction | Bridge | Construction | Bridge | $1,071,428.57 | $39,682.54 | 4% | 0 | | | | | 0001-05-020 | El Paso | 02/01/29 | $3,625,722.22 | Construction | Bridge | Construction | Bridge | $3,496,232.14 | $129,490.08 | 4% | 0 | | | | | 0002-14-045 | El Paso | 02/01/29 | $12,633,217.59 | Construction | Roadway | Construction | Roadway | $12,182,031.25 | $451,186.34 | 4% | 0 | | | | | 0035-05-060 | San Angelo | 02/01/29 | $2,035,823.00 | Construction | Roadway | Construction | Roadway | $1,963,114.00 | $72,709.00 | 4% | 0 | | | | | 0035-06-033 | San Angelo | 02/01/29 | $43,100,201.00 | Construction | Roadway | Construction | Roadway | $41,560,907.00 | $1,539,294.00 | 4% | 0 | | | | | 0396-01-041 | San Angelo | 02/01/29 | $7,085,454.00 | Construction | Roadway | Construction | Roadway | $6,832,401.00 | $253,053.00 | 4% | 0 | | | | | 0002-14-051 | El Paso | 01/01/29 | $1,522,667.48 | Construction | Roadway | Construction | Roadway | $1,468,286.50 | $54,380.98 | 4% | 0 | | | | | 0003-03-055 | El Paso | 01/01/29 | $13,179,514.81 | Construction | Roadway | Construction | Roadway | $12,708,817.86 | $470,696.95 | 4% | 0 | | | | | 0003-04-057 | El Paso | 01/01/29 | $4,469,133.33 | Construction | Bridge | Construction | Bridge | $4,309,521.43 | $159,611.90 | 4% | 0 | | | | | 0003-04-058 | El Paso | 01/01/29 | $4,469,133.33 | Construction | Bridge | Construction | Bridge | $4,309,521.43 | $159,611.90 | 4% | 0 | | | | | 0005-04-074 | Odessa | 01/01/29 | $52,303,704.63 | Construction | Bridge | Construction | Bridge | $50,435,715.00 | $1,867,989.63 | 4% | 0 | | | | | 0005-13-063 | Odessa | 01/01/29 | $249,045,410.85 | Construction | Roadway | Construction | Roadway | $240,150,931.00 | $8,894,479.85 | 4% | 0 | | | | | 0075-01-025 | El Paso | 01/01/29 | $4,720,383.33 | Construction | Bridge | Construction | Bridge | $4,551,798.21 | $168,585.12 | 4% | 0 | | | | | 0167-02-094 | El Paso | 01/01/29 | $5,550,735.94 | Construction | Roadway | Construction | Roadway | $5,352,495.37 | $198,240.57 | 4% | 0 | | | | | 0231-02-070 | Waco | 01/01/29 | $9,382,407.41 | Construction | Roadway | Construction | Roadway | $9,047,322.32 | $335,085.09 | 4% | 0 | | | | | 0374-06-024 | El Paso | 01/01/29 | $429,537.04 | Construction | Roadway | Construction | Roadway | $414,196.43 | $15,340.61 | 4% | 0 | | | | | 0374-07-031 | El Paso | 01/01/29 | $429,537.11 | Construction | Roadway | Construction | Roadway | $414,196.50 | $15,340.61 | 4% | 0 | | | | | 0374-08-027 | El Paso | 01/01/29 | $3,546,863.89 | Construction | Bridge | Construction | Bridge | $3,420,190.18 | $126,673.71 | 4% | 0 | | | | | 0508-02-139 | Beaumont | 01/01/29 | $8,664,091.67 | Construction | Roadway | Construction | Roadway | $8,354,659.82 | $309,431.85 | 4% | 0 | | | | | 0002-06-063 | El Paso | 12/05/28 | $780,418.52 | Construction | Roadway | Construction | Roadway | $752,546.43 | $27,872.09 | 4% | 0 | | | | | 0002-07-055 | El Paso | 12/05/28 | $641,183.33 | Construction | Roadway | Construction | Roadway | $618,283.93 | $22,899.40 | 4% | 0 | | | | | 0002-08-056 | El Paso | 12/05/28 | $761,911.11 | Construction | Roadway | Construction | Roadway | $734,700.00 | $27,211.11 | 4% | 0 | | | | | 0002-09-041 | El Paso | 12/05/28 | $784,988.89 | Construction | Roadway | Construction | Roadway | $756,953.57 | $28,035.32 | 4% | 0 | | | | | 0002-10-040 | El Paso | 12/05/28 | $502,716.67 | Construction | Roadway | Construction | Roadway | $484,762.50 | $17,954.17 | 4% | 0 | | | | | 0002-11-062 | El Paso | 12/05/28 | $172,652.78 | Construction | Roadway | Construction | Roadway | $166,486.61 | $6,166.17 | 4% | 0 | | | | | 0002-14-049 | El Paso | 12/05/28 | $453,062.04 | Construction | Roadway | Construction | Roadway | $436,881.25 | $16,180.79 | 4% | 0 | | | | | 0002-20-012 | El Paso | 12/05/28 | $264,537.04 | Construction | Roadway | Construction | Roadway | $255,089.29 | $9,447.75 | 4% | 0 | | | | | 0003-01-065 | El Paso | 12/05/28 | $1,142,436.11 | Construction | Roadway | Construction | Roadway | $1,101,634.82 | $40,801.29 | 4% | 0 | | | | | 0003-02-050 | El Paso | 12/05/28 | $546,891.67 | Construction | Roadway | Construction | Roadway | $527,359.82 | $19,531.85 | 4% | 0 | | | | | 0003-03-052 | El Paso | 12/05/28 | $89,813.89 | Construction | Roadway | Construction | Roadway | $86,606.25 | $3,207.64 | 4% | 0 | | | | | 0167-02-096 | El Paso | 12/05/28 | $234,746.30 | Construction | Roadway | Construction | Roadway | $226,362.50 | $8,383.80 | 4% | 0 | | | | | 0358-03-040 | El Paso | 12/05/28 | $2,360,953.70 | Construction | Roadway | Construction | Roadway | $2,276,633.93 | $84,319.77 | 4% | 0 | | | | | 0358-04-019 | El Paso | 12/05/28 | $2,370,162.04 | Construction | Roadway | Construction | Roadway | $2,285,513.39 | $84,648.65 | 4% | 0 | | | | | 0374-03-033 | El Paso | 12/05/28 | $370,370.37 | Construction | Roadway | Construction | Roadway | $357,142.86 | $13,227.51 | 4% | 0 | | | | | 0674-01-082 | El Paso | 12/05/28 | $408,994.44 | Construction | Roadway | Construction | Roadway | $394,387.50 | $14,606.94 | 4% | 0 | | | | | 1282-01-017 | El Paso | 12/05/28 | $1,410,241.67 | Construction | Roadway | Construction | Roadway | $1,359,875.89 | $50,365.78 | 4% | 0 | | | | | 2121-02-189 | El Paso | 12/05/28 | $1,045,788.89 | Construction | Roadway | Construction | Roadway | $1,008,439.29 | $37,349.60 | 4% | 0 | | | | | 2121-03-173 | El Paso | 12/05/28 | $119,899.07 | Construction | Roadway | Construction | Roadway | $115,616.96 | $4,282.11 | 4% | 0 | | | | | 2122-01-019 | El Paso | 12/05/28 | $176,183.33 | Construction | Roadway | Construction | Roadway | $169,891.07 | $6,292.26 | 4% | 0 | | | | | 2552-03-073 | El Paso | 12/05/28 | $272,277.78 | Construction | Roadway | Construction | Roadway | $262,553.57 | $9,724.21 | 4% | 0 | | | | | 0001-02-081 | El Paso | 11/01/28 | $830,986.11 | Construction | Roadway | Construction | Roadway | $801,308.04 | $29,678.07 | 4% | 0 | | | | | 0001-03-064 | El Paso | 11/01/28 | $415,493.04 | Construction | Roadway | Construction | Roadway | $400,654.00 | $14,839.04 | 4% | 0 | | | | | 0002-01-109 | El Paso | 11/01/28 | $138,497.74 | Construction | Roadway | Construction | Roadway | $133,551.39 | $4,946.35 | 4% | 0 | | | | | 0002-02-064 | El Paso | 11/01/28 | $20,359,415.74 | Construction | Roadway | Construction | Roadway | $19,632,293.75 | $727,121.99 | 4% | 0 | | | | | 0167-02-098 | El Paso | 11/01/28 | $298,977.78 | Construction | Roadway | Construction | Roadway | $288,300.00 | $10,677.78 | 4% | 0 | | | | | 0924-06-767 | El Paso | 11/01/28 | $470,418.52 | Construction | Roadway | Construction | Roadway | $453,617.86 | $16,800.66 | 4% | 0 | | | | | 0924-06-768 | El Paso | 11/01/28 | $250,287.04 | Construction | Roadway | Construction | Roadway | $241,348.21 | $8,938.83 | 4% | 0 | | | | | 1046-03-013 | El Paso | 11/01/28 | $132,274.07 | Construction | Roadway | Construction | Roadway | $127,550.00 | $4,724.07 | 4% | 0 | | | | | 2552-03-072 | El Paso | 11/01/28 | $821,507.41 | Construction | Roadway | Construction | Roadway | $792,167.86 | $29,339.55 | 4% | 0 | | | | | 0086-14-086 | Laredo | 10/04/28 | $73,735,991.67 | Construction | Roadway | Construction | Roadway | $71,102,563.39 | $2,633,428.28 | 4% | 0 | | | | | 0014-10-064 | Waco | 09/06/28 | $31,525,925.93 | Construction | Roadway | Construction | Roadway | $30,400,000.00 | $1,125,925.93 | 4% | 0 | | | | | 0167-01-138 | El Paso | 09/06/28 | $2,864,814.81 | Construction | Bridge | Construction | Bridge | $2,762,500.00 | $102,314.81 | 4% | 0 | | | | | 0374-04-032 | El Paso | 09/06/28 | $4,714,168.52 | Construction | Roadway | Construction | Roadway | $4,545,805.36 | $168,363.16 | 4% | 0 | | | | | 0800-02-010 | Lubbock | 11/03/26 | $120,582.51 | Construction | Roadway | Construction | Roadway | $116,301.00 | $4,281.51 | 4% | 0 | | | | | 2252-01-010 | Childress | 09/02/26 | $330,125.70 | Construction | Bridge | Construction | Bridge | $342,525.70 | $(12,400.00) | -4% | 0 | | | | | 0307-01-157 | Beaumont | 09/02/26 | $21,112.40 | Construction | Roadway | Construction | Roadway | $20,380.72 | $731.68 | 4% | 0 | | | | | 2690-01-040 | Austin | 09/01/27 | $7,400,000.00 | Construction | Roadway | Construction | Roadway | $7,674,074.07 | $(274,074.07) | -4% | -91 | -3 months | | | | 0380-02-028 | Lubbock | 11/03/26 | $1,054,219.47 | Construction | Roadway | Construction | Roadway | $1,093,137.00 | $(38,917.53) | -4% | 0 | | | | | 1061-01-040 | Beaumont | 09/02/26 | $255,621.30 | Construction | Roadway | Construction | Roadway | $246,933.04 | $8,688.26 | 4% | 0 | | | | | 2777-01-007 | Lubbock | 11/03/26 | $423,370.18 | Construction | Roadway | Construction | Roadway | $438,001.00 | $(14,630.82) | -3% | 0 | | | | | 2500-01-006 | Lubbock | 11/03/26 | $172,505.46 | Construction | Roadway | Construction | Roadway | $167,026.00 | $5,479.46 | 3% | 0 | | | | | 0035-05-059 | San Angelo | 01/05/28 | $84,068,318.00 | Construction | Roadway | Construction | Roadway | $81,417,639.00 | $2,650,679.00 | 3% | 0 | | | | | 3520-01-023 | Lubbock | 11/03/26 | $236,455.13 | Construction | Roadway | Construction | Roadway | $244,320.00 | $(7,864.87) | -3% | 0 | | | | | 3416-01-012 | Houston | 08/04/27 | $71,912,652.00 | Construction | Roadway | Construction | Roadway | $74,299,327.00 | $(2,386,675.00) | -3% | 0 | | | | | 0703-03-030 | Beaumont | 09/02/26 | $415,927.70 | Construction | Roadway | Construction | Roadway | $403,282.08 | $12,645.62 | 3% | 0 | | | | | 0249-02-026 | Wichita Falls | 10/06/26 | $2,839,873.45 | Construction | Roadway | Construction | Roadway | $2,929,721.75 | $(89,848.30) | -3% | 0 | | | | | 0092-05-061 | Dallas | 10/06/26 | $4,119,048.50 | Construction | Roadway | Construction | Roadway | $4,248,174.25 | $(129,125.75) | -3% | 0 | | | | | 0427-01-042 | Paris | 09/02/26 | $1,783,455.25 | Construction | Bridge | Construction | Bridge | $1,731,524.25 | $51,931.00 | 3% | 0 | | | | | 0305-03-046 | Beaumont | 09/02/26 | $608,997.50 | Construction | Roadway | Construction | Roadway | $591,399.36 | $17,598.14 | 3% | 0 | | | | | 0092-06-114 | Dallas | 10/06/26 | $7,078,917.75 | Construction | Roadway | Construction | Roadway | $7,283,254.00 | $(204,336.25) | -3% | 0 | | | | | 0339-04-036 | Beaumont | 09/01/28 | $118,318,519.44 | Construction | Roadway | Construction | Roadway | $115,100,000.00 | $3,218,519.44 | 3% | -122 | -4 months | | | | 0050-06-110 | Houston | 02/02/27 | $1,846,179.07 | Construction | Roadway | Construction | Roadway | $1,796,095.00 | $50,084.07 | 3% | 63 | 2 months | | | | 3629-02-002 | Pharr | 09/06/28 | $172,212,794.20 | Construction | Roadway | Construction | Roadway | $167,568,412.00 | $4,644,382.20 | 3% | 0 | | | | | 2748-02-015 | Lufkin | 11/03/26 | $106,962.80 | Construction | Roadway | Construction | Roadway | $110,000.00 | $(3,037.20) | -3% | 0 | | | | | 0601-01-066 | Beaumont | 09/02/26 | $1,188,826.90 | Construction | Roadway | Construction | Roadway | $1,157,862.42 | $30,964.48 | 3% | 0 | | | | | 0305-04-039 | Beaumont | 09/02/26 | $612,390.70 | Construction | Roadway | Construction | Roadway | $596,516.62 | $15,874.08 | 3% | 0 | | | | | 0307-02-052 | Beaumont | 09/02/26 | $998,604.00 | Construction | Roadway | Construction | Roadway | $972,857.88 | $25,746.12 | 3% | 0 | | | | | 0703-01-068 | Beaumont | 09/02/26 | $852,520.20 | Construction | Roadway | Construction | Roadway | $830,720.32 | $21,799.88 | 3% | 0 | | | | | 1687-02-010 | Houston | 09/02/26 | $361,581.08 | Construction | Roadway | Construction | Roadway | $352,443.60 | $9,137.48 | 3% | 0 | | | | | 0485-01-026 | El Paso | 12/01/26 | $1,969,177.27 | Construction | Roadway | Construction | Roadway | $1,919,937.50 | $49,239.77 | 3% | 0 | | | | | 0265-03-042 | Austin | 01/06/27 | $61,647,805.38 | Construction | Roadway | Construction | Roadway | $60,122,400.00 | $1,525,405.38 | 3% | 0 | | | | | 0243-03-072 | Beaumont | 09/02/26 | $213,371.40 | Construction | Roadway | Construction | Roadway | $208,128.60 | $5,242.80 | 3% | 0 | | | | | 0912-72-828 | Houston | 05/15/28 | $1,677,345.00 | Construction | Local Let | Construction | Local Let | $1,720,400.00 | $(43,055.00) | -3% | 0 | | | | | 0710-01-051 | Beaumont | 09/02/26 | $738,380.90 | Construction | Roadway | Construction | Roadway | $720,678.84 | $17,702.06 | 2% | 0 | | | | | 0388-06-006 | Lufkin | 11/03/26 | $51,225.85 | Construction | Roadway | Construction | Roadway | $50,000.00 | $1,225.85 | 2% | 0 | | | | | 0275-13-075 | Childress | 06/01/28 | $4,000,000.00 | Construction | Roadway | Construction | Roadway | $4,100,000.00 | $(100,000.00) | -2% | 0 | | | | | 0775-01-021 | Pharr | 09/02/26 | $377,459.59 | Construction | Roadway | Construction | Roadway | $386,659.59 | $(9,200.00) | -2% | 0 | | | | | 2510-01-020 | Lufkin | 11/03/26 | $61,416.60 | Construction | Roadway | Construction | Roadway | $60,000.00 | $1,416.60 | 2% | 0 | | | | | 0804-01-020 | Wichita Falls | 11/03/26 | $249,504.24 | Construction | Roadway | Construction | Roadway | $255,468.00 | $(5,963.76) | -2% | 0 | | | | | 1876-01-043 | Lufkin | 11/03/26 | $185,584.40 | Construction | Roadway | Construction | Roadway | $190,000.00 | $(4,415.60) | -2% | 0 | | | | | 0553-02-019 | Lufkin | 11/03/26 | $195,376.00 | Construction | Roadway | Construction | Roadway | $200,000.00 | $(4,624.00) | -2% | 0 | | | | | 0221-01-078 | Paris | 03/07/28 | $111,223,783.65 | Construction | Roadway | Construction | Roadway | $108,728,384.26 | $2,495,399.39 | 2% | 0 | | | | | 2810-01-014 | Lufkin | 11/03/26 | $214,785.20 | Construction | Roadway | Construction | Roadway | $210,000.00 | $4,785.20 | 2% | 0 | | | | | 0337-05-048 | Bryan | 09/01/27 | $3,349,749.79 | Construction | Bridge | Construction | Bridge | $3,278,786.69 | $70,963.10 | 2% | 0 | | | | | 0200-01-093 | Lufkin | 10/06/26 | $30,456,009.45 | Construction | Roadway | Construction | Roadway | $29,811,165.20 | $644,844.25 | 2% | 0 | | | | | 0014-23-042 | Waco | 10/06/26 | $6,123,029.55 | Construction | Roadway | Construction | Roadway | $6,000,000.00 | $123,029.55 | 2% | 0 | | | | | 0092-04-087 | Dallas | 10/06/26 | $7,280,456.10 | Construction | Roadway | Construction | Roadway | $7,432,853.20 | $(152,397.10) | -2% | 0 | | | | | 0063-02-041 | Atlanta | 10/06/26 | $215,642.29 | Construction | Roadway | Construction | Roadway | $220,068.00 | $(4,425.71) | -2% | 0 | | | | | 0970-01-019 | Childress | 10/06/26 | $488,693.10 | Construction | Roadway | Construction | Roadway | $498,665.00 | $(9,971.90) | -2% | 0 | | | | | 0515-03-061 | Yoakum | 11/03/26 | $119,072.35 | Construction | Roadway | Construction | Roadway | $121,493.00 | $(2,420.65) | -2% | 0 | | | | | 0810-03-016 | Lufkin | 11/03/26 | $265,136.20 | Construction | Roadway | Construction | Roadway | $260,000.00 | $5,136.20 | 2% | 0 | | | | | 0593-01-142 | Beaumont | 09/02/26 | $90,843.10 | Construction | Roadway | Construction | Roadway | $89,087.32 | $1,755.78 | 2% | 0 | | | | | 3018-01-011 | Wichita Falls | 11/03/26 | $211,522.82 | Construction | Roadway | Construction | Roadway | $215,708.00 | $(4,185.18) | -2% | 0 | | | | | 0085-04-052 | Atlanta | 10/06/26 | $926,451.98 | Construction | Roadway | Construction | Roadway | $908,838.00 | $17,613.98 | 2% | 0 | | | | | 0342-03-040 | Pharr | 08/01/29 | $13,503,772.71 | Construction | Roadway | Construction | Roadway | $13,767,575.00 | $(263,802.29) | -2% | 0 | | | | | 0445-01-068 | Yoakum | 11/03/26 | $94,804.75 | Construction | Roadway | Construction | Roadway | $93,038.00 | $1,766.75 | 2% | 0 | | | | | 0093-01-110 | Dallas | 10/06/26 | $7,031,121.50 | Construction | Roadway | Construction | Roadway | $7,164,958.00 | $(133,836.50) | -2% | 0 | | | | | 3100-02-002 | Pharr | 09/06/28 | $38,538,427.00 | Construction | Roadway | Construction | Roadway | $37,840,008.12 | $698,418.88 | 2% | 0 | | | | | 0243-04-062 | Beaumont | 09/02/26 | $117,258.40 | Construction | Roadway | Construction | Roadway | $115,153.71 | $2,104.69 | 2% | 0 | | | | | 0028-06-098 | Beaumont | 09/02/26 | $95,444.30 | Construction | Roadway | Construction | Roadway | $93,755.78 | $1,688.52 | 2% | 0 | | | | | 0266-08-018 | Yoakum | 01/06/27 | $677,634.80 | Construction | Non Roadway | Construction | Non Roadway | $690,000.00 | $(12,365.20) | -2% | 0 | | | | | 0912-72-627 | Houston | 10/05/27 | $1,136,754.00 | Construction | Bridge | Construction | Bridge | $1,157,249.00 | $(20,495.00) | -2% | 0 | | | | | 2550-01-012 | Fort Worth | 12/01/26 | $521,254.27 | Construction | Roadway | Construction | Roadway | $530,468.22 | $(9,213.95) | -2% | 0 | | | | | 1750-01-011 | Lubbock | 11/03/26 | $29,003.30 | Construction | Roadway | Construction | Roadway | $29,455.53 | $(452.23) | -2% | 0 | | | | | 0285-03-066 | Austin | 11/03/26 | $981,254.00 | Construction | Non Roadway | Construction | Non Roadway | $966,889.00 | $14,365.00 | 1% | 0 | | | | | 0109-06-046 | Lufkin | 11/03/26 | $207,139.20 | Construction | Roadway | Construction | Roadway | $210,000.00 | $(2,860.80) | -1% | 0 | | | | | 0593-01-141 | Beaumont | 09/02/26 | $185,837.00 | Construction | Roadway | Construction | Roadway | $188,400.68 | $(2,563.68) | -1% | 0 | | | | | 0064-02-020 | Lufkin | 11/03/26 | $385,266.00 | Construction | Roadway | Construction | Roadway | $390,000.00 | $(4,734.00) | -1% | 0 | | | | | 0869-02-018 | Brownwood | 11/03/26 | $577,386.94 | Construction | Roadway | Construction | Roadway | $570,977.00 | $6,409.94 | 1% | 0 | | | | | 0968-02-004 | Lubbock | 11/03/26 | $215,495.78 | Construction | Roadway | Construction | Roadway | $217,921.00 | $(2,425.22) | -1% | 0 | | | | | 3271-01-019 | Beaumont | 09/02/26 | $447,006.40 | Construction | Roadway | Construction | Roadway | $442,193.04 | $4,813.36 | 1% | 0 | | | | | 0319-01-073 | Lufkin | 11/03/26 | $1,019,011.60 | Construction | Roadway | Construction | Roadway | $1,030,000.00 | $(10,988.40) | -1% | 0 | | | | | 2419-01-011 | Lubbock | 11/03/26 | $579,019.39 | Construction | Roadway | Construction | Roadway | $584,914.00 | $(5,894.61) | -1% | 0 | | | | | 2879-01-011 | Atlanta | 10/05/27 | $2,563,215.00 | Construction | Roadway | Construction | Roadway | $2,588,020.00 | $(24,805.00) | -1% | 308 | 10 months | | | | 0921-02-529 | Pharr | 10/06/26 | $412,890.76 | Construction | Roadway | Construction | Roadway | $409,038.76 | $3,852.00 | 1% | 0 | | | | | 1510-01-024 | Lufkin | 11/03/26 | $416,130.05 | Construction | Roadway | Construction | Roadway | $420,000.00 | $(3,869.95) | -1% | 0 | | | | | 2164-02-020 | Childress | 10/06/26 | $319,941.00 | Construction | Roadway | Construction | Roadway | $322,692.00 | $(2,751.00) | -1% | 0 | | | | | 0109-06-045 | Lufkin | 11/03/26 | $352,947.45 | Construction | Roadway | Construction | Roadway | $350,000.00 | $2,947.45 | 1% | 0 | | | | | 0475-09-041 | Lufkin | 11/03/26 | $446,318.40 | Construction | Roadway | Construction | Roadway | $450,000.00 | $(3,681.60) | -1% | 0 | | | | | 0921-02-527 | Pharr | 10/06/26 | $123,310.50 | Construction | Roadway | Construction | Roadway | $122,310.50 | $1,000.00 | 1% | 0 | | | | | 0059-05-048 | Lufkin | 11/03/26 | $555,436.80 | Construction | Roadway | Construction | Roadway | $560,000.00 | $(4,563.20) | -1% | 0 | | | | | 0388-05-011 | Beaumont | 09/02/26 | $271,935.80 | Construction | Roadway | Construction | Roadway | $269,778.04 | $2,157.76 | 1% | 0 | | | | | 1258-02-044 | Houston | 09/02/26 | $483,448.89 | Construction | Roadway | Construction | Roadway | $479,659.19 | $3,789.70 | 1% | 0 | | | | | 0009-11-248 | Dallas | 10/06/26 | $51,718,095.61 | Construction | Roadway | Construction | Roadway | $52,122,703.81 | $(404,608.20) | -1% | 0 | | | | | 0388-03-090 | Beaumont | 09/02/26 | $18,995.40 | Construction | Roadway | Construction | Roadway | $18,848.40 | $147.00 | 1% | 0 | | | | | 0485-02-018 | El Paso | 12/01/26 | $1,322,645.59 | Construction | Roadway | Construction | Roadway | $1,313,086.54 | $9,559.05 | 1% | 0 | | | | | 0187-05-068 | Houston | 09/02/26 | $354,602.37 | Construction | Roadway | Construction | Roadway | $352,056.55 | $2,545.82 | 1% | 0 | | | | | 0354-04-043 | Odessa | 12/01/26 | $26,065,517.45 | Construction | Roadway | Construction | Roadway | $26,242,851.29 | $(177,333.84) | -1% | 0 | | | | | 2094-01-072 | Pharr | 11/03/26 | $4,545,021.29 | Construction | Roadway | Construction | Roadway | $4,514,108.73 | $30,912.56 | 1% | 0 | | | | | 0918-47-544 | Dallas | 05/05/27 | $511,543.46 | Construction | Roadway | Construction | Roadway | $514,990.58 | $(3,447.12) | -1% | 0 | | | | | 0304-02-042 | Lufkin | 11/03/26 | $845,503.30 | Construction | Roadway | Construction | Roadway | $840,000.00 | $5,503.30 | 1% | 0 | | | | | 0668-01-020 | Abilene | 12/01/27 | $248,803.93 | Construction | Roadway | Construction | Roadway | $247,216.00 | $1,587.93 | 1% | 0 | | | | | 0336-05-067 | Lufkin | 11/03/26 | $462,935.15 | Construction | Roadway | Construction | Roadway | $460,000.00 | $2,935.15 | 1% | 0 | | | | | 0336-07-078 | Lufkin | 11/03/26 | $308,058.95 | Construction | Roadway | Construction | Roadway | $310,000.00 | $(1,941.05) | -1% | 0 | | | | | 0912-72-626 | Houston | 10/05/27 | $974,484.40 | Construction | Bridge | Construction | Bridge | $980,366.00 | $(5,881.60) | -1% | 0 | | | | | 0921-02-528 | Pharr | 10/06/26 | $84,987.25 | Construction | Roadway | Construction | Roadway | $84,487.25 | $500.00 | 1% | 0 | | | | | 0014-23-041 | Waco | 10/06/26 | $5,965,959.25 | Construction | Roadway | Construction | Roadway | $6,000,000.00 | $(34,040.75) | -1% | 0 | | | | | 1194-01-025 | Lufkin | 11/03/26 | $656,408.80 | Construction | Roadway | Construction | Roadway | $660,000.00 | $(3,591.20) | -1% | 0 | | | | | 0667-01-130 | Beaumont | 09/02/26 | $339,090.70 | Construction | Roadway | Construction | Roadway | $340,907.65 | $(1,816.95) | -1% | 0 | | | | | 3330-01-011 | Waco | 11/03/26 | $303,599.30 | Construction | Roadway | Construction | Roadway | $302,164.80 | $1,434.50 | 0% | 0 | | | | | 0251-04-023 | Brownwood | 08/02/28 | $111,069,230.76 | Construction | Roadway | Construction | Roadway | $111,585,185.19 | $(515,954.43) | -0% | 0 | | | | | 3632-01-002 | Pharr | 09/02/26 | $60,647,815.45 | Construction | Roadway | Construction | Roadway | $60,369,515.45 | $278,300.00 | 0% | 0 | | | | | 0052-05-052 | Lubbock | 11/03/26 | $606,482.59 | Construction | Roadway | Construction | Roadway | $603,778.00 | $2,704.59 | 0% | 0 | | | | | 0307-01-161 | Beaumont | 09/02/26 | $248,232.80 | Construction | Roadway | Construction | Roadway | $249,212.44 | $(979.64) | -0% | 0 | | | | | 0706-04-022 | Lufkin | 11/03/26 | $617,713.20 | Construction | Roadway | Construction | Roadway | $620,000.00 | $(2,286.80) | -0% | 0 | | | | | 0014-15-036 | Fort Worth | 08/05/26 | $19,317,040.90 | | | Construction | Roadway | $19,258,280.90 | $58,760.00 | 0% | 0 | | | | | 0015-13-432 | Austin | 11/03/26 | $238,770,933.57 | Construction | Bridge | Construction | Bridge | $239,362,478.11 | $(591,544.54) | -0% | 0 | | | | | 0074-06-256 | Corpus Christi | 11/03/26 | $1,496,610.00 | Construction | Bridge | Construction | Bridge | $1,500,000.00 | $(3,390.00) | -0% | 0 | | | | | 0932-01-122 | Beaumont | 09/02/26 | $347,223.90 | Construction | Roadway | Construction | Roadway | $346,453.56 | $770.34 | 0% | 0 | | | | | 0172-12-007 | Dallas | 11/02/27 | $51,363,055.90 | Construction | Roadway | Construction | Roadway | $51,472,754.02 | $(109,698.12) | -0% | 181 | 6 months | | | | 0213-02-049 | Lufkin | 11/03/26 | $851,739.40 | Construction | Roadway | Construction | Roadway | $850,000.00 | $1,739.40 | 0% | 0 | | | | | 2292-01-035 | Fort Worth | 12/01/26 | $969,295.36 | Construction | Roadway | Construction | Roadway | $967,447.71 | $1,847.65 | 0% | 0 | | | | | 0015-13-441 | Austin | 11/03/26 | $93,542,062.51 | Construction | Roadway | Construction | Roadway | $93,710,663.04 | $(168,600.53) | -0% | 0 | | | | | 0114-01-071 | Austin | 11/03/26 | $3,761,482.94 | Construction | Non Roadway | Construction | Non Roadway | $3,768,059.17 | $(6,576.23) | -0% | 0 | | | | | 0180-11-016 | Corpus Christi | 06/01/28 | $2,596,153.85 | Construction | Roadway | Construction | Roadway | $2,600,000.00 | $(3,846.15) | -0% | 57 | 2 months | | | | 0114-01-070 | Austin | 11/03/26 | $439,163.83 | Construction | Non Roadway | Construction | Non Roadway | $439,821.46 | $(657.63) | -0% | 0 | | | | | 1582-01-029 | Lufkin | 11/03/26 | $1,058,560.90 | Construction | Roadway | Construction | Roadway | $1,060,000.00 | $(1,439.10) | -0% | 0 | | | | | 1927-01-011 | Brownwood | 11/03/26 | $266,002.15 | Construction | Roadway | Construction | Roadway | $265,712.00 | $290.15 | 0% | 0 | | | | | 0014-15-033 | Fort Worth | 08/05/26 | $8,290,894.75 | | | Construction | Roadway | $8,282,938.75 | $7,956.00 | 0% | 0 | | | | | 0692-01-020 | Paris | 10/04/28 | $32,981,481.48 | Construction | Roadway | Construction | Roadway | $33,000,000.00 | $(18,518.52) | -0% | 0 | | | | | 0336-01-071 | Lufkin | 11/03/26 | $350,218.05 | Construction | Roadway | Construction | Roadway | $350,000.00 | $218.05 | 0% | 0 | | | | | 0143-10-058 | Yoakum | 09/02/26 | $6,552,127.50 | Construction | Roadway | Construction | Roadway | $6,548,377.50 | $3,750.00 | 0% | 0 | | | | | 0902-48-579 | Fort Worth | 08/05/26 | $22,931,806.10 | | | Construction | Roadway | $22,917,686.10 | $14,120.00 | 0% | 0 | | | | | 3510-04-070 | Houston | 08/05/26 | $19,111,450.30 | | | Construction | Roadway | $19,121,150.30 | $(9,700.00) | -0% | 0 | | | | | 0016-03-125 | Austin | 11/03/26 | $2,826,631.57 | Construction | Roadway | Construction | Roadway | $2,827,670.53 | $(1,038.96) | -0% | 0 | | | | | 0016-09-045 | Austin | 11/03/26 | $213,459.69 | Construction | Roadway | Construction | Roadway | $213,525.75 | $(66.06) | -0% | 0 | | | | | 0143-03-049 | San Antonio | 10/06/26 | $47,441,025.10 | Construction | Roadway | Construction | Roadway | $47,428,077.66 | $12,947.44 | 0% | 0 | | | | | 0366-01-080 | Austin | 11/03/26 | $396,072.86 | Construction | Roadway | Construction | Roadway | $396,158.18 | $(85.32) | -0% | 0 | | | | | 0014-15-034 | Fort Worth | 08/05/26 | $19,181,957.10 | | | Construction | Roadway | $19,177,771.10 | $4,186.00 | 0% | 0 | | | | | 0366-01-089 | Austin | 11/03/26 | $227,222.93 | Construction | Roadway | Construction | Roadway | $227,251.37 | $(28.44) | -0% | 0 | | | | | 0987-03-017 | Austin | 11/03/26 | $123,522.92 | Construction | Roadway | Construction | Roadway | $123,537.07 | $(14.15) | -0% | 0 | | | | | 0028-15-063 | Beaumont | 09/02/26 | $177,997.00 | Construction | Roadway | Construction | Roadway | $178,010.08 | $(13.08) | -0% | 0 | | | | | 0038-04-064 | Pharr | 09/06/28 | $83,428,591.67 | Construction | Roadway | Construction | Roadway | $83,428,593.00 | $(1.33) | 0% | 0 | | | | | 0495-10-105 | Atlanta | 09/06/28 | $5,976,102.00 | Construction | Roadway | Construction | Roadway | $5,976,110.38 | $(8.38) | 0% | 0 | | | | | 0008-09-037 | Fort Worth | 06/01/28 | $17,300,892.00 | Construction | Roadway | Construction | Roadway | $17,300,891.50 | $0.50 | 0% | 0 | | | | | 1024-01-077 | Beaumont | 05/03/28 | $70,192,308.65 | Construction | Roadway | Construction | Roadway | $70,192,307.69 | $0.96 | 0% | 0 | | | | | 1728-02-069 | San Antonio | 12/01/26 | $4,204,671.06 | Construction | Roadway | Construction | Roadway | $4,204,612.00 | $59.06 | 0% | 0 | | | | --- ## Putting It Together The TxDOT pipeline shows an overall increase in both active project numbers and total value, driven by a mix of letting-date shifts and steady subtype classifications. While project costs have risen significantly, the concentration of projects mainly remains within the roadway category, supporting ongoing infrastructure development. --- ## Final Takeaway The updated pipeline reflects a continued investment in transportation infrastructure with stable classifications and a growing financial commitment. --- --- ## Build automations with Flows https://www.bidlo.ai/research/build-automations-with-flows Product updates for August 11, 2026–August 17, 2026 This week, Bidlo adds workspace automations, builds pages and apps from a description, and puts page sharing in one clear place. ### Build automations with Flows Describe an automation in plain language. Bidlo assembles the steps on a canvas, or you can build the flow yourself. A flow can run on a schedule, from a webhook, when collection data changes, or by hand. Connect steps to update data, call an API, ask the assistant, send a notification, branch, wait, merge paths, or run code. Credentials stay encrypted, and every run keeps a readable, step-by-step log. HCSS estimates now use the same flow system to sync into a dedicated Estimates collection every ten minutes. Estimates link to matching projects and agencies, and you can open the flow to change the schedule, pause it, or add more steps. ### Build a page from the sentence you type Open a new page the instant you ask for one with **+**. Type “kanban board” to open a board, or describe a table and let the page-building assistant choose the data, add fields, and name the page. New-page descriptions now route to the correct builder instead of sending nearly every request to one general builder. If you prefer to choose, Bidlo suggests useful views based on how you and your team work. Each layout opens in the correct empty state, and the data choice appears exactly when you need it. Choose **App**, and the page itself becomes the app, with one name, icon, sidebar entry, and sharing flow. ### Share a page without leaving it Use the **Share** button in the page header to find teammates and give them **Can edit** or **Can view** access. Shared pages move into a dedicated **Shared** section for both the owner and everyone invited. The same panel also holds web publishing. Moving a shared page back to **Private** or **Public** explains who will gain or lose access before anything changes. ### What else changed #### Views and formulas - **View improvements** — Long formulas display correctly in the editor, and date-filter preview calendars now highlight the days the filter actually matches. - **Faster sorted and notification views** — Views sorted by two fields and views built from saved lists now load noticeably faster. - **Clear formula failures and reliable views** — Formula cells show error and retry statuses instead of loading forever, while grouped and filtered views avoid an intermittent loading error. - **Large views load in under a second** — Date, relation, search, filter, sort, and grouping operations are much faster across large collections. - **Safer formula and dashboard setup** — New formulas wait until their fields are saved, transient errors trigger another attempt, and dashboard cards now use the same description-first builder as pages. - **The formula assistant understands your data** — It can see which fields are allowed across related collections, check real tag and linked-item values, and explain unsupported relation paths. - **Saved formulas pick up planner improvements** — Existing formulas use execution improvements automatically without requiring you to edit and save them again. - **Formula recalculation keeps up under load** — Large collections and dependent formulas recalculate faster. Work is shared fairly, and rapid edits keep one consistent version. - **Formula backfills start reliably** — A new formula begins filling in even while other recalculations are running, and invalid sidebar drops no longer hide pages. - **Dictate or attach files to the formula assistant** — Speak a formula or attach screenshots and files while the full editor stays visible wherever its table cell sits. - **See which formulas a field change will affect** — When you delete a field, Bidlo lists the formulas that use it and lets you replace the field before anything breaks. - **Sort groups by count or calculation** — Order groups by item count, sum, average, or another numeric calculation, and convert a view to a dashboard from the layout menu. - **Dependent formulas finish cleanly** — Rollups over calculated columns stay fast, interrupted work resumes, and progress shows what a recalculation is waiting for. #### Notes, pages, and apps - **Chat starts faster and stays in the right mode** — App builder, page builder, and agent conversations keep the correct tools and target, while new-page routing handles retries more reliably. - **Chat replies start about twice as fast** — Everyday answers begin sooner, file tasks reconnect to their existing workspace, and long turns explain when they need another attempt. - **Activity and notifications share one inbox** — Review **New**, **Older**, **Unread**, and **Archived** items in one stream, then archive items or change their read status without opening each one. - **Search for a page when inserting a page block** — The page block command searches your workspace and inserts a preview card that opens the linked page in the side panel. - **Embedded view filters stay personal until published** — Filter and sort **Views** tabs without changing them for everyone, then reset or save the changes for the team. - **More reliable Notes and team setup** — Assistant-created files return as document cards, dialogs consistently dim the page, and teams without a contractor now open correctly. - **Custom apps keep one name and sharing experience** — Shared-app sign-in works, names and icons stay in sync, and shared apps use the same card design as recently visited apps. - **Move, resize, and re-dock floating chat** — Place chat anywhere on the screen, resize it from any edge, and drag it back into the sidebar when you are done. #### Plans and takeoffs - **See real progress while a PDF opens** — Large plan sets show download progress, preparation status, and page placeholders instead of a blank panel. - **Measured shapes stay solid while you edit** — Dragging areas, lengths, and vertices preserves their geometry and stays responsive on sheets with many markups. - **Know whether a PDF is ready for AI** — The header shows AI readiness and lets you start or retry parsing if a file was missed. - **Cleaner navigation and PDF controls** — Duplicated pages stay beside the original, the collapsed-sidebar control remains reachable, and the PDF tray explains the difference between **Ask AI** and **AI measure**. --- ## Build custom apps inside Bidlo https://www.bidlo.ai/research/build-custom-apps-inside-bidlo Product updates for August 4, 2026–August 10, 2026 This week, Bidlo turns a plain-language workflow request into a working app, brings the full product to your phone, and adds Timeline view for project schedules and milestones. ### Build custom apps inside Bidlo Describe a dashboard, tracker, or field workflow in plain language. Bidlo builds the app against the project and contractor data you already use, shows the result in the same workspace, and keeps earlier build conversations available when you return. ### Bring Bidlo to the phone Bidlo now fits a phone screen. Use the bottom navigation, open menus and editors as touch-friendly sheets, review project and contractor data without losing your place, and work with views using controls sized for a thumb. ### Timeline view Turn project dates into a schedule for bids, mobilization, and other milestones. Timeline keeps work in order across days or months, and each bar opens the same project your team already uses. ### What else changed #### Views and data - [**Lock views and columns**](https://app.notion.com/p/Lock-views-and-columns-3b9dad00a1dc8108b80fe3aaea076b14) — Views can now be locked, so a table you set up for the team stays set up that way. Anyone can still duplicate a locked view to get an unlocked copy. - [**Publish views as websites**](https://app.notion.com/p/Publish-views-as-websites-3b9dad00a1dc81ed9533d4c0d63e29ad) — You can publish a view—or a Views app tab—as a read-only website with its current layout and data. - [**Conditional color from the column menu**](https://app.notion.com/p/Conditional-color-from-the-column-menu-3b8dad00a1dc814490ffc38508597a3b) — Conditional color is back in the table's column menu, so you can color a column by its values without opening view settings. - [**Draft and publish dashboard filters**](https://app.notion.com/p/Draft-and-publish-dashboard-filters-3b8dad00a1dc8163b4bdeb652367d261) — Dashboard filters now work like filters elsewhere in Bidlo. On a shared page, changes to global filters or an individual card's filters stay personal until you publish them. - [**Date-only fields keep the selected day**](https://app.notion.com/p/Date-only-fields-keep-the-selected-day-3b5dad00a1dc81cf879bd4e3e926bdfa) — Date-only fields now keep the day you selected in every local time zone instead of shifting during editing. - [**Views improvements**](https://app.notion.com/p/3b4dad00a1dc81dd9205dbadcab42c12) — Views now give clearer formula feedback, show units, and filter through connected project and contractor data. - [**Views improvements**](https://app.notion.com/p/Views-improvements-3b4dad00a1dc81458f2de69da6224fe7) — Views now handle large summaries and incomplete date filters more reliably. - [**Clearer dates and settings in charts**](https://app.notion.com/p/Clearer-dates-and-settings-in-charts-3b4dad00a1dc81bda3e2ee4134d9df6f) — Chart views format date values more clearly and present a cleaner set of display settings. - [**More reliable formula recalculation**](https://app.notion.com/p/More-reliable-formula-recalculation-3b4dad00a1dc814dacfffd64755519ba) — Large formula batches now complete without turning otherwise valid results into error cells. - [**Sub-items in views**](https://app.notion.com/p/3b4dad00a1dc81238cd9d41375646146) — Related projects, contractors, and other data can now sit beneath an expandable parent, keeping detailed work connected without flattening the entire view into one list. - [**Maps follow the area you are reviewing**](https://app.notion.com/p/Maps-follow-the-area-you-are-reviewing-3b4dad00a1dc81bbb0caff6979042484) — Map views update their working area as you pan and provide clearer location sorting for nearby projects and opportunities. - [**Move from a view into a dashboard**](https://app.notion.com/p/Move-from-a-view-into-a-dashboard-3b4dad00a1dc817987a7ed7b6c8407c3) — Start a dashboard from an existing view and continue arranging the same information without rebuilding the page from scratch. - [**Field definitions in the data glossary**](https://app.notion.com/p/Field-definitions-in-the-data-glossary-3b4dad00a1dc81a1b927dbc0cde1b3eb) — The data glossary now shows clear field definitions and sample values. You can check unfamiliar project data before you use it in a view or formula. - [**Highlight important data with color**](https://app.notion.com/p/3b4dad00a1dc8155ad1bd83e27defc7b) — Views can now color projects, contractors, and other data when they match a rule. Overdue work, high-value bids, and missing information stand out while you scan the list. - [**Faster table setup and calculations**](https://app.notion.com/p/3b4dad00a1dc81539080d11f847beafd) — You can now add fields and formulas from the table header. Large tables also stay responsive while Bidlo calculates the results. #### Custom apps - [**Save a version automatically when sharing needs one**](https://app.notion.com/p/Save-a-version-automatically-when-sharing-needs-one-3b9dad00a1dc8166a534ee5defe1c3de) — Sharing an app outside your team no longer stops to ask you for anything. If the app has never been saved, Continue saves a version, checks it, and shares that — you just pick who gets it. - [**Run the outside-share security check automatically**](https://app.notion.com/p/Run-the-outside-share-security-check-automatically-3b9dad00a1dc8109a459d5681008686e) — Sharing an app outside your team no longer waits on anyone. Click Share, type an outside address, and a step explains who's getting what: Continue runs the security check, sends the invite, and tells you exactly which data that person can now reach through the app. - [**Share custom apps outside your team**](https://app.notion.com/p/Share-custom-apps-outside-your-team-3b9dad00a1dc81d0b817c439bfce5473) — Share a custom app with people outside your team and let them work in that app without giving them access to everything else. - [**General improvements**](https://app.notion.com/p/3b4dad00a1dc81c1953bf3a09fc22639) — You can now open original projects, contractors, and other data from custom apps and receive digest emails every hour. - [**Version history for custom apps**](https://app.notion.com/p/Version-history-for-custom-apps-3b4dad00a1dc815fb122c789a7fd145f) — Custom apps now keep working changes and saved versions. You can test an edit, save it when it is ready, or return to an earlier version. - [**Sharing controls for custom apps**](https://app.notion.com/p/Sharing-controls-for-custom-apps-3b4dad00a1dc812bbbdbdbab05fca3df) — Custom apps now have clearer sharing controls. Invite specific teammates while you build, or publish the finished app for everyone on your team. #### Workflows - [**General improvements**](https://app.notion.com/p/General-improvements-3b4dad00a1dc8199a273e400d68a2332) — Suggestions now use your contractor profile, and map controls stay clear while you work. - [**A clearer AI model picker**](https://app.notion.com/p/A-clearer-AI-model-picker-3b4dad00a1dc8116a244f620aab48e49) — The model picker groups options by provider, supports search, and shows reasoning controls where they apply, making speed-versus-depth choices easier to understand. - [**A more focused home screen**](https://app.notion.com/p/3b4dad00a1dc818eb0f4dd81e6a86268) — The Bidlo home screen gives more room to the prompt and suggested actions, putting common starting points closer at hand. - [**Simpler sidebar organization**](https://app.notion.com/p/Simpler-sidebar-organization-3b4dad00a1dc8179bc0beb193084e0a3) — Sidebar pages now use one tree for adding, moving, grouping, and removing pages, with fewer folder rules to manage. - [**Undo and redo across Bidlo**](https://app.notion.com/p/3b4dad00a1dc81b1ac26dea4bd32118e) — Undo and redo now cover field edits, deletions, page moves, and view changes across Bidlo—not only text in an editor. - [**Deep research in chat**](https://app.notion.com/p/3b4dad00a1dc81a89441eb656f1a5cc1) — Deep Research now shows its plan and each research step in chat. You can see what Bidlo is checking while it works. - [**Search and commands in one place**](https://app.notion.com/p/3b4dad00a1dc8118969aebf7d265bfe4) — Search now finds project and contractor data, documents, and common actions in one place. You can open the right project or start a task without moving through several menus. - [**Interactive tables in Notes**](https://app.notion.com/p/Interactive-tables-in-Notes-3b4dad00a1dc8149990feacc805729bb) — Tables in Notes now work as an editing surface for plans, comparisons, handoffs, and simple trackers that belong beside the work they explain. - [**Project details, comments, and activity in one panel**](https://app.notion.com/p/Project-details-comments-and-activity-in-one-panel-3b4dad00a1dc81aa8216f1a3da077e46) — Project pages now keep details, comments, and recent changes in one side panel. The project stays on screen while you review its context. #### Mobile and alerts - [**More useful notifications and email updates**](https://app.notion.com/p/More-useful-notifications-and-email-updates-3b9dad00a1dc81d79a93c257b40bbed7) — Notifications and email updates now show the right content, clearer details, and useful links. - [**Reliable sign-in recovery**](https://app.notion.com/p/Reliable-sign-in-recovery-3b8dad00a1dc81b4b661f7a7587fe638) — Signing in to Bidlo is reliable again. Sign-ins that stalled after the sign-in page was left open now recover automatically, and brief connection problems no longer end the session. - [**Install Bidlo on your phone or computer**](https://app.notion.com/p/3b4dad00a1dc812d883bd7ad1e80c8dc) — Bidlo can now be installed like an app, with a touch-friendly mobile layout and push notifications for views you follow—even when the browser is closed. - [**Email digests for view updates**](https://app.notion.com/p/Email-digests-for-view-updates-3b4dad00a1dc8149beeff0c2efd5994d) — View notification settings now include email digest controls for following important changes without staying in the app throughout the day. --- ## Texas DOT Backlog Report - August 2026 https://www.bidlo.ai/research/texas-dot-backlog-report-august-2026 Active Construction Backlog by District ## Before the Next Letting, $18.30B Is Already on the Books Texas is preparing for a new round of TxDOT lettings, even as it faces an already extensive active workload. This workload is unevenly distributed across the state, with certain districts carrying a larger share of projects and associated values. The statewide active backlog currently stands at $18.30 billion, comprising a total of 3,242 active projects spread across 25 districts. Active backlog reflects the remaining value tied to those underway projects. Additionally, change orders represent the contract values added after project awards, which can shift project costs significantly. The Dallas district leads the state with an active backlog of $4.61 billion, while Fort Worth has the highest change order percentage at 21.4%. Austin contrasts this with a significant project count but less total backlog. Examining both district totals and individual projects will reveal varying workloads and financial landscapes. A comprehensive view of these metrics is essential to fully understand the current construction market in Texas. --- ## Interactive District View [https://info.bidlo.ai/heatmap/backlog-by-district?embed=1&snapshot_id=2a0267ef-8b66-4b8d-8ee5-ce4dec8b0e30&style=v2](https://info.bidlo.ai/heatmap/backlog-by-district?embed=1&snapshot_id=2a0267ef-8b66-4b8d-8ee5-ce4dec8b0e30&style=v2) The interactive district view shows how active backlog and change orders are distributed across Texas. One view illustrates where remaining active backlog is concentrated, while the other indicates where approved change orders are concentrated. This dual perspective highlights different aspects of the active market. Dallas stands out with the largest backlog, while Fort Worth's high change order percentage indicates a market dynamic where awarded contract values have substantially grown. --- ## Dallas Is Carrying the Largest Remaining Workload The Dallas district holds the largest active backlog at $4.61 billion across 287 projects. In contrast, Austin follows with $2.17 billion in backlog but has a higher project count at 151 active projects. Houston, with a significant $1.99 billion backlog, also has the most active projects at 364. Lastly, Fort Worth, while ranking lower in backlog at $1.07 billion, has a notable change order percentage of 21.4%, reflecting a different workload profile. This multi-faceted comparison reveals that project count alone does not capture the concentration of financial responsibility among active projects. The distribution of the backlog differs significantly across districts, which illustrates the importance of viewing both backlog and project counts together. | Rank | District | Active backlog | Projects | Change order % | Change orders | | --- | --- | --- | --- | --- | --- | | 1 | DALLAS | $4.61B | 287 | 2.1% | $163.94M | | 2 | AUSTIN | $2.17B | 151 | 4.7% | $213.23M | | 3 | HOUSTON | $1.99B | 364 | 7.9% | $472.87M | | 4 | SAN ANTONIO | $1.39B | 178 | 3.9% | $210.07M | | 5 | FORT WORTH | $1.07B | 175 | 21.4% | $623.49M | | 6 | BRYAN | $852.60M | 150 | 6.2% | $92.14M | | 7 | BEAUMONT | $698.18M | 136 | 6.2% | $106.79M | | 8 | PHARR | $643.85M | 118 | 5.3% | $66.39M | | 9 | YOAKUM | $554.83M | 136 | 2.3% | $45.97M | | 10 | EL PASO | $533.23M | 102 | 12.5% | $170.57M | | 11 | CORPUS CHRISTI | $520.25M | 157 | 3.9% | $45.01M | | 12 | AMARILLO | $369.85M | 86 | 1.6% | $16.84M | | 13 | LAREDO | $369.80M | 87 | 3.2% | $26.58M | | 14 | PARIS | $359.99M | 146 | 6.2% | $81.57M | | 15 | TYLER | $350.00M | 158 | 7.7% | $69.21M | | 16 | ODESSA | $341.92M | 151 | 5.2% | $61.17M | | 17 | WICHITA FALLS | $317.27M | 79 | 1.5% | $14.04M | | 18 | WACO | $275.08M | 93 | 3.2% | $24.09M | | 19 | ATLANTA | $192.24M | 77 | 7.2% | $39.96M | | 20 | LUFKIN | $163.48M | 72 | 2.6% | $18.57M | | 21 | LUBBOCK | $156.00M | 70 | 2.7% | $13.62M | | 22 | ABILENE | $129.25M | 60 | 2.4% | $7.80M | | 23 | BROWNWOOD | $91.66M | 106 | 6.8% | $18.96M | | 24 | SAN ANGELO | $79.45M | 66 | 7.7% | $24.36M | | 25 | CHILDRESS | $71.41M | 37 | 8.4% | $15.19M | --- ## Change Orders Add a Second View The statewide change order percentage stands at 5.8%, indicating that awarded contract values often increase after the initial award. Fort Worth leads with a 21.4% change order percentage, alongside a notable total of $623.49 million in change orders. Houston also demonstrates significant activity in this area, with $472.87 million in approved change orders and a change order percentage of 7.9%. Austin and Bryan follow, with change orders of $213.23 million and $92.14 million, respectively. This change order perspective provides insights into districts where contract scopes are shifting significantly post-award, contrasting sharply with the backlog view, which focuses on the remaining dollar values tied to projects already started. --- ## Notable Active Projects Several projects illustrate key concentrations of active backlog and change orders. The largest active backlog project is CCSJ 2374-01-137 in Dallas, with a remaining value of $1.71 billion and no change orders impacting its value. Another notable project in Dallas is CCSJ 0009-11-254, with a backlog of $736.61 million and $3.42 million in change orders, indicating a minor adjustment post-award. Fort Worth's CCSJ 0008-13-125 stands out with a backlog of $725.20 million and significant change orders totaling $451.41 million, leading to a change order percentage of 28.4%. This project exemplifies how active projects can reflect both backlog and contract adaptations. A summary table follows to provide further detail on the largest active projects. The table below shows the largest active projects by remaining backlog. | CCSJ | Project | District | Active backlog | Change orders | Change order % | | --- | --- | --- | --- | --- | --- | | 2374-01-137 | CCSJ 2374-01-137 (project NH 1902(389)) | DALLAS | $1.71B | $0 | 0.0% | | 0009-11-254 | CCSJ 0009-11-254 (project F 2025(365)) | DALLAS | $736.61M | $3.42M | 0.4% | | 0008-13-125 | CCSJ 0008-13-125 (project F 2022(675)) | FORT WORTH | $725.20M | $451.41M | 28.4% | | 0049-12-110 | CCSJ 0049-12-110 (project F 2025(274)) | BRYAN | $525.35M | $2.87M | 0.4% | | 0015-13-428 | CCSJ 0015-13-428 (project F 2024(833)) | AUSTIN | $523.74M | $753,983 | 0.1% | These highlighted projects underscore the concentrated financial stakes within the active workload across various districts. --- ## What the Current Active Market Looks Like In summary, the Texas active market reveals a sizable statewide backlog of $18.30 billion across 3,242 active projects. Dallas holds the largest share of this backlog, while Fort Worth's notable change order percentage illustrates a different aspect of the active market. Continued scrutiny of backlog and change orders reveals the complexities driving project dynamics, helping to illustrate where challenges and opportunities may arise. --- --- ## Interactive tables in Notes https://www.bidlo.ai/research/interactive-tables-in-notes Product updates for July 28, 2026–August 3, 2026 Here are this week’s most useful improvements in Bidlo, with the biggest workflow changes first. ### Interactive tables in Notes Tables in Notes now work as an editing surface for plans, comparisons, handoffs, and simple trackers that belong beside the work they explain. ### Build custom apps inside Bidlo Describe the workflow you need, follow the build, and use the finished app beside the project and contractor data it needs. ### Undo and redo across Bidlo Undo and redo now cover field edits, deletions, page moves, and view changes across Bidlo—not only text in an editor. ### What else changed #### Views and data - **Views improvements** — Views now give clearer formula feedback, show units, and filter through connected project and contractor data. #### Custom apps - **General improvements** — You can now open original projects, contractors, and other data from custom apps and receive digest emails every hour. #### Access and alerts - **Install Bidlo on your phone or computer** — Bidlo can now be installed like an app, with a touch-friendly mobile layout and push notifications for views you follow—even when the browser is closed. --- ## TxDOT Pipeline Changes - July 2026 https://www.bidlo.ai/research/txdot-pipeline-changes-july-2026 Project changes in July added $2.36B and 59 net projects to the active pipeline, led by significant growth in Houston. - The active pipeline value increased from $31.35B to $33.71B, a change of +$2.36B. - Project entry into the letting window saw 91 new projects, with a net addition of 59 total projects. - Houston reports the largest district net cost increase at +$2.19B. --- ## Overview Looking at the July 3 vs. August 3, 2026 snapshots, across a letting window of July 1, 2026 to July 1, 2029, the active project pipeline shows a marked increase in both value and count. The total pipeline value rose by +$2.36B, underscoring a growing infrastructure commitment. Additionally, 91 projects entered the letting stage, while the predominant project type remains roadway, representing 76.2% of the pipeline value. --- ## Letting Date Shifts (Slippage) [https://info.bidlo.ai/embed/letting-slippage-bubble?publication_id=e411840e-f0e4-49c0-bca2-9b0276422d92](https://info.bidlo.ai/embed/letting-slippage-bubble?publication_id=e411840e-f0e4-49c0-bca2-9b0276422d92) > How to read this chart: Of the 78 projects whose letting dates shifted by six months or more, 43 moved earlier and 35 moved later. This means 8 more projects were pulled forward than delayed. Overall, the changes leaned slightly toward earlier letting dates, although the volume of movement in both directions indicates meaningful scheduling adjustments. | CSJ | District | Est. Letting Date | Project Estimate | Current Type | Current Subtype | Prev. Type | Prev. Subtype | Prev. Date | Letting Δ (days) | Letting Date Δ | Cost Δ | %Cost Δ | Type/Subtype Δ | Lifecycle | | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | | 0808-03-009 | Waco | 09/01/45 | $650,000.00 | | | Construction | Roadway | 09/01/27 | 6575 | 18 years | | | | | | 0598-02-136 | Houston | 01/01/40 | $1,341,371.02 | | | Construction | Roadway | 11/02/27 | 4443 | 12 years | | | | | | 0367-02-083 | Houston | 01/01/40 | $5,270,345.00 | | | Construction | Roadway | 01/05/28 | 4379 | 12 years | | | | | | 0367-03-039 | Houston | 01/01/40 | $5,270,345.00 | | | Construction | Roadway | 01/05/28 | 4379 | 12 years | | | | | | 0367-04-084 | Houston | 01/01/40 | $5,270,345.00 | | | Construction | Roadway | 01/05/28 | 4379 | 12 years | | | | | | 2523-03-020 | Houston | 01/01/40 | $3,681,924.00 | | | Construction | Roadway | 01/05/28 | 4379 | 12 years | | | | | | 0912-72-836 | Houston | 01/01/40 | $720,898.00 | | | Construction | Roadway | 07/06/28 | 4196 | 11 years | | | | | | 2920-02-005 | Austin | 07/01/27 | $2,083,536.54 | Construction | Roadway | Unassigned | Unassigned | 02/01/38 | -3868 | -11 years | $(83,341.24) | -4% | Unassigned → Construction / Roadway | | | 0912-72-797 | Houston | 01/15/37 | $28,142,008.00 | | | Construction | Local Let | 01/15/27 | 3653 | 10 years | | | | | | 0598-02-093 | Houston | 07/30/26 | $216,068,000.00 | Non-Let | Roadway | Unassigned | Unassigned | 08/01/35 | -3289 | -9 years | $26,068,000.00 | 14% | Unassigned → Non-Let / Roadway | | | 3510-04-038 | Houston | 01/15/37 | $39,800,000.00 | | | Construction | Local Let | 01/15/28 | 3288 | 9 years | | | | | | 0912-72-694 | Houston | 09/01/36 | $0.00 | | | Construction | Non Roadway | 09/01/27 | 3288 | 9 years | | | | | | 0422-05-011 | Fort Worth | 07/01/27 | $13,592,874.18 | Construction | Bridge | Unassigned | Unassigned | 01/01/35 | -2741 | -8 years | | | Unassigned → Construction / Bridge | | | 1062-02-029 | Houston | 06/01/35 | $58,274,791.00 | | | | | 06/01/29 | 2191 | 6 years | | | | | | 0809-04-054 | Lufkin | 06/01/27 | $42,800,000.89 | Construction | Roadway | Unassigned | Unassigned | 01/01/32 | -1675 | -5 years | | | Unassigned → Construction / Roadway | | | 0809-05-021 | Lufkin | 06/01/27 | $8,200,000.89 | Construction | Roadway | Unassigned | Unassigned | 01/01/32 | -1675 | -5 years | | | Unassigned → Construction / Roadway | | | 0902-90-376 | Fort Worth | 08/15/31 | $20,017,500.00 | | | Construction | Local Let | 08/15/27 | 1461 | 4 years | | | | | | 0261-02-087 | Dallas | 04/01/32 | $2,264,548.86 | | | Construction | Roadway | 04/05/28 | 1457 | 4 years | | | | | | 0314-01-086 | Fort Worth | 12/05/28 | $979,785.00 | Construction | Roadway | Unassigned | Unassigned | 01/01/32 | -1122 | -3 years | $(953,578.39) | -49% | Unassigned → Construction / Roadway | | | 0314-01-091 | Fort Worth | 12/05/28 | $3,016,004.00 | Construction | Roadway | Unassigned | Unassigned | 01/01/32 | -1122 | -3 years | $(6,253,808.40) | -67% | Unassigned → Construction / Roadway | | | 0902-90-374 | Fort Worth | 10/04/30 | $32,884,620.00 | | | Construction | Local Let | 10/04/27 | 1096 | 3 years | | | | | | 0912-72-845 | Houston | 05/15/31 | $75,920,000.00 | | | Construction | Local Let | 05/15/28 | 1095 | 3 years | | | | | | 2398-01-063 | Abilene | 03/03/27 | $11,607,143.00 | Construction | Bridge | Construction | Bridge | 01/01/30 | -1035 | -3 years | | | | | | 0014-10-069 | Waco | 05/05/27 | $4,500,000.00 | Construction | Roadway | Construction | Roadway | 09/01/29 | -850 | -2 years | | | | | | 1361-03-030 | Abilene | 12/01/26 | $806,245.00 | Construction | Roadway | Construction | Roadway | 12/05/28 | -735 | -2 years | | | | | | 0151-09-151 | Austin | 10/02/29 | $462,962.96 | Construction | Local Let | Construction | Local Let | 10/02/27 | 731 | 2 years | | | | | | 0008-02-078 | Fort Worth | 11/03/26 | $632,887.20 | Construction | Roadway | Construction | Roadway | 10/04/28 | -701 | -2 years | $(378,121.04) | -37% | | | | 0912-72-796 | Houston | 10/27/25 | $2,500,000.00 | Non-Let | Non Roadway | Non-Let | Non Roadway | 08/15/27 | -657 | -2 years | | | | | | 0249-07-072 | Fort Worth | 01/06/27 | $42,784,246.29 | Construction | Bridge | Construction | Bridge | 09/06/28 | -609 | -2 years | | | | | | 1006-02-012 | Houston | 03/07/28 | $6,000,000.00 | Construction | Roadway | Construction | Roadway | 09/01/29 | -543 | -1 year | $5,360,000.00 | 838% | | | | 0451-01-053 | Dallas | 06/01/27 | $117,610,100.89 | Construction | Roadway | Construction | Roadway | 11/01/28 | -519 | -1 year | | | | | | 0912-72-727 | Houston | 07/27/26 | $418,655.00 | Construction | Local Let | Construction | Local Let | 12/15/27 | -506 | -1 year | | | | | | 1127-05-024 | Odessa | 12/01/26 | $1,815,251.00 | Construction | Roadway | Construction | Roadway | 04/05/28 | -491 | -1 year | | | | | | 1718-05-021 | Odessa | 12/01/26 | $2,153,993.53 | Construction | Roadway | Construction | Roadway | 04/05/28 | -491 | -1 year | | | | | | 0014-01-033 | Fort Worth | 11/14/28 | $0.00 | Construction | Local Let | Construction | Local Let | 08/01/27 | 471 | 1 year | | | | | | 2266-02-164 | Fort Worth | 10/31/28 | $4,200,000.00 | Construction | Local Let | Construction | Local Let | 10/11/27 | 386 | 1 year | | | | | | 0358-03-040 | El Paso | 12/05/28 | $2,276,633.93 | Construction | Roadway | Construction | Roadway | 12/01/27 | 370 | 1 year | $(84,319.77) | -4% | | | | 0358-04-019 | El Paso | 12/05/28 | $2,285,513.39 | Construction | Roadway | Construction | Roadway | 12/01/27 | 370 | 1 year | $(84,648.65) | -4% | | | | 1003-01-112 | Houston | 03/03/27 | $722,090.00 | Construction | Roadway | Construction | Roadway | 03/07/28 | -370 | -1 year | | | | | | 0912-00-704 | Houston | 09/15/28 | $1,000,000.00 | Construction | Local Let | Construction | Local Let | 09/15/27 | 366 | 1 year | | | | | | 0263-05-027 | Abilene | 06/01/27 | $2,358,156.80 | Construction | Roadway | Construction | Roadway | 06/01/28 | -366 | -1 year | | | | | | 0318-02-028 | Abilene | 12/01/27 | $1,135,643.00 | Construction | Roadway | Construction | Roadway | 12/01/26 | 365 | 1 year | | | | | | 0104-07-027 | El Paso | 12/01/26 | $1,601,075.00 | Construction | Roadway | Construction | Roadway | 12/01/27 | -365 | -1 year | $59,299.07 | 4% | | | | 0485-01-026 | El Paso | 12/01/26 | $1,919,937.50 | Construction | Roadway | Construction | Roadway | 12/01/27 | -365 | -1 year | $71,108.80 | 4% | | | | 0485-02-018 | El Paso | 12/01/26 | $1,313,086.54 | Construction | Roadway | Construction | Roadway | 12/01/27 | -365 | -1 year | $48,632.84 | 4% | | | | 1012-01-023 | Dallas | 06/02/29 | $4,550,000.00 | Construction | Roadway | Construction | Roadway | 06/03/28 | 364 | 12 months | | | | | | 0103-01-047 | Odessa | 11/02/27 | $1,523,627.80 | Construction | Roadway | Construction | Roadway | 11/03/26 | 364 | 12 months | | | | | | 0906-18-022 | Odessa | 11/02/27 | $938,819.42 | Construction | Roadway | Construction | Roadway | 11/03/26 | 364 | 12 months | | | | | | 0836-03-075 | Waco | 09/04/25 | $540,374.48 | Non-Let | Change Order | Construction | Roadway | 09/02/26 | -363 | -12 months | $(15,445.38) | -3% | Construction / Roadway → Non-Let / Change Order | | | 0065-05-159 | Beaumont | 06/01/27 | $5,500,000.00 | Construction | Roadway | Construction | Roadway | 05/03/28 | -337 | -11 months | | | | | | 0693-03-046 | Abilene | 12/01/26 | $13,000,000.00 | Construction | Roadway | Construction | Roadway | 11/02/27 | -336 | -11 months | | | | | | 3256-01-131 | Houston | 03/03/27 | $2,062,700.00 | Construction | Roadway | Construction | Roadway | 01/05/28 | -308 | -10 months | | | | | | 0918-47-568 | Dallas | 06/02/29 | $8,290,000.00 | Construction | Roadway | Construction | Roadway | 08/04/28 | 302 | 10 months | | | | | | 0131-02-044 | Lubbock | 08/04/27 | $1,622,164.23 | Construction | Roadway | Construction | Roadway | 10/06/26 | 302 | 10 months | | | | | | 0740-02-030 | Lubbock | 08/04/27 | $351,903.99 | Construction | Roadway | Construction | Roadway | 10/06/26 | 302 | 10 months | | | | | | 0079-05-075 | Fort Worth | 03/07/28 | $58,004.10 | Construction | Roadway | Construction | Roadway | 01/01/29 | -300 | -10 months | | | | | | 0079-05-076 | Fort Worth | 03/07/28 | $54,084.10 | Construction | Roadway | Construction | Roadway | 01/01/29 | -300 | -10 months | | | | | | 0080-01-059 | Fort Worth | 03/07/28 | $47,619.35 | Construction | Roadway | Construction | Roadway | 01/01/29 | -300 | -10 months | | | | | | 0259-03-067 | Fort Worth | 03/07/28 | $54,372.42 | Construction | Roadway | Construction | Roadway | 01/01/29 | -300 | -10 months | | | | | | 0912-72-722 | Houston | 08/13/26 | $2,156,235.00 | Construction | Local Let | Construction | Local Let | 05/15/27 | -275 | -9 months | | | | | | 2552-03-071 | El Paso | 04/06/27 | $4,417,014.42 | Construction | Roadway | Construction | Roadway | 01/05/28 | -274 | -9 months | $163,593.12 | 4% | | | | 0177-06-097 | Houston | 03/01/29 | $4,954,065.00 | Construction | Roadway | Construction | Roadway | 06/01/28 | 273 | 9 months | | | | | | 0336-03-082 | Lufkin | 01/06/27 | $2,716,548.07 | Construction | Roadway | Construction | Roadway | 10/05/27 | -272 | -9 months | $48,618.00 | 2% | | | | 0018-04-070 | Laredo | 07/01/27 | $752,697.07 | Construction | Roadway | Construction | Roadway | 03/07/28 | -250 | -8 months | | | | | | 0909-36-205 | Waco | 06/03/28 | $782,407.41 | Construction | Local Let | Construction | Local Let | 10/02/27 | 245 | 8 months | | | | | | 0002-04-039 | El Paso | 05/05/27 | $274,927.69 | Construction | Roadway | Construction | Roadway | 01/05/28 | -245 | -8 months | $10,182.50 | 4% | | | | 0002-07-058 | El Paso | 05/05/27 | $1,688,910.45 | Construction | Roadway | Construction | Roadway | 01/05/28 | -245 | -8 months | | | | | | 0003-02-053 | El Paso | 05/05/27 | $740,740.74 | Construction | Roadway | Construction | Roadway | 01/05/28 | -245 | -8 months | | | | | | 2326-01-033 | El Paso | 05/05/27 | $416,666.67 | Construction | Roadway | Construction | Roadway | 01/05/28 | -245 | -8 months | | | | | | 0190-02-040 | Tyler | 08/01/27 | $200,000.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 12/03/26 | 241 | 8 months | | | | | | 0914-05-194 | Austin | 12/04/26 | $20,620,128.85 | Construction | Local Let | Construction | Local Let | 08/02/27 | -241 | -8 months | | | | | | 0024-08-152 | San Antonio | 09/01/27 | $14,850,000.00 | Construction | Roadway | Construction | Roadway | 01/06/27 | 238 | 8 months | | | | | | 0114-11-101 | Houston | 06/01/27 | $6,000,000.00 | Construction | Roadway | Construction | Roadway | 01/05/28 | -218 | -7 months | | | | | | 0912-00-703 | Houston | 09/01/27 | $500,000.00 | Construction | Rail - Safety | Construction | Rail - Safety | 02/02/27 | 211 | 7 months | | | | | | 0912-72-611 | Houston | 07/08/26 | $2,402,343.00 | Construction | Local Let | Construction | Local Let | 12/09/25 | 211 | 7 months | | | | | | 3510-03-009 | Houston | 04/05/28 | $52,000,000.00 | Construction | Roadway | Construction | Roadway | 11/01/28 | -210 | -7 months | $(52,000,000.00) | -50% | | | | 3510-04-083 | Houston | 04/05/28 | $138,000,000.00 | Construction | Roadway | Construction | Roadway | 11/01/28 | -210 | -7 months | | | | | | 0008-08-079 | Dallas | 06/03/27 | $6,822,500.00 | Construction | Local Let | Construction | Local Let | 12/03/26 | 182 | 6 months | | | | | | 1258-04-070 | Houston | 08/04/27 | $2,100,000.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | 154 | 5 months | | | | | | 0177-01-123 | Lufkin | 07/01/27 | $2,677,773.44 | Construction | Roadway | Construction | Roadway | 02/02/27 | 149 | 5 months | | | | | | 0072-07-077 | San Antonio | 04/06/27 | $3,572,000.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | -148 | -5 months | | | | | | 0619-03-065 | Dallas | 06/03/27 | $805,000.00 | Construction | Roadway | Construction | Roadway | 02/01/27 | 122 | 4 months | | | | | | 0320-05-016 | Waco | 03/03/27 | $1,940,700.00 | Construction | Roadway | Construction | Roadway | 07/01/27 | -120 | -4 months | | | | | | 0320-05-017 | Waco | 03/03/27 | $1,940,700.00 | Construction | Roadway | Construction | Roadway | 07/01/27 | -120 | -4 months | | | | | | 0142-04-056 | San Antonio | 06/01/27 | $10,684,500.00 | Construction | Roadway | Construction | Roadway | 02/02/27 | 119 | 4 months | | | | | | 0142-05-088 | San Antonio | 06/01/27 | $467,278.00 | Construction | Roadway | Construction | Roadway | 02/02/27 | 119 | 4 months | | | | | | 0048-09-033 | Waco | 05/05/27 | $672,672.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | -119 | -4 months | | | | | | 0022-01-034 | Odessa | 10/06/26 | $10,000,000.00 | Construction | Bridge | Construction | Bridge | 02/02/27 | -119 | -4 months | | | | | | 0172-06-108 | Fort Worth | 08/27/26 | $389,873.00 | Construction | Local Let | Construction | Local Let | 05/14/26 | 105 | 3 months | | | | | | 1202-02-015 | Austin | 07/07/26 | $1,340,944.00 | Construction | Local Let | Construction | Local Let | 04/01/26 | 97 | 3 months | | | | | | 0371-01-097 | Yoakum | 07/01/27 | $3,267,476.85 | Construction | Roadway | Construction | Roadway | 10/05/27 | -96 | -3 months | | | | | | 1303-02-012 | Yoakum | 07/01/27 | $3,549,412.00 | Construction | Roadway | Construction | Roadway | 10/05/27 | -96 | -3 months | | | | | | 1794-01-028 | Lufkin | 07/01/27 | $4,138,513.00 | Construction | Roadway | Construction | Roadway | 10/05/27 | -96 | -3 months | | | | | | 1794-01-029 | Lufkin | 07/01/27 | $1,483,715.74 | Construction | Roadway | Construction | Roadway | 10/05/27 | -96 | -3 months | | | | | | 0840-05-023 | Yoakum | 06/01/27 | $2,170,000.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | -92 | -3 months | | | | | | 1875-03-023 | Lufkin | 06/01/27 | $16,643,518.52 | Construction | Roadway | Construction | Roadway | 09/01/27 | -92 | -3 months | | | | | | 0916-28-089 | Corpus Christi | 02/01/27 | $395,150.00 | Construction | Local Let | Construction | Local Let | 11/01/26 | 92 | 3 months | | | | | | 0508-01-411 | Houston | 12/01/27 | $1,640,136.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 91 | 3 months | | | | | | 1310-03-029 | Fort Worth | 04/06/27 | $1,475,733.75 | Construction | Roadway | Construction | Roadway | 01/06/27 | 90 | 3 months | | | | | | 0018-03-066 | Laredo | 03/03/27 | $25,961,538.46 | Construction | Roadway | Construction | Roadway | 06/01/27 | -90 | -3 months | | | | | | 2094-01-074 | Pharr | 07/29/26 | $3,810,405.84 | Construction | Local Let | Construction | Local Let | 05/01/26 | 89 | 3 months | | | | | | 0921-02-565 | Pharr | 07/17/26 | $12,400,000.00 | Construction | Roadway | Construction | Roadway | 05/02/26 | 76 | 2 months | | | | | | 0915-17-083 | San Antonio | 02/15/27 | $141,779.00 | Construction | Local Let | Construction | Local Let | 12/07/26 | 70 | 2 months | | | | | | 0909-36-192 | Waco | 07/07/26 | $3,955,000.00 | Construction | Local Let | Construction | Local Let | 05/02/26 | 66 | 2 months | | | | | | 1186-01-104 | Austin | 12/04/26 | $711,000.00 | Construction | Local Let | Construction | Local Let | 10/01/26 | 64 | 2 months | | | | | | 0055-08-120 | Waco | 04/06/27 | $39,892,364.56 | Construction | Roadway | Construction | Roadway | 02/02/27 | 63 | 2 months | | | | | | 0440-01-047 | Austin | 04/06/27 | $84,423.03 | Construction | Roadway | Construction | Roadway | 02/02/27 | 63 | 2 months | | | | | | 1201-01-016 | Austin | 04/06/27 | $64,740.80 | Construction | Roadway | Construction | Roadway | 02/02/27 | 63 | 2 months | | | | | | 1201-02-031 | Austin | 04/06/27 | $69,599.92 | Construction | Roadway | Construction | Roadway | 02/02/27 | 63 | 2 months | | | | | | 0271-15-106 | Houston | 12/05/28 | $774,390.00 | Construction | Roadway | Construction | Roadway | 10/04/28 | 62 | 2 months | | | | | | 6495-05-001 | Houston | 11/10/26 | $557,000.00 | Maintenance | Routine Maintenance Contract | Maintenance | Routine Maintenance Contract | 09/10/26 | 61 | 2 months | | | | | | 0914-05-257 | Austin | 02/01/27 | $9,426,620.00 | Construction | Local Let | Construction | Local Let | 12/03/26 | 60 | 2 months | | | | | | 0271-15-107 | Houston | 12/01/27 | $2,400,000.00 | Construction | Bridge | Construction | Bridge | 10/05/27 | 57 | 2 months | | | | | | 0912-72-833 | Houston | 07/10/26 | $7,516,164.00 | Transfer | Transfer | Transfer | Transfer | 05/15/26 | 56 | 2 months | | | | | | 0013-10-092 | Fort Worth | 09/04/26 | $449,928.60 | Construction | Local Let | Construction | Local Let | 07/15/26 | 51 | 2 months | | | | | | 0912-72-819 | Houston | 07/29/26 | $17,209,746.00 | Construction | Local Let | Construction | Local Let | 09/15/26 | -48 | -2 months | | | | | | 0178-02-092 | Houston | 07/15/26 | $186,793,464.00 | Alternative Delivery | Design Build | Alternative Delivery | Design Build | 06/04/26 | 41 | 1 month | | | | | | 0178-02-095 | Houston | 07/15/26 | $17,033,792.00 | Alternative Delivery | Design Build | Alternative Delivery | Design Build | 06/04/26 | 41 | 1 month | | | | | | 0178-03-160 | Houston | 07/15/26 | $17,033,792.00 | Alternative Delivery | Design Build | Alternative Delivery | Design Build | 06/04/26 | 41 | 1 month | | | | | | 3510-01-001 | Houston | 07/15/26 | $816,785,287.00 | Alternative Delivery | Design Build | Alternative Delivery | Design Build | 06/04/26 | 41 | 1 month | | | | | | 3510-02-001 | Houston | 07/15/26 | $785,799,942.00 | Alternative Delivery | Design Build | Alternative Delivery | Design Build | 06/04/26 | 41 | 1 month | | | | | | 3510-02-003 | Houston | 07/15/26 | $131,212,051.00 | Alternative Delivery | Design Build | Alternative Delivery | Design Build | 06/04/26 | 41 | 1 month | | | | | | 0017-08-123 | Laredo | 09/06/28 | $100,000.00 | Construction | Bridge | Construction | Bridge | 08/02/28 | 35 | 1 month | | | | | | 0299-14-039 | Laredo | 09/06/28 | $85,000.00 | Construction | Bridge | Construction | Bridge | 08/02/28 | 35 | 1 month | | | | | | 0178-04-008 | Houston | 08/02/28 | $1,190,482.00 | Construction | Roadway | Construction | Roadway | 09/06/28 | -35 | -1 month | | | | | | 0178-03-162 | Houston | 12/05/28 | $296,360.00 | Construction | Roadway | Construction | Roadway | 11/01/28 | 34 | 1 month | | | | | | 0271-16-172 | Houston | 12/05/28 | $1,265,799.00 | Construction | Roadway | Construction | Roadway | 11/01/28 | 34 | 1 month | | | | | | 0017-03-074 | San Antonio | 03/07/28 | $10,627,384.00 | Construction | Roadway | Construction | Roadway | 02/02/28 | 34 | 1 month | | | | | | 0143-01-070 | San Antonio | 03/07/28 | $5,943,716.00 | Construction | Roadway | Construction | Roadway | 02/02/28 | 34 | 1 month | | | | | | 0192-02-069 | Houston | 10/05/27 | $474,554.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 34 | 1 month | | | | | | 1316-01-068 | Bryan | 07/01/27 | $11,000,000.00 | Construction | Roadway | Construction | Roadway | 08/04/27 | -34 | -1 month | | | | | | 1316-01-080 | Bryan | 07/01/27 | $13,000,000.00 | Construction | Roadway | Construction | Roadway | 08/04/27 | -34 | -1 month | | | | | | 0177-11-165 | Houston | 04/06/27 | $750,873.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | 34 | 1 month | | | | | | 0500-03-654 | Houston | 04/06/27 | $258,965.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | 34 | 1 month | | | | | | 0151-09-152 | Austin | 10/05/26 | $292,293.27 | Construction | Local Let | Construction | Local Let | 09/04/26 | 31 | 1 month | | | | | | 1003-01-113 | Houston | 10/04/28 | $447,805.00 | Construction | Roadway | Construction | Roadway | 09/06/28 | 28 | 28 days | | | | | | 1524-01-090 | Houston | 10/04/28 | $441,911.00 | Construction | Roadway | Construction | Roadway | 09/06/28 | 28 | 28 days | | | | | | 0980-02-020 | Houston | 08/04/27 | $8,353,888.19 | Construction | Roadway | Construction | Roadway | 09/01/27 | -28 | -28 days | | | | | | 0196-03-297 | Dallas | 07/10/26 | $4,000,000.00 | Transfer | Transfer | Transfer | Transfer | 06/12/26 | 28 | 28 days | | | | | | 0192-03-023 | Houston | 12/05/28 | $448,573.00 | Construction | Roadway | Construction | Roadway | 01/01/29 | -27 | -27 days | | | | | | 0081-03-069 | Dallas | 07/16/26 | $620,464.93 | Construction | Local Let | Construction | Local Let | 08/02/26 | -17 | -17 days | | | | | | 0918-24-315 | Dallas | 08/01/28 | $1,296,500.00 | Transfer | Transfer | Transfer | Transfer | 08/04/28 | -3 | -3 days | | | | | --- ## Project Type & Subtype Changes Overall, the project type and subtype mix remains largely stable with a slight shift, as roadway projects now comprise 77.9% of the active pipeline project count. There were 11 type/subtype changes observed, highlighting minimal churn in classifications. Furthermore, 7 projects achieved newly assigned classifications during this period. | Subtype | Jul 3 | Aug 3 | Δ (pp, n) | | --- | --- | --- | --- | | Roadway | 78.2% (4,370) | 77.9% (4,404) | -0.2 (+34) | | Bridge | 13.8% (770) | 13.8% (781) | +0.0 (+11) | | Local Let | 3.3% (183) | 3.2% (179) | -0.1 (-4) | | Non Roadway | 2.0% (110) | 2.0% (113) | +0.0 (+3) | | Rail - Safety | 1.1% (64) | 1.1% (64) | -0.0 (+0) | | CSJ | District | Est. Letting Date | Project Estimate | Current Type | Current Subtype | Type/Subtype Δ | Prev. Type | Prev. Subtype | Prev. Cost | Prev. Date | Letting Δ (days) | Letting Date Δ | Cost Δ | %Cost Δ | Lifecycle | | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | | 0836-03-075 | Waco | 09/04/25 | $540,374.48 | Non-Let | Change Order | Construction / Roadway → Non-Let / Change Order | Construction | Roadway | $555,819.86 | 09/02/26 | -363 | -12 months | $(15,445.38) | -3% | | | 0598-02-093 | Houston | 07/30/26 | $216,068,000.00 | Non-Let | Roadway | Unassigned → Non-Let / Roadway | Unassigned | Unassigned | $190,000,000.00 | 08/01/35 | -3289 | -9 years | $26,068,000.00 | 14% | | | 2717-01-032 | Pharr | 08/31/26 | $0.00 | Non-Let | Non Roadway | Non-Let / Local → Non-Let / Non Roadway | Non-Let | Local | $0.00 | 08/31/26 | 0 | | | | | | 2032-01-012 | Abilene | 01/01/27 | $1,854,893.24 | Non-Let | Local | Non-Let / Roadway → Non-Let / Local | Non-Let | Roadway | $1,854,893.24 | 01/01/27 | 0 | | | | | | 0809-04-054 | Lufkin | 06/01/27 | $42,800,000.89 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $42,800,000.89 | 01/01/32 | -1675 | -5 years | | | | | 0809-05-021 | Lufkin | 06/01/27 | $8,200,000.89 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $8,200,000.89 | 01/01/32 | -1675 | -5 years | | | | | 0422-05-011 | Fort Worth | 07/01/27 | $13,592,874.18 | Construction | Bridge | Unassigned → Construction / Bridge | Unassigned | Unassigned | $13,592,874.18 | 01/01/35 | -2741 | -8 years | | | | | 2920-02-005 | Austin | 07/01/27 | $2,083,536.54 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $2,166,877.78 | 02/01/38 | -3868 | -11 years | $(83,341.24) | -4% | | | 0275-13-075 | Childress | 06/01/28 | $4,100,000.00 | Construction | Roadway | Construction / Bridge → Construction / Roadway | Construction | Bridge | $4,100,000.00 | 06/01/28 | 0 | | | | | | 0314-01-086 | Fort Worth | 12/05/28 | $979,785.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $1,933,363.39 | 01/01/32 | -1122 | -3 years | $(953,578.39) | -49% | | | 0314-01-091 | Fort Worth | 12/05/28 | $3,016,004.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $9,269,812.40 | 01/01/32 | -1122 | -3 years | $(6,253,808.40) | -67% | | --- ## Cost Changes The active pipeline value has increased from $31.35B to $33.71B. Cost movements reveal that local let projects faced a decline of -$187.38M, while roadway projects saw an increase of +$284.11M. The largest net cost increase was reported in the Houston district at +$2.19B, while Fort Worth recorded a decrease of -$17.43M. This indicates a trend of repricing within the existing pipeline rather than significant structural changes. | CSJ | District | Est. Letting Date | Project Estimate | Current Type | Current Subtype | Prev. Type | Prev. Subtype | Prev. Cost | Cost Δ | %Cost Δ | Letting Δ (days) | Letting Date Δ | Type/Subtype Δ | Lifecycle | | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | | 3586-02-009 | Laredo | 07/01/27 | $20,000,000.00 | Construction | Roadway | Construction | Roadway | $1.00 | $19,999,999.00 | 1999999900% | 0 | | | | | 1042-02-029 | San Antonio | 09/01/27 | $8,023,990.00 | Construction | Roadway | Construction | Roadway | $10.00 | $8,023,980.00 | 80239800% | 0 | | | | | 1042-03-017 | San Antonio | 09/01/27 | $3,106,799.00 | Construction | Roadway | Construction | Roadway | $10.00 | $3,106,789.00 | 31067890% | 0 | | | | | 0049-14-015 | Bryan | 10/06/26 | $2,893,248.75 | Construction | Roadway | Construction | Roadway | $62,315.00 | $2,830,933.75 | 4543% | 0 | | | | | 0648-03-079 | Bryan | 10/06/26 | $30,081.50 | Construction | Roadway | Construction | Roadway | $1,597.00 | $28,484.50 | 1784% | 0 | | | | | 0017-13-013 | San Antonio | 10/06/26 | $776,325.10 | Construction | Roadway | Construction | Roadway | $76,000.00 | $700,325.10 | 921% | 0 | | | | | 1006-02-012 | Houston | 03/07/28 | $6,000,000.00 | Construction | Roadway | Construction | Roadway | $640,000.00 | $5,360,000.00 | 838% | -543 | -1 year | | | | 0007-04-143 | Brownwood | 01/05/28 | $350,000.00 | Construction | Bridge | Construction | Bridge | $75,000.00 | $275,000.00 | 367% | 0 | | | | | 0231-01-070 | Brownwood | 01/05/28 | $680,000.00 | Construction | Bridge | Construction | Bridge | $175,000.00 | $505,000.00 | 289% | 0 | | | | | 0426-02-023 | Bryan | 10/06/26 | $247,877.40 | Construction | Roadway | Construction | Roadway | $85,136.00 | $162,741.40 | 191% | 0 | | | | | 2377-01-051 | Brownwood | 01/06/27 | $2,300,000.00 | Construction | Roadway | Construction | Roadway | $800,000.00 | $1,500,000.00 | 188% | 0 | | | | | 1412-03-045 | Yoakum | 06/01/28 | $695,000.00 | Construction | Roadway | Construction | Roadway | $250,000.00 | $445,000.00 | 178% | 0 | | | | | 0578-02-050 | Bryan | 10/06/26 | $153,975.90 | Construction | Roadway | Construction | Roadway | $65,836.00 | $88,139.90 | 134% | 0 | | | | | 0291-01-053 | Austin | 04/06/27 | $6,462,182.69 | Construction | Roadway | Construction | Roadway | $2,935,085.58 | $3,527,097.11 | 120% | 0 | | | | | 1547-01-052 | San Antonio | 10/06/26 | $1,045,537.95 | Construction | Roadway | Construction | Roadway | $484,326.00 | $561,211.95 | 116% | 0 | | | | | 0636-01-042 | Brownwood | 01/06/27 | $520,000.00 | Construction | Roadway | Construction | Roadway | $250,000.00 | $270,000.00 | 108% | 0 | | | | | 0283-04-038 | Wichita Falls | 11/01/28 | $1,156,308.00 | Construction | Roadway | Construction | Roadway | $571,016.75 | $585,291.25 | 103% | 0 | | | | | 2705-01-017 | Bryan | 10/06/26 | $162,910.80 | Construction | Roadway | Construction | Roadway | $82,460.00 | $80,450.80 | 98% | 0 | | | | | 3544-06-003 | San Antonio | 10/06/26 | $32,384.21 | Construction | Roadway | Construction | Roadway | $16,400.00 | $15,984.21 | 97% | 0 | | | | | 2705-01-016 | Bryan | 10/06/26 | $111,242.80 | Construction | Roadway | Construction | Roadway | $56,399.00 | $54,843.80 | 97% | 0 | | | | | 1015-01-082 | Dallas | 10/06/26 | $339,360.27 | Construction | Roadway | Construction | Roadway | $174,831.75 | $164,528.52 | 94% | 0 | | | | | 2827-01-013 | Bryan | 10/06/26 | $200,579.10 | Construction | Roadway | Construction | Roadway | $103,660.00 | $96,919.10 | 94% | 0 | | | | | 2144-01-016 | Bryan | 10/06/26 | $297,416.25 | Construction | Roadway | Construction | Roadway | $155,859.00 | $141,557.25 | 91% | 0 | | | | | 0098-05-038 | Childress | 05/05/27 | $100,000.00 | Construction | Bridge | Construction | Bridge | $1,000,000.00 | $(900,000.00) | -90% | 0 | | | | | 0254-01-148 | Corpus Christi | 10/06/26 | $570,630.80 | Construction | Roadway | Construction | Roadway | $303,398.00 | $267,232.80 | 88% | 0 | | | | | 0382-03-037 | Waco | 09/01/27 | $146,981.48 | Construction | Roadway | Construction | Roadway | $1,118,361.11 | $(971,379.63) | -87% | 0 | | | | | 0057-07-018 | Bryan | 10/06/26 | $187,628.30 | Construction | Roadway | Construction | Roadway | $101,743.00 | $85,885.30 | 84% | 0 | | | | | 1729-01-020 | San Antonio | 10/06/26 | $631,366.19 | Construction | Roadway | Construction | Roadway | $343,000.00 | $288,366.19 | 84% | 0 | | | | | 0057-03-049 | Bryan | 10/06/26 | $13,184.20 | Construction | Roadway | Construction | Roadway | $69,987.46 | $(56,803.26) | -81% | 0 | | | | | 0902-90-377 | Fort Worth | 01/15/28 | $449,823.18 | Construction | Local Let | Construction | Local Let | $1,965,873.87 | $(1,516,050.69) | -77% | 0 | | | | | 1092-01-025 | Dallas | 10/06/26 | $171,416.88 | Construction | Roadway | Construction | Roadway | $653,165.42 | $(481,748.54) | -74% | 0 | | | | | 0675-07-107 | Bryan | 10/06/26 | $492,511.55 | Construction | Roadway | Construction | Roadway | $285,893.00 | $206,618.55 | 72% | 0 | | | | | 3024-01-008 | Corpus Christi | 10/06/26 | $102,687.00 | Construction | Roadway | Construction | Roadway | $367,678.00 | $(264,991.00) | -72% | 0 | | | | | 0598-04-030 | Houston | 02/02/27 | $1,276,256.10 | Construction | Roadway | Construction | Roadway | $4,200,000.00 | $(2,923,743.90) | -70% | 0 | | | | | 0853-01-018 | San Antonio | 10/06/26 | $664,644.20 | Construction | Roadway | Construction | Roadway | $395,009.00 | $269,635.20 | 68% | 0 | | | | | 0314-01-091 | Fort Worth | 12/05/28 | $3,016,004.00 | Construction | Roadway | Unassigned | Unassigned | $9,269,812.40 | $(6,253,808.40) | -67% | -1122 | -3 years | Unassigned → Construction / Roadway | | | 0598-03-062 | Houston | 02/02/27 | $7,526,529.40 | Construction | Roadway | Construction | Roadway | $4,600,000.00 | $2,926,529.40 | 64% | 0 | | | | | 1500-02-015 | Laredo | 10/06/26 | $141,740.76 | Construction | Roadway | Construction | Roadway | $86,820.00 | $54,920.76 | 63% | 0 | | | | | 1039-03-022 | Brownwood | 01/05/28 | $285,000.00 | Construction | Bridge | Construction | Bridge | $175,000.00 | $110,000.00 | 63% | 0 | | | | | 0289-03-029 | Brownwood | 01/05/28 | $300,000.00 | Construction | Bridge | Construction | Bridge | $185,000.00 | $115,000.00 | 62% | 0 | | | | | 0987-03-017 | Austin | 11/03/26 | $123,537.07 | Construction | Roadway | Construction | Roadway | $324,482.69 | $(200,945.62) | -62% | 0 | | | | | 0073-13-015 | San Antonio | 10/06/26 | $945,061.57 | Construction | Roadway | Construction | Roadway | $593,223.00 | $351,838.57 | 59% | 0 | | | | | 0143-12-006 | San Antonio | 10/06/26 | $46,965.57 | Construction | Roadway | Construction | Roadway | $109,675.00 | $(62,709.43) | -57% | 0 | | | | | 1500-01-027 | San Antonio | 10/06/26 | $417,065.52 | Construction | Roadway | Construction | Roadway | $265,500.00 | $151,565.52 | 57% | 0 | | | | | 2238-01-015 | Bryan | 10/06/26 | $87,034.55 | Construction | Roadway | Construction | Roadway | $201,402.00 | $(114,367.45) | -57% | 0 | | | | | 3024-02-009 | Corpus Christi | 10/06/26 | $172,199.20 | Construction | Roadway | Construction | Roadway | $367,678.00 | $(195,478.80) | -53% | 0 | | | | | 0281-01-038 | Dallas | 10/06/26 | $523,382.75 | Construction | Roadway | Construction | Roadway | $1,090,833.41 | $(567,450.66) | -52% | 0 | | | | | 0816-03-026 | Dallas | 10/06/26 | $223,461.31 | Construction | Roadway | Construction | Roadway | $459,601.38 | $(236,140.07) | -51% | 0 | | | | | 0442-03-050 | Dallas | 12/01/26 | $491,217.88 | Construction | Roadway | Construction | Roadway | $997,198.66 | $(505,980.78) | -51% | 0 | | | | | 0279-02-052 | Paris | 04/01/29 | $100,000.00 | Construction | Bridge | Construction | Bridge | $200,000.00 | $(100,000.00) | -50% | 0 | | | | | 3510-03-009 | Houston | 04/05/28 | $52,000,000.00 | Construction | Roadway | Construction | Roadway | $104,000,000.00 | $(52,000,000.00) | -50% | -210 | -7 months | | | | 0050-07-016 | Bryan | 10/06/26 | $84,161.25 | Construction | Roadway | Construction | Roadway | $166,780.00 | $(82,618.75) | -50% | 0 | | | | | 0314-01-086 | Fort Worth | 12/05/28 | $979,785.00 | Construction | Roadway | Unassigned | Unassigned | $1,933,363.39 | $(953,578.39) | -49% | -1122 | -3 years | Unassigned → Construction / Roadway | | | 1500-03-012 | San Antonio | 10/06/26 | $72,696.83 | Construction | Roadway | Construction | Roadway | $49,000.00 | $23,696.83 | 48% | 0 | | | | | 0280-02-046 | Dallas | 10/06/26 | $1,078,383.96 | Construction | Roadway | Construction | Roadway | $2,076,918.76 | $(998,534.80) | -48% | 0 | | | | | 0816-03-025 | Dallas | 10/06/26 | $124,183.31 | Construction | Roadway | Construction | Roadway | $235,702.32 | $(111,519.01) | -47% | 0 | | | | | 0029-02-060 | San Antonio | 10/06/26 | $715,223.49 | Construction | Roadway | Construction | Roadway | $1,334,390.00 | $(619,166.51) | -46% | 0 | | | | | 0142-02-030 | San Antonio | 10/06/26 | $271,048.91 | Construction | Roadway | Construction | Roadway | $498,436.00 | $(227,387.09) | -46% | 0 | | | | | 2358-01-008 | Corpus Christi | 10/06/26 | $189,423.80 | Construction | Roadway | Construction | Roadway | $130,432.00 | $58,991.80 | 45% | 0 | | | | | 2238-02-027 | Bryan | 10/06/26 | $578,915.00 | Construction | Roadway | Construction | Roadway | $399,656.00 | $179,259.00 | 45% | 0 | | | | | 0024-04-073 | San Antonio | 10/06/26 | $932,553.39 | Construction | Roadway | Construction | Roadway | $1,684,578.00 | $(752,024.61) | -45% | 0 | | | | | 0792-04-051 | San Antonio | 10/06/26 | $283,721.13 | Construction | Roadway | Construction | Roadway | $495,000.00 | $(211,278.87) | -43% | 0 | | | | | 1012-02-045 | Dallas | 10/06/26 | $68,826.14 | Construction | Roadway | Construction | Roadway | $119,463.46 | $(50,637.32) | -42% | 0 | | | | | 1062-02-030 | Houston | 01/06/27 | $710,353.56 | Construction | Roadway | Construction | Roadway | $1,198,253.00 | $(487,899.44) | -41% | 0 | | | | | 1318-01-022 | Dallas | 10/06/26 | $505,148.53 | Construction | Roadway | Construction | Roadway | $851,285.89 | $(346,137.36) | -41% | 0 | | | | | 0526-01-023 | San Antonio | 10/06/26 | $53,938.94 | Construction | Roadway | Construction | Roadway | $90,851.00 | $(36,912.06) | -41% | 0 | | | | | 0648-03-081 | Bryan | 10/06/26 | $558,497.65 | Construction | Roadway | Construction | Roadway | $397,704.38 | $160,793.27 | 40% | 0 | | | | | 0320-03-104 | Austin | 10/06/26 | $73,542.88 | Construction | Bridge | Construction | Bridge | $123,388.60 | $(49,845.72) | -40% | 0 | | | | | 0054-05-029 | Brownwood | 01/06/27 | $280,000.00 | Construction | Roadway | Construction | Roadway | $200,000.00 | $80,000.00 | 40% | 0 | | | | | 1739-03-012 | San Antonio | 10/06/26 | $666,184.52 | Construction | Roadway | Construction | Roadway | $477,750.00 | $188,434.52 | 39% | 0 | | | | | 0067-17-039 | Amarillo | 10/06/26 | $880,473.95 | Construction | Bridge | Construction | Bridge | $1,450,000.00 | $(569,526.05) | -39% | 0 | | | | | 1559-01-027 | Corpus Christi | 10/06/26 | $272,289.40 | Construction | Roadway | Construction | Roadway | $443,420.00 | $(171,130.60) | -39% | 0 | | | | | 0249-02-026 | Wichita Falls | 10/06/26 | $2,929,721.75 | Construction | Roadway | Construction | Roadway | $4,723,750.00 | $(1,794,028.25) | -38% | 0 | | | | | 0116-04-113 | Bryan | 10/06/26 | $1,673,290.05 | Construction | Roadway | Construction | Roadway | $1,214,668.00 | $458,622.05 | 38% | 0 | | | | | 0168-08-076 | Amarillo | 10/06/26 | $841,693.75 | Construction | Bridge | Construction | Bridge | $1,350,000.00 | $(508,306.25) | -38% | 0 | | | | | 0048-04-111 | Dallas | 12/01/26 | $1,409,093.91 | Construction | Roadway | Construction | Roadway | $1,025,160.00 | $383,933.91 | 37% | 0 | | | | | 0008-02-078 | Fort Worth | 11/03/26 | $632,887.20 | Construction | Roadway | Construction | Roadway | $1,011,008.24 | $(378,121.04) | -37% | -701 | -2 years | | | | 2175-03-011 | San Antonio | 10/06/26 | $28,031.32 | Construction | Roadway | Construction | Roadway | $44,650.00 | $(16,618.68) | -37% | 0 | | | | | 0048-08-060 | Dallas | 12/01/26 | $3,033,308.84 | Construction | Roadway | Construction | Roadway | $2,210,949.60 | $822,359.24 | 37% | 0 | | | | | 3426-01-005 | Dallas | 10/06/26 | $275,353.38 | Construction | Roadway | Construction | Roadway | $433,918.76 | $(158,565.38) | -37% | 0 | | | | | 0426-01-014 | Bryan | 10/06/26 | $472,171.15 | Construction | Roadway | Construction | Roadway | $738,017.00 | $(265,845.85) | -36% | 0 | | | | | 2512-03-010 | Dallas | 10/06/26 | $341,389.85 | Construction | Roadway | Construction | Roadway | $529,485.68 | $(188,095.83) | -36% | 0 | | | | | 0299-14-037 | Laredo | 03/01/29 | $1,559,186.61 | Construction | Roadway | Construction | Roadway | $1,151,274.60 | $407,912.01 | 35% | 0 | | | | | 0045-21-024 | Paris | 01/06/27 | $2,989,000.00 | Construction | Bridge | Construction | Bridge | $2,207,000.00 | $782,000.00 | 35% | 0 | | | | | 2556-02-013 | San Antonio | 10/06/26 | $224,928.25 | Construction | Roadway | Construction | Roadway | $347,521.00 | $(122,592.75) | -35% | 0 | | | | | 0037-01-046 | San Antonio | 10/06/26 | $432,668.31 | Construction | Roadway | Construction | Roadway | $666,418.00 | $(233,749.69) | -35% | 0 | | | | | 0025-03-108 | San Antonio | 10/06/26 | $98,608.50 | Construction | Roadway | Construction | Roadway | $150,609.00 | $(52,000.50) | -35% | 0 | | | | | 0150-05-053 | Austin | 10/04/28 | $544,642.86 | Construction | Bridge | Construction | Bridge | $830,357.14 | $(285,714.28) | -34% | 0 | | | | | 0517-01-050 | San Antonio | 10/06/26 | $444,729.61 | Construction | Roadway | Construction | Roadway | $331,066.00 | $113,663.61 | 34% | 0 | | | | | 0855-04-033 | San Antonio | 10/06/26 | $540,343.81 | Construction | Roadway | Construction | Roadway | $822,800.00 | $(282,456.19) | -34% | 0 | | | | | 0873-01-030 | Pharr | 10/06/26 | $19,356.00 | Construction | Roadway | Construction | Roadway | $29,450.00 | $(10,094.00) | -34% | 0 | | | | | 1396-01-016 | Dallas | 10/06/26 | $381,875.89 | Construction | Roadway | Construction | Roadway | $570,739.99 | $(188,864.10) | -33% | 0 | | | | | 1564-01-037 | Bryan | 10/06/26 | $54,246.90 | Construction | Roadway | Construction | Roadway | $40,759.00 | $13,487.90 | 33% | 0 | | | | | 0328-01-016 | San Antonio | 10/06/26 | $516,078.74 | Construction | Roadway | Construction | Roadway | $387,945.00 | $128,133.74 | 33% | 0 | | | | | 0179-04-112 | Yoakum | 10/04/28 | $800,000.00 | Construction | Roadway | Construction | Roadway | $602,000.00 | $198,000.00 | 33% | 0 | | | | | 2525-01-020 | Yoakum | 10/04/28 | $800,000.00 | Construction | Roadway | Construction | Roadway | $602,000.00 | $198,000.00 | 33% | 0 | | | | | 0366-01-080 | Austin | 11/03/26 | $396,158.18 | Construction | Roadway | Construction | Roadway | $589,819.23 | $(193,661.05) | -33% | 0 | | | | | 0285-03-066 | Austin | 11/03/26 | $966,889.00 | Construction | Non Roadway | Construction | Non Roadway | $1,439,357.92 | $(472,468.92) | -33% | 0 | | | | | 0921-02-528 | Pharr | 10/06/26 | $84,487.25 | Construction | Roadway | Construction | Roadway | $63,969.00 | $20,518.25 | 32% | 0 | | | | | 0067-17-040 | Amarillo | 10/06/26 | $850,003.00 | Construction | Bridge | Construction | Bridge | $1,250,000.00 | $(399,997.00) | -32% | 0 | | | | | 2815-01-010 | Dallas | 10/06/26 | $222,479.71 | Construction | Roadway | Construction | Roadway | $326,937.80 | $(104,458.09) | -32% | 0 | | | | | 2850-01-019 | Bryan | 10/06/26 | $378,523.00 | Construction | Roadway | Construction | Roadway | $556,174.08 | $(177,651.08) | -32% | 0 | | | | | 0697-03-034 | Dallas | 10/06/26 | $272,745.38 | Construction | Roadway | Construction | Roadway | $399,567.90 | $(126,822.52) | -32% | 0 | | | | | 0173-04-062 | Dallas | 10/06/26 | $69,047.73 | Construction | Roadway | Construction | Roadway | $52,898.66 | $16,149.07 | 31% | 0 | | | | | 1974-01-013 | Dallas | 10/06/26 | $285,309.49 | Construction | Roadway | Construction | Roadway | $410,380.52 | $(125,071.03) | -30% | 0 | | | | | 2343-01-040 | Corpus Christi | 10/06/26 | $253,068.80 | Construction | Roadway | Construction | Roadway | $362,659.00 | $(109,590.20) | -30% | 0 | | | | | 3544-05-003 | San Antonio | 10/06/26 | $81,874.56 | Construction | Roadway | Construction | Roadway | $62,963.00 | $18,911.56 | 30% | 0 | | | | | 3544-04-017 | San Antonio | 10/06/26 | $151,480.32 | Construction | Roadway | Construction | Roadway | $116,575.00 | $34,905.32 | 30% | 0 | | | | | 0162-09-043 | Dallas | 10/06/26 | $964,677.94 | Construction | Roadway | Construction | Roadway | $1,376,529.70 | $(411,851.76) | -30% | 0 | | | | | 0792-03-011 | San Antonio | 10/06/26 | $87,967.48 | Construction | Roadway | Construction | Roadway | $125,000.00 | $(37,032.52) | -30% | 0 | | | | | 0204-01-075 | Austin | 10/06/26 | $48,395.78 | Construction | Bridge | Construction | Bridge | $68,546.50 | $(20,150.72) | -29% | 0 | | | | | 3075-02-014 | Corpus Christi | 10/06/26 | $14,729.30 | Construction | Roadway | Construction | Roadway | $11,415.00 | $3,314.30 | 29% | 0 | | | | | 0366-09-034 | San Antonio | 10/06/26 | $296,558.53 | Construction | Roadway | Construction | Roadway | $417,500.00 | $(120,941.47) | -29% | 0 | | | | | 0299-04-088 | Laredo | 03/01/29 | $3,870,348.21 | Construction | Roadway | Construction | Roadway | $3,004,045.00 | $866,303.21 | 29% | 0 | | | | | 0092-05-058 | Dallas | 10/06/26 | $3,246,330.95 | Construction | Roadway | Construction | Roadway | $4,553,198.71 | $(1,306,867.76) | -29% | 0 | | | | | 0321-01-056 | Austin | 10/06/26 | $485,258.55 | Construction | Bridge | Construction | Bridge | $679,854.80 | $(194,596.25) | -29% | 0 | | | | | 3279-01-009 | Corpus Christi | 10/06/26 | $380,814.20 | Construction | Roadway | Construction | Roadway | $532,557.00 | $(151,742.80) | -28% | 0 | | | | | 2452-05-005 | San Antonio | 10/06/26 | $34,493.92 | Construction | Roadway | Construction | Roadway | $48,200.00 | $(13,706.08) | -28% | 0 | | | | | 1015-02-017 | Dallas | 10/06/26 | $165,018.52 | Construction | Roadway | Construction | Roadway | $229,809.76 | $(64,791.24) | -28% | 0 | | | | | 0483-02-022 | San Antonio | 10/06/26 | $691,761.64 | Construction | Roadway | Construction | Roadway | $963,132.00 | $(271,370.36) | -28% | 0 | | | | | 0675-07-113 | Bryan | 10/06/26 | $86,385.15 | Construction | Roadway | Construction | Roadway | $67,400.00 | $18,985.15 | 28% | 0 | | | | | 0054-06-109 | Brownwood | 01/06/27 | $2,050,000.00 | Construction | Roadway | Construction | Roadway | $1,600,000.00 | $450,000.00 | 28% | 0 | | | | | 0057-02-040 | Bryan | 10/06/26 | $83,548.75 | Construction | Roadway | Construction | Roadway | $115,936.13 | $(32,387.38) | -28% | 0 | | | | | 0483-05-011 | San Antonio | 10/06/26 | $5,515.85 | Construction | Roadway | Construction | Roadway | $4,317.00 | $1,198.85 | 28% | 0 | | | | | 0122-01-047 | Dallas | 10/06/26 | $706,835.31 | Construction | Roadway | Construction | Roadway | $978,043.07 | $(271,207.76) | -28% | 0 | | | | | 1209-02-023 | Corpus Christi | 10/06/26 | $248,688.60 | Construction | Roadway | Construction | Roadway | $340,501.00 | $(91,812.40) | -27% | 0 | | | | | 0574-01-034 | Dallas | 10/06/26 | $496,905.09 | Construction | Roadway | Construction | Roadway | $676,908.40 | $(180,003.31) | -27% | 0 | | | | | 3330-01-011 | Waco | 11/03/26 | $302,164.80 | Construction | Roadway | Construction | Roadway | $411,155.00 | $(108,990.20) | -27% | 0 | | | | | 0349-01-033 | Corpus Christi | 10/06/26 | $610,807.80 | Construction | Roadway | Construction | Roadway | $829,681.00 | $(218,873.20) | -26% | 0 | | | | | 0114-01-070 | Austin | 11/03/26 | $439,821.46 | Construction | Non Roadway | Construction | Non Roadway | $596,153.85 | $(156,332.39) | -26% | 0 | | | | | 1899-02-023 | San Antonio | 10/06/26 | $363,137.27 | Construction | Roadway | Construction | Roadway | $489,943.00 | $(126,805.73) | -26% | 0 | | | | | 1471-02-011 | Corpus Christi | 10/06/26 | $271,948.60 | Construction | Roadway | Construction | Roadway | $364,606.00 | $(92,657.40) | -25% | 0 | | | | | 0197-05-066 | Dallas | 10/06/26 | $32,650.38 | Construction | Roadway | Construction | Roadway | $43,746.32 | $(11,095.94) | -25% | 0 | | | | | 0280-04-009 | Dallas | 10/06/26 | $70,773.60 | Construction | Roadway | Construction | Roadway | $94,741.58 | $(23,967.98) | -25% | 0 | | | | | 0992-01-023 | Corpus Christi | 10/06/26 | $473,580.60 | Construction | Roadway | Construction | Roadway | $633,621.00 | $(160,040.40) | -25% | 0 | | | | | 0092-03-064 | Dallas | 10/06/26 | $4,017,336.55 | Construction | Roadway | Construction | Roadway | $5,342,838.96 | $(1,325,502.41) | -25% | 0 | | | | | 0067-01-088 | Amarillo | 10/06/26 | $1,223,017.95 | Construction | Bridge | Construction | Bridge | $1,620,000.00 | $(396,982.05) | -25% | 0 | | | | | 1052-01-087 | Corpus Christi | 10/06/26 | $241,756.40 | Construction | Roadway | Construction | Roadway | $317,948.00 | $(76,191.60) | -24% | 0 | | | | | 0857-01-040 | San Antonio | 10/06/26 | $151,702.19 | Construction | Roadway | Construction | Roadway | $122,600.00 | $29,102.19 | 24% | 0 | | | | | 1209-01-035 | Corpus Christi | 10/06/26 | $285,214.90 | Construction | Roadway | Construction | Roadway | $373,805.00 | $(88,590.10) | -24% | 0 | | | | | 0016-03-125 | Austin | 11/03/26 | $2,827,670.53 | Construction | Roadway | Construction | Roadway | $3,696,666.35 | $(868,995.82) | -24% | 0 | | | | | 0738-03-036 | Corpus Christi | 10/06/26 | $270,192.60 | Construction | Roadway | Construction | Roadway | $352,457.00 | $(82,264.40) | -23% | 0 | | | | | 0092-02-145 | Dallas | 10/06/26 | $981,366.75 | Construction | Roadway | Construction | Roadway | $1,278,476.75 | $(297,110.00) | -23% | 0 | | | | | 0051-09-128 | Houston | 08/05/26 | $2,897,520.60 | Construction | Roadway | Construction | Roadway | $3,767,287.50 | $(869,766.90) | -23% | 0 | | | | | 0280-03-005 | Dallas | 10/06/26 | $167,428.56 | Construction | Roadway | Construction | Roadway | $217,333.66 | $(49,905.10) | -23% | 0 | | | | | 0181-01-071 | Abilene | 09/02/26 | $331,750.00 | Construction | Roadway | Construction | Roadway | $429,762.50 | $(98,012.50) | -23% | 0 | | | | | 0441-09-054 | Odessa | 08/05/26 | $21,197,037.88 | Construction | Roadway | Construction | Roadway | $17,312,839.88 | $3,884,198.00 | 22% | 0 | | | | | 1548-01-018 | San Antonio | 10/06/26 | $348,599.39 | Construction | Roadway | Construction | Roadway | $449,250.00 | $(100,650.61) | -22% | 0 | | | | | 2255-02-030 | San Antonio | 10/06/26 | $413,907.26 | Construction | Roadway | Construction | Roadway | $339,191.00 | $74,716.26 | 22% | 0 | | | | | 2948-02-015 | Bryan | 10/06/26 | $406,879.55 | Construction | Roadway | Construction | Roadway | $333,793.00 | $73,086.55 | 22% | 0 | | | | | 0249-03-056 | Wichita Falls | 10/06/26 | $216,523.18 | Construction | Roadway | Construction | Roadway | $276,250.00 | $(59,726.82) | -22% | 0 | | | | | 0506-02-026 | Bryan | 10/06/26 | $322,440.25 | Construction | Roadway | Construction | Roadway | $265,181.00 | $57,259.25 | 22% | 0 | | | | | 0024-02-081 | San Antonio | 10/06/26 | $1,487,182.70 | Construction | Roadway | Construction | Roadway | $1,224,062.00 | $263,120.70 | 22% | 0 | | | | | 1558-02-040 | Corpus Christi | 10/06/26 | $226,727.60 | Construction | Roadway | Construction | Roadway | $288,752.00 | $(62,024.40) | -21% | 0 | | | | | 0643-05-066 | Bryan | 10/06/26 | $773,518.65 | Construction | Roadway | Construction | Roadway | $637,560.00 | $135,958.65 | 21% | 0 | | | | | 3544-07-002 | San Antonio | 10/06/26 | $40,084.08 | Construction | Roadway | Construction | Roadway | $33,074.00 | $7,010.08 | 21% | 0 | | | | | 0215-09-037 | San Antonio | 10/06/26 | $307,386.24 | Construction | Roadway | Construction | Roadway | $385,985.00 | $(78,598.76) | -20% | 0 | | | | | 1899-01-020 | San Antonio | 10/06/26 | $126,868.06 | Construction | Roadway | Construction | Roadway | $159,286.00 | $(32,417.94) | -20% | 0 | | | | | 0068-05-039 | Lubbock | 09/02/26 | $4,420,417.03 | Construction | Roadway | Construction | Roadway | $3,673,081.36 | $747,335.67 | 20% | 0 | | | | | 0050-03-111 | Bryan | 10/06/26 | $216,170.10 | Construction | Roadway | Construction | Roadway | $179,625.60 | $36,544.50 | 20% | 0 | | | | | 0008-07-034 | Fort Worth | 11/03/28 | $4,331,078.00 | Construction | Local Let | Construction | Local Let | $3,604,001.50 | $727,076.50 | 20% | 0 | | | | | 0045-20-030 | Paris | 01/06/27 | $619,000.00 | Construction | Bridge | Construction | Bridge | $774,000.00 | $(155,000.00) | -20% | 0 | | | | | 1239-01-034 | Brownwood | 01/05/28 | $150,000.00 | Construction | Bridge | Construction | Bridge | $125,000.00 | $25,000.00 | 20% | 0 | | | | | 0918-47-544 | Dallas | 05/05/27 | $514,990.58 | Construction | Roadway | Construction | Roadway | $643,616.00 | $(128,625.42) | -20% | 0 | | | | | 0135-04-043 | Dallas | 10/06/26 | $60,503.14 | Construction | Roadway | Construction | Roadway | $75,509.20 | $(15,006.06) | -20% | 0 | | | | | 0024-05-105 | San Antonio | 10/06/26 | $116,384.02 | Construction | Roadway | Construction | Roadway | $145,199.00 | $(28,814.98) | -20% | 0 | | | | | 1083-01-013 | Corpus Christi | 10/06/26 | $344,569.00 | Construction | Roadway | Construction | Roadway | $427,808.00 | $(83,239.00) | -19% | 0 | | | | | 0215-11-026 | San Antonio | 10/06/26 | $186,352.80 | Construction | Roadway | Construction | Roadway | $156,200.00 | $30,152.80 | 19% | 0 | | | | | 0270-08-024 | Corpus Christi | 10/06/26 | $759,771.30 | Construction | Roadway | Construction | Roadway | $936,058.00 | $(176,286.70) | -19% | 0 | | | | | 0366-03-075 | San Antonio | 10/06/26 | $683,692.94 | Construction | Roadway | Construction | Roadway | $575,570.00 | $108,122.94 | 19% | 0 | | | | | 0172-09-047 | Fort Worth | 09/02/26 | $4,776,312.18 | Construction | Roadway | Construction | Roadway | $4,029,170.17 | $747,142.01 | 19% | 0 | | | | | 3441-01-004 | Corpus Christi | 10/06/26 | $163,595.60 | Construction | Roadway | Construction | Roadway | $200,517.00 | $(36,921.40) | -18% | 0 | | | | | 0197-12-008 | Dallas | 10/06/26 | $239,271.24 | Construction | Roadway | Construction | Roadway | $202,195.99 | $37,075.25 | 18% | 0 | | | | | 0540-01-053 | Bryan | 10/06/26 | $870,783.25 | Construction | Roadway | Construction | Roadway | $738,283.00 | $132,500.25 | 18% | 0 | | | | | 2142-02-019 | Corpus Christi | 10/06/26 | $107,978.20 | Construction | Roadway | Construction | Roadway | $131,536.00 | $(23,557.80) | -18% | 0 | | | | | 0516-02-034 | Corpus Christi | 10/06/26 | $285,606.10 | Construction | Roadway | Construction | Roadway | $346,779.00 | $(61,172.90) | -18% | 0 | | | | | 0143-14-009 | San Antonio | 10/06/26 | $25,459.46 | Construction | Roadway | Construction | Roadway | $30,910.00 | $(5,450.54) | -18% | 0 | | | | | 0275-01-265 | Amarillo | 03/01/29 | $2,235,776.00 | Construction | Roadway | Construction | Roadway | $1,901,170.00 | $334,606.00 | 18% | 0 | | | | | 2452-04-020 | San Antonio | 10/06/26 | $201,314.19 | Construction | Roadway | Construction | Roadway | $171,200.00 | $30,114.19 | 18% | 0 | | | | | 0086-11-054 | Corpus Christi | 10/06/26 | $1,034,740.80 | Construction | Roadway | Construction | Roadway | $1,246,242.00 | $(211,501.20) | -17% | 0 | | | | | 0353-01-031 | Fort Worth | 11/03/26 | $654,905.19 | Construction | Roadway | Construction | Roadway | $561,319.55 | $93,585.64 | 17% | 0 | | | | | 0014-01-031 | Fort Worth | 08/02/28 | $2,730,508.00 | Construction | Bridge | Construction | Bridge | $2,341,663.00 | $388,845.00 | 17% | 0 | | | | | 0648-02-022 | Bryan | 10/06/26 | $246,338.00 | Construction | Roadway | Construction | Roadway | $211,381.63 | $34,956.37 | 17% | 0 | | | | | 0916-27-016 | Corpus Christi | 12/01/26 | $882,212.21 | Construction | Bridge | Construction | Bridge | $1,050,000.00 | $(167,787.79) | -16% | 0 | | | | | 0918-47-537 | Dallas | 10/05/27 | $693,359.89 | Construction | Roadway | Construction | Roadway | $598,483.05 | $94,876.84 | 16% | 0 | | | | | 0552-02-034 | Bryan | 10/06/26 | $399,509.95 | Construction | Roadway | Construction | Roadway | $345,147.26 | $54,362.69 | 16% | 0 | | | | | 1785-01-044 | Dallas | 01/05/28 | $513,849.71 | Construction | Roadway | Construction | Roadway | $609,042.00 | $(95,192.29) | -16% | 0 | | | | | 1722-01-020 | Bryan | 10/06/26 | $472,621.30 | Construction | Roadway | Construction | Roadway | $409,502.00 | $63,119.30 | 15% | 0 | | | | | 0143-11-006 | San Antonio | 10/06/26 | $58,969.58 | Construction | Roadway | Construction | Roadway | $69,700.00 | $(10,730.42) | -15% | 0 | | | | | 1137-02-044 | Pharr | 10/06/26 | $85,827.65 | Construction | Roadway | Construction | Roadway | $101,055.00 | $(15,227.35) | -15% | 0 | | | | | 0102-02-106 | Corpus Christi | 10/06/26 | $580,472.70 | Construction | Roadway | Construction | Roadway | $681,589.00 | $(101,116.30) | -15% | 0 | | | | | 1451-01-032 | Dallas | 10/06/26 | $740,028.52 | Construction | Roadway | Construction | Roadway | $867,504.82 | $(127,476.30) | -15% | 0 | | | | | 0015-13-441 | Austin | 11/03/26 | $93,710,663.04 | Construction | Roadway | Construction | Roadway | $81,730,769.23 | $11,979,893.81 | 15% | 0 | | | | | 0387-01-016 | Dallas | 10/06/26 | $6,915,964.31 | Construction | Roadway | Construction | Roadway | $6,039,010.45 | $876,953.86 | 15% | 0 | | | | | 1196-02-016 | Corpus Christi | 10/06/26 | $187,060.20 | Construction | Roadway | Construction | Roadway | $218,613.00 | $(31,552.80) | -14% | 0 | | | | | 0092-03-067 | Dallas | 10/06/26 | $3,202,034.00 | Construction | Roadway | Construction | Roadway | $3,720,762.00 | $(518,728.00) | -14% | 0 | | | | | 0943-04-037 | Corpus Christi | 10/06/26 | $763,048.80 | Construction | Roadway | Construction | Roadway | $886,353.00 | $(123,304.20) | -14% | 0 | | | | | 0081-04-046 | Dallas | 01/05/28 | $587,379.76 | Construction | Roadway | Construction | Roadway | $682,245.00 | $(94,865.24) | -14% | 0 | | | | | 1325-02-017 | Bryan | 10/06/26 | $206,462.55 | Construction | Roadway | Construction | Roadway | $181,533.00 | $24,929.55 | 14% | 0 | | | | | 0598-02-093 | Houston | 07/30/26 | $216,068,000.00 | Non-Let | Roadway | Unassigned | Unassigned | $190,000,000.00 | $26,068,000.00 | 14% | -3289 | -9 years | Unassigned → Non-Let / Roadway | | | 1327-02-026 | Bryan | 10/06/26 | $323,599.25 | Construction | Roadway | Construction | Roadway | $284,607.00 | $38,992.25 | 14% | 0 | | | | | 1145-02-023 | Bryan | 10/06/26 | $636,717.80 | Construction | Roadway | Construction | Roadway | $560,964.00 | $75,753.80 | 14% | 0 | | | | | 3033-02-015 | Bryan | 10/06/26 | $198,431.25 | Construction | Roadway | Construction | Roadway | $174,880.00 | $23,551.25 | 13% | 0 | | | | | 3510-04-070 | Houston | 08/05/26 | $19,121,150.30 | Construction | Roadway | Construction | Roadway | $16,853,512.33 | $2,267,637.97 | 13% | 0 | | | | | 0921-02-529 | Pharr | 10/06/26 | $409,038.76 | Construction | Roadway | Construction | Roadway | $360,698.00 | $48,340.76 | 13% | 0 | | | | | 2346-02-010 | Corpus Christi | 10/06/26 | $43,712.60 | Construction | Roadway | Construction | Roadway | $50,385.00 | $(6,672.40) | -13% | 0 | | | | | 0014-15-034 | Fort Worth | 08/05/26 | $19,177,771.10 | Construction | Roadway | Construction | Roadway | $16,946,001.10 | $2,231,770.00 | 13% | 0 | | | | | 0506-05-010 | Bryan | 10/06/26 | $13,363.50 | Construction | Roadway | Construction | Roadway | $15,346.00 | $(1,982.50) | -13% | 0 | | | | | 0337-03-020 | Austin | 09/02/26 | $2,723,608.24 | Construction | Roadway | Construction | Roadway | $3,125,366.79 | $(401,758.55) | -13% | 0 | | | | | 0738-03-035 | Corpus Christi | 10/06/26 | $25,618.00 | Construction | Roadway | Construction | Roadway | $29,335.00 | $(3,717.00) | -13% | 0 | | | | | 1553-01-015 | Corpus Christi | 10/06/26 | $477,164.00 | Construction | Roadway | Construction | Roadway | $543,321.00 | $(66,157.00) | -12% | 0 | | | | | 0369-01-042 | San Antonio | 10/06/26 | $57,471.24 | Construction | Roadway | Construction | Roadway | $51,250.00 | $6,221.24 | 12% | 0 | | | | | 2104-01-016 | San Antonio | 10/06/26 | $232,324.89 | Construction | Roadway | Construction | Roadway | $207,750.00 | $24,574.89 | 12% | 0 | | | | | 0197-13-007 | Dallas | 10/06/26 | $197,779.93 | Construction | Roadway | Construction | Roadway | $223,904.41 | $(26,124.48) | -12% | 0 | | | | | 2528-01-006 | Odessa | 08/05/26 | $8,844,235.35 | Construction | Roadway | Construction | Roadway | $7,922,603.47 | $921,631.88 | 12% | 0 | | | | | 0648-04-005 | Bryan | 10/06/26 | $225,818.85 | Construction | Roadway | Construction | Roadway | $202,440.00 | $23,378.85 | 12% | 0 | | | | | 0921-02-527 | Pharr | 10/06/26 | $122,310.50 | Construction | Roadway | Construction | Roadway | $138,101.00 | $(15,790.50) | -11% | 0 | | | | | 3055-01-011 | Houston | 09/02/26 | $137,388.48 | Construction | Roadway | Construction | Roadway | $154,991.03 | $(17,602.55) | -11% | 0 | | | | | 0981-02-014 | Houston | 09/02/26 | $71,481.66 | Construction | Roadway | Construction | Roadway | $80,542.96 | $(9,061.30) | -11% | 0 | | | | | 0856-02-013 | San Antonio | 10/06/26 | $227,315.29 | Construction | Roadway | Construction | Roadway | $256,000.00 | $(28,684.71) | -11% | 0 | | | | | 1685-05-140 | Houston | 08/05/26 | $2,203,492.80 | Construction | Roadway | Construction | Roadway | $2,479,057.90 | $(275,565.10) | -11% | 0 | | | | | 0092-06-114 | Dallas | 10/06/26 | $7,283,254.00 | Construction | Roadway | Construction | Roadway | $8,192,021.25 | $(908,767.25) | -11% | 0 | | | | | 0092-04-087 | Dallas | 10/06/26 | $7,432,853.20 | Construction | Roadway | Construction | Roadway | $8,347,322.50 | $(914,469.30) | -11% | 0 | | | | | 0161-01-033 | Laredo | 03/01/29 | $1,595,078.57 | Construction | Roadway | Construction | Roadway | $1,438,067.40 | $157,011.17 | 11% | 0 | | | | | 0506-04-027 | Bryan | 10/06/26 | $264,189.80 | Construction | Roadway | Construction | Roadway | $238,259.00 | $25,930.80 | 11% | 0 | | | | | 0990-01-013 | Corpus Christi | 10/06/26 | $608,452.20 | Construction | Roadway | Construction | Roadway | $682,537.00 | $(74,084.80) | -11% | 0 | | | | | 1844-01-032 | Houston | 09/02/26 | $87,577.43 | Construction | Roadway | Construction | Roadway | $98,200.58 | $(10,623.15) | -11% | 0 | | | | | 0613-02-071 | San Antonio | 10/06/26 | $288,801.32 | Construction | Roadway | Construction | Roadway | $260,631.00 | $28,170.32 | 11% | 0 | | | | | 0273-04-051 | Austin | 09/02/28 | $498,198.21 | Construction | Local Let | Construction | Local Let | $557,981.88 | $(59,783.67) | -11% | 0 | | | | | 1558-03-125 | Corpus Christi | 10/06/26 | $752,751.60 | Construction | Roadway | Construction | Roadway | $842,086.00 | $(89,334.40) | -11% | 0 | | | | | 0944-01-029 | Bryan | 10/06/26 | $243,284.55 | Construction | Roadway | Construction | Roadway | $219,986.00 | $23,298.55 | 11% | 0 | | | | | 0027-10-074 | Houston | 08/05/26 | $1,782,087.46 | Construction | Bridge | Construction | Bridge | $1,986,114.00 | $(204,026.54) | -10% | 0 | | | | | 1122-01-034 | Corpus Christi | 10/06/26 | $12,832,486.60 | Construction | Roadway | Construction | Roadway | $14,250,000.00 | $(1,417,513.40) | -10% | 0 | | | | | 0204-06-068 | Bryan | 10/06/26 | $469,399.50 | Construction | Roadway | Construction | Roadway | $519,983.00 | $(50,583.50) | -10% | 0 | | | | | 3544-06-004 | San Antonio | 10/06/26 | $58,087.54 | Construction | Roadway | Construction | Roadway | $52,952.00 | $5,135.54 | 10% | 0 | | | | | 0092-05-061 | Dallas | 10/06/26 | $4,248,174.25 | Construction | Roadway | Construction | Roadway | $4,700,639.25 | $(452,465.00) | -10% | 0 | | | | | 1739-04-015 | San Antonio | 10/06/26 | $255,431.71 | Construction | Roadway | Construction | Roadway | $282,150.00 | $(26,718.29) | -9% | 0 | | | | | 1147-03-017 | Bryan | 10/06/26 | $369,887.95 | Construction | Roadway | Construction | Roadway | $337,918.00 | $31,969.95 | 9% | 0 | | | | | 1122-01-036 | Corpus Christi | 10/06/26 | $118,519.80 | Construction | Roadway | Construction | Roadway | $108,350.00 | $10,169.80 | 9% | 0 | | | | | 1741-02-039 | San Antonio | 10/06/26 | $235,139.08 | Construction | Roadway | Construction | Roadway | $215,050.00 | $20,089.08 | 9% | 0 | | | | | 0267-08-008 | Bryan | 10/06/26 | $114,284.75 | Construction | Roadway | Construction | Roadway | $104,671.00 | $9,613.75 | 9% | 0 | | | | | 0187-05-068 | Houston | 09/02/26 | $352,056.55 | Construction | Roadway | Construction | Roadway | $322,456.55 | $29,600.00 | 9% | 0 | | | | | 0095-12-003 | Dallas | 10/06/26 | $19,676.50 | Construction | Roadway | Construction | Roadway | $21,625.24 | $(1,948.74) | -9% | 0 | | | | | 0168-03-040 | Lubbock | 10/06/26 | $1,568,633.25 | Construction | Roadway | Construction | Roadway | $1,720,122.19 | $(151,488.94) | -9% | 0 | | | | | 0093-01-110 | Dallas | 10/06/26 | $7,164,958.00 | Construction | Roadway | Construction | Roadway | $7,855,998.00 | $(691,040.00) | -9% | 0 | | | | | 0009-11-248 | Dallas | 10/06/26 | $52,122,703.81 | Construction | Roadway | Construction | Roadway | $57,043,890.08 | $(4,921,186.27) | -9% | 0 | | | | | 0209-05-054 | Bryan | 10/06/26 | $996,837.10 | Construction | Roadway | Construction | Roadway | $1,090,527.00 | $(93,689.90) | -9% | 0 | | | | | 0166-01-061 | Dallas | 10/06/26 | $3,764,545.50 | Construction | Roadway | Construction | Roadway | $4,115,608.25 | $(351,062.75) | -9% | 0 | | | | | 0500-03-664 | Houston | 08/05/26 | $4,502,236.90 | Construction | Roadway | Construction | Roadway | $4,921,686.24 | $(419,449.34) | -9% | 0 | | | | | 0215-11-025 | San Antonio | 10/06/26 | $307,684.47 | Construction | Roadway | Construction | Roadway | $335,700.00 | $(28,015.53) | -8% | 0 | | | | | 1739-01-015 | Corpus Christi | 10/06/26 | $6,691,123.84 | Construction | Roadway | Construction | Roadway | $7,300,000.00 | $(608,876.16) | -8% | 0 | | | | | 0483-03-036 | San Antonio | 10/06/26 | $561,438.93 | Construction | Roadway | Construction | Roadway | $611,601.00 | $(50,162.07) | -8% | 0 | | | | | 0738-02-028 | Corpus Christi | 10/06/26 | $178,349.20 | Construction | Roadway | Construction | Roadway | $164,992.00 | $13,357.20 | 8% | 0 | | | | | 0173-05-044 | Dallas | 10/06/26 | $533,456.92 | Construction | Roadway | Construction | Roadway | $579,192.66 | $(45,735.74) | -8% | 0 | | | | | 0912-56-059 | Houston | 10/06/26 | $1,131,295.70 | Construction | Bridge | Construction | Bridge | $1,227,767.00 | $(96,471.30) | -8% | 0 | | | | | 1159-02-041 | Dallas | 10/06/26 | $570,893.19 | Construction | Roadway | Construction | Roadway | $618,897.73 | $(48,004.54) | -8% | 0 | | | | | 1754-02-033 | Austin | 05/05/27 | $13,817,307.69 | Construction | Roadway | Construction | Roadway | $12,850,961.54 | $966,346.15 | 8% | 0 | | | | | 1402-02-020 | Bryan | 10/06/26 | $425,658.95 | Construction | Roadway | Construction | Roadway | $396,773.00 | $28,885.95 | 7% | 0 | | | | | 1844-02-025 | Houston | 09/02/26 | $126,419.79 | Construction | Roadway | Construction | Roadway | $136,321.34 | $(9,901.55) | -7% | 0 | | | | | 1009-01-044 | San Antonio | 10/06/26 | $361,666.47 | Construction | Roadway | Construction | Roadway | $389,823.00 | $(28,156.53) | -7% | 0 | | | | | 0050-03-110 | Bryan | 10/06/26 | $152,320.65 | Construction | Roadway | Construction | Roadway | $142,148.16 | $10,172.49 | 7% | 0 | | | | | 3510-04-072 | Houston | 08/05/26 | $12,602,101.49 | Construction | Roadway | Construction | Roadway | $11,775,459.70 | $826,641.79 | 7% | 0 | | | | | 2132-01-014 | Bryan | 10/06/26 | $493,814.90 | Construction | Roadway | Construction | Roadway | $462,724.00 | $31,090.90 | 7% | 0 | | | | | 0114-01-071 | Austin | 11/03/26 | $3,768,059.17 | Construction | Non Roadway | Construction | Non Roadway | $4,038,461.54 | $(270,402.37) | -7% | 0 | | | | | 0944-01-030 | Bryan | 10/06/26 | $236,822.70 | Construction | Roadway | Construction | Roadway | $221,972.00 | $14,850.70 | 7% | 0 | | | | | 1205-01-018 | Corpus Christi | 10/06/26 | $542,878.40 | Construction | Roadway | Construction | Roadway | $581,658.00 | $(38,779.60) | -7% | 0 | | | | | 0022-04-021 | Laredo | 03/01/29 | $11,464,725.00 | Construction | Roadway | Construction | Roadway | $10,763,000.85 | $701,724.15 | 7% | 0 | | | | | 0013-05-046 | Wichita Falls | 08/05/26 | $15,521,039.92 | Construction | Safety Rest Area | Construction | Safety Rest Area | $14,570,882.56 | $950,157.36 | 7% | 0 | | | | | 0143-03-049 | San Antonio | 10/06/26 | $47,428,077.66 | Construction | Roadway | Construction | Roadway | $50,707,452.96 | $(3,279,375.30) | -6% | 0 | | | | | 0016-08-053 | San Antonio | 12/01/26 | $1,127,594.15 | Construction | Roadway | Construction | Roadway | $1,060,000.00 | $67,594.15 | 6% | 0 | | | | | 0051-09-127 | Houston | 09/02/26 | $2,526,048.60 | Construction | Non Roadway | Construction | Non Roadway | $2,378,421.60 | $147,627.00 | 6% | 0 | | | | | 0168-04-019 | Lubbock | 10/06/26 | $649,207.75 | Construction | Roadway | Construction | Roadway | $692,068.47 | $(42,860.72) | -6% | 0 | | | | | 0909-40-091 | Waco | 08/04/27 | $553,846.15 | Construction | Bridge | Construction | Bridge | $590,000.00 | $(36,153.85) | -6% | 0 | | | | | 2337-02-012 | Bryan | 10/06/26 | $586,040.60 | Construction | Roadway | Construction | Roadway | $623,145.60 | $(37,105.00) | -6% | 0 | | | | | 0903-28-073 | Wichita Falls | 09/02/26 | $1,165,961.87 | Construction | Bridge | Construction | Bridge | $1,239,741.87 | $(73,780.00) | -6% | 0 | | | | | 0128-04-045 | Brownwood | 01/06/27 | $2,800,000.00 | Construction | Roadway | Construction | Roadway | $2,644,230.00 | $155,770.00 | 6% | 0 | | | | | 0912-31-343 | Houston | 01/05/28 | $529,109.68 | Construction | Bridge | Construction | Bridge | $500,000.00 | $29,109.68 | 6% | 0 | | | | | 1003-01-105 | Houston | 01/05/28 | $4,820,000.00 | Construction | Bridge | Construction | Bridge | $5,116,513.00 | $(296,513.00) | -6% | 0 | | | | | 0648-03-084 | Bryan | 10/06/26 | $178,377.00 | Construction | Roadway | Construction | Roadway | $168,866.00 | $9,511.00 | 6% | 0 | | | | | 0173-04-063 | Dallas | 09/02/26 | $949,220.25 | Construction | Roadway | Construction | Roadway | $900,431.25 | $48,789.00 | 5% | 0 | | | | | 1088-01-025 | Corpus Christi | 10/06/26 | $465,110.00 | Construction | Roadway | Construction | Roadway | $491,228.00 | $(26,118.00) | -5% | 0 | | | | | 1414-03-043 | Houston | 10/06/26 | $1,078,721.72 | Construction | Roadway | Construction | Roadway | $1,027,880.00 | $50,841.72 | 5% | 0 | | | | | 2830-02-014 | Bryan | 10/06/26 | $308,332.35 | Construction | Roadway | Construction | Roadway | $293,832.00 | $14,500.35 | 5% | 0 | | | | | 1414-01-025 | Houston | 09/02/26 | $391,484.38 | Construction | Roadway | Construction | Roadway | $411,754.93 | $(20,270.55) | -5% | 0 | | | | | 0354-04-043 | Odessa | 12/01/26 | $26,242,851.29 | Construction | Roadway | Construction | Roadway | $25,039,685.33 | $1,203,165.96 | 5% | 0 | | | | | 0675-04-089 | Bryan | 10/06/26 | $71,800.65 | Construction | Roadway | Construction | Roadway | $68,568.00 | $3,232.65 | 5% | 0 | | | | | 0027-08-147 | Houston | 08/05/26 | $52,496,966.16 | Construction | Roadway | Construction | Roadway | $54,960,380.56 | $(2,463,414.40) | -4% | 0 | | | | | 0050-06-108 | Houston | 08/05/26 | $1,357,254.35 | Construction | Bridge | Construction | Bridge | $1,299,070.05 | $58,184.30 | 4% | 0 | | | | | 0865-01-118 | Pharr | 09/02/26 | $419,668.34 | Construction | Roadway | Construction | Roadway | $401,878.34 | $17,790.00 | 4% | 0 | | | | | 3510-04-069 | Houston | 08/05/26 | $26,519,488.25 | Construction | Roadway | Construction | Roadway | $27,634,165.45 | $(1,114,677.20) | -4% | 0 | | | | | 2920-02-005 | Austin | 07/01/27 | $2,083,536.54 | Construction | Roadway | Unassigned | Unassigned | $2,166,877.78 | $(83,341.24) | -4% | -3868 | -11 years | Unassigned → Construction / Roadway | | | 0002-04-039 | El Paso | 05/05/27 | $274,927.69 | Construction | Roadway | Construction | Roadway | $264,745.19 | $10,182.50 | 4% | -245 | -8 months | | | | 2552-03-071 | El Paso | 04/06/27 | $4,417,014.42 | Construction | Roadway | Construction | Roadway | $4,253,421.30 | $163,593.12 | 4% | -274 | -9 months | | | | 0104-07-027 | El Paso | 12/01/26 | $1,601,075.00 | Construction | Roadway | Construction | Roadway | $1,541,775.93 | $59,299.07 | 4% | -365 | -1 year | | | | 0485-01-026 | El Paso | 12/01/26 | $1,919,937.50 | Construction | Roadway | Construction | Roadway | $1,848,828.70 | $71,108.80 | 4% | -365 | -1 year | | | | 0485-02-018 | El Paso | 12/01/26 | $1,313,086.54 | Construction | Roadway | Construction | Roadway | $1,264,453.70 | $48,632.84 | 4% | -365 | -1 year | | | | 0410-02-047 | Paris | 10/06/26 | $9,134,695.27 | Construction | Roadway | Construction | Roadway | $8,800,000.00 | $334,695.27 | 4% | 0 | | | | | 0902-20-238 | Fort Worth | 08/05/26 | $854,301.50 | Construction | Bridge | Construction | Bridge | $824,349.50 | $29,952.00 | 4% | 0 | | | | | 0358-03-040 | El Paso | 12/05/28 | $2,276,633.93 | Construction | Roadway | Construction | Roadway | $2,360,953.70 | $(84,319.77) | -4% | 370 | 1 year | | | | 0358-04-019 | El Paso | 12/05/28 | $2,285,513.39 | Construction | Roadway | Construction | Roadway | $2,370,162.04 | $(84,648.65) | -4% | 370 | 1 year | | | | 0100-08-108 | Corpus Christi | 10/06/26 | $365,022.00 | Construction | Roadway | Construction | Roadway | $378,254.00 | $(13,232.00) | -4% | 0 | | | | | 0047-06-178 | Dallas | 09/02/26 | $1,127,227.75 | Construction | Roadway | Construction | Roadway | $1,167,955.25 | $(40,727.50) | -3% | 0 | | | | | 0976-03-120 | Houston | 09/02/26 | $460,985.44 | Construction | Roadway | Construction | Roadway | $477,545.44 | $(16,560.00) | -3% | 0 | | | | | 0100-08-107 | Corpus Christi | 10/06/26 | $345,930.00 | Construction | Roadway | Construction | Roadway | $358,043.00 | $(12,113.00) | -3% | 0 | | | | | 3510-04-071 | Houston | 08/05/26 | $15,647,807.69 | Construction | Roadway | Construction | Roadway | $16,148,907.85 | $(501,100.16) | -3% | 0 | | | | | 0427-01-042 | Paris | 09/02/26 | $1,731,524.25 | Construction | Bridge | Construction | Bridge | $1,786,746.95 | $(55,222.70) | -3% | 0 | | | | | 0578-03-054 | Bryan | 10/06/26 | $821,766.65 | Construction | Roadway | Construction | Roadway | $798,159.00 | $23,607.65 | 3% | 0 | | | | | 0573-02-008 | Austin | 09/02/26 | $5,431,676.47 | Construction | Roadway | Construction | Roadway | $5,595,395.23 | $(163,718.76) | -3% | 0 | | | | | 0410-03-020 | Dallas | 10/06/26 | $124,285.46 | Construction | Roadway | Construction | Roadway | $128,004.79 | $(3,719.33) | -3% | 0 | | | | | 0236-01-024 | San Antonio | 10/06/26 | $257,793.75 | Construction | Roadway | Construction | Roadway | $265,286.00 | $(7,492.25) | -3% | 0 | | | | | 0836-03-075 | Waco | 09/04/25 | $540,374.48 | Non-Let | Change Order | Construction | Roadway | $555,819.86 | $(15,445.38) | -3% | -363 | -12 months | Construction / Roadway → Non-Let / Change Order | | | 1223-01-050 | Bryan | 10/06/26 | $227,749.95 | Construction | Roadway | Construction | Roadway | $221,760.00 | $5,989.95 | 3% | 0 | | | | | 0848-02-010 | San Antonio | 10/06/26 | $189,288.61 | Construction | Roadway | Construction | Roadway | $194,500.00 | $(5,211.39) | -3% | 0 | | | | | 0204-07-057 | Bryan | 10/06/26 | $445,864.90 | Construction | Roadway | Construction | Roadway | $457,801.00 | $(11,936.10) | -3% | 0 | | | | | 1564-01-038 | Bryan | 10/06/26 | $30,998.60 | Construction | Roadway | Construction | Roadway | $30,337.00 | $661.60 | 2% | 0 | | | | | 0902-20-233 | Fort Worth | 05/05/27 | $1,201,880.91 | Construction | Bridge | Construction | Bridge | $1,176,674.45 | $25,206.46 | 2% | 0 | | | | | 0912-34-209 | Houston | 10/06/26 | $1,107,896.28 | Construction | Bridge | Construction | Bridge | $1,085,413.00 | $22,483.28 | 2% | 0 | | | | | 1068-01-242 | Fort Worth | 02/02/28 | $3,057,330.65 | Construction | Roadway | Construction | Roadway | $3,000,643.80 | $56,686.85 | 2% | 0 | | | | | 0336-03-082 | Lufkin | 01/06/27 | $2,716,548.07 | Construction | Roadway | Construction | Roadway | $2,667,930.07 | $48,618.00 | 2% | -272 | -9 months | | | | 0918-47-542 | Dallas | 04/06/27 | $916,907.25 | Construction | Roadway | Construction | Roadway | $902,431.20 | $14,476.05 | 2% | 0 | | | | | 0675-04-092 | Bryan | 10/06/26 | $183,527.75 | Construction | Roadway | Construction | Roadway | $186,323.00 | $(2,795.25) | -2% | 0 | | | | | 3537-01-007 | Bryan | 10/06/26 | $34,691.00 | Construction | Roadway | Construction | Roadway | $34,195.39 | $495.61 | 1% | 0 | | | | | 0143-15-034 | San Antonio | 10/06/26 | $85,377.59 | Construction | Roadway | Construction | Roadway | $86,564.00 | $(1,186.41) | -1% | 0 | | | | | 0254-01-149 | Corpus Christi | 08/05/26 | $10,519,557.65 | Construction | Roadway | Construction | Roadway | $10,383,718.65 | $135,839.00 | 1% | 0 | | | | | 0541-02-033 | Childress | 08/05/26 | $8,833,129.70 | Construction | Roadway | Construction | Roadway | $8,730,229.70 | $102,900.00 | 1% | 0 | | | | | 0200-01-093 | Lufkin | 10/06/26 | $29,811,165.20 | Construction | Roadway | Construction | Roadway | $29,476,360.55 | $334,804.65 | 1% | 0 | | | | | 0043-20-023 | Wichita Falls | 05/03/28 | $979,629.00 | Construction | Roadway | Construction | Roadway | $989,000.00 | $(9,371.00) | -1% | 0 | | | | | 0132-03-036 | Childress | 08/05/26 | $11,192,055.34 | Construction | Roadway | Construction | Roadway | $11,087,882.05 | $104,173.29 | 1% | 0 | | | | | 0041-07-121 | Amarillo | 08/05/26 | $26,383,173.75 | Construction | Roadway | Construction | Roadway | $26,146,123.75 | $237,050.00 | 1% | 0 | | | | | 0917-30-068 | Bryan | 11/03/26 | $664,775.00 | Construction | Bridge | Construction | Bridge | $670,698.73 | $(5,923.73) | -1% | 0 | | | | | 0047-14-092 | Dallas | 09/02/26 | $2,012,848.75 | Construction | Roadway | Construction | Roadway | $1,995,770.00 | $17,078.75 | 1% | 0 | | | | | 0315-08-051 | Bryan | 10/06/26 | $499,467.35 | Construction | Roadway | Construction | Roadway | $495,766.66 | $3,700.69 | 1% | 0 | | | | | 0276-07-035 | San Antonio | 08/05/26 | $8,663,166.47 | Construction | Roadway | Construction | Roadway | $8,601,216.47 | $61,950.00 | 1% | 0 | | | | | 0366-01-089 | Austin | 11/03/26 | $227,251.37 | Construction | Roadway | Construction | Roadway | $225,793.27 | $1,458.10 | 1% | 0 | | | | | 2552-04-055 | El Paso | 08/05/26 | $3,871,558.00 | Construction | Roadway | Construction | Roadway | $3,847,548.00 | $24,010.00 | 1% | 0 | | | | | 0991-02-014 | Corpus Christi | 08/05/26 | $9,367,704.15 | Construction | Roadway | Construction | Roadway | $9,316,494.15 | $51,210.00 | 1% | 0 | | | | | 1147-02-029 | Bryan | 10/06/26 | $142,919.00 | Construction | Roadway | Construction | Roadway | $142,193.00 | $726.00 | 1% | 0 | | | | | 0056-02-034 | Waco | 09/02/26 | $2,474,491.12 | Construction | Roadway | Construction | Roadway | $2,465,492.67 | $8,998.45 | 0% | 0 | | | | | 0013-08-149 | Fort Worth | 03/03/27 | $15,880,993.12 | Construction | Roadway | Construction | Roadway | $15,928,453.33 | $(47,460.21) | -0% | 0 | | | | | 0089-07-166 | Yoakum | 08/05/26 | $241,162,764.90 | Construction | Roadway | Construction | Roadway | $240,432,788.90 | $729,976.00 | 0% | 0 | | | | | 0028-05-057 | Beaumont | 09/02/26 | $2,125,317.21 | Construction | Roadway | Construction | Roadway | $2,120,317.21 | $5,000.00 | 0% | 0 | | | | | 0015-13-432 | Austin | 11/03/26 | $239,362,478.11 | Construction | Bridge | Construction | Bridge | $239,903,846.15 | $(541,368.04) | -0% | 0 | | | | | 0902-48-579 | Fort Worth | 08/05/26 | $22,917,686.10 | Construction | Roadway | Construction | Roadway | $22,873,538.60 | $44,147.50 | 0% | 0 | | | | | 0016-09-045 | Austin | 11/03/26 | $213,525.75 | Construction | Roadway | Construction | Roadway | $213,254.81 | $270.94 | 0% | 0 | | | | | 1691-01-018 | Bryan | 10/06/26 | $613,560.95 | Construction | Roadway | Construction | Roadway | $612,944.64 | $616.31 | 0% | 0 | | | | | 0842-03-037 | Yoakum | 08/05/26 | $33,725,491.10 | Construction | Roadway | Construction | Roadway | $33,704,491.10 | $21,000.00 | 0% | 0 | | | | | 0110-07-022 | Houston | 09/02/26 | $346,443.13 | Construction | Roadway | Construction | Roadway | $346,537.14 | $(94.01) | -0% | 0 | | | | | 0610-05-060 | Atlanta | 08/05/26 | $12,397,796.00 | Construction | Roadway | Construction | Roadway | $12,401,196.00 | $(3,400.00) | -0% | 0 | | | | | 2552-04-058 | El Paso | 08/05/26 | $3,077,730.00 | Construction | Roadway | Construction | Roadway | $3,076,855.00 | $875.00 | 0% | 0 | | | | | 0133-01-055 | Childress | 08/05/26 | $16,097,926.96 | Construction | Roadway | Construction | Roadway | $16,096,986.21 | $940.75 | 0% | 0 | | | | | 0029-03-056 | Austin | 01/05/28 | $1,760,771.76 | Construction | Bridge | Construction | Bridge | $1,760,772.22 | $(0.46) | 0% | 0 | | | | | 0338-03-100 | Houston | 02/02/27 | $727,888.00 | Construction | Bridge | Construction | Bridge | $727,880.00 | $8.00 | 0% | 0 | | | | | 0018-05-089 | Laredo | 08/05/26 | $226,858,175.99 | Construction | Roadway | Construction | Roadway | $226,855,600.99 | $2,575.00 | 0% | 0 | | | | | 0014-15-077 | Fort Worth | 03/03/27 | $15,548,985.00 | Construction | Roadway | Construction | Roadway | $0.00 | $15,548,985.00 | | 0 | | | | --- ## Putting It Together The data reveals a dynamic landscape with increased project counts and adjusted letting dates. The slight shift in project types indicates stability, while the cost changes reflect active repricing among significant districts. --- ## Final Takeaway Pipeline changes last month resulted in a larger active pipeline, with total value increasing by $2.36B and project count rising by 59. Houston accounted for most of the value increase, while the overall project mix remained largely unchanged and roadway work continued to represent 77.9% of the pipeline. Letting-date changes were substantial in both directions, although slightly more projects moved earlier than later. Overall, the month’s movement reflects a combination of new project additions, estimate revisions, and scheduling changes rather than a major shift in the types of work entering the market. --- --- ## Self-Learning AI Models https://www.bidlo.ai/research/self-learning-ai-models How self-learning AI models are evolving to optimize workflows and bidding in public construction. [https://www.youtube.com/watch?v=Cd4_rwG6nWU](https://www.youtube.com/watch?v=Cd4_rwG6nWU) ### Summary AI is beginning to learn from experience, which could make it far more useful for everyday construction work. This article explains how these advances could help contractors automate bidding, vendor management, and other complex tasks—and how Bidlo is preparing to put them to work. ### How AI Models Are Built Today, we'll discuss AI models that actually learn, where the industry is now, where it's headed, and what you can do today to prepare. The best place to start is how these models are built. Take GPT 5.6, OpenAI's most recent model. The GPT-5 in the name represents the base model. To build such a base model, you feed a massive amount of data and compute into a system that outputs weights. These weights mathematically represent the model's understanding of the world. In simple terms, these weights help the model match new inputs to what it has already learned so it can provide answers. The 0.6 in GPT 5.6 comes from fine-tuning and reinforcement learning (RL). Labs like OpenAI or Anthropic create pass-fail tests and repeatedly have the model perform and readjust to optimize for accuracy. So, building models involves spending a lot of money and resources to generate the base model, then applying these pass-fail tests to fine-tune and improve performance on specific tasks. That's how you get GPT 5.6. The challenge is the enormous cost and resources required, which explains the long gaps between versions, such as between GPT 5.5 and 5.6, and even longer between GPT 4 and GPT 5. These models are hitting multiple walls. ### Data and Training Walls First is the data wall. Much of the data used to train these models is public, but a lot of remaining data is private, such as company data, or it exists in poor or non-digital formats—for example, public construction or Department of Transportation data is often inaccessible or unstructured. This makes training with such data very difficult. ### Limits of Pass-Fail Training A bigger wall is the training method itself. These models excel on clear pass-fail online tasks—like writing code and checking for errors—but real-world applications such as running a business or navigating complex situations are messy and ambiguous. This messiness makes it hard to train models using strict pass-fail approaches, which explains why autonomous driving has taken so long to develop compared to other AI models. Finally, even when it’s possible to retrain or use RL on messy real-world data, retraining is computationally expensive and time-consuming, making constant learning impractical. Humans excel at this process—we quickly absorb new information, reconsider our approach, and improve. ### Human vs. AI Sample Efficiency This process, called sample efficiency, is where models currently lag because retraining and fine-tuning take so long, limiting their ability to handle real-world tasks effectively. So far, the strategy has been to train models on as much data as possible, hoping they have a rough idea for any scenario. Humans have less breadth of knowledge but can adapt quickly in new situations. The future of this technology lies in models that can learn from ongoing interactions and adjust their weights accordingly. Many labs focus on implementing this ability with greater sample efficiency. Temporary solutions you may have seen include memory systems or agent harnesses that save rules or memories, but these are band-aids—they do not represent true learning but rather give the model a fixed set of rules to follow. ### On-Policy Self-Distillation Promising technologies to watch include On-Policy Self-Distillation (OPSD). This technique allows a model to adjust only the weights related to a specific task after receiving feedback, rather than retraining the entire large model, reducing time and energy costs. ### How AI Dreaming Works Another gaining traction is the concept of “dreaming.” Neuroscience suggests humans dream to simulate scenarios and prepare for future situations. Similarly, models can simulate many variations of an experience to find optimized responses and adjust their weights accordingly. This limits downtime and enables autonomous reinforcement learning. ### Open-Weight Models for Businesses Meanwhile, open-weight models are catching up to larger lab models. For example, with sufficient hardware, an organization could run an open-weight model and use reinforcement learning techniques to teach it how to operate within their specific business context. This ability to own, train, and improve a model on proprietary data is the ultimate goal. ### Bidlo’s Vision for Learning Agents What are we advising customers to do now, and how is Bidlo preparing? A model needs a "classroom" where it can learn your business operations, understand right and wrong, work alongside you on complex tasks that might take days or weeks, then eventually perform autonomously. These will be your digital employees of the future. As you see updates to the Bidlo platform in coming months, keep in mind this is our direction. Today, the platform helps with procurement, bidding, solicitation assembly, vendor management, schedule management, and various AI-driven automation tools. The end goal is not for you to manually step through each task but to delegate them to an agent that continually learns and optimizes to improve your bottom line. --- ## Texas DOT Backlog Report - July 2026 https://www.bidlo.ai/research/texas-dot-backlog-report-july-2026 Active Construction Backlog by District ## Before the Next Letting, $19.17B Is Already on the Books Every new TxDOT letting enters a market that already has substantial active work in progress. TxDOT's current workload reveals a considerable active backlog, not evenly distributed across districts. The statewide active backlog stands at $19.17 billion, tied to 3,405 active projects across 25 districts. Active backlog represents the remaining value linked to ongoing projects, while change orders capture value added to contracts after award. Currently, the Dallas District has the largest active backlog at $4.71 billion, whereas the Fort Worth District has the highest change order percentage at 21.1%. These districts illustrate contrasting aspects within the overall market dynamics, emphasizing the need to examine both district totals and individual active projects. The current active market reflects significant irregularities in workload concentration and project distribution. --- ## Interactive District View [https://info.bidlo.ai/heatmap/backlog-by-district?embed=1&snapshot_id=98ac7916-6e68-4dc3-8c4b-eec226d59d16](https://info.bidlo.ai/heatmap/backlog-by-district?embed=1&snapshot_id=98ac7916-6e68-4dc3-8c4b-eec226d59d16) The interactive district view shows how active backlog and change orders are distributed across Texas. One view highlights where remaining active backlog is concentrated, while the other view reveals where approved change orders are most prominent. Together, they highlight different segments of the active market. Dallas stands out in the backlog view, and Fort Worth leads in change orders, illustrating diverse market characteristics. --- ## Dallas Is Carrying the Largest Remaining Workload Dallas holds the largest active backlog, totaling $4.71 billion across 298 active projects. This contrasts with Austin and Houston, the second and third largest districts, which have active backlogs of $2.23 billion and $2.14 billion, respectively, but each carries a higher project count—156 and 384 projects. While Fort Worth has a significant backlog of $1.12 billion, its standout metric is its change order percentage at 21.1%, reflecting substantial contract adjustments post-award. The distribution of project numbers and backlog values highlights that project count alone does not fully explain the concentration of remaining dollars. | Rank | District | Active backlog | Projects | Change order % | Change orders | | --- | --- | --- | --- | --- | --- | | 1 | DALLAS | $4.71B | 298 | 1.6% | $129.76M | | 2 | AUSTIN | $2.23B | 156 | 4.7% | $211.23M | | 3 | HOUSTON | $2.14B | 384 | 7.8% | $481.23M | | 4 | SAN ANTONIO | $1.47B | 186 | 3.8% | $208.46M | | 5 | FORT WORTH | $1.12B | 186 | 21.1% | $626.10M | | 6 | BRYAN | $881.73M | 159 | 5.9% | $88.31M | | 7 | BEAUMONT | $721.28M | 140 | 6.2% | $106.14M | | 8 | PHARR | $680.99M | 122 | 5.1% | $63.97M | | 9 | YOAKUM | $590.54M | 149 | 2.5% | $50.98M | | 10 | EL PASO | $555.92M | 108 | 12.0% | $173.05M | | 11 | CORPUS CHRISTI | $535.88M | 162 | 4.2% | $50.37M | | 12 | AMARILLO | $398.20M | 88 | 1.6% | $16.64M | | 13 | PARIS | $391.11M | 158 | 6.0% | $79.04M | | 14 | LAREDO | $387.25M | 88 | 3.3% | $27.21M | | 15 | TYLER | $372.94M | 163 | 6.9% | $63.81M | | 16 | ODESSA | $370.08M | 153 | 6.0% | $72.42M | | 17 | WICHITA FALLS | $336.73M | 82 | 1.4% | $13.37M | | 18 | WACO | $295.75M | 98 | 3.1% | $23.30M | | 19 | ATLANTA | $205.22M | 86 | 6.4% | $37.70M | | 20 | LUFKIN | $181.91M | 79 | 2.6% | $18.89M | | 21 | LUBBOCK | $180.31M | 79 | 3.7% | $25.34M | | 22 | ABILENE | $139.29M | 63 | 2.7% | $9.04M | | 23 | BROWNWOOD | $99.97M | 110 | 6.4% | $18.22M | | 24 | SAN ANGELO | $87.51M | 68 | 7.6% | $23.94M | | 25 | CHILDRESS | $83.88M | 40 | 8.5% | $15.69M | --- ## Change Orders Add a Second View The statewide change order percentage is currently 5.7%, indicating the extent to which contract values have grown post-award. Fort Worth notably leads with a change order percentage of 21.1%, significantly higher than other districts. It also has the highest total for approved change orders at $626.10 million. Austin and Houston follow in change order activity, with percentages of 4.7% and 7.8%, respectively. The disparity in change order percentages across districts reveals variances in contract management and execution, underscoring that high change orders are not uniformly spread among the largest backlogs. --- ## Notable Active Projects Examining individual active projects shows where significant backlog values and change orders are situated. The largest active backlog project is in Dallas, CCSJ 2374-01-137, with a backlog of $1.71 billion, reflecting the district's overall leading position. In terms of change orders, CCSJ 0008-13-125 in Fort Worth has received $451.41 million in change orders against a backlog of $752.82 million, marking it as a critical project. The interplay of high active backlog and significant change orders emphasizes the diverse profiles within the TxDOT landscape. The table below shows the largest active projects by remaining backlog. | CCSJ | Project | District | Active backlog | Change orders | Change order % | | --- | --- | --- | --- | --- | --- | | 2374-01-137 | CCSJ 2374-01-137 (project NH 1902(389)) | DALLAS | $1.71B | $0 | 0.0% | | 0008-13-125 | CCSJ 0008-13-125 (project F 2022(675)) | FORT WORTH | $752.82M | $451.41M | 28.4% | | 0009-11-254 | CCSJ 0009-11-254 (project F 2025(365)) | DALLAS | $749.58M | $3.42M | 0.4% | | 0049-12-110 | CCSJ 0049-12-110 (project F 2025(274)) | BRYAN | $535.75M | $2.87M | 0.4% | | 0015-13-428 | CCSJ 0015-13-428 (project F 2024(833)) | AUSTIN | $528.87M | $753,983 | 0.1% | Projects like CCSJ 0008-13-125 in Fort Worth highlight the potential for considerable financial impacts due to change orders. --- ## What the Current Active Market Looks Like Currently, the active TxDOT market displays a statewide backlog of $19.17 billion, tied to 3,405 active projects. Dallas leads with the largest backlog, while Fort Worth commands the highest change order percentage. Notable contrasts exist, such as the project count and backlog concentration in districts like Austin and Houston. These dynamics illustrate a multifaceted market, with varying project profiles contributing to the overall landscape. --- --- ## TxDOT Pipeline Changes - June 2026 https://www.bidlo.ai/research/txdot-pipeline-changes-june-2026 How did the TxDOT project pipeline change in June? - The Texas Department of Transportation's (TxDOT) active project pipeline value increased from $30.12B to $30.34B, reflecting a $223.10M rise. - A total of 5,440 active projects were recorded, marking a gain of 5 projects since the last snapshot, with 79 entering and 74 exiting the letting window. - Houston experienced the largest net cost increase of $178.94M, while San Antonio saw a decrease of $46.63M. --- ## Overview Looking at the June 3 vs. July 3, 2026 snapshots, across a letting window of July 3, 2026 to July 1, 2029, the pipeline reflects a mixed dynamic. The letting dates show a drift with 99 projects shifting later and 71 moving earlier, indicating a net delay for the cohort. Roadway projects dominate the active pipeline at 78.1% of the total, while the pipeline value saw an increase of $223.10M. Overall, the changes suggest a moderate level of activity and adjustments in project timing. --- ## Letting Date Shifts (Slippage) [https://info.bidlo.ai/embed/letting-slippage-bubble?publication_id=bc5fcd59-b902-43d1-9bf9-2f36c6323eeb](https://info.bidlo.ai/embed/letting-slippage-bubble?publication_id=bc5fcd59-b902-43d1-9bf9-2f36c6323eeb) > How to read this chart: The letting dates for projects are shifting mainly later, with 99 projects pushed out over 6 months and 60 over 12 months. In contrast, 71 projects moved to earlier dates by 6 months or more, and 42 by 12 months or more. Overall, this leads to a net shift to later dates, indicating a trend towards delayed timelines in the project list. | CSJ | District | Est. Letting Date | Project Estimate | Current Type | Current Subtype | Prev. Type | Prev. Subtype | Prev. Date | Letting Δ (days) | Letting Date Δ | Cost Δ | %Cost Δ | Type/Subtype Δ | Lifecycle | | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | | 0093-04-050 | Waco | 09/01/27 | $0.00 | Construction | Roadway | Unassigned | Unassigned | 09/01/49 | -8036 | -22 years | | | Unassigned → Construction / Roadway | | | 2061-04-014 | Waco | 09/06/28 | $374,017.86 | Construction | Roadway | Unassigned | Unassigned | 10/01/49 | -7695 | -21 years | $(3,824,482.14) | -91% | Unassigned → Construction / Roadway | | | 2867-01-009 | Waco | 09/06/28 | $129,464.29 | Construction | Roadway | Unassigned | Unassigned | 10/01/49 | -7695 | -21 years | $(2,070,535.71) | -94% | Unassigned → Construction / Roadway | | | 0834-02-033 | Waco | 09/01/45 | $44,500.00 | | | Construction | Roadway | 09/01/27 | 6575 | 18 years | | | | | | 2061-03-014 | Waco | 09/01/45 | $292,050.00 | | | Construction | Roadway | 09/01/27 | 6575 | 18 years | | | | | | 0834-05-008 | Waco | 09/01/27 | $637,962.96 | Construction | Roadway | Unassigned | Unassigned | 09/01/45 | -6575 | -18 years | | | Unassigned → Construction / Roadway | | | 0168-09-195 | Amarillo | 04/01/45 | $900,000.00 | | | | | 04/06/27 | 6570 | 18 years | | | | | | 0232-04-016 | Waco | 01/01/45 | $77,900.00 | | | Construction | Roadway | 09/01/27 | 6332 | 17 years | | | | | | 0550-05-002 | Waco | 01/01/45 | $77,900.00 | | | Construction | Roadway | 09/01/27 | 6332 | 17 years | | | | | | 0162-02-041 | Waco | 09/06/28 | $1,616,526.79 | Construction | Roadway | Unassigned | Unassigned | 11/01/45 | -6265 | -17 years | $866,526.79 | 116% | Unassigned → Construction / Roadway | | | 0752-04-030 | Waco | 09/06/28 | $467,633.93 | Construction | Roadway | Unassigned | Unassigned | 09/01/45 | -6204 | -17 years | $361,633.93 | 341% | Unassigned → Construction / Roadway | | | 1372-02-015 | Waco | 09/06/28 | $330,357.14 | Construction | Roadway | Unassigned | Unassigned | 09/01/45 | -6204 | -17 years | $101,357.14 | 44% | Unassigned → Construction / Roadway | | | 1720-01-011 | Waco | 01/01/45 | $443,650.00 | | | Construction | Roadway | 09/06/28 | 5961 | 16 years | | | | | | 0168-09-198 | Amarillo | 12/01/40 | $900,000.00 | | | Construction | Non Roadway | 12/01/27 | 4749 | 13 years | | | | | | 2635-04-020 | Amarillo | 01/02/40 | $11,760,000.00 | | | Non-Let | Roadway | 01/01/28 | 4384 | 12 years | | | | | | 0904-02-057 | Amarillo | 05/01/40 | $500,000.00 | | | Construction | Non Roadway | 05/03/28 | 4381 | 12 years | | | | | | 0932-01-120 | Beaumont | 12/01/37 | $1,000,000.00 | | | Construction | Roadway | 10/06/26 | 4074 | 11 years | | | | | | 0041-01-053 | Amarillo | 01/01/40 | $4,000,000.00 | | | Construction | Roadway | 01/01/29 | 4017 | 11 years | | | | Canceled | | 0808-02-015 | Waco | 09/01/27 | $518,055.56 | Construction | Roadway | Unassigned | Unassigned | 01/01/38 | -3775 | -10 years | $(5,981,944.44) | -92% | Unassigned → Construction / Roadway | | | 0808-03-009 | Waco | 09/01/27 | $650,000.00 | Construction | Roadway | Unassigned | Unassigned | 01/01/38 | -3775 | -10 years | | | Unassigned → Construction / Roadway | | | 2920-02-005 | Austin | 02/01/38 | $2,166,877.78 | | | Construction | Roadway | 02/02/28 | 3652 | 10 years | | | | | | 0521-04-309 | San Antonio | 09/01/37 | $8,000,000.00 | | | Construction | Roadway | 09/06/28 | 3282 | 9 years | | | | | | 0521-04-310 | San Antonio | 09/01/37 | $6,000,000.00 | | | Construction | Roadway | 09/06/28 | 3282 | 9 years | | | | | | 0245-06-091 | Tyler | 03/02/35 | $142,770.00 | | | Non-Let | Roadway | 03/02/28 | 2556 | 7 years | | | | | | 0281-07-009 | Dallas | 10/01/33 | $215,599.80 | | | Construction | Roadway | 10/06/26 | 2552 | 7 years | | | | | | 0007-02-066 | Abilene | 12/01/32 | $296,259.00 | | | Construction | Roadway | 12/01/27 | 1827 | 5 years | | | | | | 0904-11-068 | Amarillo | 07/01/33 | $1,010,854.00 | | | Construction | Non Roadway | 07/06/28 | 1821 | 5 years | | | | | | 0904-11-072 | Amarillo | 07/01/33 | $58,840.00 | | | Construction | Roadway | 07/06/28 | 1821 | 5 years | | | | | | 0981-01-122 | Houston | 04/01/31 | $1,235,700.00 | | | Construction | Roadway | 09/02/26 | 1672 | 5 years | | | | | | 0981-02-012 | Houston | 04/01/31 | $678,042.00 | | | Construction | Roadway | 09/02/26 | 1672 | 5 years | | | | | | 0180-01-086 | Yoakum | 05/05/27 | $39,769,715.00 | Construction | Bridge | Unassigned | Unassigned | 10/01/31 | -1610 | -4 years | | | Unassigned → Construction / Bridge | | | 0528-01-113 | Pharr | 12/01/26 | $27,120,566.00 | Construction | Roadway | Unassigned | Unassigned | 08/01/30 | -1339 | -4 years | | | Unassigned → Construction / Roadway | | | 0976-03-122 | Houston | 04/01/31 | $528,000.00 | | | Construction | Roadway | 11/02/27 | 1246 | 3 years | | | | | | 1566-01-023 | Austin | 10/02/29 | $676,923.08 | Construction | Local Let | Construction | Local Let | 10/01/26 | 1097 | 3 years | | | | | | 0162-11-005 | Dallas | 10/05/27 | $1,885,635.00 | Construction | Roadway | Unassigned | Unassigned | 10/01/30 | -1092 | -3 years | | | Unassigned → Construction / Roadway | | | 0261-02-087 | Dallas | 04/05/28 | $2,264,548.86 | Construction | Roadway | Unassigned | Unassigned | 11/01/30 | -940 | -3 years | | | Unassigned → Construction / Roadway | | | 0918-47-555 | Dallas | 06/26/26 | $7,940,000.00 | Non-Let | Non Roadway | Construction | Roadway | 08/02/28 | -768 | -2 years | | | Construction / Roadway → Non-Let / Non Roadway | | | 0421-06-025 | San Antonio | 10/01/30 | $18,200,000.00 | | | Construction | Roadway | 09/06/28 | 755 | 2 years | | | | | | 0015-11-068 | Austin | 09/01/26 | $13,017,053.57 | Construction | Local Let | Construction | Local Let | 09/02/28 | -732 | -2 years | | | | | | 0006-14-006 | Abilene | 12/01/29 | $158,589.00 | Construction | Roadway | Construction | Roadway | 12/01/27 | 731 | 2 years | | | | | | 0006-15-042 | Abilene | 12/01/29 | $621,190.61 | Construction | Roadway | Construction | Roadway | 12/01/27 | 731 | 2 years | | | | | | 0007-01-063 | Abilene | 12/01/29 | $393,636.29 | Construction | Roadway | Construction | Roadway | 12/01/27 | 731 | 2 years | | | | | | 0033-05-094 | Abilene | 12/01/29 | $2,452,243.00 | Construction | Roadway | Construction | Roadway | 12/01/27 | 731 | 2 years | | | | | | 0296-05-036 | Abilene | 12/01/29 | $1,108,232.00 | Construction | Roadway | Construction | Roadway | 12/01/27 | 731 | 2 years | | | | | | 0332-01-028 | Abilene | 12/01/29 | $585,803.00 | Construction | Roadway | Construction | Roadway | 12/01/27 | 731 | 2 years | | | | | | 0480-03-047 | Abilene | 12/01/29 | $252,285.00 | Construction | Roadway | Construction | Roadway | 12/01/27 | 731 | 2 years | | | | | | 0480-03-048 | Abilene | 12/01/29 | $111,474.00 | Construction | Roadway | Construction | Roadway | 12/01/27 | 731 | 2 years | | | | | | 0550-07-005 | Waco | 09/01/29 | $310,600.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 731 | 2 years | | | | | | 1927-02-015 | Waco | 09/01/29 | $378,400.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 731 | 2 years | | | | | | 1927-03-018 | Waco | 09/01/29 | $485,950.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 731 | 2 years | | | | | | 2308-01-008 | Waco | 09/01/29 | $425,150.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 731 | 2 years | | | | | | 1243-02-033 | Amarillo | 03/05/29 | $1,000,000.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 03/05/27 | 731 | 2 years | | | | | | 1042-02-026 | San Antonio | 02/01/31 | $4,210,518.00 | | | Construction | Roadway | 02/01/29 | 730 | 2 years | | | | | | 0367-02-084 | Houston | 09/01/30 | $456,000.00 | | | Construction | Roadway | 09/06/28 | 725 | 2 years | | | | | | 1503-02-014 | Abilene | 10/01/30 | $7,000,000.00 | | | Construction | Roadway | 11/01/28 | 699 | 2 years | | | | | | 0918-46-358 | Dallas | 06/07/30 | $5,430,200.00 | Construction | Roadway | Construction | Roadway | 08/04/28 | 672 | 2 years | | | | | | 0912-72-583 | Houston | 01/15/29 | $736,806.00 | Construction | Local Let | Construction | Local Let | 03/15/27 | 672 | 2 years | | | | | | 0092-03-053 | Dallas | 12/01/26 | $62,131,255.85 | Construction | Roadway | Construction | Roadway | 09/06/28 | -645 | -2 years | | | | | | 1051-03-001 | Dallas | 12/01/26 | $54,002,986.08 | Construction | Roadway | Construction | Roadway | 09/06/28 | -645 | -2 years | | | | | | 0452-02-041 | Abilene | 01/01/31 | $5,100,000.00 | | | Construction | Roadway | 04/01/29 | 640 | 2 years | | | | | | 0168-08-077 | Amarillo | 02/01/29 | $300,000.00 | Construction | Bridge | Construction | Bridge | 05/05/27 | 638 | 2 years | | | | | | 0904-11-067 | Amarillo | 02/01/29 | $2,397,026.00 | Construction | Non Roadway | Construction | Non Roadway | 05/05/27 | 638 | 2 years | | | | | | 0089-15-019 | Yoakum | 01/06/27 | $690,000.00 | Construction | Non Roadway | Construction | Non Roadway | 10/04/28 | -637 | -2 years | | | | | | 0266-03-033 | Yoakum | 01/06/27 | $265,000.00 | Construction | Non Roadway | Construction | Non Roadway | 10/04/28 | -637 | -2 years | | | | | | 0266-08-018 | Yoakum | 01/06/27 | $690,000.00 | Construction | Non Roadway | Construction | Non Roadway | 10/04/28 | -637 | -2 years | | | | | | 1685-06-049 | Houston | 01/15/28 | $500,000.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 05/15/26 | 610 | 2 years | | | | | | 1414-03-043 | Houston | 10/06/26 | $1,027,880.00 | Construction | Roadway | Construction | Roadway | 06/01/28 | -604 | -2 years | | | | | | 0086-14-108 | Laredo | 08/04/27 | $197,420.69 | Construction | Non Roadway | Construction | Non Roadway | 01/01/26 | 580 | 2 years | | | | | | 2523-01-031 | Houston | 01/15/28 | $700,000.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 06/15/26 | 579 | 2 years | | | | | | 3595-01-030 | Houston | 01/15/28 | $238,000.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 06/15/26 | 579 | 2 years | | | | | | 3595-01-031 | Houston | 01/15/28 | $258,800.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 06/15/26 | 579 | 2 years | | | | | | 0902-90-338 | Fort Worth | 08/02/30 | $20,000,000.00 | Construction | Local Let | Construction | Local Let | 01/02/29 | 577 | 2 years | | | | | | 0341-04-075 | Beaumont | 01/06/27 | $104,910.00 | Construction | Roadway | Construction | Roadway | 08/02/28 | -574 | -2 years | | | | | | 0508-04-192 | Beaumont | 01/06/27 | $206,249.00 | Construction | Roadway | Construction | Roadway | 08/02/28 | -574 | -2 years | | | | | | 0883-02-097 | Beaumont | 01/06/27 | $61,394.00 | Construction | Roadway | Construction | Roadway | 08/02/28 | -574 | -2 years | | | | | | 1024-01-092 | Beaumont | 01/06/27 | $91,879.00 | Construction | Roadway | Construction | Roadway | 08/02/28 | -574 | -2 years | | | | | | 0521-04-305 | San Antonio | 05/05/27 | $30,151,873.00 | Construction | Roadway | Construction | Roadway | 10/04/28 | -518 | -1 year | | | | | | 0523-04-021 | Houston | 06/01/28 | $1,937,328.00 | Construction | Bridge | Construction | Bridge | 01/06/27 | 512 | 1 year | | | | | | 0741-01-025 | Abilene | 11/01/30 | $6,500,000.00 | | | Construction | Roadway | 07/01/29 | 488 | 1 year | | | | | | 0902-90-365 | Fort Worth | 08/01/27 | $11,748.22 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 04/02/26 | 486 | 1 year | | | | | | 0249-02-026 | Wichita Falls | 10/06/26 | $4,723,750.00 | Construction | Roadway | Construction | Roadway | 02/02/28 | -484 | -1 year | | | | | | 0249-03-056 | Wichita Falls | 10/06/26 | $276,250.00 | Construction | Roadway | Construction | Roadway | 02/02/28 | -484 | -1 year | | | | | | 0113-09-072 | Austin | 07/03/26 | $16,950,000.00 | Construction | Local Let | Construction | Local Let | 09/03/27 | -427 | -1 year | | | | | | 0627-04-070 | Beaumont | 12/01/26 | $3,000,000.00 | Construction | Roadway | Construction | Roadway | 01/05/28 | -400 | -1 year | | | | | | 0177-01-123 | Lufkin | 02/02/27 | $2,677,773.44 | Construction | Roadway | Construction | Roadway | 03/07/28 | -399 | -1 year | | | | | | 0903-28-073 | Wichita Falls | 09/02/26 | $1,239,741.87 | Construction | Bridge | Construction | Bridge | 10/05/27 | -398 | -1 year | $155,741.87 | 14% | | | | 2950-01-010 | Houston | 01/05/28 | $4,624,667.00 | Construction | Roadway | Construction | Roadway | 02/01/29 | -393 | -1 year | | | | | | 0387-01-016 | Dallas | 10/06/26 | $6,039,010.45 | Construction | Roadway | Construction | Roadway | 11/02/27 | -392 | -1 year | | | | | | 0051-03-123 | Houston | 07/06/28 | $9,073,088.00 | Construction | Roadway | Construction | Roadway | 08/01/29 | -391 | -1 year | | | | | | 1361-03-030 | Abilene | 12/05/28 | $806,245.00 | Construction | Roadway | Construction | Roadway | 12/01/27 | 370 | 1 year | | | | | | 2032-01-011 | Abilene | 12/05/28 | $250,584.00 | Construction | Roadway | Construction | Roadway | 12/01/27 | 370 | 1 year | | | | | | 2032-02-016 | Abilene | 12/05/28 | $773,738.50 | Construction | Roadway | Construction | Roadway | 12/01/27 | 370 | 1 year | | | | | | 0062-07-098 | Atlanta | 03/07/28 | $9,175,275.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | 370 | 1 year | | | | | | 1601-02-037 | Fort Worth | 12/01/27 | $450,000.00 | Construction | Roadway | Construction | Roadway | 12/05/28 | -370 | -1 year | | | | | | 1601-03-017 | Fort Worth | 12/01/27 | $450,000.00 | Construction | Roadway | Construction | Roadway | 12/05/28 | -370 | -1 year | | | | | | 0111-05-019 | Houston | 03/03/27 | $4,480,673.00 | Construction | Roadway | Construction | Roadway | 03/07/28 | -370 | -1 year | | | | | | 0847-06-013 | Houston | 03/03/27 | $3,919,359.00 | Construction | Roadway | Construction | Roadway | 03/07/28 | -370 | -1 year | | | | | | 0912-72-799 | Houston | 02/15/28 | $5,012,434.62 | Construction | Local Let | Construction | Local Let | 02/15/27 | 365 | 1 year | $(709,773.38) | -12% | | | | 0027-08-192 | Houston | 01/15/28 | $1,407,100.00 | Construction | Local Let | Construction | Local Let | 01/15/27 | 365 | 1 year | | | | | | 0109-04-030 | Lufkin | 04/06/27 | $1,248,237.85 | Construction | Roadway | Construction | Roadway | 04/05/28 | -365 | -1 year | | | | | | 0109-05-045 | Lufkin | 04/06/27 | $990,000.00 | Construction | Roadway | Construction | Roadway | 04/05/28 | -365 | -1 year | | | | | | 0117-07-046 | Lufkin | 04/06/27 | $811,501.22 | Construction | Roadway | Construction | Roadway | 04/05/28 | -365 | -1 year | | | | | | 0118-01-021 | Lufkin | 04/06/27 | $1,253,430.00 | Construction | Roadway | Construction | Roadway | 04/05/28 | -365 | -1 year | | | | | | 0336-01-067 | Lufkin | 04/06/27 | $986,678.00 | Construction | Roadway | Construction | Roadway | 04/05/28 | -365 | -1 year | | | | | | 0340-01-042 | Lufkin | 04/06/27 | $722,577.70 | Construction | Roadway | Construction | Roadway | 04/05/28 | -365 | -1 year | | | | | | 1875-02-031 | Lufkin | 04/06/27 | $1,126,458.63 | Construction | Roadway | Construction | Roadway | 04/05/28 | -365 | -1 year | | | | | | 0172-09-045 | Fort Worth | 02/02/27 | $4,306,849.55 | Construction | Non Roadway | Construction | Non Roadway | 02/02/28 | -365 | -1 year | | | | | | 0271-14-244 | Houston | 02/02/27 | $1,000,000.00 | Construction | Roadway | Construction | Roadway | 02/02/28 | -365 | -1 year | | | | | | 0156-07-115 | Wichita Falls | 12/01/26 | $528,592.00 | Construction | Roadway | Construction | Roadway | 12/01/27 | -365 | -1 year | | | | | | 1344-02-027 | Lubbock | 08/01/29 | $40,000,000.00 | Construction | Roadway | Construction | Roadway | 08/02/28 | 364 | 12 months | | | | | | 0511-02-030 | San Antonio | 05/03/28 | $5,773,214.00 | Construction | Roadway | Construction | Roadway | 05/05/27 | 364 | 12 months | | | | | | 0511-02-031 | San Antonio | 05/03/28 | $4,372,262.00 | Construction | Roadway | Construction | Roadway | 05/05/27 | 364 | 12 months | | | | | | 1076-01-040 | Wichita Falls | 11/02/27 | $273,746.00 | Construction | Roadway | Construction | Roadway | 11/03/26 | 364 | 12 months | | | | | | 6493-98-001 | Houston | 09/01/27 | $1,902,980.58 | Maintenance | Routine Maintenance Contract | Maintenance | Routine Maintenance Contract | 09/02/26 | 364 | 12 months | | | | | | 3271-01-019 | Beaumont | 09/02/26 | $442,193.04 | Construction | Roadway | Construction | Roadway | 09/01/27 | -364 | -12 months | $(324,983.96) | -42% | | | | 0918-24-316 | Dallas | 06/02/29 | $3,907,500.00 | Construction | Local Let | Construction | Local Let | 06/04/28 | 363 | 12 months | | | | | | 0780-01-021 | Fort Worth | 12/01/29 | $450,000.00 | Construction | Roadway | Construction | Roadway | 12/05/28 | 361 | 12 months | | | | | | 1004-01-066 | Houston | 04/05/28 | $2,690,262.00 | Construction | Roadway | Construction | Roadway | 04/01/29 | -361 | -12 months | | | | | | 1004-01-067 | Houston | 04/05/28 | $3,392,846.00 | Construction | Roadway | Construction | Roadway | 04/01/29 | -361 | -12 months | | | | | | 3158-01-048 | Houston | 04/05/28 | $2,859,997.00 | Construction | Roadway | Construction | Roadway | 04/01/29 | -361 | -12 months | | | | | | 0232-01-056 | Waco | 09/01/29 | $1,442,651.79 | Construction | Roadway | Construction | Roadway | 09/06/28 | 360 | 12 months | $(173,118.21) | -11% | | | | 0251-02-057 | Waco | 09/01/29 | $1,860,160.71 | Construction | Roadway | Construction | Roadway | 09/06/28 | 360 | 12 months | $(223,219.29) | -11% | | | | 0909-37-070 | Waco | 03/07/28 | $399,000.00 | Construction | Bridge | Construction | Bridge | 03/01/29 | -359 | -12 months | | | | | | 0298-01-044 | Lubbock | 05/03/28 | $695,200.00 | Construction | Roadway | Construction | Roadway | 06/01/27 | 337 | 11 months | | | | | | 0453-05-019 | Lubbock | 05/03/28 | $752,400.00 | Construction | Roadway | Construction | Roadway | 06/01/27 | 337 | 11 months | | | | | | 0558-01-015 | Lubbock | 05/03/28 | $607,200.00 | Construction | Roadway | Construction | Roadway | 06/01/27 | 337 | 11 months | | | | | | 0806-04-021 | Lubbock | 05/03/28 | $734,800.00 | Construction | Roadway | Construction | Roadway | 06/01/27 | 337 | 11 months | | | | | | 0053-05-055 | Lubbock | 06/01/27 | $1,200,000.00 | Construction | Roadway | Construction | Roadway | 05/03/28 | -337 | -11 months | | | | | | 0053-05-056 | Lubbock | 06/01/27 | $1,200,000.00 | Construction | Roadway | Construction | Roadway | 05/03/28 | -337 | -11 months | | | | | | 0067-07-108 | Lubbock | 06/01/27 | $569,000.00 | Construction | Roadway | Construction | Roadway | 05/03/28 | -337 | -11 months | | | | | | 0380-01-099 | Lubbock | 06/01/27 | $2,000,000.00 | Construction | Roadway | Construction | Roadway | 05/03/28 | -337 | -11 months | | | | | | 1139-02-024 | Dallas | 04/06/27 | $12,120,167.17 | Construction | Roadway | Construction | Roadway | 03/07/28 | -336 | -11 months | | | | | | 0718-01-077 | Dallas | 01/06/27 | $605,770.20 | Construction | Roadway | Construction | Roadway | 12/01/27 | -329 | -11 months | | | | | | 0222-05-054 | Atlanta | 09/06/28 | $750,000.00 | Construction | Rail - Safety | Construction | Rail - Safety | 11/02/27 | 309 | 10 months | | | | | | 0027-02-034 | Yoakum | 11/01/29 | $21,600,000.00 | Construction | Roadway | Construction | Roadway | 01/01/29 | 304 | 10 months | | | | | | 0047-07-252 | Dallas | 06/02/29 | $3,000,000.00 | Construction | Local Let | Construction | Local Let | 08/04/28 | 302 | 10 months | | | | | | 0918-00-472 | Dallas | 06/02/29 | $495,000.00 | Construction | Roadway | Construction | Roadway | 08/04/28 | 302 | 10 months | | | | | | 0918-46-363 | Dallas | 06/02/29 | $3,750,000.00 | Construction | Local Let | Construction | Local Let | 08/04/28 | 302 | 10 months | | | | | | 2304-03-016 | Waco | 01/06/27 | $19,300,000.00 | Construction | Roadway | Construction | Roadway | 11/02/27 | -300 | -10 months | | | | | | 2150-04-102 | Laredo | 08/04/27 | $1,651,000.00 | Construction | Roadway | Construction | Roadway | 11/01/26 | 276 | 9 months | | | | | | 0677-01-025 | Abilene | 01/01/30 | $1,250,000.00 | Construction | Roadway | Construction | Roadway | 04/01/29 | 275 | 9 months | | | | | | 0699-03-019 | Abilene | 01/01/30 | $2,900,000.00 | Construction | Roadway | Construction | Roadway | 04/01/29 | 275 | 9 months | | | | | | 0699-03-021 | Abilene | 01/01/30 | $650,000.00 | Construction | Roadway | Construction | Roadway | 04/01/29 | 275 | 9 months | | | | | | 0141-07-034 | San Angelo | 02/02/27 | $9,303,974.04 | Construction | Roadway | Construction | Roadway | 11/02/27 | -273 | -9 months | | | | | | 2240-01-021 | Atlanta | 07/01/27 | $746,753.00 | Construction | Bridge | Construction | Bridge | 10/06/26 | 268 | 9 months | | | | | | 0233-05-039 | El Paso | 08/04/27 | $72,115.38 | Construction | Rail | Construction | Rail | 12/01/26 | 246 | 8 months | | | | | | 0674-01-077 | El Paso | 08/04/27 | $72,115.38 | Construction | Rail | Construction | Rail | 12/01/26 | 246 | 8 months | | | | | | 1281-01-020 | El Paso | 08/04/27 | $72,115.38 | Construction | Rail | Construction | Rail | 12/01/26 | 246 | 8 months | | | | | | 1378-04-058 | Austin | 05/03/28 | $1,494,901.64 | Construction | Roadway | Construction | Roadway | 09/01/27 | 245 | 8 months | | | | | | 0619-03-065 | Dallas | 02/01/27 | $805,000.00 | Construction | Roadway | Construction | Roadway | 06/01/26 | 245 | 8 months | | | | | | 0581-02-158 | Dallas | 12/03/26 | $1,527,291.40 | Construction | Local Let | Construction | Local Let | 08/02/27 | -242 | -8 months | $877,291.40 | 135% | | | | 0052-07-067 | Lubbock | 04/06/27 | $590,724.69 | Construction | Roadway | Construction | Roadway | 12/01/27 | -239 | -8 months | | | | | | 0228-03-034 | Lubbock | 04/06/27 | $629,522.76 | Construction | Roadway | Construction | Roadway | 12/01/27 | -239 | -8 months | | | | | | 0880-04-045 | Lubbock | 04/06/27 | $1,068,204.01 | Construction | Roadway | Construction | Roadway | 12/01/27 | -239 | -8 months | | | | | | 2883-02-011 | San Antonio | 09/01/27 | $1,105,769.00 | Construction | Roadway | Construction | Roadway | 01/06/27 | 238 | 8 months | | | | | | 1062-03-055 | Houston | 06/01/27 | $6,804,421.00 | Construction | Roadway | Construction | Roadway | 01/05/28 | -218 | -7 months | | | | | | 0195-02-090 | Dallas | 06/01/29 | $159,894,765.10 | Construction | Roadway | Construction | Roadway | 11/01/28 | 212 | 7 months | | | | | | 0397-02-043 | Childress | 07/01/27 | $1,200,000.00 | Construction | Roadway | Construction | Roadway | 12/01/26 | 212 | 7 months | | | | | | 1530-01-012 | Abilene | 03/07/28 | $6,218,588.70 | Construction | Roadway | Construction | Roadway | 10/04/28 | -211 | -7 months | $(383,859.00) | -6% | | | | 3256-02-122 | Houston | 06/01/27 | $130,000.00 | Construction | Bridge | Construction | Bridge | 11/03/26 | 210 | 7 months | | | | | | 0918-47-542 | Dallas | 04/06/27 | $902,431.20 | Construction | Roadway | Construction | Roadway | 11/02/27 | -210 | -7 months | | | | | | 0014-01-033 | Fort Worth | 08/01/27 | $0.00 | Construction | Local Let | Non-Let | Local | 01/15/27 | 198 | 7 months | $(2,000,000.00) | -100% | Non-Let / Local → Construction / Local Let | | | 0143-10-059 | Yoakum | 03/07/28 | $9,280,000.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 188 | 6 months | | | | | | 0181-02-033 | Abilene | 09/06/28 | $11,871,252.80 | Construction | Roadway | Construction | Roadway | 03/07/28 | 183 | 6 months | | | | | | 0111-03-064 | Houston | 08/04/27 | $108,568,030.00 | Construction | Roadway | Construction | Roadway | 02/02/27 | 183 | 6 months | | | | | | 0643-01-057 | Bryan | 08/04/27 | $22,973,558.00 | Construction | Roadway | Construction | Roadway | 02/02/27 | 183 | 6 months | | | | | | 0168-10-084 | Amarillo | 06/01/27 | $100,000.00 | Construction | Non Roadway | Construction | Non Roadway | 12/01/27 | -183 | -6 months | | | | | | 0168-09-197 | Amarillo | 06/01/27 | $847,000.00 | Construction | Non Roadway | Construction | Non Roadway | 12/01/26 | 182 | 6 months | | | | | | 0168-10-083 | Amarillo | 06/01/27 | $300,000.00 | Construction | Roadway | Construction | Roadway | 12/01/26 | 182 | 6 months | | | | | | 0502-01-252 | Houston | 04/15/27 | $600,000.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 10/15/26 | 182 | 6 months | | | | | | 0648-03-082 | Bryan | 04/06/27 | $506,313.00 | Construction | Roadway | Construction | Roadway | 10/05/27 | -182 | -6 months | | | | | | 0648-04-004 | Bryan | 04/06/27 | $142,727.00 | Construction | Roadway | Construction | Roadway | 10/05/27 | -182 | -6 months | | | | | | 0916-36-024 | Corpus Christi | 12/01/26 | $4,000,000.00 | Construction | Bridge | Construction | Bridge | 06/01/27 | -182 | -6 months | | | | | | 0918-47-544 | Dallas | 05/05/27 | $643,616.00 | Construction | Roadway | Construction | Roadway | 11/02/27 | -181 | -6 months | | | | | | 1418-03-021 | Houston | 06/01/26 | $431,140.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 11/15/26 | -167 | -5 months | | | | | | 0275-01-261 | Amarillo | 10/05/27 | $800,000.00 | Construction | Bridge | Construction | Bridge | 03/07/28 | -154 | -5 months | | | | | | 0275-01-262 | Amarillo | 10/05/27 | $800,000.00 | Construction | Bridge | Construction | Bridge | 03/07/28 | -154 | -5 months | | | | | | 0049-07-072 | Bryan | 05/05/27 | $540,512.00 | Construction | Roadway | Construction | Roadway | 10/05/27 | -153 | -5 months | | | | | | 0912-37-259 | Houston | 03/15/27 | $13,200,000.00 | Construction | Local Let | Construction | Local Let | 10/15/26 | 151 | 5 months | | | | | | 0317-01-045 | Abilene | 04/06/27 | $5,250,000.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | -148 | -5 months | | | | | | 0619-05-040 | Dallas | 04/06/27 | $493,912.10 | Construction | Roadway | Construction | Roadway | 09/01/27 | -148 | -5 months | | | | | | 2121-03-172 | El Paso | 06/01/27 | $5,373,871.15 | Construction | Bridge | Construction | Bridge | 01/06/27 | 146 | 5 months | | | | | | 0035-01-036 | San Angelo | 12/01/26 | $16,300,000.00 | Construction | Roadway | Construction | Roadway | 04/06/27 | -126 | -4 months | | | | | | 2006-03-013 | San Angelo | 12/01/26 | $926,675.86 | Construction | Roadway | Construction | Roadway | 04/06/27 | -126 | -4 months | | | | | | 1911-01-023 | Houston | 09/02/26 | $3,375,346.25 | Construction | Bridge | Construction | Bridge | 01/06/27 | -126 | -4 months | $(572,500.75) | -15% | | | | 3595-01-027 | Houston | 04/15/27 | $540,000.00 | Construction | Local Let | Construction | Local Let | 12/15/26 | 121 | 4 months | | | | | | 0918-22-174 | Dallas | 05/01/29 | $1,128,765.60 | Construction | Bridge | Construction | Bridge | 01/01/29 | 120 | 4 months | | | | | | 0002-05-053 | El Paso | 02/02/28 | $25,138.30 | Construction | Roadway | Construction | Roadway | 10/05/27 | 120 | 4 months | | | | | | 0002-06-065 | El Paso | 02/02/28 | $16,758.86 | Construction | Roadway | Construction | Roadway | 10/05/27 | 120 | 4 months | | | | | | 0002-07-059 | El Paso | 02/02/28 | $50,276.59 | Construction | Roadway | Construction | Roadway | 10/05/27 | 120 | 4 months | | | | | | 0002-08-058 | El Paso | 02/02/28 | $25,138.30 | Construction | Roadway | Construction | Roadway | 10/05/27 | 120 | 4 months | | | | | | 0002-09-042 | El Paso | 02/02/28 | $16,758.86 | Construction | Roadway | Construction | Roadway | 10/05/27 | 120 | 4 months | | | | | | 0002-10-041 | El Paso | 02/02/28 | $67,035.46 | Construction | Roadway | Construction | Roadway | 10/05/27 | 120 | 4 months | | | | | | 0002-11-063 | El Paso | 02/02/28 | $41,897.17 | Construction | Roadway | Construction | Roadway | 10/05/27 | 120 | 4 months | | | | | | 0003-01-069 | El Paso | 02/02/28 | $16,758.86 | Construction | Roadway | Construction | Roadway | 10/05/27 | 120 | 4 months | | | | | | 0003-02-054 | El Paso | 02/02/28 | $16,758.86 | Construction | Roadway | Construction | Roadway | 10/05/27 | 120 | 4 months | | | | | | 0003-03-053 | El Paso | 02/02/28 | $16,758.86 | Construction | Roadway | Construction | Roadway | 10/05/27 | 120 | 4 months | | | | | | 0003-04-060 | El Paso | 02/02/28 | $50,276.59 | Construction | Roadway | Construction | Roadway | 10/05/27 | 120 | 4 months | | | | | | 0358-01-033 | El Paso | 02/02/28 | $52,821.56 | Construction | Roadway | Construction | Roadway | 10/05/27 | 120 | 4 months | | | | | | 0358-05-019 | El Paso | 02/02/28 | $313,963.89 | Construction | Roadway | Construction | Roadway | 10/05/27 | 120 | 4 months | | | | | | 0415-01-028 | El Paso | 02/02/28 | $166,804.95 | Construction | Roadway | Construction | Roadway | 10/05/27 | 120 | 4 months | | | | | | 0415-02-033 | El Paso | 02/02/28 | $125,103.71 | Construction | Roadway | Construction | Roadway | 10/05/27 | 120 | 4 months | | | | | | 0512-02-017 | El Paso | 02/02/28 | $41,701.24 | Construction | Roadway | Construction | Roadway | 10/05/27 | 120 | 4 months | | | | | | 2121-05-058 | El Paso | 02/02/28 | $33,517.73 | Construction | Roadway | Construction | Roadway | 10/05/27 | 120 | 4 months | | | | | | 2121-06-061 | El Paso | 02/02/28 | $16,758.86 | Construction | Roadway | Construction | Roadway | 10/05/27 | 120 | 4 months | | | | | | 0013-08-149 | Fort Worth | 03/03/27 | $15,928,453.33 | Construction | Roadway | Construction | Roadway | 07/01/27 | -120 | -4 months | | | | | | 0500-03-656 | Houston | 03/03/27 | $1,280,375.00 | Construction | Roadway | Construction | Roadway | 11/03/26 | 120 | 4 months | | | | | | 0009-11-248 | Dallas | 10/06/26 | $57,043,890.08 | Construction | Roadway | Construction | Roadway | 02/02/27 | -119 | -4 months | | | | | | 0013-10-092 | Fort Worth | 07/15/26 | $449,928.60 | Construction | Local Let | Construction | Local Let | 04/01/26 | 105 | 3 months | | | | | | 0023-05-092 | San Antonio | 07/01/27 | $800,000.00 | Construction | Bridge | Construction | Bridge | 10/05/27 | -96 | -3 months | | | | | | 0072-06-093 | San Antonio | 07/01/27 | $676,000.00 | Construction | Bridge | Construction | Bridge | 10/05/27 | -96 | -3 months | | | | | | 0073-09-043 | San Antonio | 07/01/27 | $500,000.00 | Construction | Bridge | Construction | Bridge | 10/05/27 | -96 | -3 months | | | | | | 0073-09-044 | San Antonio | 07/01/27 | $500,000.00 | Construction | Bridge | Construction | Bridge | 10/05/27 | -96 | -3 months | | | | | | 0073-10-067 | San Antonio | 07/01/27 | $500,000.00 | Construction | Bridge | Construction | Bridge | 10/05/27 | -96 | -3 months | | | | | | 0521-06-167 | San Antonio | 07/01/27 | $471,000.00 | Construction | Bridge | Construction | Bridge | 10/05/27 | -96 | -3 months | | | | | | 0521-06-168 | San Antonio | 07/01/27 | $623,000.00 | Construction | Bridge | Construction | Bridge | 10/05/27 | -96 | -3 months | | | | | | 0916-27-016 | Corpus Christi | 12/01/26 | $1,050,000.00 | Construction | Bridge | Construction | Bridge | 03/03/27 | -92 | -3 months | | | | | | 2208-02-026 | Dallas | 11/01/28 | $6,590,209.08 | Construction | Roadway | Construction | Roadway | 08/02/28 | 91 | 3 months | | | | | | 3510-06-038 | Houston | 08/04/27 | $23,978,813.00 | Construction | Roadway | Construction | Roadway | 05/05/27 | 91 | 3 months | | | | | | 3510-07-012 | Houston | 08/04/27 | $63,904,122.00 | Construction | Roadway | Construction | Roadway | 05/05/27 | 91 | 3 months | | | | | | 0195-02-091 | Dallas | 08/04/27 | $130,262,376.64 | Construction | Roadway | Construction | Roadway | 11/02/27 | -90 | -3 months | | | | | | 0014-15-090 | Fort Worth | 06/01/27 | $55,912,929.52 | Construction | Roadway | Construction | Roadway | 03/03/27 | 90 | 3 months | | | | | | 0981-02-014 | Houston | 09/02/26 | $80,542.96 | Construction | Roadway | Construction | Roadway | 12/01/26 | -90 | -3 months | $19,942.96 | 33% | | | | 1414-01-025 | Houston | 09/02/26 | $411,754.93 | Construction | Roadway | Construction | Roadway | 12/01/26 | -90 | -3 months | $90,979.93 | 28% | | | | 1844-01-032 | Houston | 09/02/26 | $98,200.58 | Construction | Roadway | Construction | Roadway | 12/01/26 | -90 | -3 months | $8,200.58 | 9% | | | | 1844-02-025 | Houston | 09/02/26 | $136,321.34 | Construction | Roadway | Construction | Roadway | 12/01/26 | -90 | -3 months | $(1,678.66) | -1% | | | | 3055-01-011 | Houston | 09/02/26 | $154,991.03 | Construction | Roadway | Construction | Roadway | 12/01/26 | -90 | -3 months | $28,991.03 | 23% | | | | 0904-11-069 | Amarillo | 02/01/29 | $2,193,438.00 | Construction | Non Roadway | Construction | Non Roadway | 05/01/29 | -89 | -3 months | $679,300.00 | 45% | | | | 0018-05-110 | Laredo | 08/04/27 | $33,110.00 | Construction | Roadway | Construction | Roadway | 11/01/27 | -89 | -3 months | | | | | | 0018-06-223 | Laredo | 08/04/27 | $871,519.00 | Construction | Roadway | Construction | Roadway | 11/01/27 | -89 | -3 months | | | | | | 0922-33-217 | Laredo | 01/06/27 | $700,000.00 | Construction | Bridge | Construction | Bridge | 11/03/26 | 64 | 2 months | | | | | | 0912-73-246 | Houston | 03/15/27 | $9,403,008.00 | Construction | Local Let | Construction | Local Let | 01/15/27 | 59 | 2 months | | | | | | 0238-06-040 | Amarillo | 11/01/28 | $6,000,000.00 | Construction | Roadway | Construction | Roadway | 09/06/28 | 56 | 2 months | $(2,000,000.00) | -25% | | | | 0451-01-053 | Dallas | 11/01/28 | $117,610,100.89 | Construction | Roadway | Construction | Roadway | 09/06/28 | 56 | 2 months | | | | | | 0027-03-078 | Yoakum | 01/06/27 | $1,500,000.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | -56 | -2 months | | | | | | 0445-01-072 | Yoakum | 01/06/27 | $7,200,000.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | -56 | -2 months | | | | | | 0445-02-074 | Yoakum | 01/06/27 | $800,000.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | -56 | -2 months | | | | | | 0196-03-297 | Dallas | 06/12/26 | $4,000,000.00 | Transfer | Transfer | Transfer | Transfer | 08/02/26 | -51 | -2 months | | | | | | 2635-03-031 | Amarillo | 12/01/26 | $4,000,000.00 | Construction | Roadway | Construction | Roadway | 01/06/27 | -36 | -1 month | $2,800,000.00 | 233% | | | | 2635-04-048 | Amarillo | 12/01/26 | $300,000.00 | Construction | Roadway | Construction | Roadway | 01/06/27 | -36 | -1 month | | | | | | 0924-06-749 | El Paso | 02/02/28 | $88,385.63 | Construction | Roadway | Construction | Roadway | 03/07/28 | -34 | -1 month | $(0.93) | 0% | | | | 0924-06-750 | El Paso | 02/02/28 | $36,787.85 | Construction | Roadway | Construction | Roadway | 03/07/28 | -34 | -1 month | $(0.93) | 0% | | | | 0110-06-151 | Houston | 09/02/26 | $937,804.97 | Construction | Roadway | Construction | Roadway | 10/06/26 | -34 | -1 month | $(67,347.09) | -7% | | | | 0110-07-022 | Houston | 09/02/26 | $346,537.14 | Construction | Roadway | Construction | Roadway | 10/06/26 | -34 | -1 month | $(3,369.99) | -1% | | | | 0747-01-020 | Dallas | 02/01/29 | $2,868,310.60 | Construction | Bridge | Construction | Bridge | 01/01/29 | 31 | 1 month | | | | | | 0747-01-021 | Dallas | 02/01/29 | $3,269,965.03 | Construction | Bridge | Construction | Bridge | 01/01/29 | 31 | 1 month | | | | | | 0549-01-041 | Paris | 02/02/27 | $2,200,000.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | -29 | -29 days | | | | | | 0066-05-071 | Amarillo | 03/01/29 | $4,240,000.00 | Construction | Bridge | Construction | Bridge | 02/01/29 | 28 | 28 days | | | | | | 0066-05-072 | Amarillo | 03/01/29 | $4,150,000.00 | Construction | Bridge | Construction | Bridge | 02/01/29 | 28 | 28 days | | | | | | 0066-05-076 | Amarillo | 03/01/29 | $3,090,000.00 | Construction | Bridge | Construction | Bridge | 02/01/29 | 28 | 28 days | | | | | | 0066-05-077 | Amarillo | 03/01/29 | $3,150,000.00 | Construction | Bridge | Construction | Bridge | 02/01/29 | 28 | 28 days | | | | | | 0090-03-067 | Amarillo | 02/01/29 | $1,000,000.00 | Construction | Bridge | Construction | Bridge | 03/01/29 | -28 | -28 days | | | | | | 0090-05-119 | Amarillo | 02/01/29 | $720,000.00 | Construction | Bridge | Construction | Bridge | 03/01/29 | -28 | -28 days | | | | | | 0727-04-022 | Amarillo | 02/02/28 | $2,071,017.51 | Construction | Roadway | Construction | Roadway | 01/05/28 | 28 | 28 days | | | | | | 2001-01-011 | Amarillo | 02/02/28 | $1,435,425.24 | Construction | Roadway | Construction | Roadway | 01/05/28 | 28 | 28 days | | | | | | 2494-01-018 | Amarillo | 02/02/28 | $1,176,471.00 | Construction | Roadway | Construction | Roadway | 01/05/28 | 28 | 28 days | $1,000.00 | 0% | | | | 0912-73-247 | Houston | 03/15/27 | $6,043,008.00 | Construction | Local Let | Construction | Local Let | 02/15/27 | 28 | 28 days | | | | | | 0089-07-166 | Yoakum | 08/05/26 | $240,432,788.90 | Construction | Roadway | Construction | Roadway | 09/02/26 | -28 | -28 days | $10,675,535.40 | 5% | | | | 0265-03-042 | Austin | 01/06/27 | $60,122,400.00 | Construction | Roadway | Construction | Roadway | 02/02/27 | -27 | -27 days | | | | | | 0902-90-296 | Fort Worth | 09/24/26 | $2,573,875.05 | Construction | Local Let | Construction | Local Let | 09/15/26 | 9 | 9 days | | | | | | 0902-90-350 | Fort Worth | 09/24/26 | $1,552,000.00 | Construction | Local Let | Construction | Local Let | 09/15/26 | 9 | 9 days | | | | | | 6495-90-001 | Dallas | 10/14/26 | $333,500.00 | Maintenance | Bridge Preventive | Maintenance | Bridge Preventive | 10/06/26 | 8 | 8 days | | | | | --- ## Project Type & Subtype Changes The subtype mix within the pipeline remained relatively stable. Roadway projects make up 78.1% of the pipeline, slightly down from 78.3%. There were 17 type/subtype transitions in total, with 13 newly assigned classifications, highlighting some level of reclassification activity without significant churn in the overall structure. | Subtype | Jun 3 | Jul 3 | Δ (pp, n) | | --- | --- | --- | --- | | Roadway | 78.3% (4,231) | 78.1% (4,224) | -0.2 (-7) | | Bridge | 13.7% (741) | 13.7% (743) | +0.0 (+2) | | Local Let | 3.3% (179) | 3.4% (183) | +0.1 (+4) | | Non Roadway | 1.8% (99) | 1.8% (99) | -0.0 (+0) | | Rail - Safety | 1.1% (60) | 1.2% (64) | +0.1 (+4) | | CSJ | District | Est. Letting Date | Project Estimate | Current Type | Current Subtype | Type/Subtype Δ | Prev. Type | Prev. Subtype | Prev. Cost | Prev. Date | Letting Δ (days) | Letting Date Δ | Cost Δ | %Cost Δ | Lifecycle | | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | | 0918-47-555 | Dallas | 06/26/26 | $7,940,000.00 | Non-Let | Non Roadway | Construction / Roadway → Non-Let / Non Roadway | Construction | Roadway | $7,940,000.00 | 08/02/28 | -768 | -2 years | | | | | 0528-01-113 | Pharr | 12/01/26 | $27,120,566.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $27,120,566.00 | 08/01/30 | -1339 | -4 years | | | | | 0180-01-086 | Yoakum | 05/05/27 | $39,769,715.00 | Construction | Bridge | Unassigned → Construction / Bridge | Unassigned | Unassigned | $39,769,715.00 | 10/01/31 | -1610 | -4 years | | | | | 0014-01-033 | Fort Worth | 08/01/27 | $0.00 | Construction | Local Let | Non-Let / Local → Construction / Local Let | Non-Let | Local | $2,000,000.00 | 01/15/27 | 198 | 7 months | $(2,000,000.00) | -100% | | | 0093-04-050 | Waco | 09/01/27 | $0.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $0.00 | 09/01/49 | -8036 | -22 years | | | | | 0808-02-015 | Waco | 09/01/27 | $518,055.56 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $6,500,000.00 | 01/01/38 | -3775 | -10 years | $(5,981,944.44) | -92% | | | 0808-03-009 | Waco | 09/01/27 | $650,000.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $650,000.00 | 01/01/38 | -3775 | -10 years | | | | | 0834-05-008 | Waco | 09/01/27 | $637,962.96 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $637,962.96 | 09/01/45 | -6575 | -18 years | | | | | 0162-11-005 | Dallas | 10/05/27 | $1,885,635.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $1,885,635.00 | 10/01/30 | -1092 | -3 years | | | | | 0261-02-087 | Dallas | 04/05/28 | $2,264,548.86 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $2,264,548.86 | 11/01/30 | -940 | -3 years | | | | | 0918-24-315 | Dallas | 08/04/28 | $1,296,500.00 | Transfer | Transfer | Construction / Roadway → Transfer / Transfer | Construction | Roadway | $1,250,000.00 | 08/04/28 | 0 | | $46,500.00 | 4% | | | 1137-02-047 | Pharr | 09/01/28 | $5,265,000.00 | Construction | Local Let | Construction / Roadway → Construction / Local Let | Construction | Roadway | $5,265,000.00 | 09/01/28 | 0 | | | | | | 0162-02-041 | Waco | 09/06/28 | $1,616,526.79 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $750,000.00 | 11/01/45 | -6265 | -17 years | $866,526.79 | 116% | | | 0752-04-030 | Waco | 09/06/28 | $467,633.93 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $106,000.00 | 09/01/45 | -6204 | -17 years | $361,633.93 | 341% | | | 1372-02-015 | Waco | 09/06/28 | $330,357.14 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $229,000.00 | 09/01/45 | -6204 | -17 years | $101,357.14 | 44% | | | 2061-04-014 | Waco | 09/06/28 | $374,017.86 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $4,198,500.00 | 10/01/49 | -7695 | -21 years | $(3,824,482.14) | -91% | | | 2867-01-009 | Waco | 09/06/28 | $129,464.29 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $2,200,000.00 | 10/01/49 | -7695 | -21 years | $(2,070,535.71) | -94% | | --- ## Cost Changes The active pipeline value rose by $223.10M, from $30.12B to $30.34B, indicating a repricing within the same pipeline rather than a total restructuring. The largest district net cost increase was noted in Houston at $178.94M, with others like Austin (+$86.13M) and Abilene (+$64.28M) also contributing positively. Conversely, San Antonio reported a net decrease of $46.63M. In total, 254 projects exhibited changes in cost exceeding 10%, with 96 increasing and 158 decreasing, reflecting a mix of upward and downward adjustments. | CSJ | District | Est. Letting Date | Project Estimate | Current Type | Current Subtype | Prev. Type | Prev. Subtype | Prev. Cost | Cost Δ | %Cost Δ | Letting Δ (days) | Letting Date Δ | Type/Subtype Δ | Lifecycle | | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | | 1718-05-019 | Odessa | 09/02/26 | $5,061,804.94 | Construction | Roadway | Construction | Roadway | $1,039,545.49 | $4,022,259.45 | 387% | 0 | | | | | 0185-01-046 | Waco | 09/02/26 | $627,269.33 | Construction | Roadway | Construction | Roadway | $132,913.46 | $494,355.87 | 372% | 0 | | | | | 2910-02-002 | Pharr | 09/02/26 | $455,029.15 | Construction | Roadway | Construction | Roadway | $100,967.00 | $354,062.15 | 351% | 0 | | | | | 0042-01-032 | Amarillo | 12/01/26 | $2,100,000.00 | Construction | Roadway | Construction | Roadway | $470,000.00 | $1,630,000.00 | 347% | 0 | | | | | 0752-04-030 | Waco | 09/06/28 | $467,633.93 | Construction | Roadway | Unassigned | Unassigned | $106,000.00 | $361,633.93 | 341% | -6204 | -17 years | Unassigned → Construction / Roadway | | | 2635-03-031 | Amarillo | 12/01/26 | $4,000,000.00 | Construction | Roadway | Construction | Roadway | $1,200,000.00 | $2,800,000.00 | 233% | -36 | -1 month | | | | 3292-01-017 | Waco | 09/02/26 | $271,116.54 | Construction | Roadway | Construction | Roadway | $81,894.23 | $189,222.31 | 231% | 0 | | | | | 0015-13-452 | Austin | 02/02/27 | $125,961,538.46 | Construction | Roadway | Construction | Roadway | $40,384,615.38 | $85,576,923.08 | 212% | 0 | | | | | 0086-07-038 | Pharr | 09/02/26 | $779,993.90 | Construction | Roadway | Construction | Roadway | $265,229.64 | $514,764.26 | 194% | 0 | | | | | 0039-10-095 | Pharr | 09/02/26 | $849,644.03 | Construction | Roadway | Construction | Roadway | $298,996.92 | $550,647.11 | 184% | 0 | | | | | 0912-72-773 | Houston | 01/01/29 | $1,204,686.05 | Construction | Bridge | Construction | Bridge | $427,000.00 | $777,686.05 | 182% | 0 | | | | | 0028-05-057 | Beaumont | 09/02/26 | $2,120,317.21 | Construction | Roadway | Construction | Roadway | $774,594.00 | $1,345,723.21 | 174% | 0 | | | | | 0912-72-807 | Houston | 12/05/28 | $1,366,096.00 | Construction | Bridge | Construction | Bridge | $500,000.00 | $866,096.00 | 173% | 0 | | | | | 0912-72-806 | Houston | 12/05/28 | $1,270,690.00 | Construction | Bridge | Construction | Bridge | $500,000.00 | $770,690.00 | 154% | 0 | | | | | 0600-01-013 | Odessa | 09/02/26 | $766,184.70 | Construction | Roadway | Construction | Roadway | $311,138.27 | $455,046.43 | 146% | 0 | | | | | 0169-06-043 | Amarillo | 11/03/26 | $950,000.00 | Construction | Roadway | Construction | Roadway | $400,000.00 | $550,000.00 | 138% | 0 | | | | | 0581-02-158 | Dallas | 12/03/26 | $1,527,291.40 | Construction | Local Let | Construction | Local Let | $650,000.00 | $877,291.40 | 135% | -242 | -8 months | | | | 1228-03-060 | Pharr | 09/02/26 | $212,288.32 | Construction | Roadway | Construction | Roadway | $90,451.00 | $121,837.32 | 135% | 0 | | | | | 0169-08-029 | Amarillo | 11/03/26 | $1,280,000.00 | Construction | Roadway | Construction | Roadway | $550,000.00 | $730,000.00 | 133% | 0 | | | | | 0912-31-327 | Houston | 10/04/28 | $1,078,489.10 | Construction | Bridge | Construction | Bridge | $495,000.00 | $583,489.10 | 118% | 0 | | | | | 0162-02-041 | Waco | 09/06/28 | $1,616,526.79 | Construction | Roadway | Unassigned | Unassigned | $750,000.00 | $866,526.79 | 116% | -6265 | -17 years | Unassigned → Construction / Roadway | | | 0167-01-136 | El Paso | 09/02/26 | $655,917.00 | Construction | Roadway | Construction | Roadway | $307,125.00 | $348,792.00 | 114% | 0 | | | | | 0228-05-072 | Odessa | 09/02/26 | $5,259,381.35 | Construction | Roadway | Construction | Roadway | $2,489,658.75 | $2,769,722.60 | 111% | 0 | | | | | 1717-01-012 | Odessa | 09/02/26 | $386,480.13 | Construction | Roadway | Construction | Roadway | $185,981.37 | $200,498.76 | 108% | 0 | | | | | 3510-04-083 | Houston | 11/01/28 | $138,000,000.00 | Construction | Roadway | Construction | Roadway | $66,500,000.00 | $71,500,000.00 | 108% | 0 | | | | | 0026-06-039 | Yoakum | 08/04/27 | $0.01 | | | Construction | Non Roadway | $95,000.00 | $(94,999.99) | -100% | 0 | | | Canceled | | 0014-01-033 | Fort Worth | 08/01/27 | $0.00 | Construction | Local Let | Non-Let | Local | $2,000,000.00 | $(2,000,000.00) | -100% | 198 | 7 months | Non-Let / Local → Construction / Local Let | | | 0169-09-021 | Amarillo | 11/03/26 | $600,000.00 | Construction | Roadway | Construction | Roadway | $300,000.00 | $300,000.00 | 100% | 0 | | | | | 0375-06-027 | Laredo | 09/02/26 | $1,022,199.30 | Construction | Roadway | Construction | Roadway | $513,794.40 | $508,404.90 | 99% | 0 | | | | | 0427-01-042 | Paris | 09/02/26 | $1,786,746.95 | Construction | Bridge | Construction | Bridge | $901,300.00 | $885,446.95 | 98% | 0 | | | | | 2867-01-009 | Waco | 09/06/28 | $129,464.29 | Construction | Roadway | Unassigned | Unassigned | $2,200,000.00 | $(2,070,535.71) | -94% | -7695 | -21 years | Unassigned → Construction / Roadway | | | 0912-72-656 | Houston | 12/05/28 | $977,230.01 | Construction | Bridge | Construction | Bridge | $505,000.00 | $472,230.01 | 94% | 0 | | | | | 0808-02-015 | Waco | 09/01/27 | $518,055.56 | Construction | Roadway | Unassigned | Unassigned | $6,500,000.00 | $(5,981,944.44) | -92% | -3775 | -10 years | Unassigned → Construction / Roadway | | | 0912-72-808 | Houston | 12/05/28 | $1,149,207.00 | Construction | Bridge | Construction | Bridge | $600,000.00 | $549,207.00 | 92% | 0 | | | | | 2061-04-014 | Waco | 09/06/28 | $374,017.86 | Construction | Roadway | Unassigned | Unassigned | $4,198,500.00 | $(3,824,482.14) | -91% | -7695 | -21 years | Unassigned → Construction / Roadway | | | 0004-02-075 | Odessa | 09/02/26 | $3,238,830.18 | Construction | Roadway | Construction | Roadway | $1,727,517.00 | $1,511,313.18 | 87% | 0 | | | | | 1588-01-003 | Pharr | 09/02/26 | $27,788.31 | Construction | Roadway | Construction | Roadway | $213,543.00 | $(185,754.69) | -87% | 0 | | | | | 0092-02-145 | Dallas | 10/06/26 | $1,278,476.75 | Construction | Roadway | Construction | Roadway | $7,080,000.00 | $(5,801,523.25) | -82% | 0 | | | | | 0791-05-022 | Amarillo | 11/03/26 | $1,270,000.00 | Construction | Roadway | Construction | Roadway | $700,000.00 | $570,000.00 | 81% | 0 | | | | | 0167-01-135 | El Paso | 09/02/26 | $46,858.00 | Construction | Roadway | Construction | Roadway | $230,992.34 | $(184,134.34) | -80% | 0 | | | | | 0320-01-083 | Waco | 09/06/28 | $601,598.21 | Construction | Roadway | Construction | Roadway | $336,895.00 | $264,703.21 | 79% | 0 | | | | | 1414-01-024 | Houston | 09/02/26 | $13,329.16 | Construction | Roadway | Construction | Roadway | $61,492.00 | $(48,162.84) | -78% | 0 | | | | | 0243-03-072 | Beaumont | 09/02/26 | $208,128.60 | Construction | Roadway | Construction | Roadway | $768,700.00 | $(560,571.40) | -73% | 0 | | | | | 0001-01-075 | El Paso | 09/02/26 | $691,556.00 | Construction | Roadway | Construction | Roadway | $400,700.02 | $290,855.98 | 73% | 0 | | | | | 0115-03-028 | Austin | 08/04/27 | $1,214,302.88 | Construction | Roadway | Construction | Roadway | $705,649.04 | $508,653.84 | 72% | 0 | | | | | 1192-03-018 | Waco | 09/02/26 | $184,850.97 | Construction | Roadway | Construction | Roadway | $617,019.23 | $(432,168.26) | -70% | 0 | | | | | 1491-01-020 | Amarillo | 11/03/26 | $1,700,000.00 | Construction | Roadway | Construction | Roadway | $1,000,000.00 | $700,000.00 | 70% | 0 | | | | | 1065-02-044 | Pharr | 09/02/26 | $447,883.08 | Construction | Roadway | Construction | Roadway | $266,917.68 | $180,965.40 | 68% | 0 | | | | | 0386-03-024 | Waco | 09/02/26 | $901,234.06 | Construction | Roadway | Construction | Roadway | $539,759.62 | $361,474.44 | 67% | 0 | | | | | 1043-01-012 | Houston | 09/02/26 | $342,330.90 | Construction | Roadway | Construction | Roadway | $1,000,000.00 | $(657,669.10) | -66% | 0 | | | | | 1687-02-010 | Houston | 09/02/26 | $352,443.60 | Construction | Roadway | Construction | Roadway | $1,000,959.00 | $(648,515.40) | -65% | 0 | | | | | 0101-01-070 | Corpus Christi | 09/02/26 | $120,610.80 | Construction | Roadway | Construction | Roadway | $326,866.00 | $(206,255.20) | -63% | 0 | | | | | 0045-10-022 | Paris | 11/01/28 | $207,947.52 | Construction | Roadway | Construction | Roadway | $551,738.88 | $(343,791.36) | -62% | 0 | | | | | 2326-01-032 | El Paso | 09/02/26 | $101,831.00 | Construction | Roadway | Construction | Roadway | $267,680.40 | $(165,849.40) | -62% | 0 | | | | | 2635-04-043 | Amarillo | 09/01/27 | $4,000,000.00 | Construction | Roadway | Construction | Roadway | $10,000,000.00 | $(6,000,000.00) | -60% | 0 | | | | | 1687-01-019 | Houston | 09/02/26 | $366,039.44 | Construction | Roadway | Construction | Roadway | $886,354.00 | $(520,314.56) | -59% | 0 | | | | | 1801-01-065 | Pharr | 09/02/26 | $129,648.40 | Construction | Roadway | Construction | Roadway | $82,175.00 | $47,473.40 | 58% | 0 | | | | | 3544-06-003 | San Antonio | 10/06/26 | $16,400.00 | Construction | Roadway | Construction | Roadway | $38,627.00 | $(22,227.00) | -58% | 0 | | | | | 0652-01-042 | Laredo | 09/02/26 | $165,560.43 | Construction | Roadway | Construction | Roadway | $388,011.75 | $(222,451.32) | -57% | 0 | | | | | 1043-02-005 | Houston | 09/02/26 | $76,953.87 | Construction | Roadway | Construction | Roadway | $177,120.00 | $(100,166.13) | -57% | 0 | | | | | 1718-07-048 | Odessa | 09/02/26 | $161,720.30 | Construction | Roadway | Construction | Roadway | $369,919.58 | $(208,199.28) | -56% | 0 | | | | | 0015-13-457 | Austin | 01/01/29 | $6,927,606.51 | Construction | Non Roadway | Construction | Non Roadway | $15,535,714.29 | $(8,608,107.78) | -55% | 0 | | | | | 0307-01-157 | Beaumont | 09/02/26 | $20,380.72 | Construction | Roadway | Construction | Roadway | $45,407.00 | $(25,026.28) | -55% | 0 | | | | | 0932-01-122 | Beaumont | 09/02/26 | $346,453.56 | Construction | Roadway | Construction | Roadway | $766,227.00 | $(419,773.44) | -55% | 0 | | | | | 0187-05-068 | Houston | 09/02/26 | $322,456.55 | Construction | Roadway | Construction | Roadway | $699,790.00 | $(377,333.45) | -54% | 0 | | | | | 2726-01-016 | Amarillo | 11/03/26 | $1,230,000.00 | Construction | Roadway | Construction | Roadway | $800,000.00 | $430,000.00 | 54% | 0 | | | | | 0092-06-112 | Dallas | 08/05/26 | $641,135.01 | Construction | Bridge | Construction | Bridge | $426,254.00 | $214,881.01 | 50% | 0 | | | | | 0433-05-027 | Pharr | 09/02/26 | $1,214,912.94 | Construction | Roadway | Construction | Roadway | $810,304.56 | $404,608.38 | 50% | 0 | | | | | 0027-10-074 | Houston | 08/05/26 | $1,986,114.00 | Construction | Bridge | Construction | Bridge | $3,967,039.00 | $(1,980,925.00) | -50% | 0 | | | | | 0275-02-076 | Amarillo | 12/01/27 | $3,500,000.00 | Construction | Roadway | Construction | Roadway | $6,900,000.00 | $(3,400,000.00) | -49% | 0 | | | | | 0320-03-104 | Austin | 10/06/26 | $123,388.60 | Construction | Bridge | Construction | Bridge | $236,912.50 | $(113,523.90) | -48% | 0 | | | | | 0865-01-118 | Pharr | 09/02/26 | $401,878.34 | Construction | Roadway | Construction | Roadway | $271,882.38 | $129,995.96 | 48% | 0 | | | | | 0549-02-038 | Paris | 09/02/26 | $2,626,356.93 | Construction | Roadway | Construction | Roadway | $5,000,000.00 | $(2,373,643.07) | -47% | 0 | | | | | 0185-01-045 | Waco | 09/02/26 | $213,488.97 | Construction | Roadway | Construction | Roadway | $144,855.77 | $68,633.20 | 47% | 0 | | | | | 0844-04-011 | Childress | 09/02/26 | $2,670,739.78 | Construction | Bridge | Construction | Bridge | $5,000,000.00 | $(2,329,260.22) | -47% | 0 | | | | | 0873-01-029 | Pharr | 09/02/26 | $790,740.20 | Construction | Roadway | Construction | Roadway | $539,696.52 | $251,043.68 | 47% | 0 | | | | | 0371-02-083 | Corpus Christi | 09/02/26 | $1,603,267.91 | Construction | Roadway | Construction | Roadway | $2,971,790.00 | $(1,368,522.09) | -46% | 0 | | | | | 0909-00-074 | Waco | 08/05/26 | $1,849,456.42 | Construction | Roadway | Construction | Roadway | $1,267,977.00 | $581,479.42 | 46% | 0 | | | | | 0904-11-069 | Amarillo | 02/01/29 | $2,193,438.00 | Construction | Non Roadway | Construction | Non Roadway | $1,514,138.00 | $679,300.00 | 45% | -89 | -3 months | | | | 1372-02-015 | Waco | 09/06/28 | $330,357.14 | Construction | Roadway | Unassigned | Unassigned | $229,000.00 | $101,357.14 | 44% | -6204 | -17 years | Unassigned → Construction / Roadway | | | 2905-01-015 | Odessa | 09/02/26 | $796,133.26 | Construction | Roadway | Construction | Roadway | $1,396,822.36 | $(600,689.10) | -43% | 0 | | | | | 3271-01-019 | Beaumont | 09/02/26 | $442,193.04 | Construction | Roadway | Construction | Roadway | $767,177.00 | $(324,983.96) | -42% | -364 | -12 months | | | | 0722-03-016 | Paris | 09/02/26 | $1,707,256.67 | Construction | Bridge | Construction | Bridge | $1,200,000.00 | $507,256.67 | 42% | 0 | | | | | 1258-02-044 | Houston | 09/02/26 | $479,659.19 | Construction | Roadway | Construction | Roadway | $829,051.00 | $(349,391.81) | -42% | 0 | | | | | 0231-03-159 | Waco | 09/02/26 | $303,486.48 | Construction | Roadway | Construction | Roadway | $524,250.00 | $(220,763.52) | -42% | 0 | | | | | 0265-02-043 | Austin | 08/02/28 | $2,270,411.00 | Construction | Roadway | Construction | Roadway | $1,600,000.00 | $670,411.00 | 42% | 0 | | | | | 0258-03-048 | Waco | 09/02/26 | $319,519.11 | Construction | Roadway | Construction | Roadway | $547,375.00 | $(227,855.89) | -42% | 0 | | | | | 0299-03-077 | Laredo | 09/02/26 | $870,746.20 | Construction | Roadway | Construction | Roadway | $614,952.00 | $255,794.20 | 42% | 0 | | | | | 2158-01-020 | Tyler | 08/05/26 | $18,471,565.25 | Construction | Roadway | Construction | Roadway | $31,500,000.00 | $(13,028,434.75) | -41% | 0 | | | | | 0068-05-039 | Lubbock | 09/02/26 | $3,673,081.36 | Construction | Roadway | Construction | Roadway | $2,599,497.00 | $1,073,584.36 | 41% | 0 | | | | | 0092-04-087 | Dallas | 10/06/26 | $8,347,322.50 | Construction | Roadway | Construction | Roadway | $5,940,000.00 | $2,407,322.50 | 41% | 0 | | | | | 0037-02-060 | Laredo | 08/05/26 | $17,896,171.15 | Construction | Bridge | Construction | Bridge | $30,000,000.00 | $(12,103,828.85) | -40% | 0 | | | | | 2266-02-169 | Fort Worth | 09/02/26 | $5,198,453.23 | Construction | Roadway | Construction | Roadway | $8,658,289.39 | $(3,459,836.16) | -40% | 0 | | | | | 0305-03-046 | Beaumont | 09/02/26 | $591,399.36 | Construction | Roadway | Construction | Roadway | $974,186.00 | $(382,786.64) | -39% | 0 | | | | | 3534-01-021 | Waco | 08/05/26 | $4,466,139.97 | Construction | Roadway | Construction | Roadway | $7,261,014.00 | $(2,794,874.03) | -38% | 0 | | | | | 0601-01-066 | Beaumont | 09/02/26 | $1,157,862.42 | Construction | Roadway | Construction | Roadway | $1,881,849.00 | $(723,986.58) | -38% | 0 | | | | | 0092-06-114 | Dallas | 10/06/26 | $8,192,021.25 | Construction | Roadway | Construction | Roadway | $5,940,000.00 | $2,252,021.25 | 38% | 0 | | | | | 0092-03-067 | Dallas | 10/06/26 | $3,720,762.00 | Construction | Roadway | Construction | Roadway | $5,940,000.00 | $(2,219,238.00) | -37% | 0 | | | | | 0710-01-051 | Beaumont | 09/02/26 | $720,678.84 | Construction | Roadway | Construction | Roadway | $1,146,420.00 | $(425,741.16) | -37% | 0 | | | | | 0695-01-019 | Odessa | 09/02/26 | $383,124.24 | Construction | Roadway | Construction | Roadway | $600,099.10 | $(216,974.86) | -36% | 0 | | | | | 0221-09-039 | Atlanta | 09/02/26 | $1,181,335.97 | Construction | Roadway | Construction | Roadway | $1,823,023.80 | $(641,687.83) | -35% | 0 | | | | | 0305-04-039 | Beaumont | 09/02/26 | $596,516.62 | Construction | Roadway | Construction | Roadway | $917,779.00 | $(321,262.38) | -35% | 0 | | | | | 1664-01-022 | Waco | 09/02/26 | $763,599.41 | Construction | Roadway | Construction | Roadway | $1,161,875.00 | $(398,275.59) | -34% | 0 | | | | | 1718-06-013 | Odessa | 09/02/26 | $136,312.63 | Construction | Roadway | Construction | Roadway | $207,105.93 | $(70,793.30) | -34% | 0 | | | | | 0047-07-251 | Dallas | 07/02/28 | $1,868,055.56 | Construction | Local Let | Construction | Local Let | $2,830,000.00 | $(961,944.44) | -34% | 0 | | | | | 0275-03-073 | Amarillo | 12/01/27 | $5,100,000.00 | Construction | Roadway | Construction | Roadway | $7,700,000.00 | $(2,600,000.00) | -34% | 0 | | | | | 1658-01-012 | Waco | 09/02/26 | $166,189.59 | Construction | Roadway | Construction | Roadway | $250,769.23 | $(84,579.64) | -34% | 0 | | | | | 1373-01-014 | Waco | 09/02/26 | $230,320.90 | Construction | Roadway | Construction | Roadway | $347,115.38 | $(116,794.48) | -34% | 0 | | | | | 0029-02-060 | San Antonio | 10/06/26 | $1,334,390.00 | Construction | Roadway | Construction | Roadway | $998,593.00 | $335,797.00 | 34% | 0 | | | | | 0674-01-079 | El Paso | 09/02/26 | $406,267.00 | Construction | Roadway | Construction | Roadway | $611,274.48 | $(205,007.48) | -34% | 0 | | | | | 3044-01-017 | Pharr | 09/02/26 | $424,749.15 | Construction | Roadway | Construction | Roadway | $637,489.44 | $(212,740.29) | -33% | 0 | | | | | 0981-02-014 | Houston | 09/02/26 | $80,542.96 | Construction | Roadway | Construction | Roadway | $60,600.00 | $19,942.96 | 33% | -90 | -3 months | | | | 0867-03-029 | Waco | 09/02/26 | $328,676.36 | Construction | Roadway | Construction | Roadway | $486,105.77 | $(157,429.41) | -32% | 0 | | | | | 0093-01-110 | Dallas | 10/06/26 | $7,855,998.00 | Construction | Roadway | Construction | Roadway | $5,940,000.00 | $1,915,998.00 | 32% | 0 | | | | | 0116-02-049 | Bryan | 08/05/26 | $931,513.85 | Construction | Roadway | Construction | Roadway | $1,370,000.00 | $(438,486.15) | -32% | 0 | | | | | 1057-01-016 | Pharr | 09/02/26 | $250,822.06 | Construction | Roadway | Construction | Roadway | $190,139.40 | $60,682.66 | 32% | 0 | | | | | 0917-31-037 | Bryan | 09/02/26 | $510,699.80 | Construction | Bridge | Construction | Bridge | $739,395.09 | $(228,695.29) | -31% | 0 | | | | | 0166-01-061 | Dallas | 10/06/26 | $4,115,608.25 | Construction | Roadway | Construction | Roadway | $5,940,000.00 | $(1,824,391.75) | -31% | 0 | | | | | 0593-01-142 | Beaumont | 09/02/26 | $89,087.32 | Construction | Roadway | Construction | Roadway | $128,234.00 | $(39,146.68) | -31% | 0 | | | | | 0028-15-063 | Beaumont | 09/02/26 | $178,010.08 | Construction | Roadway | Construction | Roadway | $136,576.00 | $41,434.08 | 30% | 0 | | | | | 0276-04-033 | Laredo | 09/02/26 | $1,814,980.38 | Construction | Roadway | Construction | Roadway | $1,392,920.55 | $422,059.83 | 30% | 0 | | | | | 0276-05-030 | Laredo | 09/02/26 | $863,508.86 | Construction | Roadway | Construction | Roadway | $1,215,427.50 | $(351,918.64) | -29% | 0 | | | | | 0917-31-036 | Bryan | 09/02/26 | $530,140.30 | Construction | Bridge | Construction | Bridge | $744,534.09 | $(214,393.79) | -29% | 0 | | | | | 0024-06-070 | San Antonio | 04/06/27 | $45,000,000.00 | Construction | Roadway | Construction | Roadway | $35,000,000.00 | $10,000,000.00 | 29% | 0 | | | | | 0028-01-116 | Houston | 03/03/27 | $4,520,787.96 | Construction | Roadway | Construction | Roadway | $3,520,023.00 | $1,000,764.96 | 28% | 0 | | | | | 2484-01-008 | Laredo | 09/02/26 | $138,791.95 | Construction | Roadway | Construction | Roadway | $193,780.65 | $(54,988.70) | -28% | 0 | | | | | 1414-01-025 | Houston | 09/02/26 | $411,754.93 | Construction | Roadway | Construction | Roadway | $320,775.00 | $90,979.93 | 28% | -90 | -3 months | | | | 2059-02-014 | Waco | 09/02/26 | $291,367.54 | Construction | Roadway | Construction | Roadway | $402,596.15 | $(111,228.61) | -28% | 0 | | | | | 0143-03-049 | San Antonio | 10/06/26 | $50,707,452.96 | Construction | Roadway | Construction | Roadway | $69,947,811.00 | $(19,240,358.04) | -28% | 0 | | | | | 0143-10-058 | Yoakum | 09/02/26 | $6,548,377.50 | Construction | Roadway | Construction | Roadway | $9,000,000.00 | $(2,451,622.50) | -27% | 0 | | | | | 0307-02-052 | Beaumont | 09/02/26 | $972,857.88 | Construction | Roadway | Construction | Roadway | $1,337,111.00 | $(364,253.12) | -27% | 0 | | | | | 0593-01-141 | Beaumont | 09/02/26 | $188,400.68 | Construction | Roadway | Construction | Roadway | $257,972.00 | $(69,571.32) | -27% | 0 | | | | | 0173-06-058 | Paris | 11/03/26 | $255,552.00 | Construction | Roadway | Construction | Roadway | $349,615.79 | $(94,063.79) | -27% | 0 | | | | | 2614-01-031 | Amarillo | 11/03/26 | $22,000.00 | Construction | Roadway | Construction | Roadway | $17,500.00 | $4,500.00 | 26% | 0 | | | | | 0228-06-098 | Odessa | 09/02/26 | $865,519.02 | Construction | Roadway | Construction | Roadway | $691,209.02 | $174,310.00 | 25% | 0 | | | | | 0238-06-040 | Amarillo | 11/01/28 | $6,000,000.00 | Construction | Roadway | Construction | Roadway | $8,000,000.00 | $(2,000,000.00) | -25% | 56 | 2 months | | | | 0042-10-004 | Amarillo | 12/01/26 | $2,350,000.00 | Construction | Roadway | Construction | Roadway | $1,880,000.00 | $470,000.00 | 25% | 0 | | | | | 2850-01-020 | Bryan | 10/06/26 | $1,500,000.00 | Construction | Roadway | Construction | Roadway | $2,000,000.00 | $(500,000.00) | -25% | 0 | | | | | 1081-01-020 | Odessa | 09/02/26 | $565,395.08 | Construction | Roadway | Construction | Roadway | $753,310.87 | $(187,915.79) | -25% | 0 | | | | | 0024-02-081 | San Antonio | 10/06/26 | $1,224,062.00 | Construction | Roadway | Construction | Roadway | $980,458.00 | $243,604.00 | 25% | 0 | | | | | 3451-01-050 | El Paso | 09/02/26 | $132,319.00 | Construction | Roadway | Construction | Roadway | $174,955.72 | $(42,636.72) | -24% | 0 | | | | | 0307-01-161 | Beaumont | 09/02/26 | $249,212.44 | Construction | Roadway | Construction | Roadway | $329,100.00 | $(79,887.56) | -24% | 0 | | | | | 1430-02-018 | Pharr | 09/02/26 | $251,601.58 | Construction | Roadway | Construction | Roadway | $202,458.00 | $49,143.58 | 24% | 0 | | | | | 0331-02-061 | Pharr | 09/02/26 | $484,573.78 | Construction | Roadway | Construction | Roadway | $639,326.52 | $(154,752.74) | -24% | 0 | | | | | 0496-04-036 | Childress | 07/01/27 | $8,200,000.00 | Construction | Bridge | Construction | Bridge | $10,789,200.00 | $(2,589,200.00) | -24% | 0 | | | | | 1099-05-048 | Tyler | 02/02/27 | $14,919,102.59 | Construction | Roadway | Construction | Roadway | $12,037,603.90 | $2,881,498.69 | 24% | 0 | | | | | 0243-04-062 | Beaumont | 09/02/26 | $115,153.71 | Construction | Roadway | Construction | Roadway | $150,550.00 | $(35,396.29) | -24% | 0 | | | | | 0013-08-154 | Fort Worth | 08/05/26 | $1,221,713.62 | Construction | Roadway | Construction | Roadway | $1,593,892.79 | $(372,179.17) | -23% | 0 | | | | | 3055-01-011 | Houston | 09/02/26 | $154,991.03 | Construction | Roadway | Construction | Roadway | $126,000.00 | $28,991.03 | 23% | -90 | -3 months | | | | 0276-01-044 | Laredo | 08/05/26 | $11,559,333.07 | Construction | Roadway | Construction | Roadway | $15,000,000.00 | $(3,440,666.93) | -23% | 0 | | | | | 0249-08-046 | Fort Worth | 08/05/26 | $253,842.60 | Construction | Roadway | Construction | Roadway | $329,106.80 | $(75,264.20) | -23% | 0 | | | | | 0116-03-074 | Bryan | 05/05/27 | $1,500,000.00 | Construction | Roadway | Construction | Roadway | $1,940,000.00 | $(440,000.00) | -23% | 0 | | | | | 1639-01-019 | Odessa | 09/02/26 | $575,308.51 | Construction | Roadway | Construction | Roadway | $472,682.83 | $102,625.68 | 22% | 0 | | | | | 0081-01-054 | Fort Worth | 08/05/26 | $284,356.20 | Construction | Bridge | Construction | Bridge | $362,932.72 | $(78,576.52) | -22% | 0 | | | | | 1061-01-040 | Beaumont | 09/02/26 | $246,933.04 | Construction | Roadway | Construction | Roadway | $314,558.00 | $(67,624.96) | -22% | 0 | | | | | 0696-03-018 | Pharr | 09/02/26 | $132,989.12 | Construction | Roadway | Construction | Roadway | $109,478.00 | $23,511.12 | 21% | 0 | | | | | 0388-03-090 | Beaumont | 09/02/26 | $18,848.40 | Construction | Roadway | Construction | Roadway | $24,000.00 | $(5,151.60) | -21% | 0 | | | | | 0090-06-050 | Amarillo | 05/03/28 | $4,877,269.00 | Construction | Roadway | Construction | Roadway | $6,210,000.00 | $(1,332,731.00) | -21% | 0 | | | | | 0863-01-080 | Pharr | 09/02/26 | $73,709.29 | Construction | Roadway | Construction | Roadway | $93,671.64 | $(19,962.35) | -21% | 0 | | | | | 1937-02-034 | Laredo | 09/02/26 | $409,887.28 | Construction | Roadway | Construction | Roadway | $520,139.55 | $(110,252.27) | -21% | 0 | | | | | 0092-05-061 | Dallas | 10/06/26 | $4,700,639.25 | Construction | Roadway | Construction | Roadway | $5,940,000.00 | $(1,239,360.75) | -21% | 0 | | | | | 1077-01-029 | Waco | 09/02/26 | $171,367.12 | Construction | Roadway | Construction | Roadway | $216,346.15 | $(44,979.03) | -21% | 0 | | | | | 0200-01-093 | Lufkin | 10/06/26 | $29,476,360.55 | Construction | Roadway | Construction | Roadway | $36,934,615.38 | $(7,458,254.83) | -20% | 0 | | | | | 2185-01-002 | Lubbock | 08/05/26 | $535,523.81 | Construction | Roadway | Construction | Roadway | $445,995.11 | $89,528.70 | 20% | 0 | | | | | 0066-03-045 | Amarillo | 11/03/26 | $3,000,000.00 | Construction | Roadway | Construction | Roadway | $2,500,000.00 | $500,000.00 | 20% | 0 | | | | | 0001-04-106 | El Paso | 09/02/26 | $268,577.50 | Construction | Roadway | Construction | Roadway | $335,523.95 | $(66,946.45) | -20% | 0 | | | | | 0042-07-077 | Childress | 05/05/27 | $431,000.00 | Construction | Bridge | Construction | Bridge | $360,000.00 | $71,000.00 | 20% | 0 | | | | | 1947-02-017 | Beaumont | 09/02/26 | $614,931.12 | Construction | Roadway | Construction | Roadway | $514,348.00 | $100,583.12 | 20% | 0 | | | | | 0090-06-053 | Amarillo | 06/01/27 | $14,250,000.00 | Construction | Roadway | Construction | Roadway | $17,700,000.00 | $(3,450,000.00) | -19% | 0 | | | | | 3625-01-002 | Pharr | 09/02/26 | $26,653.32 | Construction | Roadway | Construction | Roadway | $33,035.04 | $(6,381.72) | -19% | 0 | | | | | 1803-03-010 | Pharr | 09/02/26 | $85,855.52 | Construction | Roadway | Construction | Roadway | $106,132.68 | $(20,277.16) | -19% | 0 | | | | | 3027-01-007 | Waco | 09/02/26 | $172,551.25 | Construction | Roadway | Construction | Roadway | $213,317.31 | $(40,766.06) | -19% | 0 | | | | | 2384-01-011 | Odessa | 09/02/26 | $410,791.72 | Construction | Roadway | Construction | Roadway | $506,216.56 | $(95,424.84) | -19% | 0 | | | | | 1803-02-052 | Pharr | 09/02/26 | $498,934.21 | Construction | Roadway | Construction | Roadway | $614,634.48 | $(115,700.27) | -19% | 0 | | | | | 0924-06-724 | El Paso | 09/02/26 | $114,522.00 | Construction | Roadway | Construction | Roadway | $96,544.39 | $17,977.61 | 19% | 0 | | | | | 2395-01-015 | Waco | 09/02/26 | $24,929.42 | Construction | Roadway | Construction | Roadway | $30,625.00 | $(5,695.58) | -19% | 0 | | | | | 3032-01-008 | Waco | 09/02/26 | $346,340.13 | Construction | Roadway | Construction | Roadway | $425,384.62 | $(79,044.49) | -19% | 0 | | | | | 1582-01-025 | Lufkin | 06/01/29 | $2,670,383.75 | Construction | Bridge | Construction | Bridge | $3,267,117.40 | $(596,733.65) | -18% | 0 | | | | | 0627-03-029 | Beaumont | 09/02/26 | $904,174.21 | Construction | Roadway | Construction | Roadway | $764,589.00 | $139,585.21 | 18% | 0 | | | | | 0056-03-067 | Waco | 09/02/26 | $1,201,173.44 | Construction | Roadway | Construction | Roadway | $1,468,805.00 | $(267,631.56) | -18% | 0 | | | | | 0866-07-016 | Odessa | 09/02/26 | $993,296.11 | Construction | Roadway | Construction | Roadway | $1,213,516.55 | $(220,220.44) | -18% | 0 | | | | | 0132-03-036 | Childress | 08/05/26 | $11,087,882.05 | Construction | Roadway | Construction | Roadway | $13,520,000.00 | $(2,432,117.95) | -18% | 0 | | | | | 0204-01-075 | Austin | 10/06/26 | $68,546.50 | Construction | Bridge | Construction | Bridge | $58,125.00 | $10,421.50 | 18% | 0 | | | | | 2094-01-075 | Pharr | 09/02/26 | $189,908.03 | Construction | Roadway | Construction | Roadway | $231,198.00 | $(41,289.97) | -18% | 0 | | | | | 1061-01-039 | Beaumont | 09/02/26 | $65,066.30 | Construction | Roadway | Construction | Roadway | $79,100.00 | $(14,033.70) | -18% | 0 | | | | | 0043-17-036 | Wichita Falls | 09/02/26 | $1,188,329.00 | Construction | Roadway | Construction | Roadway | $1,442,307.69 | $(253,978.69) | -18% | 0 | | | | | 2450-01-028 | Pharr | 09/02/26 | $584,447.27 | Construction | Roadway | Construction | Roadway | $708,762.96 | $(124,315.69) | -18% | 0 | | | | | 2643-01-006 | Pharr | 09/02/26 | $26,269.52 | Construction | Roadway | Construction | Roadway | $31,781.16 | $(5,511.64) | -17% | 0 | | | | | 0121-03-067 | Waco | 09/02/26 | $1,234,481.90 | Construction | Roadway | Construction | Roadway | $1,491,250.00 | $(256,768.10) | -17% | 0 | | | | | 0028-06-098 | Beaumont | 09/02/26 | $93,755.78 | Construction | Roadway | Construction | Roadway | $113,202.00 | $(19,446.22) | -17% | 0 | | | | | 0921-02-526 | Pharr | 09/02/26 | $230,687.93 | Construction | Roadway | Construction | Roadway | $278,302.00 | $(47,614.07) | -17% | 0 | | | | | 0292-07-022 | Odessa | 09/02/26 | $690,850.59 | Construction | Roadway | Construction | Roadway | $829,933.03 | $(139,082.44) | -17% | 0 | | | | | 0980-02-020 | Houston | 09/01/27 | $8,353,888.19 | Construction | Roadway | Construction | Roadway | $10,000,000.00 | $(1,646,111.81) | -16% | 0 | | | | | 0088-05-116 | Yoakum | 08/04/27 | $262,019.23 | Construction | Non Roadway | Construction | Non Roadway | $225,000.00 | $37,019.23 | 16% | 0 | | | | | 2350-01-078 | Yoakum | 08/04/27 | $262,019.23 | Construction | Non Roadway | Construction | Non Roadway | $225,000.00 | $37,019.23 | 16% | 0 | | | | | 0784-03-020 | Beaumont | 08/05/26 | $2,713,254.01 | Construction | Roadway | Construction | Roadway | $2,335,724.00 | $377,530.01 | 16% | 0 | | | | | 2262-03-018 | Odessa | 09/02/26 | $969,862.75 | Construction | Roadway | Construction | Roadway | $1,155,783.85 | $(185,921.10) | -16% | 0 | | | | | 2530-01-017 | Pharr | 09/02/26 | $880,688.02 | Construction | Roadway | Construction | Roadway | $759,598.00 | $121,090.02 | 16% | 0 | | | | | 0527-06-022 | Houston | 01/06/27 | $3,626,282.00 | Construction | Roadway | Construction | Roadway | $4,312,960.00 | $(686,678.00) | -16% | 0 | | | | | 0667-01-130 | Beaumont | 09/02/26 | $340,907.65 | Construction | Roadway | Construction | Roadway | $403,770.00 | $(62,862.35) | -16% | 0 | | | | | 1717-02-024 | Odessa | 09/02/26 | $2,253,461.83 | Construction | Roadway | Construction | Roadway | $2,652,866.75 | $(399,404.92) | -15% | 0 | | | | | 0133-01-055 | Childress | 08/05/26 | $16,096,986.21 | Construction | Roadway | Construction | Roadway | $14,000,000.00 | $2,096,986.21 | 15% | 0 | | | | | 0600-02-015 | Odessa | 09/02/26 | $600,455.86 | Construction | Roadway | Construction | Roadway | $705,516.29 | $(105,060.43) | -15% | 0 | | | | | 0237-06-054 | Laredo | 08/05/26 | $851,466.51 | Construction | Roadway | Construction | Roadway | $1,000,337.79 | $(148,871.28) | -15% | 0 | | | | | 3510-04-071 | Houston | 08/05/26 | $16,148,907.85 | Construction | Roadway | Construction | Roadway | $14,072,310.00 | $2,076,597.85 | 15% | 0 | | | | | 0412-02-022 | San Angelo | 09/06/28 | $3,186,577.66 | Construction | Bridge | Construction | Bridge | $3,732,167.00 | $(545,589.34) | -15% | 0 | | | | | 1911-01-023 | Houston | 09/02/26 | $3,375,346.25 | Construction | Bridge | Construction | Bridge | $3,947,847.00 | $(572,500.75) | -15% | -126 | -4 months | | | | 0903-28-073 | Wichita Falls | 09/02/26 | $1,239,741.87 | Construction | Bridge | Construction | Bridge | $1,084,000.00 | $155,741.87 | 14% | -398 | -1 year | | | | 1229-01-083 | Laredo | 09/02/26 | $345,798.63 | Construction | Roadway | Construction | Roadway | $403,022.00 | $(57,223.37) | -14% | 0 | | | | | 3510-04-072 | Houston | 08/05/26 | $11,775,459.70 | Construction | Roadway | Construction | Roadway | $10,347,404.00 | $1,428,055.70 | 14% | 0 | | | | | 1583-02-020 | Beaumont | 09/02/26 | $357,904.07 | Construction | Roadway | Construction | Roadway | $314,688.00 | $43,216.07 | 14% | 0 | | | | | 1803-02-051 | Pharr | 09/02/26 | $411,862.97 | Construction | Roadway | Construction | Roadway | $476,947.44 | $(65,084.47) | -14% | 0 | | | | | 0254-01-149 | Corpus Christi | 08/05/26 | $10,383,718.65 | Construction | Roadway | Construction | Roadway | $12,000,000.00 | $(1,616,281.35) | -13% | 0 | | | | | 0924-06-721 | El Paso | 09/02/26 | $108,912.00 | Construction | Roadway | Construction | Roadway | $125,768.27 | $(16,856.27) | -13% | 0 | | | | | 2262-01-022 | Odessa | 09/02/26 | $550,894.97 | Construction | Roadway | Construction | Roadway | $633,632.82 | $(82,737.85) | -13% | 0 | | | | | 0236-02-021 | Laredo | 09/02/26 | $718,334.98 | Construction | Roadway | Construction | Roadway | $824,911.00 | $(106,576.02) | -13% | 0 | | | | | 1179-03-012 | Fort Worth | 09/01/27 | $4,958,677.46 | Construction | Bridge | Construction | Bridge | $4,394,655.60 | $564,021.86 | 13% | 0 | | | | | 0056-02-034 | Waco | 09/02/26 | $2,465,492.67 | Construction | Roadway | Construction | Roadway | $2,824,625.00 | $(359,132.33) | -13% | 0 | | | | | 0907-00-243 | San Angelo | 06/13/28 | $9,581,000.00 | Construction | Roadway | Construction | Roadway | $8,509,000.00 | $1,072,000.00 | 13% | 0 | | | | | 0912-72-799 | Houston | 02/15/28 | $5,012,434.62 | Construction | Local Let | Construction | Local Let | $5,722,208.00 | $(709,773.38) | -12% | 365 | 1 year | | | | 1046-01-048 | El Paso | 09/02/26 | $836,436.50 | Construction | Roadway | Construction | Roadway | $744,447.12 | $91,989.38 | 12% | 0 | | | | | 2252-01-010 | Childress | 09/02/26 | $342,525.70 | Construction | Bridge | Construction | Bridge | $306,000.00 | $36,525.70 | 12% | 0 | | | | | 0168-03-041 | Lubbock | 08/05/26 | $318,555.25 | Construction | Roadway | Construction | Roadway | $361,462.26 | $(42,907.01) | -12% | 0 | | | | | 0774-03-017 | Waco | 09/02/26 | $307,829.65 | Construction | Roadway | Construction | Roadway | $349,086.54 | $(41,256.89) | -12% | 0 | | | | | 2635-01-044 | Amarillo | 09/01/27 | $11,300,000.00 | Construction | Roadway | Construction | Roadway | $12,800,000.00 | $(1,500,000.00) | -12% | 0 | | | | | 0703-03-030 | Beaumont | 09/02/26 | $403,282.08 | Construction | Roadway | Construction | Roadway | $456,800.00 | $(53,517.92) | -12% | 0 | | | | | 2395-01-014 | Waco | 09/02/26 | $210,823.78 | Construction | Roadway | Construction | Roadway | $238,798.08 | $(27,974.30) | -12% | 0 | | | | | 0236-03-029 | Laredo | 09/02/26 | $1,082,954.49 | Construction | Roadway | Construction | Roadway | $1,225,889.00 | $(142,934.51) | -12% | 0 | | | | | 0412-06-022 | Laredo | 09/02/26 | $476,390.44 | Construction | Roadway | Construction | Roadway | $538,683.60 | $(62,293.16) | -12% | 0 | | | | | 1582-01-026 | Lufkin | 06/01/29 | $3,155,801.25 | Construction | Bridge | Construction | Bridge | $3,549,996.50 | $(394,195.25) | -11% | 0 | | | | | 2012-02-018 | Laredo | 09/02/26 | $653,161.35 | Construction | Roadway | Construction | Roadway | $731,824.80 | $(78,663.45) | -11% | 0 | | | | | 0232-01-056 | Waco | 09/01/29 | $1,442,651.79 | Construction | Roadway | Construction | Roadway | $1,615,770.00 | $(173,118.21) | -11% | 360 | 12 months | | | | 0251-02-057 | Waco | 09/01/29 | $1,860,160.71 | Construction | Roadway | Construction | Roadway | $2,083,380.00 | $(223,219.29) | -11% | 360 | 12 months | | | | 0184-02-062 | Waco | 09/06/28 | $1,667,075.89 | Construction | Roadway | Construction | Roadway | $1,867,125.00 | $(200,049.11) | -11% | 0 | | | | | 0184-03-041 | Waco | 09/06/28 | $957,125.00 | Construction | Roadway | Construction | Roadway | $1,071,980.00 | $(114,855.00) | -11% | 0 | | | | | 0320-06-011 | Waco | 09/06/28 | $474,732.14 | Construction | Roadway | Construction | Roadway | $531,700.00 | $(56,967.86) | -11% | 0 | | | | | 0567-03-004 | Waco | 09/06/28 | $68,705.36 | Construction | Roadway | Construction | Roadway | $76,950.00 | $(8,244.64) | -11% | 0 | | | | | 0774-02-019 | Waco | 09/06/28 | $397,410.71 | Construction | Roadway | Construction | Roadway | $445,100.00 | $(47,689.29) | -11% | 0 | | | | | 0833-03-052 | Waco | 09/06/28 | $375,446.43 | Construction | Roadway | Construction | Roadway | $420,500.00 | $(45,053.57) | -11% | 0 | | | | | 1054-03-015 | Waco | 09/06/28 | $391,339.29 | Construction | Roadway | Construction | Roadway | $438,300.00 | $(46,960.71) | -11% | 0 | | | | | 1192-01-031 | Waco | 09/06/28 | $1,528,196.43 | Construction | Roadway | Construction | Roadway | $1,711,580.00 | $(183,383.57) | -11% | 0 | | | | | 1308-01-037 | Waco | 09/06/28 | $567,232.14 | Construction | Roadway | Construction | Roadway | $635,300.00 | $(68,067.86) | -11% | 0 | | | | | 1594-02-016 | Waco | 09/06/28 | $536,741.07 | Construction | Roadway | Construction | Roadway | $601,150.00 | $(64,408.93) | -11% | 0 | | | | | 2061-01-014 | Waco | 09/06/28 | $410,758.93 | Construction | Roadway | Construction | Roadway | $460,050.00 | $(49,291.07) | -11% | 0 | | | | | 2133-01-013 | Waco | 09/06/28 | $283,705.36 | Construction | Roadway | Construction | Roadway | $317,750.00 | $(34,044.64) | -11% | 0 | | | | | 2674-01-010 | Waco | 09/06/28 | $85,803.57 | Construction | Roadway | Construction | Roadway | $96,100.00 | $(10,296.43) | -11% | 0 | | | | | 3128-01-014 | Waco | 09/06/28 | $356,571.43 | Construction | Roadway | Construction | Roadway | $399,360.00 | $(42,788.57) | -11% | 0 | | | | | 0050-08-105 | Houston | 09/02/26 | $912,360.25 | Construction | Roadway | Construction | Roadway | $1,020,566.25 | $(108,206.00) | -11% | 0 | | | | | 0095-04-079 | Dallas | 08/05/26 | $1,290,272.50 | Construction | Bridge | Construction | Bridge | $1,166,626.06 | $123,646.44 | 11% | 0 | | | | | 0598-02-133 | Houston | 01/06/27 | $442,264.00 | Construction | Bridge | Construction | Bridge | $400,000.00 | $42,264.00 | 11% | 0 | | | | | 3510-04-069 | Houston | 08/05/26 | $27,634,165.45 | Construction | Roadway | Construction | Roadway | $25,084,165.45 | $2,550,000.00 | 10% | 0 | | | | | 0050-06-109 | Houston | 09/02/26 | $1,377,934.30 | Construction | Roadway | Construction | Roadway | $1,533,686.80 | $(155,752.50) | -10% | 0 | | | | | 0696-03-017 | Pharr | 09/02/26 | $225,557.34 | Construction | Roadway | Construction | Roadway | $204,906.00 | $20,651.34 | 10% | 0 | | | | | 0275-01-258 | Amarillo | 12/01/26 | $450,000.00 | Construction | Roadway | Construction | Roadway | $500,000.00 | $(50,000.00) | -10% | 0 | | | | | 0168-03-038 | Lubbock | 08/05/26 | $9,199,739.53 | Construction | Roadway | Construction | Roadway | $10,186,000.00 | $(986,260.47) | -10% | 0 | | | | | 0114-12-018 | Houston | 09/02/26 | $568,348.63 | Construction | Roadway | Construction | Roadway | $628,922.38 | $(60,573.75) | -10% | 0 | | | | | 0860-01-022 | Pharr | 09/02/26 | $613,061.79 | Construction | Roadway | Construction | Roadway | $560,202.48 | $52,859.31 | 9% | 0 | | | | | 1587-01-019 | Pharr | 09/02/26 | $476,160.05 | Construction | Roadway | Construction | Roadway | $524,697.00 | $(48,536.95) | -9% | 0 | | | | | 0864-01-082 | Pharr | 09/02/26 | $141,732.88 | Construction | Roadway | Construction | Roadway | $155,944.00 | $(14,211.12) | -9% | 0 | | | | | 1844-01-032 | Houston | 09/02/26 | $98,200.58 | Construction | Roadway | Construction | Roadway | $90,000.00 | $8,200.58 | 9% | -90 | -3 months | | | | 3632-01-002 | Pharr | 09/02/26 | $60,369,515.45 | Construction | Roadway | Construction | Roadway | $66,374,838.63 | $(6,005,323.18) | -9% | 0 | | | | | 0027-08-147 | Houston | 08/05/26 | $54,960,380.56 | Construction | Roadway | Construction | Roadway | $60,321,355.00 | $(5,360,974.44) | -9% | 0 | | | | | 2966-01-017 | Pharr | 09/02/26 | $138,878.38 | Construction | Roadway | Construction | Roadway | $152,292.00 | $(13,413.62) | -9% | 0 | | | | | 0388-05-011 | Beaumont | 09/02/26 | $269,778.04 | Construction | Roadway | Construction | Roadway | $248,179.00 | $21,599.04 | 9% | 0 | | | | | 0698-01-018 | Pharr | 09/02/26 | $249,209.57 | Construction | Roadway | Construction | Roadway | $229,313.00 | $19,896.57 | 9% | 0 | | | | | 0001-04-107 | El Paso | 09/02/26 | $102,278.00 | Construction | Roadway | Construction | Roadway | $111,841.35 | $(9,563.35) | -9% | 0 | | | | | 0703-01-068 | Beaumont | 09/02/26 | $830,720.32 | Construction | Roadway | Construction | Roadway | $908,148.00 | $(77,427.68) | -9% | 0 | | | | | 0093-07-023 | Waco | 09/02/26 | $785,047.90 | Construction | Roadway | Construction | Roadway | $857,000.00 | $(71,952.10) | -8% | 0 | | | | | 2879-01-012 | Atlanta | 12/01/26 | $433,241.85 | Construction | Roadway | Construction | Roadway | $400,010.78 | $33,231.07 | 8% | 0 | | | | | 1947-01-021 | Beaumont | 09/02/26 | $1,048,785.06 | Construction | Roadway | Construction | Roadway | $1,137,660.00 | $(88,874.94) | -8% | 0 | | | | | 0775-01-021 | Pharr | 09/02/26 | $386,659.59 | Construction | Roadway | Construction | Roadway | $418,556.16 | $(31,896.57) | -8% | 0 | | | | | 0991-02-014 | Corpus Christi | 08/05/26 | $9,316,494.15 | Construction | Roadway | Construction | Roadway | $10,085,299.15 | $(768,805.00) | -8% | 0 | | | | | 0669-01-068 | Pharr | 09/02/26 | $683,590.86 | Construction | Roadway | Construction | Roadway | $635,316.00 | $48,274.86 | 8% | 0 | | | | | 0598-02-134 | Houston | 01/06/27 | $427,693.00 | Construction | Bridge | Construction | Bridge | $400,000.00 | $27,693.00 | 7% | 0 | | | | | 0674-01-080 | El Paso | 09/02/26 | $157,058.50 | Construction | Roadway | Construction | Roadway | $168,562.08 | $(11,503.58) | -7% | 0 | | | | | 0321-01-056 | Austin | 10/06/26 | $679,854.80 | Construction | Bridge | Construction | Bridge | $729,150.00 | $(49,295.20) | -7% | 0 | | | | | 0051-09-128 | Houston | 08/05/26 | $3,767,287.50 | Construction | Roadway | Construction | Roadway | $4,039,867.80 | $(272,580.30) | -7% | 0 | | | | | 0110-06-151 | Houston | 09/02/26 | $937,804.97 | Construction | Roadway | Construction | Roadway | $1,005,152.06 | $(67,347.09) | -7% | -34 | -1 month | | | | 0022-03-032 | Odessa | 11/03/26 | $963,525.31 | Construction | Bridge | Construction | Bridge | $1,032,508.84 | $(68,983.53) | -7% | 0 | | | | | 0081-01-053 | Fort Worth | 08/05/26 | $1,297,122.14 | Construction | Bridge | Construction | Bridge | $1,388,165.32 | $(91,043.18) | -7% | 0 | | | | | 0217-02-037 | Atlanta | 12/01/28 | $17,442,427.00 | Construction | Roadway | Construction | Roadway | $18,642,426.36 | $(1,199,999.36) | -6% | 0 | | | | | 2635-05-005 | Amarillo | 08/05/26 | $50,287,231.93 | Construction | Roadway | Construction | Roadway | $47,259,223.32 | $3,028,008.61 | 6% | 0 | | | | | 1685-05-140 | Houston | 08/05/26 | $2,479,057.90 | Construction | Roadway | Construction | Roadway | $2,645,375.20 | $(166,317.30) | -6% | 0 | | | | | 1138-01-043 | Pharr | 09/02/26 | $182,609.52 | Construction | Roadway | Construction | Roadway | $172,068.00 | $10,541.52 | 6% | 0 | | | | | 0050-06-108 | Houston | 08/05/26 | $1,299,070.05 | Construction | Bridge | Construction | Bridge | $1,380,770.05 | $(81,700.00) | -6% | 0 | | | | | 0140-13-023 | San Angelo | 08/05/26 | $19,998,294.70 | Construction | Safety Rest Area | Construction | Safety Rest Area | $18,889,057.95 | $1,109,236.75 | 6% | 0 | | | | | 1530-01-012 | Abilene | 03/07/28 | $6,218,588.70 | Construction | Roadway | Construction | Roadway | $6,602,447.70 | $(383,859.00) | -6% | -211 | -7 months | | | | 0079-07-019 | Fort Worth | 03/07/28 | $1,155,543.00 | Construction | Roadway | Construction | Roadway | $1,093,877.00 | $61,666.00 | 6% | 0 | | | | | 1251-04-008 | Abilene | 01/05/28 | $1,176,493.20 | Construction | Bridge | Construction | Bridge | $1,245,950.70 | $(69,457.50) | -6% | 0 | | | | | 0313-02-073 | Fort Worth | 06/01/28 | $2,954,102.52 | Construction | Roadway | Construction | Roadway | $2,802,358.00 | $151,744.52 | 5% | 0 | | | | | 0610-05-060 | Atlanta | 08/05/26 | $12,401,196.00 | Construction | Roadway | Construction | Roadway | $13,081,456.70 | $(680,260.70) | -5% | 0 | | | | | 1228-01-014 | Pharr | 09/02/26 | $265,829.18 | Construction | Roadway | Construction | Roadway | $252,730.00 | $13,099.18 | 5% | 0 | | | | | 0784-02-011 | Beaumont | 08/05/26 | $1,050,709.80 | Construction | Roadway | Construction | Roadway | $1,000,000.00 | $50,709.80 | 5% | 0 | | | | | 1052-02-098 | Corpus Christi | 11/03/26 | $4,769,574.60 | Construction | Roadway | Construction | Roadway | $4,543,952.00 | $225,622.60 | 5% | 0 | | | | | 1505-01-016 | Pharr | 09/02/26 | $11,236,733.53 | Construction | Roadway | Construction | Roadway | $11,804,130.31 | $(567,396.78) | -5% | 0 | | | | | 0089-07-166 | Yoakum | 08/05/26 | $240,432,788.90 | Construction | Roadway | Construction | Roadway | $229,757,253.50 | $10,675,535.40 | 5% | -28 | -28 days | | | | 2528-01-006 | Odessa | 08/05/26 | $7,922,603.47 | Construction | Roadway | Construction | Roadway | $8,304,083.23 | $(381,479.76) | -5% | 0 | | | | | 0181-01-071 | Abilene | 09/02/26 | $429,762.50 | Construction | Roadway | Construction | Roadway | $410,925.00 | $18,837.50 | 5% | 0 | | | | | 0924-06-716 | El Paso | 09/02/26 | $182,031.50 | Construction | Roadway | Construction | Roadway | $174,086.44 | $7,945.06 | 5% | 0 | | | | | 2690-01-040 | Austin | 12/01/27 | $7,674,074.07 | Construction | Roadway | Construction | Roadway | $7,346,428.57 | $327,645.50 | 4% | 0 | | | | | 0208-01-026 | Atlanta | 08/05/26 | $3,307,700.41 | Construction | Roadway | Construction | Roadway | $3,449,866.61 | $(142,166.20) | -4% | 0 | | | | | 0050-09-099 | Houston | 09/02/26 | $1,964,365.36 | Construction | Roadway | Construction | Roadway | $2,047,628.36 | $(83,263.00) | -4% | 0 | | | | | 0337-03-020 | Austin | 09/02/26 | $3,125,366.79 | Construction | Roadway | Construction | Roadway | $3,257,848.14 | $(132,481.35) | -4% | 0 | | | | | 0186-03-071 | Bryan | 08/05/26 | $4,389,174.70 | Construction | Roadway | Construction | Roadway | $4,225,000.00 | $164,174.70 | 4% | 0 | | | | | 0172-05-134 | Dallas | 03/01/27 | $1,055,097.50 | Construction | Local Let | Construction | Local Let | $1,097,301.00 | $(42,203.50) | -4% | 0 | | | | | 0015-13-441 | Austin | 11/03/26 | $81,730,769.23 | Construction | Roadway | Construction | Roadway | $85,000,000.00 | $(3,269,230.77) | -4% | 0 | | | | | 0500-03-664 | Houston | 08/05/26 | $4,921,686.24 | Construction | Roadway | Construction | Roadway | $5,117,903.93 | $(196,217.69) | -4% | 0 | | | | | 0918-24-315 | Dallas | 08/04/28 | $1,296,500.00 | Transfer | Transfer | Construction | Roadway | $1,250,000.00 | $46,500.00 | 4% | 0 | | Construction / Roadway → Transfer / Transfer | | | 0214-03-035 | Beaumont | 11/02/27 | $25,600,000.00 | Construction | Bridge | Construction | Bridge | $26,584,615.38 | $(984,615.38) | -4% | 0 | | | | | 0114-10-102 | Bryan | 08/05/26 | $4,214,218.54 | Construction | Roadway | Construction | Roadway | $4,370,000.00 | $(155,781.46) | -4% | 0 | | | | | 1982-01-031 | Laredo | 08/05/26 | $119,406.04 | Construction | Roadway | Construction | Roadway | $123,600.00 | $(4,193.96) | -3% | 0 | | | | | 0047-06-178 | Dallas | 09/02/26 | $1,167,955.25 | Construction | Roadway | Construction | Roadway | $1,208,060.70 | $(40,105.45) | -3% | 0 | | | | | 1057-03-057 | Pharr | 09/02/26 | $222,214.08 | Construction | Roadway | Construction | Roadway | $215,398.44 | $6,815.64 | 3% | 0 | | | | | 1012-03-027 | Dallas | 08/05/26 | $9,562,778.90 | Construction | Roadway | Construction | Roadway | $9,867,597.40 | $(304,818.50) | -3% | 0 | | | | | 0231-16-039 | Waco | 09/02/26 | $168,159.90 | Construction | Roadway | Construction | Roadway | $164,320.26 | $3,839.64 | 2% | 0 | | | | | 0283-02-040 | Wichita Falls | 08/05/26 | $4,158,923.39 | Construction | Roadway | Construction | Roadway | $4,248,978.39 | $(90,055.00) | -2% | 0 | | | | | 0173-04-063 | Dallas | 09/02/26 | $900,431.25 | Construction | Roadway | Construction | Roadway | $883,168.07 | $17,263.18 | 2% | 0 | | | | | 0275-03-072 | Amarillo | 09/02/26 | $10,704,179.35 | Construction | Bridge | Construction | Bridge | $10,500,000.00 | $204,179.35 | 2% | 0 | | | | | 0047-03-106 | Paris | 08/05/26 | $1,185,228.20 | Construction | Roadway | Construction | Roadway | $1,164,466.93 | $20,761.27 | 2% | 0 | | | | | 1068-01-242 | Fort Worth | 02/02/28 | $3,000,643.80 | Construction | Roadway | Construction | Roadway | $3,053,262.00 | $(52,618.20) | -2% | 0 | | | | | 0541-02-033 | Childress | 08/05/26 | $8,730,229.70 | Construction | Roadway | Construction | Roadway | $8,874,218.10 | $(143,988.40) | -2% | 0 | | | | | 0517-02-046 | San Antonio | 09/01/27 | $6,604,270.95 | Construction | Bridge | Construction | Bridge | $6,501,914.80 | $102,356.15 | 2% | 0 | | | | | 0441-09-054 | Odessa | 08/05/26 | $17,312,839.88 | Construction | Roadway | Construction | Roadway | $17,048,526.81 | $264,313.07 | 2% | 0 | | | | | 0051-09-127 | Houston | 09/02/26 | $2,378,421.60 | Construction | Non Roadway | Construction | Non Roadway | $2,342,467.00 | $35,954.60 | 2% | 0 | | | | | 0976-03-120 | Houston | 09/02/26 | $477,545.44 | Construction | Roadway | Construction | Roadway | $484,617.00 | $(7,071.56) | -1% | 0 | | | | | 0842-03-037 | Yoakum | 08/05/26 | $33,704,491.10 | Construction | Roadway | Construction | Roadway | $33,218,001.00 | $486,490.10 | 1% | 0 | | | | | 1844-02-025 | Houston | 09/02/26 | $136,321.34 | Construction | Roadway | Construction | Roadway | $138,000.00 | $(1,678.66) | -1% | -90 | -3 months | | | | 0047-14-092 | Dallas | 09/02/26 | $1,995,770.00 | Construction | Roadway | Construction | Roadway | $2,018,779.35 | $(23,009.35) | -1% | 0 | | | | | 0398-04-078 | Waco | 09/02/26 | $1,433,620.53 | Construction | Roadway | Construction | Roadway | $1,418,625.00 | $14,995.53 | 1% | 0 | | | | | 0006-11-030 | Abilene | 01/05/28 | $100,000.00 | Construction | Bridge | Construction | Bridge | $99,000.00 | $1,000.00 | 1% | 0 | | | | | 0110-07-022 | Houston | 09/02/26 | $346,537.14 | Construction | Roadway | Construction | Roadway | $349,907.13 | $(3,369.99) | -1% | -34 | -1 month | | | | 1801-01-064 | Pharr | 09/02/26 | $464,860.04 | Construction | Roadway | Construction | Roadway | $469,360.04 | $(4,500.00) | -1% | 0 | | | | | 1513-02-047 | Fort Worth | 02/02/27 | $1,935,387.85 | Construction | Roadway | Construction | Roadway | $1,917,557.73 | $17,830.12 | 1% | 0 | | | | | 0041-07-123 | Amarillo | 08/05/26 | $4,790,956.65 | Construction | Roadway | Construction | Roadway | $4,750,000.00 | $40,956.65 | 1% | 0 | | | | | 0222-03-065 | Atlanta | 08/05/26 | $11,759,396.31 | Construction | Roadway | Construction | Roadway | $11,659,080.64 | $100,315.67 | 1% | 0 | | | | | 0018-05-089 | Laredo | 08/05/26 | $226,855,600.99 | Construction | Roadway | Construction | Roadway | $228,583,900.49 | $(1,728,299.50) | -1% | 0 | | | | | 0581-01-179 | Dallas | 08/05/26 | $1,714,401.50 | Construction | Roadway | Construction | Roadway | $1,725,917.34 | $(11,515.84) | -1% | 0 | | | | | 0581-01-177 | Dallas | 08/05/26 | $1,384,026.00 | Construction | Roadway | Construction | Roadway | $1,376,754.86 | $7,271.14 | 1% | 0 | | | | | 2158-01-028 | Tyler | 08/05/26 | $994,700.00 | Construction | Roadway | Construction | Roadway | $990,000.00 | $4,700.00 | 0% | 0 | | | | | 1479-01-028 | San Antonio | 09/02/26 | $2,818,208.09 | Construction | Roadway | Construction | Roadway | $2,826,369.36 | $(8,161.27) | -0% | 0 | | | | | 1012-03-028 | Dallas | 08/05/26 | $6,885,055.10 | Construction | Roadway | Construction | Roadway | $6,866,910.20 | $18,144.90 | 0% | 0 | | | | | 0904-11-071 | Amarillo | 05/05/27 | $6,114,395.83 | Construction | Bridge | Construction | Bridge | $6,100,000.00 | $14,395.83 | 0% | 0 | | | | | 0283-03-023 | Wichita Falls | 08/05/26 | $9,460,554.44 | Construction | Roadway | Construction | Roadway | $9,438,454.44 | $22,100.00 | 0% | 0 | | | | | 0041-07-121 | Amarillo | 08/05/26 | $26,146,123.75 | Construction | Roadway | Construction | Roadway | $26,200,000.00 | $(53,876.25) | -0% | 0 | | | | | 0140-05-029 | Odessa | 11/03/26 | $119,753.30 | Construction | Bridge | Construction | Bridge | $119,942.70 | $(189.40) | -0% | 0 | | | | | 3510-04-070 | Houston | 08/05/26 | $16,853,512.33 | Construction | Roadway | Construction | Roadway | $16,878,891.00 | $(25,378.67) | -0% | 0 | | | | | 2494-01-018 | Amarillo | 02/02/28 | $1,176,471.00 | Construction | Roadway | Construction | Roadway | $1,175,471.00 | $1,000.00 | 0% | 28 | 28 days | | | | 0173-04-059 | Dallas | 08/05/26 | $7,199,789.52 | Construction | Roadway | Construction | Roadway | $7,203,790.42 | $(4,000.90) | -0% | 0 | | | | | 1492-01-013 | Dallas | 08/05/26 | $1,879,427.60 | Construction | Roadway | Construction | Roadway | $1,878,822.25 | $605.35 | 0% | 0 | | | | | 0001-04-104 | El Paso | 03/01/29 | $2,431,891.96 | Construction | Roadway | Construction | Roadway | $2,431,892.59 | $(0.63) | 0% | 0 | | | | | 0374-06-024 | El Paso | 01/01/29 | $414,196.43 | Construction | Roadway | Construction | Roadway | $414,196.50 | $(0.07) | 0% | 0 | | | | | 2121-02-189 | El Paso | 12/05/28 | $1,008,439.29 | Construction | Roadway | Construction | Roadway | $1,008,439.25 | $0.04 | 0% | 0 | | | | | 2121-03-173 | El Paso | 12/05/28 | $115,616.96 | Construction | Roadway | Construction | Roadway | $115,617.14 | $(0.18) | 0% | 0 | | | | | 2552-03-073 | El Paso | 12/05/28 | $262,553.57 | Construction | Roadway | Construction | Roadway | $262,553.31 | $0.26 | 0% | 0 | | | | | 0924-06-767 | El Paso | 11/01/28 | $453,617.86 | Construction | Roadway | Construction | Roadway | $453,618.00 | $(0.14) | 0% | 0 | | | | | 0924-06-768 | El Paso | 11/01/28 | $241,348.21 | Construction | Roadway | Construction | Roadway | $241,348.00 | $0.21 | 0% | 0 | | | | | 2552-03-072 | El Paso | 11/01/28 | $792,167.86 | Construction | Roadway | Construction | Roadway | $792,168.17 | $(0.31) | 0% | 0 | | | | | 0924-06-749 | El Paso | 02/02/28 | $88,385.63 | Construction | Roadway | Construction | Roadway | $88,386.56 | $(0.93) | 0% | -34 | -1 month | | | | 0924-06-750 | El Paso | 02/02/28 | $36,787.85 | Construction | Roadway | Construction | Roadway | $36,788.78 | $(0.93) | 0% | -34 | -1 month | | | | 0015-13-462 | Austin | 08/04/27 | $11,000,000.00 | Construction | Roadway | Construction | Roadway | $11,000,001.00 | $(1.00) | 0% | 0 | | | | --- ## Putting It Together The TxDOT project's timeline adjustments suggest significant letting shifts while maintaining a consistent subtype profile. As costs compress within the active pipeline, districts like Houston and Austin persist in driving overall value despite some projects facing cuts. --- ## Final Takeaway The ongoing adjustments in project timing and costs hint at the need for adaptable strategies within the state's transportation planning efforts. --- --- ## Context Wars https://www.bidlo.ai/research/context-wars Why the next AI race is about context, not just bigger models. [https://www.youtube.com/watch?v=fkiRVCQ7cBU](https://www.youtube.com/watch?v=fkiRVCQ7cBU) ### Summary Frontier model releases may be slowing, but the AI race is moving into a new phase: context. Matt Wolfe explains how Apple, Anthropic, and OpenAI are building around personal, conversational, and file-based context, then connects that shift to Bidlo’s view of market-aware AI for public construction. ### Key Points - The frontier model race is giving way to a quieter competition over context. - Apple is using personal ecosystem context to make Siri more useful inside everyday workflows. - Anthropic’s Claude-in-Slack direction shows how team conversations can become task-specific context. - OpenAI Codex points toward file and documentation context for long-running work across industries. - Bidlo frames public construction market data as context that agents can use for bidding, vendors, pricing, and opportunity discovery. ### Chapters - 00:00 The hidden context war - 00:27 Apple and personalized context - 01:01 Claude in Slack and conversational context - 01:56 Codex and file-based context - 03:03 Turning market data into context - 03:47 Why this matters next ### Transcript Hey, I'm Matt, one of the developers at Bidlo, and today we'll be talking about the context war. It's this hidden work that's going on behind the scenes. I'm sure everyone's seen the news about GPT-5.6 being withheld from the general public just like Meta and Apple was after it was released. We are seeing a general slowdown in the speed at which frontier models are being released to the general public. This might change as more and more distilled versions of these models make their way through the open source community. However, the slowdown has shifted the focus to another work that's going on which is the context war. Apple did their big developer conference where they announced the new upcoming features. The big focus of that conference was the next iteration of Siri, and they are now partnering with Google. A lot of the Gemini models will be underpinning the macOS and iOS operating systems, but their big push into this space isn't to make Siri the absolute frontier cutting-edge model. It's to give it all the context it needs to do what you want it to do. It understands how you talk to your grandmother, it understands your current weekly schedule, but understands your preferences in terms of shopping or app usage or things like that. When you do ask to do something, its implementation is deeply personalized based on all the context that the Apple operating system or the Apple ecosystem is making available to that model. Now we can take that stuff further. This last week at Claude was introduced as a tag in Slack. Now I know a lot of people in our industry use Teams, but Slack is just the version of Teams used by developers. It is a wonderful platform, we really like that platform, and Anthropic has pushed to make that the user interface of the future for these models. When you bring Claude in to any of your chats, any of your Teams for using that analogy, you're essentially giving that Claude bot access to all of your unstructured context, all of the conversation that goes on in that thread. And as you think about it, your organization has broken up into a lot of these threads. You'll have a thread specifically for I don't know, your estimating team or you might have a private conversation amongst a smaller subset of your estimating team. All of that is context that has been scoped to a very specific task or a very specific group. And giving Claude access to those specific bubbles makes it that bot more aware of how it should act when you tell it to do things or aware of what's going on when you ask it to do things. This is just another example of one of these frontier labs in Anthropic, in this case, pursuing the context battle. The last implementation of this that I want to talk about is Codex, which is Claude code was in Anthropic's big foray into like a popular mainstream application. Codex is OpenAI's version of that. And well, and Anthropic is now focusing on the conversation part of context with its integration and does Slack. Codex is more focusing on like a file implementation. Codex, you boot it on your computer, you tell it to get started on doing something and it's able to pull out, all of the information within that environment, through all the files, all the documentation, anything like that. Now OpenAI put out a really interesting article that showed Codex adoption over the last couple of months has skyrocketed, really since GPT-4.5 came out. The reason it has skyrocketed, when I said Skyrocketed, I'm not talking about within the developer community. I'm talking about within all of the other industries, I'm talking about, the legal community, the medical community, all these other very file-focused communities that have been using apps like ChatGPT, but not the same to the same level with all the context awareness and all of the long running tasks that developers have been using through tools like Codex. So, well, Anthropic has been focusing on the conversational side of context and that's where they see this going. Anthropic has been focused on the conversation side of context. OpenAI has been focusing on files and the ability to map out a lot of unstructured data to get particular tasks done. That's their version of context. Now, we think all of these are to some degree right, depending on the workflow. At Bidlo, the way we are approaching this is we think of our product as a tool for turning your market into context. When you either launch any application or any conversation or any agent through Bidlo, it instantly has access to all of the other things that are going on outside of the project you are looking at. If you want to know bid pricing, if you want to know recommended vendors, it is aware of all that additional context in your market that is necessary to answer such a specific question on this project. Now, we think this is wonderful to do within Bidlo, but we also make that available to any of the agents you already use. If your team is a Codex user or a Claude user, or maybe you build your own harnesses internally, we think that is fantastic and all of the data that we've turned into market aware context is available directly to that agent through MCP, APIs, or any of the other ways you'd like to integrate. That's the context war in a nutshell. A lot of that is going on under the mainstream media's radar. We say pay attention to that. I think this is going to become a very big topic over the next couple of months. --- ## Texas DOT Backlog Report - June 2026 https://www.bidlo.ai/research/texas-dot-backlog-report-june-2026 Active Construction Backlog by District ## TxDOT’s Next Letting Starts With $20.18B Already in the Pipeline Every new letting from TxDOT enters a market that is already marked by significant active work. The active TxDOT workload currently stands at $20.18 billion across 3,608 active projects distributed over 25 districts. This workload is not evenly split; some districts carry much heavier backlogs than others. Active backlog refers to the remaining value tied to projects currently underway, while change orders represent the approved contract value additions after projects have been awarded. The Dallas district has the largest active backlog at $4.82 billion, while Fort Worth leads with a change order percentage of 21.0%. Houston exhibits a substantial active project count with 409 projects but carries a lower active backlog than both Dallas and Austin. This report shows both district totals and notable individual projects to reveal how active workload is shaped. Insights will be drawn not only from backlog data but also from change orders to provide a comprehensive understanding of the current market landscape. --- ## Interactive District View [https://info.bidlo.ai/heatmap/backlog-by-district?embed=1&snapshot_id=dad163f4-7abb-4c25-a6d3-cf3ac380298d](https://info.bidlo.ai/heatmap/backlog-by-district?embed=1&snapshot_id=dad163f4-7abb-4c25-a6d3-cf3ac380298d) The interactive district view shows how active backlog and change orders are distributed across Texas. One view highlights areas where the remaining active backlog is concentrated, while the other reveals where approved change orders have occurred. These perspectives showcase different facets of the active market. For example, Dallas stands out with a considerable backlog, while Fort Worth shows pronounced change orders. Together, these layers provide a nuanced view of where the market is actively evolving. --- ## Dallas Is Carrying the Largest Remaining Workload Dallas leads all districts with an active backlog of $4.82 billion across 313 projects. This marks a distinct difference from Houston, which has the second largest backlog at $2.34 billion but manages this workload over 409 projects, reflecting a broader project base with lower per-project values. In contrast, Fort Worth, with an active backlog of $1.19 billion across 196 projects, highlights a different active project profile, showing a concentrated workload despite fewer projects overall. Fort Worth's leading change order percentage of 21.0% further distinguishes its market characteristics. The distribution of backlogs and project counts illustrates that mere project volume does not fully capture where remaining dollars are concentrated. The diverse profiles across districts argue for a deeper analysis of the active market. | Rank | District | Active backlog | Projects | Change order % | Change orders | | --- | --- | --- | --- | --- | --- | | 1 | DALLAS | $4.82B | 313 | 1.6% | $126.89M | | 2 | HOUSTON | $2.34B | 409 | 7.6% | $492.11M | | 3 | AUSTIN | $2.31B | 156 | 5.0% | $226.05M | | 4 | SAN ANTONIO | $1.56B | 193 | 3.6% | $199.64M | | 5 | FORT WORTH | $1.19B | 196 | 21.0% | $625.34M | | 6 | BRYAN | $916.95M | 166 | 5.6% | $85.36M | | 7 | BEAUMONT | $736.82M | 147 | 6.0% | $104.59M | | 8 | PHARR | $700.39M | 123 | 5.1% | $64.18M | | 9 | YOAKUM | $622.26M | 156 | 2.4% | $51.22M | | 10 | EL PASO | $581.31M | 112 | 11.7% | $170.35M | | 11 | CORPUS CHRISTI | $559.66M | 175 | 4.2% | $52.75M | | 12 | AMARILLO | $433.24M | 95 | 1.4% | $15.38M | | 13 | PARIS | $424.71M | 174 | 6.5% | $85.80M | | 14 | ODESSA | $411.50M | 168 | 6.2% | $83.57M | | 15 | LAREDO | $405.16M | 90 | 2.8% | $23.77M | | 16 | TYLER | $397.61M | 168 | 6.9% | $66.78M | | 17 | WICHITA FALLS | $356.92M | 88 | 1.4% | $12.96M | | 18 | WACO | $320.67M | 104 | 3.0% | $23.20M | | 19 | ATLANTA | $228.40M | 98 | 6.6% | $41.51M | | 20 | LUFKIN | $203.83M | 97 | 2.6% | $23.71M | | 21 | LUBBOCK | $201.26M | 85 | 3.7% | $25.20M | | 22 | ABILENE | $151.58M | 65 | 2.5% | $8.58M | | 23 | BROWNWOOD | $114.45M | 120 | 7.8% | $23.76M | | 24 | CHILDRESS | $94.38M | 40 | 7.5% | $13.90M | | 25 | SAN ANGELO | $94.28M | 70 | 7.5% | $24.05M | --- ## Change Orders Add a Second View The statewide change order percentage stands at 5.6%, reflecting significant additions to project values after initial awards. In the context of notable districts, Fort Worth has the highest change order percentage at 21.0% and an exceptional $625.34 million in total change orders. Houston, although not leading in change order percentage, has notable change order totals including $492.11 million with a 7.6% change order percentage. The presence of substantial change orders in various districts indicates ongoing adjustments that influence project timelines and contractor dynamics. This perspective of change orders provides an essential contrast to backlog views, indicating both local market shifts and potential project impacts as districts navigate existing contracts and funding adjustments. --- ## Notable Active Projects Notable individual projects help illustrate the district-level trends. The largest backlog project is in Dallas, CCSJ 2374-01-137, with an active backlog of $1.71 billion and no reported change orders, representing a significant concentration of funds. Conversely, the largest change order project, CCSJ 0008-13-125 from Fort Worth, has a backlog of $788.31 million but shows dramatic change orders of $451.41 million, leading to a change order percentage of 28.4%. This highlights contrasting project challenges within the same district and underscores the variability of contract adjustments. The contrasting profiles of these projects demonstrate how backlog and change order dynamics explain the ongoing market fluctuations and contractor engagements across Texas. The table below shows the largest active projects by remaining backlog. | CCSJ | Project | District | Active backlog | Change orders | Change order % | | --- | --- | --- | --- | --- | --- | | 2374-01-137 | CCSJ 2374-01-137 (project NH 1902(389)) | DALLAS | $1.71B | $0 | 0.0% | | 0008-13-125 | CCSJ 0008-13-125 (project F 2022(675)) | FORT WORTH | $788.31M | $451.41M | 28.4% | | 0009-11-254 | CCSJ 0009-11-254 (project F 2025(365)) | DALLAS | $758.40M | $3.42M | 0.4% | | 0049-12-110 | CCSJ 0049-12-110 (project F 2025(274)) | BRYAN | $554.02M | $1.11M | 0.2% | | 0015-13-428 | CCSJ 0015-13-428 (project F 2024(833)) | AUSTIN | $535.51M | $753,983 | 0.1% | The data indicates that Dallas not only leads in backlog but also houses significant single-project values that refine the understanding of the district’s active market. --- ## What the Current Active Market Looks Like In summary, Texas has an active backlog of $20.18 billion across 3,608 projects, with Dallas standing out as the largest district by active backlog. Meanwhile, Fort Worth showcases the most substantial change order dynamics. Contrasts between Houston's project count and the concentrated values in both Dallas and Fort Worth provide insights into the diverse nature of TxDOT’s active workload. Active engagement in ongoing projects and advisory responsiveness will shape the market going forward. --- --- ## Looping Agents and AI Workflows https://www.bidlo.ai/research/looping-agents-and-ai-workflows A current AI/ML discussion on looping agents, using bid bonds as a construction example. [https://www.youtube.com/watch?v=uLP7ODIcqEg](https://www.youtube.com/watch?v=uLP7ODIcqEg) ### Summary Matt Wolfe of Bidlo explains the current conversation around looping AI agents and why it matters for teams watching AI/ML trends. The bid bond form is used as a practical construction example, not as the whole point of the video. From there, the discussion widens into agent loops, human bottlenecks, model access, regulation, open-source models, and how these trends may show up in heavy civil and public works bidding. ### Chapters - 00:00 Introduction to Looping Agents in Construction AI - 01:30 Manual to Automated Bid Bond Form Completion - 04:00 Agent Review and Removing Human Bottlenecks - 06:00 Scaling Automation Across Multiple Projects - 08:00 Removing Humans from the Loop Entirely - 10:00 Anthropic’s AI Models and Industry Trends - 13:30 Government Regulation and AI Model Access - 15:00 China’s Advancements in Open Source AI Models - 17:30 Future of AI in Construction and Final Thoughts ### Transcript Hey, everyone. I am Matt, one of the developers at Bidlo. We're going to start doing a weekly or maybe twice-monthly explainer about what we're seeing in AI and machine learning technology, focusing on big concepts and how Bidlo is thinking about applying these to heavy civil public works construction. One topic I want to start with is "looping," which has been top of mind recently and has generated a lot of activity on Twitter. Anthropic published a really interesting article about this concept, and we fully believe this is the direction these technologies are heading. Many users haven’t yet thought about using agents or large language models (LLMs) in this way. Anthropic put together a great article, and I want to walk through it in the context of heavy civil construction. We'll use a simple example—a bid bond form—which is generic and easy to understand. We'll also discuss how we're approaching building organizations around this looping architecture. In the past, if you were filling out a bid bond form, you, as a person, would answer questions like: "What’s the liquidated damages on this project?" You would ask an agent where to find that information or have it pull details from the plans. Then you’d enter the information into the form. The next step is to remove yourself from that loop. Instead of filling out the form, you ask the agent to handle it. The agent goes through the form, extracts each answer from the plans, fills out the bid bond form, and then presents you with the completed form. This automates more of the process. Then, what do you do next? You check whether the information the agent provided—like liquidated damages or working days—is correct by reviewing it against the plans. Naturally, you ask why you have to do that. Why not have another agent review the first agent’s work? Now, once the first agent completes the form, it triggers a second agent to review it. You, as the human, kick off the process, and when it’s done, you review their responses. That’s great but there’s still a human in the loop. The trend, and what we are aiming for is to remove the human from this process altogether. Why have a human involved in filling out or reviewing the bid bond form at all? The next step is scaling this. Instead of doing this for one project at a time, at the end of the week, you have a list of projects on your bid schedule. You tell an agent to fill out all the bid bond forms for every project on your list, review them, and save them to their respective project files. This shifts the work from a sequential, human-driven process to a parallel, agent-driven one. If you have, say, five projects, five agents work simultaneously to fill out, review, and file the bid bond forms. That is where we are today. Many developers and legal experts are still at this stage, where a human is part of the loop. As long as a human is involved, they are the bottleneck. Therefore, there’s a big push to remove the human whenever possible, creating a loop that runs autonomously without human blockers. For example, Anthropic illustrated a system where you never have to think about a bid bond form again. You only manage your bid list. Every few minutes, an agent checks your bid list, sees if a bid bond form is missing, fills it out, reviews it, and files it automatically. You can apply this to many tasks beyond bid bond forms—submittals, quotes, and other busy work triggered at the moment you decide to bid on a project. The agents handle the work and reviews autonomously. When you log in the next day, the agents report all the completed work. You then review the information to decide if it’s good or bad. If it’s bad, you adjust the loop. Anthropic’s article focuses on recursive learning—agents that teach themselves—and removing humans from the workflow. They acknowledge this approach has risks and have called for more government intervention. We are fully convinced this is how these tools should be integrated into workflows in construction. We’re actively working with our customers to think this way. On the broader ecosystem, Anthropic’s most capable model, Fable, was briefly released to the public in a limited, restricted form but then pulled back due to concerns from the U.S. Government. There were claims, including from Amazon engineers, that safeguards in the model could be bypassed. Whether true or not, it reflects the political and marketing dynamics at play in the U.S. AI space. Fable is a very good model, slightly better than GPT 5.5 in some tests. But these political issues are partly due to competition and the players involved, including Amazon—which, while not an LLM provider, is an infrastructure player competing in the space. We believe many of these debates are marketing-driven. The models are powerful tools, but they won’t suddenly destroy the world. Another big point is China is catching up to if not surpassing, the U.S. In model capabilities. Currently, the leaders are Anthropic and OpenAI, with products like GPT. But China has made incredible progress with far less computing power. Their models are more efficient and open source, meaning anyone with proper hardware can run them. Recently, ZAI released GLM 5.2, an open-source model with capabilities near the lower end of top GPT and Anthropic models. This democratization is where the industry is inevitably headed. Like in software, the best technologies eventually become open source, allowing anyone to host and run powerful models. This can be scary when anyone might have unrestricted access to models with Mythos-level capabilities and no safeguards. But it’s inevitable. China’s progress is impressive, especially given compute limitations, but it is also a natural progression as U.S. Models plateau in capability. The bottleneck is no longer the models themselves but the harnesses and environments that make them effective in practical applications. Because of this plateau, Chinese models are catching up, which contributes to the market noise around issues like Fable being pulled. My point is not to suggest anyone is acting maliciously but to encourage critical reading of headlines—they are often hype. The difference now is that these models are approaching their current ceiling, and ongoing improvements are driven more by better tooling and environments rather than raw model capabilities. We continue to monitor these developments daily to understand how best to apply this technology at Bidlo and for our customers. If you have any questions or want to learn more, let me know. Otherwise, I’ll see you in the next explainer. --- ## TxDOT Q4 2026 Projected Spending https://www.bidlo.ai/research/txdot-q4-2026-projected-spending How is TxDOT projected spending distributed by job size and district? [https://info.bidlo.ai/embed/district-chart-multiselect?showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59](https://info.bidlo.ai/embed/district-chart-multiselect?showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59) --- - Projected spending by size indicates a stark dominance of TEX-Size projects, expected to total approximately $10.89 billion over the upcoming forecast period, while Small and Medium tiers contribute notably less at $9.26 billion and $5.77 billion, respectively. - Spending patterns across districts show a clear concentration in Houston, which has pulled ahead as a consistent leader with projected annual allocations approaching $712.9 million, contrasting with the declining trends observed in Dallas. - The overall landscape presents a mix of volatility and steady run-rate patterns; while Houston’s consistent growth signals a reliable trajectory, districts like San Antonio reflect downward shifts that introduce variability in the projections. --- ## Overview Projected spending over the next period exhibits a notable increase from historical averages, particularly in FY 2029, where allocations are expected to reach around $3.04 billion. This represents a substantial uptick compared to spending patterns observed over the past 12 quarters, which have historically hovered around $1.67 billion, illustrating a trend of robust growth ahead. The distribution of projected spending reveals a pronounced emphasis on TEX-Size initiatives, which are anticipated to contribute approximately $10.89 billion over the forecast period from FY 2027 Q1 through FY 2029 Q4. In contrast, Small and Medium tiers exhibit lesser figures, with projections of $9.26 billion and $5.77 billion, respectively, suggesting TEX-Size projects will drive a significant portion of future spending. ### TxDOT Spend by District [https://info.bidlo.ai/embed/bubble-chart?hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59](https://info.bidlo.ai/embed/bubble-chart?hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59) - Houston demonstrates a strong leadership stance in projected spending, showcasing a rolling average nearing $712.9 million amid significant TEX-Size undertakings. - Austin is poised for impressive growth in upcoming quarters, particularly driven by its robust TEX-Size contributions, in stark contrast to declining figures in Dallas. - San Antonio faces declining projections, yet it retains a steady cadence in smaller projects, while Beaumont reflects substantial mixed-tier spending. - Fort Worth exhibits consistent growth trajectory, buoyed by a blend of Medium and Large tier investments. ## By District #### Abilene [https://info.bidlo.ai/embed/district-chart?district=ABILENE&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59](https://info.bidlo.ai/embed/district-chart?district=ABILENE&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59) Abilene's spending reflects a gradual decline in forecasted resources, with a rolling average peaking at $58.5 million in FY 2027 Q1 and dipping to $28.0 million by FY 2029 Q4. The tier distribution indicates a focus solely on Small projects totaling $336.2 million from FY 2027 Q1 through FY 2029 Q4. In terms of actual spending, Abilene reached a peak of $44.1 million in FY 2029 Q3, while its figures fell to a low of $16.4 million in FY 2029 Q4. This shows a pattern of volatility, highlighting the district's reliance on a limited number of jobs, notably 255 Small-tier projects during the forecast window. --- #### Amarillo [https://info.bidlo.ai/embed/district-chart?district=AMARILLO&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59](https://info.bidlo.ai/embed/district-chart?district=AMARILLO&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59) Amarillo's forecast showcases a strong allocation of resources across various tiers, highlighted by a peak rolling average of $91.0 million in FY 2027 Q1, with a subsequent decline to $44.9 million by FY 2029 Q4. The tier mix reveals diversified engagement, particularly through Small and Medium projects totaling $539.3 million from FY 2027 Q1 through FY 2029 Q4. Evaluating the actual counts, Amarillo's peak spending reached $224.6 million in FY 2027 Q3, while it faced a low of $4.1 million in FY 2028 Q4. This indicates a fluctuating landscape, where a significant volume of jobs, including 155 Small-tier jobs, contributes to the overall spend in a highly concentrated model. --- #### Atlanta [https://info.bidlo.ai/embed/district-chart?district=ATLANTA&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59](https://info.bidlo.ai/embed/district-chart?district=ATLANTA&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59) Atlanta's expenditure pattern shows a step-up trajectory with a rolling average peaking at $61.1 million in FY 2029 Q2, decreasing to $27.6 million by FY 2027 Q4. The anticipated tier allocations are well-rounded, featuring contributions from Small, Medium, Large, and TEX-Size projects totaling $671.4 million from FY 2027 Q1 through FY 2029 Q4. In terms of actual counts, FY 2029 Q1 saw a notable peak at $382.6 million, but the spending dipped to a mere $3.5 million in FY 2028 Q4. This indicates a varied but focused market approach, with 233 Small-tier jobs harmonizing the projected investment. --- #### Austin [https://info.bidlo.ai/embed/district-chart?district=AUSTIN&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59](https://info.bidlo.ai/embed/district-chart?district=AUSTIN&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59) Austin is projected to register a significant uptick in spending, as indicated by a steady rolling average around $346.4 million, primarily driven by TEX-Size projects. This reflects a strong commitment to elevated investment in infrastructure, positioning the district for continued growth amid a mixed-tier environment. Regarding actual expenditure, Austin observed a remarkable peak of $1.64 billion in FY 2029 Q2, notably fluctuating to just $24.4 million in FY 2029 Q3. The uptick is supported by a diverse job mix, with 252 Small jobs in the forecast window, which indicates an area of strength for the district's ongoing projects. --- #### Beaumont [https://info.bidlo.ai/embed/district-chart?district=BEAUMONT&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59](https://info.bidlo.ai/embed/district-chart?district=BEAUMONT&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59) Beaumont reflects a diverse engagement across multiple tiers, with its rolling average peaking at $102.8 million in FY 2029 Q2, contrasted with a low of $32.9 million in FY 2027 Q4. The breakdown indicates a balanced approach, with Small, Medium, and Large projects totaling $1.02 billion from FY 2027 Q1 through FY 2029 Q4. Actual figures show a substantial peak of $542.4 million in FY 2028 Q1, while spending dwindled to just $4.9 million by FY 2029 Q4. This narrative suggests a fluctuating market, driven largely by substantial job counts across 168 Small and 9 Medium projects. --- #### Brownwood [https://info.bidlo.ai/embed/district-chart?district=BROWNWOOD&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59](https://info.bidlo.ai/embed/district-chart?district=BROWNWOOD&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59) Brownwood's projected spending reflects a delicate balance with its rolling average peaking at $30.1 million in FY 2028 Q4, and momentarily dipping to $17.7 million in FY 2028 Q1, indicating some turbulence in the forecast. The tier allocation shows a strong commitment to Small and Large projects totaling $289.1 million from FY 2027 Q1 through FY 2029 Q4. In actual monetary terms, Brownwood peaked at $133.0 million in FY 2028 Q4, while it experienced a low of $3.7 million in FY 2027 Q3. The relative fluctuations suggest a reliance on select high-value projects while being bolstered by 201 Small job counts. --- #### Bryan [https://info.bidlo.ai/embed/district-chart?district=BRYAN&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59](https://info.bidlo.ai/embed/district-chart?district=BRYAN&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59) Bryan demonstrates a remarkably steady forecast with a rolling average reaching a peak of $145.9 million in FY 2028 Q2, with a modest drop to $93.8 million by FY 2028 Q3. The district is characterized by a broad tier engagement, with spending projected across Small, Medium, Large, and TEX-Size projects totaling over $1.5 billion from FY 2027 Q1 through FY 2029 Q4. In terms of actual spending, Bryan's peak hit $347.1 million in FY 2028 Q2 while tapering down to $5.8 million in FY 2029 Q4. This underscores the reliance on a diverse array of projects with 353 Small and 4 Large jobs enhancing the district's overall throughput. --- #### Childress [https://info.bidlo.ai/embed/district-chart?district=CHILDRESS&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59](https://info.bidlo.ai/embed/district-chart?district=CHILDRESS&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59) Childress exhibits modest engagement in projected spending, with a rolling average peaking at $23.5 million in FY 2027 Q1 and lightly dipping to $12.1 million by FY 2029 Q4. The tier mix is notably modest, primarily consisting of Small projects totaling $126.2 million from FY 2027 Q1 through FY 2029 Q4. Turning to actual expenditure, Childress peaked at $25.2 million in FY 2028 Q1, with a low of just $3.2 million noted in FY 2027 Q3. This reflects a volatile landscape primarily shaped by a limited count of 86 Small jobs, reinforcing the district's reliance on smaller project engagements. --- #### Corpus Christi [https://info.bidlo.ai/embed/district-chart?district=CORPUS%20CHRISTI&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59](https://info.bidlo.ai/embed/district-chart?district=CORPUS%20CHRISTI&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59) Corpus Christi's forecast displays a smooth spend pattern with a peak rolling total of $85.4 million in FY 2027 Q2, reflecting a reliance on Large projects. The tier mix shows a significant emphasis on Large projects, which account for $384.4 million over the forecast period from FY 2027 Q1 through FY 2029 Q4, indicating a focused approach in larger-scale work. In terms of actual spending, the district reached a high of $162.5 million in FY 2027 Q2, followed by a drop to $15.9 million in FY 2029 Q3. This fluctuation indicates a dependence on a handful of significant projects, with a total of 209 Small jobs contrasting sharply with heavier investments in Large tiers. --- #### Dallas [https://info.bidlo.ai/embed/district-chart?district=DALLAS&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59](https://info.bidlo.ai/embed/district-chart?district=DALLAS&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59) Dallas displays a mixed trajectory, characterized by rolling averages peaking at $399.4 million in FY 2027 Q1, before experiencing a notable decline. The tier mix is diverse, with $1.08 billion in TEX-Size projects contributing heavily to the overall forecast from FY 2027 Q1 through FY 2029 Q4, suggesting a potential recalibration of strategy towards larger endeavors. In terms of actual spending, the district achieved a local high-water mark of $1.22 billion in FY 2029 Q1, although it faces a significant dip to $22.6 million in FY 2029 Q3. This volatility highlights a concentration in fewer larger projects, with a robust job count of 340 across Small tiers as well, reflecting a dual-pronged focus on scale and volume. --- #### El Paso [https://info.bidlo.ai/embed/district-chart?district=EL%20PASO&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59](https://info.bidlo.ai/embed/district-chart?district=EL%20PASO&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59) El Paso demonstrates a steady elevation in spending patterns, peaking at $99.7 million in FY 2028 Q2. The project distribution indicates a strong focus on TEX-Size projects, contributing significantly to the $486.1 million total across the forecast from FY 2027 Q1 through FY 2029 Q4, showcasing a capacity for larger initiatives. Looking at actual counts, El Paso achieved a notable total of $570.4 million in FY 2028 Q2, while dropping to just $495,000 in FY 2029 Q4. The total of 149 Small and 8 Medium jobs reported illustrates a steady throughput, emphasizing the district's ability to handle ongoing smaller projects alongside its larger commitments. --- #### Fort Worth [https://info.bidlo.ai/embed/district-chart?district=FORT%20WORTH&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59](https://info.bidlo.ai/embed/district-chart?district=FORT%20WORTH&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59) Fort Worth's forecast illustrates strong performance, marked by a peak rolling average of $166.3 million in FY 2029 Q4, reflecting an upward trend in spending. The tier distribution showcases a balanced approach with $536.5 million from Large projects and $561 million attributed to TEX-Size efforts over the forecast period stretching from FY 2027 Q1 through FY 2029 Q4. Regarding actual figures, Fort Worth reached a peak of $614.2 million in FY 2029 Q4, while dipping to $14.3 million in FY 2029 Q3. This notable fluctuation indicates project variability, supported by 270 Small jobs that highlight a capacity for diverse project handling within the market. --- #### Houston [https://info.bidlo.ai/embed/district-chart?district=HOUSTON&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59](https://info.bidlo.ai/embed/district-chart?district=HOUSTON&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59) Houston showcases a remarkable performance with a rolling peak of $712.9 million in FY 2029 Q3, indicating a strong upward trajectory. This success is driven primarily by TEX-Size projects, which amassed $2.59 billion from FY 2027 Q1 through FY 2029 Q4, demonstrating a dominant focus on larger scale operations. In terms of actual counts, the district surged to a high of $1.65 billion in FY 2028 Q1, but saw a decrease to $84.7 million in FY 2027 Q1. The breadth of job counts reveals a substantial capacity with 424 Small jobs, further showcasing Houston's reliance on both volume and large-scale projects. --- #### Laredo [https://info.bidlo.ai/embed/district-chart?district=LAREDO&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59](https://info.bidlo.ai/embed/district-chart?district=LAREDO&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59) Laredo maintains a steady baseline in projected spending, with rolling averages showing a local high of $88.5 million in FY 2027 Q2. The tier mix illustrates a solid commitment with $182.4 million dedicated to Small projects, spanning the forecast period from FY 2027 Q1 through FY 2029 Q4, suggesting a consistent engagement in smaller initiatives. In terms of actual figures, Laredo reached a peak of $149 million in FY 2029 Q1, while experiencing a drop to just $3.6 million in FY 2028 Q3. The total of 114 Small jobs reflects a focus on maintaining volume, contrasting sharply against the fluctuations observed in larger project commitments. --- #### Lubbock [https://info.bidlo.ai/embed/district-chart?district=LUBBOCK&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59](https://info.bidlo.ai/embed/district-chart?district=LUBBOCK&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59) Lubbock's projected spending reflects a stable run-rate with rolling averages peaking at $66 million in FY 2027 Q1, indicating consistent activity levels. The tier composition highlights $126.9 million in Small projects over the forecast from FY 2027 Q1 through FY 2029 Q4, pointing towards a predominantly Smaller project focus. Regarding actual spending, Lubbock recorded a high of $204.9 million in FY 2029 Q1, then declined to $949,000 in FY 2027 Q3. The 181 Small jobs reported establish a clear alignment of project engagement, serving as a reliable foundation for ongoing activity despite lower peak values. --- #### Lufkin [https://info.bidlo.ai/embed/district-chart?district=LUFKIN&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59](https://info.bidlo.ai/embed/district-chart?district=LUFKIN&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59) Lufkin's forecast trajectory exhibits a steady yet modest approach, characterized by a peak rolling total of $34.8 million in FY 2028 Q1. The forecast reflects a focus on Small projects, which account for $216.6 million from FY 2027 Q1 through FY 2029 Q4, indicating a consistent engagement with community-sized initiatives. In actual terms, Lufkin's spending peaked at $58.1 million in FY 2028 Q1, but saw a notable drop to $494,000 in FY 2027 Q2. The 152 Small jobs indicate a significant reliance on smaller projects, encapsulating Lufkin's approach to sustained local infrastructure work. --- #### Odessa [https://info.bidlo.ai/embed/district-chart?district=ODESSA&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59](https://info.bidlo.ai/embed/district-chart?district=ODESSA&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59) Odessa's projected spending exhibits notable fluctuations, with a peak rolling average of $108.9 million in FY 2029 Q2, highlighting a market influenced by significant TEX-Size projects. The overall tier mix reveals substantial engagement in Medium and Small tiers, reflecting a diverse focus in project types. In terms of actual spending, Odessa reached a high of $472.6 million in FY 2029 Q2 but faced a stark drop to just $1.0 million in FY 2027 Q4. This pattern of volatility entails a reliance on larger projects for raw dollar value while managing a higher job count of 196 within the Small tier, indicating a mixed engagement throughout the forecast period. --- #### Paris [https://info.bidlo.ai/embed/district-chart?district=PARIS&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59](https://info.bidlo.ai/embed/district-chart?district=PARIS&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59) Paris showcases sustained activity within the Large tier, with a rolling average peaking at $108.0 million in FY 2029 Q1, signaling a strong presence in larger project awards. The district’s forecast reveals a mix heavily skewed towards Large contracts, indicating a focused market strategy driving its projected growth. Looking at actual counts, Paris achieved a peak of $361.2 million in FY 2028 Q3 but tapered off dramatically to a mere $874K by FY 2029 Q4. With 195 jobs primarily sourced from Small contracts, the district reflects a robust medium-scale operation, relying on fewer high-value projects that underline its market position. --- #### Pharr [https://info.bidlo.ai/embed/district-chart?district=PHARR&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59](https://info.bidlo.ai/embed/district-chart?district=PHARR&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59) Pharr's forecast exhibits a striking blend of tiers, evident in its rolling peak of $147.8 million in FY 2027 Q1, driven by a mix of spending across Small and Medium projects. This reinforces a diverse approach to project financing with TEX-Size commitments complementing other contract types. In terms of actual spending, Pharr soared to $337.2 million in FY 2029 Q1, showing a robust activity level that dipped to $12.1 million in FY 2028 Q4. With 272 jobs registered primarily within the Small tier, this indicates an ongoing commitment to maintaining a broad employment base while navigating fluctuating funding levels. --- #### San Angelo [https://info.bidlo.ai/embed/district-chart?district=SAN%20ANGELO&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59](https://info.bidlo.ai/embed/district-chart?district=SAN%20ANGELO&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59) San Angelo's spending reflects episodic growth, with rolling averages reaching a high point of $41.5 million in FY 2029 Q3 amidst a generally stable trajectory. This suggests a balanced focus on Medium and Small tier projects that collectively drive consistent infrastructures forward. Actual counts reveal that San Angelo peaked at $117.6 million in FY 2028 Q2 but struggled with a low of $8.1 million in FY 2027 Q4. The district recorded 168 jobs primarily from Small projects, signifying a strong base of lower-tier jobs that help stabilize the market despite larger swings in spending. --- #### San Antonio [https://info.bidlo.ai/embed/district-chart?district=SAN%20ANTONIO&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59](https://info.bidlo.ai/embed/district-chart?district=SAN%20ANTONIO&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59) San Antonio exhibits vibrant activity characterized by peaks and valleys, with a rolling high of $243.3 million in FY 2029 Q1. The robust engagement across all tiers, particularly within the TEX-Size category, highlights the area’s capability to attract significant investment during peak periods. In terms of actual counts, the district experienced a substantial peak of $697.2 million in FY 2029 Q1, but this figure sharply contrasts with a low of just $685K in FY 2027 Q4. With 326 jobs primarily attributable to Small and Medium tiers, this reflects a strategic balancing of project types that fosters a more sustainable economic environment. --- #### Tyler [https://info.bidlo.ai/embed/district-chart?district=TYLER&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59](https://info.bidlo.ai/embed/district-chart?district=TYLER&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59) Tyler's projected spending reveals a moderate growth pattern, peaking at $83.8 million in FY 2028 Q3, illustrating a reliance on multiple tiers for overall stability. This suggests a carefully cultivated project environment designed to maintain consistent support across Small to Large tiers. When evaluating actual spending, Tyler reached its highest in FY 2029 Q4 with $174.4 million, contrasted by a dip to $9.9 million in FY 2029 Q3. Job counts remain healthy, with 202 primarily in the Small tier, emphasizing a balanced approach that combines higher project values with sustained job creation across the board. --- #### Waco [https://info.bidlo.ai/embed/district-chart?district=WACO&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59](https://info.bidlo.ai/embed/district-chart?district=WACO&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59) Waco experiences a dynamic landscape with significant fluctuations, peaking at a notable $115.3 million in FY 2029 Q2, driven largely by TEX-Size projects that maintain its elevated trajectory. The tier mix showcases a strong commitment to larger contracts, indicating an aggressive expansion approach. Looking at actual counts, Waco peaked impressively at $842.9 million in FY 2029 Q1, whilst seeing a slump down to $10.1 million in FY 2028 Q3. With 249 jobs mostly sourced from Small projects, this illustrates a unique relationship where smaller job counts contribute to higher overall investment, fostering robust local engagement. --- #### Wichita Falls [https://info.bidlo.ai/embed/district-chart?district=WICHITA%20FALLS&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59](https://info.bidlo.ai/embed/district-chart?district=WICHITA%20FALLS&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59) Wichita Falls displays stability with a rising trend, hitting a rolling peak of $84.4 million in FY 2027 Q2, bolstered by consistent engagement across Large-tier projects. This reflects a balanced investment strategy that effectively utilizes available funding streams. In terms of actual spending, the district reached a high of $320.0 million in FY 2027 Q2, alongside a low of $2.4 million noted in FY 2027 Q3. With a focus on 165 jobs mainly in the Small tier, this indicates a well-rounded approach, where larger projects enrich the job market while maintaining a steady steady pace in overall funding activities. --- #### Yoakum [https://info.bidlo.ai/embed/district-chart?district=YOAKUM&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59](https://info.bidlo.ai/embed/district-chart?district=YOAKUM&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=fb137f5a-d268-4562-ac83-6068d8a2ff59) Yoakum's financial landscape reveals episodic spikes with a rolling peak at $141.4 million in FY 2027 Q1, reinforcing the district's mixed tier engagement, especially in TEX-Size projects. This suggests strategic investments align with market fluctuations, enabling adaptability to funding opportunities. When assessing actual counts, Yoakum achieved a remarkable peak of $267.0 million in FY 2027 Q1 but faced a decline to $3.3 million in FY 2028 Q4. The strong emphasis on Small and TEX-Size projects, alongside 251 jobs, conveys a commitment to community engagement while navigating broader market demands. --- --- ## TxDOT Pipeline Changes - May 2026 https://www.bidlo.ai/research/txdot-pipeline-changes-may-2026 How did the TxDOT project pipeline change in May? - The pipeline value has decreased from $5.73B to $5.67B, a drop of $51.09M. - Overall project count decreased by 83, with 190 new entries and 273 projects exiting the window. - San Antonio shows the largest net cost increase of $84.94M during this period. --- ## Overview Looking at the May 4, 2026 vs. June 3, 2026 snapshots, across a letting window of June 4, 2026 to June 1, 2029, the pipeline exhibits a decline in overall value and project count. The total pipeline dropped by $51.09M, while the total project count fell by 83. In terms of project classification, the dominant subtype remains roadway, representing 77.7% of the pipeline, with costs primarily concentrated in construction. --- ## Letting Date Shifts (Slippage) [https://info.bidlo.ai/embed/letting-slippage-bubble?publication_id=728d8541-6ebd-4d92-9cb4-c8eac7a668cf](https://info.bidlo.ai/embed/letting-slippage-bubble?publication_id=728d8541-6ebd-4d92-9cb4-c8eac7a668cf) > How to read this chart: The letting dates have seen significant shifts, with a total of 181 projects shifting by 6 months or more. Notably, 123 projects were pushed later and 58 were pulled earlier, indicating a net movement toward later letting dates. This trend suggests that many scheduled developments have experienced delays. | CSJ | District | Est. Letting Date | Project Estimate | Current Type | Current Subtype | Prev. Type | Prev. Subtype | Prev. Date | Letting Δ (days) | Letting Date Δ | Cost Δ | %Cost Δ | Type/Subtype Δ | Lifecycle | | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | | 0750-01-028 | Atlanta | 01/01/45 | $1,600,000.00 | | | Construction | Roadway | 06/01/28 | 6058 | 17 years | | | | | | 2635-03-030 | Amarillo | 11/03/26 | $287,000.00 | Construction | Roadway | Unassigned | Unassigned | 11/01/40 | -5112 | -14 years | $(413,000.00) | -59% | Unassigned → Construction / Roadway | | | 0251-05-065 | Brownwood | 11/01/40 | $887,885.00 | | | | | 11/02/27 | 4748 | 13 years | | | | | | 0835-01-030 | Waco | 09/01/39 | $492,300.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | 4747 | 13 years | | | | | | 1662-01-016 | Waco | 09/01/39 | $456,000.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | 4747 | 13 years | | | | | | 1835-01-030 | Waco | 09/01/39 | $269,401.18 | Construction | Roadway | Construction | Roadway | 09/02/26 | 4747 | 13 years | | | | | | 3430-01-007 | Waco | 09/01/39 | $152,700.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | 4747 | 13 years | | | | | | 0675-03-108 | Bryan | 10/01/39 | $78,414.00 | | | Construction | Roadway | 10/06/26 | 4743 | 13 years | | | | | | 0675-04-090 | Bryan | 10/01/39 | $30,958.00 | | | Construction | Roadway | 10/06/26 | 4743 | 13 years | | | | | | 1024-01-097 | Beaumont | 09/01/38 | $16,676.00 | | | Construction | Roadway | 09/01/27 | 4018 | 11 years | | | | | | 0836-03-073 | Waco | 01/01/40 | $5,000,000.00 | | | Construction | Roadway | 01/01/29 | 4017 | 11 years | | | | | | 0521-05-144 | San Antonio | 09/01/37 | $589,100,000.00 | | | Construction | Roadway | 09/01/27 | 3653 | 10 years | | | | | | 0182-02-049 | Brownwood | 11/01/38 | $358,064.00 | | | Construction | Roadway | 11/01/28 | 3652 | 10 years | | | | | | 0421-04-035 | San Antonio | 10/01/37 | $657,314.00 | | | Construction | Roadway | 10/05/27 | 3649 | 10 years | | | | Canceled | | 3510-04-083 | Houston | 11/01/28 | $66,500,000.00 | Construction | Roadway | Unassigned | Unassigned | 01/01/37 | -2983 | -8 years | | | Unassigned → Construction / Roadway | | | 3510-03-002 | Houston | 12/15/28 | $55,381,565.00 | Alternative Delivery | Design Build | Unassigned | Unassigned | 01/15/37 | -2953 | -8 years | | | Unassigned → Alternative Delivery / Design Build | | | 3510-03-003 | Houston | 12/15/28 | $55,381,565.00 | | | | | 01/15/37 | -2953 | -8 years | | | | | | 3510-03-004 | Houston | 12/15/28 | $76,000,000.00 | Alternative Delivery | Design Build | Unassigned | Unassigned | 01/15/37 | -2953 | -8 years | | | Unassigned → Alternative Delivery / Design Build | | | 0102-01-124 | Corpus Christi | 03/01/29 | $1,598,373.00 | Construction | Roadway | Unassigned | Unassigned | 03/01/37 | -2922 | -8 years | | | Unassigned → Construction / Roadway | | | 0186-05-050 | Bryan | 10/05/27 | $150,000.00 | Construction | Roadway | Unassigned | Unassigned | 10/01/35 | -2918 | -8 years | $(28,206.00) | -16% | Unassigned → Construction / Roadway | | | 0985-01-026 | Abilene | 03/01/34 | $5,300,000.00 | | | Construction | Roadway | 03/03/27 | 2555 | 7 years | | | | | | 0558-11-018 | San Angelo | 10/01/34 | $15,474,285.00 | | | Construction | Roadway | 10/05/27 | 2553 | 7 years | | | | | | 2685-01-012 | Atlanta | 10/01/34 | $305,200.00 | | | Construction | Roadway | 10/05/27 | 2553 | 7 years | | | | | | 0289-04-038 | Brownwood | 11/01/34 | $45,721.00 | | | Construction | Roadway | 11/01/28 | 2191 | 6 years | $(500,000.00) | -92% | | | | 1215-02-017 | Atlanta | 10/01/34 | $159,094.64 | | | Construction | Roadway | 10/04/28 | 2188 | 6 years | | | | | | 0535-02-050 | San Antonio | 08/05/26 | $5,699,898.82 | Construction | Bridge | Unassigned | Unassigned | 09/01/31 | -1853 | -5 years | | | Unassigned → Construction / Bridge | | | 0054-04-119 | Brownwood | 11/01/33 | $454,880.00 | | | Construction | Roadway | 11/01/28 | 1826 | 5 years | | | | | | 1026-01-013 | Brownwood | 11/01/32 | $205,073.00 | | | Construction | Roadway | 11/02/27 | 1826 | 5 years | | | | | | 2107-01-019 | Brownwood | 11/01/32 | $416,427.00 | | | Construction | Roadway | 11/02/27 | 1826 | 5 years | | | | | | 0079-01-048 | Brownwood | 11/01/31 | $154,509.00 | | | Construction | Roadway | 11/02/27 | 1460 | 4 years | | | | | | 0025-02-229 | San Antonio | 01/01/31 | $972,889.00 | | | Construction | Roadway | 01/06/27 | 1456 | 4 years | | | | | | 0976-03-125 | Houston | 04/06/27 | $2,200,000.00 | Construction | Roadway | Unassigned | Unassigned | 07/01/30 | -1182 | -3 years | | | Unassigned → Construction / Roadway | | | 0157-04-054 | Abilene | 12/01/30 | $105,964.00 | | | Construction | Roadway | 12/01/27 | 1096 | 3 years | | | | | | 0073-13-014 | San Antonio | 09/01/30 | $2,000,000.00 | | | Construction | Bridge | 09/01/27 | 1096 | 3 years | | | | | | 0829-01-029 | San Angelo | 12/01/29 | $586,000.00 | | | Construction | Roadway | 12/01/26 | 1096 | 3 years | | | | | | 0003-06-106 | Odessa | 11/01/30 | $37,300,000.00 | | | Construction | Roadway | 11/02/27 | 1095 | 3 years | | | | | | 0127-02-144 | Brownwood | 11/01/28 | $341,972.59 | Construction | Roadway | Unassigned | Unassigned | 11/01/31 | -1095 | -3 years | | | Unassigned → Construction / Roadway | | | 0007-06-279 | Brownwood | 11/01/29 | $15,074.00 | | | Construction | Roadway | 11/03/26 | 1094 | 3 years | | | | Canceled | | 0007-06-280 | Brownwood | 11/01/29 | $14,019.00 | | | Construction | Roadway | 11/03/26 | 1094 | 3 years | | | | Canceled | | 0088-05-113 | Yoakum | 11/01/29 | $54,941.00 | | | Construction | Roadway | 11/03/26 | 1094 | 3 years | | | | | | 0089-03-101 | Yoakum | 11/01/29 | $55,000.00 | | | Construction | Roadway | 11/03/26 | 1094 | 3 years | | | | | | 0089-11-008 | Yoakum | 11/01/29 | $95,019.00 | | | Construction | Roadway | 11/03/26 | 1094 | 3 years | | | | | | 2350-01-075 | Yoakum | 11/01/29 | $122,965.00 | | | Construction | Roadway | 11/03/26 | 1094 | 3 years | | | | | | 2786-01-021 | Brownwood | 11/01/29 | $17,480.00 | | | Construction | Roadway | 11/03/26 | 1094 | 3 years | | | | | | 2816-01-008 | Yoakum | 11/01/29 | $238,192.50 | | | Construction | Roadway | 11/03/26 | 1094 | 3 years | | | | | | 3509-01-008 | Yoakum | 11/01/29 | $40,861.00 | | | Construction | Roadway | 11/03/26 | 1094 | 3 years | | | | | | 2786-01-020 | Brownwood | 11/03/26 | $23,985.00 | Construction | Roadway | Unassigned | Unassigned | 11/01/29 | -1094 | -3 years | | | Unassigned → Construction / Roadway | | | 2941-02-054 | Houston | 09/01/31 | $1,288,740.00 | | | Construction | Roadway | 09/06/28 | 1090 | 3 years | | | | | | 0367-02-084 | Houston | 09/06/28 | $456,000.00 | Construction | Roadway | Unassigned | Unassigned | 09/01/31 | -1090 | -3 years | $(44,000.00) | -9% | Unassigned → Construction / Roadway | | | 1003-01-098 | Houston | 09/06/28 | $1,088,146.00 | Construction | Roadway | Unassigned | Unassigned | 09/01/31 | -1090 | -3 years | | | Unassigned → Construction / Roadway | | | 0229-02-050 | Odessa | 03/07/28 | $6,500,000.00 | Construction | Roadway | Unassigned | Unassigned | 03/01/31 | -1089 | -3 years | | | Unassigned → Construction / Roadway | | | 0348-12-017 | Corpus Christi | 02/02/28 | $3,200,000.00 | Construction | Bridge | Unassigned | Unassigned | 09/01/30 | -942 | -3 years | $700,000.00 | 28% | Unassigned → Construction / Bridge | | | 1392-01-058 | Dallas | 09/01/30 | $11,693,513.35 | | | Construction | Roadway | 06/01/28 | 822 | 2 years | | | | | | 2263-02-110 | Corpus Christi | 07/01/27 | $15,000,000.00 | Construction | Ferry Boat | Unassigned | Unassigned | 09/01/29 | -793 | -2 years | | | Unassigned → Construction / Ferry Boat | | | 0421-06-024 | San Antonio | 10/01/29 | $4,760,643.00 | | | Construction | Roadway | 09/01/27 | 761 | 2 years | | | | | | 0014-15-077 | Fort Worth | 03/03/27 | $0.00 | Construction | Roadway | Construction | Roadway | 04/01/29 | -760 | -2 years | | | | | | 0887-01-044 | Odessa | 11/01/29 | $22,178,571.43 | | | Construction | Roadway | 10/05/27 | 758 | 2 years | $(821,428.57) | -4% | | | | 0902-50-142 | Fort Worth | 06/01/29 | $21,994,051.23 | Construction | Roadway | Construction | Roadway | 05/05/27 | 758 | 2 years | | | | | | 0924-06-691 | El Paso | 05/02/29 | $3,716,750.00 | Construction | Local Let | Construction | Local Let | 05/01/27 | 732 | 2 years | | | | | | 0747-05-048 | Fort Worth | 12/01/27 | $200,000.00 | Construction | Roadway | Unassigned | Unassigned | 12/01/29 | -731 | -2 years | | | Unassigned → Construction / Roadway | | | 0152-03-069 | Austin | 04/02/31 | $5,560,000.00 | | | Construction | Roadway | 04/02/29 | 730 | 2 years | | | | | | 0286-03-018 | Austin | 04/02/31 | $1,000,000.00 | | | Construction | Roadway | 04/02/29 | 730 | 2 years | | | | | | 0366-02-104 | San Antonio | 02/01/31 | $2,343,970.00 | | | Construction | Roadway | 02/01/29 | 730 | 2 years | | | | | | 0366-03-076 | San Antonio | 02/01/31 | $9,179,079.00 | | | Construction | Roadway | 02/01/29 | 730 | 2 years | | | | | | 0222-05-053 | Atlanta | 01/01/31 | $9,200,000.00 | | | Construction | Roadway | 01/01/29 | 730 | 2 years | | | | | | 0222-05-056 | Atlanta | 01/01/31 | $8,784,916.00 | | | Construction | Roadway | 01/01/29 | 730 | 2 years | | | | | | 0047-09-040 | Dallas | 06/01/30 | $2,631,970.69 | | | Construction | Roadway | 06/01/28 | 730 | 2 years | | | | | | 0072-05-101 | San Antonio | 02/01/30 | $9,949,148.00 | | | Construction | Roadway | 02/02/28 | 730 | 2 years | | | | | | 0328-08-026 | Laredo | 08/01/29 | $9,551,281.75 | Construction | Roadway | Construction | Roadway | 08/04/27 | 728 | 2 years | | | | | | 0483-01-055 | Laredo | 08/01/29 | $4,348,311.50 | Construction | Roadway | Construction | Roadway | 08/04/27 | 728 | 2 years | | | | | | 0003-01-068 | El Paso | 01/01/30 | $654,175.00 | | | Construction | Roadway | 01/05/28 | 727 | 2 years | $(24,228.70) | -4% | | | | 0003-02-052 | El Paso | 01/01/30 | $720,642.86 | | | Construction | Roadway | 01/05/28 | 727 | 2 years | $(26,690.47) | -4% | | | | 0003-04-059 | El Paso | 01/01/30 | $637,426.79 | | | Construction | Roadway | 01/05/28 | 727 | 2 years | $(23,608.40) | -4% | | | | 3538-01-067 | Houston | 01/01/30 | $1,000,000.00 | | | Construction | Non Roadway | 01/05/28 | 727 | 2 years | | | | | | 3538-01-071 | Houston | 01/01/30 | $1,000,000.00 | | | Construction | Non Roadway | 01/05/28 | 727 | 2 years | | | | | | 3510-06-020 | Houston | 04/01/29 | $51,058,877.00 | Construction | Roadway | Construction | Roadway | 05/05/27 | 697 | 2 years | | | | | | 3510-06-022 | Houston | 04/01/29 | $43,829,461.00 | Construction | Roadway | Construction | Roadway | 05/05/27 | 697 | 2 years | | | | | | 0421-01-053 | San Antonio | 10/01/29 | $30,000,000.00 | | | Construction | Roadway | 12/01/27 | 670 | 2 years | $4,797,941.00 | 19% | | | | 0048-04-111 | Dallas | 12/01/26 | $1,025,160.00 | Construction | Roadway | Construction | Roadway | 08/02/28 | -610 | -2 years | | | | | | 1186-01-102 | Austin | 04/01/28 | $10,636,088.00 | Non-Let | Roadway | Non-Let | Roadway | 09/01/26 | 578 | 2 years | | | | | | 0116-04-120 | Bryan | 10/05/27 | $77,350.00 | Construction | Roadway | Construction | Roadway | 04/07/26 | 546 | 1 year | | | | | | 0249-08-046 | Fort Worth | 08/05/26 | $329,106.80 | Construction | Roadway | Construction | Roadway | 02/02/28 | -546 | -1 year | | | | | | 0502-01-243 | Houston | 01/15/29 | $24,000,000.00 | Non-Let | Local | Non-Let | Local | 08/09/27 | 525 | 1 year | | | | | | 0912-72-388 | Houston | 02/15/29 | $40,225,631.00 | Construction | Local Let | Construction | Local Let | 09/15/27 | 519 | 1 year | | | | | | 0912-72-401 | Houston | 02/15/29 | $36,530,369.00 | Construction | Local Let | Construction | Local Let | 09/15/27 | 519 | 1 year | | | | | | 0274-01-046 | Brownwood | 01/01/29 | $1,000,000.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 488 | 1 year | | | | | | 0274-02-033 | Brownwood | 01/01/29 | $2,500,000.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 488 | 1 year | | | | | | 0092-14-111 | Dallas | 06/01/27 | $18,984,267.56 | Construction | Roadway | Construction | Roadway | 09/06/28 | -463 | -1 year | | | | | | 0237-06-054 | Laredo | 08/05/26 | $1,000,337.79 | Construction | Roadway | Construction | Roadway | 11/02/27 | -454 | -1 year | | | | | | 1982-01-031 | Laredo | 08/05/26 | $123,600.00 | Construction | Roadway | Construction | Roadway | 11/02/27 | -454 | -1 year | | | | | | 0912-72-381 | Houston | 11/15/28 | $50,171,694.00 | Construction | Local Let | Construction | Local Let | 09/15/27 | 427 | 1 year | | | | | | 0167-02-098 | El Paso | 11/01/28 | $288,300.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 427 | 1 year | $(10,677.78) | -4% | | | | 1046-03-013 | El Paso | 11/01/28 | $127,550.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 427 | 1 year | $(4,724.07) | -4% | | | | 0168-03-038 | Lubbock | 08/05/26 | $10,186,000.00 | Construction | Roadway | Construction | Roadway | 10/05/27 | -426 | -1 year | | | | | | 0168-03-041 | Lubbock | 08/05/26 | $361,462.26 | Construction | Roadway | Construction | Roadway | 10/05/27 | -426 | -1 year | | | | | | 2185-01-002 | Lubbock | 08/05/26 | $445,995.11 | Construction | Roadway | Construction | Roadway | 10/05/27 | -426 | -1 year | | | | | | 0217-02-037 | Atlanta | 12/01/28 | $18,642,426.36 | Construction | Roadway | Construction | Roadway | 11/01/27 | 396 | 1 year | | | | | | 0037-02-060 | Laredo | 08/05/26 | $30,000,000.00 | Construction | Bridge | Construction | Bridge | 09/01/27 | -392 | -1 year | | | | | | 0374-04-032 | El Paso | 09/06/28 | $4,545,805.36 | Construction | Roadway | Construction | Roadway | 09/01/27 | 371 | 1 year | $(168,363.16) | -4% | | | | 0720-02-095 | Houston | 09/01/27 | $528,000.00 | Construction | Roadway | Construction | Roadway | 09/06/28 | -371 | -1 year | $(472,000.00) | -47% | | | | 0092-04-088 | Dallas | 12/01/27 | $1,281,060.00 | Construction | Roadway | Construction | Roadway | 12/05/28 | -370 | -1 year | | | | | | 1311-01-063 | Dallas | 12/01/27 | $801,923.39 | Construction | Roadway | Construction | Roadway | 12/05/28 | -370 | -1 year | | | | | | 0580-01-038 | Yoakum | 07/03/28 | $1,239,000.00 | Non-Let | Non Roadway | Non-Let | Non Roadway | 07/03/27 | 366 | 1 year | | | | | | 2529-02-017 | Pharr | 04/01/30 | $9,553,719.00 | | | Construction | Roadway | 04/01/29 | 365 | 1 year | | | | | | 0017-14-020 | San Antonio | 02/01/30 | $5,041,793.00 | | | Construction | Roadway | 02/01/29 | 365 | 1 year | | | | | | 0068-02-050 | Lubbock | 02/01/30 | $1,371,261.60 | | | Construction | Roadway | 02/01/29 | 365 | 1 year | | | | | | 0003-02-051 | El Paso | 11/01/29 | $23,459,355.36 | | | Construction | Roadway | 11/01/28 | 365 | 1 year | $(868,873.34) | -4% | | | | 0054-06-116 | Brownwood | 11/01/29 | $597,899.00 | | | Construction | Roadway | 11/01/28 | 365 | 1 year | | | | | | 0129-01-038 | Brownwood | 11/01/29 | $530,939.00 | | | Construction | Roadway | 11/01/28 | 365 | 1 year | | | | | | 0315-06-051 | Bryan | 11/01/29 | $3,000,000.00 | | | Construction | Roadway | 11/01/28 | 365 | 1 year | | | | | | 2436-01-033 | Brownwood | 11/01/29 | $101,000.00 | | | Construction | Roadway | 11/01/28 | 365 | 1 year | | | | | | 0102-07-048 | Pharr | 04/01/29 | $19,094,764.32 | Construction | Roadway | Unassigned | Unassigned | 04/01/30 | -365 | -1 year | | | Unassigned → Construction / Roadway | | | 0008-08-085 | Dallas | 11/01/28 | $15,241,283.40 | Construction | Roadway | Unassigned | Unassigned | 11/01/29 | -365 | -1 year | | | Unassigned → Construction / Roadway | | | 0776-03-016 | Brownwood | 11/01/28 | $86,544.00 | Construction | Roadway | Unassigned | Unassigned | 11/01/29 | -365 | -1 year | | | Unassigned → Construction / Roadway | | | 1242-01-009 | Brownwood | 11/01/28 | $200,408.00 | Construction | Roadway | Construction | Roadway | 11/02/27 | 365 | 1 year | | | | | | 0073-02-091 | San Antonio | 10/04/28 | $8,062,084.00 | Construction | Roadway | Construction | Roadway | 10/05/27 | 365 | 1 year | $4,994,251.00 | 163% | | | | 0521-04-305 | San Antonio | 10/04/28 | $30,151,873.00 | Construction | Roadway | Construction | Roadway | 10/05/27 | 365 | 1 year | | | | | | 0004-07-143 | Odessa | 02/02/28 | $1,434,593.19 | Construction | Roadway | Construction | Roadway | 02/02/27 | 365 | 1 year | | | | | | 0017-03-074 | San Antonio | 02/02/28 | $10,627,384.00 | Construction | Roadway | Construction | Roadway | 02/01/29 | -365 | -1 year | | | | | | 0073-08-213 | San Antonio | 02/02/28 | $22,018,694.00 | Construction | Roadway | Construction | Roadway | 02/01/29 | -365 | -1 year | | | | | | 0073-09-047 | San Antonio | 02/02/28 | $15,100,930.00 | Construction | Roadway | Construction | Roadway | 02/01/29 | -365 | -1 year | | | | | | 0389-11-061 | Houston | 02/02/28 | $3,424,252.00 | Construction | Roadway | Construction | Roadway | 02/02/27 | 365 | 1 year | | | | | | 0168-09-198 | Amarillo | 12/01/27 | $900,000.00 | Construction | Non Roadway | Construction | Non Roadway | 12/01/26 | 365 | 1 year | | | | | | 0168-10-084 | Amarillo | 12/01/27 | $100,000.00 | Construction | Non Roadway | Construction | Non Roadway | 12/01/26 | 365 | 1 year | | | | | | 0001-01-077 | El Paso | 10/05/27 | $331,759.36 | Construction | Roadway | Construction | Roadway | 10/04/28 | -365 | -1 year | $11,848.55 | 4% | | | | 0374-02-128 | El Paso | 10/05/27 | $332,783.52 | Construction | Roadway | Construction | Roadway | 10/04/28 | -365 | -1 year | $11,885.13 | 4% | | | | 3451-01-051 | El Paso | 10/05/27 | $425,949.07 | Construction | Roadway | Construction | Roadway | 10/04/28 | -365 | -1 year | $15,212.19 | 4% | | | | 3451-01-052 | El Paso | 10/05/27 | $343,217.59 | Construction | Roadway | Construction | Roadway | 10/04/28 | -365 | -1 year | $12,257.50 | 4% | | | | 0313-08-032 | Fort Worth | 12/01/26 | $450,000.00 | Construction | Roadway | Construction | Roadway | 12/01/27 | -365 | -1 year | | | | | | 1853-01-049 | Fort Worth | 12/01/26 | $384,840.66 | Construction | Roadway | Construction | Roadway | 12/01/27 | -365 | -1 year | | | | | | 2213-02-012 | Fort Worth | 12/01/26 | $450,000.00 | Construction | Roadway | Construction | Roadway | 12/01/27 | -365 | -1 year | | | | | | 2631-01-007 | Fort Worth | 12/01/26 | $450,000.00 | Construction | Roadway | Construction | Roadway | 12/01/27 | -365 | -1 year | | | | | | 2631-02-007 | Fort Worth | 12/01/26 | $450,000.00 | Construction | Roadway | Construction | Roadway | 12/01/27 | -365 | -1 year | | | | | | 2631-03-007 | Fort Worth | 12/01/26 | $145,928.00 | Construction | Roadway | Construction | Roadway | 12/01/27 | -365 | -1 year | | | | | | 1378-01-059 | Austin | 08/01/26 | $5,030,542.52 | Non-Let | Bridge | Unassigned | Unassigned | 08/01/25 | 365 | 1 year | $5,030,541.52 | 503054152% | Unassigned → Non-Let / Bridge | | | 2208-02-026 | Dallas | 08/02/28 | $6,590,209.08 | Construction | Roadway | Construction | Roadway | 08/01/29 | -364 | -12 months | | | | | | 0143-02-031 | San Antonio | 01/05/28 | $1,064,259.00 | Construction | Roadway | Construction | Roadway | 01/06/27 | 364 | 12 months | | | | | | 0291-05-051 | San Antonio | 01/05/28 | $1,286,888.00 | Construction | Roadway | Construction | Roadway | 01/06/27 | 364 | 12 months | | | | | | 1823-03-016 | Odessa | 10/01/27 | $700,000.00 | Non-Let | Roadway | Non-Let | Roadway | 10/02/26 | 364 | 12 months | | | | | | 0968-04-005 | Lubbock | 11/03/26 | $418,824.00 | Construction | Roadway | Construction | Roadway | 11/02/27 | -364 | -12 months | | | | | | 0001-04-105 | El Paso | 05/01/29 | $4,128,778.57 | Construction | Roadway | Construction | Roadway | 05/03/28 | 363 | 12 months | $(152,917.73) | -4% | | | | 0047-04-044 | Dallas | 05/01/29 | $3,502,395.48 | Construction | Roadway | Construction | Roadway | 05/03/28 | 363 | 12 months | | | | | | 0167-03-003 | El Paso | 05/01/29 | $755,593.75 | Construction | Roadway | Construction | Roadway | 05/03/28 | 363 | 12 months | $(27,984.95) | -4% | | | | 2291-01-015 | Fort Worth | 10/01/29 | $6,869,417.15 | | | Construction | Roadway | 10/04/28 | 362 | 12 months | | | | | | 2291-01-016 | Fort Worth | 10/01/29 | $13,917,409.51 | | | Construction | Roadway | 10/04/28 | 362 | 12 months | | | | | | 2291-02-010 | Fort Worth | 10/01/29 | $10,252,902.19 | | | Construction | Roadway | 10/04/28 | 362 | 12 months | | | | | | 0002-14-051 | El Paso | 01/01/29 | $1,468,286.50 | Construction | Roadway | Construction | Roadway | 01/05/28 | 362 | 12 months | $(54,380.98) | -4% | | | | 0179-09-044 | Yoakum | 03/01/29 | $2,200,000.00 | Construction | Roadway | Construction | Roadway | 03/07/28 | 359 | 12 months | | | | | | 1155-05-013 | Abilene | 03/01/29 | $6,000,000.00 | Construction | Roadway | Construction | Roadway | 03/07/28 | 359 | 12 months | | | | | | 0276-09-011 | Laredo | 02/01/30 | $1,921,342.50 | | | Construction | Roadway | 03/01/29 | 337 | 11 months | | | | | | 0299-04-088 | Laredo | 03/01/29 | $3,004,045.00 | Construction | Roadway | Unassigned | Unassigned | 02/01/30 | -337 | -11 months | | | Unassigned → Construction / Roadway | | | 0254-01-149 | Corpus Christi | 08/05/26 | $12,000,000.00 | Construction | Roadway | Construction | Roadway | 07/01/27 | -330 | -11 months | $(3,000,000.00) | -20% | | | | 0271-17-188 | Houston | 02/15/27 | $1,600,000.00 | Non-Let | Bridge | Non-Let | Bridge | 04/15/26 | 306 | 10 months | | | | | | 0018-05-089 | Laredo | 08/05/26 | $228,583,900.49 | Construction | Roadway | Construction | Roadway | 06/01/27 | -300 | -10 months | $(27,536,260.27) | -11% | | | | 2436-01-031 | Brownwood | 04/01/29 | $5,000,000.00 | Construction | Roadway | Unassigned | Unassigned | 01/01/30 | -275 | -9 months | | | Unassigned → Construction / Roadway | | | 0008-09-037 | Fort Worth | 06/01/28 | $17,300,891.50 | Construction | Roadway | Construction | Roadway | 09/01/27 | 274 | 9 months | | | | | | 1207-03-012 | Corpus Christi | 11/01/28 | $900,000.00 | Construction | Bridge | Construction | Bridge | 02/02/28 | 273 | 9 months | | | | | | 1207-03-013 | Corpus Christi | 11/01/28 | $800,000.00 | Construction | Bridge | Construction | Bridge | 02/02/28 | 273 | 9 months | | | | | | 0002-04-039 | El Paso | 01/05/28 | $264,745.19 | Construction | Roadway | Construction | Roadway | 09/06/28 | -245 | -8 months | $9,455.19 | 4% | | | | 0015-08-430 | Austin | 03/03/27 | $3,534,578.85 | Construction | Roadway | Construction | Roadway | 11/02/27 | -244 | -8 months | $950,142.74 | 37% | | | | 0015-17-030 | Austin | 03/03/27 | $1,862,339.42 | Construction | Roadway | Construction | Roadway | 11/02/27 | -244 | -8 months | $68,975.53 | 4% | | | | 0072-08-150 | San Antonio | 10/01/29 | $10,395,088.00 | | | Construction | Roadway | 02/01/29 | 242 | 8 months | | | | | | 0017-08-122 | Laredo | 04/01/29 | $100,000.00 | Construction | Bridge | Construction | Bridge | 08/02/28 | 242 | 8 months | | | | | | 0581-02-168 | Dallas | 06/01/29 | $4,836,600.00 | Construction | Roadway | Construction | Roadway | 10/04/28 | 240 | 8 months | | | | | | 0314-01-084 | Fort Worth | 06/01/27 | $14,084,845.19 | Construction | Bridge | Construction | Bridge | 10/06/26 | 238 | 8 months | | | | | | 0080-11-003 | Fort Worth | 12/31/26 | $28,387.63 | Non-Let | Non Roadway | Non-Let | Non Roadway | 05/15/26 | 230 | 8 months | | | | | | 1094-03-021 | Fort Worth | 01/14/27 | $650,000.00 | Construction | Local Let | Construction | Local Let | 06/15/26 | 213 | 7 months | | | | | | 0047-07-253 | Dallas | 06/01/29 | $1,118,945.45 | Construction | Roadway | Construction | Roadway | 11/01/28 | 212 | 7 months | | | | | | 0005-02-112 | Odessa | 05/05/27 | $6,346,155.00 | Construction | Rail - Safety | Construction | Rail - Safety | 10/06/26 | 211 | 7 months | | | | | | 0912-34-212 | Houston | 05/05/27 | $1,846,148.00 | Construction | Bridge | Construction | Bridge | 10/06/26 | 211 | 7 months | | | | | | 0912-37-247 | Houston | 05/05/27 | $769,262.00 | Construction | Bridge | Construction | Bridge | 10/06/26 | 211 | 7 months | | | | | | 0080-03-049 | Fort Worth | 06/01/27 | $115,461,159.08 | Construction | Roadway | Construction | Roadway | 11/03/26 | 210 | 7 months | | | | | | 0092-06-111 | Dallas | 08/05/26 | $2,943,326.59 | Construction | Roadway | Construction | Roadway | 03/03/27 | -210 | -7 months | $(625,650.29) | -18% | | | | 0093-01-108 | Dallas | 08/05/26 | $2,373,824.25 | Construction | Roadway | Construction | Roadway | 03/03/27 | -210 | -7 months | $(871,672.95) | -27% | | | | 0166-01-060 | Dallas | 08/05/26 | $1,337,640.54 | Construction | Roadway | Construction | Roadway | 03/03/27 | -210 | -7 months | $(1,623,135.30) | -55% | | | | 0902-90-296 | Fort Worth | 09/15/26 | $2,573,875.05 | Construction | Local Let | Construction | Local Let | 02/18/26 | 209 | 7 months | | | | | | 0902-90-350 | Fort Worth | 09/15/26 | $1,552,000.00 | Construction | Local Let | Construction | Local Let | 02/18/26 | 209 | 7 months | | | | | | 2266-02-164 | Fort Worth | 10/11/27 | $4,200,000.00 | Construction | Local Let | Construction | Local Let | 04/01/27 | 193 | 6 months | | | | | | 0507-03-055 | Corpus Christi | 09/01/29 | $8,000,000.00 | | | Construction | Roadway | 03/01/29 | 184 | 6 months | | | | | | 0943-04-035 | Corpus Christi | 10/01/29 | $5,500,000.00 | | | Construction | Roadway | 04/01/29 | 183 | 6 months | | | | | | 0916-00-282 | Corpus Christi | 04/01/27 | $9,480,737.00 | Construction | Local Let | Construction | Local Let | 10/01/26 | 182 | 6 months | | | | | | 0001-04-114 | El Paso | 05/03/28 | $740,740.74 | Construction | Roadway | Construction | Roadway | 12/01/27 | 154 | 5 months | $17,017.48 | 2% | | | | 0283-02-040 | Wichita Falls | 08/05/26 | $4,248,978.39 | Construction | Roadway | Construction | Roadway | 01/06/27 | -154 | -5 months | $748,978.39 | 21% | | | | 0283-03-023 | Wichita Falls | 08/05/26 | $9,438,454.44 | Construction | Roadway | Construction | Roadway | 01/06/27 | -154 | -5 months | $538,454.44 | 6% | | | | 1586-01-085 | Pharr | 08/05/26 | $6,597,423.30 | Construction | Roadway | Construction | Roadway | 01/06/27 | -154 | -5 months | $(917,408.70) | -12% | | | | 0281-02-078 | Dallas | 04/01/29 | $774,488.72 | Construction | Roadway | Construction | Roadway | 11/01/28 | 151 | 5 months | | | | | | 0204-01-075 | Austin | 10/06/26 | $58,125.00 | Construction | Bridge | Construction | Bridge | 03/03/27 | -148 | -5 months | | | | | | 0320-03-104 | Austin | 10/06/26 | $236,912.50 | Construction | Bridge | Construction | Bridge | 03/03/27 | -148 | -5 months | | | | | | 0321-01-056 | Austin | 10/06/26 | $729,150.00 | Construction | Bridge | Construction | Bridge | 03/03/27 | -148 | -5 months | | | | | | 0030-02-057 | Amarillo | 12/05/28 | $1,800,000.00 | Construction | Roadway | Construction | Roadway | 05/01/29 | -147 | -5 months | | | | | | 3176-01-012 | Corpus Christi | 11/02/27 | $10,000,000.00 | Construction | Roadway | Construction | Roadway | 07/01/27 | 124 | 4 months | $4,830,000.00 | 93% | | | | 0047-06-182 | Dallas | 08/01/26 | $1,127,591.83 | Construction | Local Let | Construction | Local Let | 12/03/26 | -124 | -4 months | | | | | | 1014-03-063 | Dallas | 08/01/26 | $1,731,094.70 | Construction | Local Let | Construction | Local Let | 12/03/26 | -124 | -4 months | | | | | | 0912-72-843 | Houston | 08/15/26 | $1,048,217.76 | Non-Let | Roadway | Non-Let | Roadway | 04/15/26 | 122 | 4 months | | | | | | 0197-02-141 | Dallas | 06/01/29 | $878,343.00 | Construction | Roadway | Construction | Roadway | 02/01/29 | 120 | 4 months | | | | | | 0045-08-039 | Paris | 07/01/27 | $124,861,809.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | 120 | 4 months | | | | | | 0915-12-827 | San Antonio | 09/01/27 | $654,893.00 | Construction | Roadway | Construction | Roadway | 05/05/27 | 119 | 4 months | | | | | | 0915-12-828 | San Antonio | 09/01/27 | $362,736.00 | Construction | Roadway | Construction | Roadway | 05/05/27 | 119 | 4 months | | | | | | 0088-05-115 | Yoakum | 05/05/27 | $250,000.00 | Construction | Roadway | Construction | Roadway | 01/06/27 | 119 | 4 months | | | | | | 0371-06-027 | Yoakum | 05/05/27 | $300,000.00 | Construction | Non Roadway | Construction | Non Roadway | 01/06/27 | 119 | 4 months | | | | | | 0363-03-061 | Fort Worth | 08/05/26 | $2,924,978.47 | Construction | Roadway | Construction | Roadway | 12/01/26 | -118 | -4 months | $38,121.42 | 1% | | | | 0441-09-054 | Odessa | 08/05/26 | $17,048,526.81 | Construction | Roadway | Construction | Roadway | 12/01/26 | -118 | -4 months | $2,248,526.81 | 15% | | | | 1012-03-027 | Dallas | 08/05/26 | $9,867,597.40 | Construction | Roadway | Construction | Roadway | 12/01/26 | -118 | -4 months | $1,194,303.15 | 14% | | | | 1012-03-028 | Dallas | 08/05/26 | $6,866,910.20 | Construction | Roadway | Construction | Roadway | 12/01/26 | -118 | -4 months | $493,087.90 | 8% | | | | 1492-01-013 | Dallas | 08/05/26 | $1,878,822.25 | Construction | Roadway | Construction | Roadway | 12/01/26 | -118 | -4 months | $547,330.80 | 41% | | | | 0027-02-034 | Yoakum | 01/01/29 | $21,600,000.00 | Construction | Roadway | Construction | Roadway | 09/06/28 | 117 | 4 months | $13,400,000.00 | 163% | | | | 0025-07-068 | Yoakum | 09/06/28 | $16,500,000.00 | Construction | Roadway | Construction | Roadway | 01/01/29 | -117 | -4 months | | | | | | 0134-09-070 | Dallas | 09/06/28 | $998,659.20 | Construction | Roadway | Construction | Roadway | 01/01/29 | -117 | -4 months | | | | | | 0918-46-369 | Dallas | 09/06/28 | $782,150.04 | Construction | Roadway | Construction | Roadway | 01/01/29 | -117 | -4 months | | | | | | 3138-01-020 | Bryan | 10/05/27 | $100,882,922.00 | Construction | Roadway | Construction | Roadway | 07/01/27 | 96 | 3 months | | | | | | 1022-01-037 | Beaumont | 05/05/27 | $730,000.00 | Construction | Roadway | Construction | Roadway | 02/02/27 | 92 | 3 months | | | | | | 0151-03-045 | Austin | 03/03/27 | $9,180,769.23 | Construction | Roadway | Construction | Roadway | 12/01/26 | 92 | 3 months | | | | | | 1200-02-037 | Austin | 02/02/27 | $2,221,995.59 | Construction | Roadway | Construction | Roadway | 11/03/26 | 91 | 3 months | | | | | | 1200-02-038 | Austin | 02/02/27 | $1,783,857.69 | Construction | Roadway | Construction | Roadway | 11/03/26 | 91 | 3 months | | | | | | 1200-03-069 | Austin | 02/02/27 | $1,500,782.69 | Construction | Roadway | Construction | Roadway | 11/03/26 | 91 | 3 months | $(60,031.73) | -4% | | | | 1047-02-052 | Dallas | 10/04/28 | $1,132,257.00 | Construction | Roadway | Construction | Roadway | 01/01/29 | -89 | -3 months | | | | | | 0024-08-152 | San Antonio | 01/06/27 | $14,850,000.00 | Construction | Roadway | Construction | Roadway | 11/03/26 | 64 | 2 months | | | | | | 0604-01-047 | Yoakum | 01/06/27 | $766,000.00 | Construction | Roadway | Construction | Roadway | 11/03/26 | 64 | 2 months | | | | | | 6493-98-001 | Houston | 09/02/26 | $1,902,980.58 | Maintenance | Routine Maintenance Contract | Maintenance | Routine Maintenance Contract | 07/01/26 | 63 | 2 months | | | | | | 0072-12-202 | San Antonio | 07/01/26 | $247,586.98 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 0918-47-569 | Dallas | 12/05/28 | $704,830.00 | Construction | Roadway | Construction | Roadway | 10/04/28 | 62 | 2 months | | | | | | 0204-06-072 | Bryan | 11/02/27 | $60,710.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 62 | 2 months | | | | | | 0204-07-058 | Bryan | 11/02/27 | $51,610.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 62 | 2 months | | | | | | 0209-05-055 | Bryan | 11/02/27 | $328,381.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 62 | 2 months | | | | | | 0267-08-009 | Bryan | 11/02/27 | $23,600.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 62 | 2 months | | | | | | 0315-08-052 | Bryan | 11/02/27 | $298,824.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 62 | 2 months | | | | | | 0506-02-027 | Bryan | 11/02/27 | $19,930.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 62 | 2 months | | | | | | 0506-04-028 | Bryan | 11/02/27 | $106,290.12 | Construction | Roadway | Construction | Roadway | 09/01/27 | 62 | 2 months | | | | | | 0506-05-011 | Bryan | 11/02/27 | $3,460.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 62 | 2 months | | | | | | 0648-03-085 | Bryan | 11/02/27 | $5,090.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 62 | 2 months | | | | | | 0648-03-086 | Bryan | 11/02/27 | $29,880.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 62 | 2 months | | | | | | 0648-03-087 | Bryan | 11/02/27 | $9,730.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 62 | 2 months | | | | | | 0648-04-006 | Bryan | 11/02/27 | $13,320.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 62 | 2 months | | | | | | 1564-01-040 | Bryan | 11/02/27 | $20,446.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 62 | 2 months | | | | | | 1564-01-041 | Bryan | 11/02/27 | $13,011.20 | Construction | Roadway | Construction | Roadway | 09/01/27 | 62 | 2 months | | | | | | 2238-01-016 | Bryan | 11/02/27 | $45,760.71 | Construction | Roadway | Construction | Roadway | 09/01/27 | 62 | 2 months | | | | | | 2238-02-028 | Bryan | 11/02/27 | $267,141.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 62 | 2 months | | | | | | 2830-02-015 | Bryan | 11/02/27 | $152,417.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 62 | 2 months | | | | | | 0947-03-034 | Beaumont | 11/03/26 | $2,000,000.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | 62 | 2 months | | | | | | 0089-07-166 | Yoakum | 09/02/26 | $229,757,253.50 | Construction | Roadway | Construction | Roadway | 11/03/26 | -62 | -2 months | | | | | | 0041-07-121 | Amarillo | 08/05/26 | $26,200,000.00 | Construction | Roadway | Construction | Roadway | 10/06/26 | -62 | -2 months | | | | | | 0041-07-123 | Amarillo | 08/05/26 | $4,750,000.00 | Construction | Roadway | Construction | Roadway | 10/06/26 | -62 | -2 months | | | | | | 0842-03-037 | Yoakum | 08/05/26 | $33,218,001.00 | Construction | Roadway | Construction | Roadway | 10/06/26 | -62 | -2 months | | | | | | 3510-04-070 | Houston | 08/05/26 | $16,878,891.00 | Construction | Roadway | Construction | Roadway | 10/06/26 | -62 | -2 months | | | | | | 3510-04-072 | Houston | 08/05/26 | $10,347,404.00 | Construction | Roadway | Construction | Roadway | 10/06/26 | -62 | -2 months | | | | | | 0338-03-096 | Houston | 06/01/27 | $7,643,900.00 | Construction | Roadway | Construction | Roadway | 04/06/27 | 56 | 2 months | | | | | | 0338-11-061 | Houston | 06/01/27 | $4,316,885.00 | Construction | Roadway | Construction | Roadway | 04/06/27 | 56 | 2 months | | | | | | 0229-01-042 | Odessa | 07/01/26 | $46,211,492.52 | Construction | Roadway | Construction | Roadway | 05/06/26 | 56 | 2 months | $452,908.75 | 1% | | | | 0908-33-112 | Abilene | 06/15/26 | $1,765,043.00 | Construction | Local Let | Construction | Local Let | 08/02/26 | -48 | -2 months | | | | | | 1743-01-012 | Houston | 12/01/26 | $2,927,659.00 | Construction | Roadway | Construction | Roadway | 01/06/27 | -36 | -1 month | | | | | | 0049-14-016 | Bryan | 10/05/27 | $14,050.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 34 | 1 month | | | | | | 0050-03-118 | Bryan | 10/05/27 | $43,890.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 34 | 1 month | | | | | | 0050-03-119 | Bryan | 10/05/27 | $43,890.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 34 | 1 month | | | | | | 0050-07-017 | Bryan | 10/05/27 | $20,410.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 34 | 1 month | | | | | | 0540-01-056 | Bryan | 10/05/27 | $363,242.68 | Construction | Roadway | Construction | Roadway | 09/01/27 | 34 | 1 month | | | | | | 0643-05-069 | Bryan | 10/05/27 | $383,498.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 34 | 1 month | | | | | | 0648-02-023 | Bryan | 10/05/27 | $47,670.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 34 | 1 month | | | | | | 0944-01-031 | Bryan | 10/05/27 | $132,899.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 34 | 1 month | | | | | | 0944-01-032 | Bryan | 10/05/27 | $47,060.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 34 | 1 month | | | | | | 1691-01-019 | Bryan | 10/05/27 | $138,200.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 34 | 1 month | | | | | | 2337-02-013 | Bryan | 10/05/27 | $140,500.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 34 | 1 month | | | | | | 2827-01-014 | Bryan | 10/05/27 | $42,070.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 34 | 1 month | | | | | | 3033-02-016 | Bryan | 10/05/27 | $105,670.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 34 | 1 month | | | | | | 0976-03-120 | Houston | 09/02/26 | $484,617.00 | Construction | Roadway | Construction | Roadway | 10/06/26 | -34 | -1 month | | | | | | 0981-01-122 | Houston | 09/02/26 | $1,235,700.00 | Construction | Roadway | Construction | Roadway | 10/06/26 | -34 | -1 month | | | | | | 0981-02-012 | Houston | 09/02/26 | $678,042.00 | Construction | Roadway | Construction | Roadway | 10/06/26 | -34 | -1 month | | | | | | 1414-01-024 | Houston | 09/02/26 | $61,492.00 | Construction | Roadway | Construction | Roadway | 10/06/26 | -34 | -1 month | | | | | | 0366-01-085 | Austin | 05/05/27 | $3,501,490.46 | Construction | Non Roadway | Construction | Non Roadway | 04/06/27 | 29 | 29 days | | | | | | 2992-01-012 | Brownwood | 05/05/27 | $154,292.00 | Construction | Roadway | Construction | Roadway | 04/06/27 | 29 | 29 days | | | | | | 0161-01-033 | Laredo | 03/01/29 | $1,438,067.40 | Construction | Roadway | Construction | Roadway | 02/01/29 | 28 | 28 days | | | | | | 0299-13-035 | Laredo | 02/01/29 | $1,789,754.40 | Construction | Roadway | Construction | Roadway | 03/01/29 | -28 | -28 days | | | | | | 0918-47-573 | Dallas | 11/01/28 | $418,876.00 | Construction | Roadway | Construction | Roadway | 10/04/28 | 28 | 28 days | | | | | | 0238-06-040 | Amarillo | 09/06/28 | $8,000,000.00 | Construction | Roadway | Construction | Roadway | 10/04/28 | -28 | -28 days | | | | | | 3416-01-012 | Houston | 08/04/27 | $74,299,327.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | -28 | -28 days | | | | | | 0285-03-066 | Austin | 11/03/26 | $1,439,357.92 | Construction | Non Roadway | Construction | Non Roadway | 10/06/26 | 28 | 28 days | | | | | | 0276-07-035 | San Antonio | 08/05/26 | $8,601,216.47 | Construction | Roadway | Construction | Roadway | 09/02/26 | -28 | -28 days | | | | | | 3510-04-069 | Houston | 08/05/26 | $25,084,165.45 | Construction | Roadway | Construction | Roadway | 09/02/26 | -28 | -28 days | $8,980,253.45 | 56% | | | | 3510-04-071 | Houston | 08/05/26 | $14,072,310.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -28 | -28 days | | | | | | 0338-03-098 | Houston | 02/02/27 | $804,047.00 | Construction | Bridge | Construction | Bridge | 01/06/27 | 27 | 27 days | | | | | | 0338-03-099 | Houston | 02/02/27 | $654,592.00 | Construction | Bridge | Construction | Bridge | 01/06/27 | 27 | 27 days | | | | | | 0338-03-100 | Houston | 02/02/27 | $727,880.00 | Construction | Bridge | Construction | Bridge | 01/06/27 | 27 | 27 days | | | | | | 0338-03-101 | Houston | 02/02/27 | $686,576.00 | Construction | Bridge | Construction | Bridge | 01/06/27 | 27 | 27 days | | | | | | 0675-08-123 | Houston | 02/02/27 | $2,357,388.00 | | | Construction | Non Roadway | 01/06/27 | 27 | 27 days | | | | Canceled | | 2374-01-199 | Dallas | 08/01/27 | $721,035.00 | Construction | Roadway | Construction | Roadway | 08/04/27 | -3 | -3 days | | | | | | 6501-30-001 | Bryan | 06/10/26 | $900,000.00 | Maintenance | Routine Maintenance Contract | Maintenance | Routine Maintenance Contract | 06/09/26 | 1 | 1 day | | | | | --- ## Project Type & Subtype Changes The mix of project types shows relative stability, with roadway projects comprising 77.7% of the pipeline, up from 76.1%. There were 26 type/subtype transitions observed, signaling some reclassification activity, although significant churn remains limited. | Subtype | May 4 | Jun 3 | Δ (pp, n) | | --- | --- | --- | --- | | Roadway | 76.1% (4,326) | 77.7% (4,368) | +1.6 (+42) | | Bridge | 15.3% (868) | 13.6% (766) | -1.6 (-102) | | Local Let | 3.5% (199) | 3.4% (189) | -0.1 (-10) | | Non Roadway | 2.1% (118) | 1.9% (109) | -0.1 (-9) | | Rail - Safety | 1.3% (75) | 1.1% (63) | -0.2 (-12) | | CSJ | District | Est. Letting Date | Project Estimate | Current Type | Current Subtype | Type/Subtype Δ | Prev. Type | Prev. Subtype | Prev. Cost | Prev. Date | Letting Δ (days) | Letting Date Δ | Cost Δ | %Cost Δ | Lifecycle | | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | | 1378-01-059 | Austin | 08/01/26 | $5,030,542.52 | Non-Let | Bridge | Unassigned → Non-Let / Bridge | Unassigned | Unassigned | $1.00 | 08/01/25 | 365 | 1 year | $5,030,541.52 | 503054152% | | | 0535-02-050 | San Antonio | 08/05/26 | $5,699,898.82 | Construction | Bridge | Unassigned → Construction / Bridge | Unassigned | Unassigned | $5,699,898.82 | 09/01/31 | -1853 | -5 years | | | | | 0047-06-178 | Dallas | 09/02/26 | $1,208,060.70 | Construction | Roadway | Construction / Non Roadway → Construction / Roadway | Construction | Non Roadway | $1,208,060.70 | 09/02/26 | 0 | | | | | | 0047-14-092 | Dallas | 09/02/26 | $2,018,779.35 | Construction | Roadway | Construction / Non Roadway → Construction / Roadway | Construction | Non Roadway | $2,018,779.35 | 09/02/26 | 0 | | | | | | 2635-03-030 | Amarillo | 11/03/26 | $287,000.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $700,000.00 | 11/01/40 | -5112 | -14 years | $(413,000.00) | -59% | | | 2786-01-020 | Brownwood | 11/03/26 | $23,985.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $23,985.00 | 11/01/29 | -1094 | -3 years | | | | | 0081-06-050 | Dallas | 01/01/27 | $907,463.00 | Construction | Local Let | Construction / Roadway → Construction / Local Let | Construction | Roadway | $907,463.00 | 01/01/27 | 0 | | | | | | 0976-03-125 | Houston | 04/06/27 | $2,200,000.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $2,200,000.00 | 07/01/30 | -1182 | -3 years | | | | | 2263-02-110 | Corpus Christi | 07/01/27 | $15,000,000.00 | Construction | Ferry Boat | Unassigned → Construction / Ferry Boat | Unassigned | Unassigned | $15,000,000.00 | 09/01/29 | -793 | -2 years | | | | | 0186-05-050 | Bryan | 10/05/27 | $150,000.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $178,206.00 | 10/01/35 | -2918 | -8 years | $(28,206.00) | -16% | | | 0747-05-048 | Fort Worth | 12/01/27 | $200,000.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $200,000.00 | 12/01/29 | -731 | -2 years | | | | | 0348-12-017 | Corpus Christi | 02/02/28 | $3,200,000.00 | Construction | Bridge | Unassigned → Construction / Bridge | Unassigned | Unassigned | $2,500,000.00 | 09/01/30 | -942 | -3 years | $700,000.00 | 28% | | | 0229-02-050 | Odessa | 03/07/28 | $6,500,000.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $6,500,000.00 | 03/01/31 | -1089 | -3 years | | | | | 0907-00-243 | San Angelo | 06/13/28 | $8,509,000.00 | Construction | Roadway | Construction / Local Let → Construction / Roadway | Construction | Local Let | $8,509,000.00 | 06/13/28 | 0 | | | | | | 0367-02-084 | Houston | 09/06/28 | $456,000.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $500,000.00 | 09/01/31 | -1090 | -3 years | $(44,000.00) | -9% | | | 1003-01-098 | Houston | 09/06/28 | $1,088,146.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $1,088,146.00 | 09/01/31 | -1090 | -3 years | | | | | 0008-08-085 | Dallas | 11/01/28 | $15,241,283.40 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $15,241,283.40 | 11/01/29 | -365 | -1 year | | | | | 0127-02-144 | Brownwood | 11/01/28 | $341,972.59 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $341,972.59 | 11/01/31 | -1095 | -3 years | | | | | 0776-03-016 | Brownwood | 11/01/28 | $86,544.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $86,544.00 | 11/01/29 | -365 | -1 year | | | | | 3510-04-083 | Houston | 11/01/28 | $66,500,000.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $66,500,000.00 | 01/01/37 | -2983 | -8 years | | | | | 3510-03-002 | Houston | 12/15/28 | $55,381,565.00 | Alternative Delivery | Design Build | Unassigned → Alternative Delivery / Design Build | Unassigned | Unassigned | $55,381,565.00 | 01/15/37 | -2953 | -8 years | | | | | 3510-03-004 | Houston | 12/15/28 | $76,000,000.00 | Alternative Delivery | Design Build | Unassigned → Alternative Delivery / Design Build | Unassigned | Unassigned | $76,000,000.00 | 01/15/37 | -2953 | -8 years | | | | | 0102-01-124 | Corpus Christi | 03/01/29 | $1,598,373.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $1,598,373.00 | 03/01/37 | -2922 | -8 years | | | | | 0299-04-088 | Laredo | 03/01/29 | $3,004,045.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $3,004,045.00 | 02/01/30 | -337 | -11 months | | | | | 0102-07-048 | Pharr | 04/01/29 | $19,094,764.32 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $19,094,764.32 | 04/01/30 | -365 | -1 year | | | | | 2436-01-031 | Brownwood | 04/01/29 | $5,000,000.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $5,000,000.00 | 01/01/30 | -275 | -9 months | | | | --- ## Cost Changes The total pipeline value decreased by $51.09M, moving from $5.73B to $5.67B. Costs concentrated within construction projects saw a net increase of $38.10M overall. Notably, the largest cost increase was in San Antonio, which gained $84.94M, while Austin faced the largest decrease at -$61.19M across the same timeframe, emphasizing adjustments within the existing project framework. | CSJ | District | Est. Letting Date | Project Estimate | Current Type | Current Subtype | Prev. Type | Prev. Subtype | Prev. Cost | Cost Δ | %Cost Δ | Letting Δ (days) | Letting Date Δ | Type/Subtype Δ | Lifecycle | | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | | 1378-01-059 | Austin | 08/01/26 | $5,030,542.52 | Non-Let | Bridge | Unassigned | Unassigned | $1.00 | $5,030,541.52 | 503054152% | 365 | 1 year | Unassigned → Non-Let / Bridge | | | 0480-04-032 | Brownwood | 11/03/26 | $823,846.00 | Construction | Roadway | Construction | Roadway | $23,351.00 | $800,495.00 | 3428% | 0 | | | | | 0257-02-042 | Brownwood | 11/03/26 | $355,605.00 | Construction | Roadway | Construction | Roadway | $15,928.00 | $339,677.00 | 2133% | 0 | | | | | 0452-03-036 | Brownwood | 11/03/26 | $547,407.00 | Construction | Roadway | Construction | Roadway | $25,346.00 | $522,061.00 | 2060% | 0 | | | | | 2638-01-028 | Brownwood | 11/03/26 | $843,798.00 | Construction | Roadway | Construction | Roadway | $39,662.00 | $804,136.00 | 2027% | 0 | | | | | 0869-02-018 | Brownwood | 11/03/26 | $570,977.00 | Construction | Roadway | Construction | Roadway | $54,276.00 | $516,701.00 | 952% | 0 | | | | | 0080-03-063 | Fort Worth | 03/03/27 | $7,312,608.09 | Construction | Roadway | Construction | Roadway | $1,401,871.88 | $5,910,736.21 | 422% | 0 | | | | | 2206-02-009 | Austin | 11/03/26 | $807,488.46 | Construction | Roadway | Construction | Roadway | $201,768.27 | $605,720.19 | 300% | 0 | | | | | 1875-03-023 | Lufkin | 09/01/27 | $16,643,518.52 | Construction | Roadway | Construction | Roadway | $4,453,125.00 | $12,190,393.52 | 274% | 0 | | | | | 0912-56-061 | Houston | 02/02/28 | $662,769.00 | Construction | Bridge | Construction | Bridge | $240,000.00 | $422,769.00 | 176% | 0 | | | | | 0027-02-034 | Yoakum | 01/01/29 | $21,600,000.00 | Construction | Roadway | Construction | Roadway | $8,200,000.00 | $13,400,000.00 | 163% | 117 | 4 months | | | | 0073-02-091 | San Antonio | 10/04/28 | $8,062,084.00 | Construction | Roadway | Construction | Roadway | $3,067,833.00 | $4,994,251.00 | 163% | 365 | 1 year | | | | 0912-72-657 | Houston | 10/05/27 | $1,049,626.00 | Construction | Bridge | Construction | Bridge | $400,000.00 | $649,626.00 | 162% | 0 | | | | | 1219-01-020 | Waco | 09/01/27 | $447,175.93 | Construction | Roadway | Construction | Roadway | $172,275.00 | $274,900.93 | 160% | 0 | | | | | 0314-04-040 | Fort Worth | 07/01/26 | $96,192.93 | Construction | Bridge | Construction | Bridge | $43,907.58 | $52,285.35 | 119% | 0 | | | | | 2638-05-012 | Brownwood | 11/03/26 | $136,716.00 | Construction | Roadway | Construction | Roadway | $62,986.00 | $73,730.00 | 117% | 0 | | | | | 0213-02-049 | Lufkin | 11/03/26 | $850,000.00 | Construction | Roadway | Construction | Roadway | $402,349.72 | $447,650.28 | 111% | 0 | | | | | 3176-01-012 | Corpus Christi | 11/02/27 | $10,000,000.00 | Construction | Roadway | Construction | Roadway | $5,170,000.00 | $4,830,000.00 | 93% | 124 | 4 months | | | | 0056-02-034 | Waco | 09/02/26 | $2,824,625.00 | Construction | Roadway | Construction | Roadway | $1,468,805.00 | $1,355,820.00 | 92% | 0 | | | | | 1192-03-018 | Waco | 09/02/26 | $617,019.23 | Construction | Roadway | Construction | Roadway | $320,850.00 | $296,169.23 | 92% | 0 | | | | | 0289-04-038 | Brownwood | 11/01/34 | $45,721.00 | | | Construction | Roadway | $545,721.00 | $(500,000.00) | -92% | 2191 | 6 years | | | | 0182-01-020 | Brownwood | 11/02/27 | $100,000.00 | Construction | Roadway | Construction | Roadway | $1,000,000.00 | $(900,000.00) | -90% | 0 | | | | | 0912-34-227 | Houston | 02/02/28 | $944,486.00 | Construction | Bridge | Construction | Bridge | $500,000.00 | $444,486.00 | 89% | 0 | | | | | 0275-02-074 | Amarillo | 12/01/27 | $1,000,000.00 | Construction | Roadway | Construction | Roadway | $7,900,000.00 | $(6,900,000.00) | -87% | 0 | | | | | 0519-02-026 | Waco | 09/01/27 | $1,113,787.04 | Construction | Roadway | Construction | Roadway | $598,000.00 | $515,787.04 | 86% | 0 | | | | | 0231-04-066 | Waco | 09/01/27 | $2,821,962.96 | Construction | Roadway | Construction | Roadway | $1,524,640.00 | $1,297,322.96 | 85% | 0 | | | | | 0912-34-226 | Houston | 02/02/28 | $918,026.00 | Construction | Bridge | Construction | Bridge | $500,000.00 | $418,026.00 | 84% | 0 | | | | | 0192-02-070 | Houston | 06/01/28 | $1,800,000.00 | Construction | Roadway | Construction | Roadway | $1,000,000.00 | $800,000.00 | 80% | 0 | | | | | 0057-04-035 | Bryan | 07/01/26 | $15,720.99 | Construction | Roadway | Construction | Roadway | $9,072.53 | $6,648.46 | 73% | 0 | | | | | 0050-05-071 | Houston | 08/05/26 | $1,971,805.50 | Construction | Roadway | Construction | Roadway | $1,144,025.00 | $827,780.50 | 72% | 0 | | | | | 1971-01-017 | Bryan | 07/01/26 | $86,709.33 | Construction | Roadway | Construction | Roadway | $272,226.93 | $(185,517.60) | -68% | 0 | | | | | 0050-06-108 | Houston | 08/05/26 | $1,380,770.05 | Construction | Bridge | Construction | Bridge | $4,302,581.00 | $(2,921,810.95) | -68% | 0 | | | | | 0117-06-053 | Lufkin | 11/03/26 | $380,000.00 | Construction | Roadway | Construction | Roadway | $1,133,251.43 | $(753,251.43) | -66% | 0 | | | | | 0413-05-039 | Bryan | 07/01/26 | $180,964.20 | Construction | Roadway | Construction | Roadway | $525,448.20 | $(344,484.00) | -66% | 0 | | | | | 1148-02-021 | Bryan | 07/01/26 | $115,251.76 | Construction | Roadway | Construction | Roadway | $328,623.76 | $(213,372.00) | -65% | 0 | | | | | 2708-01-036 | San Antonio | 02/02/27 | $8,000,000.00 | Construction | Roadway | Construction | Roadway | $22,285,674.00 | $(14,285,674.00) | -64% | 0 | | | | | 0314-04-039 | Fort Worth | 07/01/26 | $41,142.75 | Construction | Bridge | Construction | Bridge | $25,160.09 | $15,982.66 | 64% | 0 | | | | | 0093-03-027 | Bryan | 07/01/26 | $41,461.35 | Construction | Roadway | Construction | Roadway | $25,432.11 | $16,029.24 | 63% | 0 | | | | | 0185-01-045 | Waco | 09/02/26 | $144,855.77 | Construction | Roadway | Construction | Roadway | $391,690.00 | $(246,834.23) | -63% | 0 | | | | | 0050-08-104 | Houston | 02/01/29 | $10,000,000.00 | Construction | Roadway | Construction | Roadway | $27,031,845.00 | $(17,031,845.00) | -63% | 0 | | | | | 0042-01-032 | Amarillo | 12/01/26 | $470,000.00 | Construction | Roadway | Construction | Roadway | $1,268,520.00 | $(798,520.00) | -63% | 0 | | | | | 0016-09-044 | Austin | 02/01/29 | $2,638,862.50 | Construction | Roadway | Construction | Roadway | $1,623,159.82 | $1,015,702.68 | 63% | 0 | | | | | 0169-09-021 | Amarillo | 11/03/26 | $300,000.00 | Construction | Roadway | Construction | Roadway | $780,000.00 | $(480,000.00) | -62% | 0 | | | | | 0262-06-036 | Bryan | 07/01/26 | $211,159.98 | Construction | Roadway | Construction | Roadway | $535,183.90 | $(324,023.92) | -61% | 0 | | | | | 0317-01-045 | Abilene | 09/01/27 | $5,250,000.00 | Construction | Roadway | Construction | Roadway | $3,300,000.00 | $1,950,000.00 | 59% | 0 | | | | | 2635-03-030 | Amarillo | 11/03/26 | $287,000.00 | Construction | Roadway | Unassigned | Unassigned | $700,000.00 | $(413,000.00) | -59% | -5112 | -14 years | Unassigned → Construction / Roadway | | | 3510-04-069 | Houston | 08/05/26 | $25,084,165.45 | Construction | Roadway | Construction | Roadway | $16,103,912.00 | $8,980,253.45 | 56% | -28 | -28 days | | | | 0169-06-043 | Amarillo | 11/03/26 | $400,000.00 | Construction | Roadway | Construction | Roadway | $900,000.00 | $(500,000.00) | -56% | 0 | | | | | 0169-08-029 | Amarillo | 11/03/26 | $550,000.00 | Construction | Roadway | Construction | Roadway | $1,230,000.00 | $(680,000.00) | -55% | 0 | | | | | 0109-06-046 | Lufkin | 11/03/26 | $210,000.00 | Construction | Roadway | Construction | Roadway | $467,751.43 | $(257,751.43) | -55% | 0 | | | | | 0166-01-060 | Dallas | 08/05/26 | $1,337,640.54 | Construction | Roadway | Construction | Roadway | $2,960,775.84 | $(1,623,135.30) | -55% | -210 | -7 months | | | | 0475-09-041 | Lufkin | 11/03/26 | $450,000.00 | Construction | Roadway | Construction | Roadway | $958,397.04 | $(508,397.04) | -53% | 0 | | | | | 0338-03-102 | Houston | 09/06/28 | $151,021.00 | Construction | Roadway | Construction | Roadway | $313,461.82 | $(162,440.82) | -52% | 0 | | | | | 0109-06-045 | Lufkin | 11/03/26 | $350,000.00 | Construction | Roadway | Construction | Roadway | $666,291.14 | $(316,291.14) | -47% | 0 | | | | | 0720-02-095 | Houston | 09/01/27 | $528,000.00 | Construction | Roadway | Construction | Roadway | $1,000,000.00 | $(472,000.00) | -47% | -371 | -1 year | | | | 0002-14-048 | El Paso | 04/02/27 | $6,166,337.98 | Construction | Local Let | Construction | Local Let | $11,667,327.88 | $(5,500,989.90) | -47% | 0 | | | | | 0617-01-214 | Corpus Christi | 03/01/29 | $2,400,000.00 | Construction | Roadway | Construction | Roadway | $4,500,000.00 | $(2,100,000.00) | -47% | 0 | | | | | 0336-07-078 | Lufkin | 11/03/26 | $310,000.00 | Construction | Roadway | Construction | Roadway | $579,383.60 | $(269,383.60) | -46% | 0 | | | | | 0791-05-022 | Amarillo | 11/03/26 | $700,000.00 | Construction | Roadway | Construction | Roadway | $1,300,000.00 | $(600,000.00) | -46% | 0 | | | | | 0527-02-017 | Houston | 09/01/27 | $888,000.00 | Construction | Roadway | Construction | Roadway | $1,597,309.00 | $(709,309.00) | -44% | 0 | | | | | 0834-04-026 | Waco | 09/01/27 | $495,879.63 | Construction | Roadway | Construction | Roadway | $344,500.00 | $151,379.63 | 44% | 0 | | | | | 0714-01-016 | Fort Worth | 11/03/26 | $108,470.00 | Construction | Roadway | Construction | Roadway | $189,398.00 | $(80,928.00) | -43% | 0 | | | | | 0810-03-016 | Lufkin | 11/03/26 | $260,000.00 | Construction | Roadway | Construction | Roadway | $451,145.62 | $(191,145.62) | -42% | 0 | | | | | 0731-01-058 | Atlanta | 07/01/26 | $1,973,067.92 | Construction | Roadway | Construction | Roadway | $3,405,908.79 | $(1,432,840.87) | -42% | 0 | | | | | 0110-06-151 | Houston | 10/06/26 | $1,005,152.06 | Construction | Roadway | Construction | Roadway | $1,727,740.95 | $(722,588.89) | -42% | 0 | | | | | 1491-01-020 | Amarillo | 11/03/26 | $1,000,000.00 | Construction | Roadway | Construction | Roadway | $1,700,000.00 | $(700,000.00) | -41% | 0 | | | | | 1492-01-013 | Dallas | 08/05/26 | $1,878,822.25 | Construction | Roadway | Construction | Roadway | $1,331,491.45 | $547,330.80 | 41% | -118 | -4 months | | | | 0151-04-075 | Austin | 12/01/27 | $907,553.70 | Construction | Roadway | Construction | Roadway | $644,338.89 | $263,214.81 | 41% | 0 | | | | | 3538-01-063 | Houston | 08/05/26 | $178,462.50 | Construction | Roadway | Construction | Roadway | $128,855.00 | $49,607.50 | 39% | 0 | | | | | 0199-07-012 | Lufkin | 11/03/26 | $50,000.00 | Construction | Roadway | Construction | Roadway | $80,469.95 | $(30,469.95) | -38% | 0 | | | | | 0266-13-019 | Yoakum | 03/03/27 | $4,241,000.00 | Construction | Roadway | Construction | Roadway | $3,089,000.00 | $1,152,000.00 | 37% | 0 | | | | | 0028-01-109 | Houston | 08/05/26 | $171,349.50 | Construction | Roadway | Construction | Roadway | $271,016.00 | $(99,666.50) | -37% | 0 | | | | | 0015-08-430 | Austin | 03/03/27 | $3,534,578.85 | Construction | Roadway | Construction | Roadway | $2,584,436.11 | $950,142.74 | 37% | -244 | -8 months | | | | 0204-06-069 | Bryan | 08/05/26 | $394,845.83 | Construction | Roadway | Construction | Roadway | $616,000.00 | $(221,154.17) | -36% | 0 | | | | | 3027-01-007 | Waco | 09/02/26 | $213,317.31 | Construction | Roadway | Construction | Roadway | $157,000.00 | $56,317.31 | 36% | 0 | | | | | 0337-03-020 | Austin | 09/02/26 | $3,257,848.14 | Construction | Roadway | Construction | Roadway | $5,060,576.92 | $(1,802,728.78) | -36% | 0 | | | | | 0054-05-027 | Brownwood | 11/03/26 | $98,099.00 | Construction | Roadway | Construction | Roadway | $72,594.00 | $25,505.00 | 35% | 0 | | | | | 2726-01-016 | Amarillo | 11/03/26 | $800,000.00 | Construction | Roadway | Construction | Roadway | $1,225,000.00 | $(425,000.00) | -35% | 0 | | | | | 0059-05-048 | Lufkin | 11/03/26 | $560,000.00 | Construction | Roadway | Construction | Roadway | $848,152.64 | $(288,152.64) | -34% | 0 | | | | | 1469-01-024 | Fort Worth | 11/02/27 | $1,159,322.75 | Construction | Roadway | Construction | Roadway | $1,740,013.40 | $(580,690.65) | -33% | 0 | | | | | 1479-01-029 | San Antonio | 09/02/26 | $1,240,368.40 | Construction | Roadway | Construction | Roadway | $1,858,522.00 | $(618,153.60) | -33% | 0 | | | | | 0336-01-071 | Lufkin | 11/03/26 | $350,000.00 | Construction | Roadway | Construction | Roadway | $520,640.54 | $(170,640.54) | -33% | 0 | | | | | 1729-01-020 | San Antonio | 10/06/26 | $343,000.00 | Construction | Roadway | Construction | Roadway | $258,467.00 | $84,533.00 | 33% | 0 | | | | | 0364-05-043 | Fort Worth | 08/05/26 | $825,559.00 | Construction | Roadway | Construction | Roadway | $1,221,633.00 | $(396,074.00) | -32% | 0 | | | | | 2270-01-030 | Abilene | 05/03/28 | $2,200,000.00 | Construction | Roadway | Construction | Roadway | $1,666,666.67 | $533,333.33 | 32% | 0 | | | | | 3158-01-047 | Houston | 08/05/26 | $338,688.50 | Construction | Roadway | Construction | Roadway | $496,803.00 | $(158,114.50) | -32% | 0 | | | | | 0290-02-017 | Austin | 03/07/28 | $1,440,583.33 | Construction | Roadway | Construction | Roadway | $2,053,907.41 | $(613,324.08) | -30% | 0 | | | | | 0320-05-018 | Waco | 08/05/26 | $536,405.82 | Construction | Roadway | Construction | Roadway | $764,436.00 | $(228,030.18) | -30% | 0 | | | | | 0113-13-193 | Austin | 12/01/26 | $6,183,003.85 | Construction | Roadway | Construction | Roadway | $8,789,640.38 | $(2,606,636.53) | -30% | 0 | | | | | 0029-03-057 | Austin | 10/05/27 | $1,177,745.48 | Construction | Roadway | Construction | Roadway | $1,670,221.30 | $(492,475.82) | -29% | 0 | | | | | 0348-12-017 | Corpus Christi | 02/02/28 | $3,200,000.00 | Construction | Bridge | Unassigned | Unassigned | $2,500,000.00 | $700,000.00 | 28% | -942 | -3 years | Unassigned → Construction / Bridge | | | 0001-02-080 | El Paso | 09/01/27 | $416,666.67 | Construction | Roadway | Construction | Roadway | $326,239.81 | $90,426.86 | 28% | 0 | | | | | 0093-01-108 | Dallas | 08/05/26 | $2,373,824.25 | Construction | Roadway | Construction | Roadway | $3,245,497.20 | $(871,672.95) | -27% | -210 | -7 months | | | | 0496-01-025 | Childress | 07/01/26 | $266,196.60 | Construction | Roadway | Construction | Roadway | $363,849.00 | $(97,652.40) | -27% | 0 | | | | | 0007-05-016 | Brownwood | 11/03/26 | $10,000,000.00 | Construction | Roadway | Construction | Roadway | $13,600,000.00 | $(3,600,000.00) | -26% | 0 | | | | | 0008-08-081 | Dallas | 12/02/28 | $2,417,014.29 | Construction | Local Let | Construction | Local Let | $1,920,000.00 | $497,014.29 | 26% | 0 | | | | | 0110-07-022 | Houston | 10/06/26 | $349,907.13 | Construction | Roadway | Construction | Roadway | $464,909.35 | $(115,002.22) | -25% | 0 | | | | | 0140-05-028 | Odessa | 11/03/26 | $671,189.90 | Construction | Bridge | Construction | Bridge | $886,246.00 | $(215,056.10) | -24% | 0 | | | | | 1510-01-024 | Lufkin | 11/03/26 | $420,000.00 | Construction | Roadway | Construction | Roadway | $553,142.86 | $(133,142.86) | -24% | 0 | | | | | 0441-07-079 | Odessa | 11/03/26 | $647,802.80 | Construction | Bridge | Construction | Bridge | $848,068.00 | $(200,265.20) | -24% | 0 | | | | | 0388-06-006 | Lufkin | 11/03/26 | $50,000.00 | Construction | Roadway | Construction | Roadway | $65,180.65 | $(15,180.65) | -23% | 0 | | | | | 0990-02-014 | Corpus Christi | 11/01/28 | $8,000,000.00 | Construction | Roadway | Construction | Roadway | $6,500,000.00 | $1,500,000.00 | 23% | 0 | | | | | 0266-05-055 | Yoakum | 07/01/26 | $694,213.00 | Construction | Roadway | Construction | Roadway | $894,213.00 | $(200,000.00) | -22% | 0 | | | | | 0314-04-037 | Fort Worth | 07/01/26 | $341,297.51 | Construction | Bridge | Construction | Bridge | $437,865.47 | $(96,567.96) | -22% | 0 | | | | | 0848-01-044 | San Antonio | 03/03/27 | $12,500,000.00 | Construction | Roadway | Construction | Roadway | $15,977,033.00 | $(3,477,033.00) | -22% | 0 | | | | | 1809-01-023 | Bryan | 07/01/26 | $1,050.50 | Construction | Roadway | Construction | Roadway | $862.92 | $187.58 | 22% | 0 | | | | | 0366-01-089 | Austin | 11/03/26 | $225,793.27 | Construction | Roadway | Construction | Roadway | $288,461.54 | $(62,668.27) | -22% | 0 | | | | | 0283-02-040 | Wichita Falls | 08/05/26 | $4,248,978.39 | Construction | Roadway | Construction | Roadway | $3,500,000.00 | $748,978.39 | 21% | -154 | -5 months | | | | 3158-01-048 | Houston | 04/01/29 | $2,859,997.00 | Construction | Roadway | Construction | Roadway | $2,364,536.00 | $495,461.00 | 21% | 0 | | | | | 2452-01-079 | San Antonio | 01/05/28 | $15,679,700.00 | Construction | Roadway | Construction | Roadway | $13,000,000.00 | $2,679,700.00 | 21% | 0 | | | | | 1745-01-021 | Houston | 09/01/27 | $1,600,000.00 | Construction | Roadway | Construction | Roadway | $2,000,000.00 | $(400,000.00) | -20% | 0 | | | | | 0254-01-149 | Corpus Christi | 08/05/26 | $12,000,000.00 | Construction | Roadway | Construction | Roadway | $15,000,000.00 | $(3,000,000.00) | -20% | -330 | -11 months | | | | 2810-01-014 | Lufkin | 11/03/26 | $210,000.00 | Construction | Roadway | Construction | Roadway | $261,929.67 | $(51,929.67) | -20% | 0 | | | | | 0311-01-019 | Childress | 07/01/26 | $545,969.97 | Construction | Roadway | Construction | Roadway | $678,234.00 | $(132,264.03) | -20% | 0 | | | | | 0720-02-114 | Houston | 04/06/27 | $724,693.00 | Construction | Roadway | Construction | Roadway | $900,000.00 | $(175,307.00) | -19% | 0 | | | | | 0165-02-061 | Tyler | 07/01/26 | $62,823,120.04 | Construction | Roadway | Construction | Roadway | $77,883,082.55 | $(15,059,962.51) | -19% | 0 | | | | | 0421-01-053 | San Antonio | 10/01/29 | $30,000,000.00 | | | Construction | Roadway | $25,202,059.00 | $4,797,941.00 | 19% | 670 | 2 years | | | | 0165-03-036 | Tyler | 07/01/26 | $38,029,749.91 | Construction | Roadway | Construction | Roadway | $46,939,079.29 | $(8,909,329.38) | -19% | 0 | | | | | 0573-02-009 | Austin | 09/01/27 | $8,935,220.37 | Construction | Roadway | Construction | Roadway | $7,516,940.74 | $1,418,279.63 | 19% | 0 | | | | | 0976-07-019 | Houston | 02/01/29 | $3,734,039.00 | Construction | Roadway | Construction | Roadway | $4,589,682.24 | $(855,643.24) | -19% | 0 | | | | | 1812-01-024 | Houston | 08/05/26 | $871,111.50 | Construction | Roadway | Construction | Roadway | $1,069,424.00 | $(198,312.50) | -19% | 0 | | | | | 3538-01-064 | Houston | 08/05/26 | $79,614.00 | Construction | Roadway | Construction | Roadway | $67,491.00 | $12,123.00 | 18% | 0 | | | | | 0092-06-111 | Dallas | 08/05/26 | $2,943,326.59 | Construction | Roadway | Construction | Roadway | $3,568,976.88 | $(625,650.29) | -18% | -210 | -7 months | | | | 0573-02-008 | Austin | 09/02/26 | $5,595,395.23 | Construction | Roadway | Construction | Roadway | $6,754,048.08 | $(1,158,652.85) | -17% | 0 | | | | | 0327-08-109 | Pharr | 08/05/26 | $224,192.00 | Construction | Non Roadway | Construction | Non Roadway | $270,001.00 | $(45,809.00) | -17% | 0 | | | | | 2748-02-015 | Lufkin | 11/03/26 | $110,000.00 | Construction | Roadway | Construction | Roadway | $132,373.45 | $(22,373.45) | -17% | 0 | | | | | 0917-16-042 | Bryan | 08/05/26 | $457,508.40 | Construction | Bridge | Construction | Bridge | $550,524.90 | $(93,016.50) | -17% | 0 | | | | | 0610-05-060 | Atlanta | 08/05/26 | $13,081,456.70 | Construction | Roadway | Construction | Roadway | $11,193,279.34 | $1,888,177.36 | 17% | 0 | | | | | 1558-03-114 | Corpus Christi | 12/05/28 | $15,000,000.00 | Construction | Roadway | Construction | Roadway | $18,000,000.00 | $(3,000,000.00) | -17% | 0 | | | | | 0258-03-048 | Waco | 09/02/26 | $547,375.00 | Construction | Roadway | Construction | Roadway | $469,270.00 | $78,105.00 | 17% | 0 | | | | | 0211-03-039 | Austin | 12/01/26 | $2,489,243.27 | Construction | Roadway | Construction | Roadway | $2,983,476.92 | $(494,233.65) | -17% | 0 | | | | | 0492-04-034 | Tyler | 07/01/26 | $40,176,061.12 | Construction | Roadway | Construction | Roadway | $48,109,014.53 | $(7,932,953.41) | -16% | 0 | | | | | 0047-04-041 | Dallas | 06/01/27 | $1,470,022.23 | Construction | Roadway | Construction | Roadway | $1,749,097.74 | $(279,075.51) | -16% | 0 | | | | | 0117-09-006 | Bryan | 07/01/26 | $22,306.65 | Construction | Roadway | Construction | Roadway | $26,530.90 | $(4,224.25) | -16% | 0 | | | | | 1200-01-029 | Austin | 12/01/27 | $1,192,495.37 | Construction | Roadway | Construction | Roadway | $1,029,212.96 | $163,282.41 | 16% | 0 | | | | | 0186-05-050 | Bryan | 10/05/27 | $150,000.00 | Construction | Roadway | Unassigned | Unassigned | $178,206.00 | $(28,206.00) | -16% | -2918 | -8 years | Unassigned → Construction / Roadway | | | 1023-01-039 | Beaumont | 08/05/26 | $481,150.01 | Construction | Roadway | Construction | Roadway | $415,600.00 | $65,550.01 | 16% | 0 | | | | | 0917-16-044 | Bryan | 08/05/26 | $509,190.00 | Construction | Bridge | Construction | Bridge | $603,666.00 | $(94,476.00) | -16% | 0 | | | | | 0917-16-040 | Bryan | 08/05/26 | $593,282.20 | Construction | Bridge | Construction | Bridge | $702,786.45 | $(109,504.25) | -16% | 0 | | | | | 0338-02-046 | Houston | 09/06/28 | $587,072.00 | Construction | Roadway | Construction | Roadway | $508,316.46 | $78,755.54 | 15% | 0 | | | | | 2510-01-020 | Lufkin | 11/03/26 | $60,000.00 | Construction | Roadway | Construction | Roadway | $70,813.55 | $(10,813.55) | -15% | 0 | | | | | 0441-09-054 | Odessa | 08/05/26 | $17,048,526.81 | Construction | Roadway | Construction | Roadway | $14,800,000.00 | $2,248,526.81 | 15% | -118 | -4 months | | | | 3417-02-036 | Austin | 11/02/27 | $5,839,377.78 | Construction | Roadway | Construction | Roadway | $6,882,865.74 | $(1,043,487.96) | -15% | 0 | | | | | 0720-02-105 | Houston | 08/05/26 | $176,288.25 | Construction | Roadway | Construction | Roadway | $153,356.00 | $22,932.25 | 15% | 0 | | | | | 0496-04-039 | Childress | 07/01/26 | $204,812.17 | Construction | Roadway | Construction | Roadway | $240,676.00 | $(35,863.83) | -15% | 0 | | | | | 0917-16-041 | Bryan | 08/05/26 | $518,058.90 | Construction | Bridge | Construction | Bridge | $607,979.40 | $(89,920.50) | -15% | 0 | | | | | 1202-01-021 | Austin | 09/01/27 | $3,808,187.96 | Construction | Roadway | Construction | Roadway | $3,333,333.33 | $474,854.63 | 14% | 0 | | | | | 0918-47-542 | Dallas | 11/02/27 | $902,431.20 | Construction | Roadway | Construction | Roadway | $790,489.00 | $111,942.20 | 14% | 0 | | | | | 1876-01-043 | Lufkin | 11/03/26 | $190,000.00 | Construction | Roadway | Construction | Roadway | $221,292.35 | $(31,292.35) | -14% | 0 | | | | | 0014-03-088 | Fort Worth | 07/01/26 | $71,230,243.02 | Construction | Roadway | Construction | Roadway | $82,826,148.94 | $(11,595,905.92) | -14% | 0 | | | | | 1801-01-064 | Pharr | 09/02/26 | $469,360.04 | Construction | Roadway | Construction | Roadway | $411,791.00 | $57,569.04 | 14% | 0 | | | | | 0066-03-045 | Amarillo | 11/03/26 | $2,500,000.00 | Construction | Roadway | Construction | Roadway | $2,900,000.00 | $(400,000.00) | -14% | 0 | | | | | 1418-03-021 | Houston | 11/15/26 | $431,140.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | $500,000.00 | $(68,860.00) | -14% | 0 | | | | | 1012-03-027 | Dallas | 08/05/26 | $9,867,597.40 | Construction | Roadway | Construction | Roadway | $8,673,294.25 | $1,194,303.15 | 14% | -118 | -4 months | | | | 2317-01-013 | Amarillo | 04/05/28 | $13,000,000.00 | Construction | Bridge | Construction | Bridge | $15,000,000.00 | $(2,000,000.00) | -13% | 0 | | | | | 0185-03-037 | Bryan | 07/01/26 | $80,963.61 | Construction | Roadway | Construction | Roadway | $71,519.04 | $9,444.57 | 13% | 0 | | | | | 0050-06-106 | Houston | 08/05/26 | $666,700.50 | Construction | Roadway | Construction | Roadway | $589,346.00 | $77,354.50 | 13% | 0 | | | | | 0211-10-053 | Yoakum | 07/01/26 | $1,740,773.38 | Construction | Roadway | Construction | Roadway | $2,000,000.00 | $(259,226.62) | -13% | 0 | | | | | 0095-04-079 | Dallas | 08/05/26 | $1,166,626.06 | Construction | Bridge | Construction | Bridge | $1,338,522.57 | $(171,896.51) | -13% | 0 | | | | | 0872-04-037 | Pharr | 08/05/26 | $345,165.48 | Construction | Roadway | Construction | Roadway | $305,999.93 | $39,165.55 | 13% | 0 | | | | | 1023-01-040 | Beaumont | 08/05/26 | $2,012,098.18 | Construction | Roadway | Construction | Roadway | $2,300,000.00 | $(287,901.82) | -13% | 0 | | | | | 2326-01-033 | El Paso | 01/05/28 | $416,666.67 | Construction | Roadway | Construction | Roadway | $370,363.89 | $46,302.78 | 13% | 0 | | | | | 0016-01-142 | Austin | 12/01/26 | $2,705,164.42 | Construction | Roadway | Construction | Roadway | $3,087,441.35 | $(382,276.93) | -12% | 0 | | | | | 0747-01-021 | Dallas | 01/01/29 | $3,269,965.03 | Construction | Bridge | Construction | Bridge | $3,727,742.12 | $(457,777.09) | -12% | 0 | | | | | 1586-01-085 | Pharr | 08/05/26 | $6,597,423.30 | Construction | Roadway | Construction | Roadway | $7,514,832.00 | $(917,408.70) | -12% | -154 | -5 months | | | | 0747-01-020 | Dallas | 01/01/29 | $2,868,310.60 | Construction | Bridge | Construction | Bridge | $3,264,405.21 | $(396,094.61) | -12% | 0 | | | | | 0991-02-014 | Corpus Christi | 08/05/26 | $10,085,299.15 | Construction | Roadway | Construction | Roadway | $9,000,000.00 | $1,085,299.15 | 12% | 0 | | | | | 0420-01-051 | Yoakum | 08/05/26 | $5,670,190.45 | Construction | Roadway | Construction | Roadway | $6,423,958.00 | $(753,767.55) | -12% | 0 | | | | | 1377-01-023 | Austin | 04/05/28 | $577,495.37 | Construction | Roadway | Construction | Roadway | $517,403.70 | $60,091.67 | 12% | 0 | | | | | 0912-72-857 | Houston | 09/06/28 | $563,468.00 | Construction | Roadway | Construction | Roadway | $637,366.33 | $(73,898.33) | -12% | 0 | | | | | 0521-06-175 | San Antonio | 08/05/26 | $2,977,217.14 | Construction | Roadway | Construction | Roadway | $2,670,328.38 | $306,888.76 | 11% | 0 | | | | | 0553-03-038 | Lufkin | 11/03/26 | $580,000.00 | Construction | Roadway | Construction | Roadway | $654,220.65 | $(74,220.65) | -11% | 0 | | | | | 0446-01-056 | Yoakum | 07/01/26 | $1,591,665.95 | Construction | Roadway | Construction | Roadway | $1,791,665.95 | $(200,000.00) | -11% | 0 | | | | | 0492-04-048 | Tyler | 08/04/27 | $1,169,985.00 | Construction | Roadway | Construction | Roadway | $1,052,917.27 | $117,067.73 | 11% | 0 | | | | | 1582-01-025 | Lufkin | 06/01/29 | $3,267,117.40 | Construction | Bridge | Construction | Bridge | $2,940,386.00 | $326,731.40 | 11% | 0 | | | | | 1582-01-026 | Lufkin | 06/01/29 | $3,549,996.50 | Construction | Bridge | Construction | Bridge | $3,194,964.00 | $355,032.50 | 11% | 0 | | | | | 0520-06-047 | Tyler | 08/04/27 | $1,303,730.00 | Construction | Roadway | Construction | Roadway | $1,173,357.00 | $130,373.00 | 11% | 0 | | | | | 0697-02-067 | Tyler | 08/04/27 | $1,350,352.00 | Construction | Roadway | Construction | Roadway | $1,215,316.80 | $135,035.20 | 11% | 0 | | | | | 0027-10-074 | Houston | 08/05/26 | $3,967,039.00 | Construction | Bridge | Construction | Bridge | $4,454,282.00 | $(487,243.00) | -11% | 0 | | | | | 0018-05-089 | Laredo | 08/05/26 | $228,583,900.49 | Construction | Roadway | Construction | Roadway | $256,120,160.76 | $(27,536,260.27) | -11% | -300 | -10 months | | | | 0492-04-041 | Tyler | 07/01/26 | $24,213,212.87 | Construction | Roadway | Construction | Roadway | $27,128,231.85 | $(2,915,018.98) | -11% | 0 | | | | | 0111-08-134 | Houston | 01/01/29 | $340,287.00 | Construction | Roadway | Construction | Roadway | $381,121.40 | $(40,834.40) | -11% | 0 | | | | | 0192-03-023 | Houston | 01/01/29 | $448,573.00 | Construction | Roadway | Construction | Roadway | $502,401.31 | $(53,828.31) | -11% | 0 | | | | | 0179-01-052 | Houston | 12/05/28 | $518,273.00 | Construction | Roadway | Construction | Roadway | $580,465.38 | $(62,192.38) | -11% | 0 | | | | | 0178-03-162 | Houston | 11/01/28 | $296,360.00 | Construction | Roadway | Construction | Roadway | $331,923.65 | $(35,563.65) | -11% | 0 | | | | | 0271-16-172 | Houston | 11/01/28 | $1,265,799.00 | Construction | Roadway | Construction | Roadway | $1,417,694.40 | $(151,895.40) | -11% | 0 | | | | | 0111-08-133 | Houston | 10/04/28 | $378,799.00 | Construction | Roadway | Construction | Roadway | $424,254.34 | $(45,455.34) | -11% | 0 | | | | | 0271-15-106 | Houston | 10/04/28 | $774,390.00 | Construction | Roadway | Construction | Roadway | $867,317.35 | $(92,927.35) | -11% | 0 | | | | | 0912-00-774 | Houston | 09/06/28 | $807,880.00 | Construction | Roadway | Construction | Roadway | $904,825.59 | $(96,945.59) | -11% | 0 | | | | | 0912-72-851 | Houston | 09/06/28 | $69,173.00 | Construction | Roadway | Construction | Roadway | $77,474.21 | $(8,301.21) | -11% | 0 | | | | | 0912-72-853 | Houston | 09/06/28 | $1,312,896.00 | Construction | Roadway | Construction | Roadway | $1,470,443.30 | $(157,547.30) | -11% | 0 | | | | | 0912-72-860 | Houston | 09/06/28 | $458,486.00 | Construction | Roadway | Construction | Roadway | $513,504.24 | $(55,018.24) | -11% | 0 | | | | | 0912-72-861 | Houston | 09/06/28 | $213,145.00 | Construction | Roadway | Construction | Roadway | $238,722.77 | $(25,577.77) | -11% | 0 | | | | | 1003-01-113 | Houston | 09/06/28 | $447,805.00 | Construction | Roadway | Construction | Roadway | $501,541.67 | $(53,736.67) | -11% | 0 | | | | | 1524-01-090 | Houston | 09/06/28 | $441,911.00 | Construction | Roadway | Construction | Roadway | $494,940.77 | $(53,029.77) | -11% | 0 | | | | | 0192-02-069 | Houston | 09/01/27 | $474,554.00 | Construction | Roadway | Construction | Roadway | $531,500.26 | $(56,946.26) | -11% | 0 | | | | | 0384-01-028 | Austin | 12/01/27 | $3,688,967.59 | Construction | Roadway | Construction | Roadway | $4,129,750.00 | $(440,782.41) | -11% | 0 | | | | | 2399-01-088 | Bryan | 05/05/27 | $13,110.58 | Construction | Local Let | Construction | Local Let | $14,661.00 | $(1,550.42) | -11% | 0 | | | | | 0014-15-034 | Fort Worth | 08/05/26 | $16,946,001.10 | Construction | Roadway | Construction | Roadway | $18,925,918.73 | $(1,979,917.63) | -10% | 0 | | | | | 1378-01-054 | Austin | 02/02/28 | $5,257,091.67 | Construction | Roadway | Construction | Roadway | $4,762,312.96 | $494,778.71 | 10% | 0 | | | | | 0315-02-061 | Bryan | 07/01/26 | $20,672.83 | Construction | Roadway | Construction | Roadway | $18,748.81 | $1,924.02 | 10% | 0 | | | | | 2374-04-099 | Dallas | 06/01/27 | $931,467.08 | Construction | Roadway | Construction | Roadway | $1,036,691.04 | $(105,223.96) | -10% | 0 | | | | | 0315-03-073 | Bryan | 07/01/26 | $85,570.95 | Construction | Roadway | Construction | Roadway | $77,696.54 | $7,874.41 | 10% | 0 | | | | | 0712-02-021 | Fort Worth | 07/01/26 | $1,428,638.47 | Construction | Roadway | Construction | Roadway | $1,297,721.50 | $130,916.97 | 10% | 0 | | | | | 1228-03-052 | Pharr | 08/05/26 | $648,520.91 | Construction | Roadway | Construction | Roadway | $720,842.00 | $(72,321.09) | -10% | 0 | | | | | 3158-01-050 | Houston | 02/01/29 | $4,954,011.00 | Construction | Roadway | Construction | Roadway | $5,500,000.00 | $(545,989.00) | -10% | 0 | | | | | 0718-02-079 | Fort Worth | 07/01/26 | $318,033.50 | Construction | Roadway | Construction | Roadway | $353,033.50 | $(35,000.00) | -10% | 0 | | | | | 0014-03-103 | Fort Worth | 08/05/26 | $3,991,946.40 | Construction | Bridge | Construction | Bridge | $4,429,192.32 | $(437,245.92) | -10% | 0 | | | | | 0014-15-033 | Fort Worth | 08/05/26 | $8,282,938.75 | Construction | Roadway | Construction | Roadway | $9,188,337.11 | $(905,398.36) | -10% | 0 | | | | | 0047-07-250 | Dallas | 06/01/27 | $742,221.17 | Construction | Roadway | Construction | Roadway | $822,114.43 | $(79,893.26) | -10% | 0 | | | | | 0222-03-065 | Atlanta | 08/05/26 | $11,659,080.64 | Construction | Roadway | Construction | Roadway | $12,904,737.36 | $(1,245,656.72) | -10% | 0 | | | | | 0320-03-105 | Austin | 03/07/28 | $7,938,860.19 | Construction | Roadway | Construction | Roadway | $8,763,500.00 | $(824,639.81) | -9% | 0 | | | | | 0003-02-053 | El Paso | 01/05/28 | $740,740.74 | Construction | Roadway | Construction | Roadway | $678,403.70 | $62,337.04 | 9% | 0 | | | | | 0261-02-085 | Dallas | 06/01/27 | $935,327.77 | Construction | Roadway | Construction | Roadway | $1,030,001.89 | $(94,674.12) | -9% | 0 | | | | | 0248-03-024 | Atlanta | 11/02/27 | $12,186,040.75 | Construction | Roadway | Construction | Roadway | $13,405,864.00 | $(1,219,823.25) | -9% | 0 | | | | | 1194-01-025 | Lufkin | 11/03/26 | $660,000.00 | Construction | Roadway | Construction | Roadway | $605,938.69 | $54,061.31 | 9% | 0 | | | | | 0367-02-084 | Houston | 09/06/28 | $456,000.00 | Construction | Roadway | Unassigned | Unassigned | $500,000.00 | $(44,000.00) | -9% | -1090 | -3 years | Unassigned → Construction / Roadway | | | 0978-01-045 | Houston | 07/01/26 | $1,205,072.40 | Construction | Roadway | Construction | Roadway | $1,319,719.40 | $(114,647.00) | -9% | 0 | | | | | 1685-05-140 | Houston | 08/05/26 | $2,645,375.20 | Construction | Roadway | Construction | Roadway | $2,437,069.00 | $208,306.20 | 9% | 0 | | | | | 0259-05-086 | Fort Worth | 07/01/26 | $616,970.35 | Construction | Roadway | Construction | Roadway | $568,444.50 | $48,525.85 | 9% | 0 | | | | | 0016-09-045 | Austin | 11/03/26 | $213,254.81 | Construction | Roadway | Construction | Roadway | $233,062.50 | $(19,807.69) | -9% | 0 | | | | | 0173-04-059 | Dallas | 08/05/26 | $7,203,790.42 | Construction | Roadway | Construction | Roadway | $6,640,524.42 | $563,266.00 | 8% | 0 | | | | | 0304-02-042 | Lufkin | 11/03/26 | $840,000.00 | Construction | Roadway | Construction | Roadway | $916,552.66 | $(76,552.66) | -8% | 0 | | | | | 0587-01-070 | Houston | 07/06/28 | $4,026,250.00 | Construction | Non Roadway | Construction | Non Roadway | $4,391,550.00 | $(365,300.00) | -8% | 0 | | | | | 0587-01-071 | Houston | 07/06/28 | $4,026,250.00 | Construction | Non Roadway | Construction | Non Roadway | $4,391,550.00 | $(365,300.00) | -8% | 0 | | | | | 0140-01-083 | Odessa | 11/03/26 | $146,332.10 | Construction | Bridge | Construction | Bridge | $159,563.00 | $(13,230.90) | -8% | 0 | | | | | 1373-01-014 | Waco | 09/02/26 | $347,115.38 | Construction | Roadway | Construction | Roadway | $320,850.00 | $26,265.38 | 8% | 0 | | | | | 0057-04-036 | Bryan | 07/01/26 | $41,370.47 | Construction | Roadway | Construction | Roadway | $38,310.83 | $3,059.64 | 8% | 0 | | | | | 0261-03-071 | Dallas | 06/01/27 | $977,421.06 | Construction | Roadway | Construction | Roadway | $1,059,743.69 | $(82,322.63) | -8% | 0 | | | | | 1012-03-028 | Dallas | 08/05/26 | $6,866,910.20 | Construction | Roadway | Construction | Roadway | $6,373,822.30 | $493,087.90 | 8% | -118 | -4 months | | | | 0014-15-036 | Fort Worth | 08/05/26 | $19,258,280.90 | Construction | Roadway | Construction | Roadway | $20,865,852.16 | $(1,607,571.26) | -8% | 0 | | | | | 0151-06-158 | Austin | 03/07/28 | $2,948,634.26 | Construction | Roadway | Construction | Roadway | $2,740,116.67 | $208,517.59 | 8% | 0 | | | | | 0014-15-035 | Fort Worth | 08/05/26 | $1,400,739.80 | Construction | Roadway | Construction | Roadway | $1,515,651.69 | $(114,911.89) | -8% | 0 | | | | | 0092-02-146 | Dallas | 07/01/26 | $432,029.85 | Construction | Roadway | Construction | Roadway | $466,949.50 | $(34,919.65) | -7% | 0 | | | | | 3510-04-066 | Houston | 07/01/26 | $20,082,206.39 | Construction | Roadway | Construction | Roadway | $21,704,627.94 | $(1,622,421.55) | -7% | 0 | | | | | 3447-01-008 | Waco | 09/01/27 | $160,416.67 | Construction | Roadway | Construction | Roadway | $173,300.00 | $(12,883.33) | -7% | 0 | | | | | 0290-03-031 | Austin | 03/07/28 | $4,474,535.19 | Construction | Roadway | Construction | Roadway | $4,832,498.15 | $(357,962.96) | -7% | 0 | | | | | 0015-05-053 | Waco | 09/01/27 | $145,555.56 | Construction | Roadway | Construction | Roadway | $157,200.00 | $(11,644.44) | -7% | 0 | | | | | 0055-02-024 | Waco | 09/01/27 | $1,176,851.85 | Construction | Roadway | Construction | Roadway | $1,271,010.00 | $(94,158.15) | -7% | 0 | | | | | 0055-05-053 | Waco | 09/01/27 | $774,462.96 | Construction | Roadway | Construction | Roadway | $836,420.00 | $(61,957.04) | -7% | 0 | | | | | 0184-03-042 | Waco | 09/01/27 | $172,500.00 | Construction | Roadway | Construction | Roadway | $186,300.00 | $(13,800.00) | -7% | 0 | | | | | 0231-03-158 | Waco | 09/01/27 | $1,411,703.70 | Construction | Roadway | Construction | Roadway | $1,524,640.00 | $(112,936.30) | -7% | 0 | | | | | 0320-02-048 | Waco | 09/01/27 | $1,710,944.44 | Construction | Roadway | Construction | Roadway | $1,847,820.00 | $(136,875.56) | -7% | 0 | | | | | 0382-03-037 | Waco | 09/01/27 | $1,118,361.11 | Construction | Roadway | Construction | Roadway | $1,207,830.00 | $(89,468.89) | -7% | 0 | | | | | 0590-03-016 | Waco | 09/01/27 | $56,071.76 | Construction | Roadway | Construction | Roadway | $60,557.50 | $(4,485.74) | -7% | 0 | | | | | 0724-01-060 | Waco | 09/01/27 | $2,257,064.82 | Construction | Roadway | Construction | Roadway | $2,437,630.00 | $(180,565.18) | -7% | 0 | | | | | 0774-02-018 | Waco | 09/01/27 | $304,768.52 | Construction | Roadway | Construction | Roadway | $329,150.00 | $(24,381.48) | -7% | 0 | | | | | 1187-01-033 | Waco | 09/01/27 | $650,277.78 | Construction | Roadway | Construction | Roadway | $702,300.00 | $(52,022.22) | -7% | 0 | | | | | 1829-02-015 | Waco | 09/01/27 | $419,212.96 | Construction | Roadway | Construction | Roadway | $452,750.00 | $(33,537.04) | -7% | 0 | | | | | 1829-03-006 | Waco | 09/01/27 | $141,296.30 | Construction | Roadway | Construction | Roadway | $152,600.00 | $(11,303.70) | -7% | 0 | | | | | 2174-01-017 | Waco | 09/01/27 | $323,009.26 | Construction | Roadway | Construction | Roadway | $348,850.00 | $(25,840.74) | -7% | 0 | | | | | 0047-07-248 | Dallas | 07/01/26 | $284,460.75 | Construction | Roadway | Construction | Roadway | $306,923.00 | $(22,462.25) | -7% | 0 | | | | | 2964-04-012 | Dallas | 06/01/27 | $978,972.49 | Construction | Roadway | Construction | Roadway | $1,054,590.35 | $(75,617.86) | -7% | 0 | | | | | 0260-02-055 | Dallas | 07/01/26 | $503,398.00 | Construction | Non Roadway | Construction | Non Roadway | $542,093.50 | $(38,695.50) | -7% | 0 | | | | | 0314-04-038 | Fort Worth | 07/01/26 | $24,872.75 | Construction | Bridge | Construction | Bridge | $23,218.09 | $1,654.66 | 7% | 0 | | | | | 2100-01-075 | Austin | 11/01/28 | $2,920,377.68 | Construction | Roadway | Construction | Roadway | $2,731,016.96 | $189,360.72 | 7% | 0 | | | | | 0911-00-142 | Lufkin | 05/05/27 | $1,442,307.69 | Construction | Non Roadway | Construction | Non Roadway | $1,350,000.00 | $92,307.69 | 7% | 0 | | | | | 0138-06-047 | Lufkin | 07/01/26 | $63,982,542.40 | Construction | Roadway | Construction | Roadway | $59,915,665.95 | $4,066,876.45 | 7% | 0 | | | | | 2374-02-166 | Dallas | 07/01/26 | $263,751.00 | Construction | Roadway | Construction | Roadway | $282,932.75 | $(19,181.75) | -7% | 0 | | | | | 0092-06-112 | Dallas | 08/05/26 | $426,254.00 | Construction | Bridge | Construction | Bridge | $456,170.72 | $(29,916.72) | -7% | 0 | | | | | 1973-01-021 | Dallas | 07/01/26 | $1,566,536.49 | Construction | Roadway | Construction | Roadway | $1,674,101.10 | $(107,564.61) | -6% | 0 | | | | | 0319-01-073 | Lufkin | 11/03/26 | $1,030,000.00 | Construction | Roadway | Construction | Roadway | $968,762.66 | $61,237.34 | 6% | 0 | | | | | 0381-02-022 | Childress | 07/01/26 | $181,040.06 | Construction | Roadway | Construction | Roadway | $193,214.00 | $(12,173.94) | -6% | 0 | | | | | 0140-04-049 | Odessa | 11/03/26 | $215,789.50 | Construction | Bridge | Construction | Bridge | $230,220.00 | $(14,430.50) | -6% | 0 | | | | | 0140-05-029 | Odessa | 11/03/26 | $119,942.70 | Construction | Bridge | Construction | Bridge | $127,785.00 | $(7,842.30) | -6% | 0 | | | | | 0706-04-022 | Lufkin | 11/03/26 | $620,000.00 | Construction | Roadway | Construction | Roadway | $584,211.80 | $35,788.20 | 6% | 0 | | | | | 0283-03-023 | Wichita Falls | 08/05/26 | $9,438,454.44 | Construction | Roadway | Construction | Roadway | $8,900,000.00 | $538,454.44 | 6% | -154 | -5 months | | | | 1525-02-010 | Fort Worth | 11/03/26 | $250,640.00 | Construction | Roadway | Construction | Roadway | $266,752.00 | $(16,112.00) | -6% | 0 | | | | | 0314-04-041 | Fort Worth | 07/01/26 | $24,688.24 | Construction | Bridge | Construction | Bridge | $26,222.89 | $(1,534.65) | -6% | 0 | | | | | 0092-14-107 | Dallas | 07/01/26 | $85,449.00 | Construction | Roadway | Construction | Roadway | $90,688.50 | $(5,239.50) | -6% | 0 | | | | | 0054-06-113 | Brownwood | 07/01/26 | $2,463,639.10 | Construction | Roadway | Construction | Roadway | $2,329,284.20 | $134,354.90 | 6% | 0 | | | | | 0712-01-052 | Fort Worth | 07/01/26 | $2,200,452.10 | Construction | Roadway | Construction | Roadway | $2,333,679.07 | $(133,226.97) | -6% | 0 | | | | | 0005-04-084 | Odessa | 07/01/26 | $5,911,334.34 | Construction | Roadway | Construction | Roadway | $5,595,705.62 | $315,628.72 | 6% | 0 | | | | | 0015-13-432 | Austin | 11/03/26 | $239,903,846.15 | Construction | Bridge | Construction | Bridge | $254,000,000.00 | $(14,096,153.85) | -6% | 0 | | | | | 0354-04-043 | Odessa | 12/01/26 | $25,039,685.33 | Construction | Roadway | Construction | Roadway | $23,731,405.74 | $1,308,279.59 | 6% | 0 | | | | | 0047-06-175 | Dallas | 07/01/26 | $244,804.00 | Construction | Roadway | Construction | Roadway | $258,723.00 | $(13,919.00) | -5% | 0 | | | | | 0693-03-046 | Abilene | 11/02/27 | $13,000,000.00 | Construction | Roadway | Construction | Roadway | $13,700,000.00 | $(700,000.00) | -5% | 0 | | | | | 1392-03-017 | Dallas | 07/01/26 | $2,889,906.52 | Construction | Roadway | Construction | Roadway | $3,043,980.80 | $(154,074.28) | -5% | 0 | | | | | 0091-06-061 | Dallas | 07/01/26 | $5,451,342.50 | Construction | Roadway | Construction | Roadway | $5,190,264.90 | $261,077.60 | 5% | 0 | | | | | 1257-01-057 | Houston | 09/06/28 | $1,792,664.00 | Construction | Roadway | Construction | Roadway | $1,707,298.56 | $85,365.44 | 5% | 0 | | | | | 2121-02-186 | El Paso | 12/01/27 | $486,111,111.11 | Construction | Roadway | Construction | Roadway | $462,962,962.96 | $23,148,148.15 | 5% | 0 | | | | | 2059-02-014 | Waco | 09/02/26 | $402,596.15 | Construction | Roadway | Construction | Roadway | $423,400.00 | $(20,803.85) | -5% | 0 | | | | | 2977-01-011 | Dallas | 07/01/26 | $12,347,605.91 | Construction | Roadway | Construction | Roadway | $11,777,297.44 | $570,308.47 | 5% | 0 | | | | | 0047-06-176 | Dallas | 07/01/26 | $143,063.50 | Construction | Roadway | Construction | Roadway | $150,126.50 | $(7,063.00) | -5% | 0 | | | | | 0007-06-268 | Brownwood | 07/01/26 | $1,318,735.86 | Construction | Roadway | Construction | Roadway | $1,261,391.90 | $57,343.96 | 5% | 0 | | | | | 0902-48-579 | Fort Worth | 08/05/26 | $22,873,538.60 | Construction | Roadway | Construction | Roadway | $23,961,192.05 | $(1,087,653.45) | -5% | 0 | | | | | 0327-07-049 | Pharr | 08/05/26 | $329,756.75 | Construction | Roadway | Construction | Roadway | $315,468.34 | $14,288.41 | 5% | 0 | | | | | 0327-06-031 | Pharr | 08/05/26 | $372,100.87 | Construction | Roadway | Construction | Roadway | $356,081.69 | $16,019.18 | 5% | 0 | | | | | 0327-07-047 | Pharr | 08/05/26 | $324,172.10 | Construction | Roadway | Construction | Roadway | $310,280.42 | $13,891.68 | 4% | 0 | | | | | 0327-07-048 | Pharr | 08/05/26 | $350,098.51 | Construction | Roadway | Construction | Roadway | $335,989.93 | $14,108.58 | 4% | 0 | | | | | 0178-11-003 | Houston | 06/01/29 | $2,350,084.00 | Construction | Roadway | Construction | Roadway | $2,450,890.96 | $(100,806.96) | -4% | 0 | | | | | 0517-01-050 | San Antonio | 10/06/26 | $331,066.00 | Construction | Roadway | Construction | Roadway | $318,100.00 | $12,966.00 | 4% | 0 | | | | | 0261-01-052 | Dallas | 07/01/26 | $650,440.25 | Construction | Non Roadway | Construction | Non Roadway | $677,275.50 | $(26,835.25) | -4% | 0 | | | | | 0720-01-049 | Bryan | 04/06/27 | $474,183.65 | Construction | Local Let | Construction | Local Let | $456,158.65 | $18,025.00 | 4% | 0 | | | | | 0902-20-238 | Fort Worth | 08/05/26 | $824,349.50 | Construction | Bridge | Construction | Bridge | $793,145.80 | $31,203.70 | 4% | 0 | | | | | 0015-17-030 | Austin | 03/03/27 | $1,862,339.42 | Construction | Roadway | Construction | Roadway | $1,793,363.89 | $68,975.53 | 4% | -244 | -8 months | | | | 1200-03-069 | Austin | 02/02/27 | $1,500,782.69 | Construction | Roadway | Construction | Roadway | $1,560,814.42 | $(60,031.73) | -4% | 91 | 3 months | | | | 0114-01-070 | Austin | 11/03/26 | $596,153.85 | Construction | Non Roadway | Construction | Non Roadway | $620,000.00 | $(23,846.15) | -4% | 0 | | | | | 0114-01-071 | Austin | 11/03/26 | $4,038,461.54 | Construction | Non Roadway | Construction | Non Roadway | $4,200,000.00 | $(161,538.46) | -4% | 0 | | | | | 0043-17-036 | Wichita Falls | 09/02/26 | $1,442,307.69 | Construction | Roadway | Construction | Roadway | $1,500,000.00 | $(57,692.31) | -4% | 0 | | | | | 0093-07-023 | Waco | 09/02/26 | $857,000.00 | Construction | Roadway | Construction | Roadway | $891,280.00 | $(34,280.00) | -4% | 0 | | | | | 0185-01-046 | Waco | 09/02/26 | $132,913.46 | Construction | Roadway | Construction | Roadway | $138,230.00 | $(5,316.54) | -4% | 0 | | | | | 0231-03-159 | Waco | 09/02/26 | $524,250.00 | Construction | Roadway | Construction | Roadway | $545,220.00 | $(20,970.00) | -4% | 0 | | | | | 0231-16-039 | Waco | 09/02/26 | $164,320.26 | Construction | Roadway | Construction | Roadway | $170,893.07 | $(6,572.81) | -4% | 0 | | | | | 0386-03-024 | Waco | 09/02/26 | $539,759.62 | Construction | Roadway | Construction | Roadway | $561,350.00 | $(21,590.38) | -4% | 0 | | | | | 0398-04-078 | Waco | 09/02/26 | $1,418,625.00 | Construction | Roadway | Construction | Roadway | $1,475,370.00 | $(56,745.00) | -4% | 0 | | | | | 0774-03-017 | Waco | 09/02/26 | $349,086.54 | Construction | Roadway | Construction | Roadway | $363,050.00 | $(13,963.46) | -4% | 0 | | | | | 0867-03-029 | Waco | 09/02/26 | $486,105.77 | Construction | Roadway | Construction | Roadway | $505,550.00 | $(19,444.23) | -4% | 0 | | | | | 1658-01-012 | Waco | 09/02/26 | $250,769.23 | Construction | Roadway | Construction | Roadway | $260,800.00 | $(10,030.77) | -4% | 0 | | | | | 1664-01-022 | Waco | 09/02/26 | $1,161,875.00 | Construction | Roadway | Construction | Roadway | $1,208,350.00 | $(46,475.00) | -4% | 0 | | | | | 2395-01-014 | Waco | 09/02/26 | $238,798.08 | Construction | Roadway | Construction | Roadway | $248,350.00 | $(9,551.92) | -4% | 0 | | | | | 2395-01-015 | Waco | 09/02/26 | $30,625.00 | Construction | Roadway | Construction | Roadway | $31,850.00 | $(1,225.00) | -4% | 0 | | | | | 3032-01-008 | Waco | 09/02/26 | $425,384.62 | Construction | Roadway | Construction | Roadway | $442,400.00 | $(17,015.38) | -4% | 0 | | | | | 3292-01-017 | Waco | 09/02/26 | $81,894.23 | Construction | Roadway | Construction | Roadway | $85,170.00 | $(3,275.77) | -4% | 0 | | | | | 0002-04-039 | El Paso | 01/05/28 | $264,745.19 | Construction | Roadway | Construction | Roadway | $255,290.00 | $9,455.19 | 4% | -245 | -8 months | | | | 0358-03-040 | El Paso | 12/01/27 | $2,360,953.70 | Construction | Roadway | Construction | Roadway | $2,276,633.93 | $84,319.77 | 4% | 0 | | | | | 0358-04-019 | El Paso | 12/01/27 | $2,370,162.04 | Construction | Roadway | Construction | Roadway | $2,285,513.39 | $84,648.65 | 4% | 0 | | | | | 2552-01-066 | El Paso | 11/02/27 | $4,430,013.02 | Construction | Bridge | Construction | Bridge | $4,600,398.13 | $(170,385.11) | -4% | 0 | | | | | 0001-01-077 | El Paso | 10/05/27 | $331,759.36 | Construction | Roadway | Construction | Roadway | $319,910.81 | $11,848.55 | 4% | -365 | -1 year | | | | 0374-02-128 | El Paso | 10/05/27 | $332,783.52 | Construction | Roadway | Construction | Roadway | $320,898.39 | $11,885.13 | 4% | -365 | -1 year | | | | 3451-01-051 | El Paso | 10/05/27 | $425,949.07 | Construction | Roadway | Construction | Roadway | $410,736.88 | $15,212.19 | 4% | -365 | -1 year | | | | 3451-01-052 | El Paso | 10/05/27 | $343,217.59 | Construction | Roadway | Construction | Roadway | $330,960.09 | $12,257.50 | 4% | -365 | -1 year | | | | 0327-07-050 | Pharr | 08/05/26 | $390,773.44 | Construction | Roadway | Construction | Roadway | $405,710.18 | $(14,936.74) | -4% | 0 | | | | | 3510-04-065 | Houston | 07/01/26 | $3,510,808.16 | Construction | Non Roadway | Construction | Non Roadway | $3,386,248.00 | $124,560.16 | 4% | 0 | | | | | 0009-11-269 | Dallas | 07/01/26 | $258,360.50 | Construction | Roadway | Construction | Roadway | $268,029.00 | $(9,668.50) | -4% | 0 | | | | | 0003-01-068 | El Paso | 01/01/30 | $654,175.00 | | | Construction | Roadway | $678,403.70 | $(24,228.70) | -4% | 727 | 2 years | | | | 0003-02-052 | El Paso | 01/01/30 | $720,642.86 | | | Construction | Roadway | $747,333.33 | $(26,690.47) | -4% | 727 | 2 years | | | | 0003-04-059 | El Paso | 01/01/30 | $637,426.79 | | | Construction | Roadway | $661,035.19 | $(23,608.40) | -4% | 727 | 2 years | | | | 0003-02-051 | El Paso | 11/01/29 | $23,459,355.36 | | | Construction | Roadway | $24,328,228.70 | $(868,873.34) | -4% | 365 | 1 year | | | | 0887-01-044 | Odessa | 11/01/29 | $22,178,571.43 | | | Construction | Roadway | $23,000,000.00 | $(821,428.57) | -4% | 758 | 2 years | | | | 0001-04-105 | El Paso | 05/01/29 | $4,128,778.57 | Construction | Roadway | Construction | Roadway | $4,281,696.30 | $(152,917.73) | -4% | 363 | 12 months | | | | 0167-03-003 | El Paso | 05/01/29 | $755,593.75 | Construction | Roadway | Construction | Roadway | $783,578.70 | $(27,984.95) | -4% | 363 | 12 months | | | | 0002-14-051 | El Paso | 01/01/29 | $1,468,286.50 | Construction | Roadway | Construction | Roadway | $1,522,667.48 | $(54,380.98) | -4% | 362 | 12 months | | | | 0002-06-063 | El Paso | 12/05/28 | $752,546.43 | Construction | Roadway | Construction | Roadway | $780,418.52 | $(27,872.09) | -4% | 0 | | | | | 0002-07-055 | El Paso | 12/05/28 | $618,283.93 | Construction | Roadway | Construction | Roadway | $641,183.33 | $(22,899.40) | -4% | 0 | | | | | 0002-08-056 | El Paso | 12/05/28 | $734,700.00 | Construction | Roadway | Construction | Roadway | $761,911.11 | $(27,211.11) | -4% | 0 | | | | | 0002-09-041 | El Paso | 12/05/28 | $756,953.57 | Construction | Roadway | Construction | Roadway | $784,988.89 | $(28,035.32) | -4% | 0 | | | | | 0002-10-040 | El Paso | 12/05/28 | $484,762.50 | Construction | Roadway | Construction | Roadway | $502,716.67 | $(17,954.17) | -4% | 0 | | | | | 0002-11-062 | El Paso | 12/05/28 | $166,486.61 | Construction | Roadway | Construction | Roadway | $172,652.78 | $(6,166.17) | -4% | 0 | | | | | 0002-14-049 | El Paso | 12/05/28 | $436,881.25 | Construction | Roadway | Construction | Roadway | $453,062.04 | $(16,180.79) | -4% | 0 | | | | | 0002-20-012 | El Paso | 12/05/28 | $255,089.29 | Construction | Roadway | Construction | Roadway | $264,537.04 | $(9,447.75) | -4% | 0 | | | | | 0003-01-065 | El Paso | 12/05/28 | $1,101,634.82 | Construction | Roadway | Construction | Roadway | $1,142,436.11 | $(40,801.29) | -4% | 0 | | | | | 0003-02-050 | El Paso | 12/05/28 | $527,359.82 | Construction | Roadway | Construction | Roadway | $546,891.67 | $(19,531.85) | -4% | 0 | | | | | 0003-03-052 | El Paso | 12/05/28 | $86,606.25 | Construction | Roadway | Construction | Roadway | $89,813.89 | $(3,207.64) | -4% | 0 | | | | | 0167-02-096 | El Paso | 12/05/28 | $226,362.50 | Construction | Roadway | Construction | Roadway | $234,746.30 | $(8,383.80) | -4% | 0 | | | | | 0374-03-033 | El Paso | 12/05/28 | $357,142.86 | Construction | Roadway | Construction | Roadway | $370,370.37 | $(13,227.51) | -4% | 0 | | | | | 0674-01-082 | El Paso | 12/05/28 | $394,387.50 | Construction | Roadway | Construction | Roadway | $408,994.44 | $(14,606.94) | -4% | 0 | | | | | 1282-01-017 | El Paso | 12/05/28 | $1,359,875.89 | Construction | Roadway | Construction | Roadway | $1,410,241.67 | $(50,365.78) | -4% | 0 | | | | | 2122-01-019 | El Paso | 12/05/28 | $169,891.07 | Construction | Roadway | Construction | Roadway | $176,183.33 | $(6,292.26) | -4% | 0 | | | | | 0167-02-098 | El Paso | 11/01/28 | $288,300.00 | Construction | Roadway | Construction | Roadway | $298,977.78 | $(10,677.78) | -4% | 427 | 1 year | | | | 1046-03-013 | El Paso | 11/01/28 | $127,550.00 | Construction | Roadway | Construction | Roadway | $132,274.07 | $(4,724.07) | -4% | 427 | 1 year | | | | 0374-04-032 | El Paso | 09/06/28 | $4,545,805.36 | Construction | Roadway | Construction | Roadway | $4,714,168.52 | $(168,363.16) | -4% | 371 | 1 year | | | | 0121-03-067 | Waco | 09/02/26 | $1,491,250.00 | Construction | Roadway | Construction | Roadway | $1,546,350.00 | $(55,100.00) | -4% | 0 | | | | | 0208-01-026 | Atlanta | 08/05/26 | $3,449,866.61 | Construction | Roadway | Construction | Roadway | $3,335,405.55 | $114,461.06 | 3% | 0 | | | | | 0500-03-664 | Houston | 08/05/26 | $5,117,903.93 | Construction | Roadway | Construction | Roadway | $4,948,342.00 | $169,561.93 | 3% | 0 | | | | | 0086-07-040 | Pharr | 08/05/26 | $380,817.17 | Construction | Roadway | Construction | Roadway | $368,950.49 | $11,866.68 | 3% | 0 | | | | | 0261-02-086 | Dallas | 07/01/26 | $654,168.50 | Construction | Non Roadway | Construction | Non Roadway | $675,870.00 | $(21,701.50) | -3% | 0 | | | | | 1479-01-028 | San Antonio | 09/02/26 | $2,826,369.36 | Construction | Roadway | Construction | Roadway | $2,919,925.00 | $(93,555.64) | -3% | 0 | | | | | 0151-05-122 | Austin | 12/01/27 | $5,688,993.52 | Construction | Roadway | Construction | Roadway | $5,515,607.41 | $173,386.11 | 3% | 0 | | | | | 0553-02-019 | Lufkin | 11/03/26 | $200,000.00 | Construction | Roadway | Construction | Roadway | $193,932.56 | $6,067.44 | 3% | 0 | | | | | 0022-03-032 | Odessa | 11/03/26 | $1,032,508.84 | Construction | Bridge | Construction | Bridge | $1,065,488.54 | $(32,979.70) | -3% | 0 | | | | | 0019-01-153 | Fort Worth | 07/01/26 | $1,518,165.79 | Construction | Roadway | Construction | Roadway | $1,566,691.63 | $(48,525.84) | -3% | 0 | | | | | 0064-02-020 | Lufkin | 11/03/26 | $390,000.00 | Construction | Roadway | Construction | Roadway | $402,349.72 | $(12,349.72) | -3% | 0 | | | | | 3000-01-027 | Dallas | 07/01/26 | $504,944.00 | Construction | Roadway | Construction | Roadway | $520,281.50 | $(15,337.50) | -3% | 0 | | | | | 1062-03-055 | Houston | 01/05/28 | $6,804,421.00 | Construction | Roadway | Construction | Roadway | $7,000,000.00 | $(195,579.00) | -3% | 0 | | | | | 0338-02-045 | Houston | 09/06/28 | $800,183.00 | Construction | Roadway | Construction | Roadway | $822,392.23 | $(22,209.23) | -3% | 0 | | | | | 0336-05-067 | Lufkin | 11/03/26 | $460,000.00 | Construction | Roadway | Construction | Roadway | $472,358.57 | $(12,358.57) | -3% | 0 | | | | | 0389-02-061 | Beaumont | 08/05/26 | $408,836.45 | Construction | Roadway | Construction | Roadway | $399,270.00 | $9,566.45 | 2% | 0 | | | | | 0051-09-128 | Houston | 08/05/26 | $4,039,867.80 | Construction | Roadway | Construction | Roadway | $4,137,427.00 | $(97,559.20) | -2% | 0 | | | | | 0001-04-114 | El Paso | 05/03/28 | $740,740.74 | Construction | Roadway | Construction | Roadway | $723,723.26 | $17,017.48 | 2% | 154 | 5 months | | | | 0143-01-068 | San Antonio | 07/01/26 | $2,571,222.84 | Construction | Roadway | Construction | Roadway | $2,514,127.89 | $57,094.95 | 2% | 0 | | | | | 0186-03-074 | Bryan | 07/01/26 | $34,808.08 | Construction | Roadway | Construction | Roadway | $34,155.43 | $652.65 | 2% | 0 | | | | | 0115-04-057 | Austin | 02/01/29 | $6,381,700.89 | Construction | Roadway | Construction | Roadway | $6,500,816.96 | $(119,116.07) | -2% | 0 | | | | | 0150-02-043 | Austin | 08/05/26 | $2,487,668.03 | Construction | Roadway | Construction | Roadway | $2,532,219.03 | $(44,551.00) | -2% | 0 | | | | | 0252-03-056 | Austin | 08/05/26 | $2,495,198.94 | Construction | Roadway | Construction | Roadway | $2,452,584.79 | $42,614.15 | 2% | 0 | | | | | 0114-02-111 | Austin | 08/05/26 | $534,779.50 | Construction | Roadway | Construction | Roadway | $526,301.50 | $8,478.00 | 2% | 0 | | | | | 1197-01-027 | Austin | 08/05/26 | $3,130,181.38 | Construction | Roadway | Construction | Roadway | $3,080,501.38 | $49,680.00 | 2% | 0 | | | | | 0381-03-026 | Childress | 07/01/26 | $382,327.94 | Construction | Roadway | Construction | Roadway | $388,411.00 | $(6,083.06) | -2% | 0 | | | | | 0675-08-121 | Houston | 07/01/26 | $4,183,840.68 | Construction | Non Roadway | Construction | Non Roadway | $4,119,323.00 | $64,517.68 | 2% | 0 | | | | | 0013-05-046 | Wichita Falls | 08/05/26 | $14,570,882.56 | Construction | Safety Rest Area | Construction | Safety Rest Area | $14,351,572.00 | $219,310.56 | 2% | 0 | | | | | 0156-07-115 | Wichita Falls | 12/01/27 | $528,592.00 | Construction | Roadway | Construction | Roadway | $521,092.00 | $7,500.00 | 1% | 0 | | | | | 0363-03-061 | Fort Worth | 08/05/26 | $2,924,978.47 | Construction | Roadway | Construction | Roadway | $2,886,857.05 | $38,121.42 | 1% | -118 | -4 months | | | | 0069-07-113 | San Angelo | 08/05/26 | $1,800,039.59 | Construction | Roadway | Construction | Roadway | $1,777,990.78 | $22,048.81 | 1% | 0 | | | | | 1582-01-029 | Lufkin | 11/03/26 | $1,060,000.00 | Construction | Roadway | Construction | Roadway | $1,071,859.66 | $(11,859.66) | -1% | 0 | | | | | 3510-04-064 | Houston | 07/01/26 | $3,478,453.16 | Construction | Non Roadway | Construction | Non Roadway | $3,440,293.00 | $38,160.16 | 1% | 0 | | | | | 0229-01-042 | Odessa | 07/01/26 | $46,211,492.52 | Construction | Roadway | Construction | Roadway | $45,758,583.77 | $452,908.75 | 1% | 56 | 2 months | | | | 0086-07-041 | Pharr | 08/05/26 | $356,777.62 | Construction | Roadway | Construction | Roadway | $360,110.74 | $(3,333.12) | -1% | 0 | | | | | 2552-04-055 | El Paso | 08/05/26 | $3,847,548.00 | Construction | Roadway | Construction | Roadway | $3,879,275.00 | $(31,727.00) | -1% | 0 | | | | | 0025-02-234 | San Antonio | 08/05/26 | $7,430,961.91 | Construction | Roadway | Construction | Roadway | $7,487,310.06 | $(56,348.15) | -1% | 0 | | | | | 0114-02-112 | Austin | 08/05/26 | $619,415.25 | Construction | Roadway | Construction | Roadway | $615,753.25 | $3,662.00 | 1% | 0 | | | | | 2552-04-058 | El Paso | 08/05/26 | $3,076,855.00 | Construction | Roadway | Construction | Roadway | $3,060,085.00 | $16,770.00 | 1% | 0 | | | | | 0114-02-120 | Austin | 08/05/26 | $3,010,182.20 | Construction | Roadway | Construction | Roadway | $2,996,561.70 | $13,620.50 | 0% | 0 | | | | | 3409-01-011 | Waco | 05/01/28 | $6,183,634.26 | Construction | Roadway | Construction | Roadway | $6,200,000.00 | $(16,365.74) | -0% | 0 | | | | | 0016-05-128 | San Antonio | 07/01/26 | $12,488,187.55 | Construction | Roadway | Construction | Roadway | $12,462,037.55 | $26,150.00 | 0% | 0 | | | | | 3110-01-003 | Lufkin | 07/01/26 | $4,068,795.80 | Construction | Roadway | Construction | Roadway | $4,060,440.80 | $8,355.00 | 0% | 0 | | | | | 0051-03-122 | Houston | 07/01/26 | $723,873.60 | Construction | Roadway | Construction | Roadway | $722,838.60 | $1,035.00 | 0% | 0 | | | | | 0978-02-085 | Houston | 07/01/26 | $1,327,602.60 | Construction | Roadway | Construction | Roadway | $1,325,706.60 | $1,896.00 | 0% | 0 | | | | | 0915-12-782 | San Antonio | 07/01/26 | $381,422.93 | Construction | Roadway | Construction | Roadway | $380,947.73 | $475.20 | 0% | 0 | | | | | 0165-01-110 | Tyler | 11/02/27 | $5,005,789.00 | Construction | Roadway | Construction | Roadway | $5,002,789.25 | $2,999.75 | 0% | 0 | | | | | 0331-04-074 | Pharr | 09/02/26 | $89,950.48 | Construction | Roadway | Construction | Roadway | $90,000.00 | $(49.52) | -0% | 0 | | | | | 0213-03-112 | Lufkin | 07/01/26 | $3,332,948.00 | Construction | Bridge | Construction | Bridge | $3,331,418.00 | $1,530.00 | 0% | 0 | | | | | 2452-03-128 | San Antonio | 07/01/26 | $180,045,142.69 | Construction | Roadway | Construction | Roadway | $180,125,212.86 | $(80,070.17) | -0% | 0 | | | | | 0015-09-208 | Austin | 07/01/26 | $2,899,090.65 | Construction | Roadway | Construction | Roadway | $2,898,081.65 | $1,009.00 | 0% | 0 | | | | | 0540-03-039 | Bryan | 07/01/26 | $4,315,845.66 | Construction | Roadway | Construction | Roadway | $4,315,533.66 | $312.00 | 0% | 0 | | | | | 1502-01-031 | Lubbock | 07/01/26 | $166,957,611.35 | Construction | Roadway | Construction | Roadway | $166,952,606.35 | $5,005.00 | 0% | 0 | | | | | 0014-15-090 | Fort Worth | 03/03/27 | $55,912,929.52 | Construction | Roadway | Construction | Roadway | $0.00 | $55,912,929.52 | | 0 | | | | --- ## Putting It Together Overall, while the pipeline has shrunk in both value and project count, the predominant roadway subtype remains stable. Costs have shifted in various directions, reflecting broader trends of delays in project scheduling. --- ## Final Takeaway This indicates a period of adjustment as agencies navigate evolving project timelines and financial considerations. --- --- ## Generative UI https://www.bidlo.ai/research/generative-ui Generative UI explores how AI can create interfaces on demand for more flexible workflows. [https://www.youtube.com/watch?v=aSY2gFhmArE](https://www.youtube.com/watch?v=aSY2gFhmArE) ### Summary Generative UI dynamically builds customized user interfaces to meet unique user needs beyond traditional design systems. Bidlo leverages generative UI to enable public construction professionals to generate personalized dashboards and workflows that enhance bidding intelligence, overcoming the limitations of rigid design. ### Chapters - 0:00 Introduction to Generative UI - 1:10 Google’s Project Genie and the Future of Generative UI - 2:30 Bidlo’s Opinionated Design System - 4:00 Limitations of Traditional UI and Role of Generative UI - 5:20 Balancing Flexibility and Structure - 7:10 Generative UI’s Impact on Public Construction Workflows - 8:30 Conclusion and Future Outlook ### Transcript Hi, I'm Matt, an engineer at Bidlow, and today we're discussing generative UI. You may not have heard of this term, but you've likely encountered it through chatbots like Google’s or ChatGPT. Generative UI refers to a user interface that is dynamically generated to suit your specific request. Google is a leader in this space, particularly with chatbots. They highlighted this in a recent keynote, emphasizing generative UI as central to their product strategy. The concept is that instead of delivering a pre-made UI or pointing you to a website, the system generates a UI on the spot to better answer your question. This approach provides a more tailored experience than a generic text response. Google’s Project Genie exemplifies this idea. Genie 3 is an experimental video game that generates content as you play. You can provide an image, and the game allows you to navigate its environment, which is created dynamically. This represents a pinnacle of generative UI—a seemingly infinite game world generated in real time. At Bidlow, generative UI is very important. There’s considerable industry focus on quickly generating user interfaces precisely when users need them. Engineers across platforms are investing heavily in solving this problem. Why is this challenging? At Bidlow, we use an opinionated design system. For example, when creating a new private page, you can select templates like a three-month lookahead table showing procurement opportunities in your area. Users can customize this by adding columns such as districts or adjust filtering and sorting. This level of customization covers about 80% of user requests. However, the remaining 20% are requests our system can't accommodate. Users often export data to Excel to perform those custom tasks. Generative UI addresses this gap by enabling users to generate the specific app features they want using the platform’s existing data, such as adding action buttons, color coding, or custom dashboards with charts and activity tracking. This frees users from being confined to our design system. Why not rely entirely on generative UI? Because while generative UI overcomes the rigidity of static design systems, it introduces a challenge of too much flexibility. Presenting users with a blank slate and unlimited options can be overwhelming—they may not know where to start or what to generate. Our approach at Bidlow finds a middle ground. We offer opinionated templates and predefined rules so users can quickly build what they need. Then, when users encounter limits, it becomes clear what to generate next. Generative UI solves the problem where the system hits a wall, letting users build functionalities previously unavailable. In summary, generative AI helps overcome the inherent limitations of user interfaces by enabling on-demand feature creation. However, it requires guidance to prevent user overwhelm. At Bidlow, we combine structured templates with generative UI to provide flexibility without losing direction. We'll be integrating more generative UI capabilities in the coming months. This overview explains our approach and why generative UI is gaining so much attention in the industry. --- ## Texas DOT Backlog Report - May 2026 https://www.bidlo.ai/research/texas-dot-backlog-report-may-2026 Where TxDOT Work Is Already Stacked Up ### Before the Next Letting, $20.95B Is Already on the Books Every new TxDOT letting enters a market that already has work in motion. That existing workload is not evenly distributed. As of May 11, TxDOT has **$20.95B in active backlog** across **3,792 active projects** and **25 districts**. Active backlog refers to the remaining value tied to active projects. Change orders refer to approved contract value added after award. Together, those two measures show two different parts of the current market. Active backlog shows where work is already on the books. Change orders show where active contract values have grown since award. Dallas has the largest remaining workload in the state. Fort Worth has the highest change order percentage. Houston has the largest active project count among the top five districts. Austin has nearly the same active backlog as Houston, but across far fewer projects. That is the shape of the current TxDOT active market: concentrated, uneven, and already carrying a large amount of work before the next letting is added. --- ### Interactive district view The map below shows how active work is distributed across TxDOT districts. Use the toggle to switch between **active backlog** and **change orders**. The active backlog view shows where remaining project value is concentrated. The change order view shows where approved contract growth has accumulated after award. The two views do not tell the same story. Dallas stands out in the active backlog view because it carries the largest remaining workload in the state. Fort Worth becomes more prominent in the change order view because it has the largest approved change order total and the highest change order percentage. That split is the main reason to look at both layers. One shows where work is still on the books. The other shows where active contract values have grown. [https://info.bidlo.ai/heatmap/backlog-by-district?embed=1&snapshot_id=225df532-31fd-4ec6-96d7-2a1fd29c49f8](https://info.bidlo.ai/heatmap/backlog-by-district?embed=1&snapshot_id=225df532-31fd-4ec6-96d7-2a1fd29c49f8) --- ### Dallas is carrying the largest remaining workload Dallas ranks first statewide with **$4.89B** in active backlog across **324 active projects**. That is more than double the active backlog in Houston or Austin, which rank second and third. Houston has **$2.41B** in active backlog across **422 projects**. Austin has **$2.39B** across **163 projects**. Those two districts are nearly tied by remaining value, but they are not carrying that work the same way. Houston’s backlog is spread across a larger number of active projects. Austin’s is concentrated across a smaller set of projects. Fort Worth ranks fifth by active backlog, with **$1.28B** across **202 projects**, but it becomes much more prominent when change orders are added to the view. | Rank | District | Active backlog | Projects | Change order % | Change orders | | --- | --- | --- | --- | --- | --- | | 1 | Dallas | $4.89B | 324 | 1.2% | $98.88M | | 2 | Houston | $2.41B | 422 | 7.5% | $489.05M | | 3 | Austin | $2.39B | 163 | 4.7% | $217.54M | | 4 | San Antonio | $1.65B | 195 | 3.4% | $189.00M | | 5 | Fort Worth | $1.28B | 202 | 21.1% | $641.74M | | 6 | Bryan | $940.49M | 180 | 5.5% | $84.55M | | 7 | Beaumont | $755.48M | 152 | 5.8% | $102.55M | | 8 | Pharr | $720.83M | 121 | 5.1% | $63.69M | | 9 | Yoakum | $663.99M | 179 | 2.5% | $52.96M | | 10 | El Paso | $601.02M | 116 | 11.8% | $173.03M | The top of the ranking shows multiple backlog profiles. - **Dallas** is the clear leader by remaining value. - **Houston** has the broadest active project count among the top five. - **Austin** has a Houston-sized backlog across a much smaller project base. - **Fort Worth** is not the largest backlog district, but it has the highest change order percentage in the state. That is why project count alone does not explain the active workload. The same dollar amount can be spread across hundreds of active projects or concentrated in far fewer contracts. --- ### Change orders tell a different story than backlog Statewide, approved change orders equal **5.5% of original bid value**. Fort Worth is the outlier. Its approved change orders equal **21.1% of original bid value**, the highest district-level percentage in the state. It also has **$641.74M** in approved change orders, the largest total among all districts. That puts Fort Worth in a different position than its backlog ranking alone would suggest. - By active backlog, Fort Worth ranks fifth. - By change order percentage, it ranks first. - By total approved change order value, it also ranks first. El Paso is another example of the difference between the two views. It ranks tenth by active backlog at **$601.02M**, but second by change order percentage at **11.8%**. Houston also appears in both views. It ranks second by active backlog and has **$489.05M** in approved change orders, equal to **7.5%** of original bid value. The active backlog ranking shows where remaining work is largest. The change order view shows where contract values have grown after award. --- ### Project spotlights District totals can be shaped by a small number of large active projects. Dallas has the largest individual active project backlog in the snapshot. **CCSJ 2374-01-137**, project **NH 1902(389)**, carries **$1.71B** in active backlog. Dallas also has the third-largest active project backlog: **CCSJ 0009-11-254**, project **F 2025(365)**, with **$768.65M** remaining. Fort Worth’s largest active project stands out in a different way. **CCSJ 0008-13-125**, project **F 2022(675)**, carries **$843.74M** in active backlog and **$451.41M** in approved change orders. It is both one of the largest remaining project backlogs in the state and the largest project-level change order total in the snapshot. **Largest active project backlogs** | CCSJ | Project | District | Active backlog | Change orders | Change order % | | --- | --- | --- | --- | --- | --- | | 2374-01-137 | NH 1902(389) | Dallas | $1.71B | $0 | 0.0% | | 0008-13-125 | F 2022(675) | Fort Worth | $843.74M | $451.41M | 28.4% | | 0009-11-254 | F 2025(365) | Dallas | $768.65M | $3.42M | 0.4% | | 0049-12-110 | F 2025(274) | Bryan | $560.02M | $49,661 | 0.0% | | 0015-13-428 | F 2024(833) | Austin | $538.76M | $753,983 | 0.1% | The table is sorted by **active backlog**, not change orders. That distinction matters. The Dallas projects help explain why Dallas leads the state by remaining backlog. The Fort Worth project helps explain why Fort Worth stands out in the change order view. --- ### What the current active market looks like The active TxDOT workload is not defined by one number. The statewide backlog is large: **$20.95B**. But the distribution is uneven. - Dallas carries the largest remaining workload. - Houston carries more active projects than any other top-five backlog district. - Austin has nearly the same active backlog as Houston with fewer projects. - Fort Worth has the highest change order percentage and the largest approved change order total. Those differences show why active backlog and change orders should be read together. Active backlog shows where work is already stacked up. Change orders show where active contract values have grown since award. Together, they show the existing workload that new lettings are being added onto. --- ## TxDOT Pipeline Changes - April 2026 https://www.bidlo.ai/research/txdot-pipeline-changes-april-2026 How did the TxDOT project pipeline change in April? - The TxDOT pipeline expanded from 6,282 to 6,414 total projects between the April 3 and May 4, 2026 snapshots, within a letting window from May 5, 2026 to March 1, 2029. - Overall pipeline value increased by $163.98 million to a total of $6.71 billion. - The largest cost movement occurred in Dallas with a net increase of $63.49 million. --- ## Overview Comparing how the project pipeline changed from April 3 to May 4, 2026, across a letting window of May 5, 2026 to March 1, 2029, there was significant activity. The total number of projects increased from 6,282 to 6,414. Letting dates reflected a drift with 211 projects shifting by six months or more, of which 142 moved later and 69 moved earlier. The overall pipeline value grew to $6.71 billion, indicating a shift in funding focus. --- ## Letting Date Shifts (Slippage) [https://info.bidlo.ai/embed/letting-slippage-bubble?publication_id=5ff27706-df70-4859-8767-b831621b5c0b](https://info.bidlo.ai/embed/letting-slippage-bubble?publication_id=5ff27706-df70-4859-8767-b831621b5c0b) > How to read this chart: Project letting dates experienced notable shifts, with 211 projects having changes of six months or more, 142 moved later while 69 moved earlier. There were 130 projects with shifts of a year or more, 96 later and 34 earlier. This suggests that many projects are being deferred, contributing to a later project delivery schedule. | CSJ | District | Est. Letting Date | Project Estimate | Current Type | Current Subtype | Prev. Type | Prev. Subtype | Prev. Date | Letting Δ (days) | Letting Date Δ | Cost Δ | %Cost Δ | Type/Subtype Δ | Lifecycle | | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | | 2664-01-007 | Lufkin | 10/04/28 | $4,882,572.05 | Construction | Roadway | Unassigned | Unassigned | 09/01/45 | -6176 | -17 years | | | Unassigned → Construction / Roadway | | | 0495-08-107 | Atlanta | 01/01/39 | $5,357,426.00 | | | Construction | Roadway | 01/05/28 | 4014 | 11 years | | | | | | 0495-10-090 | Atlanta | 01/01/39 | $7,841,466.00 | | | Construction | Roadway | 01/05/28 | 4014 | 11 years | | | | | | 0495-10-103 | Atlanta | 01/01/39 | $5,466,829.00 | | | Construction | Roadway | 01/05/28 | 4014 | 11 years | | | | | | 0495-10-104 | Atlanta | 01/01/39 | $8,713,538.00 | | | Construction | Roadway | 01/05/28 | 4014 | 11 years | | | | | | 0610-03-089 | Atlanta | 01/01/39 | $8,377,828.00 | | | Construction | Roadway | 01/05/28 | 4014 | 11 years | | | | | | 0610-05-052 | Atlanta | 01/01/39 | $7,638,133.00 | | | Construction | Roadway | 01/05/28 | 4014 | 11 years | | | | | | 0610-06-094 | Atlanta | 01/01/39 | $6,602,181.00 | | | Construction | Roadway | 01/05/28 | 4014 | 11 years | | | | | | 0610-06-095 | Atlanta | 01/01/39 | $5,452,059.00 | | | Construction | Roadway | 01/05/28 | 4014 | 11 years | | | | | | 0275-16-004 | Amarillo | 11/01/37 | $170,000.00 | | | Construction | Roadway | 11/02/27 | 3652 | 10 years | | | | | | 1092-01-026 | Dallas | 05/05/27 | $12,239,522.17 | Construction | Roadway | Unassigned | Unassigned | 08/01/35 | -3010 | -8 years | | | Unassigned → Construction / Roadway | | | 3510-03-003 | Houston | 01/15/37 | $55,381,565.00 | | | | | 01/15/29 | 2922 | 8 years | | | | | | 0558-09-040 | San Angelo | 06/01/35 | $13,200,000.00 | | | Construction | Roadway | 06/01/28 | 2556 | 7 years | | | | | | 0007-03-099 | Brownwood | 11/02/27 | $587,822.00 | Construction | Roadway | Unassigned | Unassigned | 11/01/34 | -2556 | -7 years | | | Unassigned → Construction / Roadway | | | 0007-03-100 | Brownwood | 11/02/27 | $590,391.00 | Construction | Roadway | Unassigned | Unassigned | 11/01/34 | -2556 | -7 years | | | Unassigned → Construction / Roadway | | | 1014-02-051 | Dallas | 10/01/35 | $548,755.00 | | | Construction | Roadway | 10/04/28 | 2553 | 7 years | | | | | | 2263-02-112 | Corpus Christi | 10/01/35 | $17,000,000.00 | | | Construction | Ferry Boat | 10/04/28 | 2553 | 7 years | | | | | | 0997-01-051 | Dallas | 10/01/33 | $534,725.65 | | | Construction | Roadway | 10/06/26 | 2552 | 7 years | | | | | | 0999-01-049 | Dallas | 10/01/33 | $271,147.24 | | | Construction | Roadway | 10/06/26 | 2552 | 7 years | | | | | | 2462-04-009 | Dallas | 10/01/33 | $452,799.26 | | | Construction | Roadway | 10/06/26 | 2552 | 7 years | | | | | | 0520-05-054 | Atlanta | 08/02/28 | $3,500,000.00 | Construction | Roadway | Unassigned | Unassigned | 01/01/35 | -2343 | -6 years | $(14,000,000.00) | -80% | Unassigned → Construction / Roadway | | | 0143-14-006 | San Antonio | 09/06/28 | $6,540,250.00 | Construction | Roadway | Unassigned | Unassigned | 01/01/35 | -2308 | -6 years | | | Unassigned → Construction / Roadway | | | 0183-01-059 | Brownwood | 11/01/32 | $14,114.00 | | | Construction | Roadway | 11/03/26 | 2190 | 6 years | | | | | | 0047-04-042 | Dallas | 10/01/34 | $420,992.25 | | | Construction | Roadway | 10/04/28 | 2188 | 6 years | | | | | | 2170-05-018 | Laredo | 02/02/28 | $2,000,000.00 | Construction | Roadway | Unassigned | Unassigned | 11/01/33 | -2099 | -6 years | $1,600,000.00 | 400% | Unassigned → Construction / Roadway | | | 0521-05-144 | San Antonio | 09/01/27 | $589,100,000.00 | Construction | Roadway | Unassigned | Unassigned | 09/01/32 | -1827 | -5 years | | | Unassigned → Construction / Roadway | | | 2013-02-018 | Brownwood | 11/01/31 | $11,626.00 | | | Construction | Roadway | 11/03/26 | 1824 | 5 years | | | | | | 0337-02-055 | Austin | 10/02/30 | $945,350.00 | | | Construction | Local Let | 10/01/26 | 1462 | 4 years | | | | | | 0088-02-070 | Corpus Christi | 12/01/31 | $1,000,000.00 | | | Construction | Non Roadway | 12/01/27 | 1461 | 4 years | | | | | | 0447-03-043 | Corpus Christi | 12/01/31 | $1,500,000.00 | | | Construction | Non Roadway | 12/01/27 | 1461 | 4 years | | | | | | 0912-71-692 | Houston | 09/15/30 | $15,000.00 | | | Non-Let | Roadway | 09/15/26 | 1461 | 4 years | | | | | | 0912-72-005 | Houston | 09/15/30 | $30,000.00 | | | Non-Let | Roadway | 09/15/26 | 1461 | 4 years | | | | | | 0054-04-119 | Brownwood | 11/01/28 | $454,880.00 | Construction | Roadway | Unassigned | Unassigned | 11/01/32 | -1461 | -4 years | | | Unassigned → Construction / Roadway | | | 0070-06-053 | Brownwood | 11/01/28 | $263,697.00 | Construction | Roadway | Unassigned | Unassigned | 11/01/32 | -1461 | -4 years | | | Unassigned → Construction / Roadway | | | 2270-01-030 | Abilene | 05/03/28 | $1,666,666.67 | Construction | Roadway | Unassigned | Unassigned | 05/01/32 | -1459 | -4 years | $(565,476.33) | -25% | Unassigned → Construction / Roadway | | | 0007-06-269 | Brownwood | 11/03/26 | $131,061.00 | Construction | Roadway | Unassigned | Unassigned | 11/01/30 | -1459 | -4 years | | | Unassigned → Construction / Roadway | | | 0007-06-272 | Brownwood | 11/03/26 | $131,061.00 | Construction | Roadway | Unassigned | Unassigned | 11/01/30 | -1459 | -4 years | | | Unassigned → Construction / Roadway | | | 0523-01-032 | Houston | 03/01/32 | $961,403.00 | | | Construction | Roadway | 03/07/28 | 1455 | 4 years | | | | | | 0367-02-084 | Houston | 09/01/31 | $500,000.00 | | | Construction | Roadway | 03/07/28 | 1273 | 3 years | $(1,406,590.00) | -74% | | | | 0014-23-042 | Waco | 10/06/26 | $6,000,000.00 | Construction | Roadway | Unassigned | Unassigned | 02/01/30 | -1214 | -3 years | $(4,000,000.00) | -40% | Unassigned → Construction / Roadway | | | 0756-05-021 | Lufkin | 09/01/31 | $6,440,000.00 | | | Construction | Bridge | 06/01/28 | 1187 | 3 years | | | | | | 0038-01-089 | Laredo | 02/01/31 | $2,261,754.60 | | | Construction | Roadway | 02/02/28 | 1095 | 3 years | | | | | | 0086-14-104 | Laredo | 02/01/31 | $4,493,788.95 | | | Construction | Roadway | 02/02/28 | 1095 | 3 years | | | | | | 2786-01-020 | Brownwood | 11/01/29 | $23,985.00 | | | Construction | Roadway | 11/03/26 | 1094 | 3 years | | | | | | 0870-06-025 | Brownwood | 05/01/31 | $4,048,369.20 | | | Construction | Roadway | 05/03/28 | 1093 | 3 years | | | | | | 0999-01-048 | Dallas | 08/01/30 | $7,921,726.91 | | | Construction | Roadway | 08/04/27 | 1093 | 3 years | | | | | | 1003-01-098 | Houston | 09/01/31 | $1,088,146.00 | | | Construction | Roadway | 09/06/28 | 1090 | 3 years | $(23,057,977.00) | -95% | | | | 0843-06-020 | Atlanta | 02/01/29 | $3,751,667.00 | Construction | Roadway | Unassigned | Unassigned | 01/01/32 | -1064 | -3 years | | | Unassigned → Construction / Roadway | | | 0013-08-147 | Fort Worth | 06/01/27 | $54,615,384.64 | Construction | Roadway | Unassigned | Unassigned | 01/01/30 | -945 | -3 years | $7,034,010.88 | 15% | Unassigned → Construction / Roadway | | | 0014-15-087 | Fort Worth | 06/01/27 | $20,384,615.38 | Construction | Roadway | Unassigned | Unassigned | 01/01/30 | -945 | -3 years | $5,826,381.58 | 40% | Unassigned → Construction / Roadway | | | 0027-10-082 | Houston | 05/05/27 | $1,429,810.00 | Construction | Roadway | Unassigned | Unassigned | 12/01/29 | -941 | -3 years | | | Unassigned → Construction / Roadway | | | 2594-01-015 | Lufkin | 05/01/30 | $5,608,654.30 | | | Construction | Bridge | 10/05/27 | 939 | 3 years | | | | | | 2374-05-092 | Fort Worth | 01/09/30 | $3,037,016.40 | | | Construction | Local Let | 11/09/27 | 792 | 2 years | | | | | | 0063-04-069 | Atlanta | 01/06/27 | $5,242,917.00 | Construction | Roadway | Construction | Roadway | 03/01/29 | -785 | -2 years | | | | | | 0063-05-041 | Atlanta | 01/06/27 | $3,257,083.00 | Construction | Roadway | Construction | Roadway | 03/01/29 | -785 | -2 years | | | | | | 0978-02-092 | Houston | 11/01/29 | $17,357,933.00 | | | Construction | Roadway | 10/05/27 | 758 | 2 years | | | | | | 3049-01-037 | Houston | 11/01/29 | $64,696,185.00 | | | Construction | Roadway | 10/05/27 | 758 | 2 years | | | | | | 3049-01-038 | Houston | 11/01/29 | $33,838,904.00 | | | Construction | Roadway | 10/05/27 | 758 | 2 years | | | | | | 0378-06-024 | Tyler | 12/05/28 | $91,443.18 | Construction | Roadway | Construction | Roadway | 12/01/26 | 735 | 2 years | | | | | | 0187-05-063 | Houston | 09/06/28 | $3,674,142.32 | Construction | Non Roadway | Construction | Non Roadway | 09/02/26 | 735 | 2 years | | | | | | 1043-01-012 | Houston | 09/02/26 | $1,000,000.00 | Construction | Roadway | Construction | Roadway | 09/06/28 | -735 | -2 years | | | | | | 1043-02-005 | Houston | 09/02/26 | $177,120.00 | Construction | Roadway | Construction | Roadway | 09/06/28 | -735 | -2 years | | | | | | 3256-03-107 | Houston | 07/01/29 | $1,291,992.00 | Construction | Roadway | Construction | Roadway | 07/01/27 | 731 | 2 years | | | | | | 0300-01-111 | Laredo | 03/01/31 | $3,185,762.83 | | | Construction | Roadway | 03/01/29 | 730 | 2 years | | | | | | 1549-04-036 | Corpus Christi | 01/01/31 | $5,000,000.00 | | | Construction | Roadway | 01/01/29 | 730 | 2 years | | | | | | 0119-01-020 | Lufkin | 11/01/29 | $4,699,706.70 | | | Construction | Bridge | 11/02/27 | 730 | 2 years | | | | | | 0743-02-029 | Lufkin | 11/01/29 | $4,925,806.28 | | | Construction | Bridge | 11/02/27 | 730 | 2 years | | | | | | 0050-08-104 | Houston | 02/01/29 | $27,031,845.00 | Construction | Roadway | Construction | Roadway | 02/02/27 | 730 | 2 years | | | | | | 3022-02-009 | Dallas | 02/01/29 | $5,938,245.17 | Construction | Roadway | Construction | Roadway | 02/02/27 | 730 | 2 years | $950,010.49 | 19% | | | | 0109-08-052 | Lufkin | 11/02/27 | $1,126,844.19 | Construction | Roadway | Unassigned | Unassigned | 11/01/29 | -730 | -2 years | | | Unassigned → Construction / Roadway | | | 0720-02-098 | Houston | 03/03/27 | $7,639,008.00 | Construction | Roadway | Construction | Roadway | 03/01/29 | -729 | -2 years | | | | | | 0815-03-016 | Dallas | 10/01/30 | $605,163.96 | | | Construction | Roadway | 10/04/28 | 727 | 2 years | $536,313.96 | 779% | | | | 0074-03-050 | Corpus Christi | 01/01/30 | $4,500,000.00 | | | Construction | Roadway | 01/05/28 | 727 | 2 years | $1,100,000.00 | 32% | | | | 0074-04-049 | Corpus Christi | 01/01/30 | $3,000,000.00 | | | Construction | Roadway | 01/05/28 | 727 | 2 years | $900,000.00 | 43% | | | | 2846-01-008 | Dallas | 12/01/30 | $6,759,240.62 | | | Construction | Roadway | 12/05/28 | 726 | 2 years | $261,323.36 | 4% | | | | 0912-72-809 | Houston | 01/01/29 | $500,000.00 | Construction | Rail - Safety | Construction | Rail - Safety | 01/06/27 | 726 | 2 years | | | | | | 0069-01-061 | Abilene | 07/01/30 | $20,000,000.00 | | | Construction | Roadway | 07/06/28 | 725 | 2 years | | | | | | 0069-02-030 | San Angelo | 07/01/30 | $5,000,000.00 | | | Construction | Roadway | 07/06/28 | 725 | 2 years | | | | | | 0217-01-038 | Atlanta | 09/06/28 | $2,400,000.00 | Construction | Bridge | Construction | Bridge | 10/06/26 | 701 | 2 years | | | | | | 0051-03-123 | Houston | 08/01/29 | $9,073,088.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 700 | 2 years | | | | | | 0976-05-031 | Houston | 03/01/29 | $1,847,549.00 | Construction | Roadway | Construction | Roadway | 04/06/27 | 695 | 2 years | | | | | | 2977-01-011 | Dallas | 07/01/26 | $11,777,297.44 | Construction | Roadway | Construction | Roadway | 05/03/28 | -672 | -2 years | $(553,199.50) | -4% | | | | 0138-08-034 | Tyler | 01/01/31 | $2,620,282.00 | | | Construction | Non Roadway | 03/01/29 | 671 | 2 years | | | | | | 1680-03-031 | Lufkin | 09/01/29 | $2,098,409.53 | | | Construction | Bridge | 11/02/27 | 669 | 2 years | | | | | | 0912-72-812 | Houston | 09/15/28 | $500,000.00 | Non-Let | Rail | Construction | Rail - Safety | 12/01/26 | 654 | 2 years | | | Construction / Rail - Safety → Non-Let / Rail | | | 0070-03-062 | San Angelo | 07/01/26 | $3,599,697.00 | Construction | Roadway | Construction | Roadway | 04/05/28 | -644 | -2 years | $(1,026,460.00) | -22% | | | | 0070-04-041 | San Angelo | 07/01/26 | $175,049.00 | Construction | Roadway | Construction | Roadway | 04/05/28 | -644 | -2 years | $36,849.00 | 27% | | | | 0368-03-042 | Beaumont | 07/01/26 | $1,762,157.35 | Construction | Roadway | Construction | Roadway | 04/05/28 | -644 | -2 years | $262,157.35 | 17% | | | | 0786-01-095 | Beaumont | 07/01/26 | $4,288,248.61 | Construction | Roadway | Construction | Roadway | 04/05/28 | -644 | -2 years | $(211,751.39) | -5% | | | | 0118-08-085 | Lufkin | 06/01/30 | $5,554,561.67 | | | Construction | Bridge | 10/04/28 | 605 | 2 years | | | | | | 0172-09-044 | Fort Worth | 08/02/28 | $2,582,000.00 | Construction | Roadway | Construction | Roadway | 02/02/27 | 547 | 1 year | | | | | | 0383-04-065 | Corpus Christi | 07/01/30 | $3,000,000.00 | | | Construction | Roadway | 01/01/29 | 546 | 1 year | $(1,600,000.00) | -35% | | | | 0008-07-034 | Fort Worth | 11/03/28 | $3,604,001.50 | Construction | Local Let | Construction | Local Let | 07/03/27 | 489 | 1 year | | | | | | 0029-01-031 | San Antonio | 01/05/28 | $102,880.00 | Construction | Roadway | Construction | Roadway | 10/06/26 | 456 | 1 year | | | | | | 0366-12-033 | San Antonio | 01/05/28 | $90,889.00 | Construction | Roadway | Construction | Roadway | 10/06/26 | 456 | 1 year | | | | | | 1003-01-105 | Houston | 01/05/28 | $5,116,513.00 | Construction | Bridge | Construction | Bridge | 10/06/26 | 456 | 1 year | | | | | | 1385-01-046 | Atlanta | 01/05/28 | $600,000.00 | Construction | Roadway | Construction | Roadway | 10/06/26 | 456 | 1 year | | | | | | 1020-01-068 | Atlanta | 03/03/27 | $2,400,000.00 | Construction | Roadway | Construction | Roadway | 06/01/28 | -456 | -1 year | $598,270.00 | 33% | | | | 0976-03-122 | Houston | 11/02/27 | $528,000.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | 426 | 1 year | | | | | | 6487-61-001 | Houston | 09/02/27 | $1,000,000.00 | Maintenance | Routine Maintenance Contract | Unassigned | Unassigned | 08/01/26 | 397 | 1 year | | | Unassigned → Maintenance / Routine Maintenance Contract | | | 0943-04-035 | Corpus Christi | 04/01/29 | $5,500,000.00 | Construction | Roadway | Construction | Roadway | 03/07/28 | 390 | 1 year | | | | | | 0912-00-704 | Houston | 09/15/27 | $1,000,000.00 | Construction | Local Let | Construction | Rail - Safety | 09/02/26 | 378 | 1 year | | | Construction / Rail - Safety → Construction / Local Let | | | 0109-01-066 | Tyler | 09/06/28 | $3,800,000.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 371 | 1 year | | | | | | 0109-02-027 | Tyler | 09/06/28 | $3,250,000.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 371 | 1 year | | | | | | 0169-02-071 | Amarillo | 09/06/28 | $1,970,000.00 | Construction | Bridge | Construction | Bridge | 09/01/27 | 371 | 1 year | | | | | | 0169-02-072 | Amarillo | 09/06/28 | $1,500,000.00 | Construction | Bridge | Construction | Bridge | 09/01/27 | 371 | 1 year | | | | | | 2635-02-040 | Amarillo | 09/06/28 | $1,100,000.00 | Construction | Bridge | Construction | Bridge | 09/01/27 | 371 | 1 year | | | | | | 2635-02-041 | Amarillo | 09/06/28 | $1,140,000.00 | Construction | Bridge | Construction | Bridge | 09/01/27 | 371 | 1 year | | | | | | 0111-05-019 | Houston | 03/07/28 | $4,480,673.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | 370 | 1 year | | | | | | 0847-06-013 | Houston | 03/07/28 | $3,919,359.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | 370 | 1 year | | | | | | 0253-06-041 | San Antonio | 09/03/27 | $4,700,000.00 | Non-Let | Bridge | Non-Let | Bridge | 09/01/26 | 367 | 1 year | | | | | | 0517-02-043 | San Antonio | 09/03/27 | $5,452,200.00 | Non-Let | Bridge | Non-Let | Bridge | 09/01/26 | 367 | 1 year | | | | | | 0248-04-086 | Atlanta | 03/01/30 | $6,750,000.00 | | | Construction | Roadway | 03/01/29 | 365 | 1 year | | | | | | 0163-04-066 | Tyler | 02/01/30 | $12,300,000.00 | | | Construction | Roadway | 02/01/29 | 365 | 1 year | | | | | | 0192-04-113 | Houston | 02/01/30 | $7,570,207.00 | | | Construction | Roadway | 02/01/29 | 365 | 1 year | | | | | | 0495-02-072 | Tyler | 02/01/30 | $12,037,037.04 | | | Construction | Roadway | 02/01/29 | 365 | 1 year | | | | | | 0091-09-019 | Dallas | 01/01/30 | $8,932,684.66 | | | Construction | Roadway | 01/01/29 | 365 | 1 year | $(2,862,848.38) | -24% | | | | 0978-02-089 | Houston | 01/01/30 | $2,266,543.00 | | | Construction | Roadway | 01/01/29 | 365 | 1 year | | | | | | 1875-02-030 | Lufkin | 11/01/29 | $471,364.14 | | | Construction | Roadway | 11/01/28 | 365 | 1 year | | | | | | 0068-02-050 | Lubbock | 02/01/29 | $1,371,261.60 | Construction | Roadway | Unassigned | Unassigned | 02/01/30 | -365 | -1 year | | | Unassigned → Construction / Roadway | | | 0192-04-110 | Houston | 01/01/29 | $19,417,883.00 | Construction | Roadway | Unassigned | Unassigned | 01/01/30 | -365 | -1 year | | | Unassigned → Construction / Roadway | | | 0002-02-064 | El Paso | 11/01/28 | $19,632,293.75 | Construction | Roadway | Construction | Roadway | 11/02/27 | 365 | 1 year | $(727,121.99) | -4% | | | | 0109-07-056 | Lufkin | 11/01/28 | $1,496,424.29 | Construction | Roadway | Unassigned | Unassigned | 11/01/29 | -365 | -1 year | | | Unassigned → Construction / Roadway | | | 0074-12-006 | Corpus Christi | 10/04/28 | $115,828.00 | Construction | Roadway | Construction | Roadway | 10/05/27 | 365 | 1 year | | | | | | 0087-04-043 | Corpus Christi | 10/04/28 | $197,663.00 | Construction | Roadway | Construction | Roadway | 10/05/27 | 365 | 1 year | | | | | | 0255-02-064 | Corpus Christi | 10/04/28 | $770,676.00 | Construction | Roadway | Construction | Roadway | 10/05/27 | 365 | 1 year | | | | | | 0507-02-061 | Corpus Christi | 10/04/28 | $264,978.00 | Construction | Roadway | Construction | Roadway | 10/05/27 | 365 | 1 year | | | | | | 2521-01-018 | Corpus Christi | 10/04/28 | $214,534.00 | Construction | Roadway | Construction | Roadway | 10/05/27 | 365 | 1 year | | | | | | 0172-06-109 | Fort Worth | 02/15/28 | $310,000.00 | Construction | Local Let | Construction | Local Let | 02/15/27 | 365 | 1 year | | | | | | 0017-08-117 | Laredo | 02/02/28 | $8,699,053.65 | Construction | Roadway | Construction | Roadway | 02/01/29 | -365 | -1 year | $(2,344,163.85) | -21% | | | | 0038-01-104 | Laredo | 02/02/28 | $2,615,401.95 | Construction | Roadway | Construction | Roadway | 02/01/29 | -365 | -1 year | $11,200.52 | 0% | | | | 0542-02-046 | Laredo | 02/02/28 | $6,049,963.50 | Construction | Roadway | Construction | Roadway | 02/01/29 | -365 | -1 year | $(750,036.50) | -11% | | | | 0005-05-115 | Abilene | 12/01/27 | $769,821.00 | Construction | Roadway | Construction | Roadway | 12/01/26 | 365 | 1 year | | | | | | 0006-06-116 | Abilene | 12/01/27 | $404,000.00 | Construction | Roadway | Construction | Roadway | 12/01/26 | 365 | 1 year | | | | | | 0134-04-038 | Fort Worth | 12/01/27 | $25,848,256.43 | Construction | Roadway | Construction | Roadway | 12/01/26 | 365 | 1 year | | | | | | 0480-03-048 | Abilene | 12/01/27 | $111,474.00 | Construction | Roadway | Construction | Roadway | 12/01/26 | 365 | 1 year | | | | | | 1099-03-015 | Tyler | 12/01/27 | $427,539.09 | Construction | Roadway | Construction | Roadway | 12/01/26 | 365 | 1 year | | | | | | 1463-02-017 | Paris | 11/02/27 | $143,672.32 | Construction | Roadway | Construction | Roadway | 11/01/28 | -365 | -1 year | | | | | | 0101-03-128 | Corpus Christi | 10/05/27 | $152,817.00 | Construction | Roadway | Construction | Roadway | 10/04/28 | -365 | -1 year | | | | | | 1310-01-051 | Dallas | 10/05/27 | $8,305,445.16 | Construction | Roadway | Construction | Roadway | 10/04/28 | -365 | -1 year | $(2,369,843.23) | -22% | | | | 1655-01-036 | Abilene | 07/01/27 | $5,512,640.10 | Construction | Roadway | Construction | Roadway | 07/01/26 | 365 | 1 year | | | | | | 0389-11-061 | Houston | 02/02/27 | $3,424,252.00 | Construction | Roadway | Construction | Roadway | 02/02/28 | -365 | -1 year | $(670,780.00) | -16% | | | | 0008-03-140 | Fort Worth | 08/01/29 | $4,110,095.04 | Construction | Roadway | Construction | Roadway | 08/02/28 | 364 | 12 months | $734,341.31 | 22% | | | | 0598-02-136 | Houston | 11/02/27 | $1,341,371.02 | Construction | Roadway | Construction | Roadway | 11/03/26 | 364 | 12 months | | | | | | 0017-09-102 | San Antonio | 09/03/27 | $250,000.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 09/04/26 | 364 | 12 months | | | | | | 0017-09-103 | San Antonio | 09/03/27 | $250,000.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 09/04/26 | 364 | 12 months | | | | | | 0073-03-065 | San Antonio | 09/03/27 | $70,000.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 09/04/26 | 364 | 12 months | | | | | | 0915-12-599 | San Antonio | 09/03/27 | $250,000.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 09/04/26 | 364 | 12 months | | | | | | 0915-12-600 | San Antonio | 09/03/27 | $250,000.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 09/04/26 | 364 | 12 months | | | | | | 0915-12-606 | San Antonio | 09/03/27 | $250,000.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 09/04/26 | 364 | 12 months | | | | | | 0915-12-607 | San Antonio | 09/03/27 | $250,000.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 09/04/26 | 364 | 12 months | | | | | | 0915-17-082 | San Antonio | 09/03/27 | $250,000.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 09/04/26 | 364 | 12 months | | | | | | 0915-46-055 | San Antonio | 09/03/27 | $250,000.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 09/04/26 | 364 | 12 months | | | | | | 0915-46-056 | San Antonio | 09/03/27 | $250,000.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 09/04/26 | 364 | 12 months | | | | | | 1273-01-040 | San Antonio | 09/03/27 | $300,000.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 09/04/26 | 364 | 12 months | | | | | | 1433-02-049 | San Antonio | 09/03/27 | $250,000.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 09/04/26 | 364 | 12 months | | | | | | 0220-04-049 | Pharr | 08/04/27 | $23,319,932.34 | Construction | Roadway | Construction | Roadway | 08/05/26 | 364 | 12 months | | | | | | 0872-04-035 | Pharr | 08/04/27 | $314,622.34 | Construction | Roadway | Construction | Roadway | 08/05/26 | 364 | 12 months | | | | | | 0714-01-016 | Fort Worth | 11/03/26 | $189,398.00 | Construction | Roadway | Construction | Roadway | 11/02/27 | -364 | -12 months | | | | | | 0714-02-022 | Brownwood | 11/03/26 | $445,147.00 | Construction | Roadway | Construction | Roadway | 11/02/27 | -364 | -12 months | | | | | | 1051-01-065 | Dallas | 10/01/29 | $105,284.34 | | | Construction | Roadway | 10/04/28 | 362 | 12 months | $(14,680.63) | -12% | | | | 2461-01-011 | Dallas | 10/01/29 | $1,051,197.00 | | | Construction | Roadway | 10/04/28 | 362 | 12 months | $(210,599.16) | -17% | | | | 0164-03-058 | Tyler | 01/01/29 | $8,130,000.00 | Construction | Roadway | Construction | Roadway | 01/05/28 | 362 | 12 months | | | | | | 1986-01-075 | Houston | 01/05/28 | $10,245,762.00 | Construction | Roadway | Construction | Roadway | 01/01/29 | -362 | -12 months | | | | | | 1259-01-051 | Houston | 04/01/29 | $6,060,069.00 | Construction | Roadway | Construction | Roadway | 04/05/28 | 361 | 12 months | | | | | | 1763-02-034 | Tyler | 07/01/29 | $1,637,000.00 | Construction | Roadway | Construction | Roadway | 07/06/28 | 360 | 12 months | | | | | | 1763-03-049 | Tyler | 07/01/29 | $4,200,000.00 | Construction | Roadway | Construction | Roadway | 07/06/28 | 360 | 12 months | | | | | | 0022-04-021 | Laredo | 03/01/29 | $10,763,000.85 | Construction | Roadway | Construction | Roadway | 03/07/28 | 359 | 12 months | $(259,864.50) | -2% | | | | 0299-13-035 | Laredo | 03/01/29 | $1,789,754.40 | Construction | Roadway | Construction | Roadway | 03/07/28 | 359 | 12 months | $235,065.60 | 15% | | | | 0299-14-037 | Laredo | 03/01/29 | $1,151,274.60 | Construction | Roadway | Construction | Roadway | 03/07/28 | 359 | 12 months | $(713,358.45) | -38% | | | | 0172-11-016 | Dallas | 03/07/28 | $10,429,429.46 | Construction | Roadway | Construction | Roadway | 03/01/29 | -359 | -12 months | | | | | | 3138-01-039 | Bryan | 05/03/28 | $761,876.00 | Construction | Roadway | Construction | Roadway | 06/01/27 | 337 | 11 months | $(76,995.00) | -9% | | | | 1558-03-114 | Corpus Christi | 12/05/28 | $18,000,000.00 | Construction | Roadway | Construction | Roadway | 01/05/28 | 335 | 11 months | $5,600,000.00 | 45% | | | | 0926-05-009 | Lufkin | 09/01/29 | $9,169,916.07 | | | Construction | Roadway | 10/04/28 | 332 | 11 months | | | | | | 0161-01-033 | Laredo | 02/01/29 | $1,438,067.40 | Construction | Roadway | Construction | Roadway | 03/07/28 | 331 | 11 months | $(1,496,579.45) | -51% | | | | 1685-01-123 | Houston | 05/05/27 | $3,451,656.00 | Construction | Roadway | Construction | Roadway | 03/07/28 | -307 | -10 months | | | | | | 1685-02-053 | Houston | 05/05/27 | $3,763,259.00 | Construction | Roadway | Construction | Roadway | 03/07/28 | -307 | -10 months | | | | | | 0044-04-066 | Wichita Falls | 08/02/28 | $2,464,352.00 | Construction | Roadway | Construction | Roadway | 10/05/27 | 302 | 10 months | | | | | | 0914-04-370 | Austin | 08/04/27 | $78,014.05 | Construction | Roadway | Construction | Roadway | 10/06/26 | 302 | 10 months | | | | | | 0914-04-371 | Austin | 08/04/27 | $131,936.30 | Construction | Non Roadway | Construction | Non Roadway | 10/06/26 | 302 | 10 months | | | | | | 0173-04-059 | Dallas | 08/05/26 | $6,640,524.42 | Construction | Roadway | Construction | Roadway | 06/01/27 | -300 | -10 months | | | | | | 0581-01-177 | Dallas | 08/05/26 | $1,376,754.86 | Construction | Roadway | Construction | Roadway | 06/01/27 | -300 | -10 months | $(218,877.45) | -14% | | | | 0581-01-179 | Dallas | 08/05/26 | $1,725,917.34 | Construction | Roadway | Construction | Roadway | 06/01/27 | -300 | -10 months | $77,435.80 | 5% | | | | 0054-06-113 | Brownwood | 07/01/26 | $2,329,284.20 | Construction | Roadway | Construction | Roadway | 04/06/27 | -279 | -9 months | $329,284.20 | 16% | | | | 0902-90-374 | Fort Worth | 10/04/27 | $32,884,620.00 | Construction | Local Let | Construction | Local Let | 01/02/27 | 275 | 9 months | | | | | | 2744-01-041 | Houston | 08/04/27 | $10,000,000.00 | Construction | Roadway | Construction | Roadway | 11/03/26 | 274 | 9 months | | | | | | 0256-01-061 | Wichita Falls | 05/05/27 | $200,000.00 | Construction | Bridge | Construction | Bridge | 09/02/26 | 245 | 8 months | | | | | | 1556-01-032 | Corpus Christi | 11/02/27 | $8,000,000.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | 244 | 8 months | $4,000,000.00 | 100% | | | | 1052-02-103 | Corpus Christi | 12/05/28 | $293,307.00 | Construction | Roadway | Construction | Roadway | 08/01/29 | -239 | -8 months | | | | | | 0853-02-033 | San Antonio | 04/06/27 | $16,290,622.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | 216 | 7 months | | | | | | 0019-01-153 | Fort Worth | 07/01/26 | $1,566,691.63 | Construction | Roadway | Construction | Roadway | 02/02/27 | -216 | -7 months | $1,650.10 | 0% | | | | 0249-01-053 | Wichita Falls | 07/01/26 | $425,058.58 | Construction | Bridge | Construction | Bridge | 02/02/27 | -216 | -7 months | $98,563.58 | 30% | | | | 0249-01-054 | Wichita Falls | 07/01/26 | $181,321.60 | Construction | Bridge | Construction | Bridge | 02/02/27 | -216 | -7 months | $35,167.60 | 24% | | | | 0249-01-055 | Wichita Falls | 07/01/26 | $219,131.60 | Construction | Bridge | Construction | Bridge | 02/02/27 | -216 | -7 months | $35,442.60 | 19% | | | | 0249-01-056 | Wichita Falls | 07/01/26 | $251,218.60 | Construction | Bridge | Construction | Bridge | 02/02/27 | -216 | -7 months | $59,002.60 | 31% | | | | 0249-01-057 | Wichita Falls | 07/01/26 | $216,315.60 | Construction | Bridge | Construction | Bridge | 02/02/27 | -216 | -7 months | $11,982.60 | 6% | | | | 0249-01-058 | Wichita Falls | 07/01/26 | $166,226.60 | Construction | Bridge | Construction | Bridge | 02/02/27 | -216 | -7 months | $(23,121.40) | -12% | | | | 0249-01-059 | Wichita Falls | 07/01/26 | $341,741.20 | Construction | Bridge | Construction | Bridge | 02/02/27 | -216 | -7 months | $139,088.20 | 69% | | | | 0249-01-060 | Wichita Falls | 07/01/26 | $261,344.20 | Construction | Bridge | Construction | Bridge | 02/02/27 | -216 | -7 months | $(2,987.80) | -1% | | | | 0259-05-086 | Fort Worth | 07/01/26 | $568,444.50 | Construction | Roadway | Construction | Roadway | 02/02/27 | -216 | -7 months | $2,750.00 | 0% | | | | 0700-04-055 | Austin | 07/01/26 | $66,708.00 | Construction | Bridge | Construction | Bridge | 02/02/27 | -216 | -7 months | | | | | | 0700-04-057 | Austin | 07/01/26 | $68,543.50 | Construction | Bridge | Construction | Bridge | 02/02/27 | -216 | -7 months | | | | | | 0700-04-058 | Austin | 07/01/26 | $657,212.50 | Construction | Bridge | Construction | Bridge | 02/02/27 | -216 | -7 months | | | | | | 2024-01-009 | Corpus Christi | 01/01/29 | $886,012.00 | Construction | Roadway | Construction | Roadway | 08/01/29 | -212 | -7 months | | | | | | 0912-73-249 | Houston | 04/15/27 | $3,022,870.19 | Construction | Local Let | Construction | Local Let | 09/15/26 | 212 | 7 months | | | | | | 2370-01-009 | Odessa | 07/01/26 | $6,906,220.22 | Construction | Roadway | Construction | Roadway | 01/06/27 | -189 | -6 months | $(5,293,779.78) | -43% | | | | 3330-01-011 | Waco | 11/03/26 | $411,155.00 | Construction | Roadway | Construction | Roadway | 05/05/27 | -183 | -6 months | | | | | | 1068-01-242 | Fort Worth | 02/02/28 | $3,053,262.00 | Construction | Roadway | Construction | Roadway | 08/02/28 | -182 | -6 months | | | | | | 0002-14-048 | El Paso | 04/02/27 | $11,667,327.88 | Construction | Local Let | Construction | Local Let | 10/02/26 | 182 | 6 months | | | | | | 0915-12-691 | San Antonio | 03/03/27 | $250,000.00 | Construction | Rail - Safety | Construction | Rail - Safety | 09/02/26 | 182 | 6 months | | | | | | 3441-01-005 | Corpus Christi | 02/01/29 | $1,026,657.00 | Construction | Roadway | Construction | Roadway | 08/01/29 | -181 | -6 months | | | | | | 0363-03-060 | Fort Worth | 09/30/26 | $136,306,104.60 | Alternative Delivery | Design Build Finance Operate Maintain | Alternative Delivery | Design Build Finance Operate Maintain | 04/03/26 | 180 | 6 months | | | | | | 0259-05-083 | Fort Worth | 02/02/28 | $8,009,664.43 | Construction | Roadway | Unassigned | Unassigned | 09/01/27 | 154 | 5 months | | | Unassigned → Construction / Roadway | | | 0924-06-691 | El Paso | 05/01/27 | $3,716,750.00 | Construction | Local Let | Construction | Local Let | 10/02/27 | -154 | -5 months | | | | | | 1197-01-027 | Austin | 08/05/26 | $3,080,501.38 | Construction | Roadway | Construction | Roadway | 01/06/27 | -154 | -5 months | $(30,328.22) | -1% | | | | 0015-13-437 | Austin | 02/02/27 | $387,000,000.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | 153 | 5 months | | | | | | 0026-02-040 | Yoakum | 02/02/27 | $275,000.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | 153 | 5 months | | | | | | 0446-03-053 | Yoakum | 02/02/27 | $450,000.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | 153 | 5 months | | | | | | 0015-13-461 | Austin | 02/01/27 | $9,400,000.00 | Non-Let | Non Roadway | Non-Let | Non Roadway | 09/01/26 | 153 | 5 months | | | | | | 0013-10-098 | Fort Worth | 07/01/26 | $8,676,166.77 | Construction | Roadway | Construction | Roadway | 12/01/26 | -153 | -5 months | $260,080.06 | 3% | | | | 2452-03-128 | San Antonio | 07/01/26 | $180,125,212.86 | Construction | Roadway | Construction | Roadway | 12/01/26 | -153 | -5 months | $(10,189,109.14) | -5% | | | | 0338-02-045 | Houston | 09/06/28 | $822,392.23 | Construction | Roadway | Construction | Roadway | 02/01/29 | -148 | -5 months | | | | | | 0338-02-046 | Houston | 09/06/28 | $508,316.46 | Construction | Roadway | Construction | Roadway | 02/01/29 | -148 | -5 months | | | | | | 0338-03-102 | Houston | 09/06/28 | $313,461.82 | Construction | Roadway | Construction | Roadway | 02/01/29 | -148 | -5 months | | | | | | 0720-02-095 | Houston | 09/06/28 | $1,000,000.00 | Construction | Roadway | Construction | Roadway | 02/01/29 | -148 | -5 months | $(15,300,278.00) | -94% | | | | 1039-04-011 | Brownwood | 06/01/28 | $6,400,000.00 | Construction | Bridge | Construction | Bridge | 01/05/28 | 148 | 5 months | | | | | | 0389-05-134 | Houston | 01/06/27 | $4,892,062.00 | Construction | Non Roadway | Construction | Non Roadway | 09/02/26 | 126 | 4 months | | | | | | 0015-13-432 | Austin | 11/03/26 | $254,000,000.00 | Construction | Bridge | Construction | Bridge | 07/01/26 | 125 | 4 months | | | | | | 0015-13-441 | Austin | 11/03/26 | $85,000,000.00 | Construction | Roadway | Construction | Roadway | 07/01/26 | 125 | 4 months | | | | | | 0114-01-070 | Austin | 11/03/26 | $620,000.00 | Construction | Non Roadway | Construction | Non Roadway | 07/01/26 | 125 | 4 months | | | | | | 0114-01-071 | Austin | 11/03/26 | $4,200,000.00 | Construction | Non Roadway | Construction | Non Roadway | 07/01/26 | 125 | 4 months | | | | | | 0054-07-086 | Brownwood | 05/01/29 | $25,000,000.00 | Construction | Roadway | Construction | Roadway | 01/01/29 | 120 | 4 months | | | | | | 0015-13-452 | Austin | 02/02/27 | $40,384,615.38 | Construction | Roadway | Construction | Roadway | 10/06/26 | 119 | 4 months | | | | | | 0009-13-166 | Paris | 05/06/26 | $173,300,000.00 | Non-Let | Roadway | Non-Let | Roadway | 09/01/26 | -118 | -4 months | | | | | | 0471-05-051 | Austin | 12/05/28 | $518,770.79 | Construction | Roadway | Construction | Roadway | 04/01/29 | -117 | -4 months | | | | | | 0918-47-520 | Dallas | 04/17/26 | $30,000,000.00 | Non-Let | Roadway | Non-Let | Roadway | 08/02/26 | -107 | -4 months | | | | | | 0053-08-077 | Abilene | 07/01/26 | $857,598.00 | Construction | Roadway | Construction | Roadway | 10/06/26 | -97 | -3 months | $(130,426.00) | -13% | | | | 0053-09-082 | Abilene | 07/01/26 | $174,438.00 | Construction | Roadway | Construction | Roadway | 10/06/26 | -97 | -3 months | $(85,068.00) | -33% | | | | 0068-01-073 | Lubbock | 07/01/26 | $138,352,841.20 | Construction | Roadway | Construction | Roadway | 10/06/26 | -97 | -3 months | $2,504,958.20 | 2% | | | | 1502-01-031 | Lubbock | 07/01/26 | $166,952,606.35 | Construction | Roadway | Construction | Roadway | 10/06/26 | -97 | -3 months | $2,085,314.75 | 1% | | | | 0693-03-046 | Abilene | 11/02/27 | $13,700,000.00 | Construction | Roadway | Construction | Roadway | 02/02/28 | -92 | -3 months | | | | | | 0172-12-007 | Dallas | 05/05/27 | $51,472,754.02 | Construction | Roadway | Construction | Roadway | 02/02/27 | 92 | 3 months | | | | | | 1012-03-027 | Dallas | 12/01/26 | $8,673,294.25 | Construction | Roadway | Construction | Roadway | 03/03/27 | -92 | -3 months | $(433,664.71) | -5% | | | | 1012-03-028 | Dallas | 12/01/26 | $6,373,822.30 | Construction | Roadway | Construction | Roadway | 03/03/27 | -92 | -3 months | $(318,691.12) | -5% | | | | 1492-01-013 | Dallas | 12/01/26 | $1,331,491.45 | Construction | Roadway | Construction | Roadway | 03/03/27 | -92 | -3 months | $(66,574.57) | -5% | | | | 0251-03-022 | Waco | 08/02/28 | $11,407,407.41 | Construction | Roadway | Construction | Roadway | 05/03/28 | 91 | 3 months | | | | | | 0251-04-023 | Brownwood | 08/02/28 | $111,585,185.19 | Construction | Roadway | Construction | Roadway | 05/03/28 | 91 | 3 months | | | | | | 0251-05-066 | Brownwood | 08/02/28 | $15,000,000.00 | Construction | Roadway | Construction | Roadway | 05/03/28 | 91 | 3 months | | | | | | 0978-02-090 | Houston | 04/05/28 | $180,015.00 | Construction | Roadway | Construction | Roadway | 01/05/28 | 91 | 3 months | | | | | | 0143-02-032 | San Antonio | 12/01/27 | $1,431,302.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 91 | 3 months | | | | | | 0643-01-057 | Bryan | 02/02/27 | $22,973,558.00 | Construction | Roadway | Construction | Roadway | 11/03/26 | 91 | 3 months | | | | | | 2635-05-005 | Amarillo | 08/05/26 | $47,259,223.32 | Construction | Roadway | Construction | Roadway | 11/03/26 | -90 | -3 months | | | | | | 0024-06-078 | San Antonio | 04/06/27 | $950,000.00 | Construction | Roadway | Construction | Roadway | 07/01/27 | -86 | -3 months | | | | | | 0923-09-070 | Brownwood | 08/04/27 | $900,000.00 | Construction | Bridge | Construction | Bridge | 06/01/27 | 64 | 2 months | | | | | | 0923-17-094 | Brownwood | 08/04/27 | $1,100,000.00 | Construction | Bridge | Construction | Bridge | 06/01/27 | 64 | 2 months | | | | | | 1756-01-024 | Yoakum | 08/05/26 | $935,446.45 | Construction | Roadway | Construction | Roadway | 06/02/26 | 64 | 2 months | | | | | | 0915-12-827 | San Antonio | 05/05/27 | $654,893.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | 63 | 2 months | | | | | | 0915-12-828 | San Antonio | 05/05/27 | $362,736.00 | Construction | Roadway | Construction | Roadway | 03/03/27 | 63 | 2 months | | | | | | 0358-03-041 | El Paso | 04/06/27 | $690,056.73 | Construction | Roadway | Construction | Roadway | 02/02/27 | 63 | 2 months | | | | | | 0358-04-020 | El Paso | 04/06/27 | $101,021.15 | Construction | Roadway | Construction | Roadway | 02/02/27 | 63 | 2 months | | | | | | 0415-03-026 | El Paso | 04/06/27 | $58,509.62 | Construction | Roadway | Construction | Roadway | 02/02/27 | 63 | 2 months | | | | | | 0415-04-016 | El Paso | 04/06/27 | $39,006.73 | Construction | Roadway | Construction | Roadway | 02/02/27 | 63 | 2 months | | | | | | 0485-01-027 | El Paso | 04/06/27 | $158,944.23 | Construction | Roadway | Construction | Roadway | 02/02/27 | 63 | 2 months | | | | | | 0485-02-019 | El Paso | 04/06/27 | $105,963.46 | Construction | Roadway | Construction | Roadway | 02/02/27 | 63 | 2 months | | | | | | 0471-04-038 | Austin | 12/05/28 | $833,399.88 | Construction | Roadway | Construction | Roadway | 10/04/28 | 62 | 2 months | | | | | | 0807-03-041 | Yoakum | 11/02/27 | $479,241.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 62 | 2 months | | | | | | 0132-03-036 | Childress | 08/05/26 | $13,520,000.00 | Construction | Roadway | Construction | Roadway | 10/06/26 | -62 | -2 months | | | | | | 0133-01-055 | Childress | 08/05/26 | $14,000,000.00 | Construction | Roadway | Construction | Roadway | 10/06/26 | -62 | -2 months | | | | | | 0783-01-111 | Lubbock | 11/01/28 | $10,000,000.00 | Construction | Bridge | Construction | Bridge | 01/01/29 | -61 | -2 months | | | | | | 0915-12-802 | San Antonio | 11/01/26 | $10,874,765.00 | Construction | Local Let | Construction | Local Let | 09/01/26 | 61 | 2 months | | | | | | 0039-02-081 | Pharr | 02/01/29 | $1,871,711.00 | Construction | Roadway | Construction | Roadway | 04/01/29 | -59 | -2 months | | | | | | 0052-07-067 | Lubbock | 12/01/27 | $590,724.69 | Construction | Roadway | Construction | Roadway | 10/05/27 | 57 | 2 months | | | | | | 3510-05-062 | Houston | 07/01/27 | $46,000,000.00 | Construction | Roadway | Construction | Roadway | 05/05/27 | 57 | 2 months | | | | | | 0976-03-120 | Houston | 10/06/26 | $484,617.00 | Construction | Roadway | Construction | Roadway | 12/01/26 | -56 | -2 months | | | | | | 0981-01-122 | Houston | 10/06/26 | $1,235,700.00 | Construction | Roadway | Construction | Roadway | 12/01/26 | -56 | -2 months | | | | | | 0981-02-012 | Houston | 10/06/26 | $678,042.00 | Construction | Roadway | Construction | Roadway | 12/01/26 | -56 | -2 months | | | | | | 1414-01-024 | Houston | 10/06/26 | $61,492.00 | Construction | Roadway | Construction | Roadway | 12/01/26 | -56 | -2 months | | | | | | 2941-02-070 | Houston | 12/01/27 | $51,875.00 | Construction | Roadway | Construction | Roadway | 01/05/28 | -35 | -1 month | | | | | | 0079-02-059 | Brownwood | 10/06/26 | $240,000.00 | Non-Let | Local | Non-Let | Local | 09/01/26 | 35 | 1 month | | | | | | 0508-02-140 | Beaumont | 07/01/26 | $3,459,416.41 | Construction | Roadway | Construction | Roadway | 08/05/26 | -35 | -1 month | $(373,835.98) | -10% | | | | 1421-01-027 | Beaumont | 07/01/26 | $1,853,387.00 | Construction | Roadway | Construction | Roadway | 08/05/26 | -35 | -1 month | $(29,957.00) | -2% | | | | 1421-01-028 | Beaumont | 07/01/26 | $5,038,939.85 | Construction | Roadway | Construction | Roadway | 08/05/26 | -35 | -1 month | $(488,234.65) | -9% | | | | 0912-37-259 | Houston | 10/15/26 | $13,200,000.00 | Construction | Local Let | Construction | Local Let | 09/15/26 | 30 | 30 days | | | | | | 0022-08-027 | Laredo | 02/01/29 | $5,729,476.20 | Construction | Roadway | Construction | Roadway | 03/01/29 | -28 | -28 days | $(1,544,308.42) | -21% | | | | 0161-03-027 | Laredo | 02/01/29 | $2,562,041.70 | Construction | Roadway | Construction | Roadway | 03/01/29 | -28 | -28 days | $(372,615.15) | -13% | | | | 1592-01-017 | Laredo | 02/01/29 | $925,485.75 | Construction | Roadway | Construction | Roadway | 03/01/29 | -28 | -28 days | $(266,142.87) | -22% | | | | 0028-01-109 | Houston | 08/05/26 | $271,016.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -28 | -28 days | | | | | | 0050-05-071 | Houston | 08/05/26 | $1,144,025.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -28 | -28 days | | | | | | 0050-06-106 | Houston | 08/05/26 | $589,346.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -28 | -28 days | | | | | | 0320-05-018 | Waco | 08/05/26 | $764,436.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -28 | -28 days | | | | | | 0720-02-105 | Houston | 08/05/26 | $153,356.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -28 | -28 days | | | | | | 0909-00-074 | Waco | 08/05/26 | $1,267,977.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -28 | -28 days | | | | | | 1812-01-024 | Houston | 08/05/26 | $1,069,424.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -28 | -28 days | | | | | | 3538-01-063 | Houston | 08/05/26 | $128,855.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -28 | -28 days | | | | | | 3538-01-064 | Houston | 08/05/26 | $67,491.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -28 | -28 days | | | | | | 0348-04-052 | Corpus Christi | 01/01/29 | $3,500,000.00 | Construction | Roadway | Construction | Roadway | 12/05/28 | 27 | 27 days | | | | | | 0348-04-053 | Corpus Christi | 01/01/29 | $9,500,000.00 | Construction | Roadway | Construction | Roadway | 12/05/28 | 27 | 27 days | | | | | | 0912-00-750 | Houston | 08/15/28 | $500,000.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 08/01/28 | 14 | 14 days | | | | | | 0912-00-751 | Houston | 08/15/28 | $600,000.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 08/01/28 | 14 | 14 days | | | | | | 0502-01-252 | Houston | 10/15/26 | $600,000.00 | Non-Let | Rail - Safety | Construction | Rail - Safety | 10/06/26 | 9 | 9 days | | | Construction / Rail - Safety → Non-Let / Rail - Safety | | --- ## Project Type & Subtype Changes The subtype mix within the pipeline remained mostly stable, with roadway projects constituting 75.4% of the total on May 4, 2026, up slightly from 75.3% on April 3. Notable transitions included 46 projects undergoing type or subtype changes. A primary transition observed was from unclassified to construction/roadway for 37 projects, indicating some stabilization in project classifications. | Subtype | Apr 3 | May 4 | Δ (pp, n) | | --- | --- | --- | --- | | Roadway | 75.3% (4,284) | 75.4% (4,392) | +0.1 (+108) | | Bridge | 15.9% (905) | 15.5% (901) | -0.4 (-4) | | Local Let | 3.4% (195) | 3.4% (197) | -0.0 (+2) | | Non Roadway | 2.0% (112) | 2.0% (119) | +0.1 (+7) | | Rail - Safety | 1.4% (78) | 1.3% (78) | -0.0 (+0) | | CSJ | District | Est. Letting Date | Project Estimate | Current Type | Current Subtype | Type/Subtype Δ | Prev. Type | Prev. Subtype | Prev. Cost | Prev. Date | Letting Δ (days) | Letting Date Δ | Cost Δ | %Cost Δ | Lifecycle | | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | | 6501-30-001 | Bryan | 06/09/26 | $900,000.00 | Maintenance | Routine Maintenance Contract | Unassigned → Maintenance / Routine Maintenance Contract | Unassigned | Unassigned | $900,000.00 | 06/09/26 | 0 | | | | | | 0364-05-043 | Fort Worth | 08/05/26 | $1,221,633.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $1,221,633.00 | 08/05/26 | 0 | | | | | | 0228-06-098 | Odessa | 09/02/26 | $691,209.02 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $691,209.02 | 09/02/26 | 0 | | | | | | 0014-23-042 | Waco | 10/06/26 | $6,000,000.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $10,000,000.00 | 02/01/30 | -1214 | -3 years | $(4,000,000.00) | -40% | | | 0502-01-252 | Houston | 10/15/26 | $600,000.00 | Non-Let | Rail - Safety | Construction / Rail - Safety → Non-Let / Rail - Safety | Construction | Rail - Safety | $600,000.00 | 10/06/26 | 9 | 9 days | | | | | 0007-06-269 | Brownwood | 11/03/26 | $131,061.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $131,061.00 | 11/01/30 | -1459 | -4 years | | | | | 0007-06-272 | Brownwood | 11/03/26 | $131,061.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $131,061.00 | 11/01/30 | -1459 | -4 years | | | | | 0271-06-141 | Houston | 11/03/26 | $1,300,000.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $1,300,000.00 | 11/03/26 | 0 | | | | | | 0271-07-359 | Houston | 11/03/26 | $1,300,000.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $1,300,000.00 | 11/03/26 | 0 | | | | | | 1007-02-020 | Yoakum | 11/03/26 | $662,000.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $662,000.00 | 11/03/26 | 0 | | | | | | 1685-05-144 | Houston | 11/03/26 | $400,000.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $400,000.00 | 11/03/26 | 0 | | | | | | 1861-01-014 | Amarillo | 11/03/26 | $23,000.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $23,000.00 | 11/03/26 | 0 | | | | | | 3128-01-015 | Waco | 04/01/27 | $992,012.50 | Non-Let | Roadway | Unassigned → Non-Let / Roadway | Unassigned | Unassigned | $992,012.50 | 04/01/27 | 0 | | | | | | 0027-10-082 | Houston | 05/05/27 | $1,429,810.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $1,429,810.00 | 12/01/29 | -941 | -3 years | | | | | 0176-05-205 | Lufkin | 05/05/27 | $32,000,000.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $1.00 | 05/05/27 | 0 | | $31,999,999.00 | 3199999900% | | | 0904-11-071 | Amarillo | 05/05/27 | $6,100,000.00 | Construction | Bridge | Unassigned → Construction / Bridge | Unassigned | Unassigned | $6,100,000.00 | 05/05/27 | 0 | | | | | | 1092-01-026 | Dallas | 05/05/27 | $12,239,522.17 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $12,239,522.17 | 08/01/35 | -3010 | -8 years | | | | | 2399-01-088 | Bryan | 05/05/27 | $14,661.00 | Construction | Local Let | Unassigned → Construction / Local Let | Unassigned | Unassigned | $14,661.00 | 05/05/27 | 0 | | | | | | 0013-08-147 | Fort Worth | 06/01/27 | $54,615,384.64 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $47,581,373.76 | 01/01/30 | -945 | -3 years | $7,034,010.88 | 15% | | | 0014-15-087 | Fort Worth | 06/01/27 | $20,384,615.38 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $14,558,233.80 | 01/01/30 | -945 | -3 years | $5,826,381.58 | 40% | | | 3510-07-022 | Houston | 07/01/27 | $7,574,519.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $7,574,519.00 | 07/01/27 | 0 | | | | | | 0245-05-054 | Tyler | 08/04/27 | $1,600,000.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $1,600,000.00 | 08/04/27 | 0 | | | | | | 0245-19-031 | Tyler | 08/04/27 | $470,000.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $470,000.00 | 08/04/27 | 0 | | | | | | 0521-05-144 | San Antonio | 09/01/27 | $589,100,000.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $589,100,000.00 | 09/01/32 | -1827 | -5 years | | | | | 6487-61-001 | Houston | 09/02/27 | $1,000,000.00 | Maintenance | Routine Maintenance Contract | Unassigned → Maintenance / Routine Maintenance Contract | Unassigned | Unassigned | $1,000,000.00 | 08/01/26 | 397 | 1 year | | | | | 0912-00-704 | Houston | 09/15/27 | $1,000,000.00 | Construction | Local Let | Construction / Rail - Safety → Construction / Local Let | Construction | Rail - Safety | $1,000,000.00 | 09/02/26 | 378 | 1 year | | | | | 0007-03-099 | Brownwood | 11/02/27 | $587,822.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $587,822.00 | 11/01/34 | -2556 | -7 years | | | | | 0007-03-100 | Brownwood | 11/02/27 | $590,391.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $590,391.00 | 11/01/34 | -2556 | -7 years | | | | | 0109-08-052 | Lufkin | 11/02/27 | $1,126,844.19 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $1,126,844.19 | 11/01/29 | -730 | -2 years | | | | | 0248-03-024 | Atlanta | 11/02/27 | $13,405,864.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $13,160,923.50 | 11/02/27 | 0 | | $244,940.50 | 2% | | | 0259-05-083 | Fort Worth | 02/02/28 | $8,009,664.43 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $8,009,664.43 | 09/01/27 | 154 | 5 months | | | | | 2170-05-018 | Laredo | 02/02/28 | $2,000,000.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $400,000.00 | 11/01/33 | -2099 | -6 years | $1,600,000.00 | 400% | | | 2270-01-030 | Abilene | 05/03/28 | $1,666,666.67 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $2,232,143.00 | 05/01/32 | -1459 | -4 years | $(565,476.33) | -25% | | | 0520-05-054 | Atlanta | 08/02/28 | $3,500,000.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $17,500,000.00 | 01/01/35 | -2343 | -6 years | $(14,000,000.00) | -80% | | | 0891-01-017 | Tyler | 08/02/28 | $1,586,530.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $1,586,530.00 | 08/02/28 | 0 | | | | | | 0273-04-051 | Austin | 09/02/28 | $557,981.88 | Construction | Local Let | Unassigned → Construction / Local Let | Unassigned | Unassigned | $557,981.88 | 09/02/28 | 0 | | | | | | 0143-14-006 | San Antonio | 09/06/28 | $6,540,250.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $6,540,250.00 | 01/01/35 | -2308 | -6 years | | | | | 0912-72-812 | Houston | 09/15/28 | $500,000.00 | Non-Let | Rail | Construction / Rail - Safety → Non-Let / Rail | Construction | Rail - Safety | $500,000.00 | 12/01/26 | 654 | 2 years | | | | | 2664-01-007 | Lufkin | 10/04/28 | $4,882,572.05 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $4,882,572.05 | 09/01/45 | -6176 | -17 years | | | | | 0054-04-119 | Brownwood | 11/01/28 | $454,880.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $454,880.00 | 11/01/32 | -1461 | -4 years | | | | | 0070-06-053 | Brownwood | 11/01/28 | $263,697.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $263,697.00 | 11/01/32 | -1461 | -4 years | | | | | 0109-07-056 | Lufkin | 11/01/28 | $1,496,424.29 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $1,496,424.29 | 11/01/29 | -365 | -1 year | | | | | 0003-03-055 | El Paso | 01/01/29 | $12,708,817.86 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $12,708,817.86 | 01/01/29 | 0 | | | | | | 0192-04-110 | Houston | 01/01/29 | $19,417,883.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $19,417,883.00 | 01/01/30 | -365 | -1 year | | | | | 0068-02-050 | Lubbock | 02/01/29 | $1,371,261.60 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $1,371,261.60 | 02/01/30 | -365 | -1 year | | | | | 0843-06-020 | Atlanta | 02/01/29 | $3,751,667.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $3,751,667.00 | 01/01/32 | -1064 | -3 years | | | | --- ## Cost Changes The total pipeline value increased by $163.98 million to $6.71 billion. Cost changes observed include 256 projects with cost movements of 10% or more, 109 project costs increased while 147 decreased. Notably, construction projects saw a price increase of $121.78 million, highlighting areas of repricing within existing projects rather than a complete overhaul of the pipeline. | CSJ | District | Est. Letting Date | Project Estimate | Current Type | Current Subtype | Prev. Type | Prev. Subtype | Prev. Cost | Cost Δ | %Cost Δ | Letting Δ (days) | Letting Date Δ | Type/Subtype Δ | Lifecycle | | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | | 0176-05-205 | Lufkin | 05/05/27 | $32,000,000.00 | Construction | Roadway | Unassigned | Unassigned | $1.00 | $31,999,999.00 | 3199999900% | 0 | | Unassigned → Construction / Roadway | | | 0057-03-052 | Bryan | 07/01/26 | $207,229.26 | Construction | Roadway | Construction | Roadway | $9,900.00 | $197,329.26 | 1993% | 0 | | | | | 2552-01-062 | El Paso | 11/02/27 | $11,971,606.48 | Construction | Roadway | Construction | Roadway | $961,538.46 | $11,010,068.02 | 1145% | 0 | | | | | 0276-09-011 | Laredo | 03/01/29 | $1,921,342.50 | Construction | Roadway | Construction | Roadway | $206,526.60 | $1,714,815.90 | 830% | 0 | | | | | 0815-03-016 | Dallas | 10/01/30 | $605,163.96 | | | Construction | Roadway | $68,850.00 | $536,313.96 | 779% | 727 | 2 years | | | | 1316-01-068 | Bryan | 08/04/27 | $11,000,000.00 | Construction | Roadway | Construction | Roadway | $1,500,000.00 | $9,500,000.00 | 633% | 0 | | | | | 0918-47-525 | Dallas | 08/02/27 | $8,000,000.00 | Construction | Roadway | Construction | Roadway | $1,111,111.11 | $6,888,888.89 | 620% | 0 | | | | | 2170-05-018 | Laredo | 02/02/28 | $2,000,000.00 | Construction | Roadway | Unassigned | Unassigned | $400,000.00 | $1,600,000.00 | 400% | -2099 | -6 years | Unassigned → Construction / Roadway | | | 0117-01-062 | Bryan | 07/01/26 | $266,997.40 | Construction | Roadway | Construction | Roadway | $77,350.00 | $189,647.40 | 245% | 0 | | | | | 0683-07-013 | Austin | 01/06/27 | $8,173,076.92 | Construction | Roadway | Construction | Roadway | $2,482,355.77 | $5,690,721.15 | 229% | 0 | | | | | 0081-16-004 | Paris | 07/01/26 | $272,653.65 | Construction | Non Roadway | Construction | Non Roadway | $90,000.00 | $182,653.65 | 203% | 0 | | | | | 1229-02-019 | Laredo | 06/01/28 | $3,000,000.00 | Construction | Roadway | Construction | Roadway | $1,000,000.00 | $2,000,000.00 | 200% | 0 | | | | | 1895-03-027 | Atlanta | 05/03/28 | $5,690,799.64 | Construction | Roadway | Construction | Roadway | $1,967,575.00 | $3,723,224.64 | 189% | 0 | | | | | 0508-01-409 | Houston | 04/06/27 | $7,000,000.00 | Construction | Roadway | Construction | Roadway | $2,497,189.00 | $4,502,811.00 | 180% | 0 | | | | | 0081-10-057 | Paris | 07/01/26 | $287,785.64 | Construction | Non Roadway | Construction | Non Roadway | $110,000.00 | $177,785.64 | 162% | 0 | | | | | 0440-05-016 | Austin | 06/01/27 | $38,461,538.46 | Construction | Roadway | Construction | Roadway | $15,120,913.46 | $23,340,625.00 | 154% | 0 | | | | | 1148-02-021 | Bryan | 07/01/26 | $328,623.76 | Construction | Roadway | Construction | Roadway | $130,514.00 | $198,109.76 | 152% | 0 | | | | | 0186-03-073 | Bryan | 07/01/26 | $110,385.01 | Construction | Roadway | Construction | Roadway | $43,920.00 | $66,465.01 | 151% | 0 | | | | | 0413-05-039 | Bryan | 07/01/26 | $525,448.20 | Construction | Roadway | Construction | Roadway | $209,369.00 | $316,079.20 | 151% | 0 | | | | | 0907-00-239 | San Angelo | 08/05/26 | $497,748.40 | Construction | Roadway | Construction | Roadway | $199,305.00 | $298,443.40 | 150% | 0 | | | | | 0677-02-017 | Abilene | 12/01/26 | $295,967.00 | Construction | Roadway | Construction | Roadway | $120,071.00 | $175,896.00 | 146% | 0 | | | | | 1971-01-017 | Bryan | 07/01/26 | $272,226.93 | Construction | Roadway | Construction | Roadway | $113,474.00 | $158,752.93 | 140% | 0 | | | | | 0262-06-036 | Bryan | 07/01/26 | $535,183.90 | Construction | Roadway | Construction | Roadway | $230,595.00 | $304,588.90 | 132% | 0 | | | | | 3455-01-011 | Abilene | 12/01/26 | $447,277.00 | Construction | Roadway | Construction | Roadway | $208,736.00 | $238,541.00 | 114% | 0 | | | | | 0683-06-035 | Austin | 01/06/27 | $6,346,153.85 | Construction | Roadway | Construction | Roadway | $3,033,990.38 | $3,312,163.47 | 109% | 0 | | | | | 1210-02-016 | Bryan | 07/01/26 | $740,760.00 | Construction | Bridge | Construction | Bridge | $354,261.00 | $386,499.00 | 109% | 0 | | | | | 0117-09-006 | Bryan | 07/01/26 | $26,530.90 | Construction | Roadway | Construction | Roadway | $12,980.00 | $13,550.90 | 104% | 0 | | | | | 0022-03-032 | Odessa | 11/03/26 | $1,065,488.54 | Construction | Bridge | Construction | Bridge | $530,410.80 | $535,077.74 | 101% | 0 | | | | | 1556-01-032 | Corpus Christi | 11/02/27 | $8,000,000.00 | Construction | Roadway | Construction | Roadway | $4,000,000.00 | $4,000,000.00 | 100% | 244 | 8 months | | | | 0912-37-265 | Houston | 05/15/26 | $1.00 | Construction | Local Let | Construction | Local Let | $9,413,000.00 | $(9,412,999.00) | -100% | 0 | | | | | 0005-08-107 | Abilene | 12/01/26 | $1,058,935.00 | Construction | Roadway | Construction | Roadway | $535,593.00 | $523,342.00 | 98% | 0 | | | | | 1003-01-098 | Houston | 09/01/31 | $1,088,146.00 | | | Construction | Roadway | $24,146,123.00 | $(23,057,977.00) | -95% | 1090 | 3 years | | | | 0720-02-095 | Houston | 09/06/28 | $1,000,000.00 | Construction | Roadway | Construction | Roadway | $16,300,278.00 | $(15,300,278.00) | -94% | -148 | -5 months | | | | 0091-06-061 | Dallas | 07/01/26 | $5,190,264.90 | Construction | Roadway | Construction | Roadway | $2,734,376.72 | $2,455,888.18 | 90% | 0 | | | | | 1555-01-009 | Corpus Christi | 07/01/26 | $15,605.17 | Construction | Roadway | Construction | Roadway | $139,502.00 | $(123,896.83) | -89% | 0 | | | | | 0005-06-124 | Abilene | 12/01/26 | $1,624,233.00 | Construction | Roadway | Construction | Roadway | $864,449.00 | $759,784.00 | 88% | 0 | | | | | 3116-01-033 | Corpus Christi | 07/01/26 | $25,616.10 | Construction | Roadway | Construction | Roadway | $151,985.00 | $(126,368.90) | -83% | 0 | | | | | 0907-00-240 | San Angelo | 08/05/26 | $49,251.00 | Construction | Roadway | Construction | Roadway | $273,105.00 | $(223,854.00) | -82% | 0 | | | | | 0092-05-058 | Dallas | 10/06/26 | $4,553,198.71 | Construction | Roadway | Construction | Roadway | $25,202,541.30 | $(20,649,342.59) | -82% | 0 | | | | | 0520-05-054 | Atlanta | 08/02/28 | $3,500,000.00 | Construction | Roadway | Unassigned | Unassigned | $17,500,000.00 | $(14,000,000.00) | -80% | -2343 | -6 years | Unassigned → Construction / Roadway | | | 0675-02-101 | Bryan | 07/01/26 | $1,074.76 | Construction | Roadway | Construction | Roadway | $5,190.00 | $(4,115.24) | -79% | 0 | | | | | 0114-02-112 | Austin | 08/05/26 | $615,753.25 | Construction | Roadway | Construction | Roadway | $2,735,940.00 | $(2,120,186.75) | -77% | 0 | | | | | 1115-01-010 | Corpus Christi | 07/01/26 | $132,013.59 | Construction | Roadway | Construction | Roadway | $583,647.00 | $(451,633.41) | -77% | 0 | | | | | 0296-06-016 | Abilene | 12/01/26 | $128,965.00 | Construction | Roadway | Construction | Roadway | $72,764.00 | $56,201.00 | 77% | 0 | | | | | 0921-26-113 | Pharr | 09/03/27 | $4,200,000.00 | Construction | Local Let | Construction | Local Let | $18,000,000.00 | $(13,800,000.00) | -77% | 0 | | | | | 1294-02-022 | Corpus Christi | 07/01/26 | $173,642.98 | Construction | Roadway | Construction | Roadway | $723,570.00 | $(549,927.02) | -76% | 0 | | | | | 0140-05-029 | Odessa | 11/03/26 | $127,785.00 | Construction | Bridge | Construction | Bridge | $522,571.68 | $(394,786.68) | -76% | 0 | | | | | 0332-02-028 | Abilene | 12/01/26 | $123,275.00 | Construction | Roadway | Construction | Roadway | $70,662.00 | $52,613.00 | 74% | 0 | | | | | 0367-02-084 | Houston | 09/01/31 | $500,000.00 | | | Construction | Roadway | $1,906,590.00 | $(1,406,590.00) | -74% | 1273 | 3 years | | | | 3089-01-013 | Dallas | 07/01/26 | $726,590.00 | Construction | Roadway | Construction | Roadway | $419,957.48 | $306,632.52 | 73% | 0 | | | | | 0371-05-022 | Corpus Christi | 07/01/26 | $88,823.89 | Construction | Roadway | Construction | Roadway | $314,636.00 | $(225,812.11) | -72% | 0 | | | | | 0058-04-023 | Tyler | 12/01/26 | $582,678.84 | Construction | Roadway | Construction | Roadway | $341,403.96 | $241,274.88 | 71% | 0 | | | | | 0140-01-083 | Odessa | 11/03/26 | $159,563.00 | Construction | Bridge | Construction | Bridge | $536,429.33 | $(376,866.33) | -70% | 0 | | | | | 0249-01-059 | Wichita Falls | 07/01/26 | $341,741.20 | Construction | Bridge | Construction | Bridge | $202,653.00 | $139,088.20 | 69% | -216 | -7 months | | | | 1446-01-016 | Corpus Christi | 07/01/26 | $41,470.22 | Construction | Roadway | Construction | Roadway | $130,740.00 | $(89,269.78) | -68% | 0 | | | | | 0791-01-021 | Amarillo | 11/02/27 | $450,730.00 | Construction | Roadway | Construction | Roadway | $1,363,000.00 | $(912,270.00) | -67% | 0 | | | | | 0271-14-244 | Houston | 02/02/28 | $1,000,000.00 | Construction | Roadway | Construction | Roadway | $3,000,000.00 | $(2,000,000.00) | -67% | 0 | | | | | 2942-02-019 | Corpus Christi | 07/01/26 | $100,233.75 | Construction | Roadway | Construction | Roadway | $285,222.00 | $(184,988.25) | -65% | 0 | | | | | 0204-05-046 | Bryan | 07/01/26 | $103,360.42 | Construction | Roadway | Construction | Roadway | $64,590.00 | $38,770.42 | 60% | 0 | | | | | 0677-01-024 | Abilene | 12/01/26 | $429,303.00 | Construction | Roadway | Construction | Roadway | $271,073.00 | $158,230.00 | 58% | 0 | | | | | 0140-04-049 | Odessa | 11/03/26 | $230,220.00 | Construction | Bridge | Construction | Bridge | $539,414.40 | $(309,194.40) | -57% | 0 | | | | | 0521-06-175 | San Antonio | 08/05/26 | $2,670,328.38 | Construction | Roadway | Construction | Roadway | $6,184,458.00 | $(3,514,129.62) | -57% | 0 | | | | | 1809-01-023 | Bryan | 07/01/26 | $862.92 | Construction | Roadway | Construction | Roadway | $1,990.00 | $(1,127.08) | -57% | 0 | | | | | 1147-01-034 | Bryan | 07/01/26 | $80,027.00 | Construction | Roadway | Construction | Roadway | $51,110.00 | $28,917.00 | 57% | 0 | | | | | 0915-12-829 | San Antonio | 09/06/28 | $2,435,670.00 | Construction | Roadway | Construction | Roadway | $1,566,606.00 | $869,064.00 | 55% | 0 | | | | | 0980-02-020 | Houston | 09/01/27 | $10,000,000.00 | Construction | Roadway | Construction | Roadway | $21,668,136.00 | $(11,668,136.00) | -54% | 0 | | | | | 0166-05-009 | Bryan | 07/01/26 | $2,881.00 | Construction | Roadway | Construction | Roadway | $6,160.00 | $(3,279.00) | -53% | 0 | | | | | 0520-09-057 | Tyler | 07/01/26 | $84,542.50 | Construction | Roadway | Construction | Roadway | $180,000.00 | $(95,457.50) | -53% | 0 | | | | | 0047-03-106 | Paris | 08/05/26 | $1,164,466.93 | Construction | Roadway | Construction | Roadway | $2,463,364.40 | $(1,298,897.47) | -53% | 0 | | | | | 1392-03-017 | Dallas | 07/01/26 | $3,043,980.80 | Construction | Roadway | Construction | Roadway | $2,006,803.41 | $1,037,177.39 | 52% | 0 | | | | | 0161-01-033 | Laredo | 02/01/29 | $1,438,067.40 | Construction | Roadway | Construction | Roadway | $2,934,646.85 | $(1,496,579.45) | -51% | 331 | 11 months | | | | 0598-03-062 | Houston | 02/02/27 | $4,600,000.00 | Construction | Roadway | Construction | Roadway | $9,268,723.98 | $(4,668,723.98) | -50% | 0 | | | | | 0315-10-013 | Bryan | 07/01/26 | $777.00 | Construction | Roadway | Construction | Roadway | $1,560.00 | $(783.00) | -50% | 0 | | | | | 0254-01-149 | Corpus Christi | 07/01/27 | $15,000,000.00 | Construction | Roadway | Construction | Roadway | $10,000,000.00 | $5,000,000.00 | 50% | 0 | | | | | 0598-04-030 | Houston | 02/02/27 | $4,200,000.00 | Construction | Roadway | Construction | Roadway | $8,370,328.77 | $(4,170,328.77) | -50% | 0 | | | | | 0921-06-330 | Pharr | 09/03/27 | $25,435,821.86 | Construction | Local Let | Construction | Local Let | $17,023,422.00 | $8,412,399.86 | 49% | 0 | | | | | 0047-04-041 | Dallas | 06/01/27 | $1,749,097.74 | Construction | Roadway | Construction | Roadway | $1,178,505.94 | $570,591.80 | 48% | 0 | | | | | 0205-01-052 | Bryan | 07/01/26 | $167,380.00 | Construction | Bridge | Construction | Bridge | $112,900.00 | $54,480.00 | 48% | 0 | | | | | 0517-02-046 | San Antonio | 09/01/27 | $6,501,914.80 | Construction | Bridge | Construction | Bridge | $12,500,000.00 | $(5,998,085.20) | -48% | 0 | | | | | 1223-03-015 | Bryan | 07/01/26 | $34,452.05 | Construction | Roadway | Construction | Roadway | $65,230.00 | $(30,777.95) | -47% | 0 | | | | | 1062-03-055 | Houston | 01/05/28 | $7,000,000.00 | Construction | Roadway | Construction | Roadway | $13,000,000.00 | $(6,000,000.00) | -46% | 0 | | | | | 0172-09-047 | Fort Worth | 09/02/26 | $4,029,170.17 | Construction | Roadway | Construction | Roadway | $7,466,647.62 | $(3,437,477.45) | -46% | 0 | | | | | 0587-01-070 | Houston | 07/06/28 | $4,391,550.00 | Construction | Non Roadway | Construction | Non Roadway | $8,058,425.93 | $(3,666,875.93) | -46% | 0 | | | | | 1558-03-114 | Corpus Christi | 12/05/28 | $18,000,000.00 | Construction | Roadway | Construction | Roadway | $12,400,000.00 | $5,600,000.00 | 45% | 335 | 11 months | | | | 0107-02-041 | Abilene | 12/01/26 | $860,160.00 | Construction | Roadway | Construction | Roadway | $593,609.00 | $266,551.00 | 45% | 0 | | | | | 0441-07-079 | Odessa | 11/03/26 | $848,068.00 | Construction | Bridge | Construction | Bridge | $588,806.40 | $259,261.60 | 44% | 0 | | | | | 2370-01-009 | Odessa | 07/01/26 | $6,906,220.22 | Construction | Roadway | Construction | Roadway | $12,200,000.00 | $(5,293,779.78) | -43% | -189 | -6 months | | | | 0668-03-010 | Abilene | 12/01/26 | $195,558.00 | Construction | Roadway | Construction | Roadway | $136,591.00 | $58,967.00 | 43% | 0 | | | | | 0263-05-025 | Abilene | 12/01/26 | $1,173,898.00 | Construction | Roadway | Construction | Roadway | $820,585.00 | $353,313.00 | 43% | 0 | | | | | 0074-04-049 | Corpus Christi | 01/01/30 | $3,000,000.00 | | | Construction | Roadway | $2,100,000.00 | $900,000.00 | 43% | 727 | 2 years | | | | 0919-02-043 | Atlanta | 07/01/26 | $51,552.00 | Construction | Roadway | Construction | Roadway | $90,000.00 | $(38,448.00) | -43% | 0 | | | | | 2170-05-017 | Laredo | 08/04/27 | $10,000,000.00 | Construction | Roadway | Construction | Roadway | $17,247,810.98 | $(7,247,810.98) | -42% | 0 | | | | | 1194-02-020 | Beaumont | 07/01/26 | $5,913,739.66 | Construction | Roadway | Construction | Roadway | $10,174,500.00 | $(4,260,760.34) | -42% | 0 | | | | | 0187-05-062 | Houston | 05/06/26 | $3,421,687.50 | Construction | Roadway | Construction | Roadway | $5,871,532.50 | $(2,449,845.00) | -42% | 0 | | | | | 0074-05-105 | Corpus Christi | 01/05/28 | $12,000,000.00 | Construction | Roadway | Construction | Roadway | $8,500,000.00 | $3,500,000.00 | 41% | 0 | | | | | 0057-04-035 | Bryan | 07/01/26 | $9,072.53 | Construction | Roadway | Construction | Roadway | $15,310.00 | $(6,237.47) | -41% | 0 | | | | | 0088-02-063 | Corpus Christi | 07/01/26 | $2,442,845.67 | Construction | Roadway | Construction | Roadway | $4,100,000.00 | $(1,657,154.33) | -40% | 0 | | | | | 0092-14-109 | Dallas | 08/04/27 | $11,646,900.00 | Construction | Roadway | Construction | Roadway | $8,308,500.00 | $3,338,400.00 | 40% | 0 | | | | | 0014-15-087 | Fort Worth | 06/01/27 | $20,384,615.38 | Construction | Roadway | Unassigned | Unassigned | $14,558,233.80 | $5,826,381.58 | 40% | -945 | -3 years | Unassigned → Construction / Roadway | | | 2150-04-100 | Laredo | 02/02/28 | $7,165,023.60 | Construction | Roadway | Construction | Roadway | $11,942,000.00 | $(4,776,976.40) | -40% | 0 | | | | | 0014-23-041 | Waco | 10/06/26 | $6,000,000.00 | Construction | Roadway | Construction | Roadway | $10,000,000.00 | $(4,000,000.00) | -40% | 0 | | | | | 0014-23-042 | Waco | 10/06/26 | $6,000,000.00 | Construction | Roadway | Unassigned | Unassigned | $10,000,000.00 | $(4,000,000.00) | -40% | -1214 | -3 years | Unassigned → Construction / Roadway | | | 0718-02-079 | Fort Worth | 07/01/26 | $353,033.50 | Construction | Roadway | Construction | Roadway | $578,334.00 | $(225,300.50) | -39% | 0 | | | | | 2374-04-100 | Dallas | 08/02/26 | $582,613.56 | Construction | Roadway | Construction | Roadway | $420,000.00 | $162,613.56 | 39% | 0 | | | | | 0093-03-027 | Bryan | 07/01/26 | $25,432.11 | Construction | Roadway | Construction | Roadway | $41,340.00 | $(15,907.89) | -38% | 0 | | | | | 0299-14-037 | Laredo | 03/01/29 | $1,151,274.60 | Construction | Roadway | Construction | Roadway | $1,864,633.05 | $(713,358.45) | -38% | 359 | 12 months | | | | 2270-01-029 | Abilene | 07/01/26 | $319,006.50 | Construction | Roadway | Construction | Roadway | $515,464.00 | $(196,457.50) | -38% | 0 | | | | | 0114-09-103 | Bryan | 07/01/26 | $224,868.34 | Construction | Roadway | Construction | Roadway | $163,870.00 | $60,998.34 | 37% | 0 | | | | | 0089-09-090 | Houston | 06/02/26 | $1,152,912.75 | Construction | Roadway | Construction | Roadway | $842,339.39 | $310,573.36 | 37% | 0 | | | | | 0140-05-028 | Odessa | 11/03/26 | $886,246.00 | Construction | Bridge | Construction | Bridge | $650,262.99 | $235,983.01 | 36% | 0 | | | | | 0383-04-065 | Corpus Christi | 07/01/30 | $3,000,000.00 | | | Construction | Roadway | $4,600,000.00 | $(1,600,000.00) | -35% | 546 | 1 year | | | | 0088-03-050 | Corpus Christi | 07/01/26 | $328,564.34 | Construction | Roadway | Construction | Roadway | $500,000.00 | $(171,435.66) | -34% | 0 | | | | | 0028-04-084 | Beaumont | 07/01/26 | $2,109,576.76 | Construction | Roadway | Construction | Roadway | $3,200,000.00 | $(1,090,423.24) | -34% | 0 | | | | | 0370-05-057 | Yoakum | 07/01/26 | $722,928.50 | Construction | Roadway | Construction | Roadway | $540,000.00 | $182,928.50 | 34% | 0 | | | | | 0092-14-107 | Dallas | 07/01/26 | $90,688.50 | Construction | Roadway | Construction | Roadway | $136,800.30 | $(46,111.80) | -34% | 0 | | | | | 1020-01-068 | Atlanta | 03/03/27 | $2,400,000.00 | Construction | Roadway | Construction | Roadway | $1,801,730.00 | $598,270.00 | 33% | -456 | -1 year | | | | 0027-06-062 | Houston | 06/02/26 | $484,375.15 | Construction | Roadway | Construction | Roadway | $364,239.94 | $120,135.21 | 33% | 0 | | | | | 0053-09-082 | Abilene | 07/01/26 | $174,438.00 | Construction | Roadway | Construction | Roadway | $259,506.00 | $(85,068.00) | -33% | -97 | -3 months | | | | 1529-03-010 | Abilene | 12/01/26 | $225,891.00 | Construction | Roadway | Construction | Roadway | $170,199.28 | $55,691.72 | 33% | 0 | | | | | 0074-03-050 | Corpus Christi | 01/01/30 | $4,500,000.00 | | | Construction | Roadway | $3,400,000.00 | $1,100,000.00 | 32% | 727 | 2 years | | | | 0921-06-382 | Pharr | 12/05/28 | $1,383,277.50 | Construction | Bridge | Construction | Bridge | $1,045,956.45 | $337,321.05 | 32% | 0 | | | | | 0909-40-090 | Waco | 07/01/26 | $360,583.67 | Construction | Bridge | Construction | Bridge | $530,000.00 | $(169,416.33) | -32% | 0 | | | | | 0909-40-095 | Waco | 07/01/26 | $432,052.09 | Construction | Bridge | Construction | Bridge | $635,000.00 | $(202,947.91) | -32% | 0 | | | | | 0914-04-367 | Austin | 07/01/26 | $254,757.70 | Construction | Roadway | Construction | Roadway | $373,363.00 | $(118,605.30) | -32% | 0 | | | | | 0315-02-061 | Bryan | 07/01/26 | $18,748.81 | Construction | Roadway | Construction | Roadway | $27,180.00 | $(8,431.19) | -31% | 0 | | | | | 0249-01-056 | Wichita Falls | 07/01/26 | $251,218.60 | Construction | Bridge | Construction | Bridge | $192,216.00 | $59,002.60 | 31% | -216 | -7 months | | | | 0249-01-053 | Wichita Falls | 07/01/26 | $425,058.58 | Construction | Bridge | Construction | Bridge | $326,495.00 | $98,563.58 | 30% | -216 | -7 months | | | | 0902-90-270 | Fort Worth | 07/01/26 | $1,096,961.55 | Construction | Bridge | Construction | Bridge | $1,570,540.54 | $(473,578.99) | -30% | 0 | | | | | 0909-40-094 | Waco | 07/01/26 | $391,376.83 | Construction | Bridge | Construction | Bridge | $560,000.00 | $(168,623.17) | -30% | 0 | | | | | 0578-03-057 | Bryan | 07/01/26 | $8,257.46 | Construction | Roadway | Construction | Roadway | $11,750.00 | $(3,492.54) | -30% | 0 | | | | | 0057-04-036 | Bryan | 07/01/26 | $38,310.83 | Construction | Roadway | Construction | Roadway | $54,500.00 | $(16,189.17) | -30% | 0 | | | | | 2528-01-006 | Odessa | 08/05/26 | $8,304,083.23 | Construction | Roadway | Construction | Roadway | $11,800,000.00 | $(3,495,916.77) | -30% | 0 | | | | | 0187-05-061 | Houston | 05/06/26 | $3,102,767.75 | Construction | Roadway | Construction | Roadway | $4,378,050.25 | $(1,275,282.50) | -29% | 0 | | | | | 0990-02-014 | Corpus Christi | 11/01/28 | $6,500,000.00 | Construction | Roadway | Construction | Roadway | $5,038,199.00 | $1,461,801.00 | 29% | 0 | | | | | 0382-05-023 | Bryan | 07/01/26 | $31,660.42 | Construction | Roadway | Construction | Roadway | $44,470.00 | $(12,809.58) | -29% | 0 | | | | | 0913-27-094 | Yoakum | 07/01/26 | $785,402.50 | Construction | Bridge | Construction | Bridge | $610,270.00 | $175,132.50 | 29% | 0 | | | | | 0910-07-103 | Tyler | 07/01/26 | $64,186.00 | Construction | Roadway | Construction | Roadway | $90,000.00 | $(25,814.00) | -29% | 0 | | | | | 0902-20-238 | Fort Worth | 08/05/26 | $793,145.80 | Construction | Bridge | Construction | Bridge | $1,109,884.81 | $(316,739.01) | -29% | 0 | | | | | 0047-05-062 | Dallas | 06/01/27 | $2,545,733.42 | Construction | Roadway | Construction | Roadway | $1,989,602.84 | $556,130.58 | 28% | 0 | | | | | 0318-02-028 | Abilene | 12/01/26 | $1,135,643.00 | Construction | Roadway | Construction | Roadway | $893,219.00 | $242,424.00 | 27% | 0 | | | | | 0070-04-041 | San Angelo | 07/01/26 | $175,049.00 | Construction | Roadway | Construction | Roadway | $138,200.00 | $36,849.00 | 27% | -644 | -2 years | | | | 0921-02-440 | Pharr | 05/02/28 | $6,567,414.39 | Construction | Local Let | Construction | Local Let | $5,196,846.00 | $1,370,568.39 | 26% | 0 | | | | | 0081-03-065 | Dallas | 04/05/28 | $3,181,271.71 | Construction | Roadway | Construction | Roadway | $4,276,221.30 | $(1,094,949.59) | -26% | 0 | | | | | 2270-01-030 | Abilene | 05/03/28 | $1,666,666.67 | Construction | Roadway | Unassigned | Unassigned | $2,232,143.00 | $(565,476.33) | -25% | -1459 | -4 years | Unassigned → Construction / Roadway | | | 0921-02-532 | Pharr | 05/02/27 | $1,865,601.76 | Construction | Local Let | Construction | Local Let | $1,490,283.00 | $375,318.76 | 25% | 0 | | | | | 0291-11-023 | San Antonio | 07/01/26 | $32,690.93 | Construction | Roadway | Construction | Roadway | $26,117.13 | $6,573.80 | 25% | 0 | | | | | 0186-04-036 | Bryan | 07/01/26 | $28,291.79 | Construction | Roadway | Construction | Roadway | $22,690.00 | $5,601.79 | 25% | 0 | | | | | 0166-07-073 | Bryan | 06/02/26 | $298,878.00 | Construction | Bridge | Construction | Bridge | $240,028.00 | $58,850.00 | 25% | 0 | | | | | 0686-02-033 | Houston | 02/01/29 | $1,508,379.00 | Construction | Roadway | Construction | Roadway | $1,992,603.00 | $(484,224.00) | -24% | 0 | | | | | 0091-09-019 | Dallas | 01/01/30 | $8,932,684.66 | | | Construction | Roadway | $11,795,533.04 | $(2,862,848.38) | -24% | 365 | 1 year | | | | 0914-04-368 | Austin | 07/01/26 | $292,939.00 | Construction | Non Roadway | Construction | Non Roadway | $386,671.00 | $(93,732.00) | -24% | 0 | | | | | 0909-40-079 | Waco | 07/01/26 | $530,503.45 | Construction | Bridge | Construction | Bridge | $700,000.00 | $(169,496.55) | -24% | 0 | | | | | 0053-20-007 | Abilene | 12/01/26 | $196,776.00 | Construction | Roadway | Construction | Roadway | $158,589.00 | $38,187.00 | 24% | 0 | | | | | 0249-01-054 | Wichita Falls | 07/01/26 | $181,321.60 | Construction | Bridge | Construction | Bridge | $146,154.00 | $35,167.60 | 24% | -216 | -7 months | | | | 0916-35-231 | Corpus Christi | 05/06/26 | $14,038,390.99 | Construction | Bridge | Construction | Bridge | $11,336,329.94 | $2,702,061.05 | 24% | 0 | | | | | 0817-01-029 | Dallas | 10/05/27 | $335,057.72 | Construction | Roadway | Construction | Roadway | $270,585.00 | $64,472.72 | 24% | 0 | | | | | 3610-01-004 | Abilene | 12/01/26 | $150,278.00 | Construction | Roadway | Construction | Roadway | $121,611.00 | $28,667.00 | 24% | 0 | | | | | 0187-05-066 | Houston | 07/01/26 | $259,921.71 | Construction | Roadway | Construction | Roadway | $210,344.00 | $49,577.71 | 24% | 0 | | | | | 0921-02-535 | Pharr | 10/05/27 | $846,529.43 | Construction | Bridge | Construction | Bridge | $688,235.31 | $158,294.12 | 23% | 0 | | | | | 0205-02-078 | Bryan | 07/01/26 | $25,938.89 | Construction | Roadway | Construction | Roadway | $33,480.00 | $(7,541.11) | -23% | 0 | | | | | 1592-01-017 | Laredo | 02/01/29 | $925,485.75 | Construction | Roadway | Construction | Roadway | $1,191,628.62 | $(266,142.87) | -22% | -28 | -28 days | | | | 1310-01-051 | Dallas | 10/05/27 | $8,305,445.16 | Construction | Roadway | Construction | Roadway | $10,675,288.39 | $(2,369,843.23) | -22% | -365 | -1 year | | | | 0070-03-062 | San Angelo | 07/01/26 | $3,599,697.00 | Construction | Roadway | Construction | Roadway | $4,626,157.00 | $(1,026,460.00) | -22% | -644 | -2 years | | | | 0150-02-043 | Austin | 08/05/26 | $2,532,219.03 | Construction | Roadway | Construction | Roadway | $3,253,437.15 | $(721,218.12) | -22% | 0 | | | | | 0008-03-140 | Fort Worth | 08/01/29 | $4,110,095.04 | Construction | Roadway | Construction | Roadway | $3,375,753.73 | $734,341.31 | 22% | 364 | 12 months | | | | 0022-08-027 | Laredo | 02/01/29 | $5,729,476.20 | Construction | Roadway | Construction | Roadway | $7,273,784.62 | $(1,544,308.42) | -21% | -28 | -28 days | | | | 0017-08-117 | Laredo | 02/02/28 | $8,699,053.65 | Construction | Roadway | Construction | Roadway | $11,043,217.50 | $(2,344,163.85) | -21% | -365 | -1 year | | | | 0114-02-115 | Austin | 08/05/26 | $432,938.25 | Construction | Roadway | Construction | Roadway | $546,844.87 | $(113,906.62) | -21% | 0 | | | | | 0912-72-846 | Houston | 06/02/26 | $6,892,110.25 | Construction | Roadway | Construction | Roadway | $5,709,769.58 | $1,182,340.67 | 21% | 0 | | | | | 0315-03-073 | Bryan | 07/01/26 | $77,696.54 | Construction | Roadway | Construction | Roadway | $97,980.00 | $(20,283.46) | -21% | 0 | | | | | 0924-06-780 | El Paso | 05/05/27 | $1,699,269.23 | Construction | Local Let | Construction | Local Let | $2,120,687.60 | $(421,418.37) | -20% | 0 | | | | | 0353-05-136 | Dallas | 08/02/28 | $4,698,537.36 | Construction | Roadway | Construction | Roadway | $5,840,463.89 | $(1,141,926.53) | -20% | 0 | | | | | 0262-06-037 | Bryan | 07/01/26 | $90,736.00 | Construction | Bridge | Construction | Bridge | $112,636.80 | $(21,900.80) | -19% | 0 | | | | | 0249-01-055 | Wichita Falls | 07/01/26 | $219,131.60 | Construction | Bridge | Construction | Bridge | $183,689.00 | $35,442.60 | 19% | -216 | -7 months | | | | 0266-05-055 | Yoakum | 07/01/26 | $894,213.00 | Construction | Roadway | Construction | Roadway | $750,000.00 | $144,213.00 | 19% | 0 | | | | | 0921-02-399 | Pharr | 01/04/27 | $7,360,853.76 | Construction | Local Let | Construction | Local Let | $9,110,000.00 | $(1,749,146.24) | -19% | 0 | | | | | 0921-06-362 | Pharr | 05/02/28 | $29,953,540.52 | Construction | Local Let | Construction | Local Let | $37,018,742.29 | $(7,065,201.77) | -19% | 0 | | | | | 3022-02-009 | Dallas | 02/01/29 | $5,938,245.17 | Construction | Roadway | Construction | Roadway | $4,988,234.68 | $950,010.49 | 19% | 730 | 2 years | | | | 0205-03-059 | Bryan | 07/01/26 | $56,446.02 | Construction | Roadway | Construction | Roadway | $69,710.00 | $(13,263.98) | -19% | 0 | | | | | 0440-06-030 | Austin | 01/06/27 | $39,074,038.46 | Construction | Roadway | Construction | Roadway | $48,076,923.08 | $(9,002,884.62) | -19% | 0 | | | | | 0165-02-061 | Tyler | 07/01/26 | $77,883,082.55 | Construction | Roadway | Construction | Roadway | $66,001,500.00 | $11,881,582.55 | 18% | 0 | | | | | 0921-02-396 | Pharr | 01/02/28 | $8,213,618.71 | Construction | Local Let | Construction | Local Let | $9,987,258.04 | $(1,773,639.33) | -18% | 0 | | | | | 0281-01-038 | Dallas | 10/06/26 | $1,090,833.41 | Construction | Roadway | Construction | Roadway | $1,323,157.58 | $(232,324.17) | -18% | 0 | | | | | 0368-03-042 | Beaumont | 07/01/26 | $1,762,157.35 | Construction | Roadway | Construction | Roadway | $1,500,000.00 | $262,157.35 | 17% | -644 | -2 years | | | | 1052-01-085 | Corpus Christi | 06/02/26 | $137,533.52 | Construction | Roadway | Construction | Roadway | $166,276.32 | $(28,742.80) | -17% | 0 | | | | | 2886-02-018 | Corpus Christi | 06/02/26 | $135,858.09 | Construction | Roadway | Construction | Roadway | $163,796.82 | $(27,938.73) | -17% | 0 | | | | | 0998-04-010 | Bryan | 07/01/26 | $1,943.20 | Construction | Roadway | Construction | Roadway | $2,340.00 | $(396.80) | -17% | 0 | | | | | 0205-01-053 | Bryan | 07/01/26 | $64,752.84 | Construction | Roadway | Construction | Roadway | $77,950.00 | $(13,197.16) | -17% | 0 | | | | | 0291-10-117 | San Antonio | 07/01/26 | $3,328,257.33 | Construction | Roadway | Construction | Roadway | $2,846,766.70 | $481,490.63 | 17% | 0 | | | | | 2461-01-011 | Dallas | 10/01/29 | $1,051,197.00 | | | Construction | Roadway | $1,261,796.16 | $(210,599.16) | -17% | 362 | 12 months | | | | 0166-08-064 | Bryan | 07/01/26 | $132,202.02 | Construction | Roadway | Construction | Roadway | $158,450.00 | $(26,247.98) | -17% | 0 | | | | | 0054-06-113 | Brownwood | 07/01/26 | $2,329,284.20 | Construction | Roadway | Construction | Roadway | $2,000,000.00 | $329,284.20 | 16% | -279 | -9 months | | | | 0389-11-061 | Houston | 02/02/27 | $3,424,252.00 | Construction | Roadway | Construction | Roadway | $4,095,032.00 | $(670,780.00) | -16% | -365 | -1 year | | | | 0114-02-120 | Austin | 08/05/26 | $2,996,561.70 | Construction | Roadway | Construction | Roadway | $3,577,315.00 | $(580,753.30) | -16% | 0 | | | | | 2266-02-168 | Fort Worth | 06/02/26 | $1,434,972.42 | Construction | Non Roadway | Construction | Non Roadway | $1,711,952.50 | $(276,980.08) | -16% | 0 | | | | | 0921-06-377 | Pharr | 05/01/27 | $1,113,545.00 | Construction | Local Let | Construction | Local Let | $1,325,118.55 | $(211,573.55) | -16% | 0 | | | | | 0007-06-268 | Brownwood | 07/01/26 | $1,261,391.90 | Construction | Roadway | Construction | Roadway | $1,500,000.00 | $(238,608.10) | -16% | 0 | | | | | 0199-01-091 | Tyler | 07/01/26 | $597,189.65 | Construction | Roadway | Construction | Roadway | $516,736.73 | $80,452.92 | 16% | 0 | | | | | 0902-90-129 | Fort Worth | 07/01/26 | $2,365,443.90 | Construction | Bridge | Construction | Bridge | $2,794,310.91 | $(428,867.01) | -15% | 0 | | | | | 0718-01-078 | Dallas | 06/01/27 | $457,789.20 | Construction | Bridge | Construction | Bridge | $540,000.00 | $(82,210.80) | -15% | 0 | | | | | 0095-05-061 | Dallas | 06/01/28 | $17,400,554.15 | Construction | Roadway | Construction | Roadway | $20,518,087.04 | $(3,117,532.89) | -15% | 0 | | | | | 0083-02-060 | Paris | 08/05/26 | $78,448.00 | Construction | Roadway | Construction | Roadway | $92,448.45 | $(14,000.45) | -15% | 0 | | | | | 0315-01-040 | Bryan | 07/01/26 | $3,224.76 | Construction | Roadway | Construction | Roadway | $3,800.00 | $(575.24) | -15% | 0 | | | | | 1562-03-022 | Bryan | 07/01/26 | $77,194.55 | Construction | Roadway | Construction | Roadway | $90,970.00 | $(13,775.45) | -15% | 0 | | | | | 0299-13-035 | Laredo | 03/01/29 | $1,789,754.40 | Construction | Roadway | Construction | Roadway | $1,554,688.80 | $235,065.60 | 15% | 359 | 12 months | | | | 0265-03-054 | Austin | 07/01/26 | $745,820.25 | Construction | Roadway | Construction | Roadway | $877,520.25 | $(131,700.00) | -15% | 0 | | | | | 0039-10-096 | Pharr | 12/01/27 | $3,579,328.00 | Construction | Bridge | Construction | Bridge | $3,112,459.28 | $466,868.72 | 15% | 0 | | | | | 0013-08-147 | Fort Worth | 06/01/27 | $54,615,384.64 | Construction | Roadway | Unassigned | Unassigned | $47,581,373.76 | $7,034,010.88 | 15% | -945 | -3 years | Unassigned → Construction / Roadway | | | 0039-12-260 | Pharr | 09/01/27 | $11,269,925.14 | Construction | Bridge | Construction | Bridge | $9,847,029.39 | $1,422,895.75 | 14% | 0 | | | | | 1003-01-112 | Houston | 03/07/28 | $722,090.00 | Construction | Roadway | Construction | Roadway | $631,223.00 | $90,867.00 | 14% | 0 | | | | | 0015-09-208 | Austin | 07/01/26 | $2,898,081.65 | Construction | Roadway | Construction | Roadway | $3,380,279.55 | $(482,197.90) | -14% | 0 | | | | | 3510-04-066 | Houston | 07/01/26 | $21,704,627.94 | Construction | Roadway | Construction | Roadway | $18,997,823.00 | $2,706,804.94 | 14% | 0 | | | | | 0920-38-287 | Beaumont | 06/02/26 | $2,540,906.12 | Construction | Bridge | Construction | Bridge | $2,960,906.12 | $(420,000.00) | -14% | 0 | | | | | 2446-01-037 | Bryan | 07/01/26 | $25,652.54 | Construction | Roadway | Construction | Roadway | $22,470.00 | $3,182.54 | 14% | 0 | | | | | 3510-04-065 | Houston | 07/01/26 | $3,386,248.00 | Construction | Non Roadway | Construction | Non Roadway | $3,942,056.00 | $(555,808.00) | -14% | 0 | | | | | 0581-01-180 | Dallas | 08/02/28 | $6,032,797.68 | Construction | Roadway | Construction | Roadway | $7,010,101.85 | $(977,304.17) | -14% | 0 | | | | | 2859-01-011 | Abilene | 12/01/26 | $487,839.00 | Construction | Roadway | Construction | Roadway | $428,430.00 | $59,409.00 | 14% | 0 | | | | | 0914-04-364 | Austin | 06/02/26 | $516,136.30 | Construction | Non Roadway | Construction | Non Roadway | $598,936.45 | $(82,800.15) | -14% | 0 | | | | | 3312-02-019 | Houston | 01/06/27 | $3,803,740.00 | Construction | Roadway | Construction | Roadway | $4,410,422.00 | $(606,682.00) | -14% | 0 | | | | | 0581-01-177 | Dallas | 08/05/26 | $1,376,754.86 | Construction | Roadway | Construction | Roadway | $1,595,632.31 | $(218,877.45) | -14% | -300 | -10 months | | | | 0675-05-112 | Bryan | 07/01/26 | $35,202.45 | Construction | Roadway | Construction | Roadway | $40,780.00 | $(5,577.55) | -14% | 0 | | | | | 1065-02-045 | Pharr | 08/04/27 | $1,576,228.00 | Construction | Roadway | Construction | Roadway | $1,824,968.00 | $(248,740.00) | -14% | 0 | | | | | 0675-08-121 | Houston | 07/01/26 | $4,119,323.00 | Construction | Non Roadway | Construction | Non Roadway | $3,627,242.00 | $492,081.00 | 14% | 0 | | | | | 0027-13-245 | Houston | 06/02/26 | $248,970.25 | Construction | Roadway | Construction | Roadway | $287,794.37 | $(38,824.12) | -13% | 0 | | | | | 0072-12-202 | San Antonio | 09/02/26 | $247,586.98 | Construction | Roadway | Construction | Roadway | $218,366.32 | $29,220.66 | 13% | 0 | | | | | 0395-01-036 | Bryan | 07/01/26 | $90,098.80 | Construction | Roadway | Construction | Roadway | $79,520.00 | $10,578.80 | 13% | 0 | | | | | 0047-06-182 | Dallas | 12/03/26 | $1,127,591.83 | Construction | Local Let | Construction | Local Let | $1,300,000.00 | $(172,408.17) | -13% | 0 | | | | | 0053-08-077 | Abilene | 07/01/26 | $857,598.00 | Construction | Roadway | Construction | Roadway | $988,024.00 | $(130,426.00) | -13% | -97 | -3 months | | | | 0053-12-075 | Abilene | 12/01/26 | $799,989.00 | Construction | Roadway | Construction | Roadway | $708,053.00 | $91,936.00 | 13% | 0 | | | | | 0165-03-036 | Tyler | 07/01/26 | $46,939,079.29 | Construction | Roadway | Construction | Roadway | $53,872,550.00 | $(6,933,470.71) | -13% | 0 | | | | | 0199-01-090 | Tyler | 07/01/26 | $707,258.21 | Construction | Roadway | Construction | Roadway | $811,456.44 | $(104,198.23) | -13% | 0 | | | | | 0919-19-093 | Atlanta | 06/02/26 | $897,068.40 | Construction | Bridge | Construction | Bridge | $795,421.40 | $101,647.00 | 13% | 0 | | | | | 0161-03-027 | Laredo | 02/01/29 | $2,562,041.70 | Construction | Roadway | Construction | Roadway | $2,934,656.85 | $(372,615.15) | -13% | -28 | -28 days | | | | 0921-02-561 | Pharr | 01/02/28 | $1,917,438.00 | Construction | Non Roadway | Construction | Non Roadway | $2,191,115.00 | $(273,677.00) | -12% | 0 | | | | | 0114-02-116 | Austin | 08/05/26 | $3,331,178.85 | Construction | Roadway | Construction | Roadway | $3,800,845.31 | $(469,666.46) | -12% | 0 | | | | | 1051-01-065 | Dallas | 10/01/29 | $105,284.34 | | | Construction | Roadway | $119,964.97 | $(14,680.63) | -12% | 362 | 12 months | | | | 0249-01-058 | Wichita Falls | 07/01/26 | $166,226.60 | Construction | Bridge | Construction | Bridge | $189,348.00 | $(23,121.40) | -12% | -216 | -7 months | | | | 0446-01-056 | Yoakum | 07/01/26 | $1,791,665.95 | Construction | Roadway | Construction | Roadway | $1,600,000.00 | $191,665.95 | 12% | 0 | | | | | 2011-02-016 | Abilene | 12/01/26 | $1,002,591.00 | Construction | Roadway | Construction | Roadway | $1,138,058.00 | $(135,467.00) | -12% | 0 | | | | | 0006-16-005 | Abilene | 12/01/26 | $132,725.00 | Construction | Roadway | Construction | Roadway | $150,633.26 | $(17,908.26) | -12% | 0 | | | | | 0114-02-111 | Austin | 08/05/26 | $526,301.50 | Construction | Roadway | Construction | Roadway | $596,316.00 | $(70,014.50) | -12% | 0 | | | | | 1971-02-009 | Bryan | 07/01/26 | $4,311.80 | Construction | Roadway | Construction | Roadway | $4,880.00 | $(568.20) | -12% | 0 | | | | | 1095-03-019 | Corpus Christi | 06/02/26 | $136,336.35 | Construction | Roadway | Construction | Roadway | $154,293.80 | $(17,957.45) | -12% | 0 | | | | | 0204-09-067 | Bryan | 07/01/26 | $45,448.23 | Construction | Roadway | Construction | Roadway | $51,400.00 | $(5,951.77) | -12% | 0 | | | | | 0720-03-154 | Houston | 06/02/26 | $786,744.75 | Construction | Roadway | Construction | Roadway | $887,926.00 | $(101,181.25) | -11% | 0 | | | | | 0143-01-068 | San Antonio | 07/01/26 | $2,514,127.89 | Construction | Roadway | Construction | Roadway | $2,833,055.08 | $(318,927.19) | -11% | 0 | | | | | 3417-02-039 | Austin | 07/01/26 | $432,477.50 | Construction | Non Roadway | Construction | Non Roadway | $487,340.00 | $(54,862.50) | -11% | 0 | | | | | 0543-02-086 | Houston | 07/01/26 | $173,335.46 | Construction | Roadway | Construction | Roadway | $195,093.00 | $(21,757.54) | -11% | 0 | | | | | 0171-04-087 | Fort Worth | 07/01/26 | $347,739.50 | Construction | Roadway | Construction | Roadway | $391,194.00 | $(43,454.50) | -11% | 0 | | | | | 0542-02-046 | Laredo | 02/02/28 | $6,049,963.50 | Construction | Roadway | Construction | Roadway | $6,800,000.00 | $(750,036.50) | -11% | -365 | -1 year | | | | 1429-01-039 | Pharr | 05/06/26 | $266,656.05 | Construction | Roadway | Construction | Roadway | $241,056.05 | $25,600.00 | 11% | 0 | | | | | 0006-02-126 | Abilene | 12/01/26 | $690,784.00 | Construction | Roadway | Construction | Roadway | $772,055.00 | $(81,271.00) | -11% | 0 | | | | | 0266-04-053 | Yoakum | 07/01/26 | $1,798,100.25 | Construction | Roadway | Construction | Roadway | $2,009,165.00 | $(211,064.75) | -11% | 0 | | | | | 2130-01-014 | Bryan | 07/01/26 | $59,025.95 | Construction | Roadway | Construction | Roadway | $65,840.00 | $(6,814.05) | -10% | 0 | | | | | 0456-02-037 | Bryan | 07/01/26 | $7,492.42 | Construction | Roadway | Construction | Roadway | $8,340.00 | $(847.58) | -10% | 0 | | | | | 0915-12-796 | San Antonio | 07/01/26 | $333,380.95 | Construction | Roadway | Construction | Roadway | $371,096.05 | $(37,715.10) | -10% | 0 | | | | | 0047-07-248 | Dallas | 07/01/26 | $306,923.00 | Construction | Roadway | Construction | Roadway | $340,733.40 | $(33,810.40) | -10% | 0 | | | | | 3110-01-003 | Lufkin | 07/01/26 | $4,060,440.80 | Construction | Roadway | Construction | Roadway | $4,505,928.36 | $(445,487.56) | -10% | 0 | | | | | 0918-46-334 | Dallas | 06/02/26 | $1,510,580.00 | Construction | Bridge | Construction | Bridge | $1,675,899.60 | $(165,319.60) | -10% | 0 | | | | | 0333-01-033 | Abilene | 12/01/26 | $1,647,371.00 | Construction | Roadway | Construction | Roadway | $1,500,000.00 | $147,371.00 | 10% | 0 | | | | | 0508-02-140 | Beaumont | 07/01/26 | $3,459,416.41 | Construction | Roadway | Construction | Roadway | $3,833,252.39 | $(373,835.98) | -10% | -35 | -1 month | | | | 0492-04-041 | Tyler | 07/01/26 | $27,128,231.85 | Construction | Roadway | Construction | Roadway | $30,037,794.85 | $(2,909,563.00) | -10% | 0 | | | | | 0430-01-070 | Dallas | 08/02/28 | $5,169,642.48 | Construction | Roadway | Construction | Roadway | $5,719,193.52 | $(549,551.04) | -10% | 0 | | | | | 1718-05-021 | Odessa | 04/05/28 | $2,153,993.53 | Construction | Roadway | Construction | Roadway | $2,381,745.00 | $(227,751.47) | -10% | 0 | | | | | 0213-03-112 | Lufkin | 07/01/26 | $3,331,418.00 | Construction | Bridge | Construction | Bridge | $3,682,752.30 | $(351,334.30) | -10% | 0 | | | | | 0918-46-335 | Dallas | 06/02/26 | $994,466.00 | Construction | Bridge | Construction | Bridge | $1,097,504.80 | $(103,038.80) | -9% | 0 | | | | | 3138-01-039 | Bryan | 05/03/28 | $761,876.00 | Construction | Roadway | Construction | Roadway | $838,871.00 | $(76,995.00) | -9% | 337 | 11 months | | | | 0921-02-533 | Pharr | 05/01/27 | $1,107,531.00 | Construction | Local Let | Construction | Local Let | $1,218,284.10 | $(110,753.10) | -9% | 0 | | | | | 0025-02-234 | San Antonio | 08/05/26 | $7,487,310.06 | Construction | Roadway | Construction | Roadway | $8,226,172.00 | $(738,861.94) | -9% | 0 | | | | | 0110-05-136 | Houston | 05/06/26 | $1,080,682.20 | Construction | Roadway | Construction | Roadway | $991,742.20 | $88,940.00 | 9% | 0 | | | | | 0081-04-047 | Dallas | 04/05/28 | $419,452.46 | Construction | Roadway | Construction | Roadway | $460,407.60 | $(40,955.14) | -9% | 0 | | | | | 0558-03-026 | Abilene | 12/01/26 | $696,693.00 | Construction | Roadway | Construction | Roadway | $639,955.86 | $56,737.14 | 9% | 0 | | | | | 2374-02-166 | Dallas | 07/01/26 | $282,932.75 | Construction | Roadway | Construction | Roadway | $310,476.60 | $(27,543.85) | -9% | 0 | | | | | 0990-02-015 | Corpus Christi | 06/02/26 | $30,907.60 | Construction | Roadway | Construction | Roadway | $33,912.76 | $(3,005.16) | -9% | 0 | | | | | 0314-04-036 | Fort Worth | 07/01/26 | $346,773.76 | Construction | Bridge | Construction | Bridge | $380,384.33 | $(33,610.57) | -9% | 0 | | | | | 1421-01-028 | Beaumont | 07/01/26 | $5,038,939.85 | Construction | Roadway | Construction | Roadway | $5,527,174.50 | $(488,234.65) | -9% | -35 | -1 month | | | | 0261-01-052 | Dallas | 07/01/26 | $677,275.50 | Construction | Non Roadway | Construction | Non Roadway | $742,714.35 | $(65,438.85) | -9% | 0 | | | | | 0446-02-041 | Yoakum | 07/01/26 | $1,118,407.77 | Construction | Roadway | Construction | Roadway | $1,226,012.00 | $(107,604.23) | -9% | 0 | | | | | 1315-01-033 | Dallas | 10/04/28 | $3,885,389.78 | Construction | Roadway | Construction | Roadway | $4,249,387.32 | $(363,997.54) | -9% | 0 | | | | | 2033-03-011 | Abilene | 12/01/26 | $434,259.00 | Construction | Roadway | Construction | Roadway | $400,000.00 | $34,259.00 | 9% | 0 | | | | | 0261-02-086 | Dallas | 07/01/26 | $675,870.00 | Construction | Non Roadway | Construction | Non Roadway | $737,593.50 | $(61,723.50) | -8% | 0 | | | | | 1562-04-016 | Bryan | 07/01/26 | $104,568.40 | Construction | Roadway | Construction | Roadway | $114,100.00 | $(9,531.60) | -8% | 0 | | | | | 0033-06-130 | Abilene | 05/06/26 | $1,325,572.00 | Construction | Bridge | Construction | Bridge | $1,223,572.00 | $102,000.00 | 8% | 0 | | | | | 0027-08-186 | Houston | 06/02/26 | $311,721.35 | Construction | Roadway | Construction | Roadway | $287,859.62 | $23,861.73 | 8% | 0 | | | | | 0919-13-022 | Atlanta | 06/02/26 | $845,060.00 | Construction | Bridge | Construction | Bridge | $780,583.00 | $64,477.00 | 8% | 0 | | | | | 0978-02-085 | Houston | 07/01/26 | $1,325,706.60 | Construction | Roadway | Construction | Roadway | $1,444,405.82 | $(118,699.22) | -8% | 0 | | | | | 2851-01-055 | Bryan | 07/01/26 | $50,884.35 | Construction | Roadway | Construction | Roadway | $47,050.00 | $3,834.35 | 8% | 0 | | | | | 0166-02-049 | Bryan | 07/01/26 | $137,319.70 | Construction | Roadway | Construction | Roadway | $149,130.00 | $(11,810.30) | -8% | 0 | | | | | 0013-08-149 | Fort Worth | 07/01/27 | $15,928,453.33 | Construction | Roadway | Construction | Roadway | $17,248,438.28 | $(1,319,984.95) | -8% | 0 | | | | | 0027-07-044 | Houston | 06/02/26 | $170,751.50 | Construction | Roadway | Construction | Roadway | $184,764.00 | $(14,012.50) | -8% | 0 | | | | | 0918-47-537 | Dallas | 10/05/27 | $598,483.05 | Construction | Roadway | Construction | Roadway | $647,328.00 | $(48,844.95) | -8% | 0 | | | | | 0921-02-537 | Pharr | 05/31/28 | $7,718,488.50 | Construction | Local Let | Construction | Local Let | $8,341,667.00 | $(623,178.50) | -7% | 0 | | | | | 0998-05-013 | Bryan | 07/01/26 | $56,834.35 | Construction | Roadway | Construction | Roadway | $61,420.00 | $(4,585.65) | -7% | 0 | | | | | 0919-13-020 | Atlanta | 06/02/26 | $527,087.20 | Construction | Bridge | Construction | Bridge | $490,881.20 | $36,206.00 | 7% | 0 | | | | | 0836-03-075 | Waco | 09/02/26 | $555,819.86 | Construction | Roadway | Construction | Roadway | $600,000.00 | $(44,180.14) | -7% | 0 | | | | | 0069-07-113 | San Angelo | 08/05/26 | $1,777,990.78 | Construction | Roadway | Construction | Roadway | $1,657,431.03 | $120,559.75 | 7% | 0 | | | | | 0138-06-047 | Lufkin | 07/01/26 | $59,915,665.95 | Construction | Roadway | Construction | Roadway | $64,563,586.26 | $(4,647,920.31) | -7% | 0 | | | | | 0978-01-045 | Houston | 07/01/26 | $1,319,719.40 | Construction | Roadway | Construction | Roadway | $1,421,566.46 | $(101,847.06) | -7% | 0 | | | | | 2340-02-022 | Atlanta | 01/05/28 | $10,125,634.00 | Construction | Roadway | Construction | Roadway | $9,453,804.00 | $671,830.00 | 7% | 0 | | | | | 0027-12-164 | Houston | 06/02/26 | $3,350,035.38 | Construction | Roadway | Construction | Roadway | $3,603,216.37 | $(253,180.99) | -7% | 0 | | | | | 0186-03-074 | Bryan | 07/01/26 | $34,155.43 | Construction | Roadway | Construction | Roadway | $31,920.00 | $2,235.43 | 7% | 0 | | | | | 1973-01-021 | Dallas | 07/01/26 | $1,674,101.10 | Construction | Roadway | Construction | Roadway | $1,565,564.19 | $108,536.91 | 7% | 0 | | | | | 3510-04-064 | Houston | 07/01/26 | $3,440,293.00 | Construction | Non Roadway | Construction | Non Roadway | $3,693,789.00 | $(253,496.00) | -7% | 0 | | | | | 0337-05-048 | Bryan | 09/01/27 | $3,278,786.69 | Construction | Bridge | Construction | Bridge | $3,518,509.97 | $(239,723.28) | -7% | 0 | | | | | 2133-02-016 | Bryan | 07/01/26 | $17,500.75 | Construction | Roadway | Construction | Roadway | $18,780.00 | $(1,279.25) | -7% | 0 | | | | | 0016-05-128 | San Antonio | 07/01/26 | $12,462,037.55 | Construction | Roadway | Construction | Roadway | $11,668,795.80 | $793,241.75 | 7% | 0 | | | | | 0919-13-021 | Atlanta | 06/02/26 | $495,940.80 | Construction | Bridge | Construction | Bridge | $464,576.80 | $31,364.00 | 7% | 0 | | | | | 0009-11-269 | Dallas | 07/01/26 | $268,029.00 | Construction | Roadway | Construction | Roadway | $287,026.95 | $(18,997.95) | -7% | 0 | | | | | 0521-06-165 | San Antonio | 06/02/26 | $34,630.20 | Construction | Bridge | Construction | Bridge | $32,480.20 | $2,150.00 | 7% | 0 | | | | | 0492-04-034 | Tyler | 07/01/26 | $48,109,014.53 | Construction | Roadway | Construction | Roadway | $45,157,109.53 | $2,951,905.00 | 7% | 0 | | | | | 2993-01-011 | Paris | 06/02/26 | $4,600,210.40 | Construction | Roadway | Construction | Roadway | $4,321,251.61 | $278,958.79 | 6% | 0 | | | | | 0185-03-037 | Bryan | 07/01/26 | $71,519.04 | Construction | Roadway | Construction | Roadway | $76,360.00 | $(4,840.96) | -6% | 0 | | | | | 0033-06-129 | Abilene | 05/06/26 | $2,130,350.40 | Construction | Bridge | Construction | Bridge | $2,003,350.40 | $127,000.00 | 6% | 0 | | | | | 0440-05-015 | Austin | 01/06/27 | $225,252,884.62 | Construction | Roadway | Construction | Roadway | $240,384,615.38 | $(15,131,730.76) | -6% | 0 | | | | | 0067-18-010 | Lubbock | 06/02/26 | $989,073.08 | Construction | Roadway | Construction | Roadway | $1,054,818.08 | $(65,745.00) | -6% | 0 | | | | | 3000-01-027 | Dallas | 07/01/26 | $520,281.50 | Construction | Roadway | Construction | Roadway | $554,545.95 | $(34,264.45) | -6% | 0 | | | | | 0252-03-056 | Austin | 08/05/26 | $2,452,584.79 | Construction | Roadway | Construction | Roadway | $2,613,184.34 | $(160,599.55) | -6% | 0 | | | | | 0051-03-122 | Houston | 07/01/26 | $722,838.60 | Construction | Roadway | Construction | Roadway | $770,241.06 | $(47,402.46) | -6% | 0 | | | | | 0047-06-176 | Dallas | 07/01/26 | $150,126.50 | Construction | Roadway | Construction | Roadway | $159,793.20 | $(9,666.70) | -6% | 0 | | | | | 0249-01-057 | Wichita Falls | 07/01/26 | $216,315.60 | Construction | Bridge | Construction | Bridge | $204,333.00 | $11,982.60 | 6% | -216 | -7 months | | | | 0260-02-055 | Dallas | 07/01/26 | $542,093.50 | Construction | Non Roadway | Construction | Non Roadway | $575,545.95 | $(33,452.45) | -6% | 0 | | | | | 0006-06-109 | Abilene | 06/02/26 | $126,022,721.70 | Construction | Roadway | Construction | Roadway | $119,162,496.70 | $6,860,225.00 | 6% | 0 | | | | | 2353-02-026 | Dallas | 05/05/27 | $7,573,314.29 | Construction | Roadway | Construction | Roadway | $7,164,411.29 | $408,903.00 | 6% | 0 | | | | | 0915-12-782 | San Antonio | 07/01/26 | $380,947.73 | Construction | Roadway | Construction | Roadway | $403,095.46 | $(22,147.73) | -5% | 0 | | | | | 2452-03-128 | San Antonio | 07/01/26 | $180,125,212.86 | Construction | Roadway | Construction | Roadway | $190,314,322.00 | $(10,189,109.14) | -5% | -153 | -5 months | | | | 0013-08-154 | Fort Worth | 08/05/26 | $1,593,892.79 | Construction | Roadway | Construction | Roadway | $1,681,823.02 | $(87,930.23) | -5% | 0 | | | | | 1425-03-075 | Pharr | 08/02/28 | $3,818,764.43 | Construction | Roadway | Construction | Roadway | $4,026,638.00 | $(207,873.57) | -5% | 0 | | | | | 0921-02-538 | Pharr | 05/31/28 | $7,239,537.73 | Construction | Local Let | Construction | Local Let | $7,626,667.00 | $(387,129.27) | -5% | 0 | | | | | 0572-01-076 | Odessa | 05/06/26 | $10,581,431.98 | Construction | Roadway | Construction | Roadway | $11,148,066.98 | $(566,635.00) | -5% | 0 | | | | | 0816-05-027 | Dallas | 03/01/29 | $10,802,563.00 | Construction | Roadway | Construction | Roadway | $10,285,271.43 | $517,291.57 | 5% | 0 | | | | | 0081-02-080 | Fort Worth | 07/01/26 | $459,770.00 | Construction | Roadway | Construction | Roadway | $483,209.50 | $(23,439.50) | -5% | 0 | | | | | 0092-02-146 | Dallas | 07/01/26 | $466,949.50 | Construction | Roadway | Construction | Roadway | $490,515.90 | $(23,566.40) | -5% | 0 | | | | | 1012-03-027 | Dallas | 12/01/26 | $8,673,294.25 | Construction | Roadway | Construction | Roadway | $9,106,958.96 | $(433,664.71) | -5% | -92 | -3 months | | | | 1012-03-028 | Dallas | 12/01/26 | $6,373,822.30 | Construction | Roadway | Construction | Roadway | $6,692,513.42 | $(318,691.12) | -5% | -92 | -3 months | | | | 1492-01-013 | Dallas | 12/01/26 | $1,331,491.45 | Construction | Roadway | Construction | Roadway | $1,398,066.02 | $(66,574.57) | -5% | -92 | -3 months | | | | 0047-14-092 | Dallas | 09/02/26 | $2,018,779.35 | Construction | Non Roadway | Construction | Non Roadway | $2,119,100.50 | $(100,321.15) | -5% | 0 | | | | | 0786-01-095 | Beaumont | 07/01/26 | $4,288,248.61 | Construction | Roadway | Construction | Roadway | $4,500,000.00 | $(211,751.39) | -5% | -644 | -2 years | | | | 0581-01-179 | Dallas | 08/05/26 | $1,725,917.34 | Construction | Roadway | Construction | Roadway | $1,648,481.54 | $77,435.80 | 5% | -300 | -10 months | | | | 0917-16-044 | Bryan | 08/05/26 | $603,666.00 | Construction | Bridge | Construction | Bridge | $577,321.07 | $26,344.93 | 5% | 0 | | | | | 1068-04-183 | Dallas | 08/02/28 | $6,789,193.62 | Construction | Roadway | Construction | Roadway | $7,111,311.11 | $(322,117.49) | -5% | 0 | | | | | 0581-02-165 | Dallas | 08/04/27 | $9,558,816.73 | Construction | Roadway | Construction | Roadway | $9,144,176.22 | $414,640.51 | 5% | 0 | | | | | 2977-01-011 | Dallas | 07/01/26 | $11,777,297.44 | Construction | Roadway | Construction | Roadway | $12,330,496.94 | $(553,199.50) | -4% | -672 | -2 years | | | | 0007-02-067 | Abilene | 05/06/26 | $850,415.00 | Construction | Bridge | Construction | Bridge | $815,415.00 | $35,000.00 | 4% | 0 | | | | | 0047-06-175 | Dallas | 07/01/26 | $258,723.00 | Construction | Roadway | Construction | Roadway | $270,219.60 | $(11,496.60) | -4% | 0 | | | | | 0712-01-052 | Fort Worth | 07/01/26 | $2,333,679.07 | Construction | Roadway | Construction | Roadway | $2,433,031.32 | $(99,352.25) | -4% | 0 | | | | | 2846-01-008 | Dallas | 12/01/30 | $6,759,240.62 | | | Construction | Roadway | $6,497,917.26 | $261,323.36 | 4% | 726 | 2 years | | | | 0047-06-178 | Dallas | 09/02/26 | $1,208,060.70 | Construction | Non Roadway | Construction | Non Roadway | $1,161,565.90 | $46,494.80 | 4% | 0 | | | | | 0921-02-375 | Pharr | 05/02/27 | $14,621,204.29 | Construction | Local Let | Construction | Local Let | $15,224,166.43 | $(602,962.14) | -4% | 0 | | | | | 0909-37-082 | Waco | 07/01/26 | $569,562.17 | Construction | Bridge | Construction | Bridge | $593,000.00 | $(23,437.83) | -4% | 0 | | | | | 0917-29-152 | Bryan | 07/01/27 | $1,591,764.00 | Construction | Roadway | Construction | Roadway | $1,655,435.00 | $(63,671.00) | -4% | 0 | | | | | 0924-06-625 | El Paso | 05/01/27 | $17,466,671.15 | Construction | Local Let | Construction | Local Let | $18,165,338.00 | $(698,666.85) | -4% | 0 | | | | | 0005-04-084 | Odessa | 07/01/26 | $5,595,705.62 | Construction | Roadway | Construction | Roadway | $5,400,000.00 | $195,705.62 | 4% | 0 | | | | | 0002-02-064 | El Paso | 11/01/28 | $19,632,293.75 | Construction | Roadway | Construction | Roadway | $20,359,415.74 | $(727,121.99) | -4% | 365 | 1 year | | | | 0915-12-786 | San Antonio | 07/01/26 | $373,502.68 | Construction | Roadway | Construction | Roadway | $387,275.16 | $(13,772.48) | -4% | 0 | | | | | 1228-03-057 | Pharr | 05/06/26 | $240,864.85 | Construction | Roadway | Construction | Roadway | $249,764.25 | $(8,899.40) | -4% | 0 | | | | | 0915-12-784 | San Antonio | 07/01/26 | $406,866.27 | Construction | Roadway | Construction | Roadway | $421,541.95 | $(14,675.68) | -3% | 0 | | | | | 0908-33-115 | Abilene | 06/02/26 | $176,362.29 | Construction | Roadway | Construction | Roadway | $170,510.29 | $5,852.00 | 3% | 0 | | | | | 0151-02-026 | Austin | 05/06/26 | $9,952,848.77 | Construction | Roadway | Construction | Roadway | $10,279,819.07 | $(326,970.30) | -3% | 0 | | | | | 0151-03-043 | Austin | 05/06/26 | $862,613.17 | Construction | Roadway | Construction | Roadway | $890,964.62 | $(28,351.45) | -3% | 0 | | | | | 2121-02-189 | El Paso | 12/05/28 | $1,008,439.25 | Construction | Roadway | Construction | Roadway | $1,040,554.27 | $(32,115.02) | -3% | 0 | | | | | 0013-10-098 | Fort Worth | 07/01/26 | $8,676,166.77 | Construction | Roadway | Construction | Roadway | $8,416,086.71 | $260,080.06 | 3% | -153 | -5 months | | | | 0262-07-047 | Bryan | 07/01/26 | $60,498.10 | Construction | Roadway | Construction | Roadway | $62,410.00 | $(1,911.90) | -3% | 0 | | | | | 0905-06-121 | Lubbock | 07/01/26 | $376,554.75 | Construction | Roadway | Construction | Roadway | $388,274.75 | $(11,720.00) | -3% | 0 | | | | | 0915-12-752 | San Antonio | 07/01/26 | $356,526.40 | Construction | Bridge | Construction | Bridge | $346,526.40 | $10,000.00 | 3% | 0 | | | | | 0712-02-021 | Fort Worth | 07/01/26 | $1,297,721.50 | Construction | Roadway | Construction | Roadway | $1,261,648.00 | $36,073.50 | 3% | 0 | | | | | 0686-01-051 | Houston | 04/05/28 | $3,520,607.00 | Construction | Roadway | Construction | Roadway | $3,424,252.00 | $96,355.00 | 3% | 0 | | | | | 3272-01-007 | Lubbock | 06/02/26 | $747,382.78 | Construction | Roadway | Construction | Roadway | $768,682.78 | $(21,300.00) | -3% | 0 | | | | | 0274-02-032 | Brownwood | 06/02/26 | $5,557,276.85 | Construction | Roadway | Construction | Roadway | $5,425,674.85 | $131,602.00 | 2% | 0 | | | | | 0675-08-117 | Houston | 05/06/26 | $204,710.61 | Construction | Roadway | Construction | Roadway | $209,670.61 | $(4,960.00) | -2% | 0 | | | | | 0022-04-021 | Laredo | 03/01/29 | $10,763,000.85 | Construction | Roadway | Construction | Roadway | $11,022,865.35 | $(259,864.50) | -2% | 359 | 12 months | | | | 1014-03-063 | Dallas | 12/03/26 | $1,731,094.70 | Construction | Local Let | Construction | Local Let | $1,772,766.00 | $(41,671.30) | -2% | 0 | | | | | 0018-06-185 | Laredo | 06/02/26 | $63,828,090.68 | Construction | Roadway | Construction | Roadway | $62,373,725.73 | $1,454,364.95 | 2% | 0 | | | | | 0313-02-071 | Fort Worth | 04/06/27 | $2,070,015.37 | Construction | Roadway | Construction | Roadway | $2,027,259.64 | $42,755.73 | 2% | 0 | | | | | 0110-04-212 | Houston | 05/06/26 | $3,505,666.64 | Construction | Roadway | Construction | Roadway | $3,435,426.64 | $70,240.00 | 2% | 0 | | | | | 0327-07-047 | Pharr | 08/05/26 | $310,280.42 | Construction | Roadway | Construction | Roadway | $316,539.17 | $(6,258.75) | -2% | 0 | | | | | 0540-03-039 | Bryan | 07/01/26 | $4,315,533.66 | Construction | Roadway | Construction | Roadway | $4,400,000.00 | $(84,466.34) | -2% | 0 | | | | | 0143-04-074 | San Antonio | 06/02/26 | $285,741.00 | Construction | Bridge | Construction | Bridge | $280,441.00 | $5,300.00 | 2% | 0 | | | | | 0248-03-024 | Atlanta | 11/02/27 | $13,405,864.00 | Construction | Roadway | Unassigned | Unassigned | $13,160,923.50 | $244,940.50 | 2% | 0 | | Unassigned → Construction / Roadway | | | 0068-01-073 | Lubbock | 07/01/26 | $138,352,841.20 | Construction | Roadway | Construction | Roadway | $135,847,883.00 | $2,504,958.20 | 2% | -97 | -3 months | | | | 0185-02-042 | Bryan | 07/01/26 | $76,992.76 | Construction | Roadway | Construction | Roadway | $75,610.00 | $1,382.76 | 2% | 0 | | | | | 0675-08-116 | Houston | 05/06/26 | $1,533,541.18 | Construction | Roadway | Construction | Roadway | $1,562,061.18 | $(28,520.00) | -2% | 0 | | | | | 0327-07-049 | Pharr | 08/05/26 | $315,468.34 | Construction | Roadway | Construction | Roadway | $321,317.31 | $(5,848.97) | -2% | 0 | | | | | 0073-08-183 | San Antonio | 05/06/26 | $34,315,721.05 | Construction | Roadway | Construction | Roadway | $34,945,459.80 | $(629,738.75) | -2% | 0 | | | | | 0192-01-103 | Houston | 06/02/26 | $553,663.25 | Construction | Roadway | Construction | Roadway | $563,765.64 | $(10,102.39) | -2% | 0 | | | | | 0081-03-047 | Dallas | 05/06/26 | $111,391,860.83 | Construction | Roadway | Construction | Roadway | $109,560,813.58 | $1,831,047.25 | 2% | 0 | | | | | 0916-37-038 | Corpus Christi | 06/02/26 | $915,014.80 | Construction | Bridge | Construction | Bridge | $900,224.80 | $14,790.00 | 2% | 0 | | | | | 0747-05-043 | Fort Worth | 05/06/26 | $3,042,077.60 | Construction | Roadway | Construction | Roadway | $2,993,451.70 | $48,625.90 | 2% | 0 | | | | | 0720-03-153 | Houston | 06/02/26 | $905,283.29 | Construction | Roadway | Construction | Roadway | $890,994.00 | $14,289.29 | 2% | 0 | | | | | 1421-01-027 | Beaumont | 07/01/26 | $1,853,387.00 | Construction | Roadway | Construction | Roadway | $1,883,344.00 | $(29,957.00) | -2% | -35 | -1 month | | | | 0872-04-037 | Pharr | 08/05/26 | $305,999.93 | Construction | Roadway | Construction | Roadway | $310,839.61 | $(4,839.68) | -2% | 0 | | | | | 0684-01-068 | Pharr | 03/01/27 | $33,950,374.48 | Construction | Local Let | Construction | Local Let | $33,433,603.20 | $516,771.28 | 2% | 0 | | | | | 0581-02-162 | Dallas | 06/02/26 | $17,965,404.75 | Construction | Roadway | Construction | Roadway | $17,692,389.85 | $273,014.90 | 2% | 0 | | | | | 0917-16-042 | Bryan | 08/05/26 | $550,524.90 | Construction | Bridge | Construction | Bridge | $542,395.11 | $8,129.79 | 2% | 0 | | | | | 0686-02-030 | Houston | 04/05/28 | $3,267,905.00 | Construction | Roadway | Construction | Roadway | $3,221,150.00 | $46,755.00 | 1% | 0 | | | | | 0110-04-213 | Houston | 05/06/26 | $507,480.61 | Construction | Roadway | Construction | Roadway | $514,920.61 | $(7,440.00) | -1% | 0 | | | | | 0747-05-042 | Fort Worth | 05/06/26 | $8,540,372.35 | Construction | Roadway | Construction | Roadway | $8,420,326.85 | $120,045.50 | 1% | 0 | | | | | 0625-01-001 | Waco | 07/01/26 | $2,150,632.74 | Construction | Roadway | Construction | Roadway | $2,180,000.00 | $(29,367.26) | -1% | 0 | | | | | 0747-08-002 | Fort Worth | 05/06/26 | $5,480,400.25 | Construction | Roadway | Construction | Roadway | $5,554,398.25 | $(73,998.00) | -1% | 0 | | | | | 0327-07-048 | Pharr | 08/05/26 | $335,989.93 | Construction | Roadway | Construction | Roadway | $340,335.32 | $(4,345.39) | -1% | 0 | | | | | 1502-01-031 | Lubbock | 07/01/26 | $166,952,606.35 | Construction | Roadway | Construction | Roadway | $164,867,291.60 | $2,085,314.75 | 1% | -97 | -3 months | | | | 0018-01-102 | Laredo | 05/06/26 | $7,425,536.19 | Construction | Roadway | Construction | Roadway | $7,333,506.36 | $92,029.83 | 1% | 0 | | | | | 0177-01-121 | Lufkin | 06/02/26 | $486,501.00 | Construction | Bridge | Construction | Bridge | $480,956.00 | $5,545.00 | 1% | 0 | | | | | 0500-03-655 | Houston | 05/06/26 | $8,850,867.80 | Construction | Bridge | Construction | Bridge | $8,750,914.40 | $99,953.40 | 1% | 0 | | | | | 0249-01-060 | Wichita Falls | 07/01/26 | $261,344.20 | Construction | Bridge | Construction | Bridge | $264,332.00 | $(2,987.80) | -1% | -216 | -7 months | | | | 1953-01-035 | Bryan | 07/01/26 | $77,796.65 | Construction | Roadway | Construction | Roadway | $76,940.00 | $856.65 | 1% | 0 | | | | | 0610-03-095 | Atlanta | 05/06/26 | $11,312,219.23 | Construction | Non Roadway | Construction | Non Roadway | $11,435,889.23 | $(123,670.00) | -1% | 0 | | | | | 0110-01-059 | Bryan | 07/01/26 | $127,828.73 | Construction | Roadway | Construction | Roadway | $129,210.00 | $(1,381.27) | -1% | 0 | | | | | 1397-01-036 | Dallas | 05/03/28 | $11,552,595.95 | Construction | Roadway | Construction | Roadway | $11,675,998.15 | $(123,402.20) | -1% | 0 | | | | | 0327-06-031 | Pharr | 08/05/26 | $356,081.69 | Construction | Roadway | Construction | Roadway | $359,844.53 | $(3,762.84) | -1% | 0 | | | | | 0068-01-085 | Lubbock | 06/02/26 | $691,133.93 | Construction | Roadway | Construction | Roadway | $683,933.93 | $7,200.00 | 1% | 0 | | | | | 0366-02-089 | San Antonio | 06/02/26 | $44,312,183.47 | Construction | Roadway | Construction | Roadway | $43,851,269.81 | $460,913.66 | 1% | 0 | | | | | 0068-01-084 | Lubbock | 06/02/26 | $705,358.23 | Construction | Roadway | Construction | Roadway | $698,158.23 | $7,200.00 | 1% | 0 | | | | | 0086-07-040 | Pharr | 08/05/26 | $368,950.49 | Construction | Roadway | Construction | Roadway | $372,629.79 | $(3,679.30) | -1% | 0 | | | | | 1197-01-027 | Austin | 08/05/26 | $3,080,501.38 | Construction | Roadway | Construction | Roadway | $3,110,829.60 | $(30,328.22) | -1% | -154 | -5 months | | | | 0177-14-038 | Houston | 05/06/26 | $4,713,675.29 | Construction | Roadway | Construction | Roadway | $4,757,838.09 | $(44,162.80) | -1% | 0 | | | | | 0916-26-023 | Corpus Christi | 05/06/26 | $1,200,909.50 | Construction | Bridge | Construction | Bridge | $1,189,809.50 | $11,100.00 | 1% | 0 | | | | | 0086-07-041 | Pharr | 08/05/26 | $360,110.74 | Construction | Roadway | Construction | Roadway | $363,332.71 | $(3,221.97) | -1% | 0 | | | | | 0917-16-040 | Bryan | 08/05/26 | $702,786.45 | Construction | Bridge | Construction | Bridge | $708,168.67 | $(5,382.22) | -1% | 0 | | | | | 0190-05-078 | Tyler | 06/02/26 | $1,960,952.00 | Construction | Roadway | Construction | Roadway | $1,975,005.00 | $(14,053.00) | -1% | 0 | | | | | 0291-03-077 | San Antonio | 06/02/26 | $618,826.35 | Construction | Roadway | Construction | Roadway | $622,966.35 | $(4,140.00) | -1% | 0 | | | | | 0698-03-107 | Pharr | 05/06/26 | $263,173.95 | Construction | Roadway | Construction | Roadway | $264,761.15 | $(1,587.20) | -1% | 0 | | | | | 0521-06-166 | San Antonio | 06/02/26 | $396,200.55 | Construction | Bridge | Construction | Bridge | $393,900.55 | $2,300.00 | 1% | 0 | | | | | 0167-01-122 | El Paso | 06/02/26 | $84,676,469.69 | Construction | Roadway | Construction | Roadway | $84,225,632.19 | $450,837.50 | 1% | 0 | | | | | 0259-05-086 | Fort Worth | 07/01/26 | $568,444.50 | Construction | Roadway | Construction | Roadway | $565,694.50 | $2,750.00 | 0% | -216 | -7 months | | | | 0167-02-093 | El Paso | 05/06/26 | $592,039.00 | Construction | Roadway | Construction | Roadway | $594,961.00 | $(2,922.00) | -0% | 0 | | | | | 0327-07-050 | Pharr | 08/05/26 | $405,710.18 | Construction | Roadway | Construction | Roadway | $407,530.22 | $(1,820.04) | -0% | 0 | | | | | 0038-01-104 | Laredo | 02/02/28 | $2,615,401.95 | Construction | Roadway | Construction | Roadway | $2,604,201.43 | $11,200.52 | 0% | -365 | -1 year | | | | 0025-02-230 | San Antonio | 06/02/26 | $504,445.00 | Construction | Bridge | Construction | Bridge | $502,495.00 | $1,950.00 | 0% | 0 | | | | | 1064-01-048 | Pharr | 05/06/26 | $200,859.55 | Construction | Roadway | Construction | Roadway | $200,135.05 | $724.50 | 0% | 0 | | | | | 1586-01-093 | Pharr | 05/06/26 | $177,905.35 | Construction | Roadway | Construction | Roadway | $177,268.35 | $637.00 | 0% | 0 | | | | | 0220-01-039 | Pharr | 05/06/26 | $293,896.05 | Construction | Roadway | Construction | Roadway | $293,029.05 | $867.00 | 0% | 0 | | | | | 0038-07-085 | Pharr | 05/06/26 | $232,444.80 | Construction | Roadway | Construction | Roadway | $231,845.30 | $599.50 | 0% | 0 | | | | | 0859-04-018 | Bryan | 07/01/26 | $53,671.70 | Construction | Roadway | Construction | Roadway | $53,540.00 | $131.70 | 0% | 0 | | | | | 2094-01-063 | Pharr | 05/06/26 | $33,933,190.86 | Construction | Roadway | Construction | Roadway | $33,850,470.86 | $82,720.00 | 0% | 0 | | | | | 1401-01-024 | Bryan | 07/01/26 | $109,702.55 | Construction | Roadway | Construction | Roadway | $109,910.00 | $(207.45) | -0% | 0 | | | | | 0018-05-089 | Laredo | 06/01/27 | $256,120,160.76 | Construction | Roadway | Construction | Roadway | $255,671,664.26 | $448,496.50 | 0% | 0 | | | | | 0167-01-137 | El Paso | 06/02/26 | $1,188,375.00 | Construction | Roadway | Construction | Roadway | $1,186,375.00 | $2,000.00 | 0% | 0 | | | | | 2121-03-167 | El Paso | 05/06/26 | $1,166,135.50 | Construction | Roadway | Construction | Roadway | $1,167,991.50 | $(1,856.00) | -0% | 0 | | | | | 0018-06-219 | Laredo | 05/06/26 | $4,845,177.97 | Construction | Roadway | Construction | Roadway | $4,838,092.97 | $7,085.00 | 0% | 0 | | | | | 0050-12-002 | Houston | 06/02/26 | $785,715.19 | Construction | Roadway | Construction | Roadway | $786,825.43 | $(1,110.24) | -0% | 0 | | | | | 0276-07-035 | San Antonio | 09/02/26 | $8,601,216.47 | Construction | Roadway | Construction | Roadway | $8,610,648.49 | $(9,432.02) | -0% | 0 | | | | | 0019-01-153 | Fort Worth | 07/01/26 | $1,566,691.63 | Construction | Roadway | Construction | Roadway | $1,565,041.53 | $1,650.10 | 0% | -216 | -7 months | | | | 0630-01-059 | Pharr | 05/06/26 | $64,925.00 | Construction | Roadway | Construction | Roadway | $64,985.00 | $(60.00) | -0% | 0 | | | | | 0521-04-285 | San Antonio | 05/06/26 | $131,056,485.41 | Construction | Roadway | Construction | Roadway | $131,153,285.41 | $(96,800.00) | -0% | 0 | | | | | 0521-04-286 | San Antonio | 05/06/26 | $131,056,485.41 | Joint Bid Utility | Right-of-Way | Joint Bid Utility | Right-of-Way | $131,153,285.41 | $(96,800.00) | -0% | 0 | | | | | 0937-01-027 | Lufkin | 06/02/26 | $5,065,573.30 | Construction | Roadway | Construction | Roadway | $5,062,782.80 | $2,790.50 | 0% | 0 | | | | | 0255-06-073 | Pharr | 05/06/26 | $73,884,136.67 | Construction | Roadway | Construction | Roadway | $73,911,736.67 | $(27,600.00) | -0% | 0 | | | | | 0001-02-081 | El Paso | 11/01/28 | $801,308.04 | Construction | Roadway | Construction | Roadway | $801,308.00 | $0.04 | 0% | 0 | | | | | 0207-05-089 | Atlanta | 10/05/27 | $3,526,729.00 | Construction | Bridge | Construction | Bridge | $3,526,728.76 | $0.24 | 0% | 0 | | | | | 0843-07-026 | Atlanta | 10/05/27 | $4,036,208.00 | Construction | Bridge | Construction | Bridge | $4,036,207.70 | $0.30 | 0% | 0 | | | | | 0843-07-027 | Atlanta | 10/05/27 | $5,470,641.00 | Construction | Bridge | Construction | Bridge | $5,470,640.94 | $0.06 | 0% | 0 | | | | | 1575-03-021 | Atlanta | 10/05/27 | $3,576,073.00 | Construction | Bridge | Construction | Bridge | $3,576,073.03 | $(0.03) | 0% | 0 | | | | | 0917-16-041 | Bryan | 08/05/26 | $607,979.40 | Construction | Bridge | Construction | Bridge | $607,989.40 | $(10.00) | 0% | 0 | | | | | 0880-04-040 | Lubbock | 05/06/26 | $10,274,387.05 | Construction | Roadway | Construction | Roadway | $10,274,814.05 | $(427.00) | 0% | 0 | | | | --- ## Putting It Together This latest analysis underscores that the TxDOT pipeline is expanding with a growing number of projects and increasing overall costs, despite a drift in project timelines pushing many deadlines further out. --- ## Final Takeaway This pattern suggests a cautious approach to moving forward with infrastructure projects, emphasizing the importance of careful planning and resource allocation. --- ## TxDOT Pipeline Changes - March 2026 https://www.bidlo.ai/research/txdot-pipeline-changes-march-2026 What has changed in TxDOT’s project schedule in the month of March? - The total pipeline value increased by $2.72B, reflecting a significant rise in project funding and scope. - The project count rose from 5,665 to 6,354, indicating a growing pipeline of upcoming projects. - Houston reported the largest district cost movement, with an increase of $1.43B. --- ## Overview Comparing how the TxDOT pipeline changed from February 2 to March 3 across a letting window of April 5, 2026 to February 1, 2029, the project pipeline shows substantial growth in both value and project counts. The letting timing indicates a significant push to later dates as 233 projects shifted to later letting dates by over six months. The subtype mix remained mostly stable with roadway projects dominating at 75.2%. Cost changes reflect a net increase in investment, with $2.72B added to the pipeline. --- ## Letting Date Shifts (Slippage) [https://info.bidlo.ai/embed/letting-slippage-bubble?publication_id=59358a65-60c9-4932-8691-c4adc130441a](https://info.bidlo.ai/embed/letting-slippage-bubble?publication_id=59358a65-60c9-4932-8691-c4adc130441a) > How to read this chart: Overall, the project cohort has seen a notable shift with a total of 277 projects changing their letting dates by six months or more. This includes 233 projects moving to later dates and 44 moved earlier, indicating an overall shift toward postponements. | CSJ | District | Est. Letting Date | Project Estimate | Current Type | Current Subtype | Prev. Type | Prev. Subtype | Prev. Date | Letting Δ (days) | Letting Date Δ | Cost Δ | %Cost Δ | Type/Subtype Δ | Lifecycle | | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | | 2635-03-030 | Amarillo | 11/01/40 | $700,000.00 | | | Construction | Roadway | 11/03/26 | 5112 | 14 years | | | | | | 2635-04-045 | Amarillo | 11/01/40 | $207,100.00 | | | Construction | Roadway | 11/03/26 | 5112 | 14 years | | | | | | 0790-01-024 | Amarillo | 11/01/41 | $2,400,000.00 | | | Construction | Roadway | 11/01/28 | 4748 | 13 years | | | | | | 0798-02-014 | Amarillo | 11/01/40 | $400,000.00 | | | Construction | Roadway | 11/02/27 | 4748 | 13 years | | | | | | 0798-03-015 | Amarillo | 11/01/40 | $900,000.00 | | | Construction | Roadway | 11/02/27 | 4748 | 13 years | | | | | | 1243-01-027 | Amarillo | 11/01/40 | $1,300,000.00 | | | Construction | Roadway | 11/02/27 | 4748 | 13 years | | | | | | 0675-04-091 | Bryan | 10/01/39 | $78,414.00 | | | Construction | Roadway | 10/06/26 | 4743 | 13 years | | | | | | 1145-03-011 | Bryan | 10/01/39 | $155,000.00 | | | Construction | Roadway | 10/06/26 | 4743 | 13 years | $(676.00) | -0% | | | | 2238-02-026 | Bryan | 10/01/39 | $258,663.00 | | | Construction | Roadway | 10/06/26 | 4743 | 13 years | | | | | | 0790-06-020 | Amarillo | 11/01/40 | $1,700,000.00 | | | Construction | Roadway | 11/01/28 | 4383 | 12 years | | | | | | 2803-01-012 | Amarillo | 11/01/40 | $850,000.00 | | | Construction | Roadway | 11/01/28 | 4383 | 12 years | | | | | | 1563-01-019 | Bryan | 10/01/39 | $369,674.00 | | | Construction | Roadway | 10/05/27 | 4379 | 12 years | | | | | | 0134-04-037 | Fort Worth | 01/01/38 | $696,980.80 | | | Construction | Roadway | 12/01/26 | 4049 | 11 years | $(3,025,857.95) | -81% | | | | 0275-18-006 | Amarillo | 11/01/39 | $570,000.00 | | | Construction | Roadway | 11/01/28 | 4017 | 11 years | | | | | | 1243-01-026 | Amarillo | 11/01/39 | $1,500,000.00 | | | Construction | Roadway | 11/01/28 | 4017 | 11 years | | | | | | 1246-02-013 | Amarillo | 11/01/38 | $750,120.00 | | | Construction | Roadway | 11/02/27 | 4017 | 11 years | | | | | | 1820-02-010 | Amarillo | 11/01/38 | $729,220.00 | | | Construction | Roadway | 11/02/27 | 4017 | 11 years | | | | | | 1888-01-016 | Amarillo | 11/01/38 | $1,500,000.00 | | | Construction | Roadway | 11/02/27 | 4017 | 11 years | | | | | | 0308-05-014 | Amarillo | 11/01/37 | $570,000.00 | | | Construction | Roadway | 11/03/26 | 4016 | 11 years | | | | | | 0675-03-110 | Bryan | 10/01/39 | $135,844.00 | | | Construction | Roadway | 10/04/28 | 4014 | 11 years | | | | | | 0675-03-111 | Bryan | 10/01/39 | $95,327.00 | | | Construction | Roadway | 10/04/28 | 4014 | 11 years | | | | | | 1404-02-036 | Bryan | 10/01/39 | $146,406.00 | | | Construction | Roadway | 10/04/28 | 4014 | 11 years | | | | | | 0794-05-017 | Amarillo | 11/01/37 | $900,000.00 | | | Construction | Roadway | 11/02/27 | 3652 | 10 years | | | | | | 0088-05-115 | Yoakum | 01/06/27 | $250,000.00 | Construction | Roadway | Unassigned | Unassigned | 09/01/36 | -3526 | -10 years | | | Unassigned → Construction / Roadway | | | 3510-09-006 | Beaumont | 11/02/27 | $176,000,000.00 | Construction | Roadway | Unassigned | Unassigned | 04/01/36 | -3073 | -8 years | | | Unassigned → Construction / Roadway | | | 3510-10-023 | Beaumont | 11/02/27 | $40,000,000.00 | Construction | Roadway | Unassigned | Unassigned | 04/01/36 | -3073 | -8 years | | | Unassigned → Construction / Roadway | | | 3510-02-008 | Houston | 05/15/35 | $470,000,000.00 | | | Construction | Local Let | 05/15/27 | 2922 | 8 years | | | | | | 2714-02-006 | Yoakum | 11/01/34 | $67,110.00 | | | Construction | Roadway | 11/03/26 | 2920 | 8 years | | | | | | 3427-03-008 | Dallas | 10/01/35 | $127,125.00 | Construction | Roadway | Construction | Roadway | 10/05/27 | 2918 | 8 years | | | | | | 0248-03-024 | Atlanta | 11/02/27 | $13,160,923.50 | | | | | 01/01/35 | -2617 | -7 years | $1,668,781.50 | 15% | | | | 1733-01-009 | Amarillo | 11/01/35 | $74,000.00 | | | Construction | Roadway | 11/01/28 | 2556 | 7 years | $(2,000.00) | -3% | | | | 0089-10-034 | Yoakum | 11/01/34 | $419,834.00 | | | Construction | Roadway | 11/02/27 | 2556 | 7 years | | | | | | 0240-03-041 | Yoakum | 11/01/34 | $1,176,175.00 | | | Construction | Roadway | 11/02/27 | 2556 | 7 years | | | | | | 2515-01-006 | Yoakum | 11/01/34 | $123,284.00 | | | Construction | Roadway | 11/02/27 | 2556 | 7 years | | | | | | 2600-01-006 | Yoakum | 11/01/34 | $438,439.00 | | | Construction | Roadway | 11/02/27 | 2556 | 7 years | | | | | | 0203-02-053 | Paris | 11/01/33 | $1,288,930.13 | | | Construction | Roadway | 11/03/26 | 2555 | 7 years | | | | | | 0387-06-009 | Dallas | 10/01/34 | $122,085.00 | | | Construction | Roadway | 10/05/27 | 2553 | 7 years | | | | | | 0089-03-103 | Yoakum | 11/01/34 | $80,000.00 | | | Construction | Roadway | 11/01/28 | 2191 | 6 years | | | | | | 0089-04-087 | Yoakum | 11/01/34 | $200,000.00 | | | Construction | Roadway | 11/01/28 | 2191 | 6 years | | | | | | 0211-11-004 | Yoakum | 11/01/34 | $15,000.00 | | | Construction | Roadway | 11/01/28 | 2191 | 6 years | | | | | | 0420-08-010 | Yoakum | 11/01/34 | $175,000.00 | | | Construction | Roadway | 11/01/28 | 2191 | 6 years | | | | | | 1442-04-012 | Yoakum | 11/01/34 | $106,000.00 | | | Construction | Roadway | 11/01/28 | 2191 | 6 years | | | | | | 3109-03-006 | Yoakum | 11/01/34 | $136,500.00 | | | Construction | Roadway | 11/01/28 | 2191 | 6 years | | | | | | 0314-07-070 | Fort Worth | 08/05/26 | $18,156,436.74 | Construction | Roadway | Unassigned | Unassigned | 09/01/31 | -1853 | -5 years | $(1,039,006.41) | -5% | Unassigned → Construction / Roadway | | | 0364-05-043 | Fort Worth | 08/05/26 | $1,221,633.00 | | | | | 09/01/31 | -1853 | -5 years | $(3,500.03) | -0% | | | | 0515-05-022 | Yoakum | 11/01/32 | $200,000.00 | | | Construction | Roadway | 11/02/27 | 1826 | 5 years | | | | | | 0048-01-068 | Dallas | 10/01/32 | $247,365.00 | Construction | Roadway | Construction | Roadway | 10/05/27 | 1823 | 5 years | | | | | | 0004-01-038 | Odessa | 11/01/33 | $4,104,187.00 | | | Construction | Bridge | 02/01/29 | 1734 | 5 years | | | | | | 0091-03-022 | Dallas | 12/05/28 | $37,095,271.43 | Construction | Roadway | Unassigned | Unassigned | 08/01/33 | -1700 | -5 years | | | Unassigned → Construction / Roadway | | | 3510-09-005 | Beaumont | 11/02/27 | $220,000,000.00 | Construction | Roadway | Unassigned | Unassigned | 05/01/32 | -1642 | -4 years | | | Unassigned → Construction / Roadway | | | 1024-02-051 | Beaumont | 08/15/30 | $1,750,000.00 | Non-Let | Roadway | Non-Let | Roadway | 08/15/26 | 1461 | 4 years | | | | | | 0259-05-083 | Fort Worth | 09/01/27 | $8,009,664.43 | | | | | 09/01/31 | -1461 | -4 years | $(4,412,215.45) | -36% | | | | 0146-03-048 | Childress | 02/01/32 | $8,000,000.00 | | | Construction | Roadway | 02/02/28 | 1460 | 4 years | | | | | | 0366-01-090 | Austin | 08/01/31 | $3,444,833.00 | | | Construction | Bridge | 08/02/27 | 1460 | 4 years | | | | | | 0048-03-103 | Dallas | 10/01/32 | $634,489.00 | Construction | Roadway | Construction | Roadway | 10/04/28 | 1458 | 4 years | | | | | | 1392-01-056 | Dallas | 10/01/31 | $169,155.00 | | | Construction | Roadway | 10/05/27 | 1457 | 4 years | | | | | | 0159-02-079 | San Angelo | 10/04/28 | $5,675,000.00 | Construction | Roadway | Unassigned | Unassigned | 01/01/32 | -1184 | -3 years | | | Unassigned → Construction / Roadway | | | 6411-57-001 | Beaumont | 05/04/29 | $1,000,000.00 | Maintenance | Routine Maintenance Contract | Maintenance | Routine Maintenance Contract | 05/04/26 | 1096 | 3 years | | | | | | 6418-07-001 | Beaumont | 05/04/29 | $700,000.00 | Maintenance | Routine Maintenance Contract | Maintenance | Routine Maintenance Contract | 05/04/26 | 1096 | 3 years | | | | | | 0189-01-014 | Paris | 11/01/30 | $44,953.92 | | | Construction | Roadway | 11/02/27 | 1095 | 3 years | | | | | | 0189-02-064 | Paris | 11/01/30 | $1,915,826.88 | | | Construction | Roadway | 11/02/27 | 1095 | 3 years | | | | | | 0031-01-024 | Childress | 05/01/31 | $5,000,000.00 | | | Construction | Roadway | 05/03/28 | 1093 | 3 years | | | | | | 3419-01-013 | Dallas | 10/01/31 | $305,418.15 | | | Construction | Roadway | 10/04/28 | 1092 | 3 years | | | | | | 0338-10-024 | Bryan | 04/01/31 | $9,000,000.00 | | | Construction | Roadway | 04/05/28 | 1091 | 3 years | | | | | | 0987-02-016 | San Antonio | 09/01/31 | $792,000.00 | | | Construction | Bridge | 09/06/28 | 1090 | 3 years | | | | | | 1051-01-064 | Dallas | 09/01/31 | $101,546,735.71 | | | Construction | Roadway | 09/06/28 | 1090 | 3 years | | | | | | 1207-02-024 | Corpus Christi | 10/01/30 | $1,000,000.00 | | | Construction | Bridge | 11/02/27 | 1064 | 3 years | | | | | | 0912-72-696 | Houston | 08/15/26 | $50,000.00 | Non-Let | Roadway | Unassigned | Unassigned | 10/01/23 | 1049 | 3 years | | | Unassigned → Non-Let / Roadway | | | 0348-12-015 | Corpus Christi | 09/01/30 | $8,000,000.00 | | | Construction | Roadway | 11/02/27 | 1034 | 3 years | | | | | | 0348-12-017 | Corpus Christi | 09/01/30 | $2,500,000.00 | | | Construction | Bridge | 11/02/27 | 1034 | 3 years | | | | | | 0904-11-071 | Amarillo | 05/05/27 | $6,100,000.00 | | | | | 02/01/30 | -1003 | -3 years | | | | | | 1318-01-019 | Dallas | 07/01/31 | $1,320,852.06 | | | Construction | Bridge | 11/01/28 | 972 | 3 years | $259,686.01 | 24% | | | | 1318-01-020 | Dallas | 07/01/31 | $1,149,379.99 | | | Construction | Bridge | 11/01/28 | 972 | 3 years | $88,213.94 | 8% | | | | 1663-02-013 | Dallas | 07/01/30 | $2,309,392.41 | | | Construction | Bridge | 01/05/28 | 908 | 2 years | | | | | | 1663-03-021 | Dallas | 07/01/30 | $3,587,489.26 | | | Construction | Bridge | 01/05/28 | 908 | 2 years | | | | | | 2026-01-023 | Corpus Christi | 06/01/30 | $800,000.00 | | | Construction | Bridge | 01/05/28 | 878 | 2 years | | | | | | 0902-00-235 | Fort Worth | 11/03/28 | $11,807,604.60 | Construction | Local Let | Construction | Local Let | 09/04/26 | 791 | 2 years | | | | | | 0902-00-395 | Fort Worth | 11/03/28 | $7,225,601.00 | Construction | Local Let | Construction | Local Let | 09/04/26 | 791 | 2 years | | | | | | 0179-10-119 | Yoakum | 08/28/28 | $591,600.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 08/02/26 | 757 | 2 years | | | | | | 0515-01-077 | Yoakum | 08/28/28 | $404,400.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 08/02/26 | 757 | 2 years | | | | | | 1113-01-034 | Yoakum | 08/28/28 | $132,400.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 08/02/26 | 757 | 2 years | | | | | | 1954-01-013 | Bryan | 10/01/30 | $2,400,000.00 | | | Construction | Bridge | 09/06/28 | 755 | 2 years | | | | | | 1954-01-018 | Bryan | 10/01/30 | $2,200,000.00 | | | Construction | Bridge | 09/06/28 | 755 | 2 years | | | | | | 0211-10-049 | Yoakum | 07/06/28 | $405,000.00 | Construction | Rail - Safety | Construction | Rail - Safety | 07/01/26 | 736 | 2 years | | | | | | 0211-10-050 | Yoakum | 07/06/28 | $500,000.00 | Construction | Roadway | Construction | Roadway | 07/01/26 | 736 | 2 years | | | | | | 0902-90-219 | Fort Worth | 07/06/28 | $391,387.25 | Construction | Roadway | Construction | Roadway | 07/01/26 | 736 | 2 years | | | | | | 0467-01-009 | Waco | 12/05/28 | $3,000,000.00 | Construction | Roadway | Construction | Roadway | 12/01/26 | 735 | 2 years | | | | | | 2033-02-011 | Abilene | 12/01/29 | $429,066.00 | | | Construction | Roadway | 12/01/27 | 731 | 2 years | | | | | | 0050-03-101 | Bryan | 09/01/29 | $5,500,000.00 | | | Construction | Bridge | 09/01/27 | 731 | 2 years | | | | | | 0785-02-017 | Beaumont | 08/01/28 | $209,200.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 08/01/26 | 731 | 2 years | | | | | | 0675-03-085 | Bryan | 01/01/31 | $700,000.00 | | | Construction | Bridge | 01/01/29 | 730 | 2 years | | | | | | 1922-01-019 | Bryan | 01/01/31 | $580,000.00 | | | Construction | Bridge | 01/01/29 | 730 | 2 years | | | | | | 0170-01-038 | Amarillo | 11/01/30 | $480,000.00 | | | Construction | Roadway | 11/01/28 | 730 | 2 years | $(20,000.00) | -4% | | | | 0557-07-016 | Amarillo | 11/01/30 | $330,000.00 | | | Construction | Roadway | 11/01/28 | 730 | 2 years | | | | | | 2002-03-023 | Amarillo | 11/01/30 | $976,800.00 | | | Construction | Roadway | 11/01/28 | 730 | 2 years | $(23,200.00) | -2% | | | | 0902-90-336 | Fort Worth | 02/01/30 | $3,000,000.00 | | | Construction | Roadway | 02/02/28 | 730 | 2 years | | | | | | 0018-09-007 | Laredo | 11/01/29 | $8,928,571.43 | | | Construction | Bridge | 11/02/27 | 730 | 2 years | | | | | | 1698-01-025 | Yoakum | 11/01/29 | $100,000.00 | | | Construction | Roadway | 11/02/27 | 730 | 2 years | $(149,593.00) | -60% | | | | 0496-03-013 | Childress | 02/02/27 | $4,000,000.00 | Construction | Roadway | Construction | Roadway | 02/01/29 | -730 | -2 years | $1,000,000.00 | 33% | | | | 0496-04-040 | Childress | 02/02/27 | $4,000,000.00 | Construction | Roadway | Construction | Roadway | 02/01/29 | -730 | -2 years | $1,000,000.00 | 33% | | | | 1463-02-017 | Paris | 11/01/28 | $143,672.32 | Construction | Roadway | Construction | Roadway | 11/03/26 | 729 | 2 years | | | | | | 0319-01-073 | Lufkin | 11/03/26 | $968,762.66 | Construction | Roadway | Construction | Roadway | 11/01/28 | -729 | -2 years | $(268,139.67) | -22% | | | | 0840-01-019 | Yoakum | 11/03/26 | $235,000.00 | Construction | Roadway | Construction | Roadway | 11/01/28 | -729 | -2 years | | | | | | 2516-01-012 | Yoakum | 11/03/26 | $240,000.00 | Construction | Roadway | Construction | Roadway | 11/01/28 | -729 | -2 years | $(160,000.00) | -40% | | | | 0912-31-328 | Houston | 05/01/30 | $390,000.00 | | | Construction | Bridge | 05/03/28 | 728 | 2 years | | | | | | 1142-01-019 | Amarillo | 09/01/27 | $500,000.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 09/04/25 | 727 | 2 years | | | | | | 0034-06-016 | San Angelo | 09/01/30 | $1,450,000.00 | | | Construction | Bridge | 09/06/28 | 725 | 2 years | | | | | | 0337-05-043 | Bryan | 09/01/30 | $3,472,138.22 | | | Construction | Bridge | 09/06/28 | 725 | 2 years | | | | | | 0337-05-045 | Bryan | 09/01/30 | $1,400,000.00 | | | Construction | Bridge | 09/06/28 | 725 | 2 years | | | | | | 0590-05-052 | Bryan | 09/01/30 | $4,000,000.00 | | | Construction | Bridge | 09/06/28 | 725 | 2 years | | | | | | 0711-02-044 | Childress | 09/01/30 | $1,140,000.00 | | | Construction | Bridge | 09/06/28 | 725 | 2 years | | | | | | 2990-02-005 | Childress | 09/01/30 | $1,650,000.00 | | | Construction | Bridge | 09/06/28 | 725 | 2 years | | | | | | 3454-01-014 | Fort Worth | 07/01/30 | $13,902,396.30 | | | Construction | Bridge | 07/06/28 | 725 | 2 years | | | | | | 0573-05-021 | Yoakum | 09/01/30 | $2,069,810.00 | | | Construction | Bridge | 01/01/29 | 608 | 2 years | | | | | | 0007-02-059 | Abilene | 06/01/28 | $9,414,000.00 | Construction | Bridge | Unassigned | Unassigned | 01/01/30 | -579 | -2 years | | | Unassigned → Construction / Bridge | | | 0007-02-060 | Abilene | 06/01/28 | $9,414,000.00 | Construction | Bridge | Unassigned | Unassigned | 01/01/30 | -579 | -2 years | | | Unassigned → Construction / Bridge | | | 0389-12-098 | Houston | 04/06/27 | $31,000,000.00 | Construction | Bridge | Construction | Bridge | 11/01/28 | -575 | -2 years | | | | | | 0924-06-694 | El Paso | 11/02/27 | $69,444.44 | Construction | Rail | Construction | Rail | 05/06/26 | 545 | 1 year | $(5,555.56) | -7% | | | | 0113-10-001 | Austin | 02/02/29 | $5,749,074.07 | Construction | Local Let | Construction | Local Let | 09/03/27 | 518 | 1 year | | | | | | 0550-02-058 | Fort Worth | 10/04/28 | $350,000.00 | Construction | Non Roadway | Construction | Non Roadway | 05/05/27 | 518 | 1 year | | | | | | 0265-07-054 | Yoakum | 07/01/27 | $2,089,193.66 | Construction | Roadway | Construction | Roadway | 09/06/28 | -433 | -1 year | | | | | | 0265-08-074 | Yoakum | 07/01/27 | $3,012,439.88 | Construction | Roadway | Construction | Roadway | 09/06/28 | -433 | -1 year | | | | | | 0266-02-072 | Yoakum | 07/01/27 | $1,525,996.77 | Construction | Roadway | Construction | Roadway | 09/06/28 | -433 | -1 year | | | | | | 0683-02-086 | Austin | 06/02/26 | $4,423,285.43 | Construction | Bridge | Construction | Bridge | 08/04/27 | -428 | -1 year | | | | | | 2100-01-074 | Austin | 06/02/26 | $46,340.00 | Construction | Bridge | Construction | Bridge | 08/04/27 | -428 | -1 year | | | | | | 0315-01-038 | Bryan | 10/04/28 | $12,000,000.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 399 | 1 year | | | | | | 0909-40-091 | Waco | 08/04/27 | $590,000.00 | Construction | Bridge | Construction | Bridge | 07/01/26 | 399 | 1 year | | | | | | 0918-46-334 | Dallas | 06/02/26 | $1,675,899.60 | Construction | Bridge | Construction | Bridge | 07/01/27 | -394 | -1 year | $148,609.30 | 10% | | | | 0918-46-335 | Dallas | 06/02/26 | $1,097,504.80 | Construction | Bridge | Construction | Bridge | 07/01/27 | -394 | -1 year | $159,319.80 | 17% | | | | 1122-02-045 | Corpus Christi | 09/06/28 | $5,000,000.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 371 | 1 year | $(5,000,000.00) | -50% | | | | 0210-03-027 | Bryan | 07/06/28 | $3,130,000.00 | Construction | Roadway | Construction | Roadway | 07/01/27 | 371 | 1 year | | | | | | 2087-01-023 | Bryan | 07/06/28 | $1,300,000.00 | Construction | Roadway | Construction | Roadway | 07/01/27 | 371 | 1 year | | | | | | 1875-03-024 | Lufkin | 09/01/27 | $9,509,542.59 | Construction | Roadway | Construction | Roadway | 09/06/28 | -371 | -1 year | $4,433,649.73 | 87% | | | | 0002-06-063 | El Paso | 12/05/28 | $780,418.52 | Construction | Roadway | Construction | Roadway | 12/01/27 | 370 | 1 year | | | | | | 0002-07-055 | El Paso | 12/05/28 | $641,183.33 | Construction | Roadway | Construction | Roadway | 12/01/27 | 370 | 1 year | | | | | | 0002-08-056 | El Paso | 12/05/28 | $761,911.11 | Construction | Roadway | Construction | Roadway | 12/01/27 | 370 | 1 year | | | | | | 0002-09-041 | El Paso | 12/05/28 | $784,988.89 | Construction | Roadway | Construction | Roadway | 12/01/27 | 370 | 1 year | | | | | | 0002-10-040 | El Paso | 12/05/28 | $502,716.67 | Construction | Roadway | Construction | Roadway | 12/01/27 | 370 | 1 year | | | | | | 0002-11-062 | El Paso | 12/05/28 | $172,652.78 | Construction | Roadway | Construction | Roadway | 12/01/27 | 370 | 1 year | | | | | | 0002-14-049 | El Paso | 12/05/28 | $453,062.04 | Construction | Roadway | Construction | Roadway | 12/01/27 | 370 | 1 year | | | | | | 0002-20-012 | El Paso | 12/05/28 | $264,537.04 | Construction | Roadway | Construction | Roadway | 12/01/27 | 370 | 1 year | | | | | | 0003-01-065 | El Paso | 12/05/28 | $1,142,436.11 | Construction | Roadway | Construction | Roadway | 12/01/27 | 370 | 1 year | | | | | | 0003-02-050 | El Paso | 12/05/28 | $546,891.67 | Construction | Roadway | Construction | Roadway | 12/01/27 | 370 | 1 year | | | | | | 0003-03-052 | El Paso | 12/05/28 | $89,813.89 | Construction | Roadway | Construction | Roadway | 12/01/27 | 370 | 1 year | | | | | | 0167-02-096 | El Paso | 12/05/28 | $234,746.30 | Construction | Roadway | Construction | Roadway | 12/01/27 | 370 | 1 year | | | | | | 0374-03-033 | El Paso | 12/05/28 | $370,370.37 | Construction | Roadway | Construction | Roadway | 12/01/27 | 370 | 1 year | | | | | | 0674-01-082 | El Paso | 12/05/28 | $408,994.44 | Construction | Roadway | Construction | Roadway | 12/01/27 | 370 | 1 year | | | | | | 1282-01-017 | El Paso | 12/05/28 | $1,410,241.67 | Construction | Roadway | Construction | Roadway | 12/01/27 | 370 | 1 year | | | | | | 2122-01-019 | El Paso | 12/05/28 | $176,183.33 | Construction | Roadway | Construction | Roadway | 12/01/27 | 370 | 1 year | | | | | | 0918-00-472 | Dallas | 08/04/28 | $495,000.00 | Construction | Roadway | Construction | Roadway | 08/02/27 | 368 | 1 year | | | | | | 0382-02-039 | Waco | 12/03/26 | $238,000.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 12/01/25 | 367 | 1 year | | | | | | 0643-03-034 | Waco | 12/03/26 | $183,600.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 12/01/25 | 367 | 1 year | | | | | | 1308-01-036 | Waco | 12/03/26 | $158,000.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 12/01/25 | 367 | 1 year | | | | | | 2061-02-032 | Waco | 12/03/26 | $279,600.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 12/01/25 | 367 | 1 year | | | | | | 3292-01-016 | Waco | 12/03/26 | $158,000.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 12/01/25 | 367 | 1 year | | | | | | 1808-02-014 | Corpus Christi | 02/01/30 | $900,000.00 | | | Construction | Bridge | 02/01/29 | 365 | 1 year | | | | | | 1808-03-023 | Corpus Christi | 02/01/30 | $1,200,000.00 | | | Construction | Bridge | 02/01/29 | 365 | 1 year | | | | | | 1808-03-024 | Corpus Christi | 02/01/30 | $900,000.00 | | | Construction | Bridge | 02/01/29 | 365 | 1 year | | | | | | 1808-03-025 | Corpus Christi | 02/01/30 | $1,500,000.00 | | | Construction | Bridge | 02/01/29 | 365 | 1 year | | | | | | 0418-02-036 | Waco | 01/01/30 | $7,351,000.00 | | | Construction | Bridge | 01/01/29 | 365 | 1 year | | | | | | 0836-03-062 | Waco | 01/01/30 | $2,600,000.00 | | | Construction | Bridge | 01/01/29 | 365 | 1 year | | | | | | 2281-02-007 | San Angelo | 01/01/30 | $6,529,690.18 | Construction | Bridge | Construction | Bridge | 01/01/29 | 365 | 1 year | | | | | | 2604-01-008 | Waco | 01/01/30 | $4,293,000.00 | | | Construction | Bridge | 01/01/29 | 365 | 1 year | | | | | | 0356-02-052 | Amarillo | 11/01/29 | $1,886,000.00 | | | Construction | Roadway | 11/01/28 | 365 | 1 year | $(14,000.00) | -1% | | | | 0420-03-019 | Yoakum | 11/01/29 | $181,000.00 | | | Construction | Roadway | 11/01/28 | 365 | 1 year | | | | | | 0643-01-072 | Bryan | 11/01/29 | $16,000,000.00 | | | Construction | Roadway | 11/01/28 | 365 | 1 year | | | | | | 0794-01-020 | Amarillo | 11/01/29 | $1,379,400.00 | | | Construction | Roadway | 11/01/28 | 365 | 1 year | $(20,600.00) | -1% | | | | 1052-02-101 | Corpus Christi | 11/01/29 | $15,000,000.00 | | | Construction | Roadway | 11/01/28 | 365 | 1 year | | | | | | 2016-01-014 | Yoakum | 11/01/29 | $180,000.00 | | | Construction | Roadway | 11/01/28 | 365 | 1 year | | | | | | 2081-01-011 | Amarillo | 11/01/29 | $448,000.00 | | | Construction | Roadway | 11/01/28 | 365 | 1 year | $(12,000.00) | -3% | | | | 0238-05-049 | Amarillo | 11/01/28 | $525,000.00 | Construction | Roadway | Construction | Roadway | 11/02/27 | 365 | 1 year | $(25,000.00) | -5% | | | | 0582-03-016 | Amarillo | 11/01/28 | $242,000.00 | Construction | Roadway | Construction | Roadway | 11/02/27 | 365 | 1 year | | | | | | 0990-02-014 | Corpus Christi | 11/01/28 | $5,038,199.00 | Construction | Roadway | Construction | Roadway | 11/02/27 | 365 | 1 year | | | | | | 1624-01-024 | Amarillo | 11/01/28 | $477,204.00 | Construction | Roadway | Construction | Roadway | 11/02/27 | 365 | 1 year | | | | | | 1624-01-025 | Amarillo | 11/01/28 | $780,000.00 | Construction | Roadway | Construction | Roadway | 11/02/27 | 365 | 1 year | | | | | | 2081-01-010 | Amarillo | 11/01/28 | $72,000.00 | Construction | Roadway | Construction | Roadway | 11/02/27 | 365 | 1 year | | | | | | 2097-01-010 | Yoakum | 11/01/28 | $303,526.00 | Construction | Roadway | Construction | Roadway | 11/02/27 | 365 | 1 year | | | | | | 0121-03-064 | Waco | 10/04/28 | $4,585,000.00 | Construction | Bridge | Construction | Bridge | 10/05/27 | 365 | 1 year | | | | | | 0109-04-030 | Lufkin | 04/05/28 | $1,248,237.85 | Construction | Roadway | Construction | Roadway | 04/06/27 | 365 | 1 year | $(48,009.15) | -4% | | | | 0109-05-045 | Lufkin | 04/05/28 | $990,000.00 | Construction | Roadway | Construction | Roadway | 04/06/27 | 365 | 1 year | | | | | | 0118-01-021 | Lufkin | 04/05/28 | $1,253,430.00 | Construction | Roadway | Construction | Roadway | 04/06/27 | 365 | 1 year | | | | | | 0336-01-067 | Lufkin | 04/05/28 | $986,678.00 | Construction | Roadway | Construction | Roadway | 04/06/27 | 365 | 1 year | | | | | | 0340-01-042 | Lufkin | 04/05/28 | $722,577.70 | Construction | Roadway | Construction | Roadway | 04/06/27 | 365 | 1 year | $(36,445.30) | -5% | | | | 1875-03-027 | Lufkin | 04/05/28 | $291,665.00 | Construction | Roadway | Construction | Roadway | 04/06/27 | 365 | 1 year | | | | | | 0006-05-123 | Abilene | 12/01/27 | $615,714.00 | Construction | Roadway | Construction | Roadway | 12/01/26 | 365 | 1 year | | | | | | 0006-14-006 | Abilene | 12/01/27 | $158,589.00 | Construction | Roadway | Construction | Roadway | 12/01/26 | 365 | 1 year | | | | | | 0006-15-042 | Abilene | 12/01/27 | $621,190.61 | Construction | Roadway | Construction | Roadway | 12/01/26 | 365 | 1 year | | | | | | 0007-01-063 | Abilene | 12/01/27 | $393,636.29 | Construction | Roadway | Construction | Roadway | 12/01/26 | 365 | 1 year | | | | | | 0007-02-066 | Abilene | 12/01/27 | $296,259.00 | Construction | Roadway | Construction | Roadway | 12/01/26 | 365 | 1 year | | | | | | 0033-06-127 | Abilene | 12/01/27 | $930,000.00 | Construction | Roadway | Construction | Roadway | 12/01/26 | 365 | 1 year | | | | | | 0157-04-054 | Abilene | 12/01/27 | $105,964.00 | Construction | Roadway | Construction | Roadway | 12/01/26 | 365 | 1 year | | | | | | 0332-01-028 | Abilene | 12/01/27 | $585,803.00 | Construction | Roadway | Construction | Roadway | 12/01/26 | 365 | 1 year | | | | | | 0480-03-047 | Abilene | 12/01/27 | $252,285.00 | Construction | Roadway | Construction | Roadway | 12/01/26 | 365 | 1 year | | | | | | 1361-03-030 | Abilene | 12/01/27 | $806,245.00 | Construction | Roadway | Construction | Roadway | 12/01/26 | 365 | 1 year | | | | | | 2032-01-011 | Abilene | 12/01/27 | $250,584.00 | Construction | Roadway | Construction | Roadway | 12/01/26 | 365 | 1 year | | | | | | 2032-02-016 | Abilene | 12/01/27 | $773,738.50 | Construction | Roadway | Construction | Roadway | 12/01/26 | 365 | 1 year | | | | | | 0059-05-047 | Lufkin | 11/02/27 | $605,101.04 | Construction | Roadway | Construction | Roadway | 11/01/28 | -365 | -1 year | $(197,198.10) | -25% | | | | 0346-07-045 | Yoakum | 11/02/27 | $915,000.00 | Construction | Roadway | Construction | Roadway | 11/01/28 | -365 | -1 year | $215,000.00 | 31% | | | | 2437-01-028 | Amarillo | 11/02/27 | $969,400.00 | Construction | Roadway | Construction | Roadway | 11/01/28 | -365 | -1 year | $(30,600.00) | -3% | | | | 2103-01-036 | Austin | 07/01/27 | $17,791,407.00 | Construction | Roadway | Construction | Roadway | 07/01/26 | 365 | 1 year | | | | | | 2103-01-045 | Austin | 07/01/27 | $2,400,000.00 | Construction | Roadway | Construction | Roadway | 07/01/26 | 365 | 1 year | | | | | | 0187-07-004 | Yoakum | 11/02/27 | $87,466.00 | | | Construction | Roadway | 11/03/26 | 364 | 12 months | | | | Canceled | | 0801-01-015 | Amarillo | 11/02/27 | $132,500.00 | Construction | Roadway | Construction | Roadway | 11/03/26 | 364 | 12 months | $(3,540.00) | -3% | | | | 0801-02-023 | Amarillo | 11/02/27 | $1,413,200.00 | Construction | Roadway | Construction | Roadway | 11/03/26 | 364 | 12 months | $(86,800.00) | -6% | | | | 0432-02-100 | Yoakum | 08/04/27 | $449,145.00 | Construction | Rail - Safety | Construction | Rail - Safety | 08/05/26 | 364 | 12 months | | | | | | 0905-06-119 | Lubbock | 08/04/27 | $1,161,329.00 | Construction | Roadway | Construction | Roadway | 08/05/26 | 364 | 12 months | | | | | | 0179-09-045 | Yoakum | 11/03/26 | $180,621.00 | Construction | Roadway | Construction | Roadway | 11/02/27 | -364 | -12 months | | | | | | 0179-10-118 | Yoakum | 11/03/26 | $76,508.00 | Construction | Roadway | Construction | Roadway | 11/02/27 | -364 | -12 months | | | | | | 0049-15-016 | Bryan | 10/01/29 | $399,041.00 | | | Construction | Roadway | 10/04/28 | 362 | 12 months | | | | | | 0093-08-021 | Bryan | 10/01/29 | $132,825.00 | | | Construction | Roadway | 10/04/28 | 362 | 12 months | | | | | | 0003-03-051 | El Paso | 12/01/29 | $177,284.82 | | | Construction | Roadway | 12/05/28 | 361 | 12 months | | | | | | 0003-04-056 | El Paso | 12/01/29 | $610,060.71 | | | Construction | Roadway | 12/05/28 | 361 | 12 months | | | | | | 0020-03-022 | El Paso | 12/01/29 | $807,611.61 | | | Construction | Roadway | 12/05/28 | 361 | 12 months | | | | | | 0020-04-018 | El Paso | 12/01/29 | $773,228.57 | | | Construction | Roadway | 12/05/28 | 361 | 12 months | | | | | | 0020-05-017 | El Paso | 12/01/29 | $659,080.36 | | | Construction | Roadway | 12/05/28 | 361 | 12 months | | | | | | 0104-02-031 | El Paso | 12/01/29 | $1,694,295.54 | | | Construction | Roadway | 12/05/28 | 361 | 12 months | | | | | | 0104-03-043 | El Paso | 12/01/29 | $812,981.25 | | | Construction | Roadway | 12/05/28 | 361 | 12 months | | | | | | 0104-04-015 | El Paso | 12/01/29 | $1,074,794.64 | | | Construction | Roadway | 12/05/28 | 361 | 12 months | | | | | | 0104-05-028 | El Paso | 12/01/29 | $664,796.43 | | | Construction | Roadway | 12/05/28 | 361 | 12 months | | | | | | 0415-01-027 | El Paso | 12/01/29 | $1,318,074.11 | | | Construction | Roadway | 12/05/28 | 361 | 12 months | | | | | | 0415-05-017 | El Paso | 12/01/29 | $133,981.25 | | | Construction | Roadway | 12/05/28 | 361 | 12 months | | | | | | 0415-06-005 | El Paso | 12/01/29 | $41,398.21 | | | Construction | Roadway | 12/05/28 | 361 | 12 months | | | | | | 0512-01-014 | El Paso | 12/01/29 | $131,383.04 | | | Construction | Roadway | 12/05/28 | 361 | 12 months | | | | | | 0512-02-016 | El Paso | 12/01/29 | $1,845,338.39 | | | Construction | Roadway | 12/05/28 | 361 | 12 months | | | | | | 0532-01-012 | El Paso | 12/01/29 | $100,204.46 | | | Construction | Roadway | 12/05/28 | 361 | 12 months | | | | | | 0532-01-013 | El Paso | 12/01/29 | $215,738.39 | | | Construction | Roadway | 12/05/28 | 361 | 12 months | | | | | | 2520-01-019 | San Antonio | 09/01/29 | $3,274,937.00 | | | Construction | Bridge | 09/06/28 | 360 | 12 months | | | | | | 0738-04-018 | Corpus Christi | 03/01/29 | $1,500,000.00 | Construction | Roadway | Construction | Roadway | 03/07/28 | 359 | 12 months | $(500,000.00) | -25% | | | | 0909-37-064 | Waco | 03/01/29 | $720,000.00 | Construction | Bridge | Construction | Bridge | 03/07/28 | 359 | 12 months | | | | | | 0909-37-066 | Waco | 03/01/29 | $833,000.00 | Construction | Bridge | Construction | Bridge | 03/07/28 | 359 | 12 months | | | | | | 0909-37-070 | Waco | 03/01/29 | $399,000.00 | Construction | Bridge | Construction | Bridge | 03/07/28 | 359 | 12 months | | | | | | 0912-72-796 | Houston | 08/15/27 | $2,500,000.00 | Non-Let | Non Roadway | Construction | Non Roadway | 09/02/26 | 347 | 11 months | $(3,500,000.00) | -58% | Construction / Non Roadway → Non-Let / Non Roadway | | | 1557-01-048 | Corpus Christi | 11/01/29 | $995,000.00 | | | Construction | Bridge | 12/05/28 | 331 | 11 months | | | | | | 0978-02-092 | Houston | 10/05/27 | $17,357,933.00 | Construction | Roadway | Construction | Roadway | 12/01/26 | 308 | 10 months | | | | | | 3049-01-037 | Houston | 10/05/27 | $64,696,185.00 | Construction | Roadway | Construction | Roadway | 12/01/26 | 308 | 10 months | | | | | | 3049-01-038 | Houston | 10/05/27 | $33,838,904.00 | Construction | Roadway | Construction | Roadway | 12/01/26 | 308 | 10 months | | | | | | 3110-01-003 | Lufkin | 07/01/26 | $4,505,928.36 | Construction | Roadway | Construction | Roadway | 05/05/27 | -308 | -10 months | $839,143.36 | 23% | | | | 0065-08-173 | Beaumont | 06/02/26 | $4,685,457.00 | Construction | Roadway | Construction | Roadway | 04/06/27 | -308 | -10 months | $435,457.00 | 10% | | | | 0913-27-062 | Yoakum | 12/05/28 | $1,100,000.00 | Construction | Bridge | Construction | Bridge | 02/02/28 | 307 | 10 months | | | | | | 1114-01-012 | Corpus Christi | 09/01/29 | $1,150,000.00 | | | Construction | Bridge | 11/01/28 | 304 | 10 months | | | | | | 0088-02-070 | Corpus Christi | 12/01/27 | $1,000,000.00 | Construction | Non Roadway | Construction | Non Roadway | 02/02/27 | 302 | 10 months | | | | | | 0447-03-043 | Corpus Christi | 12/01/27 | $1,500,000.00 | Construction | Non Roadway | Construction | Non Roadway | 02/02/27 | 302 | 10 months | | | | | | 0807-03-041 | Yoakum | 09/01/27 | $479,241.00 | Construction | Roadway | Construction | Roadway | 11/03/26 | 302 | 10 months | | | | | | 0909-37-081 | Waco | 07/01/27 | $552,000.00 | Construction | Bridge | Construction | Bridge | 09/02/26 | 302 | 10 months | | | | | | 0157-03-052 | Abilene | 05/01/29 | $11,500,000.00 | Construction | Roadway | Construction | Roadway | 07/06/28 | 299 | 10 months | | | | | | 0215-08-020 | San Antonio | 04/06/27 | $1,250,085.00 | Construction | Roadway | Construction | Roadway | 07/01/26 | 279 | 9 months | | | | | | 0215-09-029 | San Antonio | 04/06/27 | $24,097,000.00 | Construction | Roadway | Construction | Roadway | 07/01/26 | 279 | 9 months | | | | | | 2170-05-017 | Laredo | 08/04/27 | $17,247,810.98 | Construction | Roadway | Construction | Roadway | 11/03/26 | 274 | 9 months | | | | | | 2039-01-019 | Brownwood | 05/03/28 | $2,249,213.00 | Construction | Roadway | Construction | Roadway | 08/04/27 | 273 | 9 months | | | | | | 0924-06-579 | El Paso | 05/05/27 | $1,576,850.19 | Construction | Bridge | Construction | Bridge | 08/05/26 | 273 | 9 months | $(152,809.81) | -9% | | | | 0924-06-658 | El Paso | 05/05/27 | $1,903,846.15 | Construction | Bridge | Construction | Bridge | 08/05/26 | 273 | 9 months | $1,241,511.15 | 187% | | | | 1316-01-068 | Bryan | 08/04/27 | $1,500,000.00 | Construction | Roadway | Construction | Roadway | 12/01/26 | 246 | 8 months | | | | | | 1316-01-080 | Bryan | 08/04/27 | $13,000,000.00 | Construction | Roadway | Construction | Roadway | 12/01/26 | 246 | 8 months | | | | | | 1558-03-114 | Corpus Christi | 01/05/28 | $12,400,000.00 | Construction | Roadway | Construction | Roadway | 05/05/27 | 245 | 8 months | | | | | | 0086-10-059 | Laredo | 10/05/27 | $1,250,000.00 | Construction | Bridge | Construction | Bridge | 02/02/27 | 245 | 8 months | | | | | | 0114-09-088 | Bryan | 05/05/27 | $2,220,400.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | 245 | 8 months | | | | | | 0042-04-045 | Amarillo | 06/02/26 | $310,889.00 | Construction | Roadway | Construction | Roadway | 02/02/27 | -245 | -8 months | $(271,593.00) | -47% | | | | 0042-04-046 | Amarillo | 06/02/26 | $2,566,666.00 | Construction | Roadway | Construction | Roadway | 02/02/27 | -245 | -8 months | $(128,969.00) | -5% | | | | 0042-05-033 | Amarillo | 06/02/26 | $1,355,580.80 | Construction | Roadway | Construction | Roadway | 02/02/27 | -245 | -8 months | $(369,354.20) | -21% | | | | 0042-05-034 | Amarillo | 06/02/26 | $1,131,854.20 | Construction | Roadway | Construction | Roadway | 02/02/27 | -245 | -8 months | $(268,145.80) | -19% | | | | 0042-05-035 | Amarillo | 06/02/26 | $2,891,783.50 | Construction | Roadway | Construction | Roadway | 02/02/27 | -245 | -8 months | $641,001.50 | 28% | | | | 0105-06-023 | Childress | 06/02/26 | $3,732,460.07 | Construction | Roadway | Construction | Roadway | 02/02/27 | -245 | -8 months | $19,269.28 | 1% | | | | 0354-01-051 | Odessa | 04/06/27 | $5,710,000.00 | Construction | Roadway | Construction | Roadway | 08/05/26 | 244 | 8 months | | | | | | 1197-01-029 | Austin | 04/06/27 | $4,797,000.00 | Construction | Roadway | Construction | Roadway | 08/05/26 | 244 | 8 months | | | | | | 1601-02-036 | Fort Worth | 06/02/26 | $8,270,038.70 | Construction | Roadway | Construction | Roadway | 01/06/27 | -218 | -7 months | $(171,207.30) | -2% | | | | 3510-04-069 | Houston | 09/02/26 | $16,103,912.00 | Construction | Roadway | Construction | Roadway | 04/06/27 | -216 | -7 months | | | | | | 3510-04-071 | Houston | 09/02/26 | $14,072,310.00 | Construction | Roadway | Construction | Roadway | 04/06/27 | -216 | -7 months | | | | | | 0336-07-079 | Lufkin | 10/05/27 | $2,769,123.00 | Construction | Roadway | Construction | Roadway | 05/03/28 | -211 | -7 months | | | | | | 0233-05-039 | El Paso | 12/01/26 | $72,115.38 | Construction | Rail | Construction | Rail | 05/06/26 | 209 | 7 months | $(2,884.62) | -4% | | | | 0674-01-077 | El Paso | 12/01/26 | $72,115.38 | Construction | Rail | Construction | Rail | 05/06/26 | 209 | 7 months | $(2,884.62) | -4% | | | | 1281-01-020 | El Paso | 12/01/26 | $72,115.38 | Construction | Rail | Construction | Rail | 05/06/26 | 209 | 7 months | $(2,884.62) | -4% | | | | 0924-06-607 | El Paso | 10/01/27 | $16,978,689.42 | Construction | Local Let | Construction | Local Let | 04/01/27 | 183 | 6 months | | | | | | 1122-01-037 | Corpus Christi | 11/01/28 | $4,900,000.00 | Construction | Bridge | Construction | Bridge | 05/03/28 | 182 | 6 months | | | | | | 1122-01-038 | Corpus Christi | 11/01/28 | $1,500,000.00 | Construction | Bridge | Construction | Bridge | 05/03/28 | 182 | 6 months | | | | | | 0923-09-070 | Brownwood | 06/01/27 | $900,000.00 | Construction | Bridge | Construction | Bridge | 12/01/26 | 182 | 6 months | | | | | | 0923-17-094 | Brownwood | 06/01/27 | $1,100,000.00 | Construction | Bridge | Construction | Bridge | 12/01/26 | 182 | 6 months | | | | | | 0133-08-038 | Wichita Falls | 06/02/26 | $1,387,534.64 | Construction | Roadway | Construction | Roadway | 12/01/26 | -182 | -6 months | $(612,465.36) | -31% | | | | 0134-02-063 | Wichita Falls | 06/02/26 | $104,417.65 | Construction | Roadway | Construction | Roadway | 12/01/26 | -182 | -6 months | $(205,582.35) | -66% | | | | 0284-03-011 | Wichita Falls | 06/02/26 | $606,296.05 | Construction | Roadway | Construction | Roadway | 12/01/26 | -182 | -6 months | $56,296.05 | 10% | | | | 0444-04-024 | Wichita Falls | 06/02/26 | $290,325.95 | Construction | Roadway | Construction | Roadway | 12/01/26 | -182 | -6 months | $(39,674.05) | -12% | | | | 0562-05-018 | Wichita Falls | 06/02/26 | $238,398.55 | Construction | Roadway | Construction | Roadway | 12/01/26 | -182 | -6 months | $(311,601.45) | -57% | | | | 0916-36-023 | Corpus Christi | 06/02/26 | $1,115,074.80 | Construction | Bridge | Construction | Bridge | 12/01/26 | -182 | -6 months | $365,074.80 | 49% | | | | 1068-03-025 | Fort Worth | 06/02/26 | $1,720,788.26 | Construction | Roadway | Construction | Roadway | 12/01/26 | -182 | -6 months | $20,717.40 | 1% | | | | 2266-02-168 | Fort Worth | 06/02/26 | $1,711,952.50 | Construction | Non Roadway | Construction | Non Roadway | 12/01/26 | -182 | -6 months | | | | | | 0912-72-720 | Houston | 04/15/26 | $786,855.00 | Construction | Local Let | Construction | Local Let | 10/15/25 | 182 | 6 months | | | | | | 0912-72-721 | Houston | 04/15/26 | $625,496.00 | Construction | Local Let | Construction | Local Let | 10/15/25 | 182 | 6 months | | | | | | 0912-72-750 | Houston | 04/15/26 | $302,490.00 | Construction | Local Let | Construction | Local Let | 10/15/25 | 182 | 6 months | | | | | | 0917-29-152 | Bryan | 07/01/27 | $1,655,435.00 | Construction | Roadway | Construction | Roadway | 01/06/27 | 176 | 6 months | $331,087.00 | 25% | | | | 0915-12-692 | San Antonio | 03/20/26 | $536,650.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 09/04/26 | -168 | -6 months | | | | | | 3253-01-010 | San Antonio | 03/20/26 | $280,000.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 09/04/26 | -168 | -6 months | | | | | | 0916-26-024 | Corpus Christi | 06/02/26 | $1,292,157.80 | Construction | Bridge | Construction | Bridge | 11/03/26 | -154 | -5 months | $442,157.80 | 52% | | | | 0001-03-062 | El Paso | 05/01/26 | $500,000.00 | Non-Let | Rail | Non-Let | Rail | 12/04/25 | 148 | 5 months | | | | | | 0913-27-094 | Yoakum | 07/01/26 | $610,270.00 | Construction | Bridge | Construction | Bridge | 02/04/26 | 147 | 5 months | | | | | | 0211-08-007 | Austin | 03/27/26 | $189,000.00 | Non-Let | Local | Construction | Local Let | 08/05/26 | -131 | -4 months | | | Construction / Local Let → Non-Let / Local | | | 0915-51-012 | San Antonio | 01/05/28 | $1,000,000.00 | Construction | Bridge | Construction | Bridge | 09/01/27 | 126 | 4 months | | | | | | 0023-05-092 | San Antonio | 10/05/27 | $800,000.00 | Construction | Bridge | Construction | Bridge | 06/01/27 | 126 | 4 months | | | | | | 0072-06-093 | San Antonio | 10/05/27 | $676,000.00 | Construction | Bridge | Construction | Bridge | 06/01/27 | 126 | 4 months | | | | | | 0073-09-043 | San Antonio | 10/05/27 | $500,000.00 | Construction | Bridge | Construction | Bridge | 06/01/27 | 126 | 4 months | | | | | | 0073-09-044 | San Antonio | 10/05/27 | $500,000.00 | Construction | Bridge | Construction | Bridge | 06/01/27 | 126 | 4 months | | | | | | 0073-10-067 | San Antonio | 10/05/27 | $500,000.00 | Construction | Bridge | Construction | Bridge | 06/01/27 | 126 | 4 months | | | | | | 0521-06-167 | San Antonio | 10/05/27 | $471,000.00 | Construction | Bridge | Construction | Bridge | 06/01/27 | 126 | 4 months | | | | | | 0521-06-168 | San Antonio | 10/05/27 | $623,000.00 | Construction | Bridge | Construction | Bridge | 06/01/27 | 126 | 4 months | | | | | | 0187-01-054 | Bryan | 04/06/27 | $333,820.00 | Construction | Roadway | Construction | Roadway | 12/01/26 | 126 | 4 months | | | | | | 0187-01-060 | Bryan | 04/06/27 | $537,819.00 | Construction | Roadway | Construction | Roadway | 12/01/26 | 126 | 4 months | | | | | | 0508-02-140 | Beaumont | 08/05/26 | $3,833,252.39 | Construction | Roadway | Construction | Roadway | 04/07/26 | 120 | 4 months | $1,124,188.00 | 42% | | | | 1421-01-027 | Beaumont | 08/05/26 | $1,883,344.00 | Construction | Roadway | Construction | Roadway | 04/07/26 | 120 | 4 months | $1,046,590.00 | 125% | | | | 1421-01-028 | Beaumont | 08/05/26 | $5,527,174.50 | Construction | Roadway | Construction | Roadway | 04/07/26 | 120 | 4 months | $2,451,309.00 | 80% | | | | 0917-31-042 | Bryan | 05/03/28 | $450,000.00 | Construction | Bridge | Construction | Bridge | 01/05/28 | 119 | 4 months | | | | | | 0109-09-069 | Bryan | 06/01/27 | $3,500,000.00 | Construction | Roadway | Construction | Roadway | 02/02/27 | 119 | 4 months | | | | | | 0007-06-268 | Brownwood | 07/01/26 | $1,500,000.00 | Construction | Roadway | Construction | Roadway | 10/06/26 | -97 | -3 months | | | | | | 2835-01-008 | San Antonio | 01/05/28 | $75,176.00 | Construction | Roadway | Construction | Roadway | 10/05/27 | 92 | 3 months | | | | | | 0675-01-081 | Bryan | 05/05/27 | $7,100,000.00 | Construction | Roadway | Construction | Roadway | 02/02/27 | 92 | 3 months | | | | | | 0675-02-100 | Bryan | 05/05/27 | $7,100,000.00 | Construction | Roadway | Construction | Roadway | 02/02/27 | 92 | 3 months | | | | | | 0675-03-112 | Bryan | 05/05/27 | $7,100,000.00 | Construction | Roadway | Construction | Roadway | 02/02/27 | 92 | 3 months | | | | | | 0675-04-093 | Bryan | 05/05/27 | $7,100,000.00 | Construction | Roadway | Construction | Roadway | 02/02/27 | 92 | 3 months | | | | | | 0675-05-111 | Bryan | 05/05/27 | $7,100,000.00 | Construction | Roadway | Construction | Roadway | 02/02/27 | 92 | 3 months | | | | | | 0675-06-119 | Bryan | 05/05/27 | $7,100,000.00 | Construction | Roadway | Construction | Roadway | 02/02/27 | 92 | 3 months | | | | | | 0675-07-112 | Bryan | 05/05/27 | $7,100,000.00 | Construction | Roadway | Construction | Roadway | 02/02/27 | 92 | 3 months | | | | | | 0688-03-031 | Paris | 06/02/26 | $806,243.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -92 | -3 months | $(349,058.06) | -30% | | | | 2993-01-011 | Paris | 06/02/26 | $4,321,251.61 | Construction | Roadway | Construction | Roadway | 09/02/26 | -92 | -3 months | | | | | | 0521-05-157 | San Antonio | 12/01/27 | $57,025,027.00 | Construction | Roadway | Construction | Roadway | 09/01/27 | 91 | 3 months | | | | | | 6496-38-001 | Houston | 08/11/26 | $400,000.00 | Maintenance | Routine Maintenance Contract | Maintenance | Routine Maintenance Contract | 05/12/26 | 91 | 3 months | | | | | | 0057-03-052 | Bryan | 07/01/26 | $9,900.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 0057-04-035 | Bryan | 07/01/26 | $15,310.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 0057-04-036 | Bryan | 07/01/26 | $54,500.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 0093-03-027 | Bryan | 07/01/26 | $41,340.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 0110-01-059 | Bryan | 07/01/26 | $129,210.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 0117-01-062 | Bryan | 07/01/26 | $77,350.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 0117-09-006 | Bryan | 07/01/26 | $12,980.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 0166-02-049 | Bryan | 07/01/26 | $149,130.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 0166-05-009 | Bryan | 07/01/26 | $6,160.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 0166-08-064 | Bryan | 07/01/26 | $158,450.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 0204-09-067 | Bryan | 07/01/26 | $51,400.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 0205-01-053 | Bryan | 07/01/26 | $77,950.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 0205-02-078 | Bryan | 07/01/26 | $33,480.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 0205-03-059 | Bryan | 07/01/26 | $69,710.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 0262-06-036 | Bryan | 07/01/26 | $230,595.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 0266-04-053 | Yoakum | 07/01/26 | $2,009,165.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 0266-05-055 | Yoakum | 07/01/26 | $750,000.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | $(300,000.00) | -29% | | | | 0315-01-040 | Bryan | 07/01/26 | $3,800.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 0315-02-061 | Bryan | 07/01/26 | $27,180.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 0315-03-073 | Bryan | 07/01/26 | $97,980.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 0315-10-013 | Bryan | 07/01/26 | $1,560.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 0382-05-023 | Bryan | 07/01/26 | $44,470.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 0395-01-036 | Bryan | 07/01/26 | $79,520.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 0413-05-039 | Bryan | 07/01/26 | $209,369.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 0446-01-056 | Yoakum | 07/01/26 | $1,600,000.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 0446-02-041 | Yoakum | 07/01/26 | $1,226,012.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 0456-02-037 | Bryan | 07/01/26 | $8,340.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 0578-03-057 | Bryan | 07/01/26 | $11,750.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 0675-02-101 | Bryan | 07/01/26 | $5,190.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 0675-05-112 | Bryan | 07/01/26 | $40,780.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 0859-04-018 | Bryan | 07/01/26 | $53,540.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 0909-37-082 | Waco | 07/01/26 | $593,000.00 | Construction | Bridge | Construction | Bridge | 09/02/26 | -63 | -2 months | | | | | | 0998-04-010 | Bryan | 07/01/26 | $2,340.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 0998-05-013 | Bryan | 07/01/26 | $61,420.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 1147-01-034 | Bryan | 07/01/26 | $51,110.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 1148-02-021 | Bryan | 07/01/26 | $130,514.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 1223-03-015 | Bryan | 07/01/26 | $65,230.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 1401-01-024 | Bryan | 07/01/26 | $109,910.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 1562-03-022 | Bryan | 07/01/26 | $90,970.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 1562-04-016 | Bryan | 07/01/26 | $114,100.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 1809-01-023 | Bryan | 07/01/26 | $1,990.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 1971-01-017 | Bryan | 07/01/26 | $113,474.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 1971-02-009 | Bryan | 07/01/26 | $4,880.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 2130-01-014 | Bryan | 07/01/26 | $65,840.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 2446-01-037 | Bryan | 07/01/26 | $22,470.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 2851-01-055 | Bryan | 07/01/26 | $47,050.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | -63 | -2 months | | | | | | 0212-03-058 | Bryan | 11/03/26 | $13,742,128.00 | Construction | Bridge | Construction | Bridge | 09/02/26 | 62 | 2 months | | | | | | 0212-03-059 | Bryan | 11/03/26 | $14,811,612.00 | Construction | Bridge | Construction | Bridge | 09/02/26 | 62 | 2 months | | | | | | 0212-04-041 | Bryan | 11/03/26 | $12,490,493.00 | Construction | Bridge | Construction | Bridge | 09/02/26 | 62 | 2 months | | | | | | 0337-01-053 | Austin | 06/02/26 | $7,329,605.75 | Construction | Roadway | Construction | Roadway | 04/07/26 | 56 | 2 months | | | | | | 0025-02-234 | San Antonio | 08/05/26 | $8,226,172.00 | Construction | Roadway | Construction | Roadway | 07/01/26 | 35 | 1 month | | | | | | 0521-06-175 | San Antonio | 08/05/26 | $6,184,458.00 | Construction | Roadway | Construction | Roadway | 07/01/26 | 35 | 1 month | | | | | | 0909-40-082 | Waco | 08/04/27 | $463,420.00 | Construction | Bridge | Construction | Bridge | 07/01/27 | 34 | 1 month | | | | | | 0909-40-087 | Waco | 08/04/27 | $480,450.00 | Construction | Bridge | Construction | Bridge | 07/01/27 | 34 | 1 month | | | | | | 0909-40-093 | Waco | 08/04/27 | $429,360.00 | Construction | Bridge | Construction | Bridge | 07/01/27 | 34 | 1 month | | | | | | 3510-04-070 | Houston | 10/06/26 | $16,878,891.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | 34 | 1 month | | | | | | 3510-04-072 | Houston | 10/06/26 | $10,347,404.00 | Construction | Roadway | Construction | Roadway | 09/02/26 | 34 | 1 month | | | | | | 0116-03-074 | Bryan | 05/05/27 | $1,940,000.00 | Construction | Roadway | Construction | Roadway | 04/06/27 | 29 | 29 days | | | | | | 1525-02-010 | Fort Worth | 11/03/26 | $266,752.00 | Construction | Roadway | Construction | Roadway | 12/01/26 | -28 | -28 days | | | | | | 0917-12-089 | Bryan | 06/01/27 | $900,000.00 | Construction | Bridge | Construction | Bridge | 05/05/27 | 27 | 27 days | | | | | | 0917-18-087 | Bryan | 06/01/27 | $950,000.00 | Construction | Bridge | Construction | Bridge | 05/05/27 | 27 | 27 days | | | | | | 0917-19-060 | Bryan | 06/01/27 | $600,000.00 | Construction | Bridge | Construction | Bridge | 05/05/27 | 27 | 27 days | | | | | | 0924-06-775 | El Paso | 05/01/28 | $4,062,009.26 | Construction | Local Let | Construction | Local Let | 05/20/28 | -19 | -19 days | $(324,960.74) | -7% | | | | 6496-99-001 | Houston | 07/14/26 | $950,000.00 | Maintenance | Bridge Preventive | Maintenance | Bridge Preventive | 07/09/26 | 5 | 5 days | | | | | | 0118-06-080 | Lufkin | 11/01/27 | $1,696,569.81 | Non-Let | Roadway | Construction | Roadway | 11/02/27 | -1 | -1 day | | | Construction / Roadway → Non-Let / Roadway | | --- ## Project Type & Subtype Changes The subtype mix has remained largely stable, with minor shifts—roadway projects at 75.2% and bridge projects at 15.9%. During the snapshot period, there were 15 type or subtype changes, with 10 newly assigned classifications. This reflects consistency amidst the growing pipeline. | Subtype | Mar 3 | Apr 3 | Δ (pp, n) | | --- | --- | --- | --- | | Roadway | 75.4% (4,272) | 75.2% (4,323) | -0.3 (+51) | | Bridge | 16.2% (920) | 15.9% (914) | -0.4 (-6) | | Local Let | 3.5% (200) | 3.5% (204) | +0.0 (+4) | | Non Roadway | 1.9% (105) | 1.9% (110) | +0.1 (+5) | | Rail - Safety | 1.3% (73) | 1.4% (78) | +0.1 (+5) | | CSJ | District | Est. Letting Date | Project Estimate | Current Type | Current Subtype | Type/Subtype Δ | Prev. Type | Prev. Subtype | Prev. Cost | Prev. Date | Letting Δ (days) | Letting Date Δ | Cost Δ | %Cost Δ | Lifecycle | | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | | 0211-08-007 | Austin | 03/27/26 | $189,000.00 | Non-Let | Local | Construction / Local Let → Non-Let / Local | Construction | Local Let | $189,000.00 | 08/05/26 | -131 | -4 months | | | | | 0700-03-152 | Austin | 07/03/26 | $821,358.00 | Construction | Local Let | Construction / Roadway → Construction / Local Let | Construction | Roadway | $821,358.00 | 07/03/26 | 0 | | | | | | 0314-07-070 | Fort Worth | 08/05/26 | $18,156,436.74 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $19,195,443.15 | 09/01/31 | -1853 | -5 years | $(1,039,006.41) | -5% | | | 0912-72-696 | Houston | 08/15/26 | $50,000.00 | Non-Let | Roadway | Unassigned → Non-Let / Roadway | Unassigned | Unassigned | $50,000.00 | 10/01/23 | 1049 | 3 years | | | | | 0088-05-115 | Yoakum | 01/06/27 | $250,000.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $250,000.00 | 09/01/36 | -3526 | -10 years | | | | | 0912-72-796 | Houston | 08/15/27 | $2,500,000.00 | Non-Let | Non Roadway | Construction / Non Roadway → Non-Let / Non Roadway | Construction | Non Roadway | $6,000,000.00 | 09/02/26 | 347 | 11 months | $(3,500,000.00) | -58% | | | 0118-06-080 | Lufkin | 11/01/27 | $1,696,569.81 | Non-Let | Roadway | Construction / Roadway → Non-Let / Roadway | Construction | Roadway | $1,696,569.81 | 11/02/27 | -1 | -1 day | | | | | 3510-09-005 | Beaumont | 11/02/27 | $220,000,000.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $220,000,000.00 | 05/01/32 | -1642 | -4 years | | | | | 3510-09-006 | Beaumont | 11/02/27 | $176,000,000.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $176,000,000.00 | 04/01/36 | -3073 | -8 years | | | | | 3510-10-023 | Beaumont | 11/02/27 | $40,000,000.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $40,000,000.00 | 04/01/36 | -3073 | -8 years | | | | | 0007-02-059 | Abilene | 06/01/28 | $9,414,000.00 | Construction | Bridge | Unassigned → Construction / Bridge | Unassigned | Unassigned | $9,414,000.00 | 01/01/30 | -579 | -2 years | | | | | 0007-02-060 | Abilene | 06/01/28 | $9,414,000.00 | Construction | Bridge | Unassigned → Construction / Bridge | Unassigned | Unassigned | $9,414,000.00 | 01/01/30 | -579 | -2 years | | | | | 0052-01-046 | Lubbock | 10/04/28 | $29,726,881.09 | Non-Let | Bridge | Construction / Bridge → Non-Let / Bridge | Construction | Bridge | $27,200,001.00 | 10/04/28 | 0 | | $2,526,880.09 | 9% | | | 0159-02-079 | San Angelo | 10/04/28 | $5,675,000.00 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $5,675,000.00 | 01/01/32 | -1184 | -3 years | | | | | 0091-03-022 | Dallas | 12/05/28 | $37,095,271.43 | Construction | Roadway | Unassigned → Construction / Roadway | Unassigned | Unassigned | $37,095,271.43 | 08/01/33 | -1700 | -5 years | | | | --- ## Cost Changes The total pipeline value increased by $2.72B, rising from $5.02B to $7.74B. Cost movements concentrated in several project types, with a notable $841.18M increase in Joint Bid Utility projects and a $71.48M rise in Construction projects. Houston saw the largest district cost increase at $1.43B, followed by Odessa at $234.88M and Fort Worth at $173.69M. This suggests internal repricing rather than a major reshuffle of the pipeline itself. | CSJ | District | Est. Letting Date | Project Estimate | Current Type | Current Subtype | Prev. Type | Prev. Subtype | Prev. Cost | Cost Δ | %Cost Δ | Letting Δ (days) | Letting Date Δ | Type/Subtype Δ | Lifecycle | | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | | 0092-05-058 | Dallas | 10/06/26 | $25,202,541.30 | Construction | Roadway | Construction | Roadway | $669,134.83 | $24,533,406.47 | 3666% | 0 | | | | | 0038-01-108 | Laredo | 05/06/26 | $2,972,951.55 | Construction | Roadway | Construction | Roadway | $239,077.76 | $2,733,873.79 | 1144% | 0 | | | | | 0205-01-052 | Bryan | 07/01/26 | $112,900.00 | Construction | Bridge | Construction | Bridge | $17,304.00 | $95,596.00 | 552% | 0 | | | | | 0089-03-102 | Yoakum | 11/01/28 | $400,000.00 | Construction | Roadway | Construction | Roadway | $75,000.00 | $325,000.00 | 433% | 0 | | | | | 0154-01-070 | Yoakum | 11/02/27 | $296,000.00 | Construction | Roadway | Construction | Roadway | $58,341.00 | $237,659.00 | 407% | 0 | | | | | 0728-03-017 | Paris | 11/01/28 | $265,980.00 | Construction | Roadway | Construction | Roadway | $64,408.96 | $201,571.04 | 313% | 0 | | | | | 0366-09-034 | San Antonio | 10/06/26 | $417,500.00 | Construction | Roadway | Construction | Roadway | $104,226.00 | $313,274.00 | 301% | 0 | | | | | 0089-04-086 | Yoakum | 11/01/28 | $418,000.00 | Construction | Roadway | Construction | Roadway | $120,000.00 | $298,000.00 | 248% | 0 | | | | | 0167-02-092 | El Paso | 05/06/26 | $357,192.55 | Construction | Roadway | Construction | Roadway | $103,659.49 | $253,533.06 | 245% | 0 | | | | | 0924-06-658 | El Paso | 05/05/27 | $1,903,846.15 | Construction | Bridge | Construction | Bridge | $662,335.00 | $1,241,511.15 | 187% | 273 | 9 months | | | | 0031-05-048 | Childress | 10/04/28 | $951,714.00 | Construction | Roadway | Construction | Roadway | $360,112.00 | $591,602.00 | 164% | 0 | | | | | 0526-01-021 | San Antonio | 06/02/26 | $3,745,105.65 | Construction | Roadway | Construction | Roadway | $1,428,571.00 | $2,316,534.65 | 162% | 0 | | | | | 0067-18-010 | Lubbock | 06/02/26 | $1,054,818.08 | Construction | Roadway | Construction | Roadway | $411,413.51 | $643,404.57 | 156% | 0 | | | | | 1421-01-027 | Beaumont | 08/05/26 | $1,883,344.00 | Construction | Roadway | Construction | Roadway | $836,754.00 | $1,046,590.00 | 125% | 120 | 4 months | | | | 0301-04-027 | Laredo | 05/06/26 | $632,540.52 | Construction | Roadway | Construction | Roadway | $308,090.60 | $324,449.92 | 105% | 0 | | | | | 0031-03-048 | Childress | 05/06/26 | $1,603,142.06 | Construction | Bridge | Construction | Bridge | $781,260.00 | $821,882.06 | 105% | 0 | | | | | 0144-03-046 | Yoakum | 11/03/26 | $1,500,000.00 | Construction | Roadway | Construction | Roadway | $746,667.00 | $753,333.00 | 101% | 0 | | | | | 0014-15-090 | Fort Worth | 03/03/27 | $0.00 | Construction | Roadway | Construction | Roadway | $53,762,432.23 | $(53,762,432.23) | -100% | 0 | | | | | 0274-02-032 | Brownwood | 06/02/26 | $5,425,674.85 | Construction | Roadway | Construction | Roadway | $2,725,713.00 | $2,699,961.85 | 99% | 0 | | | | | 0990-02-015 | Corpus Christi | 06/02/26 | $33,912.76 | Construction | Roadway | Construction | Roadway | $541,775.00 | $(507,862.24) | -94% | 0 | | | | | 1210-02-016 | Bryan | 07/01/26 | $354,261.00 | Construction | Bridge | Construction | Bridge | $183,464.60 | $170,796.40 | 93% | 0 | | | | | 0144-06-030 | Yoakum | 11/02/27 | $842,000.00 | Construction | Roadway | Construction | Roadway | $437,028.00 | $404,972.00 | 93% | 0 | | | | | 0521-06-165 | San Antonio | 06/02/26 | $32,480.20 | Construction | Bridge | Construction | Bridge | $333,000.00 | $(300,519.80) | -90% | 0 | | | | | 1095-03-019 | Corpus Christi | 06/02/26 | $154,293.80 | Construction | Roadway | Construction | Roadway | $1,259,942.00 | $(1,105,648.20) | -88% | 0 | | | | | 1875-03-024 | Lufkin | 09/01/27 | $9,509,542.59 | Construction | Roadway | Construction | Roadway | $5,075,892.86 | $4,433,649.73 | 87% | -371 | -1 year | | | | 0515-03-063 | Yoakum | 11/02/27 | $77,000.00 | Construction | Roadway | Construction | Roadway | $515,809.00 | $(438,809.00) | -85% | 0 | | | | | 1052-01-085 | Corpus Christi | 06/02/26 | $166,276.32 | Construction | Roadway | Construction | Roadway | $1,108,561.00 | $(942,284.68) | -85% | 0 | | | | | 0291-11-023 | San Antonio | 07/01/26 | $26,117.13 | Construction | Roadway | Construction | Roadway | $152,687.00 | $(126,569.87) | -83% | 0 | | | | | 0134-04-037 | Fort Worth | 01/01/38 | $696,980.80 | | | Construction | Roadway | $3,722,838.75 | $(3,025,857.95) | -81% | 4049 | 11 years | | | | 0110-07-022 | Houston | 10/06/26 | $464,909.35 | Construction | Roadway | Construction | Roadway | $2,329,443.00 | $(1,864,533.65) | -80% | 0 | | | | | 1421-01-028 | Beaumont | 08/05/26 | $5,527,174.50 | Construction | Roadway | Construction | Roadway | $3,075,865.50 | $2,451,309.00 | 80% | 120 | 4 months | | | | 0311-03-015 | Childress | 06/02/26 | $106,140.00 | Construction | Bridge | Construction | Bridge | $450,000.00 | $(343,860.00) | -76% | 0 | | | | | 0883-02-095 | Beaumont | 05/06/26 | $120,196.33 | Construction | Roadway | Construction | Roadway | $500,000.00 | $(379,803.67) | -76% | 0 | | | | | 0909-37-084 | Waco | 01/05/28 | $551,157.41 | Construction | Bridge | Construction | Bridge | $315,000.00 | $236,157.41 | 75% | 0 | | | | | 0027-08-186 | Houston | 06/02/26 | $287,859.62 | Construction | Roadway | Construction | Roadway | $1,106,391.00 | $(818,531.38) | -74% | 0 | | | | | 2886-02-018 | Corpus Christi | 06/02/26 | $163,796.82 | Construction | Roadway | Construction | Roadway | $585,930.00 | $(422,133.18) | -72% | 0 | | | | | 0700-04-055 | Austin | 02/02/27 | $66,708.00 | Construction | Bridge | Construction | Bridge | $229,375.00 | $(162,667.00) | -71% | 0 | | | | | 0017-13-013 | San Antonio | 10/06/26 | $76,000.00 | Construction | Roadway | Construction | Roadway | $44,959.00 | $31,041.00 | 69% | 0 | | | | | 0911-28-083 | Lufkin | 08/05/26 | $693,030.25 | Construction | Bridge | Construction | Bridge | $410,120.00 | $282,910.25 | 69% | 0 | | | | | 0363-01-153 | Fort Worth | 06/17/26 | $201,801.05 | Construction | Local Let | Construction | Local Let | $647,757.55 | $(445,956.50) | -69% | 0 | | | | | 0842-03-043 | Yoakum | 11/02/27 | $112,000.00 | Construction | Roadway | Construction | Roadway | $350,000.00 | $(238,000.00) | -68% | 0 | | | | | 0134-02-063 | Wichita Falls | 06/02/26 | $104,417.65 | Construction | Roadway | Construction | Roadway | $310,000.00 | $(205,582.35) | -66% | -182 | -6 months | | | | 0167-02-093 | El Paso | 05/06/26 | $594,961.00 | Construction | Roadway | Construction | Roadway | $1,757,589.31 | $(1,162,628.31) | -66% | 0 | | | | | 0262-06-037 | Bryan | 07/01/26 | $112,636.80 | Construction | Bridge | Construction | Bridge | $67,835.40 | $44,801.40 | 66% | 0 | | | | | 1480-02-041 | Amarillo | 11/01/28 | $148,000.00 | Construction | Roadway | Construction | Roadway | $430,000.00 | $(282,000.00) | -66% | 0 | | | | | 2175-03-011 | San Antonio | 10/06/26 | $44,650.00 | Construction | Roadway | Construction | Roadway | $26,982.00 | $17,668.00 | 65% | 0 | | | | | 0291-03-077 | San Antonio | 06/02/26 | $622,966.35 | Construction | Roadway | Construction | Roadway | $1,785,714.00 | $(1,162,747.65) | -65% | 0 | | | | | 0027-06-062 | Houston | 06/02/26 | $364,239.94 | Construction | Roadway | Construction | Roadway | $1,039,968.00 | $(675,728.06) | -65% | 0 | | | | | 0700-04-057 | Austin | 02/02/27 | $68,543.50 | Construction | Bridge | Construction | Bridge | $186,562.50 | $(118,019.00) | -63% | 0 | | | | | 0265-03-054 | Austin | 07/01/26 | $877,520.25 | Construction | Roadway | Construction | Roadway | $540,000.00 | $337,520.25 | 63% | 0 | | | | | 0110-06-151 | Houston | 10/06/26 | $1,727,740.95 | Construction | Roadway | Construction | Roadway | $4,548,624.00 | $(2,820,883.05) | -62% | 0 | | | | | 1024-01-091 | Beaumont | 05/06/26 | $243,259.00 | Construction | Roadway | Construction | Roadway | $627,476.00 | $(384,217.00) | -61% | 0 | | | | | 0032-02-037 | Childress | 05/06/26 | $478,191.12 | Construction | Bridge | Construction | Bridge | $1,220,630.00 | $(742,438.88) | -61% | 0 | | | | | 1698-01-025 | Yoakum | 11/01/29 | $100,000.00 | | | Construction | Roadway | $249,593.00 | $(149,593.00) | -60% | 730 | 2 years | | | | 0261-01-053 | Dallas | 06/02/26 | $5,220,420.28 | Construction | Roadway | Construction | Roadway | $3,271,533.17 | $1,948,887.11 | 60% | 0 | | | | | 0912-72-796 | Houston | 08/15/27 | $2,500,000.00 | Non-Let | Non Roadway | Construction | Non Roadway | $6,000,000.00 | $(3,500,000.00) | -58% | 347 | 11 months | Construction / Non Roadway → Non-Let / Non Roadway | | | 2365-01-002 | Childress | 05/06/26 | $97,736.50 | Construction | Bridge | Construction | Bridge | $234,196.00 | $(136,459.50) | -58% | 0 | | | | | 0315-09-013 | Yoakum | 11/03/26 | $247,500.00 | Construction | Roadway | Construction | Roadway | $157,500.00 | $90,000.00 | 57% | 0 | | | | | 1960-02-010 | Yoakum | 11/03/26 | $123,750.00 | Construction | Roadway | Construction | Roadway | $78,750.00 | $45,000.00 | 57% | 0 | | | | | 0562-05-018 | Wichita Falls | 06/02/26 | $238,398.55 | Construction | Roadway | Construction | Roadway | $550,000.00 | $(311,601.45) | -57% | -182 | -6 months | | | | 1621-01-017 | Amarillo | 11/03/26 | $742,000.00 | Construction | Roadway | Construction | Roadway | $1,600,000.00 | $(858,000.00) | -54% | 0 | | | | | 0265-15-005 | Yoakum | 11/01/28 | $42,000.00 | Construction | Roadway | Construction | Roadway | $90,500.00 | $(48,500.00) | -54% | 0 | | | | | 0143-01-068 | San Antonio | 07/01/26 | $2,833,055.08 | Construction | Roadway | Construction | Roadway | $6,038,484.00 | $(3,205,428.92) | -53% | 0 | | | | | 0543-06-007 | Houston | 06/02/26 | $417,911.50 | Construction | Roadway | Construction | Roadway | $877,435.00 | $(459,523.50) | -52% | 0 | | | | | 0916-26-024 | Corpus Christi | 06/02/26 | $1,292,157.80 | Construction | Bridge | Construction | Bridge | $850,000.00 | $442,157.80 | 52% | -154 | -5 months | | | | 1122-02-045 | Corpus Christi | 09/06/28 | $5,000,000.00 | Construction | Roadway | Construction | Roadway | $10,000,000.00 | $(5,000,000.00) | -50% | 371 | 1 year | | | | 0003-03-050 | El Paso | 02/02/28 | $13,179,514.81 | Construction | Roadway | Construction | Roadway | $26,359,029.63 | $(13,179,514.82) | -50% | 0 | | | | | 2094-01-073 | Pharr | 06/02/26 | $187,259.50 | Construction | Roadway | Construction | Roadway | $365,803.00 | $(178,543.50) | -49% | 0 | | | | | 0916-36-023 | Corpus Christi | 06/02/26 | $1,115,074.80 | Construction | Bridge | Construction | Bridge | $750,000.00 | $365,074.80 | 49% | -182 | -6 months | | | | 0024-08-152 | San Antonio | 11/03/26 | $14,850,000.00 | Construction | Roadway | Construction | Roadway | $10,000,000.00 | $4,850,000.00 | 49% | 0 | | | | | 2452-04-020 | San Antonio | 10/06/26 | $171,200.00 | Construction | Roadway | Construction | Roadway | $323,587.00 | $(152,387.00) | -47% | 0 | | | | | 0042-04-045 | Amarillo | 06/02/26 | $310,889.00 | Construction | Roadway | Construction | Roadway | $582,482.00 | $(271,593.00) | -47% | -245 | -8 months | | | | 3591-01-006 | Atlanta | 05/06/26 | $1,157,636.50 | Construction | Roadway | Construction | Roadway | $2,143,394.00 | $(985,757.50) | -46% | 0 | | | | | 0027-12-164 | Houston | 06/02/26 | $3,603,216.37 | Construction | Roadway | Construction | Roadway | $2,485,725.00 | $1,117,491.37 | 45% | 0 | | | | | 0114-12-018 | Houston | 09/02/26 | $628,922.38 | Construction | Roadway | Construction | Roadway | $1,140,300.00 | $(511,377.62) | -45% | 0 | | | | | 0192-01-103 | Houston | 06/02/26 | $563,765.64 | Construction | Roadway | Construction | Roadway | $1,017,000.00 | $(453,234.36) | -45% | 0 | | | | | 0050-06-109 | Houston | 09/02/26 | $1,533,686.80 | Construction | Roadway | Construction | Roadway | $2,738,670.00 | $(1,204,983.20) | -44% | 0 | | | | | 1683-01-040 | Houston | 06/02/26 | $2,441,367.10 | Construction | Roadway | Construction | Roadway | $4,349,882.00 | $(1,908,514.90) | -44% | 0 | | | | | 0038-10-013 | Pharr | 08/04/27 | $9,725,893.91 | Construction | Roadway | Construction | Roadway | $6,806,281.00 | $2,919,612.91 | 43% | 0 | | | | | 0847-05-043 | Yoakum | 05/06/26 | $4,482,046.45 | Construction | Roadway | Construction | Roadway | $3,145,217.00 | $1,336,829.45 | 43% | 0 | | | | | 0050-12-002 | Houston | 06/02/26 | $786,825.43 | Construction | Roadway | Construction | Roadway | $1,361,841.00 | $(575,015.57) | -42% | 0 | | | | | 0027-07-044 | Houston | 06/02/26 | $184,764.00 | Construction | Roadway | Construction | Roadway | $319,352.00 | $(134,588.00) | -42% | 0 | | | | | 0508-02-140 | Beaumont | 08/05/26 | $3,833,252.39 | Construction | Roadway | Construction | Roadway | $2,709,064.39 | $1,124,188.00 | 42% | 120 | 4 months | | | | 0327-07-050 | Pharr | 08/05/26 | $407,530.22 | Construction | Roadway | Construction | Roadway | $289,011.00 | $118,519.22 | 41% | 0 | | | | | 3272-01-007 | Lubbock | 06/02/26 | $768,682.78 | Construction | Roadway | Construction | Roadway | $1,300,000.00 | $(531,317.22) | -41% | 0 | | | | | 2104-01-016 | San Antonio | 10/06/26 | $207,750.00 | Construction | Roadway | Construction | Roadway | $350,451.00 | $(142,701.00) | -41% | 0 | | | | | 0166-07-073 | Bryan | 06/02/26 | $240,028.00 | Construction | Bridge | Construction | Bridge | $404,475.00 | $(164,447.00) | -41% | 0 | | | | | 0941-01-027 | Yoakum | 11/03/26 | $426,933.00 | Construction | Roadway | Construction | Roadway | $303,988.00 | $122,945.00 | 40% | 0 | | | | | 0241-02-061 | Yoakum | 11/03/26 | $298,000.00 | Construction | Roadway | Construction | Roadway | $500,000.00 | $(202,000.00) | -40% | 0 | | | | | 2516-01-012 | Yoakum | 11/03/26 | $240,000.00 | Construction | Roadway | Construction | Roadway | $400,000.00 | $(160,000.00) | -40% | -729 | -2 years | | | | 0921-02-534 | Pharr | 06/02/26 | $447,695.20 | Construction | Roadway | Construction | Roadway | $743,173.20 | $(295,478.00) | -40% | 0 | | | | | 0047-06-180 | Dallas | 06/02/26 | $4,115,871.00 | Construction | Roadway | Construction | Roadway | $2,945,820.00 | $1,170,051.00 | 40% | 0 | | | | | 2069-01-009 | Lufkin | 09/06/28 | $9,652,666.96 | Construction | Roadway | Construction | Roadway | $6,910,402.19 | $2,742,264.77 | 40% | 0 | | | | | 0004-03-055 | Odessa | 10/04/28 | $26,785,714.29 | Construction | Roadway | Construction | Roadway | $44,400,000.00 | $(17,614,285.71) | -40% | 0 | | | | | 0072-12-202 | San Antonio | 09/02/26 | $218,366.32 | Construction | Roadway | Construction | Roadway | $361,440.00 | $(143,073.68) | -40% | 0 | | | | | 1438-01-027 | Yoakum | 11/02/27 | $516,000.00 | Construction | Roadway | Construction | Roadway | $841,852.00 | $(325,852.00) | -39% | 0 | | | | | 0617-02-080 | Corpus Christi | 07/01/26 | $542,860.00 | Construction | Roadway | Construction | Roadway | $870,098.00 | $(327,238.00) | -38% | 0 | | | | | 0266-03-032 | Yoakum | 11/02/27 | $530,000.00 | Construction | Roadway | Construction | Roadway | $833,701.00 | $(303,701.00) | -36% | 0 | | | | | 1321-01-024 | Yoakum | 11/02/27 | $210,000.00 | Construction | Roadway | Construction | Roadway | $330,138.00 | $(120,138.00) | -36% | 0 | | | | | 0409-01-036 | Yoakum | 11/02/27 | $519,260.00 | Construction | Roadway | Construction | Roadway | $815,980.00 | $(296,720.00) | -36% | 0 | | | | | 0420-10-020 | Yoakum | 11/03/26 | $333,576.00 | Construction | Roadway | Construction | Roadway | $524,192.00 | $(190,616.00) | -36% | 0 | | | | | 2697-01-037 | Yoakum | 11/03/26 | $167,102.00 | Construction | Roadway | Construction | Roadway | $262,590.00 | $(95,488.00) | -36% | 0 | | | | | 0605-01-070 | Yoakum | 11/02/27 | $230,000.00 | Construction | Roadway | Construction | Roadway | $361,048.00 | $(131,048.00) | -36% | 0 | | | | | 1305-03-013 | Yoakum | 11/02/27 | $180,000.00 | Construction | Roadway | Construction | Roadway | $282,370.00 | $(102,370.00) | -36% | 0 | | | | | 0408-02-051 | Yoakum | 11/02/27 | $600,000.00 | Construction | Roadway | Construction | Roadway | $940,893.00 | $(340,893.00) | -36% | 0 | | | | | 0027-04-045 | Yoakum | 11/02/27 | $530,000.00 | Construction | Roadway | Construction | Roadway | $830,830.00 | $(300,830.00) | -36% | 0 | | | | | 1303-01-021 | Yoakum | 11/02/27 | $300,000.00 | Construction | Roadway | Construction | Roadway | $470,140.00 | $(170,140.00) | -36% | 0 | | | | | 0212-02-044 | Bryan | 05/06/26 | $484,666.35 | Construction | Roadway | Construction | Roadway | $356,000.00 | $128,666.35 | 36% | 0 | | | | | 0846-03-052 | Yoakum | 11/02/27 | $385,000.00 | Construction | Roadway | Construction | Roadway | $602,000.00 | $(217,000.00) | -36% | 0 | | | | | 3417-02-039 | Austin | 07/01/26 | $487,340.00 | Construction | Non Roadway | Construction | Non Roadway | $761,848.00 | $(274,508.00) | -36% | 0 | | | | | 0792-04-051 | San Antonio | 10/06/26 | $495,000.00 | Construction | Roadway | Construction | Roadway | $364,050.00 | $130,950.00 | 36% | 0 | | | | | 0018-01-102 | Laredo | 05/06/26 | $7,333,506.36 | Construction | Roadway | Construction | Roadway | $11,432,116.76 | $(4,098,610.40) | -36% | 0 | | | | | 0847-05-044 | Yoakum | 11/02/27 | $140,000.00 | Construction | Roadway | Construction | Roadway | $218,171.00 | $(78,171.00) | -36% | 0 | | | | | 0709-01-027 | Yoakum | 11/02/27 | $200,000.00 | Construction | Roadway | Construction | Roadway | $311,410.00 | $(111,410.00) | -36% | 0 | | | | | 0187-03-080 | Yoakum | 11/02/27 | $300,000.00 | Construction | Roadway | Construction | Roadway | $466,314.00 | $(166,314.00) | -36% | 0 | | | | | 0259-05-083 | Fort Worth | 09/01/27 | $8,009,664.43 | | | | | $12,421,879.88 | $(4,412,215.45) | -36% | -1461 | -4 years | | | | 1304-02-008 | Yoakum | 11/02/27 | $125,000.00 | Construction | Roadway | Construction | Roadway | $191,895.00 | $(66,895.00) | -35% | 0 | | | | | 0231-03-156 | Waco | 06/02/26 | $3,792,762.86 | Construction | Roadway | Construction | Roadway | $5,821,159.00 | $(2,028,396.14) | -35% | 0 | | | | | 0581-02-162 | Dallas | 06/02/26 | $17,692,389.85 | Construction | Roadway | Construction | Roadway | $13,126,775.13 | $4,565,614.72 | 35% | 0 | | | | | 0187-03-081 | Yoakum | 11/02/27 | $30,000.00 | Construction | Roadway | Construction | Roadway | $45,947.00 | $(15,947.00) | -35% | 0 | | | | | 1985-03-022 | Yoakum | 11/02/27 | $300,000.00 | Construction | Roadway | Construction | Roadway | $459,113.00 | $(159,113.00) | -35% | 0 | | | | | 0001-03-063 | El Paso | 05/06/26 | $38,910.00 | Construction | Roadway | Construction | Roadway | $28,905.95 | $10,004.05 | 35% | 0 | | | | | 1179-02-041 | Fort Worth | 06/02/26 | $13,679,045.04 | Construction | Roadway | Construction | Roadway | $20,860,104.96 | $(7,181,059.92) | -34% | 0 | | | | | 0920-30-090 | Beaumont | 05/06/26 | $429,519.50 | Construction | Bridge | Construction | Bridge | $650,000.00 | $(220,480.50) | -34% | 0 | | | | | 0911-40-032 | Lufkin | 08/05/26 | $576,755.90 | Construction | Bridge | Construction | Bridge | $432,377.40 | $144,378.50 | 33% | 0 | | | | | 0187-04-036 | Yoakum | 11/02/27 | $300,000.00 | Construction | Roadway | Construction | Roadway | $450,000.00 | $(150,000.00) | -33% | 0 | | | | | 0496-03-013 | Childress | 02/02/27 | $4,000,000.00 | Construction | Roadway | Construction | Roadway | $3,000,000.00 | $1,000,000.00 | 33% | -730 | -2 years | | | | 0496-04-040 | Childress | 02/02/27 | $4,000,000.00 | Construction | Roadway | Construction | Roadway | $3,000,000.00 | $1,000,000.00 | 33% | -730 | -2 years | | | | 0856-02-013 | San Antonio | 10/06/26 | $256,000.00 | Construction | Roadway | Construction | Roadway | $192,725.00 | $63,275.00 | 33% | 0 | | | | | 0999-01-048 | Dallas | 08/04/27 | $7,921,726.91 | Construction | Roadway | Construction | Roadway | $11,769,678.90 | $(3,847,951.99) | -33% | 0 | | | | | 1500-03-012 | San Antonio | 10/06/26 | $49,000.00 | Construction | Roadway | Construction | Roadway | $36,942.00 | $12,058.00 | 33% | 0 | | | | | 1500-01-027 | San Antonio | 10/06/26 | $265,500.00 | Construction | Roadway | Construction | Roadway | $200,187.00 | $65,313.00 | 33% | 0 | | | | | 1739-04-015 | San Antonio | 10/06/26 | $282,150.00 | Construction | Roadway | Construction | Roadway | $213,138.00 | $69,012.00 | 32% | 0 | | | | | 1739-03-012 | San Antonio | 10/06/26 | $477,750.00 | Construction | Roadway | Construction | Roadway | $361,151.00 | $116,599.00 | 32% | 0 | | | | | 0855-04-033 | San Antonio | 10/06/26 | $822,800.00 | Construction | Roadway | Construction | Roadway | $622,733.00 | $200,067.00 | 32% | 0 | | | | | 0066-05-076 | Amarillo | 02/01/29 | $3,090,000.00 | Construction | Bridge | Construction | Bridge | $4,500,000.00 | $(1,410,000.00) | -31% | 0 | | | | | 0792-03-011 | San Antonio | 10/06/26 | $125,000.00 | Construction | Roadway | Construction | Roadway | $95,314.00 | $29,686.00 | 31% | 0 | | | | | 0265-14-019 | Yoakum | 11/02/27 | $330,000.00 | Construction | Roadway | Construction | Roadway | $251,648.00 | $78,352.00 | 31% | 0 | | | | | 0848-02-010 | San Antonio | 10/06/26 | $194,500.00 | Construction | Roadway | Construction | Roadway | $148,475.00 | $46,025.00 | 31% | 0 | | | | | 0346-07-045 | Yoakum | 11/02/27 | $915,000.00 | Construction | Roadway | Construction | Roadway | $700,000.00 | $215,000.00 | 31% | -365 | -1 year | | | | 0133-08-038 | Wichita Falls | 06/02/26 | $1,387,534.64 | Construction | Roadway | Construction | Roadway | $2,000,000.00 | $(612,465.36) | -31% | -182 | -6 months | | | | 0688-03-031 | Paris | 06/02/26 | $806,243.00 | Construction | Roadway | Construction | Roadway | $1,155,301.06 | $(349,058.06) | -30% | -92 | -3 months | | | | 0066-05-077 | Amarillo | 02/01/29 | $3,150,000.00 | Construction | Bridge | Construction | Bridge | $4,500,000.00 | $(1,350,000.00) | -30% | 0 | | | | | 0700-04-058 | Austin | 02/02/27 | $657,212.50 | Construction | Bridge | Construction | Bridge | $507,094.23 | $150,118.27 | 30% | 0 | | | | | 0915-12-796 | San Antonio | 07/01/26 | $371,096.05 | Construction | Roadway | Construction | Roadway | $523,015.00 | $(151,918.95) | -29% | 0 | | | | | 0086-07-040 | Pharr | 08/05/26 | $372,629.79 | Construction | Roadway | Construction | Roadway | $289,011.00 | $83,618.79 | 29% | 0 | | | | | 0253-06-042 | San Antonio | 05/06/26 | $635,458.52 | Construction | Roadway | Construction | Roadway | $894,023.73 | $(258,565.21) | -29% | 0 | | | | | 0266-05-055 | Yoakum | 07/01/26 | $750,000.00 | Construction | Roadway | Construction | Roadway | $1,050,000.00 | $(300,000.00) | -29% | -63 | -2 months | | | | 0042-05-035 | Amarillo | 06/02/26 | $2,891,783.50 | Construction | Roadway | Construction | Roadway | $2,250,782.00 | $641,001.50 | 28% | -245 | -8 months | | | | 0081-03-069 | Dallas | 08/02/26 | $620,464.93 | Construction | Local Let | Construction | Local Let | $483,000.00 | $137,464.93 | 28% | 0 | | | | | 0066-05-072 | Amarillo | 02/01/29 | $4,150,000.00 | Construction | Bridge | Construction | Bridge | $5,800,000.00 | $(1,650,000.00) | -28% | 0 | | | | | 0047-07-250 | Dallas | 06/01/27 | $822,114.43 | Construction | Roadway | Construction | Roadway | $1,148,490.42 | $(326,375.99) | -28% | 0 | | | | | 0337-02-055 | Austin | 10/01/26 | $945,350.00 | Construction | Local Let | Construction | Local Let | $1,320,446.25 | $(375,096.25) | -28% | 0 | | | | | 0446-06-019 | Yoakum | 11/02/27 | $320,000.00 | Construction | Roadway | Construction | Roadway | $250,000.00 | $70,000.00 | 28% | 0 | | | | | 0073-02-092 | San Antonio | 05/06/26 | $643,218.06 | Construction | Roadway | Construction | Roadway | $889,145.81 | $(245,927.75) | -28% | 0 | | | | | 2350-01-074 | Yoakum | 11/03/26 | $278,345.00 | Construction | Roadway | Construction | Roadway | $382,834.00 | $(104,489.00) | -27% | 0 | | | | | 0542-03-040 | Laredo | 05/06/26 | $5,466,081.50 | Construction | Roadway | Construction | Roadway | $7,504,710.40 | $(2,038,628.90) | -27% | 0 | | | | | 1741-02-039 | San Antonio | 10/06/26 | $215,050.00 | Construction | Roadway | Construction | Roadway | $294,195.00 | $(79,145.00) | -27% | 0 | | | | | 0024-08-150 | San Antonio | 06/02/26 | $296,494.00 | Construction | Bridge | Construction | Bridge | $405,000.00 | $(108,506.00) | -27% | 0 | | | | | 0327-07-046 | Pharr | 06/02/26 | $103,672.75 | Construction | Roadway | Construction | Roadway | $140,770.85 | $(37,098.10) | -26% | 0 | | | | | 0086-07-041 | Pharr | 08/05/26 | $363,332.71 | Construction | Roadway | Construction | Roadway | $289,011.00 | $74,321.71 | 26% | 0 | | | | | 0066-05-071 | Amarillo | 02/01/29 | $4,240,000.00 | Construction | Bridge | Construction | Bridge | $5,700,000.00 | $(1,460,000.00) | -26% | 0 | | | | | 0050-08-105 | Houston | 09/02/26 | $1,020,566.25 | Construction | Roadway | Construction | Roadway | $1,371,700.00 | $(351,133.75) | -26% | 0 | | | | | 0738-04-018 | Corpus Christi | 03/01/29 | $1,500,000.00 | Construction | Roadway | Construction | Roadway | $2,000,000.00 | $(500,000.00) | -25% | 359 | 12 months | | | | 0917-29-152 | Bryan | 07/01/27 | $1,655,435.00 | Construction | Roadway | Construction | Roadway | $1,324,348.00 | $331,087.00 | 25% | 176 | 6 months | | | | 0027-13-245 | Houston | 06/02/26 | $287,794.37 | Construction | Roadway | Construction | Roadway | $230,502.00 | $57,292.37 | 25% | 0 | | | | | 0364-03-108 | Dallas | 05/06/26 | $1,450,132.38 | Construction | Roadway | Construction | Roadway | $1,162,679.97 | $287,452.41 | 25% | 0 | | | | | 0059-05-047 | Lufkin | 11/02/27 | $605,101.04 | Construction | Roadway | Construction | Roadway | $802,299.14 | $(197,198.10) | -25% | -365 | -1 year | | | | 0327-06-031 | Pharr | 08/05/26 | $359,844.53 | Construction | Roadway | Construction | Roadway | $289,011.00 | $70,833.53 | 25% | 0 | | | | | 1318-01-019 | Dallas | 07/01/31 | $1,320,852.06 | | | Construction | Bridge | $1,061,166.05 | $259,686.01 | 24% | 972 | 3 years | | | | 0880-04-040 | Lubbock | 05/06/26 | $10,274,814.05 | Construction | Roadway | Construction | Roadway | $13,575,000.00 | $(3,300,185.95) | -24% | 0 | | | | | 0209-01-076 | Waco | 05/06/26 | $9,476,549.15 | Construction | Roadway | Construction | Roadway | $12,500,000.00 | $(3,023,450.85) | -24% | 0 | | | | | 0105-04-047 | Childress | 06/02/26 | $3,587,416.57 | Construction | Bridge | Construction | Bridge | $4,700,000.00 | $(1,112,583.43) | -24% | 0 | | | | | 0089-09-090 | Houston | 06/02/26 | $842,339.39 | Construction | Roadway | Construction | Roadway | $684,467.00 | $157,872.39 | 23% | 0 | | | | | 0032-02-036 | Childress | 05/06/26 | $328,481.98 | Construction | Bridge | Construction | Bridge | $266,994.00 | $61,487.98 | 23% | 0 | | | | | 3110-01-003 | Lufkin | 07/01/26 | $4,505,928.36 | Construction | Roadway | Construction | Roadway | $3,666,785.00 | $839,143.36 | 23% | -308 | -10 months | | | | 0016-05-128 | San Antonio | 07/01/26 | $11,668,795.80 | Construction | Roadway | Construction | Roadway | $15,000,000.00 | $(3,331,204.20) | -22% | 0 | | | | | 0143-04-074 | San Antonio | 06/02/26 | $280,441.00 | Construction | Bridge | Construction | Bridge | $360,000.00 | $(79,559.00) | -22% | 0 | | | | | 0914-04-356 | Austin | 06/02/26 | $406,871.00 | Construction | Roadway | Construction | Roadway | $520,779.00 | $(113,908.00) | -22% | 0 | | | | | 0138-06-049 | Lufkin | 05/06/26 | $3,029,650.50 | Construction | Roadway | Construction | Roadway | $3,877,907.00 | $(848,256.50) | -22% | 0 | | | | | 0276-07-035 | San Antonio | 09/02/26 | $8,610,648.49 | Construction | Roadway | Construction | Roadway | $11,000,000.00 | $(2,389,351.51) | -22% | 0 | | | | | 0319-01-073 | Lufkin | 11/03/26 | $968,762.66 | Construction | Roadway | Construction | Roadway | $1,236,902.33 | $(268,139.67) | -22% | -729 | -2 years | | | | 0747-05-042 | Fort Worth | 05/06/26 | $8,420,326.85 | Construction | Roadway | Construction | Roadway | $10,743,744.95 | $(2,323,418.10) | -22% | 0 | | | | | 0042-05-033 | Amarillo | 06/02/26 | $1,355,580.80 | Construction | Roadway | Construction | Roadway | $1,724,935.00 | $(369,354.20) | -21% | -245 | -8 months | | | | 0018-06-185 | Laredo | 06/02/26 | $62,373,725.73 | Construction | Roadway | Construction | Roadway | $79,245,892.42 | $(16,872,166.69) | -21% | 0 | | | | | 0002-02-063 | El Paso | 05/06/26 | $462,067.00 | Construction | Roadway | Construction | Roadway | $586,156.24 | $(124,089.24) | -21% | 0 | | | | | 0259-05-086 | Fort Worth | 02/02/27 | $565,694.50 | Construction | Roadway | Construction | Roadway | $716,072.23 | $(150,377.73) | -21% | 0 | | | | | 0747-08-002 | Fort Worth | 05/06/26 | $5,554,398.25 | Construction | Roadway | Construction | Roadway | $7,024,465.15 | $(1,470,066.90) | -21% | 0 | | | | | 0920-38-287 | Beaumont | 06/02/26 | $2,960,906.12 | Construction | Bridge | Construction | Bridge | $2,448,587.18 | $512,318.94 | 21% | 0 | | | | | 2819-02-012 | Yoakum | 11/03/26 | $145,043.00 | Construction | Roadway | Construction | Roadway | $120,000.00 | $25,043.00 | 21% | 0 | | | | | 0909-37-085 | Waco | 01/05/28 | $990,384.62 | Construction | Bridge | Construction | Bridge | $1,250,000.00 | $(259,615.38) | -21% | 0 | | | | | 0037-06-110 | Laredo | 05/06/26 | $6,350,433.16 | Construction | Roadway | Construction | Roadway | $5,260,307.25 | $1,090,125.91 | 21% | 0 | | | | | 0197-02-138 | Dallas | 04/07/26 | $1,701,466.80 | Construction | Roadway | Construction | Roadway | $2,133,482.80 | $(432,016.00) | -20% | 0 | | | | | 1307-02-010 | Yoakum | 11/03/26 | $296,000.00 | Construction | Roadway | Construction | Roadway | $246,166.00 | $49,834.00 | 20% | 0 | | | | | 0920-30-092 | Beaumont | 05/06/26 | $520,973.90 | Construction | Bridge | Construction | Bridge | $650,000.00 | $(129,026.10) | -20% | 0 | | | | | 0908-33-115 | Abilene | 06/02/26 | $170,510.29 | Construction | Roadway | Construction | Roadway | $212,705.00 | $(42,194.71) | -20% | 0 | | | | | 0167-01-137 | El Paso | 06/02/26 | $1,186,375.00 | Construction | Roadway | Construction | Roadway | $1,476,000.00 | $(289,625.00) | -20% | 0 | | | | | 0698-03-108 | Pharr | 06/02/26 | $84,096.50 | Construction | Roadway | Construction | Roadway | $70,480.00 | $13,616.50 | 19% | 0 | | | | | 0042-05-034 | Amarillo | 06/02/26 | $1,131,854.20 | Construction | Roadway | Construction | Roadway | $1,400,000.00 | $(268,145.80) | -19% | -245 | -8 months | | | | 0315-03-070 | Bryan | 06/02/26 | $1,274,703.96 | Construction | Roadway | Construction | Roadway | $1,070,000.00 | $204,703.96 | 19% | 0 | | | | | 0747-05-043 | Fort Worth | 05/06/26 | $2,993,451.70 | Construction | Roadway | Construction | Roadway | $3,701,393.15 | $(707,941.45) | -19% | 0 | | | | | 0291-10-117 | San Antonio | 07/01/26 | $2,846,766.70 | Construction | Roadway | Construction | Roadway | $3,517,238.00 | $(670,471.30) | -19% | 0 | | | | | 0269-10-027 | Yoakum | 11/03/26 | $541,028.00 | Construction | Roadway | Construction | Roadway | $666,952.00 | $(125,924.00) | -19% | 0 | | | | | 0500-03-664 | Houston | 08/05/26 | $4,948,342.00 | Construction | Roadway | Construction | Roadway | $4,167,831.55 | $780,510.45 | 19% | 0 | | | | | 0014-01-031 | Fort Worth | 08/02/28 | $2,341,663.00 | Construction | Bridge | Construction | Bridge | $2,874,713.00 | $(533,050.00) | -19% | 0 | | | | | 0521-04-285 | San Antonio | 05/06/26 | $131,153,285.41 | Construction | Roadway | Construction | Roadway | $159,536,000.00 | $(28,382,714.59) | -18% | 0 | | | | | 0327-07-048 | Pharr | 08/05/26 | $340,335.32 | Construction | Roadway | Construction | Roadway | $289,011.00 | $51,324.32 | 18% | 0 | | | | | 0842-03-045 | Yoakum | 11/02/27 | $184,000.00 | Construction | Roadway | Construction | Roadway | $156,363.00 | $27,637.00 | 18% | 0 | | | | | 2599-02-012 | Yoakum | 11/03/26 | $136,974.00 | Construction | Roadway | Construction | Roadway | $116,580.00 | $20,394.00 | 17% | 0 | | | | | 0249-08-046 | Fort Worth | 02/02/28 | $329,106.80 | Construction | Roadway | Construction | Roadway | $398,126.19 | $(69,019.39) | -17% | 0 | | | | | 0902-90-355 | Fort Worth | 01/05/28 | $456,210.00 | Construction | Roadway | Construction | Roadway | $551,313.00 | $(95,103.00) | -17% | 0 | | | | | 0187-05-063 | Houston | 09/02/26 | $3,674,142.32 | Construction | Non Roadway | Construction | Non Roadway | $4,429,425.79 | $(755,283.47) | -17% | 0 | | | | | 0018-06-219 | Laredo | 05/06/26 | $4,838,092.97 | Construction | Roadway | Construction | Roadway | $5,830,944.65 | $(992,851.68) | -17% | 0 | | | | | 0918-46-335 | Dallas | 06/02/26 | $1,097,504.80 | Construction | Bridge | Construction | Bridge | $938,185.00 | $159,319.80 | 17% | -394 | -1 year | | | | 0019-01-153 | Fort Worth | 02/02/27 | $1,565,041.53 | Construction | Roadway | Construction | Roadway | $1,344,685.10 | $220,356.43 | 16% | 0 | | | | | 0703-02-065 | Beaumont | 01/01/29 | $2,171,072.45 | Construction | Roadway | Construction | Roadway | $1,879,991.07 | $291,081.38 | 15% | 0 | | | | | 0915-12-752 | San Antonio | 07/01/26 | $346,526.40 | Construction | Bridge | Construction | Bridge | $410,000.00 | $(63,473.60) | -15% | 0 | | | | | 0918-46-369 | Dallas | 01/01/29 | $782,150.04 | Construction | Roadway | Construction | Roadway | $677,665.00 | $104,485.04 | 15% | 0 | | | | | 0015-09-208 | Austin | 07/01/26 | $3,380,279.55 | Construction | Roadway | Construction | Roadway | $3,980,769.23 | $(600,489.68) | -15% | 0 | | | | | 0917-30-068 | Bryan | 11/03/26 | $670,698.73 | Construction | Bridge | Construction | Bridge | $584,088.08 | $86,610.65 | 15% | 0 | | | | | 1655-01-036 | Abilene | 07/01/26 | $5,512,640.10 | Construction | Roadway | Construction | Roadway | $4,804,601.45 | $708,038.65 | 15% | 0 | | | | | 0177-01-123 | Lufkin | 03/07/28 | $2,677,773.44 | Construction | Roadway | Construction | Roadway | $2,334,041.00 | $343,732.44 | 15% | 0 | | | | | 0177-01-124 | Lufkin | 03/07/28 | $2,677,773.44 | Construction | Roadway | Construction | Roadway | $2,334,042.11 | $343,731.33 | 15% | 0 | | | | | 0917-16-040 | Bryan | 08/05/26 | $708,168.67 | Construction | Bridge | Construction | Bridge | $617,323.07 | $90,845.60 | 15% | 0 | | | | | 0248-03-024 | Atlanta | 11/02/27 | $13,160,923.50 | | | | | $11,492,142.00 | $1,668,781.50 | 15% | -2617 | -7 years | | | | 0916-37-038 | Corpus Christi | 06/02/26 | $900,224.80 | Construction | Bridge | Construction | Bridge | $1,050,000.00 | $(149,775.20) | -14% | 0 | | | | | 2452-05-005 | San Antonio | 10/06/26 | $48,200.00 | Construction | Roadway | Construction | Roadway | $55,940.00 | $(7,740.00) | -14% | 0 | | | | | 0025-02-231 | San Antonio | 06/02/26 | $529,849.60 | Construction | Bridge | Construction | Bridge | $614,000.00 | $(84,150.40) | -14% | 0 | | | | | 0915-12-782 | San Antonio | 07/01/26 | $403,095.46 | Construction | Roadway | Construction | Roadway | $466,978.00 | $(63,882.54) | -14% | 0 | | | | | 0413-06-015 | Bryan | 03/07/27 | $486,676.92 | Construction | Local Let | Construction | Local Let | $563,448.00 | $(76,771.08) | -14% | 0 | | | | | 0521-06-166 | San Antonio | 06/02/26 | $393,900.55 | Construction | Bridge | Construction | Bridge | $347,000.00 | $46,900.55 | 14% | 0 | | | | | 0366-03-075 | San Antonio | 10/06/26 | $575,570.00 | Construction | Roadway | Construction | Roadway | $510,359.00 | $65,211.00 | 13% | 0 | | | | | 0914-04-367 | Austin | 07/01/26 | $373,363.00 | Construction | Roadway | Construction | Roadway | $427,826.21 | $(54,463.21) | -13% | 0 | | | | | 2374-04-099 | Dallas | 06/01/27 | $1,036,691.04 | Construction | Roadway | Construction | Roadway | $1,180,456.20 | $(143,765.16) | -12% | 0 | | | | | 0024-02-081 | San Antonio | 10/06/26 | $980,458.00 | Construction | Roadway | Construction | Roadway | $874,879.00 | $105,579.00 | 12% | 0 | | | | | 0444-04-024 | Wichita Falls | 06/02/26 | $290,325.95 | Construction | Roadway | Construction | Roadway | $330,000.00 | $(39,674.05) | -12% | -182 | -6 months | | | | 0610-03-095 | Atlanta | 05/06/26 | $11,435,889.23 | Construction | Non Roadway | Construction | Non Roadway | $12,989,735.11 | $(1,553,845.88) | -12% | 0 | | | | | 0369-01-042 | San Antonio | 10/06/26 | $51,250.00 | Construction | Roadway | Construction | Roadway | $58,118.00 | $(6,868.00) | -12% | 0 | | | | | 1057-03-060 | Pharr | 07/01/27 | $5,643,901.12 | Construction | Roadway | Construction | Roadway | $5,048,399.67 | $595,501.45 | 12% | 0 | | | | | 0857-01-040 | San Antonio | 10/06/26 | $122,600.00 | Construction | Roadway | Construction | Roadway | $138,762.00 | $(16,162.00) | -12% | 0 | | | | | 0213-03-112 | Lufkin | 07/01/26 | $3,682,752.30 | Construction | Bridge | Construction | Bridge | $4,166,666.33 | $(483,914.03) | -12% | 0 | | | | | 0921-02-525 | Pharr | 08/05/26 | $873,656.84 | Construction | Roadway | Construction | Roadway | $783,996.83 | $89,660.01 | 11% | 0 | | | | | 1410-01-026 | Yoakum | 05/06/26 | $2,755,373.81 | Construction | Roadway | Construction | Roadway | $3,107,851.00 | $(352,477.19) | -11% | 0 | | | | | 1217-02-017 | Dallas | 02/02/27 | $5,180,826.09 | Construction | Roadway | Construction | Roadway | $5,834,104.25 | $(653,278.16) | -11% | 0 | | | | | 0327-07-049 | Pharr | 08/05/26 | $321,317.31 | Construction | Roadway | Construction | Roadway | $289,011.00 | $32,306.31 | 11% | 0 | | | | | 0915-12-753 | San Antonio | 07/01/26 | $1,868,281.00 | Construction | Bridge | Construction | Bridge | $2,100,000.00 | $(231,719.00) | -11% | 0 | | | | | 1794-01-029 | Lufkin | 10/05/27 | $1,483,715.74 | Construction | Roadway | Construction | Roadway | $1,666,666.67 | $(182,950.93) | -11% | 0 | | | | | 1745-01-020 | Houston | 04/07/26 | $848,686.03 | Construction | Roadway | Construction | Roadway | $951,319.38 | $(102,633.35) | -11% | 0 | | | | | 0915-12-786 | San Antonio | 07/01/26 | $387,275.16 | Construction | Roadway | Construction | Roadway | $433,966.00 | $(46,690.84) | -11% | 0 | | | | | 0902-90-354 | Fort Worth | 01/05/28 | $688,399.50 | Construction | Roadway | Construction | Roadway | $770,405.00 | $(82,005.50) | -11% | 0 | | | | | 0095-13-050 | Dallas | 06/04/26 | $1,364,275.00 | Construction | Local Let | Construction | Local Let | $1,524,810.00 | $(160,535.00) | -11% | 0 | | | | | 0069-07-113 | San Angelo | 08/05/26 | $1,657,431.03 | Construction | Roadway | Construction | Roadway | $1,500,000.00 | $157,431.03 | 11% | 0 | | | | | 0065-08-173 | Beaumont | 06/02/26 | $4,685,457.00 | Construction | Roadway | Construction | Roadway | $4,250,000.00 | $435,457.00 | 10% | -308 | -10 months | | | | 0284-03-011 | Wichita Falls | 06/02/26 | $606,296.05 | Construction | Roadway | Construction | Roadway | $550,000.00 | $56,296.05 | 10% | -182 | -6 months | | | | 1016-04-021 | Dallas | 04/07/26 | $3,419,169.90 | Construction | Roadway | Construction | Roadway | $3,804,796.15 | $(385,626.25) | -10% | 0 | | | | | 0914-04-368 | Austin | 07/01/26 | $386,671.00 | Construction | Non Roadway | Construction | Non Roadway | $430,165.89 | $(43,494.89) | -10% | 0 | | | | | 1090-03-023 | Yoakum | 11/03/26 | $262,936.00 | Construction | Roadway | Construction | Roadway | $239,033.00 | $23,903.00 | 10% | 0 | | | | | 0446-03-053 | Yoakum | 09/02/26 | $450,000.00 | Construction | Roadway | Construction | Roadway | $500,000.00 | $(50,000.00) | -10% | 0 | | | | | 0138-06-047 | Lufkin | 07/01/26 | $64,563,586.26 | Construction | Roadway | Construction | Roadway | $71,672,000.00 | $(7,108,413.74) | -10% | 0 | | | | | 2121-03-167 | El Paso | 05/06/26 | $1,167,991.50 | Construction | Roadway | Construction | Roadway | $1,295,756.18 | $(127,764.68) | -10% | 0 | | | | | 0918-46-334 | Dallas | 06/02/26 | $1,675,899.60 | Construction | Bridge | Construction | Bridge | $1,527,290.30 | $148,609.30 | 10% | -394 | -1 year | | | | 2270-01-029 | Abilene | 07/01/26 | $515,464.00 | Construction | Roadway | Construction | Roadway | $570,188.00 | $(54,724.00) | -10% | 0 | | | | | 0327-07-047 | Pharr | 08/05/26 | $316,539.17 | Construction | Roadway | Construction | Roadway | $289,011.00 | $27,528.17 | 10% | 0 | | | | | 1505-01-016 | Pharr | 09/02/26 | $11,804,130.31 | Construction | Roadway | Construction | Roadway | $13,034,269.99 | $(1,230,139.68) | -9% | 0 | | | | | 0052-01-046 | Lubbock | 10/04/28 | $29,726,881.09 | Non-Let | Bridge | Construction | Bridge | $27,200,001.00 | $2,526,880.09 | 9% | 0 | | Construction / Bridge → Non-Let / Bridge | | | 0572-01-076 | Odessa | 05/06/26 | $11,148,066.98 | Construction | Roadway | Construction | Roadway | $10,200,000.00 | $948,066.98 | 9% | 0 | | | | | 0842-01-033 | Yoakum | 11/02/27 | $560,000.00 | Construction | Roadway | Construction | Roadway | $512,504.00 | $47,496.00 | 9% | 0 | | | | | 0134-04-038 | Fort Worth | 12/01/26 | $25,848,256.43 | Construction | Roadway | Construction | Roadway | $28,459,136.00 | $(2,610,879.57) | -9% | 0 | | | | | 0187-02-074 | Yoakum | 05/06/26 | $652,746.15 | Construction | Roadway | Construction | Roadway | $718,612.65 | $(65,866.50) | -9% | 0 | | | | | 1024-01-087 | Beaumont | 05/06/26 | $136,311.00 | Construction | Roadway | Construction | Roadway | $125,000.00 | $11,311.00 | 9% | 0 | | | | | 0364-01-161 | Fort Worth | 05/06/26 | $598,673.36 | Construction | Roadway | Construction | Roadway | $549,856.86 | $48,816.50 | 9% | 0 | | | | | 0924-06-579 | El Paso | 05/05/27 | $1,576,850.19 | Construction | Bridge | Construction | Bridge | $1,729,660.00 | $(152,809.81) | -9% | 273 | 9 months | | | | 0915-12-751 | San Antonio | 07/01/26 | $2,379,112.00 | Construction | Bridge | Construction | Bridge | $2,600,000.00 | $(220,888.00) | -9% | 0 | | | | | 0366-02-089 | San Antonio | 06/02/26 | $43,851,269.81 | Construction | Roadway | Construction | Roadway | $47,921,160.02 | $(4,069,890.21) | -8% | 0 | | | | | 1318-01-020 | Dallas | 07/01/31 | $1,149,379.99 | | | Construction | Bridge | $1,061,166.05 | $88,213.94 | 8% | 972 | 3 years | | | | 0587-01-070 | Houston | 07/06/28 | $8,058,425.93 | Construction | Non Roadway | Construction | Non Roadway | $8,783,100.00 | $(724,674.07) | -8% | 0 | | | | | 0110-01-052 | Bryan | 05/06/26 | $2,143,398.15 | Construction | Roadway | Construction | Roadway | $1,980,000.00 | $163,398.15 | 8% | 0 | | | | | 3510-05-047 | Houston | 04/07/26 | $72,120,615.58 | Construction | Roadway | Construction | Roadway | $78,509,398.62 | $(6,388,783.04) | -8% | 0 | | | | | 0920-30-091 | Beaumont | 05/06/26 | $829,991.50 | Construction | Bridge | Construction | Bridge | $900,000.00 | $(70,008.50) | -8% | 0 | | | | | 0794-06-023 | Amarillo | 11/03/26 | $1,200,000.00 | Construction | Roadway | Construction | Roadway | $1,300,000.00 | $(100,000.00) | -8% | 0 | | | | | 0872-04-037 | Pharr | 08/05/26 | $310,839.61 | Construction | Roadway | Construction | Roadway | $289,011.00 | $21,828.61 | 8% | 0 | | | | | 0924-06-775 | El Paso | 05/01/28 | $4,062,009.26 | Construction | Local Let | Construction | Local Let | $4,386,970.00 | $(324,960.74) | -7% | -19 | -19 days | | | | 0265-05-092 | Austin | 03/07/28 | $4,629,629.63 | Construction | Non Roadway | Construction | Non Roadway | $5,000,000.00 | $(370,370.37) | -7% | 0 | | | | | 0265-06-036 | Austin | 03/07/28 | $4,629,629.63 | Construction | Non Roadway | Construction | Non Roadway | $5,000,000.00 | $(370,370.37) | -7% | 0 | | | | | 0059-04-050 | Lufkin | 01/05/28 | $3,518,518.52 | Construction | Roadway | Construction | Roadway | $3,800,000.00 | $(281,481.48) | -7% | 0 | | | | | 0924-06-694 | El Paso | 11/02/27 | $69,444.44 | Construction | Rail | Construction | Rail | $75,000.00 | $(5,555.56) | -7% | 545 | 1 year | | | | 1875-03-023 | Lufkin | 09/01/27 | $4,453,125.00 | Construction | Roadway | Construction | Roadway | $4,809,375.00 | $(356,250.00) | -7% | 0 | | | | | 1062-04-063 | Houston | 04/07/26 | $1,578,949.80 | Construction | Roadway | Construction | Roadway | $1,703,466.80 | $(124,517.00) | -7% | 0 | | | | | 0916-35-251 | Corpus Christi | 04/07/26 | $15,784,447.60 | Construction | Bridge | Construction | Bridge | $17,020,552.78 | $(1,236,105.18) | -7% | 0 | | | | | 0718-01-077 | Dallas | 12/01/27 | $605,770.20 | Construction | Roadway | Construction | Roadway | $652,586.55 | $(46,816.35) | -7% | 0 | | | | | 0066-02-036 | Amarillo | 11/02/27 | $643,000.00 | Construction | Roadway | Construction | Roadway | $600,000.00 | $43,000.00 | 7% | 0 | | | | | 0912-73-249 | Houston | 09/15/26 | $3,022,870.19 | Construction | Local Let | Construction | Local Let | $3,250,000.00 | $(227,129.81) | -7% | 0 | | | | | 1586-01-085 | Pharr | 01/06/27 | $7,514,832.00 | Construction | Roadway | Construction | Roadway | $8,065,000.00 | $(550,168.00) | -7% | 0 | | | | | 0598-02-120 | Houston | 04/07/26 | $5,309,850.50 | Construction | Roadway | Construction | Roadway | $4,974,658.00 | $335,192.50 | 7% | 0 | | | | | 0229-01-042 | Odessa | 05/06/26 | $45,758,583.77 | Construction | Roadway | Construction | Roadway | $48,984,668.33 | $(3,226,084.56) | -7% | 0 | | | | | 3538-01-070 | Houston | 04/07/26 | $1,779,739.32 | Construction | Roadway | Construction | Roadway | $1,905,158.40 | $(125,419.08) | -7% | 0 | | | | | 0216-03-034 | San Antonio | 06/02/26 | $2,981,999.70 | Construction | Roadway | Construction | Roadway | $2,799,009.42 | $182,990.28 | 7% | 0 | | | | | 0269-03-041 | Yoakum | 11/02/27 | $207,000.00 | Construction | Roadway | Construction | Roadway | $194,503.00 | $12,497.00 | 6% | 0 | | | | | 0924-06-659 | El Paso | 05/06/26 | $387,098.00 | Construction | Roadway | Construction | Roadway | $413,379.00 | $(26,281.00) | -6% | 0 | | | | | 0543-02-089 | Houston | 04/07/26 | $721,612.50 | Construction | Bridge | Construction | Bridge | $770,105.75 | $(48,493.25) | -6% | 0 | | | | | 0363-03-061 | Fort Worth | 12/01/26 | $2,886,857.05 | Construction | Roadway | Construction | Roadway | $2,718,460.17 | $168,396.88 | 6% | 0 | | | | | 1228-03-055 | Pharr | 06/02/26 | $204,619.75 | Construction | Roadway | Construction | Roadway | $192,788.00 | $11,831.75 | 6% | 0 | | | | | 2150-04-080 | Laredo | 06/02/26 | $3,395,617.48 | Construction | Roadway | Construction | Roadway | $3,200,000.00 | $195,617.48 | 6% | 0 | | | | | 0197-03-082 | Dallas | 04/07/26 | $2,142,967.58 | Construction | Roadway | Construction | Roadway | $2,282,217.58 | $(139,250.00) | -6% | 0 | | | | | 0047-03-091 | Paris | 04/07/26 | $138,485,945.26 | Construction | Roadway | Construction | Roadway | $147,195,094.78 | $(8,709,149.52) | -6% | 0 | | | | | 0017-10-295 | San Antonio | 06/02/26 | $342,039.50 | Construction | Bridge | Construction | Bridge | $323,000.00 | $19,039.50 | 6% | 0 | | | | | 0727-04-021 | Amarillo | 11/03/26 | $1,130,000.00 | Construction | Roadway | Construction | Roadway | $1,200,000.00 | $(70,000.00) | -6% | 0 | | | | | 0801-02-023 | Amarillo | 11/02/27 | $1,413,200.00 | Construction | Roadway | Construction | Roadway | $1,500,000.00 | $(86,800.00) | -6% | 364 | 12 months | | | | 3510-05-048 | Houston | 04/07/26 | $63,871,438.82 | Construction | Roadway | Construction | Roadway | $67,799,039.32 | $(3,927,600.50) | -6% | 0 | | | | | 2726-01-016 | Amarillo | 11/03/26 | $1,225,000.00 | Construction | Roadway | Construction | Roadway | $1,300,000.00 | $(75,000.00) | -6% | 0 | | | | | 0712-01-052 | Fort Worth | 07/01/26 | $2,433,031.32 | Construction | Roadway | Construction | Roadway | $2,300,827.83 | $132,203.49 | 6% | 0 | | | | | 0081-03-047 | Dallas | 05/06/26 | $109,560,813.58 | Construction | Roadway | Construction | Roadway | $116,223,406.73 | $(6,662,593.15) | -6% | 0 | | | | | 1006-01-082 | Houston | 04/07/26 | $468,119.00 | Construction | Roadway | Construction | Roadway | $495,827.00 | $(27,708.00) | -6% | 0 | | | | | 0081-02-080 | Fort Worth | 07/01/26 | $483,209.50 | Construction | Roadway | Construction | Roadway | $457,985.00 | $25,224.50 | 6% | 0 | | | | | 1103-04-045 | Pharr | 02/02/27 | $18,669,141.29 | Construction | Roadway | Construction | Roadway | $19,742,500.00 | $(1,073,358.71) | -5% | 0 | | | | | 2116-01-024 | Lufkin | 05/06/26 | $5,568,462.80 | Construction | Roadway | Construction | Roadway | $5,281,722.85 | $286,739.95 | 5% | 0 | | | | | 0314-07-070 | Fort Worth | 08/05/26 | $18,156,436.74 | Construction | Roadway | Unassigned | Unassigned | $19,195,443.15 | $(1,039,006.41) | -5% | -1853 | -5 years | Unassigned → Construction / Roadway | | | 0220-03-038 | Pharr | 06/02/26 | $230,038.25 | Construction | Roadway | Construction | Roadway | $242,842.00 | $(12,803.75) | -5% | 0 | | | | | 0261-02-085 | Dallas | 06/01/27 | $1,030,001.89 | Construction | Roadway | Construction | Roadway | $1,085,990.94 | $(55,989.05) | -5% | 0 | | | | | 0002-02-066 | El Paso | 05/06/26 | $385,010.03 | Construction | Roadway | Construction | Roadway | $366,346.70 | $18,663.33 | 5% | 0 | | | | | 1491-02-013 | Amarillo | 11/03/26 | $420,000.00 | Construction | Roadway | Construction | Roadway | $400,000.00 | $20,000.00 | 5% | 0 | | | | | 0937-01-027 | Lufkin | 06/02/26 | $5,062,782.80 | Construction | Roadway | Construction | Roadway | $4,825,456.82 | $237,325.98 | 5% | 0 | | | | | 2964-04-010 | Dallas | 06/02/26 | $857,717.25 | Construction | Roadway | Construction | Roadway | $901,904.59 | $(44,187.34) | -5% | 0 | | | | | 2964-04-012 | Dallas | 06/01/27 | $1,054,590.35 | Construction | Roadway | Construction | Roadway | $1,108,396.26 | $(53,805.91) | -5% | 0 | | | | | 2964-05-034 | Dallas | 06/02/26 | $904,018.50 | Construction | Roadway | Construction | Roadway | $949,650.98 | $(45,632.48) | -5% | 0 | | | | | 0340-01-042 | Lufkin | 04/05/28 | $722,577.70 | Construction | Roadway | Construction | Roadway | $759,023.00 | $(36,445.30) | -5% | 365 | 1 year | | | | 0042-04-046 | Amarillo | 06/02/26 | $2,566,666.00 | Construction | Roadway | Construction | Roadway | $2,695,635.00 | $(128,969.00) | -5% | -245 | -8 months | | | | 0342-04-036 | Pharr | 01/05/28 | $32,596,524.00 | Construction | Roadway | Construction | Roadway | $34,205,000.00 | $(1,608,476.00) | -5% | 0 | | | | | 1622-02-020 | Amarillo | 11/02/27 | $1,811,000.00 | Construction | Roadway | Construction | Roadway | $1,900,000.00 | $(89,000.00) | -5% | 0 | | | | | 0580-02-014 | Yoakum | 11/03/26 | $195,059.00 | Construction | Roadway | Construction | Roadway | $204,608.00 | $(9,549.00) | -5% | 0 | | | | | 0706-02-023 | Tyler | 04/07/26 | $3,328,769.46 | Construction | Roadway | Construction | Roadway | $3,491,717.55 | $(162,948.09) | -5% | 0 | | | | | 0902-38-134 | Fort Worth | 08/05/26 | $1,806,940.80 | Construction | Bridge | Construction | Bridge | $1,726,596.00 | $80,344.80 | 5% | 0 | | | | | 0238-05-049 | Amarillo | 11/01/28 | $525,000.00 | Construction | Roadway | Construction | Roadway | $550,000.00 | $(25,000.00) | -5% | 365 | 1 year | | | | 0674-01-083 | El Paso | 04/07/26 | $1,307,462.30 | Construction | Roadway | Construction | Roadway | $1,250,605.30 | $56,857.00 | 5% | 0 | | | | | 0842-02-024 | Yoakum | 11/02/27 | $250,000.00 | Construction | Roadway | Construction | Roadway | $261,811.00 | $(11,811.00) | -5% | 0 | | | | | 1103-04-046 | Pharr | 01/01/29 | $12,941,788.86 | Construction | Roadway | Construction | Roadway | $13,550,000.00 | $(608,211.14) | -4% | 0 | | | | | 0008-03-144 | Fort Worth | 07/01/26 | $375,912.50 | Construction | Non Roadway | Construction | Non Roadway | $393,569.93 | $(17,657.43) | -4% | 0 | | | | | 2463-01-014 | Fort Worth | 05/06/26 | $188,493.66 | Construction | Roadway | Construction | Roadway | $180,813.61 | $7,680.05 | 4% | 0 | | | | | 0517-01-050 | San Antonio | 10/06/26 | $318,100.00 | Construction | Roadway | Construction | Roadway | $331,964.00 | $(13,864.00) | -4% | 0 | | | | | 0500-03-655 | Houston | 05/06/26 | $8,750,914.40 | Construction | Bridge | Construction | Bridge | $9,120,774.40 | $(369,860.00) | -4% | 0 | | | | | 0177-14-038 | Houston | 05/06/26 | $4,757,838.09 | Construction | Roadway | Construction | Roadway | $4,957,990.50 | $(200,152.41) | -4% | 0 | | | | | 0170-01-038 | Amarillo | 11/01/30 | $480,000.00 | | | Construction | Roadway | $500,000.00 | $(20,000.00) | -4% | 730 | 2 years | | | | 0199-08-029 | Lufkin | 04/06/27 | $1,861,456.73 | Construction | Roadway | Construction | Roadway | $1,935,915.00 | $(74,458.27) | -4% | 0 | | | | | 0200-01-098 | Lufkin | 04/06/27 | $1,564,150.58 | Construction | Roadway | Construction | Roadway | $1,626,716.60 | $(62,566.02) | -4% | 0 | | | | | 0200-13-013 | Lufkin | 04/06/27 | $550,272.12 | Construction | Roadway | Construction | Roadway | $572,283.00 | $(22,010.88) | -4% | 0 | | | | | 0336-05-071 | Lufkin | 04/06/27 | $1,334,970.19 | Construction | Roadway | Construction | Roadway | $1,388,369.00 | $(53,398.81) | -4% | 0 | | | | | 0576-02-077 | Lufkin | 04/06/27 | $828,822.12 | Construction | Roadway | Construction | Roadway | $861,976.00 | $(33,153.88) | -4% | 0 | | | | | 0233-05-039 | El Paso | 12/01/26 | $72,115.38 | Construction | Rail | Construction | Rail | $75,000.00 | $(2,884.62) | -4% | 209 | 7 months | | | | 0674-01-077 | El Paso | 12/01/26 | $72,115.38 | Construction | Rail | Construction | Rail | $75,000.00 | $(2,884.62) | -4% | 209 | 7 months | | | | 1281-01-020 | El Paso | 12/01/26 | $72,115.38 | Construction | Rail | Construction | Rail | $75,000.00 | $(2,884.62) | -4% | 209 | 7 months | | | | 3063-01-013 | Yoakum | 11/03/26 | $130,000.00 | Construction | Roadway | Construction | Roadway | $125,261.00 | $4,739.00 | 4% | 0 | | | | | 0025-02-230 | San Antonio | 06/02/26 | $502,495.00 | Construction | Bridge | Construction | Bridge | $522,000.00 | $(19,505.00) | -4% | 0 | | | | | 0109-04-030 | Lufkin | 04/05/28 | $1,248,237.85 | Construction | Roadway | Construction | Roadway | $1,296,247.00 | $(48,009.15) | -4% | 365 | 1 year | | | | 1885-03-013 | Amarillo | 11/02/27 | $1,060,000.00 | Construction | Roadway | Construction | Roadway | $1,100,000.00 | $(40,000.00) | -4% | 0 | | | | | 0026-03-052 | Yoakum | 11/02/27 | $211,000.00 | Construction | Roadway | Construction | Roadway | $203,687.00 | $7,313.00 | 4% | 0 | | | | | 0358-03-040 | El Paso | 12/01/27 | $2,276,633.93 | Construction | Roadway | Construction | Roadway | $2,360,953.70 | $(84,319.77) | -4% | 0 | | | | | 0358-04-019 | El Paso | 12/01/27 | $2,285,513.39 | Construction | Roadway | Construction | Roadway | $2,370,162.04 | $(84,648.65) | -4% | 0 | | | | | 0039-07-282 | Pharr | 02/01/29 | $1,230,084.95 | Construction | Roadway | Construction | Roadway | $1,274,385.00 | $(44,300.05) | -3% | 0 | | | | | 0039-08-110 | Pharr | 02/01/29 | $3,520,432.79 | Construction | Roadway | Construction | Roadway | $3,647,217.00 | $(126,784.21) | -3% | 0 | | | | | 0865-01-121 | Pharr | 05/03/28 | $4,554,101.44 | Construction | Roadway | Construction | Roadway | $4,718,112.00 | $(164,010.56) | -3% | 0 | | | | | 1804-02-030 | Pharr | 05/03/28 | $1,389,913.90 | Construction | Roadway | Construction | Roadway | $1,439,970.00 | $(50,056.10) | -3% | 0 | | | | | 0039-08-108 | Pharr | 04/05/28 | $4,997,386.07 | Construction | Roadway | Construction | Roadway | $5,177,361.00 | $(179,974.93) | -3% | 0 | | | | | 0039-09-065 | Pharr | 04/05/28 | $3,677,687.45 | Construction | Roadway | Construction | Roadway | $3,810,135.00 | $(132,447.55) | -3% | 0 | | | | | 0039-16-073 | Pharr | 04/05/28 | $831,272.70 | Construction | Roadway | Construction | Roadway | $861,210.00 | $(29,937.30) | -3% | 0 | | | | | 1140-02-041 | Pharr | 04/05/28 | $4,566,344.52 | Construction | Roadway | Construction | Roadway | $4,730,796.00 | $(164,451.48) | -3% | 0 | | | | | 0039-18-126 | Pharr | 01/05/28 | $4,029,878.70 | Construction | Roadway | Construction | Roadway | $4,175,010.00 | $(145,131.30) | -3% | 0 | | | | | 0255-07-154 | Pharr | 01/05/28 | $5,222,606.04 | Construction | Roadway | Construction | Roadway | $5,410,692.00 | $(188,085.96) | -3% | 0 | | | | | 0255-08-112 | Pharr | 01/05/28 | $869,055.98 | Construction | Roadway | Construction | Roadway | $900,354.00 | $(31,298.02) | -3% | 0 | | | | | 3343-02-019 | Pharr | 09/01/27 | $2,378,057.13 | Construction | Roadway | Construction | Roadway | $2,463,700.00 | $(85,642.87) | -3% | 0 | | | | | 3343-03-003 | Pharr | 09/01/27 | $69,931.50 | Construction | Roadway | Construction | Roadway | $72,450.00 | $(2,518.50) | -3% | 0 | | | | | 0433-02-054 | Pharr | 01/06/27 | $649,450.80 | Construction | Roadway | Construction | Roadway | $672,840.00 | $(23,389.20) | -3% | 0 | | | | | 0433-04-033 | Pharr | 01/06/27 | $831,090.27 | Construction | Roadway | Construction | Roadway | $861,021.00 | $(29,930.73) | -3% | 0 | | | | | 1801-01-063 | Pharr | 01/06/27 | $2,121,863.60 | Construction | Roadway | Construction | Roadway | $2,198,280.00 | $(76,416.40) | -3% | 0 | | | | | 1801-02-022 | Pharr | 01/06/27 | $2,447,643.04 | Construction | Roadway | Construction | Roadway | $2,535,792.00 | $(88,148.96) | -3% | 0 | | | | | 0220-01-038 | Pharr | 11/03/26 | $7,056,372.13 | Construction | Roadway | Construction | Roadway | $7,310,499.00 | $(254,126.87) | -3% | 0 | | | | | 2094-01-072 | Pharr | 11/03/26 | $4,514,108.73 | Construction | Roadway | Construction | Roadway | $4,676,679.00 | $(162,570.27) | -3% | 0 | | | | | 0442-02-166 | Dallas | 05/06/26 | $13,090,782.97 | Construction | Roadway | Construction | Roadway | $12,657,475.67 | $433,307.30 | 3% | 0 | | | | | 0187-05-062 | Houston | 05/06/26 | $5,871,532.50 | Construction | Roadway | Construction | Roadway | $6,075,775.00 | $(204,242.50) | -3% | 0 | | | | | 0154-02-031 | Yoakum | 11/02/27 | $622,000.00 | Construction | Roadway | Construction | Roadway | $643,449.00 | $(21,449.00) | -3% | 0 | | | | | 0066-03-045 | Amarillo | 11/03/26 | $2,900,000.00 | Construction | Roadway | Construction | Roadway | $3,000,000.00 | $(100,000.00) | -3% | 0 | | | | | 0355-05-048 | Amarillo | 11/03/26 | $580,000.00 | Construction | Roadway | Construction | Roadway | $600,000.00 | $(20,000.00) | -3% | 0 | | | | | 0050-09-099 | Houston | 09/02/26 | $2,047,628.36 | Construction | Roadway | Construction | Roadway | $2,117,840.00 | $(70,211.64) | -3% | 0 | | | | | 0040-03-070 | Amarillo | 11/02/27 | $2,708,000.00 | Construction | Roadway | Construction | Roadway | $2,800,000.00 | $(92,000.00) | -3% | 0 | | | | | 0619-05-040 | Dallas | 09/01/27 | $493,912.10 | Construction | Roadway | Construction | Roadway | $510,690.00 | $(16,777.90) | -3% | 0 | | | | | 0171-04-087 | Fort Worth | 07/01/26 | $391,194.00 | Construction | Roadway | Construction | Roadway | $378,900.00 | $12,294.00 | 3% | 0 | | | | | 0073-03-071 | San Antonio | 06/02/26 | $1,177,534.93 | Construction | Roadway | Construction | Roadway | $1,140,659.29 | $36,875.64 | 3% | 0 | | | | | 0081-02-079 | Fort Worth | 06/11/26 | $531,625.25 | Construction | Local Let | Construction | Local Let | $515,157.78 | $16,467.47 | 3% | 0 | | | | | 0169-08-029 | Amarillo | 11/03/26 | $1,230,000.00 | Construction | Roadway | Construction | Roadway | $1,270,000.00 | $(40,000.00) | -3% | 0 | | | | | 0006-06-109 | Abilene | 06/02/26 | $119,162,496.70 | Construction | Roadway | Construction | Roadway | $123,039,621.00 | $(3,877,124.30) | -3% | 0 | | | | | 2437-01-028 | Amarillo | 11/02/27 | $969,400.00 | Construction | Roadway | Construction | Roadway | $1,000,000.00 | $(30,600.00) | -3% | -365 | -1 year | | | | 0176-01-116 | Lufkin | 05/06/26 | $7,775,777.73 | Construction | Roadway | Construction | Roadway | $8,019,500.93 | $(243,723.20) | -3% | 0 | | | | | 0276-01-046 | Laredo | 04/07/26 | $10,337,401.30 | Construction | Roadway | Construction | Roadway | $10,653,201.30 | $(315,800.00) | -3% | 0 | | | | | 1508-01-010 | Laredo | 04/07/26 | $4,348,360.35 | Construction | Roadway | Construction | Roadway | $4,480,000.35 | $(131,640.00) | -3% | 0 | | | | | 0915-12-784 | San Antonio | 07/01/26 | $421,541.95 | Construction | Roadway | Construction | Roadway | $433,966.00 | $(12,424.05) | -3% | 0 | | | | | 0917-16-041 | Bryan | 08/05/26 | $607,989.40 | Construction | Bridge | Construction | Bridge | $591,407.82 | $16,581.58 | 3% | 0 | | | | | 0601-01-067 | Beaumont | 05/06/26 | $1,601,631.00 | Construction | Roadway | Construction | Roadway | $1,647,471.00 | $(45,840.00) | -3% | 0 | | | | | 0790-03-030 | Amarillo | 11/02/27 | $875,420.00 | Construction | Roadway | Construction | Roadway | $900,000.00 | $(24,580.00) | -3% | 0 | | | | | 0683-05-017 | Austin | 04/07/26 | $7,492,713.85 | Construction | Roadway | Construction | Roadway | $7,697,810.85 | $(205,097.00) | -3% | 0 | | | | | 0791-01-021 | Amarillo | 11/02/27 | $1,363,000.00 | Construction | Roadway | Construction | Roadway | $1,400,000.00 | $(37,000.00) | -3% | 0 | | | | | 1733-01-009 | Amarillo | 11/01/35 | $74,000.00 | | | Construction | Roadway | $76,000.00 | $(2,000.00) | -3% | 2556 | 7 years | | | | 1623-02-020 | Amarillo | 11/02/27 | $276,600.00 | Construction | Roadway | Construction | Roadway | $284,050.00 | $(7,450.00) | -3% | 0 | | | | | 2081-01-011 | Amarillo | 11/01/29 | $448,000.00 | | | Construction | Roadway | $460,000.00 | $(12,000.00) | -3% | 365 | 1 year | | | | 0051-09-128 | Houston | 08/05/26 | $4,137,427.00 | Construction | Roadway | Construction | Roadway | $4,032,301.00 | $105,126.00 | 3% | 0 | | | | | 1685-03-115 | Houston | 04/07/26 | $295,342.00 | Construction | Roadway | Construction | Roadway | $303,260.45 | $(7,918.45) | -3% | 0 | | | | | 0801-01-015 | Amarillo | 11/02/27 | $132,500.00 | Construction | Roadway | Construction | Roadway | $136,040.00 | $(3,540.00) | -3% | 364 | 12 months | | | | 1621-02-007 | Amarillo | 11/03/26 | $110,000.00 | Construction | Roadway | Construction | Roadway | $112,860.00 | $(2,860.00) | -3% | 0 | | | | | 0169-09-021 | Amarillo | 11/03/26 | $780,000.00 | Construction | Roadway | Construction | Roadway | $800,000.00 | $(20,000.00) | -3% | 0 | | | | | 1626-01-013 | Amarillo | 11/03/26 | $780,000.00 | Construction | Roadway | Construction | Roadway | $800,000.00 | $(20,000.00) | -3% | 0 | | | | | 0356-02-050 | Amarillo | 11/03/26 | $202,000.00 | Construction | Roadway | Construction | Roadway | $207,024.00 | $(5,024.00) | -2% | 0 | | | | | 0560-05-008 | Amarillo | 11/03/26 | $112,000.00 | Construction | Roadway | Construction | Roadway | $114,760.00 | $(2,760.00) | -2% | 0 | | | | | 0356-03-020 | Amarillo | 11/03/26 | $625,000.00 | Construction | Roadway | Construction | Roadway | $640,000.00 | $(15,000.00) | -2% | 0 | | | | | 2002-03-023 | Amarillo | 11/01/30 | $976,800.00 | | | Construction | Roadway | $1,000,000.00 | $(23,200.00) | -2% | 730 | 2 years | | | | 0019-01-146 | Fort Worth | 06/02/26 | $19,892,100.87 | Construction | Roadway | Construction | Roadway | $19,442,730.37 | $449,370.50 | 2% | 0 | | | | | 0045-01-064 | Wichita Falls | 05/06/26 | $798,794.50 | Construction | Roadway | Construction | Roadway | $781,000.00 | $17,794.50 | 2% | 0 | | | | | 1491-01-021 | Amarillo | 11/02/27 | $1,075,000.00 | Construction | Roadway | Construction | Roadway | $1,100,000.00 | $(25,000.00) | -2% | 0 | | | | | 2513-01-013 | Yoakum | 11/02/27 | $224,000.00 | Construction | Roadway | Construction | Roadway | $219,229.00 | $4,771.00 | 2% | 0 | | | | | 2150-03-034 | Laredo | 04/07/26 | $823,513.55 | Construction | Roadway | Construction | Roadway | $806,013.55 | $17,500.00 | 2% | 0 | | | | | 0560-01-034 | Amarillo | 11/03/26 | $822,000.00 | Construction | Roadway | Construction | Roadway | $840,000.00 | $(18,000.00) | -2% | 0 | | | | | 1601-02-036 | Fort Worth | 06/02/26 | $8,270,038.70 | Construction | Roadway | Construction | Roadway | $8,441,246.00 | $(171,207.30) | -2% | -218 | -7 months | | | | 0066-01-022 | Amarillo | 11/02/27 | $588,300.00 | Construction | Roadway | Construction | Roadway | $600,000.00 | $(11,700.00) | -2% | 0 | | | | | 0269-09-020 | Yoakum | 11/03/26 | $138,095.00 | Construction | Roadway | Construction | Roadway | $135,453.00 | $2,642.00 | 2% | 0 | | | | | 0190-05-078 | Tyler | 06/02/26 | $1,975,005.00 | Construction | Roadway | Construction | Roadway | $1,937,340.00 | $37,665.00 | 2% | 0 | | | | | 0265-12-005 | Yoakum | 11/01/28 | $106,000.00 | Construction | Roadway | Construction | Roadway | $104,000.00 | $2,000.00 | 2% | 0 | | | | | 2452-01-066 | San Antonio | 04/07/26 | $61,080,463.21 | Construction | Roadway | Construction | Roadway | $59,934,274.21 | $1,146,189.00 | 2% | 0 | | | | | 0068-01-084 | Lubbock | 06/02/26 | $698,158.23 | Construction | Roadway | Construction | Roadway | $711,545.84 | $(13,387.61) | -2% | 0 | | | | | 1103-02-014 | Pharr | 06/01/27 | $21,981,339.38 | Construction | Roadway | Construction | Roadway | $22,400,000.00 | $(418,660.62) | -2% | 0 | | | | | 1068-04-181 | Dallas | 06/02/26 | $641,731.50 | Construction | Roadway | Construction | Roadway | $653,883.04 | $(12,151.54) | -2% | 0 | | | | | 0643-05-067 | Bryan | 05/06/26 | $2,492,627.40 | Construction | Roadway | Construction | Roadway | $2,539,776.40 | $(47,149.00) | -2% | 0 | | | | | 1388-01-010 | Tyler | 04/07/26 | $5,657,554.18 | Construction | Roadway | Construction | Roadway | $5,762,645.24 | $(105,091.06) | -2% | 0 | | | | | 0515-02-006 | Yoakum | 11/03/26 | $270,000.00 | Construction | Roadway | Construction | Roadway | $265,417.00 | $4,583.00 | 2% | 0 | | | | | 0154-01-069 | Yoakum | 11/03/26 | $260,005.00 | Construction | Roadway | Construction | Roadway | $264,394.00 | $(4,389.00) | -2% | 0 | | | | | 0039-02-080 | Pharr | 06/02/26 | $202,383.25 | Construction | Roadway | Construction | Roadway | $205,724.00 | $(3,340.75) | -2% | 0 | | | | | 2899-01-013 | Amarillo | 11/03/26 | $270,000.00 | Construction | Roadway | Construction | Roadway | $274,360.00 | $(4,360.00) | -2% | 0 | | | | | 0861-01-074 | Pharr | 06/02/26 | $2,077,235.89 | Construction | Roadway | Construction | Roadway | $2,044,653.26 | $32,582.63 | 2% | 0 | | | | | 0912-72-846 | Houston | 06/02/26 | $5,709,769.58 | Construction | Roadway | Construction | Roadway | $5,801,930.00 | $(92,160.42) | -2% | 0 | | | | | 0917-16-042 | Bryan | 08/05/26 | $542,395.11 | Construction | Bridge | Construction | Bridge | $534,337.38 | $8,057.73 | 2% | 0 | | | | | 0187-05-061 | Houston | 05/06/26 | $4,378,050.25 | Construction | Roadway | Construction | Roadway | $4,313,954.25 | $64,096.00 | 1% | 0 | | | | | 0794-01-020 | Amarillo | 11/01/29 | $1,379,400.00 | | | Construction | Roadway | $1,400,000.00 | $(20,600.00) | -1% | 365 | 1 year | | | | 0905-06-121 | Lubbock | 07/01/26 | $388,274.75 | Construction | Roadway | Construction | Roadway | $393,939.43 | $(5,664.68) | -1% | 0 | | | | | 0215-11-025 | San Antonio | 10/06/26 | $335,700.00 | Construction | Roadway | Construction | Roadway | $331,148.00 | $4,552.00 | 1% | 0 | | | | | 0215-11-026 | San Antonio | 10/06/26 | $156,200.00 | Construction | Roadway | Construction | Roadway | $154,100.00 | $2,100.00 | 1% | 0 | | | | | 0914-04-364 | Austin | 06/02/26 | $598,936.45 | Construction | Non Roadway | Construction | Non Roadway | $591,082.70 | $7,853.75 | 1% | 0 | | | | | 0167-01-122 | El Paso | 06/02/26 | $84,225,632.19 | Construction | Roadway | Construction | Roadway | $85,272,327.66 | $(1,046,695.47) | -1% | 0 | | | | | 1068-03-025 | Fort Worth | 06/02/26 | $1,720,788.26 | Construction | Roadway | Construction | Roadway | $1,700,070.86 | $20,717.40 | 1% | -182 | -6 months | | | | 0914-05-250 | Austin | 05/06/26 | $510,441.50 | Construction | Roadway | Construction | Roadway | $504,441.50 | $6,000.00 | 1% | 0 | | | | | 3524-01-008 | Fort Worth | 12/01/26 | $16,331,411.95 | Construction | Roadway | Construction | Roadway | $16,525,400.51 | $(193,988.56) | -1% | 0 | | | | | 0177-01-121 | Lufkin | 06/02/26 | $480,956.00 | Construction | Bridge | Construction | Bridge | $486,283.50 | $(5,327.50) | -1% | 0 | | | | | 0013-10-098 | Fort Worth | 12/01/26 | $8,416,086.71 | Construction | Roadway | Construction | Roadway | $8,507,754.06 | $(91,667.35) | -1% | 0 | | | | | 0068-01-085 | Lubbock | 06/02/26 | $683,933.93 | Construction | Roadway | Construction | Roadway | $691,276.15 | $(7,342.22) | -1% | 0 | | | | | 0004-07-143 | Odessa | 02/02/27 | $1,434,593.19 | Construction | Roadway | Construction | Roadway | $1,419,779.33 | $14,813.86 | 1% | 0 | | | | | 0005-08-109 | Abilene | 04/07/26 | $12,515,642.92 | Construction | Roadway | Construction | Roadway | $12,628,622.92 | $(112,980.00) | -1% | 0 | | | | | 1141-02-020 | Amarillo | 11/02/27 | $1,685,200.00 | Construction | Roadway | Construction | Roadway | $1,700,000.00 | $(14,800.00) | -1% | 0 | | | | | 0261-03-071 | Dallas | 06/01/27 | $1,059,743.69 | Construction | Roadway | Construction | Roadway | $1,068,867.18 | $(9,123.49) | -1% | 0 | | | | | 0916-26-023 | Corpus Christi | 05/06/26 | $1,189,809.50 | Construction | Bridge | Construction | Bridge | $1,200,000.00 | $(10,190.50) | -1% | 0 | | | | | 0026-02-041 | Yoakum | 11/02/27 | $554,000.00 | Construction | Roadway | Construction | Roadway | $549,534.00 | $4,466.00 | 1% | 0 | | | | | 0919-13-020 | Atlanta | 06/02/26 | $490,881.20 | Construction | Bridge | Construction | Bridge | $494,881.20 | $(4,000.00) | -1% | 0 | | | | | 2552-04-055 | El Paso | 08/05/26 | $3,879,275.00 | Construction | Roadway | Construction | Roadway | $3,849,137.50 | $30,137.50 | 1% | 0 | | | | | 2157-01-022 | Atlanta | 04/07/26 | $1,122,153.25 | Construction | Roadway | Construction | Roadway | $1,130,952.25 | $(8,799.00) | -1% | 0 | | | | | 0908-33-116 | Abilene | 06/02/26 | $203,392.28 | Construction | Roadway | Construction | Roadway | $204,953.00 | $(1,560.72) | -1% | 0 | | | | | 0356-02-052 | Amarillo | 11/01/29 | $1,886,000.00 | | | Construction | Roadway | $1,900,000.00 | $(14,000.00) | -1% | 365 | 1 year | | | | 0314-01-084 | Fort Worth | 10/06/26 | $14,084,845.19 | Construction | Bridge | Construction | Bridge | $14,184,175.80 | $(99,330.61) | -1% | 0 | | | | | 0299-04-083 | Laredo | 04/07/26 | $10,703,304.00 | Construction | Roadway | Construction | Roadway | $10,629,521.20 | $73,782.80 | 1% | 0 | | | | | 0299-14-010 | Laredo | 04/07/26 | $98,335,107.77 | Construction | Roadway | Construction | Roadway | $97,708,652.77 | $626,455.00 | 1% | 0 | | | | | 0918-47-401 | Dallas | 08/05/26 | $2,442,591.05 | Construction | Roadway | Construction | Roadway | $2,427,791.55 | $14,799.50 | 1% | 0 | | | | | 0917-16-044 | Bryan | 08/05/26 | $577,321.07 | Construction | Bridge | Construction | Bridge | $574,104.91 | $3,216.16 | 1% | 0 | | | | | 1439-01-010 | Yoakum | 11/03/26 | $230,035.00 | Construction | Roadway | Construction | Roadway | $228,836.00 | $1,199.00 | 1% | 0 | | | | | 0105-06-023 | Childress | 06/02/26 | $3,732,460.07 | Construction | Roadway | Construction | Roadway | $3,713,190.79 | $19,269.28 | 1% | -245 | -8 months | | | | 0218-05-037 | Atlanta | 04/07/26 | $1,408,694.83 | Construction | Roadway | Construction | Roadway | $1,415,316.83 | $(6,622.00) | -0% | 0 | | | | | 1145-03-011 | Bryan | 10/01/39 | $155,000.00 | | | Construction | Roadway | $155,676.00 | $(676.00) | -0% | 4743 | 13 years | | | | 1269-01-023 | San Antonio | 05/06/26 | $19,746,678.83 | Construction | Roadway | Construction | Roadway | $19,665,338.83 | $81,340.00 | 0% | 0 | | | | | 0490-03-032 | Amarillo | 11/02/27 | $1,295,000.00 | Construction | Roadway | Construction | Roadway | $1,300,000.00 | $(5,000.00) | -0% | 0 | | | | | 1105-01-018 | Yoakum | 11/03/26 | $538,511.00 | Construction | Roadway | Construction | Roadway | $536,524.00 | $1,987.00 | 0% | 0 | | | | | 0916-35-231 | Corpus Christi | 05/06/26 | $11,336,329.94 | Construction | Bridge | Construction | Bridge | $11,294,329.94 | $42,000.00 | 0% | 0 | | | | | 3419-01-014 | Dallas | 08/04/27 | $8,026,077.03 | Construction | Roadway | Construction | Roadway | $7,997,520.53 | $28,556.50 | 0% | 0 | | | | | 0039-07-281 | Pharr | 09/06/28 | $852,410.00 | Construction | Roadway | Construction | Roadway | $855,041.00 | $(2,631.00) | -0% | 0 | | | | | 0039-14-013 | Pharr | 09/06/28 | $92,664.00 | Construction | Roadway | Construction | Roadway | $92,950.00 | $(286.00) | -0% | 0 | | | | | 0039-19-063 | Pharr | 09/06/28 | $455,052.00 | Construction | Roadway | Construction | Roadway | $456,456.00 | $(1,404.00) | -0% | 0 | | | | | 0327-06-032 | Pharr | 09/06/28 | $304,485.00 | Construction | Roadway | Construction | Roadway | $305,425.00 | $(940.00) | -0% | 0 | | | | | 0327-07-051 | Pharr | 09/06/28 | $344,003.00 | Construction | Roadway | Construction | Roadway | $345,065.00 | $(1,062.00) | -0% | 0 | | | | | 0327-08-113 | Pharr | 09/06/28 | $390,744.00 | Construction | Roadway | Construction | Roadway | $391,950.00 | $(1,206.00) | -0% | 0 | | | | | 0433-06-006 | Pharr | 09/06/28 | $30,185.00 | Construction | Roadway | Construction | Roadway | $30,278.00 | $(93.00) | -0% | 0 | | | | | 0482-03-038 | Pharr | 09/06/28 | $13,685.76 | Construction | Roadway | Construction | Roadway | $13,728.00 | $(42.24) | -0% | 0 | | | | | 0517-07-049 | Pharr | 09/06/28 | $1,672,322.76 | Construction | Roadway | Construction | Roadway | $1,677,484.00 | $(5,161.24) | -0% | 0 | | | | | 0517-10-023 | Pharr | 09/06/28 | $183,844.08 | Construction | Roadway | Construction | Roadway | $184,412.00 | $(567.92) | -0% | 0 | | | | | 0669-03-032 | Pharr | 09/06/28 | $521,717.76 | Construction | Roadway | Construction | Roadway | $523,328.00 | $(1,610.24) | -0% | 0 | | | | | 0684-02-032 | Pharr | 09/06/28 | $112,679.00 | Construction | Roadway | Construction | Roadway | $113,027.00 | $(348.00) | -0% | 0 | | | | | 0698-02-062 | Pharr | 09/06/28 | $375,538.68 | Construction | Roadway | Construction | Roadway | $376,698.00 | $(1,159.32) | -0% | 0 | | | | | 0698-03-112 | Pharr | 09/06/28 | $38,319.48 | Construction | Roadway | Construction | Roadway | $38,438.00 | $(118.52) | -0% | 0 | | | | | 0698-04-012 | Pharr | 09/06/28 | $258,509.88 | Construction | Roadway | Construction | Roadway | $259,308.00 | $(798.12) | -0% | 0 | | | | | 0818-01-022 | Pharr | 09/06/28 | $168,554.52 | Construction | Roadway | Construction | Roadway | $169,075.00 | $(520.48) | -0% | 0 | | | | | 0863-03-044 | Pharr | 09/06/28 | $479,322.36 | Construction | Roadway | Construction | Roadway | $480,802.00 | $(1,479.64) | -0% | 0 | | | | | 1103-04-047 | Pharr | 09/06/28 | $114,352.56 | Construction | Roadway | Construction | Roadway | $114,706.00 | $(353.44) | -0% | 0 | | | | | 1103-05-004 | Pharr | 09/06/28 | $265,446.72 | Construction | Roadway | Construction | Roadway | $266,266.00 | $(819.28) | -0% | 0 | | | | | 1138-01-045 | Pharr | 09/06/28 | $286,793.00 | Construction | Roadway | Construction | Roadway | $287,678.00 | $(885.00) | -0% | 0 | | | | | 1228-02-033 | Pharr | 09/06/28 | $851,666.40 | Construction | Roadway | Construction | Roadway | $854,295.00 | $(2,628.60) | -0% | 0 | | | | | 1236-01-017 | Pharr | 09/06/28 | $418,480.00 | Construction | Roadway | Construction | Roadway | $419,772.00 | $(1,292.00) | -0% | 0 | | | | | 1236-01-018 | Pharr | 09/06/28 | $335,696.00 | Construction | Roadway | Construction | Roadway | $336,733.00 | $(1,037.00) | -0% | 0 | | | | | 1430-02-019 | Pharr | 09/06/28 | $37,180.00 | Construction | Roadway | Construction | Roadway | $37,294.00 | $(114.00) | -0% | 0 | | | | | 1801-02-023 | Pharr | 09/06/28 | $506,997.00 | Construction | Roadway | Construction | Roadway | $508,561.00 | $(1,564.00) | -0% | 0 | | | | | 1805-01-006 | Pharr | 09/06/28 | $218,955.96 | Construction | Roadway | Construction | Roadway | $219,632.00 | $(676.04) | -0% | 0 | | | | | 1944-02-015 | Pharr | 09/06/28 | $213,840.00 | Construction | Roadway | Construction | Roadway | $214,500.00 | $(660.00) | -0% | 0 | | | | | 2245-01-018 | Pharr | 09/06/28 | $202,091.76 | Construction | Roadway | Construction | Roadway | $202,716.00 | $(624.24) | -0% | 0 | | | | | 2245-01-019 | Pharr | 09/06/28 | $478,240.20 | Construction | Roadway | Construction | Roadway | $479,716.00 | $(1,475.80) | -0% | 0 | | | | | 2416-01-007 | Pharr | 09/06/28 | $105,860.52 | Construction | Roadway | Construction | Roadway | $106,187.00 | $(326.48) | -0% | 0 | | | | | 2416-02-007 | Pharr | 09/06/28 | $523,807.56 | Construction | Roadway | Construction | Roadway | $525,424.00 | $(1,616.44) | -0% | 0 | | | | | 2530-02-010 | Pharr | 09/06/28 | $147,371.40 | Construction | Roadway | Construction | Roadway | $147,826.00 | $(454.60) | -0% | 0 | | | | | 2909-01-012 | Pharr | 09/06/28 | $283,980.00 | Construction | Roadway | Construction | Roadway | $284,856.00 | $(876.00) | -0% | 0 | | | | | 0255-03-042 | Pharr | 09/01/27 | $97,511.00 | Construction | Roadway | Construction | Roadway | $97,812.00 | $(301.00) | -0% | 0 | | | | | 0255-03-043 | Pharr | 09/01/27 | $195,022.00 | Construction | Roadway | Construction | Roadway | $195,624.00 | $(602.00) | -0% | 0 | | | | | 0255-04-103 | Pharr | 09/01/27 | $118,838.00 | Construction | Roadway | Construction | Roadway | $119,203.50 | $(365.50) | -0% | 0 | | | | | 0255-04-104 | Pharr | 09/01/27 | $279,532.00 | Construction | Roadway | Construction | Roadway | $280,393.75 | $(861.75) | -0% | 0 | | | | | 0255-14-003 | Pharr | 09/01/27 | $234,460.00 | Construction | Roadway | Construction | Roadway | $235,183.00 | $(723.00) | -0% | 0 | | | | | 0433-01-033 | Pharr | 09/01/27 | $848,426.00 | Construction | Roadway | Construction | Roadway | $851,045.00 | $(2,619.00) | -0% | 0 | | | | | 0630-03-029 | Pharr | 09/01/27 | $533,060.00 | Construction | Roadway | Construction | Roadway | $534,706.25 | $(1,646.25) | -0% | 0 | | | | | 0630-04-008 | Pharr | 09/01/27 | $141,739.00 | Construction | Roadway | Construction | Roadway | $142,177.75 | $(438.75) | -0% | 0 | | | | | 0861-02-021 | Pharr | 09/01/27 | $136,572.00 | Construction | Roadway | Construction | Roadway | $136,994.00 | $(422.00) | -0% | 0 | | | | | 1136-01-023 | Pharr | 09/01/27 | $34,032.00 | Construction | Roadway | Construction | Roadway | $34,138.00 | $(106.00) | -0% | 0 | | | | | 1136-02-058 | Pharr | 09/01/27 | $886,700.00 | Construction | Roadway | Construction | Roadway | $889,437.25 | $(2,737.25) | -0% | 0 | | | | | 1425-02-016 | Pharr | 09/01/27 | $303,482.00 | Construction | Roadway | Construction | Roadway | $304,417.75 | $(935.75) | -0% | 0 | | | | | 1429-02-044 | Pharr | 09/01/27 | $77,735.00 | Construction | Roadway | Construction | Roadway | $77,974.00 | $(239.00) | -0% | 0 | | | | | 1430-01-033 | Pharr | 09/01/27 | $357,274.00 | Construction | Roadway | Construction | Roadway | $358,377.50 | $(1,103.50) | -0% | 0 | | | | | 1586-01-095 | Pharr | 09/01/27 | $175,710.00 | Construction | Roadway | Construction | Roadway | $176,250.75 | $(540.75) | -0% | 0 | | | | | 1889-01-008 | Pharr | 09/01/27 | $331,252.00 | Construction | Roadway | Construction | Roadway | $332,273.50 | $(1,021.50) | -0% | 0 | | | | | 1944-03-004 | Pharr | 09/01/27 | $170,901.00 | Construction | Roadway | Construction | Roadway | $171,427.75 | $(526.75) | -0% | 0 | | | | | 2529-01-025 | Pharr | 09/01/27 | $333,887.00 | Construction | Roadway | Construction | Roadway | $334,919.00 | $(1,032.00) | -0% | 0 | | | | | 2621-02-012 | Pharr | 09/01/27 | $25,136.00 | Construction | Roadway | Construction | Roadway | $25,213.50 | $(77.50) | -0% | 0 | | | | | 2621-03-013 | Pharr | 09/01/27 | $101,138.00 | Construction | Roadway | Construction | Roadway | $101,448.75 | $(310.75) | -0% | 0 | | | | | 3045-01-009 | Pharr | 09/01/27 | $195,205.00 | Construction | Roadway | Construction | Roadway | $195,806.00 | $(601.00) | -0% | 0 | | | | | 3094-03-009 | Pharr | 09/01/27 | $107,935.00 | Construction | Roadway | Construction | Roadway | $108,267.25 | $(332.25) | -0% | 0 | | | | | 3217-01-024 | Pharr | 09/01/27 | $731,975.00 | Construction | Roadway | Construction | Roadway | $734,233.50 | $(2,258.50) | -0% | 0 | | | | | 3342-01-004 | Pharr | 09/01/27 | $176,044.00 | Construction | Roadway | Construction | Roadway | $176,588.75 | $(544.75) | -0% | 0 | | | | | 0039-10-095 | Pharr | 09/02/26 | $298,996.92 | Construction | Roadway | Construction | Roadway | $299,919.75 | $(922.83) | -0% | 0 | | | | | 0086-07-038 | Pharr | 09/02/26 | $265,229.64 | Construction | Roadway | Construction | Roadway | $266,048.25 | $(818.61) | -0% | 0 | | | | | 0331-02-061 | Pharr | 09/02/26 | $639,326.52 | Construction | Roadway | Construction | Roadway | $641,299.75 | $(1,973.23) | -0% | 0 | | | | | 0433-05-027 | Pharr | 09/02/26 | $810,304.56 | Construction | Roadway | Construction | Roadway | $812,805.50 | $(2,500.94) | -0% | 0 | | | | | 0669-01-068 | Pharr | 09/02/26 | $635,316.00 | Construction | Roadway | Construction | Roadway | $637,277.00 | $(1,961.00) | -0% | 0 | | | | | 0669-01-069 | Pharr | 09/02/26 | $119,378.00 | Construction | Roadway | Construction | Roadway | $119,746.25 | $(368.25) | -0% | 0 | | | | | 0696-03-017 | Pharr | 09/02/26 | $204,906.00 | Construction | Roadway | Construction | Roadway | $205,539.17 | $(633.17) | -0% | 0 | | | | | 0696-03-018 | Pharr | 09/02/26 | $109,478.00 | Construction | Roadway | Construction | Roadway | $109,817.00 | $(339.00) | -0% | 0 | | | | | 0698-01-018 | Pharr | 09/02/26 | $229,313.00 | Construction | Roadway | Construction | Roadway | $230,018.75 | $(705.75) | -0% | 0 | | | | | 0775-01-021 | Pharr | 09/02/26 | $418,556.16 | Construction | Roadway | Construction | Roadway | $419,848.00 | $(1,291.84) | -0% | 0 | | | | | 0860-01-022 | Pharr | 09/02/26 | $560,202.48 | Construction | Roadway | Construction | Roadway | $561,931.50 | $(1,729.02) | -0% | 0 | | | | | 0863-01-080 | Pharr | 09/02/26 | $93,671.64 | Construction | Roadway | Construction | Roadway | $93,960.75 | $(289.11) | -0% | 0 | | | | | 0864-01-082 | Pharr | 09/02/26 | $155,944.00 | Construction | Roadway | Construction | Roadway | $156,425.75 | $(481.75) | -0% | 0 | | | | | 0873-01-029 | Pharr | 09/02/26 | $539,696.52 | Construction | Roadway | Construction | Roadway | $541,362.00 | $(1,665.48) | -0% | 0 | | | | | 1057-01-016 | Pharr | 09/02/26 | $190,139.40 | Construction | Roadway | Construction | Roadway | $190,726.00 | $(586.60) | -0% | 0 | | | | | 1057-03-057 | Pharr | 09/02/26 | $215,398.44 | Construction | Roadway | Construction | Roadway | $216,063.00 | $(664.56) | -0% | 0 | | | | | 1065-02-044 | Pharr | 09/02/26 | $266,917.68 | Construction | Roadway | Construction | Roadway | $267,742.00 | $(824.32) | -0% | 0 | | | | | 1138-01-043 | Pharr | 09/02/26 | $172,068.00 | Construction | Roadway | Construction | Roadway | $172,597.75 | $(529.75) | -0% | 0 | | | | | 1228-01-014 | Pharr | 09/02/26 | $252,730.00 | Construction | Roadway | Construction | Roadway | $253,509.75 | $(779.75) | -0% | 0 | | | | | 1429-01-038 | Pharr | 09/02/26 | $838,936.44 | Construction | Roadway | Construction | Roadway | $841,525.75 | $(2,589.31) | -0% | 0 | | | | | 1430-02-018 | Pharr | 09/02/26 | $202,458.00 | Construction | Roadway | Construction | Roadway | $203,082.73 | $(624.73) | -0% | 0 | | | | | 1587-01-019 | Pharr | 09/02/26 | $524,697.00 | Construction | Roadway | Construction | Roadway | $526,314.75 | $(1,617.75) | -0% | 0 | | | | | 1588-01-003 | Pharr | 09/02/26 | $213,543.00 | Construction | Roadway | Construction | Roadway | $214,201.00 | $(658.00) | -0% | 0 | | | | | 1801-01-065 | Pharr | 09/02/26 | $82,175.00 | Construction | Roadway | Construction | Roadway | $82,429.75 | $(254.75) | -0% | 0 | | | | | 1803-02-051 | Pharr | 09/02/26 | $476,947.44 | Construction | Roadway | Construction | Roadway | $478,419.50 | $(1,472.06) | -0% | 0 | | | | | 1803-02-052 | Pharr | 09/02/26 | $614,634.48 | Construction | Roadway | Construction | Roadway | $616,531.50 | $(1,897.02) | -0% | 0 | | | | | 1803-03-010 | Pharr | 09/02/26 | $106,132.68 | Construction | Roadway | Construction | Roadway | $106,460.25 | $(327.57) | -0% | 0 | | | | | 2094-01-075 | Pharr | 09/02/26 | $231,198.00 | Construction | Roadway | Construction | Roadway | $231,910.25 | $(712.25) | -0% | 0 | | | | | 2450-01-028 | Pharr | 09/02/26 | $708,762.96 | Construction | Roadway | Construction | Roadway | $710,950.50 | $(2,187.54) | -0% | 0 | | | | | 2530-01-017 | Pharr | 09/02/26 | $759,598.00 | Construction | Roadway | Construction | Roadway | $761,943.00 | $(2,345.00) | -0% | 0 | | | | | 2643-01-006 | Pharr | 09/02/26 | $31,781.16 | Construction | Roadway | Construction | Roadway | $31,879.25 | $(98.09) | -0% | 0 | | | | | 2910-02-002 | Pharr | 09/02/26 | $100,967.00 | Construction | Roadway | Construction | Roadway | $101,279.75 | $(312.75) | -0% | 0 | | | | | 2966-01-017 | Pharr | 09/02/26 | $152,292.00 | Construction | Roadway | Construction | Roadway | $152,763.00 | $(471.00) | -0% | 0 | | | | | 3044-01-017 | Pharr | 09/02/26 | $637,489.44 | Construction | Roadway | Construction | Roadway | $639,457.00 | $(1,967.56) | -0% | 0 | | | | | 3625-01-002 | Pharr | 09/02/26 | $33,035.04 | Construction | Roadway | Construction | Roadway | $33,137.00 | $(101.96) | -0% | 0 | | | | | 0364-05-043 | Fort Worth | 08/05/26 | $1,221,633.00 | | | | | $1,225,133.03 | $(3,500.03) | -0% | -1853 | -5 years | | | | 0712-02-021 | Fort Worth | 07/01/26 | $1,261,648.00 | Construction | Roadway | Construction | Roadway | $1,265,347.35 | $(3,699.35) | -0% | 0 | | | | | 2552-04-058 | El Paso | 08/05/26 | $3,060,085.00 | Construction | Roadway | Construction | Roadway | $3,052,292.50 | $7,792.50 | 0% | 0 | | | | | 1064-01-027 | Pharr | 05/06/26 | $33,439,909.61 | Construction | Roadway | Construction | Roadway | $33,504,116.11 | $(64,206.50) | -0% | 0 | | | | | 0861-01-071 | Pharr | 06/02/26 | $6,522,790.82 | Construction | Roadway | Construction | Roadway | $6,512,033.62 | $10,757.20 | 0% | 0 | | | | | 1756-01-024 | Yoakum | 06/02/26 | $935,446.45 | Construction | Roadway | Construction | Roadway | $937,067.00 | $(1,620.55) | -0% | 0 | | | | | 1548-01-018 | San Antonio | 10/06/26 | $449,250.00 | Construction | Roadway | Construction | Roadway | $448,540.00 | $710.00 | 0% | 0 | | | | | 2094-01-063 | Pharr | 05/06/26 | $33,850,470.86 | Construction | Roadway | Construction | Roadway | $33,798,958.95 | $51,511.91 | 0% | 0 | | | | | 0515-01-076 | Yoakum | 11/02/27 | $280,000.00 | Construction | Roadway | Construction | Roadway | $279,700.00 | $300.00 | 0% | 0 | | | | | 0196-07-034 | Dallas | 06/02/26 | $98,425,291.30 | Construction | Bridge | Construction | Bridge | $98,325,151.30 | $100,140.00 | 0% | 0 | | | | | 0018-05-089 | Laredo | 06/01/27 | $255,671,664.26 | Construction | Roadway | Construction | Roadway | $255,607,277.69 | $64,386.57 | 0% | 0 | | | | | 0255-06-073 | Pharr | 05/06/26 | $73,911,736.67 | Construction | Roadway | Construction | Roadway | $73,905,739.17 | $5,997.50 | 0% | 0 | | | | | 0905-06-096 | Lubbock | 04/07/26 | $14,464,477.79 | Construction | Roadway | Construction | Roadway | $14,463,074.29 | $1,403.50 | 0% | 0 | | | | | 0027-03-077 | Yoakum | 11/03/26 | $221,276.00 | Construction | Roadway | Construction | Roadway | $221,277.00 | $(1.00) | 0% | 0 | | | | | 0017-10-294 | San Antonio | 04/07/26 | $23,215,688.41 | Construction | Roadway | Construction | Roadway | $23,214,563.41 | $1,125.00 | 0% | 0 | | | | --- ## Putting It Together The overall increase in project counts and total pipeline value indicates an expanding infrastructure development landscape. With project lettings mostly pushed later, the pipelines reflect a nuanced shift towards delayed execution coupled with some cost increases in key project categories. --- ## Final Takeaway This trend emphasizes the need for ongoing monitoring of project timelines and costs to align with infrastructure goals. --- ## TxDOT Pipeline Changes - February 2026 https://www.bidlo.ai/research/txdot-pipeline-changes-february-2026 What has changed in TxDOT’s upcoming project schedule? - The pipeline remains stable in structure, with 5,541 projects in the March 2026–January 2029 letting window and no meaningful shift in project mix. - Movement is concentrated in timing and cost, with projects continuing to shift in both directions and total value decreasing by $723M (-2.1%). - Cost changes are top-heavy, with a small number of large projects driving the majority of dollar movement while most projects see routine estimate updates --- ## Overview This analysis covers 5,541 TxDOT projects scheduled to let between March 6, 2026 and January 1, 2029, comparing how that pipeline changed from February 2 to March 3. Across that window, the pipeline remains structurally consistent, with movement concentrated in timing and cost rather than scope. Total pipeline value decreased by $723.45M (-2.1%), moving from $33.91B to $33.19B, while the overall mix of projects by size remains effectively unchanged. The work program is still heavily weighted toward smaller jobs, and the types of work being let are consistent with prior snapshots. The takeaway is straightforward. This is not a shift in what TxDOT plans to build. It is an adjustment in when projects are expected to let and how they are being priced. --- ## Letting Date Shifts (Slippage) [https://info.bidlo.ai/embed/letting-slippage-bubble?publication_id=8f2ee86a-dbd4-40cb-a122-45143e394313](https://info.bidlo.ai/embed/letting-slippage-bubble?publication_id=8f2ee86a-dbd4-40cb-a122-45143e394313) > How to read this chart: Letting dates continue to move in both directions, with a slight bias toward projects being pushed further out. A total of 138 projects shifted by at least six months, with 73 moving later and 65 moving earlier. At the 12-month threshold, 60 projects shifted, with 41 moving later. At the pipeline level, these shifts show up as a gradual redistribution across time. The share of projects expected in the next 12 months increased slightly from 40.5% to 40.7%, while the share of projects two or more years out increased from 26.4% to 26.8%. For estimators, the signal is not delay in isolation. The near-term pipeline remains largely intact, but more work is being pushed into later years. That makes the outer pipeline more crowded and less certain, while the next 12 months remain relatively stable. The result is a steady flow of opportunities in the near term, with increasing competition and variability further out. | CSJ | District | Est. Letting Date | Project Estimate | Current Type | Current Subtype | Prev. Type | Prev. Subtype | Prev. Date | Letting Δ (days) | Letting Date Δ | Cost Δ | %Cost Δ | Type/Subtype Δ | Lifecycle | | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | | 0085-02-058 | Atlanta | 10/01/45 | $683,520.00 | | | | | 10/03/28 | 6206 | 17 years | | | | | | 0909-00-076 | Waco | 01/01/29 | $4,471,365.74 | Construction | Bridge | Unassigned | Unassigned | 10/31/45 | -6148 | -17 years | $4,202,365.74 | 1562% | Unassigned / Unassigned → Construction / Bridge | | | 0923-06-079 | Brownwood | 01/01/40 | $650,000.00 | | | Construction | Bridge | 10/04/27 | 4471 | 12 years | | | | | | 0231-01-069 | Brownwood | 01/01/40 | $4,000,000.00 | | | | | 12/31/28 | 4017 | 11 years | | | | | | 2560-01-079 | Lufkin | 08/04/27 | $7,615,384.62 | Construction | Roadway | Unassigned | Unassigned | 02/28/38 | -3862 | -11 years | $(5,084,615.38) | -40% | Unassigned / Unassigned → Construction / Roadway | | | 0921-02-376 | Pharr | 05/05/35 | $14,990,126.63 | | | Construction | Local Let | 05/04/28 | 2556 | 7 years | | | | | | 0921-02-521 | Pharr | 05/02/35 | $14,654,418.00 | | | Construction | Local Let | 05/01/28 | 2556 | 7 years | | | | | | 2263-02-112 | Corpus Christi | 10/04/28 | $17,000,000.00 | Construction | Ferry Boat | Unassigned | Unassigned | 09/30/35 | -2553 | -7 years | | | Unassigned / Unassigned → Construction / Ferry Boat | | | 2069-01-009 | Lufkin | 09/06/28 | $6,910,402.19 | Construction | Roadway | Construction | Roadway | 08/31/35 | -2551 | -7 years | | | | | | 0921-02-395 | Pharr | 05/05/33 | $32,240,557.00 | | | Construction | Local Let | 05/04/28 | 1826 | 5 years | | | | | | 0033-08-045 | Abilene | 05/01/32 | $5,384,615.00 | | | Construction | Roadway | 05/04/27 | 1823 | 5 years | | | | | | 0921-02-447 | Pharr | 05/02/32 | $22,400,000.00 | | | Construction | Local Let | 05/01/28 | 1461 | 4 years | | | | | | 0921-02-540 | Pharr | 01/04/32 | $17,792,625.00 | | | Construction | Roadway | 01/03/28 | 1461 | 4 years | | | | | | 0508-01-396 | Houston | 03/01/32 | $166,666,667.00 | | | Construction | Roadway | 03/06/28 | 1455 | 4 years | $(13,333,333.40) | -7% | | | | 2941-02-054 | Houston | 09/06/28 | $1,288,740.00 | Construction | Roadway | Unassigned | Unassigned | 07/31/32 | -1425 | -4 years | | | Unassigned / Unassigned → Construction / Roadway | | | 2941-02-056 | Houston | 09/06/28 | $32,000,000.00 | Construction | Roadway | Unassigned | Unassigned | 07/31/32 | -1425 | -4 years | | | Unassigned / Unassigned → Construction / Roadway | | | 0681-02-017 | Wichita Falls | 02/01/31 | $7,000,000.00 | | | Construction | Roadway | 08/31/27 | 1249 | 3 years | | | | | | 1609-01-031 | Wichita Falls | 05/01/31 | $13,000,000.00 | | | Construction | Roadway | 02/01/28 | 1184 | 3 years | | | | | | 0921-02-360 | Pharr | 01/02/31 | $20,331,577.00 | | | Construction | Roadway | 01/01/28 | 1096 | 3 years | | | | | | 0921-02-512 | Pharr | 05/02/30 | $12,663,774.13 | | | Construction | Local Let | 05/01/27 | 1096 | 3 years | | | | | | 2690-01-040 | Austin | 12/01/27 | $7,346,428.57 | Construction | Roadway | Unassigned | Unassigned | 11/30/30 | -1096 | -3 years | | | Unassigned / Unassigned → Construction / Roadway | | | 2690-01-046 | Austin | 12/01/27 | $714,285.71 | Construction | Rail - Safety | Unassigned | Unassigned | 11/30/30 | -1096 | -3 years | | | Unassigned / Unassigned → Construction / Rail - Safety | | | 0921-02-436 | Pharr | 05/02/31 | $6,688,200.00 | | | Construction | Local Let | 05/01/28 | 1095 | 3 years | | | | | | 0256-01-060 | Wichita Falls | 02/01/31 | $8,000,000.00 | | | Construction | Roadway | 02/01/28 | 1095 | 3 years | | | | | | 0773-02-020 | Paris | 11/01/30 | $1,180,502.40 | | | Construction | Roadway | 11/01/27 | 1095 | 3 years | | | | | | 1378-01-061 | Austin | 05/01/31 | $14,537,037.04 | | | | | 05/02/28 | 1093 | 3 years | | | | | | 0465-02-032 | San Antonio | 10/01/30 | $202,400.00 | | | Construction | Roadway | 10/04/27 | 1092 | 3 years | | | | | | 0283-04-037 | Wichita Falls | 03/01/31 | $5,100,000.00 | | | Construction | Roadway | 03/06/28 | 1089 | 3 years | | | | | | 0007-06-268 | Brownwood | 10/06/26 | $1,500,000.00 | Construction | Roadway | Construction | Roadway | 12/31/28 | -818 | -2 years | $(6,100,000.00) | -80% | | | | 0013-08-154 | Fort Worth | 08/05/26 | $1,681,823.02 | Construction | Roadway | Unassigned | Unassigned | 09/05/28 | -763 | -2 years | | | Unassigned / Unassigned → Construction / Roadway | | | 0902-90-267 | Fort Worth | 12/01/29 | $22,985,119.18 | | | Construction | Roadway | 11/30/27 | 731 | 2 years | | | | | | 0902-90-268 | Fort Worth | 12/01/29 | $35,000,000.00 | | | Construction | Roadway | 11/30/27 | 731 | 2 years | | | | | | 0502-01-244 | Houston | 01/15/29 | $56,000,000.00 | Non-Let | Roadway | Non-Let | Roadway | 01/14/27 | 731 | 2 years | | | | | | 1685-05-105 | Houston | 01/01/31 | $7,770,938.39 | | | | | 12/31/28 | 730 | 2 years | $(932,511.61) | -11% | | | | 1835-01-026 | Waco | 01/01/31 | $15,000,000.00 | | | | | 12/31/28 | 730 | 2 years | $(1,799,999.00) | -11% | | | | 0921-06-330 | Pharr | 09/03/27 | $17,023,422.00 | Construction | Local Let | Unassigned | Unassigned | 09/01/29 | -730 | -2 years | | | Unassigned / Unassigned → Construction / Local Let | | | 0216-03-039 | San Antonio | 10/01/29 | $240,010.00 | | | Construction | Roadway | 10/04/27 | 727 | 2 years | $(1,380.00) | -1% | | | | 0804-04-032 | Wichita Falls | 03/01/30 | $9,100,000.00 | | | Construction | Roadway | 03/06/28 | 724 | 2 years | | | | | | 0918-47-577 | Dallas | 04/02/28 | $5,700,000.00 | Construction | Local Let | Unassigned | Unassigned | 08/01/26 | 609 | 2 years | | | Unassigned / Unassigned → Construction / Local Let | | | 0005-03-071 | Odessa | 08/31/27 | $500,000.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 01/01/26 | 606 | 2 years | | | | | | 0005-03-073 | Odessa | 08/31/27 | $500,000.00 | Non-Let | Rail - Safety | Non-Let | Rail - Safety | 01/01/26 | 606 | 2 years | | | | | | 0683-03-043 | Austin | 03/03/27 | $1,837,409.82 | Construction | Roadway | Unassigned | Unassigned | 09/05/28 | -553 | -2 years | | | Unassigned / Unassigned → Construction / Roadway | | | 1810-01-033 | Lufkin | 06/01/27 | $9,167,239.01 | Construction | Roadway | Construction | Roadway | 10/03/28 | -491 | -1 year | $(366,689.56) | -4% | | | | 0914-05-250 | Austin | 05/06/26 | $504,441.50 | Construction | Roadway | Construction | Roadway | 08/31/27 | -483 | -1 year | | | | | | 0072-08-148 | San Antonio | 12/01/27 | $948,661.00 | Construction | Roadway | Construction | Roadway | 09/01/26 | 455 | 1 year | | | | | | 0018-05-089 | Laredo | 06/01/27 | $255,607,277.70 | Construction | Roadway | Construction | Roadway | 03/03/26 | 454 | 1 year | $(39,670,598.30) | -13% | | | | 1794-01-023 | Lufkin | 10/01/29 | $6,834,659.82 | | | Construction | Roadway | 07/05/28 | 452 | 1 year | $(820,159.18) | -11% | | | | 2721-03-006 | Abilene | 02/01/29 | $3,000,000.00 | Construction | Roadway | Construction | Roadway | 11/30/27 | 428 | 1 year | | | | | | 0907-24-060 | San Angelo | 06/03/27 | $3,552,743.00 | Construction | Local Let | Unassigned | Unassigned | 03/31/26 | 428 | 1 year | | | Unassigned / Unassigned → Construction / Local Let | | | 0675-08-121 | Houston | 07/01/26 | $3,627,242.00 | Construction | Non Roadway | Unassigned | Unassigned | 08/31/27 | -427 | -1 year | | | Unassigned / Unassigned → Construction / Non Roadway | | | 3510-04-064 | Houston | 07/01/26 | $3,693,789.00 | Construction | Non Roadway | Unassigned | Unassigned | 08/31/27 | -427 | -1 year | | | Unassigned / Unassigned → Construction / Non Roadway | | | 3510-04-065 | Houston | 07/01/26 | $3,942,056.00 | Construction | Non Roadway | Unassigned | Unassigned | 08/31/27 | -427 | -1 year | | | Unassigned / Unassigned → Construction / Non Roadway | | | 0189-01-014 | Paris | 11/02/27 | $44,953.92 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -399 | -1 year | | | Unassigned / Unassigned → Construction / Roadway | | | 0189-02-064 | Paris | 11/02/27 | $1,915,826.88 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -399 | -1 year | | | Unassigned / Unassigned → Construction / Roadway | | | 0027-02-034 | Yoakum | 09/06/28 | $8,200,000.00 | Construction | Roadway | Construction | Roadway | 08/31/27 | 371 | 1 year | | | | | | 1134-01-021 | Abilene | 12/05/28 | $6,000,000.00 | Construction | Roadway | Construction | Roadway | 11/30/27 | 370 | 1 year | | | | | | 0091-05-081 | Dallas | 08/04/28 | $1,200,000.00 | Construction | Roadway | Unassigned | Unassigned | 08/03/27 | 366 | 1 year | | | Unassigned / Unassigned → Construction / Roadway | | | 0124-05-032 | Wichita Falls | 11/01/29 | $418,272.00 | | | | | 10/31/28 | 365 | 1 year | | | | | | 1532-02-004 | Abilene | 02/01/29 | $3,300,000.00 | Construction | Roadway | Construction | Roadway | 02/01/28 | 365 | 1 year | | | | | | 0124-04-042 | Wichita Falls | 11/01/28 | $1,232,735.00 | Construction | Roadway | Construction | Roadway | 11/01/27 | 365 | 1 year | $793,418.00 | 181% | | | | 0203-04-044 | Paris | 11/01/28 | $814,668.80 | Construction | Roadway | Construction | Roadway | 11/01/27 | 365 | 1 year | | | | | | 0315-06-051 | Bryan | 11/01/28 | $3,000,000.00 | Construction | Roadway | Construction | Roadway | 11/01/27 | 365 | 1 year | | | | | | 0401-01-035 | Paris | 11/01/28 | $1,082,920.96 | Construction | Roadway | Construction | Roadway | 11/01/27 | 365 | 1 year | | | | | | 0729-01-052 | Paris | 11/01/28 | $434,170.88 | Construction | Roadway | Construction | Roadway | 11/01/27 | 365 | 1 year | | | | | | 0017-06-093 | San Antonio | 10/04/28 | $290,969.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | 365 | 1 year | $(488,852.00) | -63% | | | | 1730-01-046 | San Antonio | 10/04/28 | $479,735.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | 365 | 1 year | $(209,540.00) | -30% | | | | 1730-02-024 | San Antonio | 10/04/28 | $369,611.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | 365 | 1 year | $(28,677.00) | -7% | | | | 0587-01-060 | Houston | 12/01/27 | $35,503,031.00 | Construction | Bridge | Construction | Bridge | 11/30/26 | 365 | 1 year | | | | | | 2121-02-167 | El Paso | 07/01/27 | $30,118,818.27 | Construction | Roadway | Construction | Roadway | 06/30/26 | 365 | 1 year | $1,642,845.27 | 6% | | | | 0070-06-056 | Brownwood | 01/05/28 | $400,000.00 | Construction | Roadway | Unassigned | Unassigned | 01/05/27 | 364 | 12 months | | | Unassigned / Unassigned → Construction / Roadway | | | 0289-04-037 | Brownwood | 01/05/28 | $3,568,950.00 | Construction | Roadway | Unassigned | Unassigned | 01/05/27 | 364 | 12 months | $568,950.00 | 19% | Unassigned / Unassigned → Construction / Roadway | | | 0301-03-028 | San Antonio | 10/05/27 | $520,281.00 | Construction | Roadway | Construction | Roadway | 10/05/26 | 364 | 12 months | $90,520.00 | 21% | | | | 0421-05-035 | San Antonio | 10/05/27 | $290,724.00 | Construction | Roadway | Construction | Roadway | 10/05/26 | 364 | 12 months | $(154,116.00) | -35% | | | | 0993-01-014 | Corpus Christi | 10/05/27 | $205,460.00 | Construction | Roadway | Unassigned | Unassigned | 10/05/26 | 364 | 12 months | | | Unassigned / Unassigned → Construction / Roadway | | | 1434-01-016 | San Antonio | 10/05/27 | $363,650.00 | Construction | Roadway | Construction | Roadway | 10/05/26 | 364 | 12 months | $(252,783.00) | -41% | | | | 0143-02-032 | San Antonio | 09/01/27 | $1,431,302.00 | Construction | Roadway | Construction | Roadway | 09/01/26 | 364 | 12 months | | | | | | 0024-05-105 | San Antonio | 10/06/26 | $145,199.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | -364 | -12 months | $(198,801.00) | -58% | | | | 0142-02-030 | San Antonio | 10/06/26 | $498,436.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | -364 | -12 months | $(360,937.00) | -42% | | | | 0143-11-006 | San Antonio | 10/06/26 | $69,700.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | -364 | -12 months | $(15,422.00) | -18% | | | | 0143-12-006 | San Antonio | 10/06/26 | $109,675.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | -364 | -12 months | $34,825.00 | 47% | | | | 0143-14-009 | San Antonio | 10/06/26 | $30,910.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | -364 | -12 months | $(11,280.00) | -27% | | | | 0143-15-034 | San Antonio | 10/06/26 | $86,564.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | -364 | -12 months | $(19,153.00) | -18% | | | | 0215-11-025 | San Antonio | 10/06/26 | $331,148.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | -364 | -12 months | $(25,692.00) | -7% | | | | 0215-11-026 | San Antonio | 10/06/26 | $154,100.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | -364 | -12 months | $(11,956.00) | -7% | | | | 0328-01-016 | San Antonio | 10/06/26 | $387,945.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | -364 | -12 months | $(225,186.00) | -37% | | | | 0366-03-075 | San Antonio | 10/06/26 | $510,359.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | -364 | -12 months | $(516,226.00) | -50% | | | | 0526-01-023 | San Antonio | 10/06/26 | $90,851.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | -364 | -12 months | $(26,629.00) | -23% | | | | 1009-01-044 | San Antonio | 10/06/26 | $389,823.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | -364 | -12 months | $(2,240.00) | -1% | | | | 1548-01-018 | San Antonio | 10/06/26 | $448,540.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | -364 | -12 months | $(25,472.00) | -5% | | | | 1899-01-020 | San Antonio | 10/06/26 | $159,286.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | -364 | -12 months | $(915.00) | -1% | | | | 1899-02-023 | San Antonio | 10/06/26 | $489,943.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | -364 | -12 months | $(2,816.00) | -1% | | | | 2452-05-005 | San Antonio | 10/06/26 | $55,940.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | -364 | -12 months | $(8,359.00) | -13% | | | | 2116-01-020 | Lufkin | 05/01/29 | $5,942,228.57 | Construction | Roadway | Construction | Roadway | 05/02/28 | 363 | 12 months | $(713,067.43) | -11% | | | | 0407-06-046 | Abilene | 04/01/29 | $4,000,000.00 | Construction | Roadway | Construction | Roadway | 04/04/28 | 361 | 12 months | | | | | | 0407-06-049 | Abilene | 04/01/29 | $2,500,000.00 | Construction | Roadway | Construction | Roadway | 04/04/28 | 361 | 12 months | | | | | | 0500-03-599 | Houston | 09/01/29 | $600,000,000.00 | | | Construction | Roadway | 09/05/28 | 360 | 12 months | $(565,067,716.00) | -49% | | | | 0137-04-019 | Wichita Falls | 03/01/29 | $3,000,000.00 | Construction | Roadway | Construction | Roadway | 03/06/28 | 359 | 12 months | | | | | | 0137-05-038 | Wichita Falls | 03/01/29 | $5,000,000.00 | Construction | Roadway | Construction | Roadway | 03/06/28 | 359 | 12 months | | | | | | 0508-01-410 | Houston | 03/01/29 | $42,867,000.00 | Construction | Roadway | Unassigned | Unassigned | 03/06/28 | 359 | 12 months | | | Unassigned / Unassigned → Construction / Roadway | | | 0910-34-042 | Tyler | 12/01/27 | $727,368.96 | Construction | Bridge | Unassigned | Unassigned | 10/31/28 | -336 | -11 months | | | Unassigned / Unassigned → Construction / Bridge | | | 0364-03-108 | Dallas | 05/06/26 | $1,162,679.97 | Construction | Roadway | Construction | Roadway | 04/05/27 | -335 | -11 months | | | | | | 0316-03-011 | Paris | 11/01/29 | $676,146.24 | | | | | 12/04/28 | 331 | 11 months | | | | | | 0908-23-058 | Abilene | 04/07/26 | $744,831.50 | Construction | Bridge | Construction | Bridge | 03/02/27 | -330 | -11 months | $15,000.00 | 2% | | | | 0908-23-059 | Abilene | 04/07/26 | $677,937.00 | Construction | Bridge | Construction | Bridge | 03/02/27 | -330 | -11 months | | | | | | 0908-33-109 | Abilene | 04/07/26 | $1,084,409.78 | Construction | Bridge | Construction | Bridge | 03/02/27 | -330 | -11 months | | | | | | 0039-10-096 | Pharr | 12/01/27 | $3,112,459.28 | Construction | Bridge | Construction | Bridge | 10/03/28 | -308 | -10 months | | | | | | 0581-02-162 | Dallas | 06/02/26 | $13,126,775.13 | Construction | Roadway | Construction | Roadway | 04/05/27 | -308 | -10 months | | | | | | 0915-17-070 | San Antonio | 09/01/27 | $682,625.00 | Construction | Bridge | Construction | Bridge | 11/02/26 | 302 | 10 months | | | | | | 0005-08-109 | Abilene | 04/07/26 | $12,628,622.92 | Construction | Roadway | Construction | Roadway | 02/01/27 | -301 | -10 months | $(233,671.08) | -2% | | | | 0371-05-022 | Corpus Christi | 07/01/26 | $314,636.00 | Construction | Roadway | Construction | Roadway | 04/05/27 | -279 | -9 months | | | | | | 1115-01-010 | Corpus Christi | 07/01/26 | $583,647.00 | Construction | Roadway | Construction | Roadway | 04/05/27 | -279 | -9 months | | | | | | 1294-02-022 | Corpus Christi | 07/01/26 | $723,570.00 | Construction | Roadway | Construction | Roadway | 04/05/27 | -279 | -9 months | | | | | | 1446-01-016 | Corpus Christi | 07/01/26 | $130,740.00 | Construction | Roadway | Construction | Roadway | 04/05/27 | -279 | -9 months | | | | | | 1555-01-009 | Corpus Christi | 07/01/26 | $139,502.00 | Construction | Roadway | Construction | Roadway | 04/05/27 | -279 | -9 months | | | | | | 2942-02-019 | Corpus Christi | 07/01/26 | $285,222.00 | Construction | Roadway | Construction | Roadway | 04/05/27 | -279 | -9 months | | | | | | 3116-01-033 | Corpus Christi | 07/01/26 | $151,985.00 | Construction | Roadway | Construction | Roadway | 04/05/27 | -279 | -9 months | | | | | | 1794-01-028 | Lufkin | 10/05/27 | $4,138,513.00 | Construction | Roadway | Construction | Roadway | 07/05/28 | -275 | -9 months | | | | | | 1794-01-029 | Lufkin | 10/05/27 | $1,666,666.67 | Construction | Roadway | Unassigned | Unassigned | 07/05/28 | -275 | -9 months | | | Unassigned / Unassigned → Construction / Roadway | | | 1875-03-023 | Lufkin | 09/01/27 | $4,809,375.00 | Construction | Roadway | Construction | Roadway | 05/31/28 | -274 | -9 months | | | | | | 0018-01-102 | Laredo | 05/06/26 | $11,432,116.76 | Construction | Roadway | Construction | Roadway | 02/01/27 | -272 | -9 months | | | | | | 0018-06-219 | Laredo | 05/06/26 | $5,830,944.65 | Construction | Roadway | Construction | Roadway | 02/01/27 | -272 | -9 months | | | | | | 0037-06-110 | Laredo | 05/06/26 | $5,260,307.25 | Construction | Roadway | Construction | Roadway | 02/01/27 | -272 | -9 months | | | | | | 0038-01-108 | Laredo | 05/06/26 | $239,077.76 | Construction | Roadway | Unassigned | Unassigned | 02/01/27 | -272 | -9 months | | | Unassigned / Unassigned → Construction / Roadway | | | 0301-04-027 | Laredo | 05/06/26 | $308,090.60 | Construction | Roadway | Unassigned | Unassigned | 02/01/27 | -272 | -9 months | | | Unassigned / Unassigned → Construction / Roadway | | | 0542-03-040 | Laredo | 05/06/26 | $7,504,710.40 | Construction | Roadway | Unassigned | Unassigned | 02/01/27 | -272 | -9 months | | | Unassigned / Unassigned → Construction / Roadway | | | 0088-02-063 | Corpus Christi | 07/01/26 | $4,100,000.00 | Construction | Roadway | Construction | Roadway | 03/02/27 | -245 | -8 months | | | | | | 0088-03-050 | Corpus Christi | 07/01/26 | $500,000.00 | Construction | Roadway | Construction | Roadway | 03/02/27 | -245 | -8 months | | | | | | 0114-07-089 | Austin | 09/01/29 | $2,030,955.36 | | | | | 12/31/28 | 243 | 8 months | | | | | | 0987-03-018 | Austin | 03/01/27 | $662,756.00 | Construction | Local Let | Construction | Local Let | 07/02/26 | 241 | 8 months | | | | | | 0265-06-036 | Austin | 03/07/28 | $5,000,000.00 | Construction | Non Roadway | Unassigned | Unassigned | 08/03/27 | 216 | 7 months | | | Unassigned / Unassigned → Construction / Non Roadway | | | 0143-01-068 | San Antonio | 07/01/26 | $6,038,484.00 | Construction | Roadway | Construction | Roadway | 02/01/27 | -216 | -7 months | | | | | | 0502-01-243 | Houston | 08/09/27 | $24,000,000.00 | Non-Let | Local | Non-Let | Local | 01/14/27 | 206 | 7 months | | | | | | 0199-01-090 | Tyler | 07/01/26 | $811,456.44 | Construction | Roadway | Construction | Roadway | 01/05/27 | -189 | -6 months | | | | | | 0199-01-091 | Tyler | 07/01/26 | $516,736.73 | Construction | Roadway | Construction | Roadway | 01/05/27 | -189 | -6 months | | | | | | 0619-03-065 | Dallas | 06/01/26 | $805,000.00 | Construction | Roadway | Construction | Roadway | 12/02/26 | -185 | -6 months | | | | | | 0981-01-121 | Houston | 08/04/27 | $411,012.00 | Construction | Roadway | Construction | Roadway | 02/01/27 | 183 | 6 months | | | | | | 1530-01-012 | Abilene | 10/04/28 | $6,602,447.70 | Construction | Roadway | Construction | Roadway | 04/04/28 | 182 | 6 months | | | | | | 0116-03-074 | Bryan | 04/06/27 | $1,940,000.00 | Construction | Roadway | Construction | Roadway | 10/05/26 | 182 | 6 months | | | | | | 0911-28-062 | Lufkin | 12/01/26 | $780,558.50 | Construction | Bridge | Construction | Bridge | 06/01/26 | 182 | 6 months | | | | | | 0911-28-064 | Lufkin | 12/01/26 | $771,108.50 | Construction | Bridge | Construction | Bridge | 06/01/26 | 182 | 6 months | | | | | | 0908-23-045 | Abilene | 04/07/26 | $778,888.61 | Construction | Bridge | Construction | Bridge | 10/05/26 | -182 | -6 months | | | | | | 0908-23-051 | Abilene | 04/07/26 | $803,680.77 | Construction | Bridge | Construction | Bridge | 10/05/26 | -182 | -6 months | | | | | | 0908-23-052 | Abilene | 04/07/26 | $808,631.95 | Construction | Bridge | Construction | Bridge | 10/05/26 | -182 | -6 months | | | | | | 0908-23-054 | Abilene | 04/07/26 | $588,619.15 | Construction | Bridge | Construction | Bridge | 10/05/26 | -182 | -6 months | | | | | | 0908-24-051 | Abilene | 04/07/26 | $1,074,354.43 | Construction | Bridge | Construction | Bridge | 10/05/26 | -182 | -6 months | | | | | | 0908-24-052 | Abilene | 04/07/26 | $519,848.38 | Construction | Bridge | Construction | Bridge | 10/05/26 | -182 | -6 months | | | | | | 0912-72-583 | Houston | 03/15/27 | $736,806.00 | Construction | Local Let | Construction | Roadway | 09/14/26 | 181 | 6 months | | | Construction / Roadway → Construction / Local Let | | | 0442-02-166 | Dallas | 05/06/26 | $12,657,475.67 | Construction | Roadway | Construction | Roadway | 11/02/26 | -181 | -6 months | $(349,330.26) | -3% | | | | 0915-12-691 | San Antonio | 09/02/26 | $250,000.00 | Construction | Rail - Safety | Non-Let | Change Order | 02/28/27 | -180 | -6 months | | | Non-Let / Change Order → Construction / Rail - Safety | | | 0005-06-129 | Abilene | 06/01/27 | $4,000,000.00 | Construction | Roadway | Construction | Roadway | 11/01/27 | -154 | -5 months | $500,000.00 | 14% | | | | 0908-33-115 | Abilene | 06/02/26 | $212,705.00 | Construction | Roadway | Construction | Roadway | 11/02/26 | -154 | -5 months | | | | | | 0908-33-116 | Abilene | 06/02/26 | $204,953.00 | Construction | Roadway | Construction | Roadway | 11/02/26 | -154 | -5 months | | | | | | 0073-02-092 | San Antonio | 05/06/26 | $889,145.81 | Construction | Roadway | Construction | Roadway | 10/05/26 | -153 | -5 months | | | | | | 0253-06-042 | San Antonio | 05/06/26 | $894,023.73 | Construction | Roadway | Construction | Roadway | 10/05/26 | -153 | -5 months | | | | | | 1283-01-012 | El Paso | 03/03/27 | $1,281,294.23 | Construction | Roadway | Construction | Roadway | 10/05/26 | 148 | 5 months | | | | | | 0017-16-008 | San Antonio | 01/05/28 | $828,335.00 | Construction | Roadway | Construction | Roadway | 08/31/27 | 126 | 4 months | $(5,572,528.00) | -87% | | | | 0922-33-208 | Laredo | 10/05/27 | $134,100.00 | Construction | Roadway | Construction | Roadway | 05/31/27 | 126 | 4 months | | | | | | 0922-33-244 | Laredo | 10/05/27 | $204,300.00 | Construction | Roadway | Construction | Roadway | 05/31/27 | 126 | 4 months | | | | | | 0024-06-070 | San Antonio | 04/06/27 | $35,000,000.00 | Construction | Roadway | Construction | Roadway | 11/30/26 | 126 | 4 months | $9,900,000.00 | 39% | | | | 0912-31-351 | Houston | 01/06/27 | $980,000.00 | Construction | Roadway | Construction | Roadway | 09/01/26 | 126 | 4 months | | | | | | 0917-29-152 | Bryan | 01/06/27 | $1,324,348.00 | Construction | Roadway | Unassigned | Unassigned | 09/01/26 | 126 | 4 months | $(392,047.50) | -23% | Unassigned / Unassigned → Construction / Roadway | | | 2883-02-011 | San Antonio | 01/06/27 | $1,105,769.00 | Construction | Roadway | Non-Let | Rail - Safety | 09/01/26 | 126 | 4 months | | | Non-Let / Rail - Safety → Construction / Roadway | | | 0366-01-084 | Austin | 12/01/26 | $1,442,307.69 | Construction | Bridge | Construction | Bridge | 04/05/27 | -126 | -4 months | | | | | | 0921-06-378 | Pharr | 05/01/26 | $4,116,950.00 | Construction | Local Let | Construction | Local Let | 08/30/26 | -122 | -4 months | | | | | | 0915-12-800 | San Antonio | 09/01/27 | $6,398,908.00 | Construction | Roadway | Construction | Roadway | 05/04/27 | 119 | 4 months | | | | | | 0038-07-085 | Pharr | 05/06/26 | $231,845.30 | Construction | Roadway | Construction | Roadway | 09/01/26 | -119 | -4 months | $(92,965.70) | -29% | | | | 0220-01-039 | Pharr | 05/06/26 | $293,029.05 | Construction | Roadway | Construction | Roadway | 09/01/26 | -119 | -4 months | $(111,239.95) | -28% | | | | 0220-01-040 | Pharr | 05/06/26 | $261,235.01 | Construction | Roadway | Construction | Roadway | 09/01/26 | -119 | -4 months | $35,837.01 | 16% | | | | 0630-01-059 | Pharr | 05/06/26 | $64,985.00 | Construction | Roadway | Construction | Roadway | 09/01/26 | -119 | -4 months | $(259,826.00) | -80% | | | | 0698-03-107 | Pharr | 05/06/26 | $264,761.15 | Construction | Roadway | Construction | Roadway | 09/01/26 | -119 | -4 months | $(158,911.85) | -38% | | | | 0863-01-081 | Pharr | 05/06/26 | $245,353.80 | Construction | Roadway | Construction | Roadway | 09/01/26 | -119 | -4 months | $(79,457.20) | -24% | | | | 1064-01-048 | Pharr | 05/06/26 | $200,135.05 | Construction | Roadway | Construction | Roadway | 09/01/26 | -119 | -4 months | $(124,675.95) | -38% | | | | 1228-03-057 | Pharr | 05/06/26 | $249,764.25 | Construction | Roadway | Construction | Roadway | 09/01/26 | -119 | -4 months | $24,366.25 | 11% | | | | 1228-03-058 | Pharr | 05/06/26 | $63,360.00 | Construction | Roadway | Construction | Roadway | 09/01/26 | -119 | -4 months | $(236,355.00) | -79% | | | | 1228-03-059 | Pharr | 05/06/26 | $54,710.00 | Construction | Roadway | Construction | Roadway | 09/01/26 | -119 | -4 months | $(170,688.00) | -76% | | | | 1429-01-039 | Pharr | 05/06/26 | $241,056.05 | Construction | Roadway | Construction | Roadway | 09/01/26 | -119 | -4 months | $(163,212.95) | -40% | | | | 1586-01-093 | Pharr | 05/06/26 | $177,268.35 | Construction | Roadway | Construction | Roadway | 09/01/26 | -119 | -4 months | $(147,542.65) | -45% | | | | 6497-67-001 | Beaumont | 05/06/26 | $1.00 | Maintenance | Routine Maintenance Contract | Unassigned | Unassigned | 09/01/26 | -119 | -4 months | | | Unassigned / Unassigned → Maintenance / Routine Maintenance Contract | | | 1194-02-020 | Beaumont | 07/01/26 | $10,174,500.00 | Construction | Roadway | Construction | Roadway | 10/05/26 | -97 | -3 months | | | | | | 0912-72-687 | Houston | 05/15/28 | $30,689,860.00 | Construction | Local Let | Construction | Local Let | 08/14/28 | -92 | -3 months | | | | | | 0912-72-845 | Houston | 05/15/28 | $75,920,000.00 | Construction | Local Let | Unassigned | Unassigned | 08/14/28 | -92 | -3 months | | | Unassigned / Unassigned → Construction / Local Let | | | 0215-07-056 | San Antonio | 01/05/28 | $742,662.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | 92 | 3 months | $240,035.00 | 48% | | | | 0521-05-168 | San Antonio | 01/05/28 | $325,096.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | 92 | 3 months | $(82,904.00) | -20% | | | | 0521-05-169 | San Antonio | 01/05/28 | $173,444.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | 92 | 3 months | $51,044.00 | 42% | | | | 2104-02-042 | San Antonio | 01/05/28 | $152,551.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | 92 | 3 months | $(59,860.00) | -28% | | | | 2452-01-074 | San Antonio | 01/05/28 | $120,561.00 | Construction | Roadway | Construction | Roadway | 10/04/27 | 92 | 3 months | $8,672.00 | 8% | | | | 0025-02-229 | San Antonio | 01/06/27 | $972,889.00 | Construction | Roadway | Construction | Roadway | 10/05/26 | 92 | 3 months | $673,348.00 | 225% | | | | 0143-01-066 | San Antonio | 01/06/27 | $763,955.00 | Construction | Roadway | Construction | Roadway | 10/05/26 | 92 | 3 months | $(117,097.00) | -13% | | | | 0143-02-031 | San Antonio | 01/06/27 | $1,064,259.00 | Construction | Roadway | Construction | Roadway | 10/05/26 | 92 | 3 months | $255,996.00 | 32% | | | | 0291-05-051 | San Antonio | 01/06/27 | $1,286,888.00 | Construction | Roadway | Construction | Roadway | 10/05/26 | 92 | 3 months | $532,948.00 | 71% | | | | 0013-10-098 | Fort Worth | 12/01/26 | $8,507,754.06 | Construction | Roadway | Unassigned | Unassigned | 03/02/27 | -92 | -3 months | | | Unassigned / Unassigned → Construction / Roadway | | | 0909-37-081 | Waco | 09/02/26 | $552,000.00 | Construction | Bridge | Construction | Bridge | 06/01/26 | 92 | 3 months | | | | | | 0909-37-082 | Waco | 09/02/26 | $593,000.00 | Construction | Bridge | Construction | Bridge | 06/01/26 | 92 | 3 months | | | | | | 0039-02-080 | Pharr | 06/02/26 | $205,724.00 | Construction | Roadway | Construction | Roadway | 09/01/26 | -92 | -3 months | | | | | | 0220-03-038 | Pharr | 06/02/26 | $242,842.00 | Construction | Roadway | Construction | Roadway | 09/01/26 | -92 | -3 months | | | | | | 0327-07-046 | Pharr | 06/02/26 | $140,770.85 | Construction | Roadway | Construction | Roadway | 09/01/26 | -92 | -3 months | | | | | | 0698-03-108 | Pharr | 06/02/26 | $70,480.00 | Construction | Roadway | Construction | Roadway | 09/01/26 | -92 | -3 months | | | | | | 1228-03-055 | Pharr | 06/02/26 | $192,788.00 | Construction | Roadway | Construction | Roadway | 09/01/26 | -92 | -3 months | | | | | | 2094-01-073 | Pharr | 06/02/26 | $365,803.00 | Construction | Roadway | Construction | Roadway | 09/01/26 | -92 | -3 months | | | | | | 2039-01-019 | Brownwood | 08/04/27 | $2,249,213.00 | Construction | Roadway | Construction | Roadway | 05/04/27 | 91 | 3 months | | | | | | 2039-01-020 | Brownwood | 08/04/27 | $2,249,213.00 | Construction | Roadway | Construction | Roadway | 05/04/27 | 91 | 3 months | | | | | | 2964-01-052 | Dallas | 02/01/27 | $1,044,443.79 | Construction | Local Let | Construction | Local Let | 11/01/26 | 91 | 3 months | | | | | | 0019-01-146 | Fort Worth | 06/02/26 | $19,442,730.37 | Construction | Roadway | Construction | Roadway | 03/03/26 | 90 | 3 months | $(10,400,051.63) | -35% | | | | 0912-37-265 | Houston | 05/15/26 | $9,413,000.00 | Construction | Local Let | Construction | Roadway | 02/14/26 | 89 | 3 months | | | Construction / Roadway → Construction / Local Let | | | 0978-01-049 | Houston | 04/06/27 | $360,225.00 | Construction | Roadway | Construction | Roadway | 02/01/27 | 63 | 2 months | | | | | | 3049-01-036 | Houston | 04/06/27 | $232,500.00 | Construction | Roadway | Construction | Roadway | 02/01/27 | 63 | 2 months | | | | | | 0015-09-208 | Austin | 07/01/26 | $3,980,769.23 | Construction | Roadway | Construction | Roadway | 09/01/26 | -63 | -2 months | | | | | | 0114-09-103 | Bryan | 07/01/26 | $163,870.00 | Construction | Roadway | Unassigned | Unassigned | 09/01/26 | -63 | -2 months | | | Unassigned / Unassigned → Construction / Roadway | | | 0185-02-042 | Bryan | 07/01/26 | $75,610.00 | Construction | Roadway | Unassigned | Unassigned | 09/01/26 | -63 | -2 months | | | Unassigned / Unassigned → Construction / Roadway | | | 0185-03-037 | Bryan | 07/01/26 | $76,360.00 | Construction | Roadway | Unassigned | Unassigned | 09/01/26 | -63 | -2 months | | | Unassigned / Unassigned → Construction / Roadway | | | 0186-03-073 | Bryan | 07/01/26 | $43,920.00 | Construction | Roadway | Unassigned | Unassigned | 09/01/26 | -63 | -2 months | | | Unassigned / Unassigned → Construction / Roadway | | | 0186-03-074 | Bryan | 07/01/26 | $31,920.00 | Construction | Roadway | Unassigned | Unassigned | 09/01/26 | -63 | -2 months | | | Unassigned / Unassigned → Construction / Roadway | | | 0186-04-036 | Bryan | 07/01/26 | $22,690.00 | Construction | Roadway | Unassigned | Unassigned | 09/01/26 | -63 | -2 months | | | Unassigned / Unassigned → Construction / Roadway | | | 0204-05-046 | Bryan | 07/01/26 | $64,590.00 | Construction | Roadway | Unassigned | Unassigned | 09/01/26 | -63 | -2 months | | | Unassigned / Unassigned → Construction / Roadway | | | 0262-07-047 | Bryan | 07/01/26 | $62,410.00 | Construction | Roadway | Unassigned | Unassigned | 09/01/26 | -63 | -2 months | | | Unassigned / Unassigned → Construction / Roadway | | | 1953-01-035 | Bryan | 07/01/26 | $76,940.00 | Construction | Roadway | Unassigned | Unassigned | 09/01/26 | -63 | -2 months | | | Unassigned / Unassigned → Construction / Roadway | | | 2133-02-016 | Bryan | 07/01/26 | $18,780.00 | Construction | Roadway | Unassigned | Unassigned | 09/01/26 | -63 | -2 months | | | Unassigned / Unassigned → Construction / Roadway | | | 0253-06-037 | San Antonio | 09/03/27 | $3,628,000.00 | Construction | Local Let | Construction | Local Let | 07/02/27 | 62 | 2 months | | | | | | 0253-06-039 | San Antonio | 09/03/27 | $14,522,000.00 | Construction | Local Let | Construction | Local Let | 07/02/27 | 62 | 2 months | | | | | | 0034-01-144 | Abilene | 07/01/27 | $7,000,000.00 | Construction | Roadway | Unassigned | Unassigned | 08/31/27 | -62 | -2 months | $2,000,000.00 | 40% | Unassigned / Unassigned → Construction / Roadway | | | 0918-24-316 | Dallas | 06/04/28 | $3,907,500.00 | Construction | Local Let | Unassigned | Unassigned | 08/03/28 | -61 | -2 months | | | Unassigned / Unassigned → Construction / Local Let | | | 0009-06-058 | Paris | 11/01/28 | $506,769.12 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | | | Unassigned / Unassigned → Construction / Roadway | | | 0045-10-022 | Paris | 11/01/28 | $551,738.88 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | | | Unassigned / Unassigned → Construction / Roadway | | | 0045-20-029 | Paris | 11/01/28 | $2,214,062.40 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | | | Unassigned / Unassigned → Construction / Roadway | | | 0279-04-025 | Paris | 11/01/28 | $335,237.76 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | | | Unassigned / Unassigned → Construction / Roadway | | | 0510-02-035 | Paris | 11/01/28 | $551,522.40 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | | | Unassigned / Unassigned → Construction / Roadway | | | 0549-01-042 | Paris | 11/01/28 | $95,821.44 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | $(54,637.44) | -36% | Unassigned / Unassigned → Construction / Roadway | | | 0641-04-022 | Paris | 11/01/28 | $378,824.16 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | | | Unassigned / Unassigned → Construction / Roadway | | | 0641-05-023 | Paris | 11/01/28 | $148,262.40 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | | | Unassigned / Unassigned → Construction / Roadway | | | 0722-02-053 | Paris | 11/01/28 | $110,667.67 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | | | Unassigned / Unassigned → Construction / Roadway | | | 0723-01-044 | Paris | 11/01/28 | $291,202.56 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | | | Unassigned / Unassigned → Construction / Roadway | | | 0728-03-017 | Paris | 11/01/28 | $64,408.96 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | $(317,709.92) | -83% | Unassigned / Unassigned → Construction / Roadway | | | 0728-04-014 | Paris | 11/01/28 | $258,255.36 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | | | Unassigned / Unassigned → Construction / Roadway | | | 0749-04-014 | Paris | 11/01/28 | $233,418.24 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | | | Unassigned / Unassigned → Construction / Roadway | | | 0764-03-019 | Paris | 11/01/28 | $235,641.12 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | | | Unassigned / Unassigned → Construction / Roadway | | | 0765-03-030 | Paris | 11/01/28 | $152,449.44 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | | | Unassigned / Unassigned → Construction / Roadway | | | 0766-01-033 | Paris | 11/01/28 | $835,005.60 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | | | Unassigned / Unassigned → Construction / Roadway | | | 0768-01-060 | Paris | 11/01/28 | $44,272.80 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | | | Unassigned / Unassigned → Construction / Roadway | | | 0768-02-025 | Paris | 11/01/28 | $97,812.00 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | | | Unassigned / Unassigned → Construction / Roadway | | | 0769-02-036 | Paris | 11/01/28 | $1,106,957.28 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | | | Unassigned / Unassigned → Construction / Roadway | | | 0772-02-019 | Paris | 11/01/28 | $639,894.89 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | | | Unassigned / Unassigned → Construction / Roadway | | | 1154-01-021 | Paris | 11/01/28 | $601,149.12 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | | | Unassigned / Unassigned → Construction / Roadway | | | 1454-01-024 | Paris | 11/01/28 | $525,719.04 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | | | Unassigned / Unassigned → Construction / Roadway | | | 1465-01-016 | Paris | 11/01/28 | $204,145.92 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | | | Unassigned / Unassigned → Construction / Roadway | | | 1849-01-012 | Paris | 11/01/28 | $390,561.60 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | | | Unassigned / Unassigned → Construction / Roadway | | | 1849-02-008 | Paris | 11/01/28 | $65,413.92 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | | | Unassigned / Unassigned → Construction / Roadway | | | 1849-03-023 | Paris | 11/01/28 | $1,294,719.36 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | $(42,863.04) | -3% | Unassigned / Unassigned → Construction / Roadway | | | 1979-01-017 | Paris | 11/01/28 | $467,596.80 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | | | Unassigned / Unassigned → Construction / Roadway | | | 2003-01-011 | Paris | 11/01/28 | $311,794.56 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | | | Unassigned / Unassigned → Construction / Roadway | | | 2459-02-015 | Paris | 11/01/28 | $125,062.08 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | | | Unassigned / Unassigned → Construction / Roadway | | | 2683-01-009 | Paris | 11/01/28 | $66,792.00 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | | | Unassigned / Unassigned → Construction / Roadway | | | 2875-01-010 | Paris | 11/01/28 | $338,976.00 | Construction | Roadway | Unassigned | Unassigned | 12/04/28 | -34 | -1 month | | | Unassigned / Unassigned → Construction / Roadway | | | 0915-15-088 | San Antonio | 10/05/27 | $1,070,039.00 | Construction | Bridge | Construction | Bridge | 08/31/27 | 34 | 1 month | | | | | | 0338-11-062 | Houston | 05/15/27 | $2,403,000.00 | Construction | Local Let | Construction | Roadway | 06/14/27 | -31 | -1 month | | | Construction / Roadway → Construction / Local Let | | | 0912-37-259 | Houston | 09/15/26 | $13,200,000.00 | Construction | Local Let | Construction | Roadway | 08/14/26 | 31 | 1 month | | | Construction / Roadway → Construction / Local Let | | | 0912-72-761 | Houston | 09/15/26 | $1,026,535.00 | Construction | Local Let | Construction | Local Let | 08/14/26 | 31 | 1 month | | | | | | 0912-72-762 | Houston | 09/15/26 | $408,301.00 | Construction | Local Let | Construction | Local Let | 08/14/26 | 31 | 1 month | | | | | | 0912-72-819 | Houston | 09/15/26 | $17,209,746.00 | Construction | Local Let | Construction | Local Let | 08/14/26 | 31 | 1 month | | | | | | 0912-72-824 | Houston | 09/15/26 | $8,000,000.00 | Construction | Local Let | Construction | Local Let | 08/14/26 | 31 | 1 month | | | | | | 0912-73-249 | Houston | 09/15/26 | $3,250,000.00 | Construction | Local Let | Construction | Local Let | 08/14/26 | 31 | 1 month | | | | | | 3595-01-028 | Houston | 09/15/26 | $525,000.00 | Construction | Local Let | Construction | Local Let | 08/14/26 | 31 | 1 month | | | | | | 6496-99-001 | Houston | 07/09/26 | $950,000.00 | Maintenance | Bridge Preventive | Unassigned | Unassigned | 06/08/26 | 30 | 30 days | | | Unassigned / Unassigned → Maintenance / Bridge Preventive | | | 0384-04-035 | Austin | 06/01/28 | $314,391.74 | Construction | Roadway | Unassigned | Unassigned | 05/02/28 | 29 | 29 days | | | Unassigned / Unassigned → Construction / Roadway | | | 2552-01-062 | El Paso | 11/02/27 | $961,538.46 | Construction | Roadway | Construction | Roadway | 10/04/27 | 28 | 28 days | | | | | | 0128-01-122 | Brownwood | 02/02/27 | $2,900,000.00 | Construction | Bridge | Unassigned | Unassigned | 01/05/27 | 27 | 27 days | | | Unassigned / Unassigned → Construction / Bridge | | | 0289-04-036 | Brownwood | 02/02/27 | $650,000.00 | Construction | Bridge | Unassigned | Unassigned | 01/05/27 | 27 | 27 days | | | Unassigned / Unassigned → Construction / Bridge | | | 0550-01-032 | Brownwood | 02/02/27 | $150,000.00 | Construction | Bridge | Unassigned | Unassigned | 01/05/27 | 27 | 27 days | | | Unassigned / Unassigned → Construction / Bridge | | | 0550-01-033 | Brownwood | 02/02/27 | $200,000.00 | Construction | Bridge | Unassigned | Unassigned | 01/05/27 | 27 | 27 days | | | Unassigned / Unassigned → Construction / Bridge | | | 0550-01-034 | Brownwood | 02/02/27 | $150,000.00 | Construction | Bridge | Unassigned | Unassigned | 01/05/27 | 27 | 27 days | | | Unassigned / Unassigned → Construction / Bridge | | | 1026-01-014 | Brownwood | 02/02/27 | $138,304.00 | Construction | Bridge | Unassigned | Unassigned | 01/05/27 | 27 | 27 days | | | Unassigned / Unassigned → Construction / Bridge | | | 1697-02-036 | Brownwood | 02/02/27 | $350,000.00 | Construction | Bridge | Unassigned | Unassigned | 01/05/27 | 27 | 27 days | | | Unassigned / Unassigned → Construction / Bridge | | | 2106-01-011 | Brownwood | 02/02/27 | $300,000.00 | Construction | Bridge | Unassigned | Unassigned | 01/05/27 | 27 | 27 days | | | Unassigned / Unassigned → Construction / Bridge | | | 1756-01-024 | Yoakum | 06/02/26 | $937,067.00 | Construction | Roadway | Unassigned | Unassigned | 05/05/26 | 27 | 27 days | | | Unassigned / Unassigned → Construction / Roadway | | | 0907-00-242 | San Angelo | 04/05/28 | $1,956,000.00 | Construction | Roadway | Unassigned | Unassigned | 04/12/28 | -8 | -8 days | $178,000.00 | 10% | Unassigned / Unassigned → Construction / Roadway | | | 0184-03-044 | Waco | 11/01/26 | $142,061.00 | Non-Let | Roadway | Unassigned | Unassigned | 11/02/26 | -2 | -2 days | | | Unassigned / Unassigned → Non-Let / Roadway | | --- ## Project Type & Subtype Changes The mix of work in the pipeline remains consistent. Construction continues to dominate, increasing to 95.7% of the pipeline, with roadway work making up the majority of projects and bridge work representing a smaller but steady share. The measurable changes at the subtype level are small: | Subtype | Feb 2 | March 3 | Δ | | --- | --- | --- | --- | | Roadway | 52.7% | 76.0% | +23.3 | | Bridge | 11.0% | 15.4% | +4.4 | | Local Let | 2.7% | 3.6% | +1.0 | | Non Roadway | 1.1% | 1.8% | +0.7 | | Local | 0.2% | 0.6% | +0.4 | | Rail - Safety | 1.1% | 1.4% | +0.3 | | Routine Maintenance Contract | 0.1% | 0.3% | +0.2 | Only 5.3% of projects experienced a subtype change across the window. For contractors, this reinforces a familiar structure. The pipeline is still overwhelmingly roadway-driven, with bridge work as the primary secondary category. There is no indication of a shift toward new types of work or a change in how TxDOT is allocating scope across categories. | CSJ | District | Est. Letting Date | Project Estimate | Current Type | Current Subtype | Type/Subtype Δ | Prev. Type | Prev. Subtype | Prev. Cost | Prev. Date | Letting Δ (days) | Letting Date Δ | Cost Δ | %Cost Δ | Lifecycle | | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | | 0047-03-091 | Paris | 04/07/26 | $147,195,094.80 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $152,906,394.00 | | | | $(5,711,299.20) | -4% | | | 0079-05-073 | Fort Worth | 04/07/26 | $72,390.52 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | $76,624.33 | | | | $(4,233.81) | -6% | | | 0172-09-046 | Fort Worth | 04/07/26 | $286,038.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $280,000.00 | | | | $6,038.00 | 2% | | | 0314-07-087 | Fort Worth | 04/07/26 | $537,434.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $534,158.80 | | | | $3,275.20 | 1% | | | 0337-02-054 | Austin | 04/07/26 | $2,566,158.62 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $2,645,257.53 | | | | $(79,098.91) | -3% | | | 0543-02-089 | Houston | 04/07/26 | $770,105.75 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | $836,725.75 | | | | $(66,620.00) | -8% | | | 0986-03-015 | Austin | 04/07/26 | $1,713,954.79 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $1,911,737.44 | | | | $(197,782.65) | -10% | | | 1014-03-065 | Dallas | 04/07/26 | $1,202,059.26 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $852,000.00 | | | | $350,059.26 | 41% | | | 1091-04-033 | Dallas | 04/07/26 | $277,376.80 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $426,000.00 | | | | $(148,623.20) | -35% | | | 1290-03-033 | Dallas | 04/07/26 | $690,184.30 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $1,266,000.00 | | | | $(575,815.70) | -45% | | | 1330-02-052 | Fort Worth | 04/07/26 | $8,810,551.86 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $7,785,159.27 | | | | $1,025,392.59 | 13% | | | 2150-03-034 | Laredo | 04/07/26 | $806,013.55 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $419,000.00 | | | | $387,013.55 | 92% | | | 2752-01-008 | Laredo | 04/07/26 | $907,598.60 | Construction | Bridge | Construction / Roadway → Construction / Bridge | Construction | Roadway | $639,624.41 | | | | $267,974.19 | 42% | | | 0271-17-188 | Houston | 04/15/26 | $1,600,000.00 | Non-Let | Bridge | Unassigned / Unassigned → Non-Let / Bridge | Unassigned | Unassigned | $1,000,000.00 | | | | $600,000.00 | 60% | | | 0038-01-108 | Laredo | 05/06/26 | $239,077.76 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 02/01/27 | -272 | -9 months | | | | | 0048-04-109 | Dallas | 05/06/26 | $615,349.25 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $636,000.00 | | | | $(20,650.75) | -3% | | | 0081-03-047 | Dallas | 05/06/26 | $116,223,406.70 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $172,970,558.00 | | | | $(56,747,151.30) | -33% | | | 0172-11-017 | Dallas | 05/06/26 | $1,104,055.45 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $1,272,000.00 | | | | $(167,944.55) | -13% | | | 0301-04-027 | Laredo | 05/06/26 | $308,090.60 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 02/01/27 | -272 | -9 months | | | | | 0542-03-040 | Laredo | 05/06/26 | $7,504,710.40 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 02/01/27 | -272 | -9 months | | | | | 0815-08-044 | Dallas | 05/06/26 | $1,230,656.05 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $1,272,000.00 | | | | $(41,343.95) | -3% | | | 1394-02-031 | Dallas | 05/06/26 | $1,048,966.35 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $848,400.00 | | | | $200,566.35 | 24% | | | 3256-02-121 | Houston | 05/06/26 | $2,286,187.03 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $2,436,237.84 | | | | $(150,050.81) | -6% | | | 6497-67-001 | Beaumont | 05/06/26 | $1.00 | Maintenance | Routine Maintenance Contract | Unassigned / Unassigned → Maintenance / Routine Maintenance Contract | Unassigned | Unassigned | | 09/01/26 | -119 | -4 months | | | | | 0912-37-265 | Houston | 05/15/26 | $9,413,000.00 | Construction | Local Let | Construction / Roadway → Construction / Local Let | Construction | Roadway | | 02/14/26 | 89 | 3 months | | | | | 0166-07-073 | Bryan | 06/02/26 | $404,475.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | $360,772.88 | | | | $43,702.12 | 12% | | | 1756-01-024 | Yoakum | 06/02/26 | $937,067.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 05/05/26 | 27 | 27 days | | | | | 0081-02-079 | Fort Worth | 06/11/26 | $515,157.78 | Construction | Local Let | Unassigned / Unassigned → Construction / Local Let | Unassigned | Unassigned | $513,104.90 | | | | $2,052.88 | 0% | | | 0363-01-153 | Fort Worth | 06/17/26 | $647,757.55 | Construction | Local Let | Unassigned / Unassigned → Construction / Local Let | Unassigned | Unassigned | $420,708.00 | | | | $227,049.55 | 54% | | | 0353-03-117 | Fort Worth | 06/18/26 | $516,490.30 | Construction | Local Let | Unassigned / Unassigned → Construction / Local Let | Unassigned | Unassigned | $568,354.60 | | | | $(51,864.30) | -9% | | | 0114-01-070 | Austin | 07/01/26 | $620,000.00 | Construction | Non Roadway | Unassigned / Unassigned → Construction / Non Roadway | Unassigned | Unassigned | $1,800,000.00 | | | | $(1,180,000.00) | -66% | | | 0114-01-071 | Austin | 07/01/26 | $4,200,000.00 | Construction | Non Roadway | Unassigned / Unassigned → Construction / Non Roadway | Unassigned | Unassigned | $7,200,000.00 | | | | $(3,000,000.00) | -42% | | | 0114-09-103 | Bryan | 07/01/26 | $163,870.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 09/01/26 | -63 | -2 months | | | | | 0185-02-042 | Bryan | 07/01/26 | $75,610.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 09/01/26 | -63 | -2 months | | | | | 0185-03-037 | Bryan | 07/01/26 | $76,360.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 09/01/26 | -63 | -2 months | | | | | 0186-03-073 | Bryan | 07/01/26 | $43,920.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 09/01/26 | -63 | -2 months | | | | | 0186-03-074 | Bryan | 07/01/26 | $31,920.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 09/01/26 | -63 | -2 months | | | | | 0186-04-036 | Bryan | 07/01/26 | $22,690.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 09/01/26 | -63 | -2 months | | | | | 0204-05-046 | Bryan | 07/01/26 | $64,590.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 09/01/26 | -63 | -2 months | | | | | 0211-10-053 | Yoakum | 07/01/26 | $2,000,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0262-07-047 | Bryan | 07/01/26 | $62,410.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 09/01/26 | -63 | -2 months | | | | | 0370-05-057 | Yoakum | 07/01/26 | $540,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $500,000.00 | | | | $40,000.00 | 8% | | | 0675-08-121 | Houston | 07/01/26 | $3,627,242.00 | Construction | Non Roadway | Unassigned / Unassigned → Construction / Non Roadway | Unassigned | Unassigned | | 08/31/27 | -427 | -1 year | | | | | 1953-01-035 | Bryan | 07/01/26 | $76,940.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 09/01/26 | -63 | -2 months | | | | | 2133-02-016 | Bryan | 07/01/26 | $18,780.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 09/01/26 | -63 | -2 months | | | | | 3510-04-064 | Houston | 07/01/26 | $3,693,789.00 | Construction | Non Roadway | Unassigned / Unassigned → Construction / Non Roadway | Unassigned | Unassigned | | 08/31/27 | -427 | -1 year | | | | | 3510-04-065 | Houston | 07/01/26 | $3,942,056.00 | Construction | Non Roadway | Unassigned / Unassigned → Construction / Non Roadway | Unassigned | Unassigned | | 08/31/27 | -427 | -1 year | | | | | 6496-99-001 | Houston | 07/09/26 | $950,000.00 | Maintenance | Bridge Preventive | Unassigned / Unassigned → Maintenance / Bridge Preventive | Unassigned | Unassigned | | 06/08/26 | 30 | 30 days | | | | | 0313-07-023 | Fort Worth | 08/01/26 | $1,142,907.00 | Non-Let | Change Order | Unassigned / Unassigned → Non-Let / Change Order | Unassigned | Unassigned | | | | | | | | | 0050-02-132 | Bryan | 08/03/26 | $39,771.75 | Non-Let | Roadway | Unassigned / Unassigned → Non-Let / Roadway | Unassigned | Unassigned | | | | | | | | | 0013-08-154 | Fort Worth | 08/05/26 | $1,681,823.02 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 09/05/28 | -763 | -2 years | | | | | 0095-04-079 | Dallas | 08/05/26 | $1,338,522.57 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | $2,463,673.44 | | | | $(1,125,150.87) | -46% | | | 6499-31-001 | Dallas | 08/12/26 | $400,000.00 | Maintenance | Routine Maintenance Contract | Unassigned / Unassigned → Maintenance / Routine Maintenance Contract | Unassigned | Unassigned | | | | | | | | | 0015-13-437 | Austin | 09/02/26 | $387,000,000.00 | Construction | Roadway | Construction / Rail → Construction / Roadway | Construction | Rail | $402,480,000.00 | | | | $(15,480,000.00) | -4% | | | 0028-06-098 | Beaumont | 09/02/26 | $113,202.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0172-09-047 | Fort Worth | 09/02/26 | $7,466,647.62 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0307-01-161 | Beaumont | 09/02/26 | $329,100.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0388-03-090 | Beaumont | 09/02/26 | $24,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0593-01-142 | Beaumont | 09/02/26 | $128,234.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0915-12-691 | San Antonio | 09/02/26 | $250,000.00 | Construction | Rail - Safety | Non-Let / Change Order → Construction / Rail - Safety | Non-Let | Change Order | | 02/28/27 | -180 | -6 months | | | | | 2266-02-169 | Fort Worth | 09/02/26 | $8,658,289.39 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0912-37-259 | Houston | 09/15/26 | $13,200,000.00 | Construction | Local Let | Construction / Roadway → Construction / Local Let | Construction | Roadway | | 08/14/26 | 31 | 1 month | | | | | 0132-01-058 | Childress | 10/06/26 | $60,311.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0215-09-037 | San Antonio | 10/06/26 | $385,985.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0236-01-024 | San Antonio | 10/06/26 | $265,286.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0349-01-033 | Corpus Christi | 10/06/26 | $829,681.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0517-01-050 | San Antonio | 10/06/26 | $331,964.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0613-02-071 | San Antonio | 10/06/26 | $260,631.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 1738-02-015 | San Antonio | 10/06/26 | $316,285.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 2556-02-013 | San Antonio | 10/06/26 | $347,521.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 2882-02-007 | San Antonio | 10/06/26 | $168,636.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 3075-02-014 | Corpus Christi | 10/06/26 | $11,415.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 3352-01-009 | San Antonio | 10/06/26 | $292,520.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0184-03-044 | Waco | 11/01/26 | $142,061.00 | Non-Let | Roadway | Unassigned / Unassigned → Non-Let / Roadway | Unassigned | Unassigned | | 11/02/26 | -2 | -2 days | | | | | 0044-06-079 | Wichita Falls | 11/03/26 | $225,735.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0044-07-077 | Wichita Falls | 11/03/26 | $716,433.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0047-04-032 | Dallas | 11/03/26 | $46,922,696.42 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $63,694,143.00 | | | | $(16,771,446.58) | -26% | | | 0080-03-049 | Fort Worth | 11/03/26 | $115,461,159.10 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $126,999,999.80 | | | | $(11,538,840.70) | -9% | | | 0136-03-073 | Paris | 11/03/26 | $2,076,861.02 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0239-04-024 | Wichita Falls | 11/03/26 | $531,657.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0239-08-002 | Wichita Falls | 11/03/26 | $9,318.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0906-18-022 | Odessa | 11/03/26 | $938,819.42 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 2635-05-005 | Amarillo | 11/03/26 | $47,259,223.32 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $69,477,353.12 | | | | $(22,218,129.80) | -32% | | | 2659-02-004 | Paris | 11/03/26 | $192,154.45 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 2706-02-018 | Wichita Falls | 11/03/26 | $108,280.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0013-10-098 | Fort Worth | 12/01/26 | $8,507,754.06 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 03/02/27 | -92 | -3 months | | | | | 0042-10-004 | Amarillo | 12/01/26 | $1,880,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0168-09-197 | Amarillo | 12/01/26 | $847,000.00 | Construction | Non Roadway | Unassigned / Unassigned → Construction / Non Roadway | Unassigned | Unassigned | $547,000.00 | | | | $300,000.00 | 55% | | | 0168-09-198 | Amarillo | 12/01/26 | $900,000.00 | Construction | Non Roadway | Unassigned / Unassigned → Construction / Non Roadway | Unassigned | Unassigned | | | | | | | | | 0168-10-084 | Amarillo | 12/01/26 | $100,000.00 | Construction | Non Roadway | Unassigned / Unassigned → Construction / Non Roadway | Unassigned | Unassigned | | | | | | | | | 0187-01-060 | Bryan | 12/01/26 | $537,819.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0363-03-061 | Fort Worth | 12/01/26 | $2,718,460.17 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0397-02-043 | Childress | 12/01/26 | $1,200,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 2452-03-128 | San Antonio | 12/01/26 | $190,314,322.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $215,816,440.00 | | | | $(25,502,118.00) | -12% | | | 0054-06-109 | Brownwood | 01/06/27 | $1,600,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $98,640.00 | | | | $1,501,360.00 | 1522% | | | 0128-04-045 | Brownwood | 01/06/27 | $2,644,230.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $2,500,000.00 | | | | $144,230.00 | 6% | | | 0917-29-152 | Bryan | 01/06/27 | $1,324,348.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $1,716,395.50 | 09/01/26 | 126 | 4 months | $(392,047.50) | -23% | | | 1601-02-036 | Fort Worth | 01/06/27 | $8,441,246.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $9,033,592.70 | | | | $(592,346.70) | -7% | | | 2883-02-011 | San Antonio | 01/06/27 | $1,105,769.00 | Construction | Roadway | Non-Let / Rail - Safety → Construction / Roadway | Non-Let | Rail - Safety | | 09/01/26 | 126 | 4 months | | | | | 0009-11-248 | Dallas | 02/02/27 | $57,043,890.08 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $79,147,850.00 | | | | $(22,103,959.92) | -28% | | | 0128-01-122 | Brownwood | 02/02/27 | $2,900,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | 01/05/27 | 27 | 27 days | | | | | 0259-05-086 | Fort Worth | 02/02/27 | $716,072.23 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0289-04-036 | Brownwood | 02/02/27 | $650,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | 01/05/27 | 27 | 27 days | | | | | 0550-01-032 | Brownwood | 02/02/27 | $150,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | 01/05/27 | 27 | 27 days | | | | | 0550-01-033 | Brownwood | 02/02/27 | $200,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | 01/05/27 | 27 | 27 days | | | | | 0550-01-034 | Brownwood | 02/02/27 | $150,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | 01/05/27 | 27 | 27 days | | | | | 1026-01-014 | Brownwood | 02/02/27 | $138,304.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | 01/05/27 | 27 | 27 days | | | | | 1697-02-036 | Brownwood | 02/02/27 | $350,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | 01/05/27 | 27 | 27 days | | | | | 2106-01-011 | Brownwood | 02/02/27 | $300,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | 01/05/27 | 27 | 27 days | | | | | 0683-03-043 | Austin | 03/03/27 | $1,837,409.82 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 09/05/28 | -553 | -2 years | | | | | 0915-12-827 | San Antonio | 03/03/27 | $654,893.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0915-12-828 | San Antonio | 03/03/27 | $362,736.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 2208-01-074 | Fort Worth | 03/03/27 | $3,905,479.41 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0413-06-015 | Bryan | 03/07/27 | $563,448.00 | Construction | Local Let | Unassigned / Unassigned → Construction / Local Let | Unassigned | Unassigned | | | | | | | | | 0912-72-583 | Houston | 03/15/27 | $736,806.00 | Construction | Local Let | Construction / Roadway → Construction / Local Let | Construction | Roadway | | 09/14/26 | 181 | 6 months | | | | | 0114-09-104 | Bryan | 04/06/27 | $2,000,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $3,000,000.00 | | | | $(1,000,000.00) | -33% | | | 0199-08-029 | Lufkin | 04/06/27 | $1,935,915.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0200-01-098 | Lufkin | 04/06/27 | $1,626,716.60 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0200-13-013 | Lufkin | 04/06/27 | $572,283.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0336-05-071 | Lufkin | 04/06/27 | $1,388,369.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0576-02-077 | Lufkin | 04/06/27 | $861,976.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 2006-03-013 | San Angelo | 04/06/27 | $926,675.86 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0024-07-068 | San Antonio | 05/05/27 | $278,604,536.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $312,037,081.00 | | | | $(33,432,545.00) | -11% | | | 0267-01-036 | Yoakum | 05/05/27 | $1,338,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $1,216,000.00 | | | | $122,000.00 | 10% | | | 0338-11-062 | Houston | 05/15/27 | $2,403,000.00 | Construction | Local Let | Construction / Roadway → Construction / Local Let | Construction | Roadway | | 06/14/27 | -31 | -1 month | | | | | 0907-24-060 | San Angelo | 06/03/27 | $3,552,743.00 | Construction | Local Let | Unassigned / Unassigned → Construction / Local Let | Unassigned | Unassigned | | 03/31/26 | 428 | 1 year | | | | | 0034-01-144 | Abilene | 07/01/27 | $7,000,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $5,000,000.00 | 08/31/27 | -62 | -2 months | $2,000,000.00 | 40% | | | 0908-33-118 | Abilene | 08/04/27 | $613,311.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $640,506.41 | | | | $(27,195.41) | -4% | | | 2560-01-079 | Lufkin | 08/04/27 | $7,615,384.62 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $12,700,000.00 | 02/28/38 | -3862 | -11 years | $(5,084,615.38) | -40% | | | 0177-03-110 | Beaumont | 09/01/27 | $679,006.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0610-06-098 | Atlanta | 09/01/27 | $14,560,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $16,307,200.00 | | | | $(1,747,200.00) | -11% | | | 0883-02-098 | Beaumont | 09/01/27 | $341,440.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 1024-01-097 | Beaumont | 09/01/27 | $16,676.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0921-06-330 | Pharr | 09/03/27 | $17,023,422.00 | Construction | Local Let | Unassigned / Unassigned → Construction / Local Let | Unassigned | Unassigned | | 09/01/29 | -730 | -2 years | | | | | 3417-02-043 | Austin | 09/03/27 | $1,805,976.85 | Non-Let | Roadway | Unassigned / Unassigned → Non-Let / Roadway | Unassigned | Unassigned | $1,712,962.96 | | | | $93,013.89 | 5% | | | 0024-05-107 | San Antonio | 10/05/27 | $589,451.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0043-02-078 | Childress | 10/05/27 | $18,800,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $21,056,000.00 | | | | $(2,256,000.00) | -11% | | | 0328-02-048 | San Antonio | 10/05/27 | $520,690.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0328-02-049 | San Antonio | 10/05/27 | $26,377.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0359-05-013 | San Antonio | 10/05/27 | $448,499.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0517-01-051 | San Antonio | 10/05/27 | $390,803.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0517-02-050 | San Antonio | 10/05/27 | $515,422.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0993-01-014 | Corpus Christi | 10/05/27 | $205,460.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 10/05/26 | 364 | 12 months | | | | | 1794-01-029 | Lufkin | 10/05/27 | $1,666,666.67 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 07/05/28 | -275 | -9 months | | | | | 0217-02-037 | Atlanta | 11/01/27 | $18,642,426.36 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $20,879,517.00 | | | | $(2,237,090.64) | -11% | | | 0044-06-080 | Wichita Falls | 11/02/27 | $1,352,204.50 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0189-01-014 | Paris | 11/02/27 | $44,953.92 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 12/04/28 | -399 | -1 year | | | | | 0189-02-064 | Paris | 11/02/27 | $1,915,826.88 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 12/04/28 | -399 | -1 year | | | | | 0610-01-055 | Paris | 11/02/27 | $64,408.96 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 1611-01-013 | Wichita Falls | 11/02/27 | $168,468.94 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 1766-01-010 | Wichita Falls | 11/02/27 | $144,371.40 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 1767-01-008 | Wichita Falls | 11/02/27 | $32,496.55 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 2438-01-011 | Wichita Falls | 11/02/27 | $338,547.43 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 3375-01-007 | Wichita Falls | 11/02/27 | $59,587.18 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0910-34-042 | Tyler | 12/01/27 | $727,368.96 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | 10/31/28 | -336 | -11 months | | | | | 2690-01-040 | Austin | 12/01/27 | $7,346,428.57 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 11/30/30 | -1096 | -3 years | | | | | 2690-01-046 | Austin | 12/01/27 | $714,285.71 | Construction | Rail - Safety | Unassigned / Unassigned → Construction / Rail - Safety | Unassigned | Unassigned | | 11/30/30 | -1096 | -3 years | | | | | 0070-06-056 | Brownwood | 01/05/28 | $400,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 01/05/27 | 364 | 12 months | | | | | 0289-04-037 | Brownwood | 01/05/28 | $3,568,950.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $3,000,000.00 | 01/05/27 | 364 | 12 months | $568,950.00 | 19% | | | 1239-01-034 | Brownwood | 01/05/28 | $125,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | $150,000.00 | | | | $(25,000.00) | -17% | | | 3538-01-067 | Houston | 01/05/28 | $1,000,000.00 | Construction | Non Roadway | Unassigned / Unassigned → Construction / Non Roadway | Unassigned | Unassigned | $2,061,504.00 | | | | $(1,061,504.00) | -51% | | | 3538-01-071 | Houston | 01/05/28 | $1,000,000.00 | Construction | Non Roadway | Unassigned / Unassigned → Construction / Non Roadway | Unassigned | Unassigned | | | | | | | | | 0495-03-076 | Tyler | 02/02/28 | $3,846,153.85 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $4,000,000.00 | | | | $(153,846.15) | -4% | | | 3632-01-003 | Pharr | 02/02/28 | $90,352,435.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $101,194,726.00 | | | | $(10,842,291.00) | -11% | | | 0027-13-261 | Houston | 03/07/28 | $300,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0177-11-170 | Houston | 03/07/28 | $1,700,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0265-06-036 | Austin | 03/07/28 | $5,000,000.00 | Construction | Non Roadway | Unassigned / Unassigned → Construction / Non Roadway | Unassigned | Unassigned | | 08/03/27 | 216 | 7 months | | | | | 0918-47-577 | Dallas | 04/02/28 | $5,700,000.00 | Construction | Local Let | Unassigned / Unassigned → Construction / Local Let | Unassigned | Unassigned | | 08/01/26 | 609 | 2 years | | | | | 0081-04-047 | Dallas | 04/05/28 | $460,407.60 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0907-00-242 | San Angelo | 04/05/28 | $1,956,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $1,778,000.00 | 04/12/28 | -8 | -8 days | $178,000.00 | 10% | | | 1416-03-022 | Houston | 05/03/28 | $6,000,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0912-72-845 | Houston | 05/15/28 | $75,920,000.00 | Construction | Local Let | Unassigned / Unassigned → Construction / Local Let | Unassigned | Unassigned | | 08/14/28 | -92 | -3 months | | | | | 0263-05-027 | Abilene | 06/01/28 | $2,358,156.80 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $2,613,672.48 | | | | $(255,515.68) | -10% | | | 0384-04-035 | Austin | 06/01/28 | $314,391.74 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 05/02/28 | 29 | 29 days | | | | | 0918-24-316 | Dallas | 06/04/28 | $3,907,500.00 | Construction | Local Let | Unassigned / Unassigned → Construction / Local Let | Unassigned | Unassigned | | 08/03/28 | -61 | -2 months | | | | | 0907-00-243 | San Angelo | 06/13/28 | $8,509,000.00 | Construction | Local Let | Unassigned / Unassigned → Construction / Local Let | Unassigned | Unassigned | $9,581,000.00 | | | | $(1,072,000.00) | -11% | | | 0091-05-081 | Dallas | 08/04/28 | $1,200,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 08/03/27 | 366 | 1 year | | | | | 0081-13-071 | Dallas | 09/06/28 | $232,779,659.10 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $260,713,231.60 | | | | $(27,933,572.50) | -11% | | | 0092-03-053 | Dallas | 09/06/28 | $62,131,255.85 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $83,760,305.57 | | | | $(21,629,049.72) | -26% | | | 0095-02-096 | Dallas | 09/06/28 | $347,679,308.50 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $395,000,825.50 | | | | $(47,321,517.00) | -12% | | | 0167-01-138 | El Paso | 09/06/28 | $2,762,500.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | | | | | | | | 0249-07-072 | Fort Worth | 09/06/28 | $42,784,246.29 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | $41,153,041.00 | | | | $1,631,205.29 | 4% | | | 0273-02-028 | Austin | 09/06/28 | $321,428.57 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | | | | | | | | 0451-01-053 | Dallas | 09/06/28 | $117,610,100.90 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $132,731,313.00 | | | | $(15,121,212.10) | -11% | | | 0915-12-829 | San Antonio | 09/06/28 | $1,566,606.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 1051-01-064 | Dallas | 09/06/28 | $101,546,735.70 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $115,412,344.00 | | | | $(13,865,608.30) | -12% | | | 1051-03-001 | Dallas | 09/06/28 | $54,002,986.08 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $74,481,854.00 | | | | $(20,478,867.92) | -28% | | | 2941-02-054 | Houston | 09/06/28 | $1,288,740.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 07/31/32 | -1425 | -4 years | | | | | 2941-02-056 | Houston | 09/06/28 | $32,000,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 07/31/32 | -1425 | -4 years | | | | | 0024-06-079 | San Antonio | 10/04/28 | $407,013.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0052-01-046 | Lubbock | 10/04/28 | $27,200,001.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | $83,640,398.24 | | | | $(56,440,397.24) | -67% | | | 0150-05-053 | Austin | 10/04/28 | $830,357.14 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | | | | | | | | 0595-02-026 | San Antonio | 10/04/28 | $721,746.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0748-05-046 | San Antonio | 10/04/28 | $588,185.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0926-05-009 | Lufkin | 10/04/28 | $9,169,916.07 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $8,482,142.86 | | | | $687,773.21 | 8% | | | 1167-01-014 | San Antonio | 10/04/28 | $181,335.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 2263-02-112 | Corpus Christi | 10/04/28 | $17,000,000.00 | Construction | Ferry Boat | Unassigned / Unassigned → Construction / Ferry Boat | Unassigned | Unassigned | | 09/30/35 | -2553 | -7 years | | | | | 3127-01-010 | San Antonio | 10/04/28 | $93,424.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0005-15-097 | Odessa | 11/01/28 | $900,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | | | | | | | | 0005-15-098 | Odessa | 11/01/28 | $900,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | | | | | | | | 0009-06-058 | Paris | 11/01/28 | $506,769.12 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 12/04/28 | -34 | -1 month | | | | | 0045-10-022 | Paris | 11/01/28 | $551,738.88 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 12/04/28 | -34 | -1 month | | | | | 0045-12-099 | Paris | 11/01/28 | $221,892.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0045-20-029 | Paris | 11/01/28 | $2,214,062.40 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 12/04/28 | -34 | -1 month | | | | | 0124-03-067 | Wichita Falls | 11/01/28 | $381,561.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0134-02-065 | Wichita Falls | 11/01/28 | $893,996.40 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0195-02-090 | Dallas | 11/01/28 | $159,894,765.10 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $179,082,136.90 | | | | $(19,187,371.80) | -11% | | | 0239-01-025 | Wichita Falls | 11/01/28 | $328,848.96 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0249-01-061 | Wichita Falls | 11/01/28 | $50,574.77 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0249-02-027 | Wichita Falls | 11/01/28 | $204,648.11 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0279-04-025 | Paris | 11/01/28 | $335,237.76 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 12/04/28 | -34 | -1 month | | | | | 0283-04-038 | Wichita Falls | 11/01/28 | $571,016.75 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0423-05-012 | Wichita Falls | 11/01/28 | $113,875.52 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0423-06-017 | Wichita Falls | 11/01/28 | $160,881.60 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0510-02-035 | Paris | 11/01/28 | $551,522.40 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 12/04/28 | -34 | -1 month | | | | | 0549-01-042 | Paris | 11/01/28 | $95,821.44 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $150,458.88 | 12/04/28 | -34 | -1 month | $(54,637.44) | -36% | | | 0641-04-022 | Paris | 11/01/28 | $378,824.16 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 12/04/28 | -34 | -1 month | | | | | 0641-05-023 | Paris | 11/01/28 | $148,262.40 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 12/04/28 | -34 | -1 month | | | | | 0702-01-016 | Wichita Falls | 11/01/28 | $228,176.96 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0722-02-053 | Paris | 11/01/28 | $110,667.67 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 12/04/28 | -34 | -1 month | | | | | 0723-01-044 | Paris | 11/01/28 | $291,202.56 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 12/04/28 | -34 | -1 month | | | | | 0728-03-017 | Paris | 11/01/28 | $64,408.96 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $382,118.88 | 12/04/28 | -34 | -1 month | $(317,709.92) | -83% | | | 0728-04-014 | Paris | 11/01/28 | $258,255.36 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 12/04/28 | -34 | -1 month | | | | | 0749-04-014 | Paris | 11/01/28 | $233,418.24 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 12/04/28 | -34 | -1 month | | | | | 0764-03-019 | Paris | 11/01/28 | $235,641.12 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 12/04/28 | -34 | -1 month | | | | | 0765-03-030 | Paris | 11/01/28 | $152,449.44 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 12/04/28 | -34 | -1 month | | | | | 0766-01-033 | Paris | 11/01/28 | $835,005.60 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 12/04/28 | -34 | -1 month | | | | | 0768-01-060 | Paris | 11/01/28 | $44,272.80 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 12/04/28 | -34 | -1 month | | | | | 0768-02-025 | Paris | 11/01/28 | $97,812.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 12/04/28 | -34 | -1 month | | | | | 0769-02-036 | Paris | 11/01/28 | $1,106,957.28 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 12/04/28 | -34 | -1 month | | | | | 0772-02-019 | Paris | 11/01/28 | $639,894.89 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 12/04/28 | -34 | -1 month | | | | | 0782-01-038 | Wichita Falls | 11/01/28 | $206,803.52 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0802-02-080 | Wichita Falls | 11/01/28 | $92,850.56 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0815-09-010 | Wichita Falls | 11/01/28 | $548,339.73 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0845-03-070 | Wichita Falls | 11/01/28 | $122,936.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 1135-01-028 | Austin | 11/01/28 | $267,857.14 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | | | | | | | | 1154-01-021 | Paris | 11/01/28 | $601,149.12 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 12/04/28 | -34 | -1 month | | | | | 1188-02-136 | Odessa | 11/01/28 | $1,200,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | | | | | | | | 1188-02-137 | Odessa | 11/01/28 | $720,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | | | | | | | | 1188-02-138 | Odessa | 11/01/28 | $490,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | | | | | | | | 1357-01-029 | Wichita Falls | 11/01/28 | $166,534.72 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 1357-01-030 | Wichita Falls | 11/01/28 | $143,225.28 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 1357-02-015 | Wichita Falls | 11/01/28 | $94,154.13 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 1454-01-024 | Paris | 11/01/28 | $525,719.04 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 12/04/28 | -34 | -1 month | | | | | 1465-01-016 | Paris | 11/01/28 | $204,145.92 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 12/04/28 | -34 | -1 month | | | | | 1767-03-021 | Wichita Falls | 11/01/28 | $102,801.60 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 1849-01-012 | Paris | 11/01/28 | $390,561.60 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 12/04/28 | -34 | -1 month | | | | | 1849-02-008 | Paris | 11/01/28 | $65,413.92 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 12/04/28 | -34 | -1 month | | | | | 1849-03-023 | Paris | 11/01/28 | $1,294,719.36 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $1,337,582.40 | 12/04/28 | -34 | -1 month | $(42,863.04) | -3% | | | 1855-01-033 | Wichita Falls | 11/01/28 | $179,583.36 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 1979-01-017 | Paris | 11/01/28 | $467,596.80 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 12/04/28 | -34 | -1 month | | | | | 2003-01-011 | Paris | 11/01/28 | $311,794.56 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 12/04/28 | -34 | -1 month | | | | | 2322-01-012 | Wichita Falls | 11/01/28 | $171,206.93 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 2459-02-015 | Paris | 11/01/28 | $125,062.08 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 12/04/28 | -34 | -1 month | | | | | 2683-01-009 | Paris | 11/01/28 | $66,792.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 12/04/28 | -34 | -1 month | | | | | 2706-01-012 | Wichita Falls | 11/01/28 | $119,580.27 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 2706-02-019 | Wichita Falls | 11/01/28 | $137,294.67 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 2875-01-010 | Paris | 11/01/28 | $338,976.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 12/04/28 | -34 | -1 month | | | | | 3553-01-008 | Wichita Falls | 11/01/28 | $170,258.29 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $191,928.00 | | | | $(21,669.71) | -11% | | | 3562-01-009 | Wichita Falls | 11/01/28 | $218,606.66 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 3569-02-005 | Wichita Falls | 11/01/28 | $34,323.67 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 3569-03-009 | Wichita Falls | 11/01/28 | $162,664.33 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | | | | | | | | 0152-01-092 | Austin | 12/05/28 | $401,785.71 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | | | | | | | | 0005-04-074 | Odessa | 01/01/29 | $50,435,715.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | $56,488,000.00 | | | | $(6,052,285.00) | -11% | | | 0005-13-063 | Odessa | 01/01/29 | $240,150,931.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $268,969,042.70 | | | | $(28,818,111.70) | -11% | | | 0013-05-071 | Wichita Falls | 01/01/29 | $1,500,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | | | | | | | | 0013-05-072 | Wichita Falls | 01/01/29 | $550,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | | | | | | | | 0013-05-073 | Wichita Falls | 01/01/29 | $400,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | | | | | | | | 0013-05-074 | Wichita Falls | 01/01/29 | $475,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | | | | | | | | 0054-07-086 | Brownwood | 01/01/29 | $25,000,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $28,000,000.00 | | | | $(3,000,000.00) | -11% | | | 0098-03-041 | Childress | 01/01/29 | $790,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | | | | | | | | 0156-07-116 | Wichita Falls | 01/01/29 | $125,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | | | | | | | | 0156-07-117 | Wichita Falls | 01/01/29 | $125,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | | | | | | | | 0156-07-118 | Wichita Falls | 01/01/29 | $100,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | | | | | | | | 0156-07-119 | Wichita Falls | 01/01/29 | $100,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | | | | | | | | 0156-07-120 | Wichita Falls | 01/01/29 | $100,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | | | | | | | | 0156-07-121 | Wichita Falls | 01/01/29 | $100,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | | | | | | | | 0157-02-059 | Childress | 01/01/29 | $225,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | | | | | | | | 0157-02-060 | Childress | 01/01/29 | $225,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | | | | | | | | 0157-10-004 | Childress | 01/01/29 | $200,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | | | | | | | | 0157-10-005 | Childress | 01/01/29 | $175,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | | | | | | | | 0231-02-070 | Waco | 01/01/29 | $9,047,322.32 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $10,133,000.00 | | | | $(1,085,677.68) | -11% | | | 0508-02-139 | Beaumont | 01/01/29 | $8,354,659.82 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | $9,357,218.00 | | | | $(1,002,558.18) | -11% | | | 0685-01-033 | Wichita Falls | 01/01/29 | $150,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | | | | | | | | 0711-02-046 | Childress | 01/01/29 | $125,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | | | | | | | | 0909-00-076 | Waco | 01/01/29 | $4,471,365.74 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | $269,000.00 | 10/31/45 | -6148 | -17 years | $4,202,365.74 | 1562% | | | 0949-01-018 | Childress | 01/01/29 | $160,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | | | | | | | | 0950-01-030 | Childress | 01/01/29 | $120,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | | | | | | | | 0970-03-025 | Childress | 01/01/29 | $450,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | | | | | | | | 0971-03-011 | Childress | 01/01/29 | $570,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | | | | | | | | 1225-01-014 | Childress | 01/01/29 | $230,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | | | | | | | | 2011-01-010 | Childress | 01/01/29 | $240,000.00 | Construction | Bridge | Unassigned / Unassigned → Construction / Bridge | Unassigned | Unassigned | | | | | | | | | 0508-01-410 | Houston | 03/01/29 | $42,867,000.00 | Construction | Roadway | Unassigned / Unassigned → Construction / Roadway | Unassigned | Unassigned | | 03/06/28 | 359 | 12 months | | | | --- ## Cost Changes Cost movement is active across the pipeline, but the financial impact is concentrated in a small number of large projects. Total absolute cost movement reached $1.98B, with the top five projects accounting for 56.6% of that total, or $1.12B. The largest individual changes include: - **CSJ 0500-03-599**: -$600.00M - **CSJ 0018-05-089**: +$255.61M - **CSJ 0508-01-396**: -$166.67M - **CSJ 0502-01-244**: -$56.00M - **CSJ 0508-01-410**: -$42.87M At the aggregate level, construction accounts for the majority of the net change, with a total decrease of -$573.23M. District-level changes are uneven. Houston drives the largest decrease at -$836.97M, while Laredo sees a significant increase of +$256.29M, with smaller movements across other districts. For estimators, this creates two realities. Many projects are being repriced as estimates evolve, but a small number of large jobs are driving most of the dollar movement. The headline change in total pipeline value is not broad-based. It is driven by a handful of major adjustments. | CSJ | District | Est. Letting Date | Project Estimate | Current Type | Current Subtype | Prev. Type | Prev. Subtype | Prev. Cost | Cost Δ | %Cost Δ | Letting Δ (days) | Letting Date Δ | Type/Subtype Δ | Lifecycle | | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | | 0275-13-075 | Childress | 06/01/28 | $4,100,000.00 | Construction | Bridge | Construction | Bridge | $100,000.00 | $4,000,000.00 | 4000% | | | | | | 0033-06-129 | Abilene | 05/06/26 | $2,003,350.40 | Construction | Bridge | Construction | Bridge | $100,000.00 | $1,903,350.40 | 1903% | | | | | | 0909-00-076 | Waco | 01/01/29 | $4,471,365.74 | Construction | Bridge | Unassigned | Unassigned | $269,000.00 | $4,202,365.74 | 1562% | -6148 | -17 years | Unassigned / Unassigned → Construction / Bridge | | | 0054-06-109 | Brownwood | 01/06/27 | $1,600,000.00 | Construction | Roadway | Unassigned | Unassigned | $98,640.00 | $1,501,360.00 | 1522% | | | Unassigned / Unassigned → Construction / Roadway | | | 0033-06-130 | Abilene | 05/06/26 | $1,223,572.00 | Construction | Bridge | Construction | Bridge | $100,000.00 | $1,123,572.00 | 1124% | | | | | | 0421-04-035 | San Antonio | 10/05/27 | $657,314.00 | Construction | Roadway | Construction | Roadway | $65,358.00 | $591,956.00 | 906% | | | | | | 0024-09-027 | San Antonio | 04/07/26 | $11,342,513.21 | Construction | Roadway | Construction | Roadway | $1,338,675.48 | $10,003,837.73 | 747% | | | | | | 0017-10-294 | San Antonio | 04/07/26 | $23,214,563.41 | Construction | Roadway | Construction | Roadway | $3,160,403.08 | $20,054,160.33 | 635% | | | | | | 0176-01-116 | Lufkin | 05/06/26 | $8,019,500.93 | Construction | Roadway | Construction | Roadway | $1,921,786.49 | $6,097,714.44 | 317% | | | | | | 0258-08-035 | Waco | 03/03/27 | $8,846,153.85 | Construction | Roadway | Construction | Roadway | $2,407,999.00 | $6,438,154.85 | 267% | | | | | | 0025-02-229 | San Antonio | 01/06/27 | $972,889.00 | Construction | Roadway | Construction | Roadway | $299,541.00 | $673,348.00 | 225% | 92 | 3 months | | | | 1499-01-034 | San Antonio | 10/05/27 | $195,585.00 | Construction | Roadway | Construction | Roadway | $62,069.00 | $133,516.00 | 215% | | | | | | 0124-04-042 | Wichita Falls | 11/01/28 | $1,232,735.00 | Construction | Roadway | Construction | Roadway | $439,317.00 | $793,418.00 | 181% | 365 | 1 year | | | | 0912-72-626 | Houston | 10/05/27 | $980,366.00 | Construction | Bridge | Construction | Bridge | $350,000.00 | $630,366.00 | 180% | | | | | | 0031-01-024 | Childress | 05/03/28 | $5,000,000.00 | Construction | Roadway | Construction | Roadway | $1,792,000.00 | $3,208,000.00 | 179% | | | | | | 0523-09-023 | Houston | 05/06/26 | $1,625,131.85 | Construction | Roadway | Construction | Roadway | $770,688.00 | $854,443.85 | 111% | | | | | | 0262-02-031 | Bryan | 11/03/26 | $6,000,000.00 | Construction | Roadway | Construction | Roadway | $3,000,000.00 | $3,000,000.00 | 100% | | | | | | 0646-02-033 | Tyler | 12/05/28 | $352,039.00 | Construction | Roadway | Construction | Roadway | $24,000,000.00 | $(23,647,961.00) | -99% | | | | | | 0007-02-072 | Abilene | 05/06/26 | $26,670.00 | Construction | Bridge | Construction | Bridge | $370,000.00 | $(343,330.00) | -93% | | | | | | 0007-02-073 | Abilene | 05/06/26 | $26,670.00 | Construction | Bridge | Construction | Bridge | $359,000.00 | $(332,330.00) | -93% | | | | | | 2005-01-030 | Odessa | 04/07/26 | $42,689.00 | Construction | Roadway | Construction | Roadway | $593,352.00 | $(550,663.00) | -93% | | | | | | 0007-02-074 | Abilene | 05/06/26 | $24,870.00 | Construction | Bridge | Construction | Bridge | $295,000.00 | $(270,130.00) | -92% | | | | | | 2150-03-034 | Laredo | 04/07/26 | $806,013.55 | Construction | Roadway | Unassigned | Unassigned | $419,000.00 | $387,013.55 | 92% | | | Unassigned / Unassigned → Construction / Roadway | | | 0912-72-627 | Houston | 10/05/27 | $1,157,249.00 | Construction | Bridge | Construction | Bridge | $605,000.00 | $552,249.00 | 91% | | | | | | 0338-03-094 | Houston | 05/06/26 | $32,440.00 | Construction | Roadway | Construction | Roadway | $348,560.00 | $(316,120.00) | -91% | | | | | | 0006-04-086 | Abilene | 05/06/26 | $32,020.00 | Construction | Bridge | Construction | Bridge | $328,000.00 | $(295,980.00) | -90% | | | | | | 0007-02-069 | Abilene | 05/06/26 | $34,620.00 | Construction | Bridge | Construction | Bridge | $339,000.00 | $(304,380.00) | -90% | | | | | | 0007-02-070 | Abilene | 05/06/26 | $45,165.00 | Construction | Bridge | Construction | Bridge | $382,000.00 | $(336,835.00) | -88% | | | | | | 0017-16-008 | San Antonio | 01/05/28 | $828,335.00 | Construction | Roadway | Construction | Roadway | $6,400,863.00 | $(5,572,528.00) | -87% | 126 | 4 months | | | | 0006-07-090 | Abilene | 05/06/26 | $42,035.00 | Construction | Bridge | Construction | Bridge | $321,000.00 | $(278,965.00) | -87% | | | | | | 0006-07-089 | Abilene | 05/06/26 | $42,035.00 | Construction | Bridge | Construction | Bridge | $278,000.00 | $(235,965.00) | -85% | | | | | | 0747-05-043 | Fort Worth | 05/06/26 | $3,701,393.15 | Construction | Roadway | Construction | Roadway | $2,000,000.00 | $1,701,393.15 | 85% | | | | | | 0006-04-085 | Abilene | 05/06/26 | $51,145.00 | Construction | Bridge | Construction | Bridge | $328,000.00 | $(276,855.00) | -84% | | | | | | 0090-02-057 | Amarillo | 04/07/26 | $330,464.50 | Construction | Bridge | Construction | Bridge | $180,000.00 | $150,464.50 | 84% | | | | | | 0728-03-017 | Paris | 11/01/28 | $64,408.96 | Construction | Roadway | Unassigned | Unassigned | $382,118.88 | $(317,709.92) | -83% | -34 | -1 month | Unassigned / Unassigned → Construction / Roadway | | | 2255-02-033 | San Antonio | 10/05/27 | $186,521.00 | Construction | Roadway | Construction | Roadway | $957,722.00 | $(771,201.00) | -81% | | | | | | 0211-10-050 | Yoakum | 07/01/26 | $500,000.00 | Construction | Roadway | Construction | Roadway | $2,618,342.00 | $(2,118,342.00) | -81% | | | | | | 0007-06-268 | Brownwood | 10/06/26 | $1,500,000.00 | Construction | Roadway | Construction | Roadway | $7,600,000.00 | $(6,100,000.00) | -80% | -818 | -2 years | | | | 0630-01-059 | Pharr | 05/06/26 | $64,985.00 | Construction | Roadway | Construction | Roadway | $324,811.00 | $(259,826.00) | -80% | -119 | -4 months | | | | 1228-03-058 | Pharr | 05/06/26 | $63,360.00 | Construction | Roadway | Construction | Roadway | $299,715.00 | $(236,355.00) | -79% | -119 | -4 months | | | | 0007-02-067 | Abilene | 05/06/26 | $815,415.00 | Construction | Bridge | Construction | Bridge | $461,000.00 | $354,415.00 | 77% | | | | | | 0007-02-071 | Abilene | 05/06/26 | $89,840.00 | Construction | Bridge | Construction | Bridge | $388,000.00 | $(298,160.00) | -77% | | | | | | 0917-16-040 | Bryan | 08/05/26 | $617,323.07 | Construction | Bridge | Construction | Bridge | $350,000.00 | $267,323.07 | 76% | | | | | | 1228-03-059 | Pharr | 05/06/26 | $54,710.00 | Construction | Roadway | Construction | Roadway | $225,398.00 | $(170,688.00) | -76% | -119 | -4 months | | | | 0092-06-112 | Dallas | 08/05/26 | $456,170.72 | Construction | Bridge | Construction | Bridge | $1,834,595.53 | $(1,378,424.81) | -75% | | | | | | 0314-04-038 | Fort Worth | 07/01/26 | $23,218.09 | Construction | Bridge | Construction | Bridge | $13,287.76 | $9,930.33 | 75% | | | | | | 2255-02-030 | San Antonio | 10/06/26 | $339,191.00 | Construction | Roadway | Construction | Roadway | $194,641.00 | $144,550.00 | 74% | | | | | | 0291-05-051 | San Antonio | 01/06/27 | $1,286,888.00 | Construction | Roadway | Construction | Roadway | $753,940.00 | $532,948.00 | 71% | 92 | 3 months | | | | 0917-16-041 | Bryan | 08/05/26 | $591,407.82 | Construction | Bridge | Construction | Bridge | $350,000.00 | $241,407.82 | 69% | | | | | | 0052-01-046 | Lubbock | 10/04/28 | $27,200,001.00 | Construction | Bridge | Unassigned | Unassigned | $83,640,398.24 | $(56,440,397.24) | -67% | | | Unassigned / Unassigned → Construction / Bridge | | | 0043-22-012 | Wichita Falls | 11/02/27 | $565,892.00 | Construction | Roadway | Construction | Roadway | $340,800.00 | $225,092.00 | 66% | | | | | | 0114-01-070 | Austin | 07/01/26 | $620,000.00 | Construction | Non Roadway | Unassigned | Unassigned | $1,800,000.00 | $(1,180,000.00) | -66% | | | Unassigned / Unassigned → Construction / Non Roadway | | | 0909-22-206 | Waco | 05/06/26 | $94,904.00 | Construction | Bridge | Construction | Bridge | $275,000.00 | $(180,096.00) | -65% | | | | | | 0216-01-062 | San Antonio | 04/07/26 | $589,966.45 | Construction | Roadway | Construction | Roadway | $357,143.00 | $232,823.45 | 65% | | | | | | 0017-06-093 | San Antonio | 10/04/28 | $290,969.00 | Construction | Roadway | Construction | Roadway | $779,821.00 | $(488,852.00) | -63% | 365 | 1 year | | | | 0015-13-452 | Austin | 10/06/26 | $40,384,615.38 | Construction | Roadway | Construction | Roadway | $25,000,000.00 | $15,384,615.38 | 62% | | | | | | 1745-01-020 | Houston | 04/07/26 | $951,319.38 | Construction | Roadway | Construction | Roadway | $2,503,999.00 | $(1,552,679.62) | -62% | | | | | | 0271-17-188 | Houston | 04/15/26 | $1,600,000.00 | Non-Let | Bridge | Unassigned | Unassigned | $1,000,000.00 | $600,000.00 | 60% | | | Unassigned / Unassigned → Non-Let / Bridge | | | 0271-04-070 | Houston | 12/05/28 | $194,998,997.70 | Construction | Roadway | Construction | Roadway | $479,159,276.00 | $(284,160,278.30) | -59% | | | | | | 0271-04-093 | Houston | 12/05/28 | $46,286,366.28 | Construction | Roadway | Construction | Roadway | $111,483,482.00 | $(65,197,115.72) | -58% | | | | | | 0024-05-105 | San Antonio | 10/06/26 | $145,199.00 | Construction | Roadway | Construction | Roadway | $344,000.00 | $(198,801.00) | -58% | -364 | -12 months | | | | 0002-02-066 | El Paso | 05/06/26 | $366,346.70 | Construction | Roadway | Construction | Roadway | $232,157.22 | $134,189.48 | 58% | | | | | | 1421-01-027 | Beaumont | 04/07/26 | $836,754.00 | Construction | Roadway | Construction | Roadway | $2,000,000.00 | $(1,163,246.00) | -58% | | | | | | 0089-07-145 | Yoakum | 12/05/28 | $213,653,605.60 | Construction | Roadway | Construction | Roadway | $500,000,000.00 | $(286,346,394.40) | -57% | | | | | | 0187-01-054 | Bryan | 12/01/26 | $333,820.00 | Construction | Roadway | Construction | Roadway | $778,755.00 | $(444,935.00) | -57% | | | | | | 0114-02-116 | Austin | 08/05/26 | $3,800,845.31 | Construction | Roadway | Construction | Roadway | $2,426,884.00 | $1,373,961.31 | 57% | | | | | | 0549-01-041 | Paris | 03/03/27 | $2,200,000.00 | Construction | Roadway | Construction | Roadway | $5,000,000.00 | $(2,800,000.00) | -56% | | | | | | 0168-09-197 | Amarillo | 12/01/26 | $847,000.00 | Construction | Non Roadway | Unassigned | Unassigned | $547,000.00 | $300,000.00 | 55% | | | Unassigned / Unassigned → Construction / Non Roadway | | | 0015-13-441 | Austin | 07/01/26 | $85,000,000.00 | Construction | Roadway | Construction | Roadway | $189,100,000.00 | $(104,100,000.00) | -55% | | | | | | 0706-02-023 | Tyler | 04/07/26 | $3,491,717.55 | Construction | Roadway | Construction | Roadway | $2,250,000.00 | $1,241,717.55 | 55% | | | | | | 0363-01-153 | Fort Worth | 06/17/26 | $647,757.55 | Construction | Local Let | Unassigned | Unassigned | $420,708.00 | $227,049.55 | 54% | | | Unassigned / Unassigned → Construction / Local Let | | | 0917-16-042 | Bryan | 08/05/26 | $534,337.38 | Construction | Bridge | Construction | Bridge | $350,000.00 | $184,337.38 | 53% | | | | | | 2116-01-024 | Lufkin | 05/06/26 | $5,281,722.85 | Construction | Roadway | Construction | Roadway | $3,442,697.90 | $1,839,024.95 | 53% | | | | | | 2100-01-074 | Austin | 08/04/27 | $46,340.00 | Construction | Bridge | Construction | Bridge | $97,456.73 | $(51,116.73) | -52% | | | | | | 3538-01-067 | Houston | 01/05/28 | $1,000,000.00 | Construction | Non Roadway | Unassigned | Unassigned | $2,061,504.00 | $(1,061,504.00) | -51% | | | Unassigned / Unassigned → Construction / Non Roadway | | | 2835-01-008 | San Antonio | 10/05/27 | $75,176.00 | Construction | Roadway | Construction | Roadway | $49,925.00 | $25,251.00 | 51% | | | | | | 0366-03-075 | San Antonio | 10/06/26 | $510,359.00 | Construction | Roadway | Construction | Roadway | $1,026,585.00 | $(516,226.00) | -50% | -364 | -12 months | | | | 0090-02-056 | Amarillo | 04/07/26 | $263,261.00 | Construction | Bridge | Construction | Bridge | $525,000.00 | $(261,739.00) | -50% | | | | | | 0500-03-599 | Houston | 09/01/29 | $600,000,000.00 | | | Construction | Roadway | $1,165,067,716.00 | $(565,067,716.00) | -49% | 360 | 12 months | | | | 0008-06-052 | Fort Worth | 06/01/27 | $21,629,185.61 | Construction | Roadway | Construction | Roadway | $42,500,000.40 | $(20,870,814.79) | -49% | | | | | | 0215-07-056 | San Antonio | 01/05/28 | $742,662.00 | Construction | Roadway | Construction | Roadway | $502,627.00 | $240,035.00 | 48% | 92 | 3 months | | | | 0143-12-006 | San Antonio | 10/06/26 | $109,675.00 | Construction | Roadway | Construction | Roadway | $74,850.00 | $34,825.00 | 47% | -364 | -12 months | | | | 3089-01-013 | Dallas | 07/01/26 | $419,957.48 | Construction | Roadway | Construction | Roadway | $797,564.99 | $(377,607.51) | -47% | | | | | | 0214-03-032 | Beaumont | 11/02/27 | $19,000,000.00 | Construction | Bridge | Construction | Bridge | $13,000,000.00 | $6,000,000.00 | 46% | | | | | | 0095-04-079 | Dallas | 08/05/26 | $1,338,522.57 | Construction | Bridge | Unassigned | Unassigned | $2,463,673.44 | $(1,125,150.87) | -46% | | | Unassigned / Unassigned → Construction / Bridge | | | 0446-01-056 | Yoakum | 09/02/26 | $1,600,000.00 | Construction | Roadway | Construction | Roadway | $1,100,000.00 | $500,000.00 | 45% | | | | | | 0091-06-061 | Dallas | 07/01/26 | $2,734,376.72 | Construction | Roadway | Construction | Roadway | $5,005,185.35 | $(2,270,808.63) | -45% | | | | | | 1586-01-093 | Pharr | 05/06/26 | $177,268.35 | Construction | Roadway | Construction | Roadway | $324,811.00 | $(147,542.65) | -45% | -119 | -4 months | | | | 1290-03-033 | Dallas | 04/07/26 | $690,184.30 | Construction | Roadway | Unassigned | Unassigned | $1,266,000.00 | $(575,815.70) | -45% | | | Unassigned / Unassigned → Construction / Roadway | | | 0495-03-070 | Tyler | 01/06/27 | $11,057,692.31 | Construction | Roadway | Construction | Roadway | $19,656,000.00 | $(8,598,307.69) | -44% | | | | | | 0917-16-044 | Bryan | 08/05/26 | $574,104.91 | Construction | Bridge | Construction | Bridge | $400,000.00 | $174,104.91 | 44% | | | | | | 1685-05-140 | Houston | 08/05/26 | $2,437,069.00 | Construction | Roadway | Construction | Roadway | $4,306,162.00 | $(1,869,093.00) | -43% | | | | | | 0521-05-169 | San Antonio | 01/05/28 | $173,444.00 | Construction | Roadway | Construction | Roadway | $122,400.00 | $51,044.00 | 42% | 92 | 3 months | | | | 0142-02-030 | San Antonio | 10/06/26 | $498,436.00 | Construction | Roadway | Construction | Roadway | $859,373.00 | $(360,937.00) | -42% | -364 | -12 months | | | | 0114-01-071 | Austin | 07/01/26 | $4,200,000.00 | Construction | Non Roadway | Unassigned | Unassigned | $7,200,000.00 | $(3,000,000.00) | -42% | | | Unassigned / Unassigned → Construction / Non Roadway | | | 2752-01-008 | Laredo | 04/07/26 | $907,598.60 | Construction | Bridge | Construction | Roadway | $639,624.41 | $267,974.19 | 42% | | | Construction / Roadway → Construction / Bridge | | | 1434-01-016 | San Antonio | 10/05/27 | $363,650.00 | Construction | Roadway | Construction | Roadway | $616,433.00 | $(252,783.00) | -41% | 364 | 12 months | | | | 2020-02-037 | San Antonio | 10/05/27 | $571,811.00 | Construction | Roadway | Construction | Roadway | $965,982.00 | $(394,171.00) | -41% | | | | | | 0914-04-356 | Austin | 06/02/26 | $520,779.00 | Construction | Roadway | Construction | Roadway | $876,903.18 | $(356,124.18) | -41% | | | | | | 0073-08-183 | San Antonio | 05/06/26 | $34,945,459.80 | Construction | Roadway | Construction | Roadway | $24,699,593.00 | $10,245,866.80 | 41% | | | | | | 0151-02-026 | Austin | 05/06/26 | $10,279,819.07 | Construction | Roadway | Construction | Roadway | $17,555,042.02 | $(7,275,222.95) | -41% | | | | | | 0276-01-046 | Laredo | 04/07/26 | $10,653,201.30 | Construction | Roadway | Construction | Roadway | $7,573,676.00 | $3,079,525.30 | 41% | | | | | | 1014-03-065 | Dallas | 04/07/26 | $1,202,059.26 | Construction | Roadway | Unassigned | Unassigned | $852,000.00 | $350,059.26 | 41% | | | Unassigned / Unassigned → Construction / Roadway | | | 1388-01-010 | Tyler | 04/07/26 | $5,762,645.24 | Construction | Roadway | Construction | Roadway | $4,095,000.00 | $1,667,645.24 | 41% | | | | | | 2560-01-079 | Lufkin | 08/04/27 | $7,615,384.62 | Construction | Roadway | Unassigned | Unassigned | $12,700,000.00 | $(5,084,615.38) | -40% | -3862 | -11 years | Unassigned / Unassigned → Construction / Roadway | | | 0034-01-144 | Abilene | 07/01/27 | $7,000,000.00 | Construction | Roadway | Unassigned | Unassigned | $5,000,000.00 | $2,000,000.00 | 40% | -62 | -2 months | Unassigned / Unassigned → Construction / Roadway | | | 0006-05-134 | Abilene | 05/06/26 | $349,520.00 | Construction | Bridge | Construction | Bridge | $578,000.00 | $(228,480.00) | -40% | | | | | | 1429-01-039 | Pharr | 05/06/26 | $241,056.05 | Construction | Roadway | Construction | Roadway | $404,269.00 | $(163,212.95) | -40% | -119 | -4 months | | | | 0508-02-140 | Beaumont | 04/07/26 | $2,709,064.39 | Construction | Roadway | Construction | Roadway | $4,500,000.00 | $(1,790,935.61) | -40% | | | | | | 0193-01-040 | San Antonio | 10/05/27 | $942,770.00 | Construction | Roadway | Construction | Roadway | $677,277.00 | $265,493.00 | 39% | | | | | | 0024-06-070 | San Antonio | 04/06/27 | $35,000,000.00 | Construction | Roadway | Construction | Roadway | $25,100,000.00 | $9,900,000.00 | 39% | 126 | 4 months | | | | 0216-03-034 | San Antonio | 06/02/26 | $2,799,009.42 | Construction | Roadway | Construction | Roadway | $4,600,000.00 | $(1,800,990.58) | -39% | | | | | | 0006-05-133 | Abilene | 05/06/26 | $186,020.00 | Construction | Bridge | Construction | Bridge | $307,000.00 | $(120,980.00) | -39% | | | | | | 0698-03-107 | Pharr | 05/06/26 | $264,761.15 | Construction | Roadway | Construction | Roadway | $423,673.00 | $(158,911.85) | -38% | -119 | -4 months | | | | 1064-01-048 | Pharr | 05/06/26 | $200,135.05 | Construction | Roadway | Construction | Roadway | $324,811.00 | $(124,675.95) | -38% | -119 | -4 months | | | | 0328-01-016 | San Antonio | 10/06/26 | $387,945.00 | Construction | Roadway | Construction | Roadway | $613,131.00 | $(225,186.00) | -37% | -364 | -12 months | | | | 0549-01-042 | Paris | 11/01/28 | $95,821.44 | Construction | Roadway | Unassigned | Unassigned | $150,458.88 | $(54,637.44) | -36% | -34 | -1 month | Unassigned / Unassigned → Construction / Roadway | | | 0003-01-066 | El Paso | 05/06/26 | $175,344.38 | Construction | Roadway | Construction | Roadway | $272,105.97 | $(96,761.59) | -36% | | | | | | 0309-01-049 | Amarillo | 04/07/26 | $926,403.90 | Construction | Bridge | Construction | Bridge | $681,600.00 | $244,803.90 | 36% | | | | | | 0421-05-035 | San Antonio | 10/05/27 | $290,724.00 | Construction | Roadway | Construction | Roadway | $444,840.00 | $(154,116.00) | -35% | 364 | 12 months | | | | 0019-01-146 | Fort Worth | 06/02/26 | $19,442,730.37 | Construction | Roadway | Construction | Roadway | $29,842,782.00 | $(10,400,051.63) | -35% | 90 | 3 months | | | | 0006-05-135 | Abilene | 05/06/26 | $350,180.00 | Construction | Bridge | Construction | Bridge | $542,000.00 | $(191,820.00) | -35% | | | | | | 0601-01-067 | Beaumont | 05/06/26 | $1,647,471.00 | Construction | Roadway | Construction | Roadway | $2,550,000.00 | $(902,529.00) | -35% | | | | | | 1091-04-033 | Dallas | 04/07/26 | $277,376.80 | Construction | Roadway | Unassigned | Unassigned | $426,000.00 | $(148,623.20) | -35% | | | Unassigned / Unassigned → Construction / Roadway | | | 0218-05-037 | Atlanta | 04/07/26 | $1,415,316.83 | Construction | Roadway | Construction | Roadway | $2,132,187.25 | $(716,870.42) | -34% | | | | | | 0156-04-114 | Wichita Falls | 01/05/28 | $28,091,831.67 | Construction | Roadway | Construction | Roadway | $41,732,800.00 | $(13,640,968.33) | -33% | | | | | | 0114-09-104 | Bryan | 04/06/27 | $2,000,000.00 | Construction | Roadway | Unassigned | Unassigned | $3,000,000.00 | $(1,000,000.00) | -33% | | | Unassigned / Unassigned → Construction / Roadway | | | 0081-03-047 | Dallas | 05/06/26 | $116,223,406.70 | Construction | Roadway | Unassigned | Unassigned | $172,970,558.00 | $(56,747,151.30) | -33% | | | Unassigned / Unassigned → Construction / Roadway | | | 0143-02-031 | San Antonio | 01/06/27 | $1,064,259.00 | Construction | Roadway | Construction | Roadway | $808,263.00 | $255,996.00 | 32% | 92 | 3 months | | | | 2635-05-005 | Amarillo | 11/03/26 | $47,259,223.32 | Construction | Roadway | Unassigned | Unassigned | $69,477,353.12 | $(22,218,129.80) | -32% | | | Unassigned / Unassigned → Construction / Roadway | | | 0095-03-103 | Dallas | 10/06/26 | $9,784,408.00 | Construction | Bridge | Construction | Bridge | $14,294,730.66 | $(4,510,322.66) | -32% | | | | | | 0114-02-120 | Austin | 08/05/26 | $3,577,315.00 | Construction | Roadway | Construction | Roadway | $2,714,671.00 | $862,644.00 | 32% | | | | | | 0095-03-098 | Dallas | 10/06/26 | $4,724,338.30 | Construction | Bridge | Construction | Bridge | $6,884,505.24 | $(2,160,166.94) | -31% | | | | | | 3538-01-061 | Houston | 05/06/26 | $2,218,948.70 | Construction | Roadway | Construction | Roadway | $1,692,410.00 | $526,538.70 | 31% | | | | | | 1730-01-046 | San Antonio | 10/04/28 | $479,735.00 | Construction | Roadway | Construction | Roadway | $689,275.00 | $(209,540.00) | -30% | 365 | 1 year | | | | 0095-03-100 | Dallas | 10/06/26 | $7,924,367.30 | Construction | Bridge | Construction | Bridge | $11,392,450.94 | $(3,468,083.64) | -30% | | | | | | 1421-01-028 | Beaumont | 04/07/26 | $3,075,865.50 | Construction | Roadway | Construction | Roadway | $4,400,000.00 | $(1,324,134.50) | -30% | | | | | | 0095-03-099 | Dallas | 10/06/26 | $7,142,577.25 | Construction | Bridge | Construction | Bridge | $10,049,183.11 | $(2,906,605.86) | -29% | | | | | | 0038-07-085 | Pharr | 05/06/26 | $231,845.30 | Construction | Roadway | Construction | Roadway | $324,811.00 | $(92,965.70) | -29% | -119 | -4 months | | | | 0177-14-038 | Houston | 05/06/26 | $4,957,990.50 | Construction | Roadway | Construction | Roadway | $6,986,976.00 | $(2,028,985.50) | -29% | | | | | | 1051-03-001 | Dallas | 09/06/28 | $54,002,986.08 | Construction | Roadway | Unassigned | Unassigned | $74,481,854.00 | $(20,478,867.92) | -28% | | | Unassigned / Unassigned → Construction / Roadway | | | 0249-07-071 | Fort Worth | 06/01/28 | $71,927,225.18 | Construction | Bridge | Construction | Bridge | $100,000,000.00 | $(28,072,774.82) | -28% | | | | | | 2104-02-042 | San Antonio | 01/05/28 | $152,551.00 | Construction | Roadway | Construction | Roadway | $212,411.00 | $(59,860.00) | -28% | 92 | 3 months | | | | 0009-11-248 | Dallas | 02/02/27 | $57,043,890.08 | Construction | Roadway | Unassigned | Unassigned | $79,147,850.00 | $(22,103,959.92) | -28% | | | Unassigned / Unassigned → Construction / Roadway | | | 0220-01-039 | Pharr | 05/06/26 | $293,029.05 | Construction | Roadway | Construction | Roadway | $404,269.00 | $(111,239.95) | -28% | -119 | -4 months | | | | 0905-06-096 | Lubbock | 04/07/26 | $14,463,074.29 | Construction | Roadway | Construction | Roadway | $20,000,000.00 | $(5,536,925.71) | -28% | | | | | | 0091-01-061 | Paris | 11/02/27 | $1,197,738.67 | Construction | Roadway | Construction | Roadway | $1,629,957.12 | $(432,218.45) | -27% | | | | | | 0095-03-108 | Dallas | 10/06/26 | $7,397,762.80 | Construction | Bridge | Construction | Bridge | $10,094,022.52 | $(2,696,259.72) | -27% | | | | | | 0095-03-109 | Dallas | 10/06/26 | $13,641,956.75 | Construction | Bridge | Construction | Bridge | $18,780,750.97 | $(5,138,794.22) | -27% | | | | | | 0143-14-009 | San Antonio | 10/06/26 | $30,910.00 | Construction | Roadway | Construction | Roadway | $42,190.00 | $(11,280.00) | -27% | -364 | -12 months | | | | 2502-01-024 | Waco | 10/06/26 | $23,600,000.00 | Construction | Roadway | Construction | Roadway | $32,480,000.00 | $(8,880,000.00) | -27% | | | | | | 2964-05-034 | Dallas | 06/02/26 | $949,650.98 | Construction | Roadway | Construction | Roadway | $747,600.00 | $202,050.98 | 27% | | | | | | 0683-04-025 | Austin | 04/07/26 | $459,780.45 | Construction | Roadway | Construction | Roadway | $632,842.80 | $(173,062.35) | -27% | | | | | | 0092-03-053 | Dallas | 09/06/28 | $62,131,255.85 | Construction | Roadway | Unassigned | Unassigned | $83,760,305.57 | $(21,629,049.72) | -26% | | | Unassigned / Unassigned → Construction / Roadway | | | 0718-01-077 | Dallas | 12/01/27 | $652,586.55 | Construction | Roadway | Construction | Roadway | $882,020.00 | $(229,433.45) | -26% | | | | | | 0047-04-032 | Dallas | 11/03/26 | $46,922,696.42 | Construction | Roadway | Unassigned | Unassigned | $63,694,143.00 | $(16,771,446.58) | -26% | | | Unassigned / Unassigned → Construction / Roadway | | | 0492-04-034 | Tyler | 07/01/26 | $45,157,109.53 | Construction | Roadway | Construction | Roadway | $61,360,000.00 | $(16,202,890.47) | -26% | | | | | | 0151-03-043 | Austin | 05/06/26 | $890,964.62 | Construction | Roadway | Construction | Roadway | $1,201,830.24 | $(310,865.62) | -26% | | | | | | 0165-02-061 | Tyler | 07/01/26 | $66,001,500.00 | Construction | Roadway | Construction | Roadway | $88,500,000.00 | $(22,498,500.00) | -25% | | | | | | 0683-05-015 | Austin | 04/07/26 | $440,350.80 | Construction | Roadway | Construction | Roadway | $587,777.40 | $(147,426.60) | -25% | | | | | | 0073-03-071 | San Antonio | 06/02/26 | $1,140,659.29 | Construction | Roadway | Construction | Roadway | $1,491,158.00 | $(350,498.71) | -24% | | | | | | 0863-01-081 | Pharr | 05/06/26 | $245,353.80 | Construction | Roadway | Construction | Roadway | $324,811.00 | $(79,457.20) | -24% | -119 | -4 months | | | | 1394-02-031 | Dallas | 05/06/26 | $1,048,966.35 | Construction | Roadway | Unassigned | Unassigned | $848,400.00 | $200,566.35 | 24% | | | Unassigned / Unassigned → Construction / Roadway | | | 0683-05-017 | Austin | 04/07/26 | $7,697,810.85 | Construction | Roadway | Construction | Roadway | $10,071,079.76 | $(2,373,268.91) | -24% | | | | | | 2005-03-010 | Odessa | 04/07/26 | $620,623.00 | Construction | Roadway | Construction | Roadway | $500,618.00 | $120,005.00 | 24% | | | | | | 0917-29-152 | Bryan | 01/06/27 | $1,324,348.00 | Construction | Roadway | Unassigned | Unassigned | $1,716,395.50 | $(392,047.50) | -23% | 126 | 4 months | Unassigned / Unassigned → Construction / Roadway | | | 0526-01-023 | San Antonio | 10/06/26 | $90,851.00 | Construction | Roadway | Construction | Roadway | $117,480.00 | $(26,629.00) | -23% | -364 | -12 months | | | | 1655-01-036 | Abilene | 07/01/26 | $4,804,601.45 | Construction | Roadway | Construction | Roadway | $6,269,814.00 | $(1,465,212.55) | -23% | | | | | | 0007-02-068 | Abilene | 05/06/26 | $385,665.00 | Construction | Bridge | Construction | Bridge | $504,000.00 | $(118,335.00) | -23% | | | | | | 0156-04-127 | Wichita Falls | 05/06/26 | $3,996,578.52 | Construction | Roadway | Construction | Roadway | $5,199,999.00 | $(1,203,420.48) | -23% | | | | | | 0008-05-029 | Fort Worth | 06/01/27 | $102,309,774.80 | Construction | Roadway | Construction | Roadway | $131,069,840.00 | $(28,760,065.20) | -22% | | | | | | 2270-01-029 | Abilene | 07/01/26 | $570,188.00 | Construction | Roadway | Construction | Roadway | $730,750.00 | $(160,562.00) | -22% | | | | | | 0195-02-091 | Dallas | 11/02/27 | $130,262,376.60 | Construction | Roadway | Construction | Roadway | $165,000,000.00 | $(34,737,623.40) | -21% | | | | | | 0301-03-028 | San Antonio | 10/05/27 | $520,281.00 | Construction | Roadway | Construction | Roadway | $429,761.00 | $90,520.00 | 21% | 364 | 12 months | | | | 0108-11-022 | Paris | 06/01/28 | $15,679,422.00 | Construction | Roadway | Construction | Roadway | $19,510,400.00 | $(3,830,978.00) | -20% | | | | | | 0521-05-168 | San Antonio | 01/05/28 | $325,096.00 | Construction | Roadway | Construction | Roadway | $408,000.00 | $(82,904.00) | -20% | 92 | 3 months | | | | 0195-02-092 | Dallas | 11/03/26 | $157,580,992.90 | Construction | Roadway | Construction | Roadway | $196,881,863.00 | $(39,300,870.10) | -20% | | | | | | 0095-03-101 | Dallas | 10/06/26 | $11,827,282.00 | Construction | Bridge | Construction | Bridge | $9,882,855.21 | $1,944,426.79 | 20% | | | | | | 0492-04-041 | Tyler | 07/01/26 | $30,037,794.85 | Construction | Roadway | Construction | Roadway | $37,752,000.00 | $(7,714,205.15) | -20% | | | | | | 0366-02-089 | San Antonio | 06/02/26 | $47,921,160.02 | Construction | Roadway | Construction | Roadway | $59,830,714.00 | $(11,909,553.98) | -20% | | | | | | 2452-01-066 | San Antonio | 04/07/26 | $59,934,274.21 | Construction | Roadway | Construction | Roadway | $74,749,299.00 | $(14,815,024.79) | -20% | | | | | | 3133-01-022 | Amarillo | 04/07/26 | $618,044.00 | Construction | Bridge | Construction | Bridge | $775,000.00 | $(156,956.00) | -20% | | | | | | 1502-01-032 | Lubbock | 09/06/28 | $141,321,045.00 | Construction | Roadway | Construction | Roadway | $173,979,465.80 | $(32,658,420.80) | -19% | | | | | | 0289-04-037 | Brownwood | 01/05/28 | $3,568,950.00 | Construction | Roadway | Unassigned | Unassigned | $3,000,000.00 | $568,950.00 | 19% | 364 | 12 months | Unassigned / Unassigned → Construction / Roadway | | | 3632-01-002 | Pharr | 09/02/26 | $66,374,838.63 | Construction | Roadway | Construction | Roadway | $82,258,131.00 | $(15,883,292.37) | -19% | | | | | | 0314-04-041 | Fort Worth | 07/01/26 | $26,222.89 | Construction | Bridge | Construction | Bridge | $22,120.68 | $4,102.21 | 19% | | | | | | 0309-01-048 | Amarillo | 04/07/26 | $1,285,866.90 | Construction | Bridge | Construction | Bridge | $1,590,000.00 | $(304,133.10) | -19% | | | | | | 0065-06-067 | Beaumont | 02/02/28 | $48,335,222.00 | Construction | Roadway | Construction | Roadway | $58,600,000.00 | $(10,264,778.00) | -18% | | | | | | 0387-01-016 | Dallas | 11/02/27 | $6,039,010.45 | Construction | Roadway | Construction | Roadway | $7,340,124.07 | $(1,301,113.62) | -18% | | | | | | 0025-03-108 | San Antonio | 10/06/26 | $150,609.00 | Construction | Roadway | Construction | Roadway | $127,920.00 | $22,689.00 | 18% | | | | | | 0143-11-006 | San Antonio | 10/06/26 | $69,700.00 | Construction | Roadway | Construction | Roadway | $85,122.00 | $(15,422.00) | -18% | -364 | -12 months | | | | 0143-15-034 | San Antonio | 10/06/26 | $86,564.00 | Construction | Roadway | Construction | Roadway | $105,717.00 | $(19,153.00) | -18% | -364 | -12 months | | | | 0014-15-035 | Fort Worth | 08/05/26 | $1,515,651.69 | Construction | Roadway | Construction | Roadway | $1,838,179.00 | $(322,527.31) | -18% | | | | | | 0165-03-036 | Tyler | 07/01/26 | $53,872,550.00 | Construction | Roadway | Construction | Roadway | $65,300,000.00 | $(11,427,450.00) | -18% | | | | | | 0006-06-109 | Abilene | 06/02/26 | $123,039,621.00 | Construction | Roadway | Construction | Roadway | $150,000,000.00 | $(26,960,379.00) | -18% | | | | | | 1186-02-028 | Austin | 05/06/26 | $3,339,793.85 | Construction | Roadway | Construction | Roadway | $4,064,877.41 | $(725,083.56) | -18% | | | | | | 2094-01-063 | Pharr | 05/06/26 | $33,798,958.95 | Construction | Roadway | Construction | Roadway | $41,335,821.00 | $(7,536,862.05) | -18% | | | | | | 0299-14-010 | Laredo | 04/07/26 | $97,708,652.77 | Construction | Roadway | Construction | Roadway | $119,587,049.00 | $(21,878,396.23) | -18% | | | | | | 0683-05-016 | Austin | 04/07/26 | $1,721,002.10 | Construction | Roadway | Construction | Roadway | $2,103,080.55 | $(382,078.45) | -18% | | | | | | 1239-01-034 | Brownwood | 01/05/28 | $125,000.00 | Construction | Bridge | Unassigned | Unassigned | $150,000.00 | $(25,000.00) | -17% | | | Unassigned / Unassigned → Construction / Bridge | | | 0008-09-037 | Fort Worth | 09/01/27 | $17,300,891.50 | Construction | Roadway | Construction | Roadway | $14,739,999.84 | $2,560,891.66 | 17% | | | | | | 0914-04-364 | Austin | 06/02/26 | $591,082.70 | Construction | Non Roadway | Construction | Non Roadway | $713,756.00 | $(122,673.30) | -17% | | | | | | 0216-01-063 | San Antonio | 04/07/26 | $444,153.75 | Construction | Roadway | Construction | Roadway | $535,713.00 | $(91,559.25) | -17% | | | | | | 0338-02-032 | Houston | 09/06/28 | $92,559,593.00 | Construction | Roadway | Construction | Roadway | $109,802,683.00 | $(17,243,090.00) | -16% | | | | | | 1012-03-027 | Dallas | 03/03/27 | $9,106,958.96 | Construction | Roadway | Construction | Roadway | $7,834,052.56 | $1,272,906.40 | 16% | | | | | | 0220-01-040 | Pharr | 05/06/26 | $261,235.01 | Construction | Roadway | Construction | Roadway | $225,398.00 | $35,837.01 | 16% | -119 | -4 months | | | | 0747-08-002 | Fort Worth | 05/06/26 | $7,024,465.15 | Construction | Roadway | Construction | Roadway | $8,400,000.00 | $(1,375,534.85) | -16% | | | | | | 0047-09-034 | Dallas | 08/02/28 | $15,277,063.68 | Construction | Roadway | Construction | Roadway | $17,930,683.45 | $(2,653,619.77) | -15% | | | | | | 0014-15-033 | Fort Worth | 08/05/26 | $9,188,337.11 | Construction | Roadway | Construction | Roadway | $10,800,000.00 | $(1,611,662.89) | -15% | | | | | | 0220-04-049 | Pharr | 08/05/26 | $23,319,932.34 | Construction | Roadway | Construction | Roadway | $27,388,925.00 | $(4,068,992.66) | -15% | | | | | | 0018-06-185 | Laredo | 06/02/26 | $79,245,892.42 | Construction | Roadway | Construction | Roadway | $93,505,334.00 | $(14,259,441.58) | -15% | | | | | | 2157-01-022 | Atlanta | 04/07/26 | $1,130,952.25 | Construction | Roadway | Construction | Roadway | $982,170.20 | $148,782.05 | 15% | | | | | | 0271-05-025 | Houston | 10/04/28 | $258,400,000.00 | Construction | Roadway | Construction | Roadway | $299,509,331.00 | $(41,109,331.00) | -14% | | | | | | 0271-06-117 | Houston | 10/04/28 | $21,987,988.48 | Construction | Roadway | Construction | Roadway | $25,421,662.20 | $(3,433,673.72) | -14% | | | | | | 0200-04-020 | Beaumont | 09/06/28 | $18,000,000.00 | Construction | Roadway | Construction | Roadway | $20,906,667.70 | $(2,906,667.70) | -14% | | | | | | 0842-03-042 | Yoakum | 09/06/28 | $17,418,439.00 | Construction | Roadway | Construction | Roadway | $20,337,444.00 | $(2,919,005.00) | -14% | | | | | | 0005-06-129 | Abilene | 06/01/27 | $4,000,000.00 | Construction | Roadway | Construction | Roadway | $3,500,000.00 | $500,000.00 | 14% | -154 | -5 months | | | | 0912-56-059 | Houston | 10/06/26 | $1,227,767.00 | Construction | Bridge | Construction | Bridge | $1,428,864.00 | $(201,097.00) | -14% | | | | | | 0229-01-042 | Odessa | 05/06/26 | $48,984,668.33 | Construction | Roadway | Construction | Roadway | $43,100,000.00 | $5,884,668.33 | 14% | | | | | | 0909-22-218 | Waco | 05/06/26 | $305,269.00 | Construction | Bridge | Construction | Bridge | $268,000.00 | $37,269.00 | 14% | | | | | | 2230-01-020 | San Antonio | 04/07/26 | $30,754,969.97 | Construction | Roadway | Construction | Roadway | $35,818,217.00 | $(5,063,247.03) | -14% | | | | | | 0675-06-103 | Bryan | 12/01/27 | $302,019,326.00 | Construction | Roadway | Construction | Roadway | $345,751,721.00 | $(43,732,395.00) | -13% | | | | | | 0018-05-089 | Laredo | 06/01/27 | $255,607,277.70 | Construction | Roadway | Construction | Roadway | $295,277,876.00 | $(39,670,598.30) | -13% | 454 | 1 year | | | | 0085-02-053 | Atlanta | 01/06/27 | $7,660,750.00 | Construction | Roadway | Construction | Roadway | $8,810,750.00 | $(1,150,000.00) | -13% | | | | | | 0143-01-066 | San Antonio | 01/06/27 | $763,955.00 | Construction | Roadway | Construction | Roadway | $881,052.00 | $(117,097.00) | -13% | 92 | 3 months | | | | 2452-05-005 | San Antonio | 10/06/26 | $55,940.00 | Construction | Roadway | Construction | Roadway | $64,299.00 | $(8,359.00) | -13% | -364 | -12 months | | | | 0212-04-041 | Bryan | 09/02/26 | $12,490,493.00 | Construction | Bridge | Construction | Bridge | $14,396,824.00 | $(1,906,331.00) | -13% | | | | | | 2158-01-020 | Tyler | 08/05/26 | $31,500,000.00 | Construction | Roadway | Construction | Roadway | $36,400,000.00 | $(4,900,000.00) | -13% | | | | | | 0172-11-017 | Dallas | 05/06/26 | $1,104,055.45 | Construction | Roadway | Unassigned | Unassigned | $1,272,000.00 | $(167,944.55) | -13% | | | Unassigned / Unassigned → Construction / Roadway | | | 0747-05-042 | Fort Worth | 05/06/26 | $10,743,744.95 | Construction | Roadway | Construction | Roadway | $9,500,000.00 | $1,243,744.95 | 13% | | | | | | 1330-02-052 | Fort Worth | 04/07/26 | $8,810,551.86 | Construction | Roadway | Unassigned | Unassigned | $7,785,159.27 | $1,025,392.59 | 13% | | | Unassigned / Unassigned → Construction / Roadway | | | 2523-02-074 | Houston | 11/01/28 | $72,541,920.00 | Construction | Bridge | Construction | Bridge | $82,434,000.00 | $(9,892,080.00) | -12% | | | | | | 0095-02-096 | Dallas | 09/06/28 | $347,679,308.50 | Construction | Roadway | Unassigned | Unassigned | $395,000,825.50 | $(47,321,517.00) | -12% | | | Unassigned / Unassigned → Construction / Roadway | | | 0495-09-065 | Atlanta | 09/06/28 | $125,439,075.30 | Construction | Roadway | Construction | Roadway | $142,544,403.70 | $(17,105,328.40) | -12% | | | | | | 1006-01-079 | Houston | 09/06/28 | $42,835,489.94 | Construction | Roadway | Construction | Roadway | $48,676,693.00 | $(5,841,203.06) | -12% | | | | | | 1051-01-064 | Dallas | 09/06/28 | $101,546,735.70 | Construction | Roadway | Unassigned | Unassigned | $115,412,344.00 | $(13,865,608.30) | -12% | | | Unassigned / Unassigned → Construction / Roadway | | | 1159-01-030 | Dallas | 07/06/28 | $4,874,070.50 | Construction | Bridge | Construction | Bridge | $5,551,003.32 | $(676,932.82) | -12% | | | | | | 2452-03-128 | San Antonio | 12/01/26 | $190,314,322.00 | Construction | Roadway | Unassigned | Unassigned | $215,816,440.00 | $(25,502,118.00) | -12% | | | Unassigned / Unassigned → Construction / Roadway | | | 0027-08-147 | Houston | 08/05/26 | $60,321,355.00 | Construction | Roadway | Construction | Roadway | $68,275,405.00 | $(7,954,050.00) | -12% | | | | | | 0314-04-037 | Fort Worth | 07/01/26 | $437,865.47 | Construction | Bridge | Construction | Bridge | $391,798.68 | $46,066.79 | 12% | | | | | | 0166-07-073 | Bryan | 06/02/26 | $404,475.00 | Construction | Bridge | Unassigned | Unassigned | $360,772.88 | $43,702.12 | 12% | | | Unassigned / Unassigned → Construction / Bridge | | | 0255-06-073 | Pharr | 05/06/26 | $73,905,739.17 | Construction | Roadway | Construction | Roadway | $84,390,866.00 | $(10,485,126.83) | -12% | | | | | | 0921-06-373 | Pharr | 05/06/26 | $628,778.15 | Construction | Roadway | Construction | Roadway | $559,313.35 | $69,464.80 | 12% | | | | | | 0197-03-082 | Dallas | 04/07/26 | $2,282,217.58 | Construction | Roadway | Construction | Roadway | $2,595,355.76 | $(313,138.18) | -12% | | | | | | 1245-02-053 | Amarillo | 04/07/26 | $6,093,863.96 | Construction | Roadway | Construction | Roadway | $6,900,000.00 | $(806,136.04) | -12% | | | | | | 1685-05-105 | Houston | 01/01/31 | $7,770,938.39 | | | | | $8,703,450.00 | $(932,511.61) | -11% | 730 | 2 years | | | | 1835-01-026 | Waco | 01/01/31 | $15,000,000.00 | | | | | $16,799,999.00 | $(1,799,999.00) | -11% | 730 | 2 years | | | | 1794-01-023 | Lufkin | 10/01/29 | $6,834,659.82 | | | Construction | Roadway | $7,654,819.00 | $(820,159.18) | -11% | 452 | 1 year | | | | 2116-01-020 | Lufkin | 05/01/29 | $5,942,228.57 | Construction | Roadway | Construction | Roadway | $6,655,296.00 | $(713,067.43) | -11% | 363 | 12 months | | | | 0005-04-074 | Odessa | 01/01/29 | $50,435,715.00 | Construction | Bridge | Unassigned | Unassigned | $56,488,000.00 | $(6,052,285.00) | -11% | | | Unassigned / Unassigned → Construction / Bridge | | | 0005-13-063 | Odessa | 01/01/29 | $240,150,931.00 | Construction | Roadway | Unassigned | Unassigned | $268,969,042.70 | $(28,818,111.70) | -11% | | | Unassigned / Unassigned → Construction / Roadway | | | 0015-13-423 | Austin | 01/01/29 | $1,502,285,713.00 | Construction | Roadway | Construction | Roadway | $1,682,559,998.00 | $(180,274,285.00) | -11% | | | | | | 0054-07-086 | Brownwood | 01/01/29 | $25,000,000.00 | Construction | Roadway | Unassigned | Unassigned | $28,000,000.00 | $(3,000,000.00) | -11% | | | Unassigned / Unassigned → Construction / Roadway | | | 0231-02-070 | Waco | 01/01/29 | $9,047,322.32 | Construction | Roadway | Unassigned | Unassigned | $10,133,000.00 | $(1,085,677.68) | -11% | | | Unassigned / Unassigned → Construction / Roadway | | | 0508-02-139 | Beaumont | 01/01/29 | $8,354,659.82 | Construction | Roadway | Unassigned | Unassigned | $9,357,218.00 | $(1,002,558.18) | -11% | | | Unassigned / Unassigned → Construction / Roadway | | | 0195-02-090 | Dallas | 11/01/28 | $159,894,765.10 | Construction | Roadway | Unassigned | Unassigned | $179,082,136.90 | $(19,187,371.80) | -11% | | | Unassigned / Unassigned → Construction / Roadway | | | 3553-01-008 | Wichita Falls | 11/01/28 | $170,258.29 | Construction | Roadway | Unassigned | Unassigned | $191,928.00 | $(21,669.71) | -11% | | | Unassigned / Unassigned → Construction / Roadway | | | 0086-14-077 | Laredo | 10/04/28 | $33,330,081.25 | Construction | Roadway | Construction | Roadway | $37,329,691.00 | $(3,999,609.75) | -11% | | | | | | 0086-14-086 | Laredo | 10/04/28 | $71,102,563.39 | Construction | Roadway | Construction | Roadway | $79,634,871.00 | $(8,532,307.61) | -11% | | | | | | 0081-13-071 | Dallas | 09/06/28 | $232,779,659.10 | Construction | Roadway | Unassigned | Unassigned | $260,713,231.60 | $(27,933,572.50) | -11% | | | Unassigned / Unassigned → Construction / Roadway | | | 0200-05-036 | Beaumont | 09/06/28 | $90,000,000.00 | Construction | Roadway | Construction | Roadway | $100,800,000.00 | $(10,800,000.00) | -11% | | | | | | 0451-01-053 | Dallas | 09/06/28 | $117,610,100.90 | Construction | Roadway | Unassigned | Unassigned | $132,731,313.00 | $(15,121,212.10) | -11% | | | Unassigned / Unassigned → Construction / Roadway | | | 1575-05-024 | Atlanta | 09/06/28 | $237,272,901.00 | Construction | Roadway | Construction | Roadway | $265,974,733.00 | $(28,701,832.00) | -11% | | | | | | 3098-01-022 | Pharr | 09/06/28 | $23,644,598.00 | Construction | Roadway | Construction | Roadway | $26,481,950.00 | $(2,837,352.00) | -11% | | | | | | 0114-09-091 | Bryan | 06/14/28 | $84,922,091.00 | Alternative Delivery | Design Build | Alternative Delivery | Design Build | $94,955,858.28 | $(10,033,767.28) | -11% | | | | | | 0907-00-243 | San Angelo | 06/13/28 | $8,509,000.00 | Construction | Local Let | Unassigned | Unassigned | $9,581,000.00 | $(1,072,000.00) | -11% | | | Unassigned / Unassigned → Construction / Local Let | | | 0050-01-094 | Bryan | 04/05/28 | $14,207,310.00 | Construction | Roadway | Construction | Roadway | $16,034,370.56 | $(1,827,060.56) | -11% | | | | | | 3632-01-003 | Pharr | 02/02/28 | $90,352,435.00 | Construction | Roadway | Unassigned | Unassigned | $101,194,726.00 | $(10,842,291.00) | -11% | | | Unassigned / Unassigned → Construction / Roadway | | | 0217-02-037 | Atlanta | 11/01/27 | $18,642,426.36 | Construction | Roadway | Unassigned | Unassigned | $20,879,517.00 | $(2,237,090.64) | -11% | | | Unassigned / Unassigned → Construction / Roadway | | | 0043-02-078 | Childress | 10/05/27 | $18,800,000.00 | Construction | Roadway | Unassigned | Unassigned | $21,056,000.00 | $(2,256,000.00) | -11% | | | Unassigned / Unassigned → Construction / Roadway | | | 0610-06-098 | Atlanta | 09/01/27 | $14,560,000.00 | Construction | Roadway | Unassigned | Unassigned | $16,307,200.00 | $(1,747,200.00) | -11% | | | Unassigned / Unassigned → Construction / Roadway | | | 0024-07-068 | San Antonio | 05/05/27 | $278,604,536.00 | Construction | Roadway | Unassigned | Unassigned | $312,037,081.00 | $(33,432,545.00) | -11% | | | Unassigned / Unassigned → Construction / Roadway | | | 0168-09-186 | Amarillo | 05/05/27 | $16,617,549.00 | Construction | Roadway | Construction | Roadway | $18,572,730.00 | $(1,955,181.00) | -11% | | | | | | 2635-02-034 | Amarillo | 05/05/27 | $26,052,115.48 | Construction | Roadway | Construction | Roadway | $29,113,322.92 | $(3,061,207.44) | -11% | | | | | | 2635-03-023 | Amarillo | 05/05/27 | $24,592,354.00 | Construction | Roadway | Construction | Roadway | $27,518,877.36 | $(2,926,523.36) | -11% | | | | | | 2635-03-028 | Amarillo | 05/05/27 | $145,779,362.00 | Construction | Bridge | Construction | Bridge | $163,127,301.80 | $(17,347,939.80) | -11% | | | | | | 0055-08-120 | Waco | 02/02/27 | $39,892,364.56 | Construction | Roadway | Construction | Roadway | $44,739,109.00 | $(4,846,744.44) | -11% | | | | | | 0195-01-111 | Wichita Falls | 12/01/26 | $320,000,000.00 | Construction | Roadway | Construction | Roadway | $361,219,998.80 | $(41,219,998.80) | -11% | | | | | | 0014-15-036 | Fort Worth | 08/05/26 | $20,865,852.16 | Construction | Roadway | Construction | Roadway | $18,856,479.00 | $2,009,373.16 | 11% | | | | | | 0002-05-052 | El Paso | 05/06/26 | $539,871.38 | Construction | Roadway | Construction | Roadway | $609,787.61 | $(69,916.23) | -11% | | | | | | 0187-05-061 | Houston | 05/06/26 | $4,313,954.25 | Construction | Roadway | Construction | Roadway | $3,885,669.45 | $428,284.80 | 11% | | | | | | 0901-19-212 | Paris | 05/06/26 | $924,207.93 | Construction | Bridge | Construction | Bridge | $835,000.00 | $89,207.93 | 11% | | | | | | 0914-04-340 | Austin | 05/06/26 | $442,945.20 | Construction | Roadway | Construction | Roadway | $500,393.13 | $(57,447.93) | -11% | | | | | | 1228-03-057 | Pharr | 05/06/26 | $249,764.25 | Construction | Roadway | Construction | Roadway | $225,398.00 | $24,366.25 | 11% | -119 | -4 months | | | | 0263-05-027 | Abilene | 06/01/28 | $2,358,156.80 | Construction | Roadway | Unassigned | Unassigned | $2,613,672.48 | $(255,515.68) | -10% | | | Unassigned / Unassigned → Construction / Roadway | | | 0907-00-242 | San Angelo | 04/05/28 | $1,956,000.00 | Construction | Roadway | Unassigned | Unassigned | $1,778,000.00 | $178,000.00 | 10% | -8 | -8 days | Unassigned / Unassigned → Construction / Roadway | | | 0267-01-036 | Yoakum | 05/05/27 | $1,338,000.00 | Construction | Roadway | Unassigned | Unassigned | $1,216,000.00 | $122,000.00 | 10% | | | Unassigned / Unassigned → Construction / Roadway | | | 0918-47-401 | Dallas | 08/05/26 | $2,427,791.55 | Construction | Roadway | Construction | Roadway | $2,203,920.68 | $223,870.87 | 10% | | | | | | 0921-02-525 | Pharr | 08/05/26 | $783,996.83 | Construction | Roadway | Construction | Roadway | $873,656.84 | $(89,660.01) | -10% | | | | | | 0314-04-040 | Fort Worth | 07/01/26 | $43,907.58 | Construction | Bridge | Construction | Bridge | $39,819.12 | $4,088.46 | 10% | | | | | | 2263-02-107 | Corpus Christi | 05/06/26 | $43,826,715.00 | Construction | Ferry Boat | Construction | Ferry Boat | $40,000,000.00 | $3,826,715.00 | 10% | | | | | | 0986-03-015 | Austin | 04/07/26 | $1,713,954.79 | Construction | Roadway | Unassigned | Unassigned | $1,911,737.44 | $(197,782.65) | -10% | | | Unassigned / Unassigned → Construction / Roadway | | | 0016-05-111 | San Antonio | 09/06/28 | $135,556,841.00 | Construction | Roadway | Construction | Roadway | $148,231,406.20 | $(12,674,565.20) | -9% | | | | | | 0016-06-115 | San Antonio | 09/06/28 | $338,438,190.00 | Construction | Roadway | Construction | Roadway | $370,082,161.00 | $(31,643,971.00) | -9% | | | | | | 0180-10-082 | Corpus Christi | 04/05/28 | $70,750,000.00 | Construction | Roadway | Construction | Roadway | $77,490,000.00 | $(6,740,000.00) | -9% | | | | | | 0080-03-049 | Fort Worth | 11/03/26 | $115,461,159.10 | Construction | Roadway | Unassigned | Unassigned | $126,999,999.80 | $(11,538,840.70) | -9% | | | Unassigned / Unassigned → Construction / Roadway | | | 0095-03-102 | Dallas | 10/06/26 | $15,558,783.75 | Construction | Bridge | Construction | Bridge | $17,080,561.45 | $(1,521,777.70) | -9% | | | | | | 0015-13-432 | Austin | 07/01/26 | $254,000,000.00 | Construction | Bridge | Construction | Bridge | $232,000,000.00 | $22,000,000.00 | 9% | | | | | | 0353-03-117 | Fort Worth | 06/18/26 | $516,490.30 | Construction | Local Let | Unassigned | Unassigned | $568,354.60 | $(51,864.30) | -9% | | | Unassigned / Unassigned → Construction / Local Let | | | 0926-05-009 | Lufkin | 10/04/28 | $9,169,916.07 | Construction | Roadway | Unassigned | Unassigned | $8,482,142.86 | $687,773.21 | 8% | | | Unassigned / Unassigned → Construction / Roadway | | | 0976-02-086 | Houston | 08/02/28 | $70,907,942.00 | Construction | Roadway | Construction | Roadway | $77,064,068.00 | $(6,156,126.00) | -8% | | | | | | 0049-09-092 | Bryan | 04/05/28 | $5,658,269.00 | Construction | Roadway | Construction | Roadway | $6,149,406.00 | $(491,137.00) | -8% | | | | | | 0180-06-118 | Corpus Christi | 04/05/28 | $56,907,500.00 | Construction | Roadway | Construction | Roadway | $62,000,100.00 | $(5,092,600.00) | -8% | | | | | | 2452-01-074 | San Antonio | 01/05/28 | $120,561.00 | Construction | Roadway | Construction | Roadway | $111,889.00 | $8,672.00 | 8% | 92 | 3 months | | | | 0027-13-201 | Houston | 10/05/27 | $710,022,858.00 | Construction | Roadway | Construction | Roadway | $771,763,977.80 | $(61,741,119.80) | -8% | | | | | | 3416-01-012 | Houston | 09/01/27 | $74,299,327.00 | Construction | Roadway | Construction | Roadway | $80,760,137.01 | $(6,460,810.01) | -8% | | | | | | 0171-11-003 | Bryan | 08/04/27 | $118,439,867.00 | Construction | Roadway | Construction | Roadway | $128,720,447.40 | $(10,280,580.40) | -8% | | | | | | 0675-05-105 | Bryan | 08/04/27 | $89,176,337.00 | Construction | Roadway | Construction | Roadway | $96,916,842.00 | $(7,740,505.00) | -8% | | | | | | 0068-01-073 | Lubbock | 10/06/26 | $135,847,883.00 | Construction | Roadway | Construction | Roadway | $148,162,938.60 | $(12,315,055.60) | -8% | | | | | | 0912-34-209 | Houston | 10/06/26 | $1,085,413.00 | Construction | Bridge | Construction | Bridge | $1,178,554.00 | $(93,141.00) | -8% | | | | | | 1741-02-039 | San Antonio | 10/06/26 | $294,195.00 | Construction | Roadway | Construction | Roadway | $318,598.00 | $(24,403.00) | -8% | | | | | | 0173-04-063 | Dallas | 09/02/26 | $883,168.07 | Construction | Roadway | Construction | Roadway | $818,248.75 | $64,919.32 | 8% | | | | | | 0212-03-058 | Bryan | 09/02/26 | $13,742,128.00 | Construction | Bridge | Construction | Bridge | $14,934,943.92 | $(1,192,815.92) | -8% | | | | | | 0212-03-059 | Bryan | 09/02/26 | $14,811,612.00 | Construction | Bridge | Construction | Bridge | $16,097,259.36 | $(1,285,647.36) | -8% | | | | | | 0314-04-039 | Fort Worth | 07/01/26 | $25,160.09 | Construction | Bridge | Construction | Bridge | $27,382.20 | $(2,222.11) | -8% | | | | | | 0370-05-057 | Yoakum | 07/01/26 | $540,000.00 | Construction | Roadway | Unassigned | Unassigned | $500,000.00 | $40,000.00 | 8% | | | Unassigned / Unassigned → Construction / Roadway | | | 0508-07-296 | Houston | 05/06/26 | $646,244.64 | Construction | Roadway | Construction | Roadway | $599,300.64 | $46,944.00 | 8% | | | | | | 0079-05-069 | Fort Worth | 04/07/26 | $27,891.23 | Construction | Bridge | Construction | Bridge | $30,241.77 | $(2,350.54) | -8% | | | | | | 0543-02-089 | Houston | 04/07/26 | $770,105.75 | Construction | Bridge | Unassigned | Unassigned | $836,725.75 | $(66,620.00) | -8% | | | Unassigned / Unassigned → Construction / Bridge | | | 1016-04-021 | Dallas | 04/07/26 | $3,804,796.15 | Construction | Roadway | Construction | Roadway | $4,149,692.15 | $(344,896.00) | -8% | | | | | | 1823-01-011 | Odessa | 04/07/26 | $7,852,149.83 | Construction | Roadway | Construction | Roadway | $7,300,000.00 | $552,149.83 | 8% | | | | | | 0508-01-396 | Houston | 03/01/32 | $166,666,667.00 | | | Construction | Roadway | $180,000,000.40 | $(13,333,333.40) | -7% | 1455 | 4 years | | | | 0692-01-020 | Paris | 10/04/28 | $33,000,000.00 | Construction | Roadway | Construction | Roadway | $35,640,000.00 | $(2,640,000.00) | -7% | | | | | | 1730-02-024 | San Antonio | 10/04/28 | $369,611.00 | Construction | Roadway | Construction | Roadway | $398,288.00 | $(28,677.00) | -7% | 365 | 1 year | | | | 0014-10-074 | Waco | 09/06/28 | $5,092,592.59 | Construction | Bridge | Construction | Bridge | $5,500,000.00 | $(407,407.41) | -7% | | | | | | 0014-10-075 | Waco | 09/06/28 | $5,092,592.59 | Construction | Bridge | Construction | Bridge | $5,500,000.00 | $(407,407.41) | -7% | | | | | | 0038-04-064 | Pharr | 09/06/28 | $83,428,593.00 | Construction | Roadway | Construction | Roadway | $90,102,879.00 | $(6,674,286.00) | -7% | | | | | | 0495-10-105 | Atlanta | 09/06/28 | $5,976,110.38 | Construction | Roadway | Construction | Roadway | $6,454,190.00 | $(478,079.62) | -7% | | | | | | 3100-02-002 | Pharr | 09/06/28 | $37,840,008.12 | Construction | Roadway | Construction | Roadway | $40,867,208.00 | $(3,027,199.88) | -7% | | | | | | 3629-02-002 | Pharr | 09/06/28 | $167,568,412.00 | Construction | Roadway | Construction | Roadway | $180,973,885.00 | $(13,405,473.00) | -7% | | | | | | 0265-01-118 | Austin | 08/02/28 | $419,999.07 | Construction | Roadway | Construction | Roadway | $453,600.00 | $(33,600.93) | -7% | | | | | | 0265-02-043 | Austin | 08/02/28 | $1,600,000.00 | Construction | Roadway | Construction | Roadway | $1,728,000.00 | $(128,000.00) | -7% | | | | | | 0069-01-061 | Abilene | 07/06/28 | $20,000,000.00 | Construction | Roadway | Construction | Roadway | $21,600,000.00 | $(1,600,000.00) | -7% | | | | | | 0069-02-030 | San Angelo | 07/06/28 | $5,000,000.00 | Construction | Roadway | Construction | Roadway | $5,400,000.00 | $(400,000.00) | -7% | | | | | | 0186-06-082 | Bryan | 06/14/28 | $199,548,797.00 | Alternative Delivery | Design Build | Alternative Delivery | Design Build | $215,512,700.00 | $(15,963,903.00) | -7% | | | | | | 0251-03-022 | Waco | 05/03/28 | $11,407,407.41 | Construction | Roadway | Construction | Roadway | $12,319,999.00 | $(912,591.59) | -7% | | | | | | 0251-04-023 | Brownwood | 05/03/28 | $111,585,185.20 | Construction | Roadway | Construction | Roadway | $120,512,000.00 | $(8,926,814.80) | -7% | | | | | | 2977-01-011 | Dallas | 05/03/28 | $12,330,496.94 | Construction | Roadway | Construction | Roadway | $13,190,108.33 | $(859,611.39) | -7% | | | | | | 3409-01-011 | Waco | 05/01/28 | $6,200,000.00 | Construction | Roadway | Construction | Roadway | $6,678,325.00 | $(478,325.00) | -7% | | | | | | 1690-01-131 | Paris | 04/05/28 | $144,217,308.00 | Construction | Roadway | Construction | Roadway | $155,754,265.00 | $(11,536,957.00) | -7% | | | | | | 0047-05-061 | Dallas | 03/07/28 | $52,099,915.91 | Construction | Roadway | Construction | Roadway | $56,267,909.18 | $(4,167,993.27) | -7% | | | | | | 0065-07-065 | Beaumont | 02/02/28 | $13,629,629.00 | Construction | Roadway | Construction | Roadway | $14,719,999.00 | $(1,090,370.00) | -7% | | | | | | 0035-05-059 | San Angelo | 01/05/28 | $81,417,639.00 | Construction | Roadway | Construction | Roadway | $87,931,050.12 | $(6,513,411.12) | -7% | | | | | | 1803-01-092 | Pharr | 01/05/28 | $14,796,701.00 | Construction | Roadway | Construction | Roadway | $15,980,437.00 | $(1,183,736.00) | -7% | | | | | | 2121-02-186 | El Paso | 12/01/27 | $462,962,963.00 | Construction | Roadway | Construction | Roadway | $500,000,000.00 | $(37,037,037.00) | -7% | | | | | | 0545-04-048 | Tyler | 09/01/27 | $151,000,000.00 | Construction | Roadway | Construction | Roadway | $163,080,000.00 | $(12,080,000.00) | -7% | | | | | | 1149-01-033 | Austin | 09/01/27 | $56,500,000.00 | Construction | Roadway | Construction | Roadway | $61,020,000.00 | $(4,520,000.00) | -7% | | | | | | 3138-01-020 | Bryan | 07/01/27 | $100,882,922.00 | Construction | Roadway | Construction | Roadway | $109,003,297.00 | $(8,120,375.00) | -7% | | | | | | 1012-03-028 | Dallas | 03/03/27 | $6,692,513.42 | Construction | Roadway | Construction | Roadway | $6,278,088.98 | $414,424.44 | 7% | | | | | | 1601-02-036 | Fort Worth | 01/06/27 | $8,441,246.00 | Construction | Roadway | Unassigned | Unassigned | $9,033,592.70 | $(592,346.70) | -7% | | | Unassigned / Unassigned → Construction / Roadway | | | 0215-11-025 | San Antonio | 10/06/26 | $331,148.00 | Construction | Roadway | Construction | Roadway | $356,840.00 | $(25,692.00) | -7% | -364 | -12 months | | | | 0215-11-026 | San Antonio | 10/06/26 | $154,100.00 | Construction | Roadway | Construction | Roadway | $166,056.00 | $(11,956.00) | -7% | -364 | -12 months | | | | 0842-03-037 | Yoakum | 10/06/26 | $33,218,001.00 | Construction | Roadway | Construction | Roadway | $35,863,495.00 | $(2,645,494.00) | -7% | | | | | | 0143-10-058 | Yoakum | 09/02/26 | $9,000,000.00 | Construction | Roadway | Construction | Roadway | $9,724,860.00 | $(724,860.00) | -7% | | | | | | 0051-09-128 | Houston | 08/05/26 | $4,032,301.00 | Construction | Roadway | Construction | Roadway | $4,316,678.00 | $(284,377.00) | -7% | | | | | | 0178-02-092 | Houston | 06/04/26 | $186,793,464.00 | Alternative Delivery | Design Build | Alternative Delivery | Design Build | $175,379,122.00 | $11,414,342.00 | 7% | | | | | | 0196-07-034 | Dallas | 06/02/26 | $98,325,151.30 | Construction | Bridge | Construction | Bridge | $106,035,488.00 | $(7,710,336.70) | -7% | | | | | | 0523-10-049 | Houston | 05/06/26 | $1,163,842.80 | Construction | Roadway | Construction | Roadway | $1,088,363.00 | $75,479.80 | 7% | | | | | | 0091-06-062 | Dallas | 04/07/26 | $400,030.00 | Construction | Roadway | Construction | Roadway | $431,780.00 | $(31,750.00) | -7% | | | | | | 0197-02-138 | Dallas | 04/07/26 | $2,133,482.80 | Construction | Roadway | Construction | Roadway | $2,287,242.04 | $(153,759.24) | -7% | | | | | | 0909-40-098 | Waco | 04/07/26 | $408,388.21 | Construction | Bridge | Construction | Bridge | $438,822.13 | $(30,433.92) | -7% | | | | | | 0918-47-450 | Dallas | 04/07/26 | $408,665.50 | Construction | Roadway | Construction | Roadway | $437,984.00 | $(29,318.50) | -7% | | | | | | 0933-01-044 | Lubbock | 04/07/26 | $4,462,426.10 | Construction | Bridge | Construction | Bridge | $4,163,000.00 | $299,426.10 | 7% | | | | | | 2374-01-196 | Dallas | 04/07/26 | $424,730.00 | Construction | Roadway | Construction | Roadway | $457,425.00 | $(32,695.00) | -7% | | | | | | 3510-05-048 | Houston | 04/07/26 | $67,799,039.32 | Construction | Roadway | Construction | Roadway | $72,645,337.99 | $(4,846,298.67) | -7% | | | | | | 0221-01-078 | Paris | 03/07/28 | $108,728,384.30 | Construction | Roadway | Construction | Roadway | $115,672,734.00 | $(6,944,349.70) | -6% | | | | | | 2121-02-167 | El Paso | 07/01/27 | $30,118,818.27 | Construction | Roadway | Construction | Roadway | $28,475,973.00 | $1,642,845.27 | 6% | 365 | 1 year | | | | 0172-12-007 | Dallas | 02/02/27 | $51,472,754.02 | Construction | Roadway | Construction | Roadway | $54,618,327.00 | $(3,145,572.98) | -6% | | | | | | 0128-04-045 | Brownwood | 01/06/27 | $2,644,230.00 | Construction | Roadway | Unassigned | Unassigned | $2,500,000.00 | $144,230.00 | 6% | | | Unassigned / Unassigned → Construction / Roadway | | | 0372-01-101 | Corpus Christi | 01/06/27 | $102,000,000.00 | Construction | Roadway | Construction | Roadway | $108,160,000.00 | $(6,160,000.00) | -6% | | | | | | 1197-01-027 | Austin | 01/06/27 | $3,110,829.60 | Construction | Roadway | Construction | Roadway | $2,942,307.69 | $168,521.91 | 6% | | | | | | 0917-30-068 | Bryan | 11/03/26 | $584,088.08 | Construction | Bridge | Construction | Bridge | $550,000.00 | $34,088.08 | 6% | | | | | | 0909-22-211 | Waco | 05/06/26 | $269,520.50 | Construction | Bridge | Construction | Bridge | $255,000.00 | $14,520.50 | 6% | | | | | | 3256-02-121 | Houston | 05/06/26 | $2,286,187.03 | Construction | Roadway | Unassigned | Unassigned | $2,436,237.84 | $(150,050.81) | -6% | | | Unassigned / Unassigned → Construction / Roadway | | | 0079-05-067 | Fort Worth | 04/07/26 | $2,613,446.11 | Construction | Bridge | Construction | Bridge | $2,770,316.50 | $(156,870.39) | -6% | | | | | | 0079-05-073 | Fort Worth | 04/07/26 | $72,390.52 | Construction | Bridge | Unassigned | Unassigned | $76,624.33 | $(4,233.81) | -6% | | | Unassigned / Unassigned → Construction / Bridge | | | 0909-40-086 | Waco | 04/07/26 | $656,233.49 | Construction | Bridge | Construction | Bridge | $699,904.28 | $(43,670.79) | -6% | | | | | | 0918-47-444 | Dallas | 04/07/26 | $442,486.00 | Construction | Roadway | Construction | Roadway | $472,374.00 | $(29,888.00) | -6% | | | | | | 0918-47-446 | Dallas | 04/07/26 | $500,829.50 | Construction | Roadway | Construction | Roadway | $531,748.50 | $(30,919.00) | -6% | | | | | | 3417-02-043 | Austin | 09/03/27 | $1,805,976.85 | Non-Let | Roadway | Unassigned | Unassigned | $1,712,962.96 | $93,013.89 | 5% | | | Unassigned / Unassigned → Non-Let / Roadway | | | 1492-01-013 | Dallas | 03/03/27 | $1,398,066.02 | Construction | Roadway | Construction | Roadway | $1,466,641.12 | $(68,575.10) | -5% | | | | | | 0912-37-247 | Houston | 10/06/26 | $769,262.00 | Construction | Bridge | Construction | Bridge | $806,146.00 | $(36,884.00) | -5% | | | | | | 1502-01-031 | Lubbock | 10/06/26 | $164,867,291.60 | Construction | Roadway | Construction | Roadway | $173,944,900.10 | $(9,077,608.50) | -5% | | | | | | 1548-01-018 | San Antonio | 10/06/26 | $448,540.00 | Construction | Roadway | Construction | Roadway | $474,012.00 | $(25,472.00) | -5% | -364 | -12 months | | | | 0266-05-055 | Yoakum | 09/02/26 | $1,050,000.00 | Construction | Roadway | Construction | Roadway | $1,100,000.00 | $(50,000.00) | -5% | | | | | | 0314-04-036 | Fort Worth | 07/01/26 | $380,384.33 | Construction | Bridge | Construction | Bridge | $399,381.13 | $(18,996.80) | -5% | | | | | | 0389-02-059 | Beaumont | 05/06/26 | $4,682,081.87 | Construction | Roadway | Construction | Roadway | $4,466,985.00 | $215,096.87 | 5% | | | | | | 1064-01-027 | Pharr | 05/06/26 | $33,504,116.11 | Construction | Roadway | Construction | Roadway | $35,262,482.00 | $(1,758,365.89) | -5% | | | | | | 0094-02-147 | Fort Worth | 04/07/26 | $5,591,881.98 | Construction | Roadway | Construction | Roadway | $5,883,006.44 | $(291,124.46) | -5% | | | | | | 1006-01-082 | Houston | 04/07/26 | $495,827.00 | Construction | Roadway | Construction | Roadway | $519,567.00 | $(23,740.00) | -5% | | | | | | 3510-05-047 | Houston | 04/07/26 | $78,509,398.62 | Construction | Roadway | Construction | Roadway | $83,067,703.44 | $(4,558,304.82) | -5% | | | | | | 0339-04-036 | Beaumont | 01/01/29 | $115,100,000.00 | Construction | Roadway | Construction | Roadway | $119,784,000.00 | $(4,684,000.00) | -4% | | | | | | 0249-07-072 | Fort Worth | 09/06/28 | $42,784,246.29 | Construction | Bridge | Unassigned | Unassigned | $41,153,041.00 | $1,631,205.29 | 4% | | | Unassigned / Unassigned → Construction / Bridge | | | 1024-01-077 | Beaumont | 05/03/28 | $70,192,307.69 | Construction | Roadway | Construction | Roadway | $73,000,000.00 | $(2,807,692.31) | -4% | | | | | | 0180-11-016 | Corpus Christi | 04/05/28 | $2,600,000.00 | Construction | Roadway | Construction | Roadway | $2,700,000.00 | $(100,000.00) | -4% | | | | | | 0248-06-017 | Tyler | 04/05/28 | $11,700,000.00 | Construction | Roadway | Construction | Roadway | $12,168,000.00 | $(468,000.00) | -4% | | | | | | 0374-07-027 | El Paso | 04/05/28 | $20,941,251.92 | Construction | Roadway | Construction | Roadway | $21,778,901.00 | $(837,649.08) | -4% | | | | | | 3290-02-009 | Tyler | 04/05/28 | $14,500,000.00 | Construction | Roadway | Construction | Roadway | $15,080,000.00 | $(580,000.00) | -4% | | | | | | 0221-01-079 | Paris | 03/07/28 | $95,956,769.00 | Construction | Roadway | Construction | Roadway | $99,795,039.00 | $(3,838,270.00) | -4% | | | | | | 0495-02-071 | Tyler | 02/02/28 | $8,653,846.15 | Construction | Roadway | Construction | Roadway | $9,000,000.00 | $(346,153.85) | -4% | | | | | | 0495-03-076 | Tyler | 02/02/28 | $3,846,153.85 | Construction | Roadway | Unassigned | Unassigned | $4,000,000.00 | $(153,846.15) | -4% | | | Unassigned / Unassigned → Construction / Roadway | | | 1803-01-094 | Pharr | 01/05/28 | $56,017,974.00 | Construction | Roadway | Construction | Roadway | $58,258,692.96 | $(2,240,718.96) | -4% | | | | | | 0214-03-035 | Beaumont | 11/02/27 | $26,584,615.38 | Construction | Bridge | Construction | Bridge | $27,648,000.00 | $(1,063,384.62) | -4% | | | | | | 0908-33-118 | Abilene | 08/04/27 | $613,311.00 | Construction | Roadway | Unassigned | Unassigned | $640,506.41 | $(27,195.41) | -4% | | | Unassigned / Unassigned → Construction / Roadway | | | 0039-10-091 | Pharr | 07/01/27 | $185,000,000.00 | Construction | Roadway | Construction | Roadway | $192,400,000.00 | $(7,400,000.00) | -4% | | | | | | 0508-01-397 | Houston | 07/01/27 | $262,691,401.00 | Construction | Roadway | Construction | Roadway | $273,199,057.00 | $(10,507,656.00) | -4% | | | | | | 1810-01-033 | Lufkin | 06/01/27 | $9,167,239.01 | Construction | Roadway | Construction | Roadway | $9,533,928.57 | $(366,689.56) | -4% | -491 | -1 year | | | | 0178-09-019 | Houston | 05/05/27 | $48,016,232.69 | Construction | Roadway | Construction | Roadway | $49,936,882.00 | $(1,920,649.31) | -4% | | | | | | 0342-01-093 | Pharr | 05/05/27 | $29,063,727.00 | Construction | Roadway | Construction | Roadway | $30,226,276.08 | $(1,162,549.08) | -4% | | | | | | 0865-01-108 | Pharr | 05/05/27 | $21,354,188.00 | Construction | Roadway | Construction | Roadway | $22,208,355.00 | $(854,167.00) | -4% | | | | | | 2398-01-062 | Abilene | 05/05/27 | $10,384,616.00 | Construction | Roadway | Construction | Roadway | $10,800,000.00 | $(415,384.00) | -4% | | | | | | 0005-14-092 | Odessa | 03/03/27 | $213,979,449.80 | Construction | Roadway | Construction | Roadway | $222,538,626.00 | $(8,559,176.20) | -4% | | | | | | 0045-08-039 | Paris | 03/03/27 | $124,861,809.00 | Construction | Roadway | Construction | Roadway | $129,856,280.00 | $(4,994,471.00) | -4% | | | | | | 0045-09-103 | Paris | 03/03/27 | $93,663,191.00 | Construction | Roadway | Construction | Roadway | $97,409,718.64 | $(3,746,527.64) | -4% | | | | | | 0111-03-064 | Houston | 02/02/27 | $108,568,030.00 | Construction | Roadway | Construction | Roadway | $112,910,751.00 | $(4,342,721.00) | -4% | | | | | | 0265-03-042 | Austin | 02/02/27 | $60,122,400.00 | Construction | Roadway | Construction | Roadway | $62,527,296.00 | $(2,404,896.00) | -4% | | | | | | 0342-01-103 | Pharr | 02/02/27 | $12,043,275.00 | Construction | Roadway | Construction | Roadway | $12,525,006.00 | $(481,731.00) | -4% | | | | | | 0252-01-084 | Austin | 12/01/26 | $10,866,345.19 | Construction | Roadway | Construction | Roadway | $11,301,000.00 | $(434,654.81) | -4% | | | | | | 0005-02-112 | Odessa | 10/06/26 | $6,346,155.00 | Construction | Rail - Safety | Construction | Rail - Safety | $6,600,001.20 | $(253,846.20) | -4% | | | | | | 0133-01-055 | Childress | 10/06/26 | $14,000,000.00 | Construction | Roadway | Construction | Roadway | $14,560,000.00 | $(560,000.00) | -4% | | | | | | 0143-03-049 | San Antonio | 10/06/26 | $69,947,811.00 | Construction | Roadway | Construction | Roadway | $72,900,000.16 | $(2,952,189.16) | -4% | | | | | | 0200-01-093 | Lufkin | 10/06/26 | $36,934,615.38 | Construction | Roadway | Construction | Roadway | $38,411,999.00 | $(1,477,383.62) | -4% | | | | | | 0015-13-437 | Austin | 09/02/26 | $387,000,000.00 | Construction | Roadway | Construction | Rail | $402,480,000.00 | $(15,480,000.00) | -4% | | | Construction / Rail → Construction / Roadway | | | 0902-48-579 | Fort Worth | 08/05/26 | $23,961,192.05 | Construction | Roadway | Construction | Roadway | $25,056,079.00 | $(1,094,886.95) | -4% | | | | | | 0167-01-122 | El Paso | 06/02/26 | $85,272,327.66 | Construction | Roadway | Construction | Roadway | $88,452,915.00 | $(3,180,587.34) | -4% | | | | | | 0047-03-091 | Paris | 04/07/26 | $147,195,094.80 | Construction | Roadway | Unassigned | Unassigned | $152,906,394.00 | $(5,711,299.20) | -4% | | | Unassigned / Unassigned → Construction / Roadway | | | 0079-05-066 | Fort Worth | 04/07/26 | $73,735.15 | Construction | Bridge | Construction | Bridge | $76,821.46 | $(3,086.31) | -4% | | | | | | 0299-04-083 | Laredo | 04/07/26 | $10,629,521.20 | Construction | Roadway | Construction | Roadway | $11,049,043.00 | $(419,521.80) | -4% | | | | | | 0674-01-083 | El Paso | 04/07/26 | $1,250,605.30 | Construction | Roadway | Construction | Roadway | $1,307,462.30 | $(56,857.00) | -4% | | | | | | 0909-40-081 | Waco | 04/07/26 | $393,796.64 | Construction | Bridge | Construction | Bridge | $408,468.48 | $(14,671.84) | -4% | | | | | | 0922-48-004 | Laredo | 04/07/26 | $723,938.06 | Construction | Bridge | Construction | Bridge | $698,962.51 | $24,975.55 | 4% | | | | | | 1508-01-010 | Laredo | 04/07/26 | $4,480,000.35 | Construction | Roadway | Construction | Roadway | $4,646,337.92 | $(166,337.57) | -4% | | | | | | 1790-02-048 | Tyler | 04/07/26 | $1,629,505.50 | Construction | Bridge | Construction | Bridge | $1,690,315.50 | $(60,810.00) | -4% | | | | | | 1849-03-023 | Paris | 11/01/28 | $1,294,719.36 | Construction | Roadway | Unassigned | Unassigned | $1,337,582.40 | $(42,863.04) | -3% | -34 | -1 month | Unassigned / Unassigned → Construction / Roadway | | | 0048-04-109 | Dallas | 05/06/26 | $615,349.25 | Construction | Roadway | Unassigned | Unassigned | $636,000.00 | $(20,650.75) | -3% | | | Unassigned / Unassigned → Construction / Roadway | | | 0187-02-074 | Yoakum | 05/06/26 | $718,612.65 | Construction | Roadway | Construction | Roadway | $741,114.00 | $(22,501.35) | -3% | | | | | | 0187-05-062 | Houston | 05/06/26 | $6,075,775.00 | Construction | Roadway | Construction | Roadway | $5,918,914.90 | $156,860.10 | 3% | | | | | | 0442-02-166 | Dallas | 05/06/26 | $12,657,475.67 | Construction | Roadway | Construction | Roadway | $13,006,805.93 | $(349,330.26) | -3% | -181 | -6 months | | | | 0815-08-044 | Dallas | 05/06/26 | $1,230,656.05 | Construction | Roadway | Unassigned | Unassigned | $1,272,000.00 | $(41,343.95) | -3% | | | Unassigned / Unassigned → Construction / Roadway | | | 0079-05-068 | Fort Worth | 04/07/26 | $1,400,688.19 | Construction | Bridge | Construction | Bridge | $1,446,179.03 | $(45,490.84) | -3% | | | | | | 0337-01-053 | Austin | 04/07/26 | $7,329,605.75 | Construction | Roadway | Construction | Roadway | $7,553,905.75 | $(224,300.00) | -3% | | | | | | 0337-02-054 | Austin | 04/07/26 | $2,566,158.62 | Construction | Roadway | Unassigned | Unassigned | $2,645,257.53 | $(79,098.91) | -3% | | | Unassigned / Unassigned → Construction / Roadway | | | 0353-05-133 | Dallas | 04/07/26 | $660,175.50 | Construction | Roadway | Construction | Roadway | $680,452.90 | $(20,277.40) | -3% | | | | | | 0909-40-089 | Waco | 04/07/26 | $746,742.67 | Construction | Bridge | Construction | Bridge | $772,186.82 | $(25,444.15) | -3% | | | | | | 1062-04-063 | Houston | 04/07/26 | $1,703,466.80 | Construction | Roadway | Construction | Roadway | $1,655,946.32 | $47,520.48 | 3% | | | | | | 0683-02-086 | Austin | 08/04/27 | $4,423,285.43 | Construction | Bridge | Construction | Bridge | $4,507,875.00 | $(84,589.57) | -2% | | | | | | 0371-04-062 | Corpus Christi | 01/06/27 | $51,000,000.00 | Construction | Roadway | Construction | Roadway | $52,000,000.00 | $(1,000,000.00) | -2% | | | | | | 1068-04-181 | Dallas | 06/02/26 | $653,883.04 | Construction | Roadway | Construction | Roadway | $666,808.73 | $(12,925.69) | -2% | | | | | | 0521-04-285 | San Antonio | 05/06/26 | $159,536,000.00 | Construction | Roadway | Construction | Roadway | $162,726,720.00 | $(3,190,720.00) | -2% | | | | | | 0643-05-067 | Bryan | 05/06/26 | $2,539,776.40 | Construction | Roadway | Construction | Roadway | $2,579,522.00 | $(39,745.60) | -2% | | | | | | 0005-08-109 | Abilene | 04/07/26 | $12,628,622.92 | Construction | Roadway | Construction | Roadway | $12,862,294.00 | $(233,671.08) | -2% | -301 | -10 months | | | | 0172-09-046 | Fort Worth | 04/07/26 | $286,038.00 | Construction | Roadway | Unassigned | Unassigned | $280,000.00 | $6,038.00 | 2% | | | Unassigned / Unassigned → Construction / Roadway | | | 0598-02-120 | Houston | 04/07/26 | $4,974,658.00 | Construction | Roadway | Construction | Roadway | $5,083,588.00 | $(108,930.00) | -2% | | | | | | 0908-23-058 | Abilene | 04/07/26 | $744,831.50 | Construction | Bridge | Construction | Bridge | $729,831.50 | $15,000.00 | 2% | -330 | -11 months | | | | 0216-03-039 | San Antonio | 10/01/29 | $240,010.00 | | | Construction | Roadway | $241,390.00 | $(1,380.00) | -1% | 727 | 2 years | | | | 1009-01-044 | San Antonio | 10/06/26 | $389,823.00 | Construction | Roadway | Construction | Roadway | $392,063.00 | $(2,240.00) | -1% | -364 | -12 months | | | | 1899-01-020 | San Antonio | 10/06/26 | $159,286.00 | Construction | Roadway | Construction | Roadway | $160,201.00 | $(915.00) | -1% | -364 | -12 months | | | | 1899-02-023 | San Antonio | 10/06/26 | $489,943.00 | Construction | Roadway | Construction | Roadway | $492,759.00 | $(2,816.00) | -1% | -364 | -12 months | | | | 0014-15-034 | Fort Worth | 08/05/26 | $18,925,918.73 | Construction | Roadway | Construction | Roadway | $19,066,000.00 | $(140,081.27) | -1% | | | | | | 0014-03-088 | Fort Worth | 07/01/26 | $82,826,148.94 | Construction | Roadway | Construction | Roadway | $84,000,000.00 | $(1,173,851.06) | -1% | | | | | | 0110-05-136 | Houston | 05/06/26 | $991,742.20 | Construction | Roadway | Construction | Roadway | $1,005,910.00 | $(14,167.80) | -1% | | | | | | 0500-03-655 | Houston | 05/06/26 | $9,120,774.40 | Construction | Bridge | Construction | Bridge | $9,030,488.00 | $90,286.40 | 1% | | | | | | 0314-07-087 | Fort Worth | 04/07/26 | $537,434.00 | Construction | Roadway | Unassigned | Unassigned | $534,158.80 | $3,275.20 | 1% | | | Unassigned / Unassigned → Construction / Roadway | | | 0909-38-100 | Waco | 04/07/26 | $1,062,294.75 | Construction | Bridge | Construction | Bridge | $1,054,694.75 | $7,600.00 | 1% | | | | | | 1245-02-052 | Amarillo | 04/07/26 | $1,708,880.79 | Construction | Roadway | Construction | Roadway | $1,700,000.00 | $8,880.79 | 1% | | | | | | 1823-02-014 | Odessa | 04/07/26 | $2,075,285.37 | Construction | Roadway | Construction | Roadway | $2,100,000.00 | $(24,714.63) | -1% | | | | | | 2005-03-009 | Odessa | 04/07/26 | $7,108,332.52 | Construction | Roadway | Construction | Roadway | $7,062,223.42 | $46,109.10 | 1% | | | | | | 2230-01-021 | San Antonio | 04/07/26 | $54,752,251.98 | Construction | Roadway | Construction | Roadway | $54,175,797.00 | $576,454.98 | 1% | | | | | | 0081-02-079 | Fort Worth | 06/11/26 | $515,157.78 | Construction | Local Let | Unassigned | Unassigned | $513,104.90 | $2,052.88 | 0% | | | Unassigned / Unassigned → Construction / Local Let | | | 2964-04-010 | Dallas | 06/02/26 | $901,904.59 | Construction | Roadway | Construction | Roadway | $903,563.10 | $(1,658.51) | 0% | | | | | | 0077-07-010 | San Angelo | 05/06/26 | $5,202,796.65 | Construction | Bridge | Construction | Bridge | $5,206,596.65 | $(3,800.00) | 0% | | | | | | 0138-06-049 | Lufkin | 05/06/26 | $3,877,907.00 | Construction | Roadway | Construction | Roadway | $3,877,900.00 | $7.00 | 0% | | | | | | 0463-07-055 | Odessa | 05/06/26 | $1,299,947.36 | Construction | Roadway | Construction | Roadway | $1,293,759.66 | $6,187.70 | 0% | | | | | | 1271-01-013 | San Antonio | 05/06/26 | $1,202,995.95 | Construction | Bridge | Construction | Bridge | $1,199,651.14 | $3,344.81 | 0% | | | | | --- ## Putting It Together Across February, the pattern is consistent. Letting dates are moving, with a slight drift toward later years. Costs are being updated across a wide set of projects, but the financial impact is concentrated in a handful of large jobs. The mix of work remains unchanged, with roadway construction continuing to dominate. --- ## Final Takeaway The TxDOT pipeline is not changing direction. It is being adjusted. Expect continued movement in letting dates, especially beyond the next 12 months. Expect ongoing cost updates, with large projects driving most of the dollar impact. Do not expect meaningful changes in the type of work being let. The signal is not in what is coming. It is in when it will hit and how it will be priced. --- ## TxDOT Q3 2026 Projected Spending https://www.bidlo.ai/research/txdot-q3-2026-projected-spending How is TxDOT projected spending distributed by job size and district? [https://info.bidlo.ai/embed/district-chart-multiselect?showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae](https://info.bidlo.ai/embed/district-chart-multiselect?showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae) --- - Projected spending is dominated by TEX-Size projects, which lead with approximately $10.36 billion, followed by Small and Medium tiers at $8.87 billion and $5.62 billion respectively, showcasing a reliance on larger, transformative initiatives over smaller projects. - Districts like Houston and Austin consistently appear as leading contributors, with Houston projecting around $629 million in FY 2029 Q2, while Austin is set to surge thanks to TEX-Size work, contrasting with declining projections in Dallas and Yoakum. - The spending landscape reveals a mixture of steady and volatile patterns; while some districts maintain consistent spending, others experience sporadic spikes, creating a diverse engagement climate across the board. --- #### Overview Looking at the recent projections, there's a distinct upward trend compared to historical averages, which reflects a robust market for infrastructure investment. For instance, the FY 2029 Q2 estimate of approximately $2.84 billion stands in premium contrast to previous averages, particularly noting Houston's notable forecast growth, where spending estimates surged by about $306.6 million compared to its historical average. The tier distribution suggests a strong leaning towards TEX-Size projects, which dominate the total landscape with projected spending of around $10.36 billion. Small, Medium, and Large projects contribute significantly as well, with Small projects at $8.87 billion, yet it’s TEX-Size work that really propels future expenditures. ### TxDOT Spend by District [https://info.bidlo.ai/embed/bubble-chart?hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae](https://info.bidlo.ai/embed/bubble-chart?hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae) - Houston showcases a steady leadership in projected spending, consistently hovering near $629 million in FY 2029 Q2, reflecting a strong engagement in both Small and Medium projects. - Austin exhibits significant growth potential with a peak forecast of $1.63 billion in FY 2029 Q2, highlighting its reliance on Large and TEX-Size projects as key drivers while it historically averaged around $156.7 million. - Conversely, districts like Dallas and Yoakum face declines, with Dallas showing a drop of $159.1 million from historical trends, indicating an unsettling reliance on potentially less stable funding streams. - The overall distribution of spending remains mixed, with some districts cycling through high spikes while others engage in a more consistent cadence, leading to varying degrees of volatility across the board. --- #### Abilene [https://info.bidlo.ai/embed/district-chart?district=ABILENE&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae](https://info.bidlo.ai/embed/district-chart?district=ABILENE&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae) Abilene's projected spending exhibits fluctuations, with a peak rolling total of $60.2 million in FY 2026 Q4 that sharply dips to $35.7 million by FY 2029 Q3. Over the forecast period from FY 2026 Q4 through FY 2029 Q3, the cumulative tier spend reveals a focus on Small projects, comprising the majority with $285.0 million across 178 jobs. In actual totals, Abilene notably peaked at $143.0 million in FY 2026 Q4, but faced a steep decline to just $9.7 million in FY 2027 Q1. This represents both volatility and a strong reliance on a limited number of larger projects that do not consistently feed into overall job creation. --- #### Amarillo [https://info.bidlo.ai/embed/district-chart?district=AMARILLO&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae](https://info.bidlo.ai/embed/district-chart?district=AMARILLO&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae) Amarillo's forecasted spending demonstrates mixed results with a peak forecast rolling total of $91.5 million in FY 2027 Q1, but sinking to $51.5 million by the conclusion of FY 2029 Q3. In the broader timeframe from FY 2026 Q4 through FY 2029 Q3, Amarillo's cumulative projections show $259.2 million in Small projects, indicating a steady approach to smaller tier jobs over time. In terms of actual figures, Amarillo reached its zenith at $216.7 million in FY 2027 Q3 but dramatically dropped to only $4.1 million in FY 2028 Q4. This trajectory highlights both variability and a reliance on sustaining diverse tiers to maintain a more stable growth rate. --- #### Atlanta [https://info.bidlo.ai/embed/district-chart?district=ATLANTA&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae](https://info.bidlo.ai/embed/district-chart?district=ATLANTA&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae) Atlanta showcases a more optimistic forecast with its peak rolling total reaching $62.4 million in FY 2029 Q2, though it struggles with a forecast dip to $25.7 million in FY 2027 Q4. Over the anticipated period from FY 2026 Q4 through FY 2029 Q3, the cumulative projection reveals a balanced approach with $302.1 million in Small tier spending alongside $237.3 million in TEX-Size projects, showcasing a diversified market engagement. Actual numbers reflect this growth, with the district peaking at $377.8 million in FY 2029 Q1, yet staggering to just $3.4 million by FY 2028 Q4. This pattern indicates potential volatility as well as investment opportunities that could further monetize Atlanta’s existing infrastructural framework. --- #### Austin [https://info.bidlo.ai/embed/district-chart?district=AUSTIN&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae](https://info.bidlo.ai/embed/district-chart?district=AUSTIN&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae) Austin stands out with very high projected growth, with a peak forecast rolling total of $333.5 million in FY 2029 Q2 and an impressive forecast of $1.63 billion in total spending, largely driven by TEX-Size projects dominating at $2.56 billion across the projected horizon from FY 2026 Q4 through FY 2029 Q3. This suggests a solidified trajectory towards large-scale infrastructure investments. In actual expenditure, Austin has also seen fluctuating results, hitting a peak of $1.63 billion in FY 2029 Q2 but falling to just $25.7 million in FY 2029 Q3. Such variations underscore the volatility inherent to its expansive and ambitious spending targets, marking it as a key district to watch. --- #### Beaumont [https://info.bidlo.ai/embed/district-chart?district=BEAUMONT&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae](https://info.bidlo.ai/embed/district-chart?district=BEAUMONT&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae) Beaumont displays a consistent yet volatile spending pattern, peaking at $85.4 million in FY 2026 Q4 and dipping to $31.5 million by FY 2027 Q4. Across the period from FY 2026 Q4 through FY 2029 Q3, Beaumont's $299.6 million in Small projects reflects a stable focus on smaller expenditures that can support regional developments. In terms of actual fiscal insights, Beaumont reached its peak in FY 2029 Q1 at $140.2 million, only to see a diminished follow-up to $7.8 million in FY 2027 Q4. This highlights both reliance on Small scale projects and the inherent risk with inconsistent funding trajectories. --- #### Brownwood [https://info.bidlo.ai/embed/district-chart?district=BROWNWOOD&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae](https://info.bidlo.ai/embed/district-chart?district=BROWNWOOD&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae) Brownwood exhibits a pattern of peaks and troughs, with a peak forecast rolling total of $30.0 million in FY 2028 Q3 and a notable dip to $17.1 million by FY 2028 Q1. Analyzing its performance from FY 2026 Q4 through FY 2029 Q3, the cumulative view shows solid engagement with $120.7 million in Small tier spending, although it lacks larger project investments. In actual terms, the district’s peak reached $143.2 million in FY 2028 Q3, contrasting sharply with a low of only $1.4 million by FY 2029 Q1. This reflects a reliance on limited-scale projects which can yield significant variance in overall spending. --- #### Bryan [https://info.bidlo.ai/embed/district-chart?district=BRYAN&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae](https://info.bidlo.ai/embed/district-chart?district=BRYAN&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae) Bryan's fiscal landscape shows peaks of success, with an impressive forecast total reaching $316.6 million in FY 2027 Q4 and a slight decline observed in subsequent periods. Analyzing the total expectation from FY 2026 Q4 through FY 2029 Q3, Bryan’s cumulative tier allocation indicates a balanced spread, with $501.6 million earmarked for TEX-Size projects, supplementing broader economic engagement. In the actual count, the district peaked at $316.6 million in FY 2027 Q4 before experiencing a setback to $11.6 million in FY 2027 Q3. Such fluctuations point to potential volatility within larger projects, yet Bryan maintains a diversified tier engagement across its expenditures. --- #### Childress [https://info.bidlo.ai/embed/district-chart?district=CHILDRESS&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae](https://info.bidlo.ai/embed/district-chart?district=CHILDRESS&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae) Childress illustrates a more modest financial forecast with a peak rolling total of $22.7 million in FY 2027 Q1, tapering down to $13.8 million by FY 2029 Q2. When examining the period from FY 2026 Q4 through FY 2029 Q3, the cumulative tier allocation is quite constrained, with just $154.0 million in Small tier projects accounting for the majority of its contributions to regional infrastructure. In actual terms, Childress attained a high of $39.7 million in FY 2027 Q1, but also faced a significant drop to $2.2 million by FY 2027 Q3. This reflects a challenging environment that leans heavily on limited project varieties while struggling for consistency. --- #### Corpus Christi [https://info.bidlo.ai/embed/district-chart?district=CORPUS%20CHRISTI&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae](https://info.bidlo.ai/embed/district-chart?district=CORPUS%20CHRISTI&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae) Corpus Christi's rolling average shows fluctuations, peaking at a local high-water mark of $79.2 million in FY 2028 Q3 before dipping to a subdued $52.4 million in FY 2029 Q3. This variability reflects a heavy reliance on Large projects, comprising a significant portion of the overall tier engagement. In terms of actual counts, the district amassed an estimated 192 Small job counts from FY 2026 Q4 through FY 2029 Q3, alongside a lighter job distribution in higher tiers. With a summed total of $315.7 million allocated to Small projects in that period, it highlights a spend-heavy concentration on smaller contracts while Large projects played a less prominent role. --- #### Dallas [https://info.bidlo.ai/embed/district-chart?district=DALLAS&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae&scale=.7](https://info.bidlo.ai/embed/district-chart?district=DALLAS&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae&scale=.7) Dallas showcases a mixed spend backdrop with rolling averages peaking at $384.7 million in FY 2027 Q1, followed by a descent to $161.2 million in FY 2028 Q4. The tier mix reveals a balanced distribution, particularly with notable contributions from TEX-Size jobs totaling $1.08 billion across the forecast horizon. In terms of actual spending, the district experienced a dramatic peak of $1.33 billion in FY 2029 Q1. With 346 Small jobs reported within the forecast timeframe from FY 2026 Q4 through FY 2029 Q3, the ratio underscores a harmonized growth between financial allocations and job creation, marking a successful alignment of spend and count. --- #### El Paso [https://info.bidlo.ai/embed/district-chart?district=EL%20PASO&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae](https://info.bidlo.ai/embed/district-chart?district=EL%20PASO&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae) El Paso's rolling average reflects a steady cadence, with projections exhibiting a peak of $106.9 million in FY 2028 Q2, demonstrating a robust forward momentum in spending. The primary tier mix indicates a strong dependence on TEX-Size projects, which notably pulled $463 million alongside a meaningful presence from Medium-tier contributions. When examining the actual figures, the district's spending soared to $570.7 million in FY 2028 Q2. Collectively, there were 157 Small jobs, which alongside 11 Medium positions across the forecast period from FY 2026 Q4 through FY 2029 Q3, illustrates a diversified project engagement, keeping pace with the elevated spend overall. --- #### Fort Worth [https://info.bidlo.ai/embed/district-chart?district=FORT%20WORTH&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae](https://info.bidlo.ai/embed/district-chart?district=FORT%20WORTH&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae) Fort Worth shows a fairly stable engagement in its rolling averages, cresting at $125.9 million in FY 2027 Q2 and maintaining a more moderate throughput with forecasting hovering in the lower region thereafter. A nuanced tier mix displays a strong alignment between Small and Medium projects, amounting to approximately $431 million and $411 million, respectively. Actual counts within the period reflect the translation of this engagement into tangible numbers, with 246 Small jobs and 17 Medium jobs contributing significantly. This suggests a confident approach in execution, with Small projects likely taking precedence in the district's overarching strategy from FY 2026 Q4 through FY 2029 Q3. --- #### Houston [https://info.bidlo.ai/embed/district-chart?district=HOUSTON&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae](https://info.bidlo.ai/embed/district-chart?district=HOUSTON&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae) Houston's rolling averages exhibit an impressive trajectory with highs reaching $629 million in FY 2029 Q2, showcasing sustained growth amid substantial capital projects. The tier mix strongly leans toward TEX-Size engagements, amounting to a hefty $3.94 billion, indicating a dominant concentration in larger bids. In the realm of actual figures, the district achieved a significant peak of $2.13 billion in FY 2026 Q4. Across the forecast window from FY 2026 Q4 through FY 2029 Q3, Houston saw 391 Small jobs generated, aligning well with their expansive spending strategy while establishing itself as a frontrunner in project volume. --- #### Laredo [https://info.bidlo.ai/embed/district-chart?district=LAREDO&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae](https://info.bidlo.ai/embed/district-chart?district=LAREDO&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae) Laredo displays a steady growth pattern with rolling averages peaking at $76.6 million in FY 2029 Q1, while fluctuations bring it down to a low of $51.7 million in FY 2027 Q3. The tier contributions are well distributed, with the varied presence of Small and Medium projects highlighting a balanced engagement strategy. Looking at actual job counts, Laredo reported a total of 90 Small jobs from FY 2026 Q4 through FY 2029 Q3. The financial allocations further bolstered this, with spending reaching up to $296.9 million at its peak. This combination of moderate job creation and tier diversity underscores a solid foundation amid varied financial projections. --- #### Lubbock [https://info.bidlo.ai/embed/district-chart?district=LUBBOCK&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae](https://info.bidlo.ai/embed/district-chart?district=LUBBOCK&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae) Lubbock's rolling averages exhibit a moderate ebb and flow, cresting at $65 million in FY 2027 Q1 amid a backdrop of smaller project tiers. This highlights a steady, though not aggressive, market approach with a well-rounded tier mix—particularly favoring Large projects, with a contribution of $277.2 million overall. Actual counts illustrate this further, with 183 Small jobs brought into the fold from FY 2026 Q4 through FY 2029 Q3. As spending reached a peak of $334.3 million during FY 2027 Q1, the expenditure versus job count relationship suggests a concentrated focus on engaging Small and Medium jobs to reinforce the district's project landscape. --- #### Lufkin [https://info.bidlo.ai/embed/district-chart?district=LUFKIN&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae](https://info.bidlo.ai/embed/district-chart?district=LUFKIN&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae) Lufkin's rolling averages offer a gentle rise, peaking at $35.3 million in FY 2027 Q1, yet revealing mild volatility with lower points noted in subsequent quarters. The tier mix primarily leans on Small projects, contributing $215.5 million and showcasing a strategic focus on less intensive, community-driven projects. In terms of actual job counts, Lufkin amassed a respectable total of 144 Small jobs across the forecast range from FY 2026 Q4 through FY 2029 Q3. At its highest, the district recorded $82 million in FY 2026 Q4, indicating a solid correspondence between job counts and financial allocations throughout the period. --- #### Odessa [https://info.bidlo.ai/embed/district-chart?district=ODESSA&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae](https://info.bidlo.ai/embed/district-chart?district=ODESSA&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae) Odessa's rolling averages indicate a modest but steady increase, reaching a smoothed high of approximately $98.2 million. The data reveals a concentrated reliance on TEX-Size projects, suggesting a strategic focus on larger-scale developments. In terms of actual counts, Odessa recorded a peak spending of $341.9 million in FY 2029 Q2, peaking at 144 Small jobs across the forecast window from FY 2026 Q4 through FY 2029 Q3. This suggests a healthy alignment between spend and count, particularly in smaller tier projects, although larger jobs remain minimal in comparison. --- #### Paris [https://info.bidlo.ai/embed/district-chart?district=PARIS&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae](https://info.bidlo.ai/embed/district-chart?district=PARIS&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae) Paris exhibits fluctuating engagement reflected in its rolling averages, which peaked at about $94.6 million in FY 2029 Q1. A notable aspect is the dominance of Large projects, indicating a distinctive emphasis on significant undertakings within this district. The actual financial performance further demonstrates volatility, with a peak expenditure of $361.6 million in FY 2028 Q3 amidst a total of 185 Small jobs reported throughout the 12-quarter forecast from FY 2026 Q4 to FY 2029 Q3. This disparity suggests that while larger projects define the overall spend, smaller projects contribute significantly to the employment count. --- #### Pharr [https://info.bidlo.ai/embed/district-chart?district=PHARR&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae](https://info.bidlo.ai/embed/district-chart?district=PHARR&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae) Pharr's rolling averages reveal an upward trend, peaking at around $144.3 million during FY 2027 Q1, showcasing an elevated cadence particularly influenced by a mix of Medium and TEX-Size projects. This suggests a dynamic market engagement that is gradually intensifying. On the actual count side, Pharr reached a peak of $331.6 million in FY 2029 Q1, propelled by a mix of 286 Small jobs within the forecast time frame from FY 2026 Q4 through FY 2029 Q3. Here, we see a strong emphasis on smaller jobs, reflecting a productive throughput that keeps smaller scales active amidst larger contract concentrations. --- #### San Angelo [https://info.bidlo.ai/embed/district-chart?district=SAN%20ANGELO&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae](https://info.bidlo.ai/embed/district-chart?district=SAN%20ANGELO&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae) San Angelo maintains a relatively steady pattern in its rolling averages, peaking at around $41.4 million in FY 2029 Q3, reflecting a consistent approach to project planning with Small and Medium tiers leading the way. This indicates a thoughtful strategy to stabilize funding across various tier types. In terms of actual counts, San Angelo achieved a peak expenditure of $117.3 million in FY 2028 Q2, with a focus on 164 Small jobs measured throughout the 12 quarters from FY 2026 Q4 to FY 2029 Q3. This highlights a strong correlation between spending and job counts, particularly within the smaller project scope. --- #### San Antonio [https://info.bidlo.ai/embed/district-chart?district=SAN%20ANTONIO&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae&scale=.5](https://info.bidlo.ai/embed/district-chart?district=SAN%20ANTONIO&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae&scale=.5) San Antonio's rolling averages exhibit a robust engagement, reaching a high of approximately $226.7 million in FY 2029 Q1, driven predominantly by a mix of Large and TEX-Size projects. This dynamic indicates a solid construction pipeline that favors larger-scale investments. Actual quarterly figures reveal even more impressive outcomes, notably a peak spending of $620.3 million in FY 2029 Q1, with 252 Small jobs across the forecast period from FY 2026 Q4 through FY 2029 Q3. The figures suggest that while larger projects dominate spending, numerous small-scale projects sustain local employment, balancing out the overall spending strategy. --- #### Tyler [https://info.bidlo.ai/embed/district-chart?district=TYLER&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae](https://info.bidlo.ai/embed/district-chart?district=TYLER&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae) Tyler’s rolling averages suggest a gentle rise, with peaks reaching about $97.5 million in FY 2026 Q4. The data indicates a diverse mix, primarily involving Small and Medium projects, showcasing a balanced approach to tier engagement. Looking at actual spending, Tyler peaked at $231.6 million in FY 2026 Q4, with 201 Small jobs reported across the forecast window from FY 2026 Q4 through FY 2029 Q3. This relationship suggests a concentration on smaller projects that effectively support the local job market within a competitive district. --- #### Waco [https://info.bidlo.ai/embed/district-chart?district=WACO&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae](https://info.bidlo.ai/embed/district-chart?district=WACO&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae) Waco shows dynamic patterns in its rolling averages with peaks approaching $110.9 million in FY 2029 Q2, indicating a concentrated spending strategy driven largely by TEX-Size projects. This trajectory underscores an underlying commitment to major infrastructure enhancements. When examining actual quarterly figures, Waco achieved a significant peak of $810.3 million in FY 2029 Q1, while recording 248 Small jobs throughout the 12-quarter forecast window from FY 2026 Q4 through FY 2029 Q3. This reflects a successful result of investing in large projects while still supporting substantial employment through smaller contracts. --- #### Wichita Falls [https://info.bidlo.ai/embed/district-chart?district=WICHITA%20FALLS&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae](https://info.bidlo.ai/embed/district-chart?district=WICHITA%20FALLS&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae) Wichita Falls exhibits a rolling average consistent with balanced engagement, peaking at approximately $81.4 million in FY 2027 Q2. The predominant focus appears to be TEX-Size projects, suggesting an effort to align spending with larger developmental goals in the district. In actual terms, Wichita Falls recorded a peak of $337.8 million in FY 2027 Q2, with a total of 171 Small jobs noted over the 12-quarter span from FY 2026 Q4 to FY 2029 Q3. This indicates a promising relationship between job counts and spending, showcasing a blend of larger contracts while maintaining smaller project activity. --- #### Yoakum [https://info.bidlo.ai/embed/district-chart?district=YOAKUM&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae](https://info.bidlo.ai/embed/district-chart?district=YOAKUM&showArea=true&showDataType=true&hideButtonsOnHover=false&displayMode=rolling_average&source=all_projects&publication_id=f0b192cd-ddd9-4b6e-8f1f-cefb4eb218ae) Yoakum reflects an episodic pattern in its rolling averages, with peaks at around $144.4 million in FY 2027 Q1, buoyed by a strong emphasis on TEX-Size and Large projects. This suggests a noteworthy reliance on significant contracts that elevate the district’s overall spending profile. In terms of actual expenditure, Yoakum experienced a peak of $298.3 million in FY 2027 Q1, alongside 262 Small jobs recorded during the forecast period from FY 2026 Q4 through FY 2029 Q3. This illustrates a contrast where while large projects drive significant spending, smaller jobs play a crucial role in sustaining district employment. --- > If you would like more of this kind of analysis with Municipal, County, and private work, book a demo of the **Bidlo app**!